The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
    It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    
    
        
            
            Upgrading Of Do Health Centre Kibera
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Upgrading Of And Expanding The Facility
 
                - output
 
                    - -
 
                - implementation status
 
                    - OnGoing
 
                - total cost
 
                    - Ksh 15,299,015
 
                - estimate
 
                    - Ksh 14,317,282
 
            
         
    
        
            
            Emergency Funds
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Assist Various Projects
 
                - output
 
                    - -
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 12,837,833
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Karen C Sec
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction 8 First Floor Classrooms
 
                - output
 
                    - -
 
                - implementation status
 
                    - On -Going
 
                - total cost
 
                    - Ksh 11,906,900
 
                - estimate
 
                    - Ksh 7,268,875
 
            
         
    
        
            
            Karen C Secondary School
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction 4 Classrooms After Filling The Marsh Ground
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 7,707,130
 
                - estimate
 
                    - Ksh 5,262,594
 
            
         
    
        
            
            Langata High School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Provide Laboratory To The School
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 7,527,922
 
                - estimate
 
                    - Ksh 3,596,818
 
            
         
    
        
            
            Office Administration
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Facilitation Of Office Administration
 
                - output
 
                    - -
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 6,597,738
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Repair Of Nzohe Roadm
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Hardcore Compacting & Gravelling,Cabral Paving
 
                - output
 
                    - -
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 5,247,320
 
                - estimate
 
                    - Ksh 16,059,277
 
            
         
    
        
            
            Khalsa Primary School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Build A Wall To Secure The School Compound
 
                - output
 
                    - -
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 4,642,839
 
                - estimate
 
                    - Ksh 2,533,421
 
            
         
    
        
            
            Constof Classrooms At Raila Education Centre Power Pump
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Put Up Classrooms And Admin. Offices
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 4,580,000
 
                - estimate
 
                    - Ksh 5,380,000
 
            
         
    
        
            
            Langata Secondary School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of 4 Classrooms And Laboratory
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 4,300,000
 
                - estimate
 
                    - Ksh 6,140,000
 
            
         
    
        
            
            Design, Monitoring &Evaluation
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Regular Monitoring And Evaluation
 
                - output
 
                    - -
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 4,184,149
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Uhuru Garden Primary School
            
            
                - location
 
                    - 
                        Mugumoini
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction of A Perimeter Wall
 
                - output
 
                    - -
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 3,190,900
 
                - estimate
 
                    - Ksh 2,890,900
 
            
         
    
        
            
            Repair Of Muteero Muhungu Road
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Cover Potholes & Gravel
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,660,500
 
                - estimate
 
                    - Ksh 66,605,175
 
            
         
    
        
            
            Constof Walkway Duncan Springs
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Walkway 650M
 
                - output
 
                    - -
 
                - implementation status
 
                    - On-Going
 
                - total cost
 
                    - Ksh 2,356,500
 
                - estimate
 
                    - Ksh 1,415,000
 
            
         
    
        
            
            Provision Of One Security Light Mastadopt A Light
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Erect A Security Mast To Lighten Laini Saba
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Yet Installed
 
                - total cost
 
                    - Ksh 2,250,000
 
                - estimate
 
                    - Ksh 2,460,000
 
            
         
    
        
            
            Madaraka Primary School
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Laboratory
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,000,000
 
                - estimate
 
                    - Ksh 2,302,264
 
            
         
    
        
            
            Kibera Primary School
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Block Walls As Security
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,600,000
 
                - estimate
 
                    - Ksh 2,598,380
 
            
         
    
        
            
            Drainage System
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Provide Proper Drainage To Lindi Laini Saba Area
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,190,196
 
                - estimate
 
                    - Ksh 1,100,000
 
            
         
    
        
            
            Recurrent Expenditure
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Expenses On Office Machinery
 
                - output
 
                    - -
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 889,475
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Construction Of Jua Kali Sheds
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Create Employment 4 Youth
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 842,000
 
                - estimate
 
                    - Ksh 842,000
 
            
         
    
        
            
            ConSt. F Jua Kali Shed
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Provide 200 Sheds To Jua Kali Workers
 
                - output
 
                    - -
 
                - implementation status
 
                    - Stalled
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 797,000
 
            
         
    
        
            
            Karen Techfor The Deaf
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction of 1 Classroom
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Kongoni Primary School
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Perimeter Wall Kongoni Pr School
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Jua Kali Sheds At Nairobi West
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Build Jua Kali Sheds
 
                - output
 
                    - -
 
                - implementation status
 
                    - Stalled
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Repair Of South C Parking Bay
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Recarpeting Of The Parking Bay At The Shopping Centre
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 760,000
 
                - estimate
 
                    - Ksh 760,000
 
            
         
    
        
            
            Repair Of South C Parking Bay
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Recarpeting Of The Parking Bay At The Shopping Centre
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 760,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Repair Of Karen Plain Road
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Gravelling & Covering Potholes & Gravel
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 750,000
 
                - estimate
 
                    - Ksh 3,067,272
 
            
         
    
        
            
            Provision Of ,Lt Tanksmetascope
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Provide, Install & Commission Water Tanks
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 740,000
 
                - estimate
 
                    - Ksh 740,310
 
            
         
    
        
            
            Supply Of Two , Ltrwater Tanks
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Install & Commissioning Of Water Tanks
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Construction Of Jua Kali Sheds
            
            
                - location
 
                    - 
                        Mugumoini
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Create Employment 4 Youth
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Constof Door Pit Latrines
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Pit Digging And Construction Of The Structure
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 750,000
 
            
         
    
        
            
            Repair Of Karanja Road Km
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Patching Potholes 1 Km
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 650,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Repair Of Dos Office Romat
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Replacing The Roof & Extending The Frontage Of The Dos Office
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 649,770
 
                - estimate
 
                    - Ksh 650,000
 
            
         
    
        
            
            Constof Door Pit Latrine Highrise Villag
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Dig, Erect Walls And Roofs 
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 686,225
 
            
         
    
        
            
            Rehabof School Library, Langata RoadPrimary School 
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation Of Library
 
                - output
 
                    - -
 
                - implementation status
 
                    - OnGoing
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 530,996
 
            
         
    
        
            
            Langata Location Chiefs Office
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of ChiefS Office
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Repair Of Access Roadsilanga-Soweto Road
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Grading & Expanding Of Footpath To Accom. Vehicles
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 596,500
 
                - estimate
 
                    - Ksh 680,000
 
            
         
    
        
            
            Repair Of Kambimuru SilangaSoweto Road
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Hardcore Compacting & Ditch Cleaning 2 Km
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 550,000
 
                - estimate
 
                    - Ksh 550,000
 
            
         
    
        
            
            Repair Of Musufi Road
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Graveling Work
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 550,000
 
                - estimate
 
                    - Ksh 600,870
 
            
         
    
        
            
            Rehabilitation Of Bandari Villas Road
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Tarmac The Road
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 12,000,000
 
            
         
    
        
            
            Rehabilitation Of Catholic University Road
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Tarmac The Road
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Rehabilitation Of Catholic Centre For Children
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Rehabilitate A Classroom For The Needy Students
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Provision Of Water At Kicoshep
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Install Water Tanks At Kicoshep
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Repair Of Mukoyet Road
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Hardcore Compacting & Gravelling
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Rehabilitation Of Kasuku Road
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Tarmac The Road
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Rehabilitation Of Madaraka Market Road
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Tarmac The Road
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Construction Of Foot Bridge Lindi-Mashimoni Road
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction of Bridge To Connect Lindi & Mashimoni Rds
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 491,000
 
            
         
    
        
            
            Upgrading Of Laini Saba Sports Ground Changed To Construction Of Toilets
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Toilets
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Madaraka Primary School
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Repair Of Madaraka Pr School Parking Bay
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 480,000
 
                - estimate
 
                    - Ksh 480,000
 
            
         
    
        
            
            Rehabf Toilets Madaraka Primary School Door Pit Latrines
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Replacement Of Broken Equip. & ReRoofing.
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 450,000
 
                - estimate
 
                    - Ksh 480,000
 
            
         
    
        
            
            Kibera Primary School
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Erecting He Wall & Beams
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 450,000
 
                - estimate
 
                    - Ksh 450,000
 
            
         
    
        
            
            Repair Of Paw Paw Muhoho Avenue
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Cover Pot Holes & Gravel 3 Km
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 405,200
 
                - estimate
 
                    - Ksh 410,000
 
            
         
    
        
            
            Olympic Primary School
            
            
                - location
 
                    - 
                        Sarangombe
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Build Two Classrooms
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,163
 
            
         
    
        
            
            Repair Of Link Roadof South C And Mombasa Road
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - To Make Another Access Rd To Mombasa Rd From South C
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,250
 
            
         
    
        
            
            Ablution Block At Laini Saba
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of Ablution Block
 
                - output
 
                    - -
 
                - implementation status
 
                    - Tendering Done
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Provision & Installation Of Water Tank
            
            
                - location
 
                    - 
                        Langata(Masai Village)
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Installation & Commission Of Water Tank
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Rehabof Toilets At Langata West Primary School School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Repair Walls Empty Holes
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed & In Use
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,497
 
            
         
    
        
            
            Constof Door Pit Latrine
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Digging The Pit & Erecting The Walls & Roofing
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 350,000
 
                - estimate
 
                    - Ksh 360,000
 
            
         
    
        
            
            Stocking Of Library At Langata School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Supply School With Books
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 350,000
 
                - estimate
 
                    - Ksh 350,000
 
            
         
    
        
            
            Construction Of Security Reporting Office
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Repair Of The Existing Structures& Putting One Additional
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 350,000
 
                - estimate
 
                    - Ksh 350,000
 
            
         
    
        
            
            Constof Security Reporting Office Kambimuru
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Metal Structure & Installing On Concrete Basement
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 350,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Repair Of Cid Training School
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Repair 6 Dilapidated Buildings
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 340,000
 
                - estimate
 
                    - Ksh 420,000
 
            
         
    
        
            
            Raila Education Centre
            
            
                - location
 
                    - 
                        Laini Saba
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Supply Of Desks To Raila Ed Centre
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 320,000
 
                - estimate
 
                    - Ksh 320,000
 
            
         
    
        
            
            Kibera Primary School
            
            
                - location
 
                    - 
                        Makina
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Supply Of 250 Desks To Kibera Pr Sch
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 320,000
 
                - estimate
 
                    - Ksh 320,000
 
            
         
    
        
            
            Provision Of Desks At Langata BPrimary School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Supply Of Desks
 
                - output
 
                    - -
 
                - implementation status
 
                    - All Supplied
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 275,000
 
            
         
    
        
            
            Recarpeting Of Kongoni Primary School M
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Hardcore Compacting
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete & In Use
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 900,040
 
            
         
    
        
            
            Provision Of Desks At Khalsa C Primary School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Make & Supply Desks
 
                - output
 
                    - -
 
                - implementation status
 
                    - City Council Dispute
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 320,000
 
            
         
    
        
            
            Repair Of Public Toilet
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Empty The Previous Pits And Make New Ones
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 299,977
 
            
         
    
        
            
            Repair Of Tembo Road
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Repair Of Road
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Provision Of Desks
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Provide 150 Desks
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,250
 
            
         
    
        
            
            Construction F Constituency Office
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction & Improve Dos Office Building
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 283,300
 
                - estimate
 
                    - Ksh 280,000
 
            
         
    
        
            
            Kongoni Primary School
            
            
                - location
 
                    - 
                        Nairobi West
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Supply Of 250 Desks To Kongoni Pr School
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 280,000
 
                - estimate
 
                    - Ksh 280,000
 
            
         
    
        
            
            Ngong Forest Primary School
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Supply & Delivery Of 71 Lockers With Chairs
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            St. Marys Primary School Supply Of Desks
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Supply & Delivery Of 71 Lockers With Chairs
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Provision Of Lockers & Chairs At Starys Primary School
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Provision Of 75 Lockers
 
                - output
 
                    - -
 
                - implementation status
 
                    - Lockers Provided
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 247,500
 
            
         
    
        
            
            Construction Of Door Pit Latrine & Bathroom At Darajani
            
            
                - location
 
                    - 
                        Kibera
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction of Pit Latrine & Bathroom
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 225,500
 
                - estimate
 
                    - Ksh 225,500
 
            
         
    
        
            
            Karen C Primary School
            
            
                - location
 
                    - 
                        Karen (Karen C. Pri. Sch.)
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Digging The Pit & Erecting The Walls & Roofing
 
                - output
 
                    - -
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 210,000
 
                - estimate
 
                    - Ksh 240,000
 
            
         
    
        
            
            Langata School For The Blind
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Supply Books To Langata School For The Blind
 
                - output
 
                    - -
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Provision Of Desks
            
            
                - location
 
                    - 
                        Langata
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Make & Provide More Desks
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Construction Of Door Pit Latrine Kuwinda Village
            
            
                - location
 
                    - 
                        Karen
                        (in Langata)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction of Pit Latrines
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 244,075