It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Lari

Education Bursary

location
Lari (in Lari)
year first funded
2004
action
Award Of Bursary To Bright Students From Poor Backgrounds
output
Access To Proper Schooling
implementation status
Ongoing
total cost
Ksh 13,702,963
estimate
Ksh 0

Gitithia Girls Secondary School

location
Gitithia (in Lari)
year first funded
2004
action
Construction Of 4 Classrooms, 1 Admn Block,
output
A New Cdf Fully Funded Girls High School
implementation status
Classrooms, Admin Block, Toilets, Fence
total cost
Ksh 6,200,000
estimate
Ksh 7,000,000

Office Administration

location
Lari (in Lari)
year first funded
2003
action
Administration
output
Efficient Constituency Administration
implementation status
Ongoing
total cost
Ksh 5,669,748
estimate
Ksh 0

Kambaa/Githogoiyo Water Project

location
Kirenga (in Lari)
year first funded
2006
action
Drilling & Equiping Of A Borehole Plus Distribution
output
Provision Of Water To Kambaa And Githogoiyo Communities
implementation status
Complete And In Use
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Kamuchege Water Project

location
Gatamaiyu (in Lari)
year first funded
2004
action
Drilling & Equiping Of A Borehole Plus Purchase Of Distribution Pipes
output
Provision Of Clean Water To Kamuchege Community
implementation status
Complete But Not In Use
total cost
Ksh 3,100,000
estimate
Ksh 3,500,000

Lari Health Centre

location
Kirenga (in Lari)
year first funded
2004
action
Construction Of A Mortuary, Renovation Of A Tank & Purchase Of Medical Equipments
output
Modern Equipments & Clean Water Supply To The H.C.
implementation status
Equipments Purchased, Tank Complete & In Use. Mortuary Is At Planning Stage (Pdp Ongoing)
total cost
Ksh 3,080,000
estimate
Ksh 4,500,000

Mwimutoni Chosen Water Project

location
Kirenga (in Lari)
year first funded
2003
action
Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Escarpment Community
implementation status
Complete & In Use
total cost
Ksh 3,014,144
estimate
Ksh 3,500,000

Lari Secondary School

location
Kirenga (in Lari)
year first funded
2006
action
Purchase Of A 60 Seater School Bus
output
Modern School Bus
implementation status
Bus Delivered. Settlement Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 4,500,000

Githirioni Water Project

location
Lari (in Lari)
year first funded
2004
action
Drilling/Equiping Borehole, Water Points & Distribution
output
Provision Of Clean Water To Githirioni Community
implementation status
Complete & In Use
total cost
Ksh 2,978,000
estimate
Ksh 3,500,000

Uplands Primary School Kanyekin

location
Lari (in Lari)
year first funded
2007
action
Construction Of Classrooms
output
A New Cdf Fully Funded Primary School
implementation status
Complete & In Use
total cost
Ksh 2,900,000
estimate
Ksh 4,000,000

Kagaa Dispensary

location
Kamburu (in Lari)
year first funded
2004
action
Renovation Of Dispensary, Purchase Of Medical Equipments & Construction Of Septic Tank & Incenerator
output
Face Lift For The Dispensary And Provision Of Maternity Services To The Community;
implementation status
Face Lift & Purchase Of Equipments Complete
total cost
Ksh 2,900,000
estimate
Ksh 2,000,000

Kamuchege Dispensary

location
Gatamaiyu (in Lari)
year first funded
2003
action
Construction And Equiping Of A New Dispensary
output
New Standard Modern Cdf Fully Funded Dispensary
implementation status
Interior Finishing And Equiping Ongoing
total cost
Ksh 2,863,918
estimate
Ksh 2,000,000

Kagaa Water Project

location
Kamburu (in Lari)
year first funded
2005
action
Drilling And Equiping Of A Borehole Plus Water Distribution
output
Provision Of Clean Water To Kagaa Health Ctr & Community
implementation status
Complete & In Use
total cost
Ksh 2,710,000
estimate
Ksh 3,500,000

Gitithia Borehole

location
Gitithia (in Lari)
year first funded
2005
action
Drilling & Equiping Of A Borehole Plus Purchase Of Distribution Pipes
output
Provision Of Clean Water To Gitithia Community
implementation status
Borehole Complete & In Use: Distribution Ongoing
total cost
Ksh 2,510,000
estimate
Ksh 3,500,000

Muiri Water Project

location
Gatamaiyu (in Lari)
year first funded
2004
action
Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To Muiri Community
implementation status
Complete But Not In Use
total cost
Ksh 2,500,000
estimate
Ksh 3,000,000

Juvenalis Secondary School

location
Lari (in Lari)
year first funded
2004
action
Construction Of Classroom/ Lab, + Equipments & Electricity
output
Standard Modern Science Lab And Classroom. Power Supply To The Entire School
implementation status
Electricity & Classroom Projects Complete And In Use, Construction Of Lab Complete, Equiping Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 4,000,000

Kagwe Township Primary School

location
Gatamaiyu (in Lari)
year first funded
2004
action
Purchase Of Land And Construction Of A 2 Storey
output
Modern Classrooms
implementation status
Purchase Of Land Complete. Construction Of
total cost
Ksh 2,350,000
estimate
Ksh 4,500,000

Emergency Reserve

location
Lari (in Lari)
year first funded
2008
action
Emergency Reserve
output
Emergency Reserve
implementation status
not known
total cost
Ksh 2,332,619
estimate
Ksh 0

Gathaiti Secondary School

location
Lari (in Lari)
year first funded
2007
action
Construction Of 4 Classrooms, 1 Admn Block,
output
New Cdf Funded Secondary Sch. For Over 500 Students
implementation status
Ongoing: Interior Finishing For The 4 Classrooms Remaining
total cost
Ksh 2,000,000
estimate
Ksh 4,000,000

Gathima Secondary School

location
Kamburu (in Lari)
year first funded
2007
action
Rehabilitation Of 2 Classrooms, Hall, Lab & Offices
output
A New Cdf & Community Funded Mixed Sec Sch
implementation status
Complete & In Use
total cost
Ksh 2,000,000
estimate
Ksh 2,500,000

Kabunge Primary School

location
Kirenga (in Lari)
year first funded
2007
action
Purchase Of Land, Construction Of 2 Classrooms & 8 Toilets
output
A New Cdf Fully Funded Primary School
implementation status
Purchase Of Land Complete; Others Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 3,000,000

Nduriri Water Project

location
Nyanduma (in Lari)
year first funded
2003
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Nduriri Community
implementation status
Installation Of Phase 1 Pipes Complete. Phase 2 Ongoing
total cost
Ksh 1,984,536
estimate
Ksh 2,000,000

Kirenga Water Project Borehol

location
Kirenga (in Lari)
year first funded
2004
action
Drilling And Equiping Of A Borehole And Construction Of A Tank
output
Provision Of Clean Water To Lari Health Ctr & Community
implementation status
Borehole Complete & In Use; Tank Ongoing
total cost
Ksh 1,950,000
estimate
Ksh 2,500,000

Matimbei Water Project

location
Kamburu (in Lari)
year first funded
2003
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Matimbei Community
implementation status
Purchase Of Pipes Complete; Installation Ongoing
total cost
Ksh 1,784,536
estimate
Ksh 2,500,000

Gathaiti Primary School

location
Lari (in Lari)
year first funded
2004
action
Constuction Of 4 Classrooms & Purchase Of Desks
output
Standard Modern Classrooms And Desks
implementation status
Complete & In Use
total cost
Ksh 1,710,000
estimate
Ksh 1,800,000

Kamae Dispensary

location
Kamae (in Lari)
year first funded
2007
action
Construction And Equiping Of A New Dispensary
output
New Standard Modern Cdf Fully Funded Dispensary
implementation status
Complete But Not In Use
total cost
Ksh 1,700,000
estimate
Ksh 2,000,000

Monitoring And Evaluation

location
Lari (in Lari)
year first funded
2005
action
Monitoring
output
Monitoring And Evaluation Of Projects
implementation status
Ongoing
total cost
Ksh 1,679,500
estimate
Ksh 0

Utugi Primary School

location
Kinale (in Lari)
year first funded
2003
action
Constuction Of 4 Classrooms & 8 Toilets
output
Modern Classrooms And Toilets
implementation status
Complete & In Use
total cost
Ksh 1,647,423
estimate
Ksh 2,000,000

Kinale Dispensary

location
Kinale (in Lari)
year first funded
2003
action
Construction Of A Lab And Electricity Connection
output
Standard Modern Hospital Lab And Supply Of Electricity To Dispensary
implementation status
Complete & In Use
total cost
Ksh 1,627,835
estimate
Ksh 2,500,000

Nyamweru Borehole Water Project

location
Lari (in Lari)
year first funded
2008
action
Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To Nyamweru Community
implementation status
Drilling Of Borehole Complete; Equiping Ongoing
total cost
Ksh 1,600,000
estimate
Ksh 3,000,000

Kinale Water Project

location
Kinale (in Lari)
year first funded
2004
action
Drilling & Equiping Of A Borehole Plus Purchase Of Distribution Pipes
output
Provision Of Clean Water To Kinale Community
implementation status
Complete But Not In Use
total cost
Ksh 1,550,000
estimate
Ksh 1,750,000

Kirenga Primary School

location
Kirenga (in Lari)
year first funded
2004
action
Repair Of Roof After Damage By Wind
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 1,528,593
estimate
Ksh 1,528,593

Karia Ini Water Project

location
Lari (in Lari)
year first funded
2007
action
Purchase Of Land Plus Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To Lari Scheme Community
implementation status
Land Purchased; Drilling Of Borehole Complete; Equiping Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 3,500,000

Nyamuthanga Bridge Project

location
Kamburu (in Lari)
year first funded
2005
action
Re -Construction Of The Bridge
output
Improved Bridge
implementation status
Complete & In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,800,000

Gitithia Dispensary Staff House

location
Gitithia (in Lari)
year first funded
2007
action
Construction Of A Staff House
output
Residential Facility For The Dispensary Staff
implementation status
Complete But Not In Use
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Lare Primary School

location
Gitithia (in Lari)
year first funded
2004
action
Purchase Of Land & Construction Of An Admin Block
output
Land For The Sch And Offices/Boardrm For Teachers
implementation status
Complete & In Use
total cost
Ksh 1,470,000
estimate
Ksh 1,470,000

Soko Borehole Water Project

location
Kinale (in Lari)
year first funded
2008
action
Purchase Of Land Plus Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To Soko Community (Kinale)
implementation status
Drilling Of Borehole Complete; Equiping Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 3,500,000

Gathwariga Borehole Water Project

location
Kamae (in Lari)
year first funded
2008
action
Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To Gathwariga Community (Kamae)
implementation status
Drilling Of Borehole Complete; Equiping Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 3,000,000

Nyanduma Dispensary

location
Nyanduma (in Lari)
year first funded
2004
action
Construction And Equiping Of A Community Dispensary
output
New Standard Modern Cdf Fully Funded Dispensary
implementation status
Complete But Not In Use
total cost
Ksh 1,300,000
estimate
Ksh 2,000,000

Chiboni Kabacha Water Project

location
Nyanduma (in Lari)
year first funded
2005
action
Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Chiboni Community
implementation status
Installation Of Phase 1 Pipes Complete. Phase 2 Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

Kimende Secondary School

location
Kijabe (in Lari)
year first funded
2004
action
Construction And Equiping Of A Science Lab
output
Modern And Equiped Science Lab
implementation status
Ongoing; At Rental Level
total cost
Ksh 1,300,000
estimate
Ksh 2,000,000

St Patrick Secondary School

location
Nyanduma (in Lari)
year first funded
2003
action
Construction Of A Science Laboratory
output
Standard Modern Laboratory
implementation status
Interior Finishing Ongoing
total cost
Ksh 1,274,227
estimate
Ksh 2,000,000

Gitithia Primary School

location
Gitithia (in Lari)
year first funded
2003
action
Construction Of 3 Classrooms And 8 Toilets
output
Standard Modern Classrooms And Toilets
implementation status
Complete & In Use
total cost
Ksh 1,271,845
estimate
Ksh 1,500,000

Mugiko Primary School

location
Kamae (in Lari)
year first funded
2003
action
Construction Of 3 Modern Classrooms & Toilets
output
Modern Classrooms And Toilets
implementation status
2 Classrooms & Toilets Complete & In Use.
total cost
Ksh 1,244,845
estimate
Ksh 1,500,000

Kongothiria Borehole Water Project

location
Kirenga (in Lari)
year first funded
2008
action
Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To Kongothiria Community
implementation status
Drilling Of Borehole Complete; Equiping Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 3,000,000

King'Atua Borehole Water Project

location
Kijabe (in Lari)
year first funded
2008
action
Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To King'Atua Community
implementation status
Drilling Of Borehole Complete; Equiping Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 3,000,000

Ragia Primary School

location
Kamae (in Lari)
year first funded
2004
action
Construction Of An Admin. Block And Toilets
output
Standard Modern Offices, Board Room And Toilets
implementation status
Toilets Complete & In Use. Interior Finishing For
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Escarpment Secondary School

location
Kirenga (in Lari)
year first funded
2006
action
Construction Of A One Storey Classrooms Block
output
Modern Classrooms
implementation status
Ongoing: At Slab
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Mirangi Primary School

location
Kinale (in Lari)
year first funded
2003
action
Construction Of 6 Classrooms & Purchase Of Desks
output
Standard Modern Classrooms And Desks
implementation status
Complete & In Use
total cost
Ksh 1,147,423
estimate
Ksh 1,500,000

Kimathi Road Project

location
Lari (in Lari)
year first funded
2004
action
Grading And Putting Murram On The 3 Kms Road
output
Improved Road Network
implementation status
Complete & In Use
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

St Joseph The Worker Kereita High School

location
Kirenga (in Lari)
year first funded
2004
action
Construction Of An Admin Block
output
Offices For Principal, Teachers And Other Staff
implementation status
Complete & In Use
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

Magina Secondary School

location
Kijabe (in Lari)
year first funded
2006
action
Construction Of 2 Classrooms
output
Standard Modern Classrooms
implementation status
Ongoing; Interior Finishing Remaining
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

Kagwe Community Water Project

location
Gatamaiyu (in Lari)
year first funded
2008
action
Drilling And Equiping Of A Borehole
output
Provision Of Clean Water To Kagwe Girls & Surrounding Community
implementation status
Ongoing; At Planning Stage
total cost
Ksh 1,100,000
estimate
Ksh 3,000,000

Kamae Chief's & Ap Post

location
Kamae (in Lari)
year first funded
2007
action
Construction Of Chief'S Office And Aps Post
output
Provision Of Provincial Admin. & Security Services To The Community
implementation status
Ongoing; Finishing
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

Crossroad Primary School

location
Kinale (in Lari)
year first funded
2003
action
Construction Of An Admin Block And Staffroom
output
Standard Modern Offices
implementation status
Complete & In Use
total cost
Ksh 1,097,423
estimate
Ksh 1,200,000

Bomboi Water Project

location
Lari (in Lari)
year first funded
2006
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Bathi Community
implementation status
Installation Of Phase 1 Pipes Complete. Phase 2 Ongoing
total cost
Ksh 1,080,000
estimate
Ksh 1,500,000

Gathima Primary School

location
Kamburu (in Lari)
year first funded
2006
action
Purchase Of Lockers And Desks, Renovation Of 12 Classrms,
output
Standard Modern Classrooms, Toilets & Desks; And
implementation status
Complete & In Use
total cost
Ksh 1,050,000
estimate
Ksh 1,250,000

Gituamba Water Project

location
Kirenga (in Lari)
year first funded
2008
action
Purchase Of Land & Construction Of A 40,000 Ltrs Water Tank
output
Additional Reservoir For Water From Gituamba & Kongothiria B/Hs
implementation status
Land Purchased. Tank Ongoing - At Foundation Level
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Kanyekini Primary School

location
Lari (in Lari)
year first funded
2006
action
Constuction Of 4 Classrooms, Admin Block, Toilets
output
A New Cdf Fully Funded Primary School
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 4,000,000

Nyamweru Secondary School

location
Lari (in Lari)
year first funded
2003
action
Construction Of A dining Hall
output
Spacious Dining Hall
implementation status
Interior Finishing Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Muthaini Primary School

location
Kamae (in Lari)
year first funded
2003
action
Constuction Of 2 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 994,845
estimate
Ksh 1,000,000

Sulmac Primary School

location
Kamae (in Lari)
year first funded
2003
action
Constuction Of 2 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 944,845
estimate
Ksh 1,000,000

Bathi Primary School

location
Kijabe (in Lari)
year first funded
2003
action
Renovation Of A 1 Storey Classrooms Block And
output
Standard Modern Classrooms And Toilets
implementation status
Toilets Complete & In Use. Classrooms Block
total cost
Ksh 900,000
estimate
Ksh 1,500,000

Nduriri Dispensary

location
Nyanduma (in Lari)
year first funded
2005
action
Construction Of Septic Tank, Renovation Of Staff House & Purchase Of Medical Equipments
output
Provision Of Maternity Services To The Community;Proper House For Hospital Staff.
implementation status
Complete & In Use
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Kiruiru Water Project

location
Nyanduma (in Lari)
year first funded
2006
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Kiruiru Community
implementation status
Phase 1 Ongoing
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Kamahindu Ap Post

location
Gatamaiyu (in Lari)
year first funded
2006
action
Construction Of A New Ap Post
output
Provision Of Security Services To The Community
implementation status
Ongoing; At Rental Level
total cost
Ksh 900,000
estimate
Ksh 1,500,000

Water Projects

location
Lari (in Lari)
year first funded
2005
action
2004 Boreboles Works
output
Provision Of Clean Water
implementation status
Complete & In Use
total cost
Ksh 872,000
estimate
Ksh 1,000,000

Kwaregi Primary School

location
Lari (in Lari)
year first funded
2005
action
Renovation Of 8 Classrms & Construction Of Veranda
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 850,000
estimate
Ksh 1,000,000

Gitithia Secondary School

location
Gitithia (in Lari)
year first funded
2005
action
Construction Of A Classrooms & Comp Lab
output
Standard Modern Classroom & Computer Lab
implementation status
Complete & In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Githogoiyo Primary School

location
Kirenga (in Lari)
year first funded
2006
action
Construction Of 5 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Cdf Constituency Office

location
Kirenga (in Lari)
year first funded
2007
action
Construction Of The Cdf & Constituency Office
output
Offices For Cdf And Constituency
implementation status
Ongoing; Finishing
total cost
Ksh 800,000
estimate
Ksh 2,000,000

Mbau Ini Secondary School

location
Kijabe (in Lari)
year first funded
2003
action
Interior Finishing And Equiping Of A Science Lab.
output
Standard Modern Laboratory
implementation status
Interior Finishing & Partitioning Complete; Equiping Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Takinya/Gitare/Bathi Water Project

location
Kijabe (in Lari)
year first funded
2008
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Takinya & Bathi Communitities
implementation status
Installation Of Phase 1 Pipes Complete. Phase 2 Ongoing
total cost
Ksh 795,000
estimate
Ksh 1,500,000

Sports

location
Lari (in Lari)
year first funded
2008
action
Construction Of Goal Posts, Levelling Play Grounds Etc
output
Standard Sports Facilities
implementation status
Ongoing
total cost
Ksh 779,500
estimate
Ksh 0

Gituamba Borehole

location
Kirenga (in Lari)
year first funded
2005
action
Installation Of A New Pump And Motor
output
Provision Of Clean Water To Gituamba Community
implementation status
Complete & In Use
total cost
Ksh 770,000
estimate
Ksh 1,000,000

Mirangi Secondary School

location
Kinale (in Lari)
year first funded
2004
action
Construction Of 3 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Kariguini Primary School

location
Nyanduma (in Lari)
year first funded
2005
action
Interior And Exterior Finishing Of A Storeyed
output
Modern Classrooms And Toilets
implementation status
Toilets Complete & In Use. Classrooms Interior
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Gatamaiyu Primary School

location
Gatamaiyu (in Lari)
year first funded
2005
action
Construction Of An Admin Block And Electricity Supply
output
Standard Modern Offices And Electricity Supply
implementation status
Complete & In Use
total cost
Ksh 700,000
estimate
Ksh 900,000

Muhoro Primary School

location
Nyanduma (in Lari)
year first funded
2004
action
Construction Of An Admin Block & Septic Tank/Sewer System
output
Standard Modern Offices And Staff Room
implementation status
Complete & In Use
total cost
Ksh 700,000
estimate
Ksh 800,000

Kirasha Primary School

location
Kamae (in Lari)
year first funded
2003
action
Constuction Of 2 Classrooms And Purchase Of Desks
output
Standard Modern Classrooms And Desks
implementation status
Complete & In Use
total cost
Ksh 694,845
estimate
Ksh 750,000

Gituamba Secondary School

location
Kirenga (in Lari)
year first funded
2003
action
Constuction Of 1 Classroom And Toilets
output
Standard Modern Classroom And Toilets
implementation status
Complete & In Use
total cost
Ksh 692,151
estimate
Ksh 1,000,000

St Teresa Primary School

location
Nyanduma (in Lari)
year first funded
2005
action
Construction Of A Storeyed Classrooms Block
output
Modern Classrooms
implementation status
Ongoing; At Slab Level - 1St Flr
total cost
Ksh 650,000
estimate
Ksh 800,000

Munyaka Primary School

location
Kijabe (in Lari)
year first funded
2003
action
Constuction Of 3 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 635,629
estimate
Ksh 1,000,000

Kamuchege Community Ctr

location
Gatamaiyu (in Lari)
year first funded
2004
action
Renovation Of Dispensary Block And Purchase Of Equipments
output
Standard Modern Fully Equiped Dispensary
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Utugi Secondary School

location
Kinale (in Lari)
year first funded
2004
action
Construction Of A Lab & Water Tank
output
Standard Science Lab And Supply Of Clean Water
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Kagaa Secondary School

location
Kamburu (in Lari)
year first funded
2004
action
Wiring And Power Connection
output
Power Supply To The Entire School
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Karugo Primary School

location
Gatamaiyu (in Lari)
year first funded
2004
action
Construction Of A Water Tank
output
Provision Of Clean Water To The Entire School
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Mugumoini Dispensary

location
Nyanduma (in Lari)
year first funded
2005
action
Renovation Of Dispensary Block And Purchase Of Equipments
output
Standard Modern Fully Equiped Dispensary
implementation status
Complete & In Use
total cost
Ksh 600,000
estimate
Ksh 750,000

Githioro Water Tank

location
Gitithia (in Lari)
year first funded
2007
action
Construction Of A 70,000 Ltrs Water Tank
output
Reservoir For Water From Githioro Borehole
implementation status
Ongoing; Design Work Complete.
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Nyanduma Water Project

location
Nyanduma (in Lari)
year first funded
2008
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Nyanduma Community
implementation status
Ongoing; At Planning Stage
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Githogoiyo Ap Post

location
Kirenga (in Lari)
year first funded
2006
action
Construction Of A New Ap Post
output
Provision Of Security Services To The Community
implementation status
Ongoing; Finishing
total cost
Ksh 600,000
estimate
Ksh 800,000

Cdf Office Furniture

location
Kirenga (in Lari)
year first funded
2004
action
Purchase
output
Cdf Office Administration
implementation status
Purchase Of First Set Complete; Phase 2 Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Strategic Planning Project

location
Lari (in Lari)
year first funded
2007
action
Planning
output
5 Year Strategic Plan
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Kaguongo Primary School

location
Nyanduma (in Lari)
year first funded
2006
action
Construction Of A Tank
output
Provision Of Clean Water To The Entire School
implementation status
Complete & In Use
total cost
Ksh 550,000
estimate
Ksh 600,000

Kibagare Primary School

location
Gitithia (in Lari)
year first funded
2003
action
Construction Of 2 Classrooms And Electricity Supply
output
Standard Modern Classrooms And Electricity Supply
implementation status
Complete & In Use
total cost
Ksh 533,691
estimate
Ksh 800,000

Upper Sheme Farmers

location
Lari (in Lari)
year first funded
2003
action
Installation Of Electricity Mains
output
Connection For Over 200 Homes
implementation status
Ongoing
total cost
Ksh 511,237
estimate
Ksh 500,000

Publicity

location
Lari (in Lari)
year first funded
2008
action
Publicizing Cdf Activities Through Mass Media, Sign Boards, Notice Boards Etc
output
Public Awareness
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Gitithia Electricity Project

location
Gitithia (in Lari)
year first funded
2007
action
Installation Of Electricity Mains
output
Connection For Various Institutions
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Chiboni Social Hall

location
Nyanduma (in Lari)
year first funded
2007
action
n/a
output
-
implementation status
Re - Allocated
total cost
Ksh 500,000
estimate
Ksh 500,000

Karatina Technical Secondary School

location
Nyanduma (in Lari)
year first funded
2008
action
Construction Of A Classroom
output
Standard Modern Classroom
implementation status
Ongoing; At Rental Level
total cost
Ksh 500,000
estimate
Ksh 500,000

Magina Primary School

location
Kijabe (in Lari)
year first funded
2005
action
Fencing And Renovation Of 4 Classrooms
output
Enhanced Security For The Sch And Standard Classrms
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Mbau Ini Primary School

location
Kijabe (in Lari)
year first funded
2007
action
Flooring, Plastering And General Renovation Of 3 Classrms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Escarpment Dispensary

location
Kirenga (in Lari)
year first funded
2006
action
Construction Of A Staffhouse, Gate And Fencing
output
Staff Housing And Security For The Dispensary
implementation status
Fence & Gate Complete & In Use; S/Hse Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Magina Dispensary

location
Kijabe (in Lari)
year first funded
2008
action
Construction And Equiping Of A New Dispensary
output
New Standard Modern Cdf Fully Funded Dispensary
implementation status
Ongoing; At Planning Stage
total cost
Ksh 500,000
estimate
Ksh 2,500,000

Karatina Dispensary

location
Nyanduma (in Lari)
year first funded
2008
action
Construction Of A New Community Dispensary
output
New Standard Modern Cdf Fully Funded Dispensary
implementation status
Ongoing; At Planning Stage
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kamburu Health Centre

location
Kamburu (in Lari)
year first funded
2008
action
Construction Of A New Community Health Centre
output
New Standard Modern Health Centre
implementation status
Ongoing; At Floor Level
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Githembe Water Tank

location
Kirenga (in Lari)
year first funded
2008
action
Purchase Of Land & Construction Of A 40,000 Ltrs Water Tank
output
Additional Reservoir For Water From Githogoiyo Borehole
implementation status
Land Purchased. Tank Ongoing; Design Work Complete.
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Matathia/Korio/Mbau Ini Water Tank

location
Kijabe (in Lari)
year first funded
2008
action
Completion Of A 100,000 Ltrs Water Tank Halfway Done
output
Water Reservoir
implementation status
Ongoing; At Planning Stage
total cost
Ksh 500,000
estimate
Ksh 750,000

Nyambari Borehole Water Project

location
Gitithia (in Lari)
year first funded
2008
action
Power Re-Connection And Purchase Of New Pump & Motor
output
Provision Of Clean Water To Nyambari & Gitithia Communitities
implementation status
Ongoing; At Planning Stage
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Githoito Muiri Water Project

location
Gatamaiyu (in Lari)
year first funded
2008
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Githoito And Muiri Communities
implementation status
Installation Of Phase 1 Pipes Ongoing
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Karangi Water Project

location
Gatamaiyu (in Lari)
year first funded
2008
action
Purchase And Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Karangi Community
implementation status
Ongoing; At Planning Stage
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Gatamaiyu Home For Mhc

location
Nyanduma (in Lari)
year first funded
2003
action
Construction Of A Kitchen And Repair Of Sewage System
output
Standard Kitchen And Operational Drainage System
implementation status
Complete & In Use
total cost
Ksh 494,845
estimate
Ksh 1,000,000

Kamburu Primary School

location
Kamburu (in Lari)
year first funded
2006
action
Construction Of Toilets
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 450,000
estimate
Ksh 500,000

Kamuchege Non Formal L

location
Gatamaiyu (in Lari)
year first funded
2004
action
Constuction Of 2 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 450,000
estimate
Ksh 600,000

Kamburu Primary School health Care

location
Kamburu (in Lari)
year first funded
2004
action
Rehabilitation Of The Dispensary
output
Standard Modern Fully Equiped Dispensary
implementation status
Complete & In Use
total cost
Ksh 405,000
estimate
Ksh 500,000

Constituency Office Kamburu

location
Kamburu (in Lari)
year first funded
2006
action
Construction Of A Perimeter Wall
output
Constituency Admin. Services
implementation status
Complete But Not In Use
total cost
Ksh 400,000
estimate
Ksh 779,885

King'Atua Primary School

location
Kijabe (in Lari)
year first funded
2004
action
Constuction Of An Ecd Classrm & Renovation Of 8 Others
output
Standard Classrooms
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 600,000

Nyanduma Primary School

location
Nyanduma (in Lari)
year first funded
2005
action
Purchase Of A Tanks And Construction Of Water Points
output
Provision Of Clean Water To The Entire School
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 250,000

Uplands Forest Dispensary

location
Lari (in Lari)
year first funded
2008
action
Relocation Of A Community Health Centre
output
New Standard Modern Dispensary
implementation status
Ongoing; At Planning Stage
total cost
Ksh 400,000
estimate
Ksh 3,000,000

Kamae Primary School

location
Kamae (in Lari)
year first funded
2003
action
Renovation Of 8 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 500,000

Kinale Primary School

location
Kinale (in Lari)
year first funded
2004
action
Construction Of Toilets
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Lari Funds BillboaRoads Project

location
Lari (in Lari)
year first funded
2006
action
Fabrication And Erection
output
Publicity
implementation status
Complete & In Use
total cost
Ksh 400,000
estimate
Ksh 500,000

Constituency Office

location
Gatamaiyu (in Lari)
year first funded
2006
action
Construction Of The Cdf & Constituency Office
output
Offices For Cdf And Constituency
implementation status
Ongoing; At Planning Stage
total cost
Ksh 350,000
estimate
Ksh 350,000

Lari Chiefs Office

location
Lari (in Lari)
year first funded
2006
action
Renovation Of Chief'S Office Block And Construction Of A Toilet
output
Provision Of Provincial Admin. & Security Services To The Community
implementation status
Complete & In Use
total cost
Ksh 350,000
estimate
Ksh 400,000

Kagwe Primary School

location
Gatamaiyu (in Lari)
year first funded
2005
action
Purchase of Desks
output
Enhanced Learning
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Gachoire Girls Secondary School

location
Nyanduma (in Lari)
year first funded
2008
action
Purchase Of Dining Hall Tables
output
Standard Dining Hall Tables
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Mugiko Secondary School

location
Kamae (in Lari)
year first funded
2005
action
Construction Of One Classroom
output
Standard Modern Classroom
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 500,000

Kimende Police Post

location
Kijabe (in Lari)
year first funded
2008
action
Construction Of A New Police Post
output
Provision Of Security Services To The Community
implementation status
Ongoing; At Planning Stage
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Gatamaiyu Home For Mhc

location
Nyanduma (in Lari)
year first funded
2005
action
Construction Of A Kitchen
output
Standard Modern Kitchen
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kibagare Primary School

location
Gitithia (in Lari)
year first funded
2004
action
Flooring Of 2 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kirenga Community Centre

location
Kirenga (in Lari)
year first funded
2007
action
Purchase Of Chairs And Public Address System
output
Provision Of Social Services To Kirenga Community
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Environmental Activities

location
Lari (in Lari)
year first funded
2008
action
Planting Trees, Construction Of Garbage Disposal Bins Etc
output
Environmental Conservation
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Kongothiria Road Kms Approx

location
Kirenga (in Lari)
year first funded
2007
action
Murram,Hardcore And Digging Of Drainage Trenches
output
Improved Road Network
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Githirioni Community Health Centre

location
Lari (in Lari)
year first funded
2008
action
Construction Of An Extension & Purchase Of Med. Equipments
output
New Standard Modern Dispensary
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 800,000

Escarpment Primary School

location
Kirenga (in Lari)
year first funded
2006
action
Renovation Of 8 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 500,000

Juvenalis Gitau Primary School

location
Lari (in Lari)
year first funded
2005
action
Construction Of 10 Toilets And Gate
output
Standard Toilets; Fence And Gate For Security
implementation status
Complete & In Use
total cost
Ksh 300,000
estimate
Ksh 500,000

Kereita Primary School

location
Kirenga (in Lari)
year first funded
2005
action
Construction Of Toilets And Gate
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 279,658
estimate
Ksh 300,000

Cdf Office / Nyeri Trade Fair

location
Kirenga (in Lari)
year first funded
2004
action
Exhibition
output
Publicity
implementation status
Complete; 2 Exhibitions At Nyeri Ask Show
total cost
Ksh 270,000
estimate
Ksh 270,000

Bursary Schooleme

location
Lari (in Lari)
year first funded
2006
action
Award Of Bursary To Bright Students From Poor Backgrounds
output
Access To Proper Schooling
implementation status
Complete; Bursary Awarded To Needy Students
total cost
Ksh 257,300
estimate
Ksh 0

Kirenga Boys Secondary School

location
Kirenga (in Lari)
year first funded
2006
action
Provision Of Lab Gas And Water
output
Operational Science Lab & Clean Water Supply
implementation status
Complete & In Use
total cost
Ksh 250,000
estimate
Ksh 500,000

Mukeu Primary School

location
Kirenga (in Lari)
year first funded
2006
action
Construction Of Latrines And Painting Of Classrooms Roof
output
Standard Modern Classrooms And Toilets
implementation status
Complete & In Use
total cost
Ksh 250,000
estimate
Ksh 400,000

Kirenga Chiefs Office

location
Kirenga (in Lari)
year first funded
2007
action
Renovation Of Chief'S Office Block, Staff House & Installation Of Unihuts
output
Provision Of Provincial Admin. Services To The Community
implementation status
Complete & In Use
total cost
Ksh 250,000
estimate
Ksh 400,000

Uplands Non Formal Secondary School

location
Lari (in Lari)
year first funded
2006
action
Purchase Of Lab Equipments And Lockers
output
Modern Lockers And Lab Equipments
implementation status
Complete & In Use
total cost
Ksh 250,000
estimate
Ksh 400,000

Gatamaiyu Ap Post

location
Gatamaiyu (in Lari)
year first funded
2008
action
Renovation Of The A.Ps Post
output
Provision Of Security Services To The Community
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Kimoronditi Electricity Project

location
Lari (in Lari)
year first funded
2007
action
Installation Of Electricity Mains
output
Connection For Over 200 Homes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 300,000

Lari Community Centre

location
Lari (in Lari)
year first funded
2007
action
Purchase Of Chairs And Public Address System
output
Provision Of Social Services To Lari Community
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Githirioni Community Centre

location
Lari (in Lari)
year first funded
2007
action
Purchase Of Chairs And Public Address System
output
Provision Of Social Services To Githirioni Community
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kijabe Community Centre

location
Kijabe (in Lari)
year first funded
2007
action
Purchase Of 2 Ccv 10,000 Ltrs Tanks
output
Provision Of Clean Water To Kijabe Community
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kago Primary School

location
Kijabe (in Lari)
year first funded
2003
action
Renovation Of 4 Classrooms
output
Standard Classrooms
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Nduriri Secondary School

location
Nyanduma (in Lari)
year first funded
2004
action
Wiring And Electricity Supply To The School
output
Supply Of Electricity To The Entire School
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kamahindu Primary School

location
Gatamaiyu (in Lari)
year first funded
2004
action
Repainting Of Classrooms Roof And Veranda
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Githirioni Community Health Centre

location
Lari (in Lari)
year first funded
2007
action
Renovation Of Dispensary Block
output
Standard Modern Dispensary
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Kereita Health Centre

location
Kirenga (in Lari)
year first funded
2007
action
Purchase Of A Water Tank & Renovation
output
Standard Modern Health Centre With Clean Water Supply
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Lari Schooleme Swamp Project

location
Lari (in Lari)
year first funded
2006
action
Sinking Of A Drainage Trench
output
Drainage Of Water From Lari Scheme Swamp To Prevent Malaria
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Wangware Primary School

location
Gatamaiyu (in Lari)
year first funded
2004
action
Renovation Of 8 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 500,000

Kiambogo Secondary School

location
Kijabe (in Lari)
year first funded
2004
action
Constuction Of A Classroom
output
Standard Modern Classroom
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 400,000

Iriani Foot Bridge

location
Kamburu (in Lari)
year first funded
2006
action
Rehabilitation Of The Bridge
output
Improved Bridge
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Nyanduma Chief's & Ap Post

location
Nyanduma (in Lari)
year first funded
2008
action
Completion Of Chief'S Office/Ap Post Done Up To Windows Level
output
Provision Of Provincial Admin. & Security Services To The Community
implementation status
Ongoing; At Rental Level
total cost
Ksh 200,000
estimate
Ksh 500,000

Kibuto Electricity Project

location
Lari (in Lari)
year first funded
2007
action
Installation Of Electricity Mains
output
Connection For Over 200 Homes
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 300,000

Kariru Foot Bridge

location
Nyanduma (in Lari)
year first funded
2004
action
Rehabilitation Of The Bridge
output
Improved Bridge
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Kagwe Dispensary

location
Gatamaiyu (in Lari)
year first funded
2004
action
Construction Of An Extension & Purchase Of Med. Equipments
output
Standard Modern Fully Equiped Dispensary
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 500,000

Kimende Primary School

location
Kijabe (in Lari)
year first funded
2006
action
Wiring And Electricity Supply To The School
output
Electricity Supply To The Entire School
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Iriani Nursery School

location
Kamburu (in Lari)
year first funded
2006
action
Renovation Of 2 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Matimbei Primary School

location
Kamburu (in Lari)
year first funded
2006
action
Renovation Of 4 Classrms And Construction Of A Veranda
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Gachoire Primary School

location
Nyanduma (in Lari)
year first funded
2006
action
Construction Of A Gate And Fence
output
Security For The Entire School
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Kijabe Primary School

location
Kijabe (in Lari)
year first funded
2004
action
Purchase Of Desks
output
Modern School Desks
implementation status
Complete & In Use
total cost
Ksh 200,000
estimate
Ksh 300,000

Munyaka Primary School

location
Kijabe (in Lari)
year first funded
2007
action
Construction Of An Ecd Classroom
output
Standard Modern Ecd Classroom
implementation status
Ongoing; At Rental Level
total cost
Ksh 150,000
estimate
Ksh 300,000

Kinale Primary School

location
Kinale (in Lari)
year first funded
2003
action
Renovation Of 4 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 147,423
estimate
Ksh 250,000

Kanyuiro Foot Bridge

location
Gatamaiyu (in Lari)
year first funded
2006
action
Re -Construction Of The Bridge
output
Improved Bridge
implementation status
Complete & In Use
total cost
Ksh 110,000
estimate
Ksh 200,000

Kimende Kaka Enviromental Project

location
Kijabe (in Lari)
year first funded
2005
action
Purchase Of Wheelbarrows & Other Equipments To Clean The Environment
output
Environmental Conservation
implementation status
Complete & In Use
total cost
Ksh 104,888
estimate
Ksh 150,000

Kago Primary School

location
Kijabe (in Lari)
year first funded
2003
action
Wiring & Electricity Connection
output
Electricity Supply To The Entire School
implementation status
Complete & In Use
total cost
Ksh 101,485
estimate
Ksh 150,000

Kamahia Primary School

location
Kamburu (in Lari)
year first funded
2007
action
Overhaul Of Roof, Plastering And Floor Repairs For 1 Classroom
output
Standard Modern Classroom
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 300,000

Kamburu Secondary School

location
Gatamaiyu (in Lari)
year first funded
2006
action
Construction Of 4 Toilets
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Bathi Secondary School

location
Kijabe (in Lari)
year first funded
2005
action
Renovation Of 2 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 300,000

Muthandi Primary School

location
Gatamaiyu (in Lari)
year first funded
2005
action
Water System
output
Provision Of Clean Water To The Entire School
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gakenge Primary School

location
Nyanduma (in Lari)
year first funded
2006
action
Levelling Of The Playing Field
output
Proper Field For Soccer And Other Sports
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Karatina Primary School

location
Nyanduma (in Lari)
year first funded
2006
action
Construction Of Toilets
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Nyamuthanga Primary School

location
Kamburu (in Lari)
year first funded
2006
action
Renovation Of 8 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kibathithi Primary School

location
Kamburu (in Lari)
year first funded
2006
action
Renovation Of 4 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Kamuchege Primary School

location
Gatamaiyu (in Lari)
year first funded
2006
action
Construction Of One Classroom
output
Standard Modern Classroom
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Gituamba Primary School

location
Kirenga (in Lari)
year first funded
2006
action
Renovation Of 3 Classrooms
output
Standard Modern Classrooms
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Karugo Foot Bridge

location
Gatamaiyu (in Lari)
year first funded
2006
action
Rehabilitation Of The Bridge
output
Improved Bridge
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Tree Nurseries Lare

location
Lari (in Lari)
year first funded
2006
action
Preparation Of Tree Nurseries And Planting Of Trees
output
Environmental Conservation
implementation status
Tree Nurseries Complete
total cost
Ksh 100,000
estimate
Ksh 200,000

Githirioni Ap Post

location
Lari (in Lari)
year first funded
2006
action
Renovation Of The A.Ps Post Office Block
output
Provision Of Security Services To The Community
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 250,000

Magina Ap Post

location
Kijabe (in Lari)
year first funded
2008
action
Renovation Of The A.Ps Post
output
Provision Of Security Services To The Community
implementation status
Ongoing; At Planning Stage
total cost
Ksh 100,000
estimate
Ksh 300,000

Gituamba Ap Post

location
Kirenga (in Lari)
year first funded
2008
action
Construction Of A New Ap Post
output
Provision Of Security Services To The Community
implementation status
Fencing Complete; Construction Ongoing
total cost
Ksh 100,000
estimate
Ksh 500,000

Gituamba Electricity Project

location
Kirenga (in Lari)
year first funded
2006
action
Power Supply To Gituamba Pri & Sec Schools
output
Connection For Both Schools
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kinale Roads Works

location
Kinale (in Lari)
year first funded
2006
action
Installation Of Culverts
output
Improved Road Network
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Nduriri Water Project

location
Nyanduma (in Lari)
year first funded
2006
action
Installation Of Pipes And Pipes Fittings
output
Distribution Of Clean Water To Nduriri Community
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Nduriri Dispensary

location
Nyanduma (in Lari)
year first funded
2006
action
Construction Of An Incenerator
output
Hospital Wastes Management
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Kamuchege Community Centre

location
Gatamaiyu (in Lari)
year first funded
2006
action
Renovation Of The Dispensary Block
output
Standard Modern Fully Equiped Dispensary
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyamweru Primary School

location
Lari (in Lari)
year first funded
2006
action
Construction Of Toilets
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Kambaa Primary School

location
Kirenga (in Lari)
year first funded
2006
action
Renovation Of School'S Borehole
output
Provision Of Water To The School
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gathuru Bridge

location
Nyanduma (in Lari)
year first funded
2006
action
Renovation Of The Bridge
output
Improved Road Network
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Lari Division Education Office

location
Kirenga (in Lari)
year first funded
2006
action
Wiring And Electrificity Connection
output
Supply Of Electricity To The Entire Office And Hall
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gatamaiyu Diveducoffice

location
Gatamaiyu (in Lari)
year first funded
2006
action
Repainting Of The Office And Repair Of Floor And Ceiling
output
Standard Offices
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Constituency Website Project

location
Lari (in Lari)
year first funded
2006
action
Development Of A Website
output
Publicity
implementation status
Design Complete; Uploading Content & Registration Remaining
total cost
Ksh 100,000
estimate
Ksh 100,000

Uplands Forest Dispensary

location
Lari (in Lari)
year first funded
2007
action
Construction Of New Dispensary Block
output
Standard Modern Dispensary
implementation status
Planning Ongoing
total cost
Ksh 100,000
estimate
Ksh 500,000

Kariguini Primary School

location
Nyanduma (in Lari)
year first funded
2007
action
Digging & Construction Of Toilets
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gatamaiyu D.O. Office

location
Gatamaiyu (in Lari)
year first funded
2007
action
Repainting Of The Office And Repair Of Floor And Ceiling
output
Standard Offices
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Kimende Health Centre

location
Kijabe (in Lari)
year first funded
2007
action
Purchase Of Medical Equipments
output
Modern Medical Equipments For The Dispensary
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kanyekini Primary School

location
Gitithia (in Lari)
year first funded
2007
action
Purchase Of Desks
output
Stadard Modern Class For Junior Pupils
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gatamaiyu Home For The Mhc

location
Nyanduma (in Lari)
year first funded
2007
action
Construction Of Dining Hall Floor
output
Standard Modern Dining Hall
implementation status
Kitchen Complete. Hall Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Mbau Ini Dispensary

location
Kirenga (in Lari)
year first funded
2007
action
Painting Of The Dispensary, Repair Of Floor & Purchase Of Furniture
output
Standard Modern Dispensary
implementation status
Complete But Not In Use
total cost
Ksh 100,000
estimate
Ksh 500,000

King'Atua Secondary School

location
Kijabe (in Lari)
year first funded
2007
action
Plastering, Flooring And General Repairs For 2 Classrooms
output
Standard Modern Classrooms
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Nyanduma Polytechnic

location
Nyanduma (in Lari)
year first funded
2007
action
Wiring And Electrificity Connection
output
Supply Of Electricity To The Entire School
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 300,000

Kirenga Primary School

location
Kirenga (in Lari)
year first funded
2007
action
Fencing And Renovation Of Toilets
output
Enhanced Security And Standard Toilets
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 300,000

Sulmac Secondary School

location
Kamae (in Lari)
year first funded
2007
action
Purchase Of Desks
output
Standard Modern Desks
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 200,000

Constituency Food Program

location
Lari (in Lari)
year first funded
2007
action
Purchase Of Maize Flour And Other Foodstuffs
output
Aleviation Of Hunger And Starvation
implementation status
Complete; Maize Flour Distributed
total cost
Ksh 100,000
estimate
Ksh 100,000

Constituency Education Day

location
Lari (in Lari)
year first funded
2007
action
Prize Giving
output
Improved Academic Performance
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Lari Division Education Office

location
Kijabe (in Lari)
year first funded
2007
action
Repainting, Roof, Doors And Window Repairs
output
Standard Offices
implementation status
Complete And In Use
total cost
Ksh 82,619
estimate
Ksh 82,619

Gituamba Secondary School

location
Kirenga (in Lari)
year first funded
2005
action
Wiring And Electricity Supply To The School
output
Supply Of Electricity To The Entire School
implementation status
Complete & In Use
total cost
Ksh 80,000
estimate
Ksh 80,000

Kamburu Chiefs Office

location
Kamburu (in Lari)
year first funded
2006
action
Construction Of A Gate And Fence
output
Security For The Chief'S Office & A.P Post
implementation status
Complete & In Use
total cost
Ksh 80,000
estimate
Ksh 80,000

Bathi Primary School

location
Kijabe (in Lari)
year first funded
2006
action
Construction Of A Classroom
output
Standard Modern Classroom
implementation status
Complete & In Use
total cost
Ksh 61,000
estimate
Ksh 500,000

Kirenga Community Nursery

location
Kirenga (in Lari)
year first funded
2005
action
General Repairs For 2 Classrooms - Plastering, Flooring, Roof Repairs Etc
output
Standard Modern Classrooms
implementation status
Phase 1 Complete & In Use
total cost
Ksh 60,000
estimate
Ksh 60,000

King'Atua Primary School

location
Kijabe (in Lari)
year first funded
2003
action
Construction Of Toilets
output
Standard Modern Toilets
implementation status
Complete & In Use
total cost
Ksh 51,000
estimate
Ksh 51,000

Kamahindu Primary School

location
Gatamaiyu (in Lari)
year first funded
2007
action
Wiring And Electrificity Connection
output
Supply Of Electricity To The Entire School
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 300,000

Nyamweru Primary School

location
Lari (in Lari)
year first funded
2007
action
Construction Of Toilets
output
Standard Modern Toilets
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 200,000

Kambaa Cattle Dip

location
Kirenga (in Lari)
year first funded
2007
action
Renovation Of The Dip
output
Standard Cattle Dip
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 100,000

Gakenge Primary School

location
Nyanduma (in Lari)
year first funded
2007
action
Construction Of A Gate
output
Enhanced Security For The School
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 80,000

District Education Day

location
Lari (in Lari)
year first funded
2007
action
Prize Giving
output
Improved Academic Performance
implementation status
Complete; Prize Giving Held At District Hqs
total cost
Ksh 50,000
estimate
Ksh 50,000

Kbu West Nyeri Trade Fair

location
Lari (in Lari)
year first funded
2007
action
Exhibition
output
Publicity
implementation status
Complete; Exhibition Held At Nyeri Ask Show
total cost
Ksh 50,000
estimate
Ksh 50,000

Githirioni Primary School

location
Lari (in Lari)
year first funded
2006
action
Construction Of A Gate
output
Improved Security For The School
implementation status
Complete & In Use
total cost
Ksh 50,000
estimate
Ksh 100,000

Bursary Schooleme

location
Lari (in Lari)
year first funded
2003
action
Award Of Bursary To Bright Students From Poor Backgrounds
output
Access To Proper Schooling
implementation status
Complete; Bursary Awarded To Needy Students
total cost
Ksh 49,000
estimate
Ksh 0

Bursary Schooleme

location
Lari (in Lari)
year first funded
2004
action
Award Of Bursary To Bright Students From Poor Backgrounds
output
Access To Proper Schooling
implementation status
Complete; Bursary Awarded To Needy Students
total cost
Ksh 33,333
estimate
Ksh 0