The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Constituency bursary
- location
-
Lugari
(in Lugari)
- year first funded
- 2003
- action
- Supply
- output
- Bursary
- implementation status
- Completed
- total cost
- Ksh 22,800,000
- estimate
- Ksh 17,400
Mmust Lugari Campus
- location
-
Lugari
(in Lugari)
- year first funded
- 2009
- action
- 4 Lec. Halls
- output
- 4 Comp Lec. Halls
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 4,055,052
- estimate
- Ksh 4,055,052
Youth Bus Resource Centre
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- n/a
- output
- Resource Centre
- implementation status
- New
- total cost
- Ksh 3,755,000
- estimate
- Ksh 10,000,000
Lugari Health Centre
- location
-
Lugari
(in Lugari)
- year first funded
- 2004
- action
- Maternity
- output
- Delivery Unit
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 3,178,000
- estimate
- Ksh 3,500,000
TurboSoyNzoiaKogo Road
- location
-
Likuyani
(in Lugari)
- year first funded
- 2004
- action
- Rehab
- output
- Repair
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 3,035,690
- estimate
- Ksh 400,000
Sinoko Dispensary
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Maternity
- output
- Maternity Ward
- implementation status
- Completed
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,400,000
Chekalini School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2004
- action
- Construction of Dining Hall & Lab
- output
- Dining Hall & Lab
- implementation status
- Stalled 04/05
- total cost
- Ksh 3,000,000
- estimate
- Ksh 1,500,000
Constituency Office
- location
-
Likuyani
(in Lugari)
- year first funded
- 2003
- action
- Construction of Office
- output
- Office
- implementation status
- Completed
- total cost
- Ksh 2,960,000
- estimate
- Ksh 2,960,000
Munyuki R/Crossing
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 2,850,000
- estimate
- Ksh 3,800,000
Lumino Dispensary
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Maternity
- output
- Delivery Unit
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 2,350,000
- estimate
- Ksh 2,200,000
Mbagara Health Centre
- location
-
Mautuma
(in Lugari)
- year first funded
- 2004
- action
- Construction of Outpatient Block
- output
- Outpatient Block
- implementation status
- Construction Completed
- total cost
- Ksh 2,178,000
- estimate
- Ksh 3,100,000
Eshikulu
- location
-
Sinoko
(in Lugari)
- year first funded
- 2004
- action
- Floor,Screed,Plaster
- output
- Dining Hall
- implementation status
- Completed
- total cost
- Ksh 2,100,179
- estimate
- Ksh 2,600,000
Matunda Health Centre
- location
-
Nzoia
(in Lugari)
- year first funded
- 2004
- action
- Construction of Outpatient Block
- output
- Outpatient Block
- implementation status
- Construction Completed
- total cost
- Ksh 2,078,000
- estimate
- Ksh 3,300,000
Lugari Tti
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- Finishing 3 Halls
- output
- Lecture Halls
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 2,048,000
- estimate
- Ksh 5,000,000
Mbajo School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2004
- action
- Construction of Admin. Block
- output
- Admin. Block
- implementation status
- Ongoing
- total cost
- Ksh 2,008,750
- estimate
- Ksh 3,900,000
Nzoia Youth Polytechnic
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- 2 W/Shops
- output
- Workshop
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,600,000
Bishop Sulmeti Bridge
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2004
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 1,880,000
- estimate
- Ksh 2,500,000
Maturu Youth Poly
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- 2 W/Shops
- output
- Workshop
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,850,000
- estimate
- Ksh 3,000,000
St. Judes Seregeya School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Library
- output
- Comp Lib
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,850,000
- estimate
- Ksh 1,500,000
Moi Township
- location
-
Sinoko
(in Lugari)
- year first funded
- 2004
- action
- Buying 2 Acres
- output
- Playground
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,816,000
- estimate
- Ksh 190,000
Soysambu Dispensary
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Kitchen/Maternity
- output
- Kitchen/Maternity
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,800,000
- estimate
- Ksh 190,000
Mbagara R/Crossing
- location
-
Mautuma
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,400,000
Musembe School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,600,000
St. Peters School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- -
- implementation status
- OnGoing
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,900,000
Mugunga School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,600,000
Musembe Dispensary
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Maternity/Kitchen
- output
- Delivery/Kitchen
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,700,000
- estimate
- Ksh 2,000,000
Forestal School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2003
- action
- Construction of Classrooms and Lab
- output
- Classrooms and Lab
- implementation status
- On-Going-Initial Stage
- total cost
- Ksh 1,689,500
- estimate
- Ksh 2,100,000
Saisi Wabuge School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2004
- action
- New Dorm
- output
- Comp Dorm
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,678,000
- estimate
- Ksh 1,700,000
St. Marys School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,640,000
- estimate
- Ksh 1,850,000
Munyuki Dispensary
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Maternity
- output
- Delivery Unit
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,900,000
Mbururu School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,550,000
- estimate
- Ksh 1,300,000
Vinyenya School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2004
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,550,000
- estimate
- Ksh 2,200,000
Mapengo School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 1,465,000
- estimate
- Ksh 1,900,000
Lumakanda School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 1,455,000
- estimate
- Ksh 1,900,000
Mukonge School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- 2 New Classrooms
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,800,000
Staugustine Milimani
- location
-
Mautuma
(in Lugari)
- year first funded
- 2004
- action
- Buy 1 Acre
- output
- Expansion
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,368,750
- estimate
- Ksh 350,000
St. Benedict School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,500,000
Lugari School
- location
-
Lugari
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 1,320,000
- estimate
- Ksh 1,800,000
Mulimani Dispensary
- location
-
Sinoko
(in Lugari)
- year first funded
- 2007
- action
- Maternity
- output
- Delivery Unit
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,500,000
Lukusi School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,700,000
Sango Dispensary
- location
-
Kongoni
(in Lugari)
- year first funded
- 2004
- action
- Found,Slab,Wall,Rbeam
- output
- Septic Tank
- implementation status
- Completed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,200,000
Ivugwi School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,230,000
- estimate
- Ksh 1,400,000
Mapengo Dispensary
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Construction of Outpatient Block
- output
- Outpatient Block
- implementation status
- Construction Completed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,200,000
St. likuyani School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Construction of Admn. Block
- output
- Admn. Block
- implementation status
- Completed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,700,000
K/Mbaya/Matunda Health Centre
- location
-
Nzoi
(in Lugari)
- year first funded
- 2005
- action
- Connection
- output
- Umeme Pamoja
- implementation status
- Completed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
Mugumu School
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,190,000
- estimate
- Ksh 1,850,000
Matisi School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2004
- action
- 2 New Classrooms
- output
- 2 Completed C/Rms
- implementation status
- Ongoing
- total cost
- Ksh 1,188,750
- estimate
- Ksh 1,018,750
Mabusi Health Centre
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Ward
- output
- Bed Rest
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,170,000
- estimate
- Ksh 1,100,000
Kambi Mapesa School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Construction
- output
- Finishing
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,160,000
- estimate
- Ksh 1,850,000
Aligula Primary School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,700,000
Soy Youth Polytechnic
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- 1 Dormitory
- output
- New Dorm
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,100,000
- estimate
- Ksh 400,000
St. Augustine Soysambu School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Laboratory
- output
- Lab
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
Mufutu School
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,600,000
St. Annes School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Dorm
- output
- Comp Dorm
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,300,000
Marula School
- location
-
Lugari
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,098,750
- estimate
- Ksh 1,900,000
St. Monica School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,090,000
- estimate
- Ksh 1,700,000
Ivugwi School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,700,000
Aligula School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Foundation,Slab, Walling, Ringbeam
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,700,000
Mwiba School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,020,000
- estimate
- Ksh 1,800,000
Nabemo School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2007
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,010,000
- estimate
- Ksh 1,850,000
Mwamba School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2004
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 1,008,750
- estimate
- Ksh 1,900,000
Bishop Njenga School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Chekalini Health Centre
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Construction of Maternity
- output
- Maternity
- implementation status
- Ongoing
- total cost
- Ksh 964,000
- estimate
- Ksh 1,400,000
Mukuyu Girls School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Foundation,Slab,Wal
- output
- Dormitory
- implementation status
- Completed
- total cost
- Ksh 959,000
- estimate
- Ksh 1,900,000
Mautuma Secondary School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- Library
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Koromaiti School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2004
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 928,750
- estimate
- Ksh 1,900,000
Mutoni School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 910,000
- estimate
- Ksh 1,700,000
Beam R/Crossing
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
FurfuralSango Road
- location
-
Kongoni
(in Lugari)
- year first funded
- 2004
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 890,000
- estimate
- Ksh 1,500,000
Munyuki School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Construction Completed
- total cost
- Ksh 890,000
- estimate
- Ksh 1,390,000
Munge Mbagara
- location
-
Mautuma
(in Lugari)
- year first funded
- 2006
- action
- Construction of road
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 856,179
- estimate
- Ksh 1,200,000
Mlimani School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 854,000
- estimate
- Ksh 1,800,000
Mahemas School
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 1,800,000
Mayoyo Mukholosi
- location
-
Lugari
(in Lugari)
- year first funded
- 2007
- action
- Construction of road
- output
- Repair
- implementation status
- OnGoing Initial Stage
- total cost
- Ksh 850,000
- estimate
- Ksh 1,900,000
Majengo Dispensary
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2003
- action
- Construction of Water Supply
- output
- Water Supply
- implementation status
- Ongoing
- total cost
- Ksh 839,500
- estimate
- Ksh 1,700,000
St. Joseph Kogo School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Construction of C/Rms & Lab
- output
- C/Rms & Lab
- implementation status
- Construction Complete
- total cost
- Ksh 812,829
- estimate
- Ksh 1,600,000
Lugari Stn School
- location
-
Lugari
(in Lugari)
- year first funded
- 2007
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 810,000
- estimate
- Ksh 1,850,000
Maturu/Luandeti Gravity
- location
-
Luandeti
(in Lugari)
- year first funded
- 2009
- action
- Storage Tank
- output
- Water Resevoir
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Savala Dos Office
- location
-
Lugari
(in Lugari)
- year first funded
- 2007
- action
- Construction of road
- output
- Repair
- implementation status
- OnGoing Initial Stage
- total cost
- Ksh 800,000
- estimate
- Ksh 1,400,000
Seregeya Health Centre
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Septic Tank
- output
- Waste Disposal
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 800,000
- estimate
- Ksh 1,600,000
Mautuma D School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 1,800,000
Seregeya School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Foundation,Slab, Walling, Ringbeam
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 1,700,000
Soy Water Supply
- location
-
Likuyani
(in Lugari)
- year first funded
- 2009
- action
- Storage Tank
- output
- Water Resevoir
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kabras Youth Poly
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2009
- action
- 1 Dormitory
- output
- Dorm
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Mugunga School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 760,000
- estimate
- Ksh 1,850,000
Lwanda School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Vf
- output
- Classrooms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 760,000
- estimate
- Ksh 1,700,000
Mbururu School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Construction of 2 New Toilets
- output
- 2 New Toilets
- implementation status
- Completed
- total cost
- Ksh 730,000
- estimate
- Ksh 1,800,000
Machine Bridge
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 710,000
- estimate
- Ksh 800,000
Muruli School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 710,000
- estimate
- Ksh 1,850,000
St. Teresa School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 1,200,000
Makhwabuye Primary School
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Completed C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 1,700,000
Lukova Primary School
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Completed C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 1,700,000
Chamavele Primary School
- location
-
Luandeti
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 1,700,000
Mayoyo Sa Primary School
- location
-
Luandeti
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 1,700,000
Itumbu Primary School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 1,700,000
Chenjeni Secondary School
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- Office Adm.
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Lwandeti D Secondary School
- location
-
Luandeti
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Nzoia Secondary School
- location
-
Luandeti
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Lunyito School
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Construction of Admn. Block
- output
- Admn. Block
- implementation status
- Construction Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 1,200,000
Marakusi Dispensary
- location
-
Lugari
(in Lugari)
- year first funded
- 2004
- action
- Construction of Outpatient Block
- output
- Outpatient Block
- implementation status
- Construction Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 1,700,000
Mautuma S/D Hosp
- location
-
Mautuma
(in Lugari)
- year first funded
- 2009
- action
- Ward
- output
- G/Ward
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Mirembe School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Foundation,Walling, Ringbeam
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 690,000
- estimate
- Ksh 1,700,000
Kona School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2004
- action
- Construction of 2 New Toilets
- output
- 2 New Toilets
- implementation status
- Ongoing
- total cost
- Ksh 688,750
- estimate
- Ksh 1,118,750
Sikulu School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 678,750
- estimate
- Ksh 1,178,760
Mukuyu
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 660,000
- estimate
- Ksh 1,850,000
Soweto Kipkaren
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 660,000
- estimate
- Ksh 900,000
Savala School
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- OnGongInitial Stage
- total cost
- Ksh 636,179
- estimate
- Ksh 1,800,000
Forest Bridge
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 635,000
- estimate
- Ksh 900,000
Makutano School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 610,000
- estimate
- Ksh 1,850,000
Maguti Mbajo Viyalo
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Construction of road
- output
- Repair
- implementation status
- Construction Completed Process
- total cost
- Ksh 606,179
- estimate
- Ksh 1,100,000
Mois Bridge School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 600,000
- estimate
- Ksh 1,800,000
Navalayo Primary School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2009
- action
- 2 New Classrooms
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Chetambe School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2009
- action
- 2 New Classrooms
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Mwivola
- location
-
Likuyani
(in Lugari)
- year first funded
- 2009
- action
- 2 Acres
- output
- New Ground
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Lumino Special Unit
- location
-
Likuyani
(in Lugari)
- year first funded
- 2009
- action
- 2 New Classrooms
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Mawe Tatu School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2009
- action
- 2 New Classrooms
- output
- 2 C/Rms & Admn
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Matunda School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- OnGoing ?Initial Stage
- total cost
- Ksh 600,000
- estimate
- Ksh 1,100,000
Kiwanja Ndege Primary School
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 600,000
- estimate
- Ksh 1,700,000
St. Joseph's Nyorotis School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2009
- action
- 2 New Classrooms
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Chekalini School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Foundation, Floor, Wall
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 580,000
- estimate
- Ksh 1,800,000
Macho Muslim School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2004
- action
- Foundation,Slab, Walling, Ringbeam
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 578,750
- estimate
- Ksh 1,078,750
Forestal School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 570,000
- estimate
- Ksh 1,700,000
Kilimani School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 570,000
- estimate
- Ksh 1,700,000
Mapera School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2004
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 568,750
- estimate
- Ksh 1,719,750
Kongoni School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Ap Lines
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Construction of Office
- output
- Security
- implementation status
- Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 800,000
N K
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed Construction
- total cost
- Ksh 546,179
- estimate
- Ksh 700,000
NjorogeMajengo River Crossing
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2004
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 538,000
- estimate
- Ksh 800,000
Patrice School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Construction of toilets
- output
- 2 New Toilets
- implementation status
- Ongoing
- total cost
- Ksh 520,000
- estimate
- Ksh 1,850,000
Kware School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Slab,Roof
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 520,000
- estimate
- Ksh 1,900,000
Likuyani School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Construction of 1 New Classroom
- output
- 1 New Classroom
- implementation status
- Ongoing
- total cost
- Ksh 520,000
- estimate
- Ksh 1,700,000
Marakusi School
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 520,000
- estimate
- Ksh 1,800,000
Munyuki Central Umeme Pamoja
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2008
- action
- Purchase Of Transfomer
- output
- Transformer Installed
- implementation status
- Completion work in process
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Bandari Umeme Pamoja
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2008
- action
- Purchase Of Transfomer
- output
- Transformer Installed
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Kona Market Power Project
- location
-
Nzoia
(in Lugari)
- year first funded
- 2008
- action
- Purchase Of Transfomer
- output
- Transformer Installed
- implementation status
- Foundation stage
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Musembe Secondary School /Mrk
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- Purchase Of Transfomer
- output
- Transformer Installed
- implementation status
- Compleetion workin process
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Lugari Umeme Pamoja
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- Purchase Of Transfomer
- output
- Transformer Installed
- implementation status
- To be funded from second instalment
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Chepsai Prim/Market
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
mary
- location
-
Luandeti
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mapengo Health Centre
- location
-
Chekalini
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Manyonyi Primary
- location
-
Lugari
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mukonge Primary
- location
-
Mautuma
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mbaya Primary
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Brotherhood Junction
- location
-
Likuyani
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Shisundi/Mawe Tatu Primary
- location
-
Kongoni
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Vinyenya/Patrice Primary School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Godown Village
- location
-
Sinoko
(in Lugari)
- year first funded
- 2009
- action
- Transformer
- output
- Power Connected
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mwangi R/Crossing
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Completed And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Nyuri R/Crossing
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Mukuyu School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,900,000
Asira Bridge
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Njaya Bridge
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 850,000
Koromaiti Mixed School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2009
- action
- Laboratory
- output
- Laboratory
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Han Dow Secondary School
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mabuye Primary School
- location
-
Luandeti
(in Lugari)
- year first funded
- 2008
- action
- 2 Classrooms Construction
- output
- Usable Level
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,700,000
Mlimani Mautuma
- location
-
Mautuma
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Muhavi R
- location
-
Nzoia
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- Improv. Com.
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Mois Bridge Machine Tulienge
- location
-
Sinoko
(in Lugari)
- year first funded
- 2007
- action
- Rehab
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Franks Marula
- location
-
Lugari
(in Lugari)
- year first funded
- 2007
- action
- Construction of road
- output
- Repair
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Essendi Stendi Kisa
- location
-
Lugari
(in Lugari)
- year first funded
- 2007
- action
- Construction of road
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Chekalini B/Njenga
- location
-
Chekalini
(in Lugari)
- year first funded
- 2007
- action
- Construction of road
- output
- Repair
- implementation status
- OnGoing Initial Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Owaga Mukhuyu
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Construction of road
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Bondeni
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 450,000
- estimate
- Ksh 700,000
Majengo Primary School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 450,000
- estimate
- Ksh 1,700,000
Buluma
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Mtoni Tali Sango
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Repair Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 700,000
Lumakanda Munyuki
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Repair Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 700,000
Musembe Stendi
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Construction of road
- output
- Repair
- implementation status
- Construction Complete Process
- total cost
- Ksh 450,000
- estimate
- Ksh 900,000
Angayu School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 440,000
- estimate
- Ksh 1,800,000
Lumama School
- location
-
Lugari
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 438,750
- estimate
- Ksh 1,900,000
Kona Mbaya Matunda
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 430,000
- estimate
- Ksh 700,000
Onduto R/Crossing
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Ongoing
- total cost
- Ksh 425,000
- estimate
- Ksh 600,000
Sipande School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use.
- total cost
- Ksh 420,000
- estimate
- Ksh 1,700,000
K/MbayaBushofu Road
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 416,000
- estimate
- Ksh 800,000
Ingati R/Crossing
- location
-
Chekalini
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Completed
- total cost
- Ksh 410,000
- estimate
- Ksh 600,000
Mautuma
- location
-
Mautuma
(in Lugari)
- year first funded
- 2009
- action
- Drawing Room
- output
- Drawing Room
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Marakusi Youth Poly
- location
-
Lugari
(in Lugari)
- year first funded
- 2009
- action
- Ren/W/Shop
- output
- New Off/W/Shop
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Matangi R/Crossing
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Soysambu School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 1,850,000
St. Cecilia School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Construction of Lab
- output
- Lab
- implementation status
- Equipments Delivered
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Kona
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
MachineTulienge Road
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Edmos
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Mwamba Quarry
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- OnGoing ?Initial Stage
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Musembe Mulera
- location
-
Chekalini
(in Lugari)
- year first funded
- 2007
- action
- Construction of road
- output
- Repair
- implementation status
- OnGoing Initial Stage
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Muatola Roberts Seregeya
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Construction of road
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Nzoia/ Sinoko Comm Water Project
- location
-
Nzoia
(in Lugari)
- year first funded
- 2008
- action
- Water Pump
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Acacia Commwater Project
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Water Pump
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Chekalini Youth Poly
- location
-
Chekalini
(in Lugari)
- year first funded
- 2009
- action
- Rehab 4 W/Shops
- output
- Training W/Shops
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Marakusi Forest Road
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Construction of road
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 390,000
- estimate
- Ksh 700,000
Shaban R
- location
-
Nzoia
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- Improv. Com.
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 380,000
- estimate
- Ksh 800,000
Machine Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 370,000
- estimate
- Ksh 1,700,000
Godown School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Foundation,Wall,Ringbeam
- output
- Classroom
- implementation status
- Completed
- total cost
- Ksh 360,000
- estimate
- Ksh 800,000
Maram School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 360,000
- estimate
- Ksh 1,850,000
Ivugwi Water Supply
- location
-
Likuyani
(in Lugari)
- year first funded
- 2008
- action
- Water Pump
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 360,000
- estimate
- Ksh 700,000
Lumama Secondary School
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Luanda Secondary School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Andeyo Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Kware Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Bondeni Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Namunyiri Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
A Luyekhe Primary School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Lusweti Primary School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Munyuki Primary School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Jirongo Primary School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Kulumbeni Primary School
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Nambilima Primary School
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Mapengo Primary School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Angayu Primary School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 350,000
- estimate
- Ksh 1,700,000
Chekalini
- location
-
Chekalini
(in Lugari)
- year first funded
- 2007
- action
- n/a
- output
- Security Office
- implementation status
- OnGoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mapera
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 350,000
- estimate
- Ksh 200,000
Mautuma T / Shp
- location
-
Mautuma
(in Lugari)
- year first funded
- 2007
- action
- Protection
- output
- Clean Water
- implementation status
- Construction In Process
- total cost
- Ksh 350,000
- estimate
- Ksh 200,000
Ivona R/Nzoia
- location
-
Mautuma
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 350,000
- estimate
- Ksh 700,000
Matunda School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 330,000
- estimate
- Ksh 1,700,000
Musembe School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 320,000
- estimate
- Ksh 1,800,000
Mbagara Primary School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 300,000
- estimate
- Ksh 1,700,000
AndeyoWabuge Junction
- location
-
Sinoko
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Nangili School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,850,000
Sikhendu School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Completed And Use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,850,000
St. Gabriel Mbagara School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2006
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Construction Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,850,000
St. Kizito School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2009
- action
- 2 New Classrooms
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Mugunga
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Completed And In Use.
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Maji Mazuri R/Crossing
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Nyawawa R/Crossing
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Matunda Tumbo
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Kuwait Dongolo
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Chemororochi Ombima
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Matunda Baptist
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
VukusuDown Valley
- location
-
Mautuma
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Nangili Ap Lines
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Foundation,Roof,Doors,Windows
- output
- Security Office
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Seregeya A Line
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Foundation,Slab,Wall,Roof, Rbeam
- output
- Security Office
- implementation status
- Completred
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Matete Divff
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- n/a
- output
- Adm Block
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Mabunde
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- OnGoing
- total cost
- Ksh 290,000
- estimate
- Ksh 500,000
St. Vincent Secondary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Construction of classrooms
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 280,000
- estimate
- Ksh 3,000,000
Ontundo Matisi
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 280,000
- estimate
- Ksh 400,000
Angweye
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Completed
- total cost
- Ksh 275,000
- estimate
- Ksh 600,000
Malova R / Crossing
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 275,000
- estimate
- Ksh 600,000
Masasi R/Crossing
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 275,000
- estimate
- Ksh 600,000
Maua R/Crossing
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 275,000
- estimate
- Ksh 600,000
Namunyiri Cattle Dip
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Constrution
- output
- Usable Dip
- implementation status
- Ongoing
- total cost
- Ksh 274,000
- estimate
- Ksh 500,000
Matunda Mtoni Tumbo Road
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 270,000
- estimate
- Ksh 500,000
Shiundu R/Crossing
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Construction of New Bridge
- output
- New Bridge
- implementation status
- Ongoing
- total cost
- Ksh 270,000
- estimate
- Ksh 1,000,000
MumonyonzoMatisiMaloba
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 270,000
- estimate
- Ksh 500,000
Musalaba Yellow
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Connection
- output
- Umeme Pamoja
- implementation status
- Completed
- total cost
- Ksh 268,731
- estimate
- Ksh 500,000
Nangili MinyweMuhavi
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 260,000
- estimate
- Ksh 600,000
Makutano Primary School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2008
- action
- Finishing
- output
- 1 Classroom
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 260,000
- estimate
- Ksh 1,700,000
Williams MayambiMbururu
- location
-
Nzoia
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 260,000
- estimate
- Ksh 600,000
Luanda Lugari Primary School
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Usable Level
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,700,000
Kambi Mapesa R/Crossing
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Musembe Primary School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- 1 Classroom Construction
- output
- Usable Level
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,700,000
Nasianda Soysambu Lugulu
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Makuro
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Construction In Process
- total cost
- Ksh 240,000
- estimate
- Ksh 400,000
Nangili
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 230,000
- estimate
- Ksh 200,000
Musemwa School
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 220,000
- estimate
- Ksh 1,900,000
Sirende School
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 220,000
- estimate
- Ksh 1,800,000
Manyonyi School
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 220,000
- estimate
- Ksh 1,800,000
St. Theresa School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 220,000
- estimate
- Ksh 1,700,000
Nasianda School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 220,000
- estimate
- Ksh 1,700,000
Mukhuyu
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Dip
- implementation status
- OnGoing: Initial Stages
- total cost
- Ksh 220,000
- estimate
- Ksh 400,000
Township School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 218,750
- estimate
- Ksh 1,900,000
Lumino School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 218,750
- estimate
- Ksh 1,900,000
Lugari Police Post
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Construction of Post
- output
- Security
- implementation status
- Construction Completed
- total cost
- Ksh 210,000
- estimate
- Ksh 400,000
Hqs D
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 210,000
- estimate
- Ksh 200,000
Chekalini School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lugulu School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Completed And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 1,850,000
Sinoko
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mukuyu Dispensary Ovambo Wesa
- location
-
Mautuma
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Makhanu Soy
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Repair Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Imbinga St. Monica
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Repair Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Kambi Mapesa Roberts
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
ImbingaMalulu Lumino
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Ludodo Godown
- location
-
Sinoko
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
GodownSokomoko
- location
-
Sinoko
(in Lugari)
- year first funded
- 2007
- action
- Rehab
- output
- Repair
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Mapengo R/Crossing
- location
-
Chekalini
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Makhukhuni School
- location
-
Lugari
(in Lugari)
- year first funded
- 2009
- action
- Library
- output
- Library
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Lumakanda D School
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Construction of classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 1,850,000
Lukhokho Girls Secondary School
- location
-
Luandeti
(in Lugari)
- year first funded
- 2008
- action
- Power Connected
- output
- Power Supplied
- implementation status
- To be funded from second instalment
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Mautuma Youth Poly
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- Wiring And Connection
- output
- Power Connected
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Vihiga
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 185,000
- estimate
- Ksh 200,000
Lower Mlimani
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 180,000
- estimate
- Ksh 200,000
Manyonyi
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 180,000
- estimate
- Ksh 200,000
Sango
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 175,000
- estimate
- Ksh 300,000
Lugonzo
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 170,000
- estimate
- Ksh 200,000
ExRaza
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 170,000
- estimate
- Ksh 200,000
Barnabas / Nyortis
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 170,000
- estimate
- Ksh 200,000
Obongita
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 170,000
- estimate
- Ksh 200,000
ExRocken
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 165,000
- estimate
- Ksh 200,000
Angayu
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 160,000
- estimate
- Ksh 200,000
K / Ndege
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 155,000
- estimate
- Ksh 200,000
Marakusi Dispensary
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
HaRoadsman R/Crossing
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Njoroge Majengo
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Likuyani-Kogo
- location
-
Likuyani
(in Lugari)
- year first funded
- 2007
- action
- Repair
- output
- Repair
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Lukova Pri/Comm
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2009
- action
- Dug Well
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Musembe Market
- location
-
Chekalini
(in Lugari)
- year first funded
- 2009
- action
- Dug Well
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Makutano Market
- location
-
Mautuma
(in Lugari)
- year first funded
- 2009
- action
- Dug Well
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Jirongo Pri/Com
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2009
- action
- Dug Well
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nasianda Pri/Comm
- location
-
Kongoni
(in Lugari)
- year first funded
- 2009
- action
- Dug Well
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Machine Society W/Spring
- location
-
Sinoko
(in Lugari)
- year first funded
- 2009
- action
- Dug Well
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Chekalini Primary School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2006
- action
- Connection
- output
- Installation
- implementation status
- Wiring Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Mautuma Sub Dist Hospital
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- Wiring & Connection
- output
- Power Connected
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Lunyito Dispensary
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- Depisit Of Wiring
- output
- Power Connected
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Kilimani Primary School
- location
-
Likuyani
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Electricity Supplied
- implementation status
- To be funded from second instalment
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Lumino Dispensary
- location
-
Likuyani
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Electricity Supplied
- implementation status
- To be funded from second instalment
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Makhukhuni Secondary School
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Supplied
- implementation status
- To be funded from second instalment
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Marakusi Secondary School
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Supplied
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Lumani Dispensary
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Supplied
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Sinoko Health Centre
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Electricity Supplied
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Eshikulu Secondary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- To be funded from second instalment
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Mwamba Ap
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2007
- action
- Construction of Security Office
- output
- Security Office
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Sikhendu Mutarakwa
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Connection
- output
- Umeme Pamoja
- implementation status
- Completed
- total cost
- Ksh 145,090
- estimate
- Ksh 500,000
Lugulu
- location
-
Kongoni
(in Lugari)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed
- total cost
- Ksh 145,000
- estimate
- Ksh 300,000
ExOtiende
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 145,000
- estimate
- Ksh 200,000
ExGault
- location
-
Kongoni
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 140,000
- estimate
- Ksh 200,000
Bishop Njenga
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 140,000
- estimate
- Ksh 200,000
Soy Sambu Dispensary
- location
-
Kongoni
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- Ongoing
- total cost
- Ksh 135,000
- estimate
- Ksh 270,000
Museve
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 135,000
- estimate
- Ksh 200,000
Musembe
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 133,000
- estimate
- Ksh 200,000
Mwamba
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 130,000
- estimate
- Ksh 200,000
Machine
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 130,000
- estimate
- Ksh 200,000
Ivona
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 126,000
- estimate
- Ksh 200,000
Mbagara
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 125,000
- estimate
- Ksh 200,000
Mugunga
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 120,000
- estimate
- Ksh 200,000
Makhanu Lami Moja Lusweti
- location
-
Likuyani
(in Lugari)
- year first funded
- 2006
- action
- Rehab
- output
- Repair
- implementation status
- Construction Completed
- total cost
- Ksh 120,000
- estimate
- Ksh 400,000
Sirende
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 110,000
- estimate
- Ksh 200,000
Muleri
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 105,000
- estimate
- Ksh 200,000
Sirende Primary School
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- Re-allocated Kshs.375,000 from Kenyenya Dispensary
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kongoni Secondary School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Lugari Market Sheds
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2008
- action
- Construction of New Sheds
- output
- New Sheds
- implementation status
- New Sheds
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Pan Paper J/Kali Sheds
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- Construction of New Sheds
- output
- New Sheds
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Macho Primary School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2008
- action
- 8 Toilets
- output
- New Toilets
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,700,000
Mahanga 'K' School
- location
-
Mautuma
(in Lugari)
- year first funded
- 2009
- action
- 2 New Classrooms
- output
- 2 Comp C/Rms
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Aleso R/Crossing
- location
-
Mautuma
(in Lugari)
- year first funded
- 2007
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Mautuma R / Nzoia
- location
-
Mautuma
(in Lugari)
- year first funded
- 2007
- action
- Construction of road
- output
- Repair
- implementation status
- OnGoing Initial Stage
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Wangaywa
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed & In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Khasiebere
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed & In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Bushofu
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Mukuyu
- location
-
Mautuma
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Marakusi
- location
-
Lugari
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Musembe Secondary School
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- To be funded from second instalment
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Lumino
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 98,000
- estimate
- Ksh 200,000
Soy Club
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 95,000
- estimate
- Ksh 200,000
Drwandera
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 90,000
- estimate
- Ksh 200,000
Kware Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Electricity Supplied
- implementation status
- To be funded from second instalment
- total cost
- Ksh 90,000
- estimate
- Ksh 180,000
Namunyiri Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- not known
- total cost
- Ksh 90,000
- estimate
- Ksh 200,000
Mulama
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Construction In Process
- total cost
- Ksh 90,000
- estimate
- Ksh 200,000
Mahanga
- location
-
Chekalini
(in Lugari)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 86,000
- estimate
- Ksh 200,000
Lugari
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 85,000
- estimate
- Ksh 85,000
Lunyito
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 85,000
- estimate
- Ksh 85,000
Mufutu
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Handow
- location
-
Lugari
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Panyako Bridge
- location
-
Sinoko
(in Lugari)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Motorable
- implementation status
- Construction Completed
- total cost
- Ksh 70,000
- estimate
- Ksh 400,000
Wasai Commwater Supply
- location
-
Nzoia
(in Lugari)
- year first funded
- 2008
- action
- Spring
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 150,000
Kulumbeni Sub W/ Pump
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- n/a
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 210,000
Kiliboti SubW/Pump
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- n/a
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 210,000
Kivaywa SubW/Pump
- location
-
Chevaywa
(in Lugari)
- year first funded
- 2008
- action
- Water Pump
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 210,000
Okwire Water Spring
- location
-
Nzoia
(in Lugari)
- year first funded
- 2009
- action
- Spring Protection
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 60,000
- estimate
- Ksh 60,000
Asista Spring
- location
-
Lugari
(in Lugari)
- year first funded
- 2009
- action
- Spring Protection
- output
- Clean Water
- implementation status
- Awaiting 09/10 Funds
- total cost
- Ksh 60,000
- estimate
- Ksh 60,000
Moi Township Primary School
- location
-
Sinoko
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- To be funded from second
- total cost
- Ksh 60,000
- estimate
- Ksh 120,000
Nzoia Dispensary
- location
-
Luandeti
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Supplied
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 150,000
Mirembe Primary School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2008
- action
- Deposit And Wiring
- output
- Power Connected
- implementation status
- -
- total cost
- Ksh 55,600
- estimate
- Ksh 110,000
Mukuyu Girls
- location
-
Mautuma
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mufutu Primary School
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- 2 Toilets
- output
- New Toilets
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 1,700,000
Sirende Primary School
- location
-
Lugari
(in Lugari)
- year first funded
- 2008
- action
- 2 Toilets
- output
- New Toilets
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 1,700,000
Kefa / Reuben
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Nyongesa
- location
-
Sinoko
(in Lugari)
- year first funded
- 2007
- action
- Protection
- output
- Clean Water
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Mukimila
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Protection
- output
- Clean Water
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
William
- location
-
Nzoia
(in Lugari)
- year first funded
- 2007
- action
- Protection
- output
- Clean Water
- implementation status
- OnGoingInitial Stage
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Zephania Khisa
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed & In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Mbururu Mktwell
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Musembe Water Spring
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- Protection Of W.Spring
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Koromait Water Spring
- location
-
Chekalini
(in Lugari)
- year first funded
- 2008
- action
- Protection Of W.Spring
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Webi Commwater Supply
- location
-
Nzoia
(in Lugari)
- year first funded
- 2008
- action
- Spring
- output
- Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Soysambu
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Staugustine
- location
-
Mautuma
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ndungu / Mwaura
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 48,000
- estimate
- Ksh 200,000
Waithaka Spring
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 48,000
- estimate
- Ksh 200,000
Timina
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 48,000
- estimate
- Ksh 200,000
Shikhunyu
- location
-
Sinoko
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 46,000
- estimate
- Ksh 200,000
Malova
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 45,000
- estimate
- Ksh 200,000
Munyuki
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Forestall
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Mugunga
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Maganda
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Lumakanda
- location
-
Lumakanda
(in Lugari)
- year first funded
- 2006
- action
- Supply
- output
- Library Use
- implementation status
- Delivered And Received
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
St. Francis Primary School
- location
-
Kongoni
(in Lugari)
- year first funded
- 2008
- action
- Deposit
- output
- Power Connected
- implementation status
- To be funded from secnd instalment
- total cost
- Ksh 35,000
- estimate
- Ksh 70,000
Nyortis Well
- location
-
Nzoia
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 30,000
- estimate
- Ksh 200,000
Janet Mwilu
- location
-
Likuyani
(in Lugari)
- year first funded
- 2005
- action
- Protection
- output
- Clean Water
- implementation status
- Completed And In Use
- total cost
- Ksh 27,000
- estimate
- Ksh 200,000
Mukunga
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 185
- estimate
- Ksh 300,000
Wekhomba
- location
-
Kongoni
(in Lugari)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dip
- implementation status
- Completed & Operational
- total cost
- Ksh 105
- estimate
- Ksh 300,000
Kongoni Dispensary
- location
-
Kongoni
(in Lugari)
- action
- Instal Of Septic Tank
- output
- Sanitation Improved
- implementation status
- Completed
- total cost
- Ksh 0
- estimate
- Ksh 100,000