The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
    It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    
    
        
            
            Kathonzweni Dam Kwa Lum
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 6,900,000
 
                - estimate
 
                    - Ksh 6,700,000
 
            
         
    
        
            
            Mwanyani Dam
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 6,700,000
 
                - estimate
 
                    - Ksh 6,700,000
 
            
         
    
        
            
            Isyukoni Earth Dam
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Building Of Embankment To Create A Dam
 
                - output
 
                    - Community Has Access To   Water For Domestic Use And Irrigation.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 4,669,427
 
                - estimate
 
                    - Ksh 4,500,000
 
            
         
    
        
            
            Ndukuma Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Access To Clean Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 4,000,000
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Iangini Dam
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Scooping And Construction Of Three Gabions.
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 3,600,000
 
                - estimate
 
                    - Ksh 3,600,000
 
            
         
    
        
            
            Kamunyolo Earth Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Scooping And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 3,000,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kalamba-Makutano Line
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installation
 
                - output
 
                    - Community Have Regular Power Supply
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 2,800,000
 
                - estimate
 
                    - Ksh 2,800,000
 
            
         
    
        
            
            Metho Uvini Earth Dam
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Scooping And Building Of Dam And Associated Pumping Machinery
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,150,000
 
                - estimate
 
                    - Ksh 1,900,000
 
            
         
    
        
            
            Muungano Earth Dam
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Scooping And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,145,000
 
                - estimate
 
                    - Ksh 1,900,000
 
            
         
    
        
            
            Mutoa Dam
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,100,000
 
                - estimate
 
                    - Ksh 2,100,000
 
            
         
    
        
            
            Yekanga Kwa Musel Dam
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Putting A Perimeter Fence Around
 
                - output
 
                    - To Check Unnecessary Encroachment Into The Dam Land.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,000,000
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Ndumitava Dam
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,000,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Kikuu Roadam
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Sand Dam Across Kikuu River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 2,000,000
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Kwa Mwitu Gabion
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,650,000
 
                - estimate
 
                    - Ksh 1,650,000
 
            
         
    
        
            
            Mukame Wa Mbeu Borehole
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Generator And Piping
 
                - output
 
                    - -
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 1,581,717
 
                - estimate
 
                    - Ksh 1,581,717
 
            
         
    
        
            
            Malivani Market
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installation
 
                - output
 
                    - Community Have Regular Power Supply
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Vololo Dispensary
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of 17 Room Health Centre + Maternity Wing
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Kwa Kotoe Dispensary
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Dispensary Building
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Kwakakulu Water Project
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Installation Of A Distribution Tank And Extension Of Water Pipe.
 
                - output
 
                    - Provide Regular Water Supply And Serve More People
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,250,000
 
                - estimate
 
                    - Ksh 1,250,000
 
            
         
    
        
            
            Barazani Girls Secondary School
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Furniture Equipping Of Lab And Supply Of Electricity.
 
                - output
 
                    - To Provide Electricity And Equipped Lab To The School
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,250,000
 
                - estimate
 
                    - Ksh 550,000
 
            
         
    
        
            
            Mwambwani Primary School borehol
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Drilling Of A Bore Hole Well
 
                - output
 
                    - To Provide Clean Drinking Water
 
                - implementation status
 
                    - Project Was Not Initiated
 
                - total cost
 
                    - Ksh 1,100,000
 
                - estimate
 
                    - Ksh 1,100,000
 
            
         
    
        
            
            Manooni Water Proj
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Rehabilitation Of Existing And Extension Of Existing Water Pipe
 
                - output
 
                    - Provide Regular Water Supply And Serve More People
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,100,000
 
                - estimate
 
                    - Ksh 1,100,000
 
            
         
    
        
            
            Mukame Wa Mbeu Dam
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Genet &Piping
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,070,000
 
                - estimate
 
                    - Ksh 1,070,000
 
            
         
    
        
            
            Mandela Water Project
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Extension Of Existing Water Pipe
 
                - output
 
                    - Check Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Makueni Boys Borehol
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Drilling Of A Bore Hole.
 
                - output
 
                    - Provide Regular Water Supply To The Staff And Students.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Kalamba Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Renovation Of School Buildings, Completion Of Dorms, Gate, Beds And Kitchenware 
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Ngangasa Sand Dam
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Sand Dam
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Makasa Dam
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Scooping And Disilting Of Dam
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 3,197,790
 
            
         
    
        
            
            Ing'Aiioni Water Project
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Drilling Of A Bore Hole.
 
                - output
 
                    - Community Has Access To Clean Drinking Water
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Muambani Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 900,000
 
                - estimate
 
                    - Ksh 180,000
 
            
         
    
        
            
            Mii Secondary School
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Completion Of Dorm And Solar System
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 840,000
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Thithi Secondary School
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Classrooms Administration Block And Lab
 
                - output
 
                    - School Has Administration Block And Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 820,000
 
                - estimate
 
                    - Ksh 820,000
 
            
         
    
        
            
            Makueni Yoly
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction And Equipping Of The Workshop
 
                - output
 
                    - Institution Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Kitheni Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of Buildings Blown By Wind.
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Matutu Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Face Lifting Of School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - More funds needed
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Kwa Kotoe Dispensary
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Dispensary Building
 
                - output
 
                    - Community Has Accesses To Health Services
 
                - implementation status
 
                    - On-Going
 
                - total cost
 
                    - Ksh 750,000
 
                - estimate
 
                    - Ksh 750,000
 
            
         
    
        
            
            Gigiri Girls Secondary School
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Provision Of Power To The School
 
                - output
 
                    - School Is Connected To Power For Various Usage.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 750,000
 
                - estimate
 
                    - Ksh 750,000
 
            
         
    
        
            
            Londokwe Water Project
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Extension Of Water Pipe.
 
                - output
 
                    - Community Has Clean Drinking Water.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 721,400
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Iimba Primary School
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of 8 Classrooms And Administration Block
 
                - output
 
                    - Community Has Easy Access To Primary Education
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Mbeletu Secondary School
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Four Classrooms
 
                - output
 
                    - School Has Learning Facilities.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Kitise Sec
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Classroom And Administration Block.
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Syatu Girls
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Four Classrooms Rooms And Admin Block.
 
                - output
 
                    - Provide Access To Secondary Education To Primary School Graduates
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Munyuni Secondary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Purchases And Supply Laboratory Equipment
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Supplied
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Nthangu Secondary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of 2 Classrooms (40 X 25) And Pit Latrine
 
                - output
 
                    - Provide Access To Secondary Education To Primary School Leavers
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Matiku Secondary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Classrooms, Dormitory And Furnishing 
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Wote Open Air Marketelectric
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Wiring And Connecting The Market To The Main Power
 
                - output
 
                    - Traders Have Access To Power For Various Uses At The Market.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 625,000
 
                - estimate
 
                    - Ksh 625,000
 
            
         
    
        
            
            Muooni Rand Dam
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 620,000
 
                - estimate
 
                    - Ksh 620,000
 
            
         
    
        
            
            Makueni Girls School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Equipping Of Library Books
 
                - output
 
                    - School Has Improved Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Stohns Malivani Sec
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction of And Equipping Of Laboratory
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Kitonyoni Sec
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Laboratory Classroom And Equipping Of Laboratory
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Nduundune Secondary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Classroom Block
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Mungyani Sec
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Classrooms And Supply Of Lab Equipment
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Stlawrence Girls Secondary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Completion Of D/Hall
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Isololo Water Project
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Rehabilitation Of Existing And Extension Of Existing Water Pipe
 
                - output
 
                    - Provide Regular Water Supply And Serve More People
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Emali Primary School
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Completion Of 4 Classrooms
 
                - output
 
                    - Easy Congestion In School
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Nziu Secondary School
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Renovation Of Two Classrooms And Equipping Of Lab
 
                - output
 
                    - School Has Improved Learning Facilities.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 550,000
 
                - estimate
 
                    - Ksh 550,000
 
            
         
    
        
            
            Kathamboni Sec
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Equipping Of Science Laboratory
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 550,000
 
                - estimate
 
                    - Ksh 550,000
 
            
         
    
        
            
            Kalima Dispensary
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Dispensary Building
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 550,000
 
                - estimate
 
                    - Ksh 550,000
 
            
         
    
        
            
            Kiangini Secondary School
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Classrooms And Purchase Of Text Books And Lab Equipment
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 525,000
 
                - estimate
 
                    - Ksh 525,000
 
            
         
    
        
            
            Mbuvo Sec
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Classrooms And Purchase Of Text Books And Lab Equipment
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 515,000
 
                - estimate
 
                    - Ksh 515,000
 
            
         
    
        
            
            Kavingoni Primary School
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Eight Classrooms
 
                - output
 
                    - Community Has Easy Access To Primary Education
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mbenuu Dispensary
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Building And Connection Of Electricity.
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Kikumini Health Centre
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction And Dispensary
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Upendo Market
            
            
                - location
 
                    - 
                        Nziui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installation
 
                - output
 
                    - Community Have Regular Power Supply
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Matooni-Kithunani Road
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Transport And Communication Is Improved
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mutulani Sec
            
            
                - location
 
                    - 
                        Nziu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Purchases Installation And Supply Of Solar System And Lab Equipment
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mwaani Girls
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply Of Electricity And Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Tutini Sec
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Toilets, Bathrooms And A Kitchen.
 
                - output
 
                    - Students Have Proper Boarding Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Manooni Secondary School
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Administration Block.
 
                - output
 
                    - School Has An Administration Block. Current Building Made To Classrooms.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mbuthani Secondary School
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Completion Of Dining Hall And Kitchen
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Vulueni Secondary School
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction And Equipping Of Lab
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Kweleli Wroject
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation Of Existing And Extension Of Existing Water Pipe
 
                - output
 
                    - Community Has Access To Clean Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Ilengeni Water Proj
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Installation Of A Distribution Tank And Extension Of Water Pipe
 
                - output
 
                    - Provide Regular Water Supply And Serve More People
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Kathonzweni Dam
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Fencing (Putting A Perimeter Fence Around The Dam)
 
                - output
 
                    - To Check Unnecessary Encroachment Into The Dam Land
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Maumba Secondary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Supply Of Laboratory Equipment And Construction Of Classrooms
 
                - output
 
                    - Students Have An Equipped Laboratory And Classrooms
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kwa- Mutula-Kwa-Uthuku
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 495,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Makasa
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - n/a
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 490,900
 
                - estimate
 
                    - Ksh 490,900
 
            
         
    
        
            
            Masamukye Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Renovation Of 3 Classrooms
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 490,000
 
                - estimate
 
                    - Ksh 390,000
 
            
         
    
        
            
            Yikivumbuand Dam Kwa Mbole Gabio
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A 9M Sand Dam Across River Mbole
 
                - output
 
                    - Reduce Soil Erosion Provide Water And Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 405,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mukameni Secondary School
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Four Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Matutu Sec
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Mandoi Sec
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Classrooms, Dormitory, Lab And Electricity
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Kimuumo Secondary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Kyemundu
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Nguu Secondary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of 2 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Makasa Primary School
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Classrooms
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Kitise Dispensary
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Supply And Installation Of Generator
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Kathatu-Ng'Oi Road
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Transport And Communication Is Improved
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Mulala Ovc
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction
 
                - output
 
                    - More Ovc Get Better Parental Care.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Kathonzweni
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Electrification And Expansion Of Offices
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Yeemulwa Sec
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Installation Of A Solar And Completion Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 400,000
 
                - estimate
 
                    - Ksh 400,000
 
            
         
    
        
            
            Kwa Muinde Sand Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - To Check Unnecessary Encroachment Into The Dam Land
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 396,700
 
                - estimate
 
                    - Ksh 230,000
 
            
         
    
        
            
            Ack Josephs
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction And Equipping Of Lab
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 390,000
 
                - estimate
 
                    - Ksh 390,000
 
            
         
    
        
            
            Kyangwasi Sand Dam
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion, Sand Harvesting Clean Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 381,100
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kiatine Primary School
            
            
                - location
 
                    - 
                        Nziu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Renovation Of Buildings And Administration Block, Solar Installation.
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 370,000
 
                - estimate
 
                    - Ksh 370,000
 
            
         
    
        
            
            Mbitini Divisional Hqs
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Office Block
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 350,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Muuani Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 350,000
 
                - estimate
 
                    - Ksh 350,000
 
            
         
    
        
            
            Ndunguni Dispensary
            
            
                - location
 
                    - 
                        Kikumini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Completion Of Building
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 350,000
 
                - estimate
 
                    - Ksh 350,000
 
            
         
    
        
            
            Kithumani Co-OpSecondary School
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Revival
 
                - output
 
                    - To Provide Small Farmers With Ease Accesses To Markets
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 345,000
 
                - estimate
 
                    - Ksh 345,000
 
            
         
    
        
            
            Nguma Primary School
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Pre-School Building
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 330,000
 
                - estimate
 
                    - Ksh 330,000
 
            
         
    
        
            
            Kyumbuni Primary School
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Solar Power System And Flooring And Fitting Of Classroom
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 320,000
 
                - estimate
 
                    - Ksh 320,000
 
            
         
    
        
            
            Tumbuni Agro Forestry
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Sand Dam
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Vololo Dispensary
            
            
                - location
 
                    - 
                        
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Completion Of Dispensary Buildings
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Ngomani Sand Dam
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Check Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kwakinyili Sand Dam
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Check Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 30,000
 
            
         
    
        
            
            Kitise Borehole
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Drilling Of A Bore Hole Well
 
                - output
 
                    - -
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Sukuta Sand Dam
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Ndwaani Secondary School
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Classrooms
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            St. Joseph Sec
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Roofing Of Four Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kanyonga Secondary School
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Matheani Secondary School
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction And Equipping Of Lab
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Mweini Secondary School
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Purchase And Supply Of Laboratory Equipment
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Supplied
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Mwaani Mixed
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Classrooms A Laboratory And Electricity
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kanthuni Sec
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Completion Of Girls Dormitory
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kiliku Secondary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of 2 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kwa Kalelo Primary School
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Classroom Of Buildings
 
                - output
 
                    - Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kikumini Small Home
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Fencing Of Compound, Purchase Of 20 Wheel Chairs And Painting Of Dorms.
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Senda Small Home
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Ngoi Primary School
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of 2 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            K-Repemali
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Complete Construction Of A Village Bank
 
                - output
 
                    - Community Has Access To Affordable Financial Services.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Matutu Dispensary
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Completion Of Building
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Mumbuni Dispensary
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction And Furnishing Of Pharmacy
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Muaani Kalambweni Road
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Transport And Communication Is Improved
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kimuumo Secondary School
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Facilities
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kavuthu Primary School Sc
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Classroom
 
                - output
 
                    - School Has Improved Facilities
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Ng,Oi Primary School Sc
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - n/a
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kanyililya
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - n/a
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Mangauni Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 270,000
 
                - estimate
 
                    - Ksh 270,000
 
            
         
    
        
            
            Utini Primary School
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Renovation Of 3 Class
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 270,000
 
                - estimate
 
                    - Ksh 270,000
 
            
         
    
        
            
            Matutu Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Classrooms And Purchase Of Desks.
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 270,000
 
                - estimate
 
                    - Ksh 270,000
 
            
         
    
        
            
            Uthangathi Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Solar System, Plastering 7 And Flooring 2 Rooms, Kitchen And Fixing 4 Steel Doors 
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 270,000
 
                - estimate
 
                    - Ksh 270,000
 
            
         
    
        
            
            Ngangani Pri
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of 1 Room, Roofing Of 4 And Purchase Of 20 Desks
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 270,000
 
                - estimate
 
                    - Ksh 270,000
 
            
         
    
        
            
            Mbukani Primary School
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Renovation Of 3 Class
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 270,000
 
                - estimate
 
                    - Ksh 270,000
 
            
         
    
        
            
            Kitonyoni Dispensary
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Furniture And Medical Equipment
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Equipment Supplied
 
                - total cost
 
                    - Ksh 270,000
 
                - estimate
 
                    - Ksh 270,000
 
            
         
    
        
            
            Tutini Primary School
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Boys Latrines
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Kyumbuni Sec
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Kauma Gabion
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Check Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Kikumini Dispensary
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Rehabilitation And Extension Of The Local Dispensary.
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Yikivumbu Dispensary
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Medical Equipment
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Kilili Dispensary
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Staff A House
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Kawala Secondary School
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of School Roofs
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Ack Kiteei
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Roofing Of Classroom
 
                - output
 
                    - School Has Improved Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Kathonzweni Tannery
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Rehabilitation Of Facility
 
                - output
 
                    - Production Of Hides And Skins For Local Market.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kathonzweni Diary Farmers
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Putting A Perimeter Fence (Barbed Wire) Around The Diary.
 
                - output
 
                    - Dairy Has Improved Security System
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Malivani Water Project
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Supply Of Pipes And Accessories
 
                - output
 
                    - Provide Clean Piped Water
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 239,380
 
                - estimate
 
                    - Ksh 240,000
 
            
         
    
        
            
            Ngooto Primary School
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Installation Of A Water Tank And A Solar System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 220,000
 
                - estimate
 
                    - Ksh 220,000
 
            
         
    
        
            
            Ngosini Primary School
            
            
                - location
 
                    - 
                        Kikumini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Installation Of Solar System And Renovation Of 8 Classrooms
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 220,000
 
                - estimate
 
                    - Ksh 220,000
 
            
         
    
        
            
            Kakutha Dispensary
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Installation Of Water Tank, And Renovation Of The Building 
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 214,000
 
                - estimate
 
                    - Ksh 64,000
 
            
         
    
        
            
            Mwanyani Dispensary
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Purchase And Supply Of Medical Equipment
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Ngetha Ypoly
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Classrooms
 
                - output
 
                    - Institution Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Kyemole Yoly
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Classrooms
 
                - output
 
                    - Institution Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Nziu Youth Poly
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Workshop
 
                - output
 
                    - Institution Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mulangoni Primary School
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Constructions Of Administration Block
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Katulani Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of 3 Classroom And Installation Of Solar To 2 Classes And Adm Block
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Ngetha Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Ikangavya Pri
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Flooring Classrooms And Making Of Desks
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 20,000
 
            
         
    
        
            
            Kalaani Sec
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Equipping Of Lab And Installation Of Water Tank
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mutyambua Library
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Purchase And Supply Of Library Books
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Kilili Secondary School
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mwaani Borehole
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installation Of Pumping Machine
 
                - output
 
                    - To Provide Clean Drinking Water To Wote Town And Its Environs.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mkndislwha
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Support People Living With Hiv/Aids
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mweini Dispensary
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The Dispensary
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Muthwaani
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation And Fitting Of 8 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Katulye Dispensary
            
            
                - location
 
                    - 
                        
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - n/a
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mavindini Youth Polytechnic
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Purchase Of Tools And Equipment
 
                - output
 
                    - Polytechnic Has Learning And Training Facilities
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Uthasyo Primary School
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Facilities
 
                - implementation status
 
                    - More funds needed
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Nzeeni Primary School
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Girls Toilets
 
                - output
 
                    - School Has Improved Facilities
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Kathonzweni Cattle Dip
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mutula Cattle Dip
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Katulani Cattle Dip
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mithumoni Cattle Dip
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mavindini C/Dip
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Munathi Cattle Dip
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Yanthoko Cattle Dip
            
            
                - location
 
                    - 
                        Nziu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kanthuni Cattle Dip
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Vololo Poultry Farm
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - n/a
 
                - output
 
                    - Increased Livestock Production
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Kilisa Dispensary
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Rehabilitations
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Yekanga Dispensary
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Buildings
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kithuki Dispensary
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Staff Rooms
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Masumba Dispensary
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Medical Equipment
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Supplied
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Iiani Health Centre
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Maternity Wing
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 2,074,400
 
            
         
    
        
            
            Kiangini Dispensary
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Purchase And Supply Of Medical Equipment
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Kaathi Gnca Dispensary
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Medical Equipment And Partitioning Of Rooms
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Kamunyii Bhole
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Pump House And Supply Of Fuel.
 
                - output
 
                    - Ensure Regular Water Supply To Community
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 182,000
 
                - estimate
 
                    - Ksh 182,000
 
            
         
    
        
            
            Wee Small Home
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Dormitories And Fencing Of Compound
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 180,000
 
                - estimate
 
                    - Ksh 180,000
 
            
         
    
        
            
            Nzueni Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of Buildings - Roofing 2 Classes And Store
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 180,000
 
                - estimate
 
                    - Ksh 180,000
 
            
         
    
        
            
            Kivandini Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 180,000
 
                - estimate
 
                    - Ksh 180,000
 
            
         
    
        
            
            Kwambiti Primary School
            
            
                - location
 
                    - 
                        Kithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Plastering 5 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 180,000
 
                - estimate
 
                    - Ksh 18,000
 
            
         
    
        
            
            Muthyoi Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Solar Power System And Plastering And Flooring Classrooms
 
                - output
 
                    - Staff  Prepare Adequately,  Access Media(Radio) Pupils Attend Morning And Evening Preps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 170,000
 
                - estimate
 
                    - Ksh 170,000
 
            
         
    
        
            
            Ng'Oi Secondary School
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Classroom And Installation Of Solar System
 
                - output
 
                    - School Has Improved Learning Facilities Students Attend Evening Preps.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 170,000
 
                - estimate
 
                    - Ksh 170,000
 
            
         
    
        
            
            Mwasangombe Primary School
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Renovation Of School And Installation Of A Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps.
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 170,000
 
                - estimate
 
                    - Ksh 170,000
 
            
         
    
        
            
            Kyemundu Primary School
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System Flooring And Plastering 1 Classroom
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps Evening Preps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 170,000
 
                - estimate
 
                    - Ksh 170,000
 
            
         
    
        
            
            Iiani Primary School
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System Construction Of Classroom
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 170,000
 
                - estimate
 
                    - Ksh 170,000
 
            
         
    
        
            
            Kanyililya
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Classrooms And Purchase Of Desks
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 170,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Muselele Nursery
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Preschool Classroom
 
                - output
 
                    - School Has Improved Facilities
 
                - implementation status
 
                    - More funds needed
 
                - total cost
 
                    - Ksh 165,000
 
                - estimate
 
                    - Ksh 165,000
 
            
         
    
        
            
            Mbulutini Sand Dam
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Muia Mutiso Sand Dam
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Katangini Sand Dam
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kakili Sand Dam
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Makasa Sand Dam
            
            
                - location
 
                    - 
                        Wolwa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Nthungui Rock Catchments
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Putting A Perimeter Fence Around The Catchments.
 
                - output
 
                    - To Check Unnecessary Encroachment Into The Catchments
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kalumoni Gabion
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mwinga Gabion
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Nduenguu Gabion
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kiatineni Sand Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mango Sand Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mulala Girls
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Classroom Block
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Syaolwe Primary School
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Solar Power And Construction Of Pit Latrine
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mungetheele Primary School
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Solar Power System Renovation Of Classroom
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kwa Kalui Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Installation Of Solar And Renovation Of Classes
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Ngunguuni Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System(
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mwisa Pri
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Installation Of Solar System And Flooring And Plastering 3 Classes And Fitting One.
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kyase Primary School
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System And
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps 
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kitende Primary School
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Plastering And Flooring 3 Classrooms, Fitting 3 Wooden Doors, Purchase Of Office Furniture
 
                - output
 
                    - School Has Improve Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Sia Primary School
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Installation Of Solar And Flooring And Fitting Of 2 Classrooms
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kivavi Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of Office
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Muvau Primary School
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kithoni Primary School
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Completion Of 2 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Metho Uvini Sand Dam
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kangondi Ypoly
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Classrooms
 
                - output
 
                    - Institution Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kavuthu Dispensary
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Purchase And Supply Of Medical Equipment
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Ngosini Primary School
            
            
                - location
 
                    - 
                        Kikumini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of 2 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kwangwasi Sand Dam
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Sand Dam.
 
                - output
 
                    - Check Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Yandia River Sand Dam
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across Yandia River
 
                - output
 
                    - Check Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kwa Wambua Sell
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Shallow Well
 
                - output
 
                    - Community Have Access To Clean Water
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kwa Kimeu Gabio
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mungyani Sand Dam
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Mutyambua Sand Dam
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kavuthu Sand Dam
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Iteta Sand Dam
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mwambwani Sand Dam
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Masue Sand Dam
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kaliini Sand Dam
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Yumbani Sand Dam
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Ikuyuni Shallow Well
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 50,000
 
            
         
    
        
            
            Kwa Kituto Sand Dam
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kavingoni Gabion
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kyase Gabion
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Yembondo Gabion
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kimundi Gabion
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Gabion Across The River
 
                - output
 
                    - Reduce Soil Erosion Provide
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 150,000
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kathonzweni Fsa
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Putting A Perimeter Fence (Barbed Wire) Around The Diary.
 
                - output
 
                    - Institution Has Improved Security System
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 132,000
 
                - estimate
 
                    - Ksh 132,000
 
            
         
    
        
            
            Mandoi Dip
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Rehabilitation Of Existing Cattle Dips.
 
                - output
 
                    - Community Have Improved Livestock Service
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 130,000
 
                - estimate
 
                    - Ksh 130,000
 
            
         
    
        
            
            Kamunyolo Dip
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Rehabilitation Of Buildings
 
                - output
 
                    - Community Receives Better  Health Care
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 130,000
 
                - estimate
 
                    - Ksh 130,000
 
            
         
    
        
            
            Ngukuni Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Renovation Of School Buildings And Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 130,000
 
                - estimate
 
                    - Ksh 130,000
 
            
         
    
        
            
            Kwa Kukui Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Roofing Of School, Plastering And Flooring 2 Classes
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 130,000
 
                - estimate
 
                    - Ksh 130,000
 
            
         
    
        
            
            Mutini Primary School
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Roofing Of School Building
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 130,000
 
                - estimate
 
                    - Ksh 130,000
 
            
         
    
        
            
            Silanga No
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 130,000
 
                - estimate
 
                    - Ksh 13,000
 
            
         
    
        
            
            Ndulu Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Fitting Of Metal Doors And Windows In 4 Classroom
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Katangini Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovating 8 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Muangeni Primary School
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Plastering Flooring And Fitting 4 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwa Arun
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of 3 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Ngunu Primary School
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kimuumo Primary School
            
            
                - location
 
                    - 
                        Mumbuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation (Flooring And Concrete Corridor ) For 5 Classes
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mathangathi Primary School
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Boys And Girls Toilets
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mwalili Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Kitchen
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Matiliku Primary School
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of A Classroom (Plastering, Fitting 4 Windows And Metal Door).
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mithumoni Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Pre-School
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Yekanga Primary School
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Flooring 2 And Plastering 8 Classes
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kathoechnraining Tannery
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Katulani Poly
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Completion Of Classroom Building
 
                - output
 
                    - Institution Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mutula Community Hall
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction
 
                - output
 
                    - Community Has A Place For Social Activities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mbeeka Community Hall
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction
 
                - output
 
                    - Community Has A Place For Social Activities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Ngukuni Community Hall
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction
 
                - output
 
                    - Community Has A Place For Social Activities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mithumoni Ass Chiefs Of
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Completion Of Office And Construction Of Latrine
 
                - output
 
                    - Improved Service Delivery.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mumbuni Chiefs Office
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Completion Of Building
 
                - output
 
                    - Administration Is Brought Closer To The People.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwa Mutunga Gabion
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Gabion
 
                - output
 
                    - -
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mumbuni Cattle Dip
            
            
                - location
 
                    - 
                        Mumbuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Putting A Perimeter Fence (Barbed Wire) Around The Diary.
 
                - output
 
                    - Dairy Has Improved Security System
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwa Mbele Swell
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwakaleli Dam
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Muvukoni Shallow Well
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water.
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Yiumoni Shallow Well
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Misolo Shallow Well
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Nzauni Shallow Well
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwa Sanga Shallow Well
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwa Musungu Swell
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwa Kinyili Swell
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mindali Dam
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mutulani Dam
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwa Philip Dam
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mavia Aume Primary School
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Vulueni Primary School
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kiliku Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mamuu Pri
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kwakaleli Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mavindini Primary School
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kanthiitu Primary School
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kaasya Primary School
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Mikisi Primary School
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kithaathaini Primary School
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Face Lifting Of The School Buildings
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Muangeni Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Floor, Plaster Of 3 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Isambani
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Ngongweni Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Plastering And Flooring For 2 Classes & Fitting Doors And Windows Of 2 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Ndubguni Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Flooring 4 And Fitting 7 Doors And Repairs Of Desks
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Mbalani Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Solar System
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Ngutwa Primary School
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installation Of Solar System
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Mweini Primary School
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Kitchen
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Kiti Kyumu
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Fencing Of School With Metal Posts And Barbed Wire
 
                - output
 
                    - School Has Improved Security
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Itaa Primary School
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Aic Mutulani
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Improvement Of Power System In School
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Mukame Wa Mbeu Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installation Of Solar To 3 Classrooms
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Unoa Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Painting Of Roofs
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Malooi Primary School
            
            
                - location
 
                    - 
                        Nziu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Purchase And Supply Of Desks
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Athiani Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Administration Block
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Mwania Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovating Of 1 Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Mikauni Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Flooring And Plastering 3 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Kyemusoi
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Plastering Of 3 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Syethe Primary School
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Munyuni Primary School
            
            
                - location
 
                    - 
                        Kikumini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of 1 Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Kyunyu Primary School
            
            
                - location
 
                    - 
                        Mbuvo
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Repair (Roof) 2 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Ndatani Primary School
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Kitchen
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Kilisa Primary School
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Rehabilitation Of 9 Classrooms And 1 Store
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Mungyani Primary School
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Nduundune
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of 6 Classrooms And Administration Block
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            St. Johns Malivani
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installation Of Solar System
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Manzani Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Flooring 2 And Plastering 8 Classes
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Kivandini Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Wee Primary School
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - n/a
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Kasuvi Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Iviani Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of Classroom
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete.
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Mkndistrosp
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Provide Funds Towards Hiv/Aids Activities
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Done
 
                - total cost
 
                    - Ksh 80,000
 
                - estimate
 
                    - Ksh 80,000
 
            
         
    
        
            
            Itaava Primary School
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Itiani Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Itulu Primary School
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps 
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kamuithi Primary School
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps 
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Ivinganzia Primary School
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kitumbai Primary School
            
            
                - location
 
                    - 
                        Mavindini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Nzeveni Primary School
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kavumbu Primary School
            
            
                - location
 
                    - 
                        Kathonzweni
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kwa Mbaata Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kathuma Primary School
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kithumani Primary School
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kyeni Primary School
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Senda Primary School
            
            
                - location
 
                    - 
                        Muvau
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Nthangu Primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Makutano Pr
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Munathi Primary School
            
            
                - location
 
                    - 
                        Kitise
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar System
 
                - output
 
                    - Dispensary Has Regular Power Supply And Improved Health Care
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kalumbi Primary School
            
            
                - location
 
                    - 
                        Kakutha
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Katisaa Primary School
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kalima Primary School
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Yumbani Primary School
            
            
                - location
 
                    - 
                        Kyemundu
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kilili Primary School
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Mbiuni Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kalembwani Primary School
            
            
                - location
 
                    - 
                        Kalamba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Ndovea Primary School
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Maatha Primary School
            
            
                - location
 
                    - 
                        Nzaui
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Supply And Installation Of Solar Power System
 
                - output
 
                    - Staff  Prepare Adequately,  Access To Radio Pupils Hold Reps
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 70,000
 
                - estimate
 
                    - Ksh 70,000
 
            
         
    
        
            
            Kambi Mawe Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 50,000
 
                - estimate
 
                    - Ksh 50,000
 
            
         
    
        
            
            Harambee Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 50,000
 
                - estimate
 
                    - Ksh 50,000
 
            
         
    
        
            
            Kitooni Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Scooping Of Mud And Disiliting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 50,000
 
                - estimate
 
                    - Ksh 50,000
 
            
         
    
        
            
            Ngaku Shallow Well
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Shallow Well.
 
                - output
 
                    - To Provide Drinking Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 50,000
 
                - estimate
 
                    - Ksh 50,000
 
            
         
    
        
            
            Kithuki Zone
            
            
                - location
 
                    - 
                        Kithuki
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Purchase And Supply Of Desks
 
                - output
 
                    - Pupils Have Sitting Facilities
 
                - implementation status
 
                    - Supplied
 
                - total cost
 
                    - Ksh 41,000
 
                - estimate
 
                    - Ksh 41,000
 
            
         
    
        
            
            Kalumbi Secondary School
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Environmental Impact Assessment
 
                - output
 
                    - Expand The School
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 9,480
 
                - estimate
 
                    - Ksh 9,480
 
            
         
    
        
            
            Kwa Muasa Earth Dam
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - action
 
                    - Disilting And Rehabilitation
 
                - output
 
                    - Provide Clean Water
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Ndauni Sand Dam
            
            
                - location
 
                    - 
                        Kavuthu
                        (in Makueni)
                    
 
                
                - action
 
                    - Purchase And Supply Hardcore, Sand, Water And Ballast
 
                - output
 
                    - Reduce Soil Erosion Sand Harvesting Clean Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Kakuswi Dam
            
            
                - location
 
                    - 
                        Kanthuni
                        (in Makueni)
                    
 
                
                - action
 
                    - Scooping Of Mud And Disilting Of The Dam
 
                - output
 
                    - Community Have Water For  Domestic Use And Livestock
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 100,000
 
            
         
    
        
            
            Muooni Kwa Kivoko Sand Da
            
            
                - location
 
                    - 
                        Emali
                        (in Makueni)
                    
 
                
                - action
 
                    - n/a
 
                - output
 
                    - -
 
                - implementation status
 
                    - poor West manship-non acountability
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Mulato Sand Dam
            
            
                - location
 
                    - 
                        Kilili
                        (in Makueni)
                    
 
                
                - action
 
                    - Construction Of Sand Dam.
 
                - output
 
                    - Check Soil Erosion Provide Sand Harvesting Grounds
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 550,000
 
            
         
    
        
            
            Nguuh/Qs
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - action
 
                    - Completion Of Administrative
 
                - output
 
                    - Improved Service Delivery
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Aic Kyumbe
            
            
                - location
 
                    - 
                        Mulala
                        (in Makueni)
                    
 
                
                - action
 
                    - n/a
 
                - output
 
                    - -
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kambi Mawe Dispensary
            
            
                - location
 
                    - 
                        Wote
                        (in Makueni)
                    
 
                
                - action
 
                    - Expansion Of Dispensary
 
                - output
 
                    - Improved Health Services
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kiuani Primary School
            
            
                - location
 
                    - 
                        Mbitini
                        (in Makueni)
                    
 
                
                - action
 
                    - Renovation Of 6 Classrooms
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Mii Primary School
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - action
 
                    - Construction Of 1 Classroom And Furnishing It
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Kimundi primary School
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - action
 
                    - Repair And Renovation Of Roofs
 
                - output
 
                    - School Has Improved Learning Facilities
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mbole Drift
            
            
                - location
 
                    - 
                        Mweini
                        (in Makueni)
                    
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion, Sand Harvesting Clean Water
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Kakili Water Catchments
            
            
                - location
 
                    - 
                        Ithumba
                        (in Makueni)
                    
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion, Sand Harvesting Clean Water
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Matooni/Katheka S/Dam
            
            
                - location
 
                    - 
                        Mutyambua
                        (in Makueni)
                    
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion, Sand Harvesting Clean Water
 
                - implementation status
 
                    - not known
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 150,000
 
            
         
    
        
            
            Kasevi Springs
            
            
                - location
 
                    - 
                        Nguu
                        (in Makueni)
                    
 
                
                - action
 
                    - Construction Of A Sand Dam Across The River
 
                - output
 
                    - Reduce Soil Erosion, Sand Harvesting Clean Water
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Nthangu Water Project
            
            
                - location
 
                    - 
                        Unoa
                        (in Makueni)
                    
 
                
                - action
 
                    - Supply Of And Laying Of Pipes And Accessories
 
                - output
 
                    - Reduce Soil Erosion, Sand Harvesting Clean Water
 
                - implementation status
 
                    - 100,000 ex- nyamagwa Boys - 2003/4
 
                - total cost
 
                    - Ksh 0
 
                - estimate
 
                    - Ksh 0