The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
costituency office
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2008
- action
- construction of constituency office
- output
- improve efficiency
- implementation status
- not yet
- total cost
- Ksh 25,000,000
- estimate
- Ksh 0
Navakholo Sub-District hospital
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- construct-theatre
- output
- service nearer patients
- implementation status
- roofed
- total cost
- Ksh 9,500,000
- estimate
- Ksh 32,000,000
Chebuyusi Secondary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Storey Tution Blocs
- output
- To Improve Performance
- implementation status
- Foundation Level
- total cost
- Ksh 3,100,000
- estimate
- Ksh 4,400,000
Lwesero Dispensary
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- buy-furniture/land
- output
- to be upgraded to District
- implementation status
- complete & inuse
- total cost
- Ksh 2,950,000
- estimate
- Ksh 3,500,000
Elite area Borehole/pip
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2006
- action
- Drilling/constr
- output
- safe water
- implementation status
- drilled,need pump & tank
- total cost
- Ksh 2,800,000
- estimate
- Ksh 3,000,000
Hirumbi Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construction of 3 Storey Classrooms
- output
- To Improve Performance
- implementation status
- Ground Floor Complete
- total cost
- Ksh 2,760,000
- estimate
- Ksh 760,000
Ingotse Secondary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2007
- action
- Cons-Storey Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Slab Level & Columns
- total cost
- Ksh 2,500,000
- estimate
- Ksh 6,000,000
Shirere-M Purpose Road
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2009
- action
- dozz-3km,road,culvert
- output
- provide through road
- implementation status
- not yet
- total cost
- Ksh 2,500,000
- estimate
- Ksh 5,000,000
Amalemba bore hole
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2008
- action
- Drill Borehole
- output
- get enough,clean water
- implementation status
- not yet
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,000,000
Natunyi H Centre
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- construct-Disp
- output
- service nearer patients
- implementation status
- need painting,bay benches,furniture
- total cost
- Ksh 2,405,000
- estimate
- Ksh 1,700,000
Maraba Primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Construction 3*3 Storeycrm
- output
- To Improve Performance
- implementation status
- Gr Floor Complete,In Use
- total cost
- Ksh 2,200,000
- estimate
- Ksh 4,000,000
Namirama Girls Secondary
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2005
- action
- Construction of 20 Toilets,Comp Lab
- output
- Introd Comp Studies
- implementation status
- 16Done/Slab Level
- total cost
- Ksh 2,150,000
- estimate
- Ksh 2,000,000
Amalemba Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construction/Renovation of 9 Classrooms
- output
- To Improve Performance
- implementation status
- 4Comp/5Need Plaster,Grills
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,300,000
Matasi River Bridge
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- Construction of culverts
- output
- to ease crossing
- implementation status
- re-allocated to malubarasa & Alkarim 12/02/09 CDF BOARD/VOL II /48
- total cost
- Ksh 2,000,000
- estimate
- Ksh 4,000,000
Navakholo Water P
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2003
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- Complete
- total cost
- Ksh 1,980,000
- estimate
- Ksh 1,920,000
Bishop Sulumeti Girls
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construction of Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Complete Inuse
- total cost
- Ksh 1,950,000
- estimate
- Ksh 850,000
Lwesero Cluster
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- Power instal.
- output
- impr disp services
- implementation status
- not yet money with kplc
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,645,000
Rosterman Cluster
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Power instal.
- output
- foster security
- implementation status
- not yet money with kplc
- total cost
- Ksh 1,800,000
- estimate
- Ksh 6,721,000
Hirumbi Cluster
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Power instal.
- output
- foster security
- implementation status
- not yet money with kplc
- total cost
- Ksh 1,700,000
- estimate
- Ksh 18,290,000
Matende Secondary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construction Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Complete& Inuse
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,000,000
Nabongo Primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,500,000
Chief Mutsembi cluster
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Power instal.
- output
- impr perfomance
- implementation status
- complete inuse
- total cost
- Ksh 1,584,672
- estimate
- Ksh 1,436,000
Township Secondary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2005
- action
- Construction of 3 Classrooms,Twin Sci Lab
- output
- To Improve Performance
- implementation status
- C/Rms Complete & Inuse
- total cost
- Ksh 1,550,000
- estimate
- Ksh 7,000,000
Ebwambwa Primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Construction/Renov7 Classrooms
- output
- To Improve Performance
- implementation status
- Complete/Renov6C/Rmsdone
- total cost
- Ksh 1,550,000
- estimate
- Ksh 200,000
Kakamega Primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2005
- action
- Construction Mental H Unit
- output
- Assist Mentaly Challenged
- implementation status
- Complete & Inuse,Storey Class At Foundation
- total cost
- Ksh 1,510,000
- estimate
- Ksh 900,000
Navakholo Comunity
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2005
- action
- construction
- output
- to improve reading
- implementation status
- need ceiling,blandering
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,500,000
Maraba-Shikhambi drift
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2008
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- need gabions
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,600,000
Nyayo Tea Zone Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construct-6 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,500,000
Obulamu Water Proj
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2003
- action
- Pipes Extensi
- output
- safe water
- implementation status
- need extension
- total cost
- Ksh 1,449,940
- estimate
- Ksh 1,250,000
Sirigoi Secondary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2005
- action
- Construct-Twin Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Roofed,Need, Plaster,Plumbing,Benches
- total cost
- Ksh 1,400,000
- estimate
- Ksh 9,000,000
Chief's Office Lurambi
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- construct-offices AP houses
- output
- to Improve security
- implementation status
- phase I ,need outside plastering
- total cost
- Ksh 1,400,000
- estimate
- Ksh 4,000,000
Chief's Office Bukhungu
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2006
- action
- construct-offices AP houses
- output
- to Impove efficiency/security
- implementation status
- complete in use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,800,000
Chebuyusi H School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2003
- action
- Power instal.
- output
- introd comp studies
- implementation status
- complete inuse
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Bukhulunya Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- ConstructionAdm Bloc,Classroom
- output
- Improve Efficiency
- implementation status
- Roofed/ C/Room Comp
- total cost
- Ksh 1,320,000
- estimate
- Ksh 450,000
Shisasari Bridge
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2007
- action
- Construction of culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 1,300,000
- estimate
- Ksh 700,000
Rar-Koromatangi-Bridge
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Kilimo Secondary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2005
- action
- Construction Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Need Painting
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,500,000
Eshinoyi Secondary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-Dh,
- output
- Improve Students Health
- implementation status
- Kitchen Part Rooffed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,600,000
Kisembe Dispensary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2006
- action
- construct-Disp
- output
- service nearer patients
- implementation status
- roofed,need plaster,grills,painting
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,000,000
St Caroli Lwanga
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construction of Sci-Labor
- output
- To Improve Sci Performance
- implementation status
- Complete In Use
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,500,000
Shivakala Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construction of 2 Classrooms,Adm Bloc
- output
- To Improve Performance
- implementation status
- Complete And Inuse
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,200,000
Naluchira Bridge
- location
-
Butsotso N
(in Lurambi)
- year first funded
- 2006
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 1,224,000
- estimate
- Ksh 1,600,000
Kakamega H School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Drilling b hole/Instal
- output
- get enough safe water
- implementation status
- Complete-Tank under construction
- total cost
- Ksh 1,200,500
- estimate
- Ksh 1,500,000
Kakamega Muslim Primary
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Construction of 3 Classrooms, Renovation
- output
- To Improve Performance
- implementation status
- Complete& Inuse ,
- total cost
- Ksh 1,200,000
- estimate
- Ksh 900,000
Esumeyia Secondary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2003
- action
- Construct-Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 1,190,000
- estimate
- Ksh 1,300,000
Ematiha Secondary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Wing Complete & Inuse
- total cost
- Ksh 1,182,893
- estimate
- Ksh 1,600,000
Rosterman Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- ConstructionAdm Bloc,2 Crm
- output
- Efficiency,Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,000,000
Shikoye Cluster
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Power instal.
- output
- foster security
- implementation status
- not yet money with kplc
- total cost
- Ksh 1,141,800
- estimate
- Ksh 7,161,000
Shikomari Secondary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2005
- action
- Construct-Adm Bloc
- output
- Improved Eficiency
- implementation status
- Complete & Inuse
- total cost
- Ksh 1,100,000
- estimate
- Ksh 900,000
Eshihongo Police Post
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2006
- action
- construct-p post
- output
- to foster security
- implementation status
- need ceiling& painting,electricity
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,000,000
Sivilie Dispensary
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2006
- action
- ConstructionMaternity ward
- output
- prov maternity servic
- implementation status
- roofed,need plaster,flooring,paints
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,800,000
Matioli Dispensary
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- construct-Disp
- output
- improv public health
- implementation status
- complete & inuse
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,300,000
Chief Mutsembi Primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2003
- action
- Construct-6 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & Inuse
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,000,000
St Lawrence Ichina P
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construction of 6 Classes / Buy land
- output
- To Improve Performance
- implementation status
- Land Bought,C/Rms Need Plaster
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,400,000
Kharanda Dispensary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2006
- action
- construct-male wards
- output
- inpatient department
- implementation status
- roofed
- total cost
- Ksh 1,075,833
- estimate
- Ksh 700,000
Lurambi Primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Construction of Adm Bloc,Classroom
- output
- To Improve Performance
- implementation status
- Adm Complete-C/Room Need Plaster
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,100,000
Daisy Special School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2005
- action
- Construct-Kitchen
- output
- Improved Health
- implementation status
- Complete In Use
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,200,000
Lwakhupa Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-5 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & Inuse
- total cost
- Ksh 1,014,000
- estimate
- Ksh 600,000
Eshiandukusi Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-6 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse, 2 At Lintal
- total cost
- Ksh 1,004,000
- estimate
- Ksh 1,800,000
Kefingo Cluster
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2005
- action
- Power instal.
- output
- to improve security
- implementation status
- complete with power
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,987,000
Emusonga AP camp
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2009
- action
- Aps House,buy land
- output
- improve security
- implementation status
- not yet
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Kharanda -Kochwa crossing
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2008
- action
- construct-culvert
- output
- to ease movement
- implementation status
- complete & passable
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Sidikho Secondary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2007
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster
- total cost
- Ksh 1,000,000
- estimate
- Ksh 300,000
Chief's Office
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2007
- action
- construct-offices
- output
- to Impove efficiency
- implementation status
- needpainting.
- total cost
- Ksh 973,502
- estimate
- Ksh 203,000
Makhima Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 954,000
- estimate
- Ksh 600,000
Bishop Sulumeti Girls
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Storey Tution Blocs
- output
- Computer,Ibrary
- implementation status
- Not Yet
- total cost
- Ksh 950,000
- estimate
- Ksh 6,000,000
Lwesero Dispensary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Drilling b hole/Const
- output
- get enough safe water
- implementation status
- complete & inuse
- total cost
- Ksh 950,000
- estimate
- Ksh 600,000
Maraba Cluster
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Power instal.
- output
- to improve security
- implementation status
- complete with power
- total cost
- Ksh 941,800
- estimate
- Ksh 6,430,000
Lwatigu / Munyanya-Bri.
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Sivilie Secondary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2005
- action
- ConstructionSci Lab
- output
- To Improve Sci Performance
- implementation status
- Roofed Need Painting,Plaster
- total cost
- Ksh 900,000
- estimate
- Ksh 2,000,000
Navakholo Secondary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2005
- action
- Construct-Comp Lab
- output
- Introd Comp Studies
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Bondeni Primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete,1Need Painting
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Shisasari Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms,Toilet
- output
- Performance, Health
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 860,000
- estimate
- Ksh 360,000
Kisembe Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- 3Need Plaster,Verandar
- total cost
- Ksh 854,000
- estimate
- Ksh 600,000
Mahiakalo Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2005
- action
- Construction of Admin Bloc
- output
- Improv Efficiency
- implementation status
- Need Ceiling ,Seats,Paints
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
Chief's Office
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- Construction Of Chief'S Offices
- output
- to Impove efficiency
- implementation status
- need power
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Budonga Secondary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2005
- action
- Construction of Toilet,4 Crms
- output
- Improve Performance
- implementation status
- Need Plaster & Inuse
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
Simakina Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 3Complete,All In Use
- total cost
- Ksh 794,000
- estimate
- Ksh 2,400,000
Siyombe Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster,1Complete
- total cost
- Ksh 794,000
- estimate
- Ksh 900,000
Mukangu Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster,1Complete
- total cost
- Ksh 794,000
- estimate
- Ksh 600,000
St Joseph's Matoyi Priamry
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2005
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plastering, Painting
- total cost
- Ksh 780,000
- estimate
- Ksh 600,000
Chebuyusi Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- 1Complete, 2-80%
- total cost
- Ksh 754,000
- estimate
- Ksh 600,000
Navakholo Police Post
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- construct-p post
- output
- foster security
- implementation status
- foundation-dugged
- total cost
- Ksh 747,883
- estimate
- Ksh 6,700,000
Kakamega primary School
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- re-roof 3 Classrooms
- output
- to bring normal learning
- implementation status
- complete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,300,000
Sisokhe Secondary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2005
- action
- Construction of Sci-Labor
- output
- To Improve Sci Performance
- implementation status
- Roofed
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Matioli Water Supply
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2005
- action
- Drill Borehole
- output
- get enough,clean water
- implementation status
- complete & inuse
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
Musikhongo Culverts
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2009
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kakamega Muslim primary
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2008
- action
- recostruct 7 Classes
- output
- to bring normal learning
- implementation status
- 7complete
- total cost
- Ksh 700,000
- estimate
- Ksh 3,000,000
Sihanikha Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms,Ren
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse,Compl
- total cost
- Ksh 694,000
- estimate
- Ksh 600,000
Mungakha Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete Inuse
- total cost
- Ksh 694,000
- estimate
- Ksh 900,000
Lutaso Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- 4Complete & Inuse
- total cost
- Ksh 684,000
- estimate
- Ksh 600,000
Ingotse Cattle Dip
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2005
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- complete not operational
- total cost
- Ksh 670,000
- estimate
- Ksh 729,960
Musaa Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms,Toilet
- output
- Improv Performanc
- implementation status
- Complete & In Use
- total cost
- Ksh 660,000
- estimate
- Ksh 990,000
Chekata Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Plastered
- total cost
- Ksh 654,000
- estimate
- Ksh 600,000
Buhayi Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster But Rinuse
- total cost
- Ksh 654,000
- estimate
- Ksh 900,000
Mukama Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 5Built Need Shutters Plaster
- total cost
- Ksh 654,000
- estimate
- Ksh 494,000
Ebushibo Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 654,000
- estimate
- Ksh 1,000,000
Emulama Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster
- total cost
- Ksh 654,000
- estimate
- Ksh 400,000
Kharanda Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete Inuse
- total cost
- Ksh 644,000
- estimate
- Ksh 494,000
Emulundu Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- Performance,Efficiency
- implementation status
- 1Complete & Inuse
- total cost
- Ksh 644,000
- estimate
- Ksh 700,000
Ebutenje primary
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- to improve performance
- implementation status
- roofed need painting,plaster
- total cost
- Ksh 644,000
- estimate
- Ksh 1,000,000
Esumeya Primary School School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2005
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete,1Need Plaster
- total cost
- Ksh 640,000
- estimate
- Ksh 807,000
Naluchira Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- 3Complete,
- total cost
- Ksh 614,000
- estimate
- Ksh 618,800
Eshiyenga Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-6 Classrooms
- output
- To Improve Performance
- implementation status
- 3Complete
- total cost
- Ksh 614,000
- estimate
- Ksh 1,000,000
Eshingoto Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-4 Classrooms
- output
- To Improve Performance
- implementation status
- Complete
- total cost
- Ksh 614,000
- estimate
- Ksh 820,560
Lusumu Disp
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2006
- action
- construct-Disp
- output
- service nearer patients
- implementation status
- need; fencing,plaster complete ceiling
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Mwiyala Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2005
- action
- Construct-Adm Bloc
- output
- Improv Efficiency
- implementation status
- Complete ,Inuse
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Shitao Primary School Ec
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2007
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 950,000
Sicharai Cluster
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- Power instal.
- output
- to improve security
- implementation status
- complete
- total cost
- Ksh 600,000
- estimate
- Ksh 3,500,000
Chebuyusi clinic
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2008
- action
- construct-Disp
- output
- service nearer patients
- implementation status
- complete not operational
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Esokhone Secondary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2008
- action
- Construction of Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Window Level
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Ematsayi-Emetende Brid
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2006
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- re-allocated to Eshiandukusi-eshirumba
- total cost
- Ksh 600,000
- estimate
- Ksh 100,000
Eshiandukusi River crossing
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2007
- action
- put Culvert
- output
- to ease crossing
- implementation status
- re-allocated to Mumbatsiani
- total cost
- Ksh 600,000
- estimate
- Ksh 1,400,000
Sisokhe Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete Inuse
- total cost
- Ksh 594,000
- estimate
- Ksh 494,000
Musabale Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & Inuse
- total cost
- Ksh 594,000
- estimate
- Ksh 600,000
Namirama Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster
- total cost
- Ksh 594,000
- estimate
- Ksh 600,000
Naulu Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 594,000
- estimate
- Ksh 600,000
Simuli Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & Inuse
- total cost
- Ksh 564,000
- estimate
- Ksh 600,000
Emulakha Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & Use
- total cost
- Ksh 564,000
- estimate
- Ksh 1,200,000
Ebushiri Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & Inuse
- total cost
- Ksh 564,000
- estimate
- Ksh 329,000
Kakamega township Primary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2005
- action
- Renovate-Classrooms,Toilet
- output
- To Improve Performance
- implementation status
- Complete & Inuse
- total cost
- Ksh 560,000
- estimate
- Ksh 60,000
Eshikhoni Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 554,000
- estimate
- Ksh 864,380
Buhayi Muslim Secondary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2007
- action
- Construct-2 Classrooms
- output
- Get New Day Sch
- implementation status
- 1 Complete, One Stalled
- total cost
- Ksh 550,000
- estimate
- Ksh 1,200,000
Eshiandukusi-Eshirumba
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2006
- action
- culverts crossing
- output
- ease crossing
- implementation status
- re-allocated to Mumbatsiani
- total cost
- Ksh 550,000
- estimate
- Ksh 1,400,000
Shieywe Secondary Sc
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2003
- action
- Extension Comp Lab
- output
- Introd Comp Studies
- implementation status
- Complete, Unused
- total cost
- Ksh 530,000
- estimate
- Ksh 500,000
Eshisango Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms,Admin
- output
- To Improve Performance
- implementation status
- C/Rooms & In Use,Admim At Lintal Level
- total cost
- Ksh 514,000
- estimate
- Ksh 750,000
Mwiyala secondary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2009
- action
- lockers,seats,tables
- output
- improv confortant
- implementation status
- done 100,teachers tables & seats
- total cost
- Ksh 500,000
- estimate
- Ksh 0
kakamega H School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- rugby sports
- output
- travel to Dubai
- implementation status
- done
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Esokhone primary
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2006
- action
- Re -roof-4 Classrooms
- output
- good learning environ
- implementation status
- complete & inuse
- total cost
- Ksh 500,000
- estimate
- Ksh 935,903
Shitao Cattle Dip
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- need tank,acaricide
- total cost
- Ksh 500,000
- estimate
- Ksh 410,860
Road To Shitao primary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2007
- action
- opening 5km road
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 500,000
- estimate
- Ksh 880,000
Musaa Cluster
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2007
- action
- Electricity Inst
- output
- foster security
- implementation status
- not yet money with kplc
- total cost
- Ksh 500,000
- estimate
- Ksh 2,047,000
lurambi/Shikangania
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2008
- action
- Power instal.
- output
- to improve security
- implementation status
- not yet money with kplc
- total cost
- Ksh 500,000
- estimate
- Ksh 5,000,000
Esumba EshibeyeClinic
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2007
- action
- complete Constr
- output
- service nearer patients
- implementation status
- need painting,plaster,blandering,ceiling
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Sidhiko Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Buchangu Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Contruction of 2 Classrooms, Admin Block
- output
- To Improve Performance,Eefficincy
- implementation status
- 1Complete & Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Nambacha Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Emuhuni Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Navakholo Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Musaga Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Sikubale Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need W.Panes
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Sivilie Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete In Use
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Siyenga Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 1Complete
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Weremba Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster But Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Budonga Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Bukhubalo Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster But Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 600,000
Burangasi Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Kamuli Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- No Windowpanes
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Kochwa Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 1Complete All Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Lusumu Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plastering
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Namundera Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- 2Complete & Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Nang'Anda Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- No Windowpanes
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Nderema Primary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete Inuse
- total cost
- Ksh 494,000
- estimate
- Ksh 494,000
Shitao Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- Construct-Library
- output
- Improve Studies
- implementation status
- Complete & Inuse
- total cost
- Ksh 490,000
- estimate
- Ksh 750,000
Sirigoi Primary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster
- total cost
- Ksh 464,000
- estimate
- Ksh 600,000
Eshibeye Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2005
- action
- Ren,Construction of 1 C/R
- output
- To Improve Performance
- implementation status
- 1 C/Rms Need Plaster
- total cost
- Ksh 460,000
- estimate
- Ksh 580,000
Mwiyenga Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-3 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 454,000
- estimate
- Ksh 600,000
Kakamega Muslim Sec
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- Construction of Sci Lab
- output
- To Improve Sci Performance
- implementation status
- Roofeed Need Plaster,Shutters
- total cost
- Ksh 450,000
- estimate
- Ksh 1,200,000
Malubarasa Culvert cr
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 447,000
- estimate
- Ksh 1,000,000
Simuli primary
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2004
- action
- Re -roof-4 Classrooms
- output
- good learning environ
- implementation status
- done
- total cost
- Ksh 444,000
- estimate
- Ksh 1,000,000
Matioli Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms,Office
- output
- Performance, Efficiency
- implementation status
- Complete & In Use
- total cost
- Ksh 444,000
- estimate
- Ksh 500,000
Namirama Dispensary
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2005
- action
- construct-Disp,toilet
- output
- service nearer patients
- implementation status
- Power,final painting
- total cost
- Ksh 410,000
- estimate
- Ksh 350,000
Nabongo Dispensary
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- buy-furniture
- output
- improved services
- implementation status
- furniture bought
- total cost
- Ksh 406,720
- estimate
- Ksh 500,000
Ekapwonje Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & Inuse
- total cost
- Ksh 404,000
- estimate
- Ksh 500,000
Alkarim Culvert Cross
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- Construction of foot bridge
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
shirere Cattle Dip
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- re-allo to shirere's chiefs office 4/12/08 CDF BOARD LURAMBI VOLII(43)
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Namundera Secondary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2005
- action
- Construction of Sci-Labor
- output
- To Improve Performance
- implementation status
- Stalled At Foundation
- total cost
- Ksh 400,000
- estimate
- Ksh 6,000,000
Esumeya Secondary School
- location
-
Butsotso N
(in Lurambi)
- year first funded
- 2006
- action
- generator
- output
- to improve performance
- implementation status
- Bought
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nabongo cluster
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- Power instal.
- output
- to improve security
- implementation status
- not yet money with kplc
- total cost
- Ksh 400,000
- estimate
- Ksh 5,200,000
Busangavia H Centre
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- construct-Disp
- output
- service nearer patients
- implementation status
- need painting,another toilet
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Eshirembe H. Centre
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2009
- action
- Drill Borehole
- output
- get enough,clean water
- implementation status
- in progress
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Lutaso- Sivilie
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- re-allocated to -musaga-chekata Uyaya "
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Eshinoyi Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plastering
- total cost
- Ksh 354,000
- estimate
- Ksh 527,000
Ebutenje Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 354,000
- estimate
- Ksh 862,290
Ebumamu Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Need Plaster
- total cost
- Ksh 354,000
- estimate
- Ksh 562,600
Matoyi H Centre
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- furniture,ceiling
- output
- inmprove-services
- implementation status
- low qualityseats,need verandar
- total cost
- Ksh 350,000
- estimate
- Ksh 250,000
Kakamega School Deaf
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- To Improve Performance
- implementation status
- Gr Floor Need Plastering, Painting
- total cost
- Ksh 350,000
- estimate
- Ksh 7,900,000
Ekapwonje primary
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2008
- action
- Eletricity Inst
- output
- impr perfomance
- implementation status
- complete & working
- total cost
- Ksh 350,000
- estimate
- Ksh 354,000
Bushiri Health centre
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2008
- action
- dril borehole
- output
- get enough,clean water
- implementation status
- in progress
- total cost
- Ksh 340,000
- estimate
- Ksh 400,000
Sirigoi Mix Secondary
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2005
- action
- wiring4 Classrooms
- output
- impr perfomance
- implementation status
- complete
- total cost
- Ksh 327,000
- estimate
- Ksh 270,000
Eburenga Primary School
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2005
- action
- ConstructionAdm Bloc,Classroom
- output
- To Improve Performance
- implementation status
- Both Need Plastering, Painting & Inuse
- total cost
- Ksh 320,000
- estimate
- Ksh 1,000,000
Ewamukhumbi Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 304,000
- estimate
- Ksh 1,786,240
Muregu Aps Camp
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2008
- action
- construct-4 Apsrooms
- output
- to improve security
- implementation status
- phase I complete &inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
shivakhala primary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2009
- action
- toilets
- output
- improv sanitation
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Navakholo Nursery
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- good learning environ
- implementation status
- complete & inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mwikolo Road
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2009
- action
- improve drainage
- output
- to ease crossing
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Musaga -Chekata- Uyaya
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- Complete & inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 911,000
Vibanda piping water
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2006
- action
- Pipes laying
- output
- Water for use
- implementation status
- Complete & inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Eshibeye Secondary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Drill Borehole
- output
- get enough,clean water
- implementation status
- complete & inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Sidhikho Secondary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2003
- action
- wiring lab,c/m
- output
- impr perfomance
- implementation status
- complete & inuse
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Shikhambi Cluster
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2007
- action
- Power instal.
- output
- to improve security
- implementation status
- not yet money with kplc
- total cost
- Ksh 300,000
- estimate
- Ksh 4,576,000
Matende primary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2007
- action
- wiring,power
- output
- to improve performance
- implementation status
- 7c/rooms complete withpower
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Kilimo Secondary School
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2004
- action
- Wiring Tution bloc
- output
- to improve performance
- implementation status
- working
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Navakholo Nursery
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- Construct-1 Classroom
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kak Police Nursery
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2006
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Ingotse Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-1 Classroom
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 274,000
- estimate
- Ksh 300,000
Shikomari Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2005
- action
- Construct-Adm Bloc
- output
- Improved Fficiency
- implementation status
- Complete & In Use
- total cost
- Ksh 260,000
- estimate
- Ksh 544,000
Eshilakwe Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-2 Classrooms
- output
- To Improve Performance
- implementation status
- 1Complete & In Use
- total cost
- Ksh 254,000
- estimate
- Ksh 567,120
Rosterman Cattle Dip
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- poorwork-unused
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mahiakalo Cattle Dip
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- complete & operational
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Buchangu Secondary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- Buy-Land
- output
- Start A Sec Sch
- implementation status
- Bought
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Eshirembe H. Centre
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2005
- action
- Construction of health centre
- output
- service nearer patients
- implementation status
- complete inused
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Ebilatsi-Bukura River crossing
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2007
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Amalemba primary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2004
- action
- roofing-1 Classroom
- output
- prevent Damage
- implementation status
- roofed need painting,plaster
- total cost
- Ksh 250,000
- estimate
- Ksh 50,000
Eburenga primary
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2007
- action
- Construct-1 Classroom
- output
- to improve performance
- implementation status
- roofed need painting,plaster
- total cost
- Ksh 250,000
- estimate
- Ksh 575,000
Ingotse primary
- location
-
Butsotso N
(in Lurambi)
- year first funded
- 2004
- action
- wiring
- output
- impr perfomance
- implementation status
- done 3classes
- total cost
- Ksh 244,000
- estimate
- Ksh 310,660
Rosterman Rehabilitation Centre
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2005
- action
- Instaling pipes
- output
- get enough safe water
- implementation status
- Complete & broken
- total cost
- Ksh 210,000
- estimate
- Ksh 210,000
Ematiha Primary School
- location
-
NButsotso
(in Lurambi)
- year first funded
- 2005
- action
- Construct-6 Classrooms
- output
- To Improve Performance
- implementation status
- 1 Complete &In Use
- total cost
- Ksh 210,000
- estimate
- Ksh 1,666,104
Sivilie Secondary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2006
- action
- wiring tution bloc
- output
- impr perfomance
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Shinoyi Sec
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Drill Borehole
- output
- get enough,clean water
- implementation status
- complete & inuse
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
St caroli Lwanga Lutaso sec
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2006
- action
- wiring lab,Classrooms
- output
- impr perfomance
- implementation status
- wiring complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mungakha Secondary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2006
- action
- Contruct 4 Classes
- output
- To Improve Performance
- implementation status
- Need Moreclase
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Buchangu Disp
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- construct-Disp
- output
- service nearer patients
- implementation status
- not yet
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
chief's office
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2009
- action
- wiring chief office
- output
- improve efficiency
- implementation status
- inprogress
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Lutaso ECD
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2007
- action
- renovate-2 Classrooms
- output
- provide safety
- implementation status
- plaster,shutters done
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Mumbatsiani River Cros
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2007
- action
- put Culvert
- output
- to ease crossing
- implementation status
- being worked on
- total cost
- Ksh 200,000
- estimate
- Ksh 850,000
Eshihulu River Culvet
- location
-
Butsotso N
(in Lurambi)
- year first funded
- 2007
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- re-allocated to Naluchira
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Musaga- Natunyi Health center
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- re-allocated to -musaga-chekata- Uyaya
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Municipality Springs
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2004
- action
- spring protection
- output
- Water for use
- implementation status
- re-allocated to emusanda H Centre But unused -17/7/08 CDF/BOARD/LURAMMBI (28)
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Sisokhe Dispensary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2006
- action
- renovate-floor
- output
- efficient services
- implementation status
- complete inuse
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Mukombe Bridge
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2006
- action
- Re- instate gar rails
- output
- provide protection
- implementation status
- need reinforcement
- total cost
- Ksh 197,780
- estimate
- Ksh 200,000
Esokhone Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Construct-1 Classroom
- output
- To Improve Performance
- implementation status
- Complete & In Use
- total cost
- Ksh 194,000
- estimate
- Ksh 370,000
St Kizito Secondary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2007
- action
- Benches-sci lab
- output
- to improve sci performance
- implementation status
- complete & inuse
- total cost
- Ksh 170,000
- estimate
- Ksh 200,000
Kilimo Primary School
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2005
- action
- Renovate-Admin Bloc
- output
- Improv Efficiency
- implementation status
- Complete & Inuse
- total cost
- Ksh 160,000
- estimate
- Ksh 200,000
Eshiyenga primary
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2004
- action
- Drill Borehole
- output
- get enough,clean water
- implementation status
- did c/rm
- total cost
- Ksh 144,000
- estimate
- Ksh 100,000
Muregu Cattle Dip
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- need plastering, painting,tank,acaricide
- total cost
- Ksh 130,833
- estimate
- Ksh 200,000
Mauna-Lwakhupa-Simuli
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- re-allocated toMukangu-Malulu area
- total cost
- Ksh 105,834
- estimate
- Ksh 3,442,000
Sihanikha-Lusiaka-Busangavia
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- re-allocated to upukhulu
- total cost
- Ksh 100,000
- estimate
- Ksh 3,600,000
Matende Primary School
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2008
- action
- 60Desks,Tables
- output
- Reduce Congestion
- implementation status
- Made
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Lutaso Primary School
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2008
- action
- Renovate-2 Classrooms
- output
- To Improve Performance
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Chief's Office
- location
-
Butsotso N
(in Lurambi)
- year first funded
- 2007
- action
- Eletricity Inst
- output
- impr efficiency
- implementation status
- complete & inuse
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Emukaya A Chief Office
- location
-
Butsotso S
(in Lurambi)
- year first funded
- 2008
- action
- Eletricity Inst
- output
- impr efficiency
- implementation status
- complete with power
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kak Township primary
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2007
- action
- wiring
- output
- to improve performance
- implementation status
- Wiring & working
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Emusanda Disp
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2007
- action
- renovate-disp
- output
- efficient services
- implementation status
- complete & inuse
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Bukura Health Centre
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2007
- action
- Construct-incinerator
- output
- proper disposal
- implementation status
- complete in use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ebiratsi comm water sp
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2008
- action
- spring protection
- output
- get enough,clean water
- implementation status
- complete & inuse
- total cost
- Ksh 100,000
- estimate
- Ksh 50,000
Kasunire Culverts
- location
-
Butsotso N
(in Lurambi)
- year first funded
- 2008
- action
- construct-culverts
- output
- to ease crossing
- implementation status
- complete & passable
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Shikhambi-Butenje
- location
-
Shieywe
(in Lurambi)
- year first funded
- 2009
- action
- n/a
- output
- to eaze movement
- implementation status
- dozzing complete
- total cost
- Ksh 100,000
- estimate
- Ksh 3,500,000
Chief's Office
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2007
- action
- renovate
- output
- to Impove efficiency
- implementation status
- need plastering, painting plaster
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Namirama Girls secondary
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2006
- action
- built toilets
- output
- improve health
- implementation status
- 16done inuse
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Budonga dispensary
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2007
- action
- Construction of 2door Toilets
- output
- improv health
- implementation status
- complete inuse
- total cost
- Ksh 100,000
- estimate
- Ksh 160,000
Ddo's office
- location
-
Bukhungu
(in Lurambi)
- year first funded
- 2008
- action
- re-roof
- output
- improv offic efficiency
- implementation status
- a section done
- total cost
- Ksh 100,000
- estimate
- Ksh 3,000,000
Matioli Cattle Dip
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2007
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- complete & operational
- total cost
- Ksh 80,000
- estimate
- Ksh 206,935
Emukoyani Cattle Dip
- location
-
S Butsotso
(in Lurambi)
- year first funded
- 2007
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- disbute-unused
- total cost
- Ksh 70,000
- estimate
- Ksh 250,000
Sisokhe Secondary School
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- need plastering, painting
- total cost
- Ksh 60,000
- estimate
- Ksh 460,000
Navakholo -Upukhulu
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- In progress
- total cost
- Ksh 50,000
- estimate
- Ksh 250,000
Emuhuni- Buchangu Health Centre
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- re-allocated to upukhulu
- total cost
- Ksh 50,000
- estimate
- Ksh 2,050,000
Mukangu- Malulu Area
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2007
- action
- laying pipes
- output
- safe waterfor use
- implementation status
- Complete & inuse
- total cost
- Ksh 50,000
- estimate
- Ksh 1,200,000
Ematiha Secondary School
- location
-
Butsotso N
(in Lurambi)
- year first funded
- 2006
- action
- Wiring Tution bloc
- output
- to improve performance
- implementation status
- working
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Ebushibo Primary
- location
-
N Butsotso
(in Lurambi)
- year first funded
- 2009
- action
- construt toilets
- output
- improve hygine
- implementation status
- done
- total cost
- Ksh 40,000
- estimate
- Ksh 0
chebuyusi Muslim primary
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2009
- action
- 50desks
- output
- good learning environ
- implementation status
- done
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Matoi Cattle Dip
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 100,000
Kharanda Cattle Dip
- location
-
Bunyala W
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- need plastering, painting
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Segetetie Cattle Dip
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- not yet
- total cost
- Ksh 30,000
- estimate
- Ksh 450,000
Namirama Cattle Dip
- location
-
Bunyala E
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- not yet
- total cost
- Ksh 30,000
- estimate
- Ksh 250,000
Navakholo Cattle Dip
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- complete
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Naulu Cattle Dip
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- renovate-catle.dip
- output
- improve live.stock farming
- implementation status
- complete
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Navakholo Secondary School
- location
-
Bunyala C
(in Lurambi)
- year first funded
- 2006
- action
- renovateKitchen
- output
- good health
- implementation status
- complete & inuse
- total cost
- Ksh 20,000
- estimate
- Ksh 50,000
Sivilie Secondary School
- location
-
Bunyala W
(in Lurambi)
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 250,000
Esumeya Secondary School
- location
-
N Butsotso
(in Lurambi)
- action
- Drill Borehole
- output
- get enough,clean water
- implementation status
- stalled rock obstruction
- total cost
- Ksh 0
- estimate
- Ksh 282,000