The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Faza Secondary School
- location
-
Rasini
(in Lamu East)
- year first funded
- 2005
- action
- Rehabilitation Of dining Hall Roof; Repair School Laboratory
- output
- Improved Education Facility
- implementation status
- Progress As Per The Ministry Of Public Works Is 35%. Activities Done To Date Are: Removal Of Roofing Sheets,Timber,Windows,Doors Complete. Raising The Height By 600Mm Complete. Hardcore Filling In Classrooms In Progress.Levelling Complete. Plas
- total cost
- Ksh 6,100,000
- estimate
- Ksh 7,750,000
Mtangawanda Jetty
- location
-
Pate
(in Lamu East)
- year first funded
- 2005
- action
- Rehabilitation And Extension Of The Old Jetty 14 Meters.
- output
- Rehabilitation And Extension Of The Old Jetty To Ease Transport
- implementation status
- Phase1 Works Done Are: Construction Of Walls, Complete Demolition Of The Deck Not Fully Done ,Staircase Not Constructed, Concrete Footing Done, Placing The Hard Core Done ,Back Fill Done, Leveling Done, Plastering And Removal Of Trees Partially
- total cost
- Ksh 6,000,000
- estimate
- Ksh 7,000,000
Kizingitini Social Hall
- location
-
Kizingitini
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of A New Social Hall At Kizingitini
- output
- Social Construction For Community Activities
- implementation status
- Construction Complete.
- total cost
- Ksh 5,100,000
- estimate
- Ksh 3,800,000
Kizingitini Primary School
- location
-
Kizingitini
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms And 4 Door Pit Latrine + Admin Block And A Lab
- output
- A New Secondary School At Kizingitini Village
- implementation status
- Construction Of Classrooms And Pit Latrines Complete. Awaiting Tender Awarding Of Quotations On The Laboratory And Administration Block.
- total cost
- Ksh 4,200,000
- estimate
- Ksh 3,000,000
Myabogi Mbwajumwali Footbridge
- location
-
Mbwajumwali
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of A New Footbridge Connecting Myabogi Sub Location And Mbwajumwali Location
- output
- This Will Ease The Problems Commuters? Face, I.E. Rave Trudging In Water During High Tides
- implementation status
- The Contractor Is On Site.The Construction Is At Foundation Stage.
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
Mkokoni Social Hall
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of A Social Hall
- output
- Social Hall Construction
- implementation status
- Walls Have Been Fully Raised Awaiting Plastering, Fixing Of Windows, Doors And Roofing.
- total cost
- Ksh 3,150,000
- estimate
- Ksh 2,800,000
Ndau Electricity Generator
- location
-
Ndau
(in Lamu East)
- year first funded
- 2004
- action
- Purchase Of 30Kva Generator Construction Of A Generator House Wiring And Installation Of The Generator
- output
- Electricity Supply At Ndau Location
- implementation status
- 60Kva Generator Has Been Purchased. Generator House Already Constructed. Wiring Not Yet Done By Rural Electrification Company
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Siyu Tractor
- location
-
Siyu
(in Lamu East)
- year first funded
- 2008
- action
- Purchase Of A Tractor, Trailer,Plou Gh And Water Boozer.
- output
- Farming Activities And Transport Of Water In Pate Island Will Be Made Easy Due To The Presence Of The Machine
- implementation status
- Not Yet Approved By Cdf Board. The Cdfc Has In Turn Reallocated The Funds To Construction Of A Chiefs Office And Security Houses
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Siyu Social Hall
- location
-
Siyu
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of A Social Hall
- output
- Social Hall Construction For Community Activities
- implementation status
- The Structure Is Complete Except For:-Iron Sheets Have Started Rusting, Trusses Fabricated Badly, Side Doors Have Split And Are Short 150Mm Above Ground Level, No Entrance Porch Constructed And No Paving Around The Building
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
Kizingitini Electricity Project
- location
-
Kizingitini
(in Lamu East)
- year first funded
- 2003
- action
- Purchase Of 75Kva Generator Construction Of A Generator House Wiring And Installation Of The Generator
- output
- Electricity Supply At Kizingitini Location
- implementation status
- 75Kva Generator Has Been Purchased. Generator House Already Constructed. Wiring Already Done By Rural Electrification Company However Internal Wiring Is Yet To Be Done For The Project To Take Off
- total cost
- Ksh 2,600,000
- estimate
- Ksh 3,000,000
Kiunga Tractor
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Purchase Of A Tractor.
- output
- Improved Farming And Food Transport
- implementation status
- Currently The Tractor Is Not Working
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Mbwajumwali Electricity Project
- location
-
Mbwajumwali
(in Lamu East)
- year first funded
- 2003
- action
- Purchase Of 60Kva Generator Construction Of A Generator House Wiring And Installation Of The Generator
- output
- Electricity Supply At Mbwajumwali Location
- implementation status
- 60Kva Generator Has Been Purchased. Generator House Already Constructed. Wiring Already Done By Rural Electrification Company However Internal Wiring Is Yet To Be Done For The Project To Take Off
- total cost
- Ksh 2,400,000
- estimate
- Ksh 3,000,000
Pate Social Hall
- location
-
Patte
(in Lamu East)
- year first funded
- 2008
- action
- Construction Of A Social Hall
- output
- Social Hall Constructed For Community Activities
- implementation status
- The Building Is At Slab Level.
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Pate Social Hall
- location
-
Patte
(in Lamu East)
- year first funded
- 2008
- action
- Construction Of A Social Hall
- output
- Social Hall Constructed For Community Activities
- implementation status
- The Building Is At Slab Level.
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Rehabilitation Of Mbwajumwali Primary School
- location
-
Mbwajumwali
(in Lamu East)
- year first funded
- 2008
- action
- Renovation Of The Building(Doors,Windows,Roofing And The Floor.
- output
- A Rehabilitated Primary School
- implementation status
- The Project Management Committee Has Already Been Formed. Cdfc In The Process Of Disbursing The Funds To The Pmc
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Faza Health Centre Equipments
- location
-
Rasini
(in Lamu East)
- year first funded
- 2007
- action
- Provision Of Medical Equipments For The Theatre
- output
- A Functional Theatre
- implementation status
- The Project Changed To Rehabilitation Of Staff Houses The Tender Has Already Been Awarded The Contractor Has Already Started Working
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
Myabogi Nursery School
- location
-
Mbwajumwali
(in Lamu East)
- year first funded
- 2006
- action
- Construction Two Classrooms To Serve As A New Nursery School At The Village
- output
- A New Nursery School Constructed At Myabogi Village
- implementation status
- Complete Except Fixing Of One Door
- total cost
- Ksh 2,100,000
- estimate
- Ksh 900,000
Kiwaiyu Ambulance Boat
- location
-
Ndau
(in Lamu East)
- year first funded
- 2007
- action
- Purchase Of A Motor Boat To Serve As An Ambulance To The Community
- output
- Presence Of An Ambulance At Kiwaiyu
- implementation status
- The Project Has Not Kicked Off. The Community Through Cdfc Changed The Project To A Multipurpose Boat But The Authority To Reallocate That Money Has Not Been Received
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Shanga Primary School Rehabilitation
- location
-
Siyu
(in Lamu East)
- year first funded
- 2006
- action
- Foundation, Raising Height, Plastering 4 Classrooms, Roofing And Construction Of Corridors + 4 new Door Pit Latrines
- output
- Improved Education Facility For Better Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,900,000
- estimate
- Ksh 2,600,000
Ndau Primary School Rehabilitation
- location
-
Ndau
(in Lamu East)
- year first funded
- 2006
- action
- Raise Walling, Install New Ring Beam, Remove Windows, Doors, Wall Plate, Rusted Sheets
- output
- Improved Education Facility For Better Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Kiunga Djabia/Cattle Dip
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of An Underground Water Tank With Its Catchment Area And Cattle Dip.
- output
- Provision Of A Water Reservoir And A Cattle Dip
- implementation status
- An Underground Water Tank With Its Catchment Surface Constructed And Currently In Use. The Cattle Dip Is Complete But Not In Use
- total cost
- Ksh 1,512,550
- estimate
- Ksh 1,512,550
Kiunga Secondary School
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2008
- action
- Rehabilitated The Four Classrooms Of The Old Building (Plastering,Painting,Flooring,Doors And Windows
- output
- Rehabilitated School Building
- implementation status
- The Project Management Committee Has Already Been Formed. The Ministry Of Public Works Is In The Process Of Preparing The Bill Of Quantities.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Pate Primary School Administration Block
- location
-
Pate
(in Lamu East)
- year first funded
- 2004
- action
- Construction of Admin Block (Staff Room, H/T Office, Dht Office, Library And A Store)
- output
- An Improved Education Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,444,000
Pate Dispensary Renovation
- location
-
Pate
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of 2 Delivery Wards, Examination Room + Renovation Of Old Building
- output
- A Better/Improved Health Facility
- implementation status
- Completed And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Chandani Feeder School
- location
-
Ndau
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of Two Class Rooms As A Lower Primary At Chandani Village
- output
- Lower Primary School Construction To Ease Commuting Of Children Of Younger Age To Kiwayu
- implementation status
- Progress 45%.One Class Room Completed Up To Roof Cover Except Finishes. The Other Part Is Complete Up To Substructure Walling. More Funding Has Been Received And The Cdfc Has Already Released The Funds To Pmc For The Work To Continue.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 500,000
Siyu Matawau Foot Bridge
- location
-
Siyu
(in Lamu East)
- year first funded
- 2004
- action
- Rehabilitation/Extension Of Siyu Matawu Foot Bridge To High Grounds Towards The Island (400M Long)
- output
- This Will Ease The Problems Commuters? Face, I.E. Rave Trudging In Water During High Tides.
- implementation status
- Complete And In Use.
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,650,000
Kiwayu Primary School Rehabilitation
- location
-
Ndau
(in Lamu East)
- year first funded
- 2006
- action
- Repair 5 Classrooms, Raise Height, Construction Of A Ring Beam, Fixing Of Windows And Doors, Roofing Of Classrooms
- output
- Improved Education Facility For Better Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,600,000
Ndau Chiefs Office And Security Houses
- location
-
Ndau
(in Lamu East)
- year first funded
- 2008
- action
- Construction Of A Chiefs Office And Two Houses
- output
- Presence Of A Chiefs Office And Two Houses To House Security Officers In The Area
- implementation status
- The Project Management Committee Has Already Been Formed. The Tendering Process Is Ongoing.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Kiwayu And Chandani Djabia
- location
-
Ndau
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of Two Underground Water Tanks With Catchment Areas
- output
- Provision Of A Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Kiwayu Nursery School
- location
-
Kizingitini
(in Lamu East)
- year first funded
- 2007
- action
- Construction Of A Nursery School At Kiwayu Area
- output
- Availability Of A Nursery School At Kiwayu Area
- implementation status
- Money Already Disbursed To The Pmc Account. Tenders Have Already Been Awarded.
- total cost
- Ksh 1,119,907
- estimate
- Ksh 800,000
Mkokoni School Administration Block
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of A School Administration Block
- output
- Improved Education Facility
- implementation status
- An Administration Block Constructed Comprising Of A Staff Room, H/T Office, Dht Office, Library And A Store And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Siyu Electricity
- location
-
Siyu
(in Lamu East)
- year first funded
- 2007
- action
- Purchase Of A Generator
- output
- Provision Of Electricity At Siyu Village
- implementation status
- The Pmc Has Been Formed, Tendering Has Been Done, Money Has Already Been Released To The Pmc Account. The Contracted Firm Is In The Process Of Transporting The Generator To The Site.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bamako Dispensary Basuba
- location
-
Basuba
(in Lamu East)
- year first funded
- 2008
- action
- Construction Of A Bamako Dispensary At Basuba
- output
- Presence Of A New Dispensary At Basuba
- implementation status
- The Pmc Has Already Been Formed. The Ministry Of Public Works Has Already Prepared The Bq The Pmc Is At The Tendering Stage.
- total cost
- Ksh 926,059
- estimate
- Ksh 92,605,898
Milimani Clinic
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of Two Rooms And A Verandah And Four Door Pit Latrines
- output
- Provision Of A Health Facility At Milimani Area
- implementation status
- Construction Of The Clinic Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Mararani Primary School /Djabia
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of Two Class
- output
- Access Of Primary School Education Of Little Children Who Cannot Walk Far To The Neighboring Villages.
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Marerini Djabia Project
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of An Underground Water Tank And A Water Catchment Area
- output
- Availability Of A Water Reservoir At Marerini
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Kiunga Djabia
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Mangai Primary School Rehabilitation
- location
-
Basuba
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Access Of Primary School Education Of Children Who Cannot Walk Far To The Neighboring Villages.
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kiunga Primary School Extension
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of H/M Office, Staff Room, Roofing, Plaster And Flooring School Existing Workshop.
- output
- Availability Of The Headmasters Office, Staff Room, And A Well Roofed Plastered Workshop With A Good Floor
- implementation status
- Completed And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 850,000
Kiangwi Djabia
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Siyu Djabia
- location
-
Siyu
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Shanga Djabia
- location
-
Siyu
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of An Underground Water Tank With Its Catchment Surface Not Primary School
- output
- Provision Of Clean Water To The Shanga Community
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Milimani Primary School Extension
- location
-
Basuba
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Access Of Primary School Education Of Little Children Who Cannot Walk Far To The Neighboring Villages.
- implementation status
- Complete And In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Mtangawanda Primary School Rehabilitation
- location
-
Pate
(in Lamu East)
- year first funded
- 2004
- action
- Roofing The Whole School Fixing 6 New Doors And 10 Windows, Painting And Cementing The Floor
- output
- Safety Of The Furniture Inside The Classrooms, Reduce Dust From The Uncemen Ted Floor And Improve The Appearance Of The School
- implementation status
- Complete And In Use.
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Basuba Primary School Extension
- location
-
Basuba
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Access Of Primary School Education Of Little Children Who Cannot Walk Far To The Neighboring Villages.
- implementation status
- Complete And In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Mwambore Djabia
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of An Underground Water Tank And A Water Catchment Area
- output
- Availability Of A Water Reservoir At Mwambore
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Shanga Bamako Dispensary
- location
-
Siyu
(in Lamu East)
- year first funded
- 2008
- action
- Construction Of A Bamako Dispensary At Shanga
- output
- Presence Of A Dispens Ary At Shanga
- implementation status
- The Project Management Committee Has Already Been Formed. The Ministry Of Public Works Is In The Process Of Preparing Bill Of Quantities
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mvundeni Djabia
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of An Underground Water Tank And A Water Catchment Area
- output
- Availability Of A Water Reservoir At Mvundeni.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Rubu Djabia
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of An Underground Water Tank And A Water Catchment Area
- output
- Availability Of A Water Reservoir At Rubu.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mbwajumwali Djabia
- location
-
Mbwajumwali
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mkokoni Djabia
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of Water Reservoir.
- implementation status
- An Underground Water Tank With Its Catchment Surface Constructed Currently Not In Use.
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Myabogi Djabia
- location
-
Mbwajumwali
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of A Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ndau Djabia
- location
-
Ndau
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of A Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Bori Djabia
- location
-
Pate
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of A Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mtangawanda Djabia
- location
-
Pate
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of A Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Shanga Rubu Djabia
- location
-
Siyu
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of An Underground Water Tank With Its Catchment Surface.
- output
- Provision Of A Water Reservoir.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Patte Nursery School
- location
-
Pate
(in Lamu East)
- year first funded
- 2006
- action
- Construction Of One Classrooms To Serve As A Nursery School
- output
- Provision Of A Nursery School To The Community.
- implementation status
- Complete And In Use.
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Mtangawanda Bamako Dispensary
- location
-
Patte
(in Lamu East)
- year first funded
- 2008
- action
- Construction Of A Bamako Dispensary At Mtangawanda
- output
- Presence Of A Dispensary At Mtangawanda
- implementation status
- The Project Management Committee Has Already Been Formed. The Ministry Of Public Works Is In The Process Of Preparing Bill Of Quantities
- total cost
- Ksh 630,000
- estimate
- Ksh 630,000
Patte Electricity
- location
-
Patte
(in Lamu East)
- year first funded
- 2007
- action
- Overhaul Of The Generator And The Wiring System.
- output
- Restoration Of Electricity At Patte Location.
- implementation status
- The Funds Are Not Enough To Kick Off The Project,
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
Faza Footbridge Railing
- location
-
Siyu
(in Lamu East)
- year first funded
- 2006
- action
- Rehabilitation/Extension Of Siyu Matawu Foot Bridge To High Grounds Towards The Island (400M Long)
- output
- This Will Ease The Problems Commuters? Face, I.E. Rave Trudging In Water During High Tides.
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ishakani Primary School
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Repair The Existing Structure
- output
- Availability Of A Primary School In The Village
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chandani Nursery School
- location
-
Ndau
(in Lamu East)
- year first funded
- 2005
- action
- Rehabilitation Of The Nursery School
- output
- Nursery School Consisting Of One Classroom, A Store And An Office To Be Constructed.
- implementation status
- Construction Work Complete Except For Plastering, Fixing Of Doors And Windows.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Mtangwanda Boat Stage Shelter
- location
-
Pate
(in Lamu East)
- year first funded
- 2004
- action
- Construction Of Boat Stage/Shelter
- output
- A Shed For Passenger To Wait For Boat And Keep Goods From Rain And Weather.
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Pate Dispensary Furniture
- location
-
Pate
(in Lamu East)
- year first funded
- 2007
- action
- Fitting The Delivery Ward With Furniture
- output
- An Operational Delivery Ward
- implementation status
- The Equipments Are Being Transported To The Site.
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Tchundwa Dispensary Rehabilitation
- location
-
Tchundwa
(in Lamu East)
- year first funded
- 2006
- action
- Raising The Heights, Roofing The Whole Dispensary Fixing New Doors, Gable Walling.
- output
- Improved Health Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mkokoni Djabia Repair
- location
-
Kiunga
(in Lamu East)
- year first funded
- 2006
- action
- Repair Of The Dilapidated Water Tank
- output
- Improved Water Reservoir
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Pate Dispensary Renovation
- location
-
(in Lamu East)
- year first funded
- 2006
- action
- Fixing 4 Doors,6 Windows And Gable Walling
- output
- Avoid Stealing Of The Apparatus Inside The Dispensary
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mbwajumwali Dispensary Equipments
- location
-
Mbwajumwali
(in Lamu East)
- year first funded
- 2005
- action
- Purchase And Installation Of A 2,500 Litre Water Tank, Provision Of Furniture To Dispensary.
- output
- Purchase And Installation Of A The Water Tank , Provision Of Furniture Which Includes One Cupboard, One Bed, One Table, Two Stools, Two Chairs Two Benches And A Cabinet To Be Bought.
- implementation status
- A Water Tank Has Been Purchased, Not Yet Installed, One Cupboard, One Bed, One Table, Two Stools, Two Chairs, One Cabinet And Two Benches Purchased.
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mtangawanda Boat Stage
- location
-
(in Lamu East)
- year first funded
- 2005
- action
- Construction Of Boat Stage/Shelter Two Door Pit Latrine Toilets
- output
- A Sanitary Facility At Mtangawanda Boat Stage.
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Tchundwa Handcart
- location
-
Tchundwa
(in Lamu East)
- year first funded
- 2006
- action
- Purchase Of A Handcart To Be Used As An Ambulance At Tchundwa Region Under Tchundwa Dispensary
- output
- Easy Transport Of Sick Persons
- implementation status
- Complete And In Use.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Faza Health Centre
- location
-
(in Lamu East)
- year first funded
- 2004
- action
- Support The Health Centre Committee To Repair And Run The Health Centre Generator
- output
- Buy A Dynamo For The Broken Down Generator To Make It Function
- implementation status
- Dynamo Bought And Fixed. Thus The Generator Started Working Again
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Rasini Girls Primary School
- location
-
(in Lamu East)
- year first funded
- 2005
- action
- Ceiling Finishes, Fixing Metal Burglar Proof Doors And Window Grills & Installation Of Electrical Computer Accessories
- output
- Computer Laboratory In Place
- implementation status
- Complete And In Use.
- total cost
- Ksh 85,000
- estimate
- Ksh 0
Pate Dispensary Toilets
- location
-
(in Lamu East)
- action
- n/a
- output
- Improved Sanitation In Dispensary
- implementation status
- Pate Dispensary Toilets Is Complete And In Use
- total cost
- Ksh 0
- estimate
- Ksh 0