The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kathonzweni Dam Kwa Lum
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2004
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 6,900,000
- estimate
- Ksh 6,700,000
Mwanyani Dam
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 6,700,000
- estimate
- Ksh 6,700,000
Isyukoni Earth Dam
- location
-
Kalamba
(in Makueni)
- year first funded
- 2006
- action
- Building Of Embankment To Create A Dam
- output
- Community Has Access To Water For Domestic Use And Irrigation.
- implementation status
- Complete
- total cost
- Ksh 4,669,427
- estimate
- Ksh 4,500,000
Ndukuma Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Access To Clean Water
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 2,000,000
Iangini Dam
- location
-
Nzaui
(in Makueni)
- year first funded
- 2004
- action
- Scooping And Construction Of Three Gabions.
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 3,600,000
- estimate
- Ksh 3,600,000
Kamunyolo Earth Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2006
- action
- Scooping And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 0
Kalamba-Makutano Line
- location
-
Kalamba
(in Makueni)
- year first funded
- 2007
- action
- Installation
- output
- Community Have Regular Power Supply
- implementation status
- On Going
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
Metho Uvini Earth Dam
- location
-
Kithuki
(in Makueni)
- year first funded
- 2006
- action
- Scooping And Building Of Dam And Associated Pumping Machinery
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 2,150,000
- estimate
- Ksh 1,900,000
Muungano Earth Dam
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Scooping And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 2,145,000
- estimate
- Ksh 1,900,000
Mutoa Dam
- location
-
Mulala
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Yekanga Kwa Musel Dam
- location
-
Kithuki
(in Makueni)
- year first funded
- 2005
- action
- Putting A Perimeter Fence Around
- output
- To Check Unnecessary Encroachment Into The Dam Land.
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Ndumitava Dam
- location
-
Ithumba
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,500,000
Kikuu Roadam
- location
-
Ithumba
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Sand Dam Across Kikuu River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kwa Mwitu Gabion
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion
- implementation status
- Complete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,650,000
Mukame Wa Mbeu Borehole
- location
-
Nguu
(in Makueni)
- year first funded
- 2003
- action
- Generator And Piping
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,581,717
- estimate
- Ksh 1,581,717
Malivani Market
- location
-
Wote
(in Makueni)
- year first funded
- 2007
- action
- Installation
- output
- Community Have Regular Power Supply
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Vololo Dispensary
- location
-
Mweini
(in Makueni)
- year first funded
- 2003
- action
- Construction Of 17 Room Health Centre + Maternity Wing
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kwa Kotoe Dispensary
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Dispensary Building
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kwakakulu Water Project
- location
-
Emali
(in Makueni)
- year first funded
- 2004
- action
- Installation Of A Distribution Tank And Extension Of Water Pipe.
- output
- Provide Regular Water Supply And Serve More People
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,250,000
Barazani Girls Secondary School
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2004
- action
- Construction Furniture Equipping Of Lab And Supply Of Electricity.
- output
- To Provide Electricity And Equipped Lab To The School
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 550,000
Mwambwani Primary School borehol
- location
-
Kakutha
(in Makueni)
- year first funded
- 2005
- action
- Drilling Of A Bore Hole Well
- output
- To Provide Clean Drinking Water
- implementation status
- Project Was Not Initiated
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Manooni Water Proj
- location
-
Kakutha
(in Makueni)
- year first funded
- 2004
- action
- Rehabilitation Of Existing And Extension Of Existing Water Pipe
- output
- Provide Regular Water Supply And Serve More People
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Mukame Wa Mbeu Dam
- location
-
Nguu
(in Makueni)
- year first funded
- 2003
- action
- Genet &Piping
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,070,000
- estimate
- Ksh 1,070,000
Mandela Water Project
- location
-
Nzaui
(in Makueni)
- year first funded
- 2004
- action
- Extension Of Existing Water Pipe
- output
- Check Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Makueni Boys Borehol
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- Drilling Of A Bore Hole.
- output
- Provide Regular Water Supply To The Staff And Students.
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kalamba Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2006
- action
- Renovation Of School Buildings, Completion Of Dorms, Gate, Beds And Kitchenware
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ngangasa Sand Dam
- location
-
Wolwa
(in Makueni)
- year first funded
- 2008
- action
- Construction Of Sand Dam
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 100,000
Makasa Dam
- location
-
Wolwa
(in Makueni)
- year first funded
- 2008
- action
- Scooping And Disilting Of Dam
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,197,790
Ing'Aiioni Water Project
- location
-
Kithumba
(in Makueni)
- year first funded
- 2005
- action
- Drilling Of A Bore Hole.
- output
- Community Has Access To Clean Drinking Water
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Muambani Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 180,000
Mii Secondary School
- location
-
Ithumba
(in Makueni)
- year first funded
- 2005
- action
- Completion Of Dorm And Solar System
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 840,000
- estimate
- Ksh 2,000,000
Thithi Secondary School
- location
-
Wolwa
(in Makueni)
- year first funded
- 2003
- action
- Construction Of Classrooms Administration Block And Lab
- output
- School Has Administration Block And Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 820,000
Makueni Yoly
- location
-
Wote
(in Makueni)
- year first funded
- 2005
- action
- Construction And Equipping Of The Workshop
- output
- Institution Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kitheni Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of Buildings Blown By Wind.
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Matutu Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2008
- action
- Face Lifting Of School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- More funds needed
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kwa Kotoe Dispensary
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Dispensary Building
- output
- Community Has Accesses To Health Services
- implementation status
- On-Going
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Gigiri Girls Secondary School
- location
-
Kithumba
(in Makueni)
- year first funded
- 2006
- action
- Provision Of Power To The School
- output
- School Is Connected To Power For Various Usage.
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Londokwe Water Project
- location
-
Kithuki
(in Makueni)
- year first funded
- 2006
- action
- Extension Of Water Pipe.
- output
- Community Has Clean Drinking Water.
- implementation status
- Complete
- total cost
- Ksh 721,400
- estimate
- Ksh 700,000
Iimba Primary School
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2005
- action
- Construction Of 8 Classrooms And Administration Block
- output
- Community Has Easy Access To Primary Education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mbeletu Secondary School
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Four Classrooms
- output
- School Has Learning Facilities.
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kitise Sec
- location
-
Kitise
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Classroom And Administration Block.
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Syatu Girls
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Four Classrooms Rooms And Admin Block.
- output
- Provide Access To Secondary Education To Primary School Graduates
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Munyuni Secondary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Purchases And Supply Laboratory Equipment
- output
- School Has Improved Learning Facilities
- implementation status
- Supplied
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Nthangu Secondary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms (40 X 25) And Pit Latrine
- output
- Provide Access To Secondary Education To Primary School Leavers
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Matiku Secondary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Classrooms, Dormitory And Furnishing
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 200,000
Wote Open Air Marketelectric
- location
-
Wote
(in Makueni)
- year first funded
- 2003
- action
- Wiring And Connecting The Market To The Main Power
- output
- Traders Have Access To Power For Various Uses At The Market.
- implementation status
- Complete
- total cost
- Ksh 625,000
- estimate
- Ksh 625,000
Muooni Rand Dam
- location
-
Wolwa
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 620,000
- estimate
- Ksh 620,000
Makueni Girls School
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Equipping Of Library Books
- output
- School Has Improved Facilities
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Stohns Malivani Sec
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Construction of And Equipping Of Laboratory
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kitonyoni Sec
- location
-
Muvau
(in Makueni)
- year first funded
- 2004
- action
- Construction Of Laboratory Classroom And Equipping Of Laboratory
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nduundune Secondary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Classroom Block
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mungyani Sec
- location
-
Kakutha
(in Makueni)
- year first funded
- 2004
- action
- Construction Of Classrooms And Supply Of Lab Equipment
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Stlawrence Girls Secondary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2005
- action
- Completion Of D/Hall
- output
- School Has Improved Learning Facilities
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Isololo Water Project
- location
-
Nzaui
(in Makueni)
- year first funded
- 2004
- action
- Rehabilitation Of Existing And Extension Of Existing Water Pipe
- output
- Provide Regular Water Supply And Serve More People
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Emali Primary School
- location
-
Emali
(in Makueni)
- year first funded
- 2004
- action
- Completion Of 4 Classrooms
- output
- Easy Congestion In School
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nziu Secondary School
- location
-
Nzaui
(in Makueni)
- year first funded
- 2006
- action
- Renovation Of Two Classrooms And Equipping Of Lab
- output
- School Has Improved Learning Facilities.
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Kathamboni Sec
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2004
- action
- Construction Equipping Of Science Laboratory
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Kalima Dispensary
- location
-
Nzaui
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Dispensary Building
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Kiangini Secondary School
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2003
- action
- Construction Of Classrooms And Purchase Of Text Books And Lab Equipment
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 525,000
- estimate
- Ksh 525,000
Mbuvo Sec
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2003
- action
- Construction Of Classrooms And Purchase Of Text Books And Lab Equipment
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 515,000
- estimate
- Ksh 515,000
Kavingoni Primary School
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Eight Classrooms
- output
- Community Has Easy Access To Primary Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mbenuu Dispensary
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2003
- action
- Construction Of Building And Connection Of Electricity.
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kikumini Health Centre
- location
-
Wote
(in Makueni)
- year first funded
- 2006
- action
- Construction And Dispensary
- output
- Improved Health Services
- implementation status
- Complete.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Upendo Market
- location
-
Nziui
(in Makueni)
- year first funded
- 2007
- action
- Installation
- output
- Community Have Regular Power Supply
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Matooni-Kithunani Road
- location
-
Kakutha
(in Makueni)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Transport And Communication Is Improved
- implementation status
- Done
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mutulani Sec
- location
-
Nziu
(in Makueni)
- year first funded
- 2004
- action
- Purchases Installation And Supply Of Solar System And Lab Equipment
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mwaani Girls
- location
-
Unoa
(in Makueni)
- year first funded
- 2006
- action
- Supply Of Electricity And Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tutini Sec
- location
-
Emali
(in Makueni)
- year first funded
- 2003
- action
- Construction Of Toilets, Bathrooms And A Kitchen.
- output
- Students Have Proper Boarding Facilities
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Manooni Secondary School
- location
-
Kakutha
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Administration Block.
- output
- School Has An Administration Block. Current Building Made To Classrooms.
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mbuthani Secondary School
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2006
- action
- Completion Of Dining Hall And Kitchen
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Vulueni Secondary School
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2006
- action
- Construction And Equipping Of Lab
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kweleli Wroject
- location
-
Kilili
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation Of Existing And Extension Of Existing Water Pipe
- output
- Community Has Access To Clean Drinking Water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Ilengeni Water Proj
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2004
- action
- Installation Of A Distribution Tank And Extension Of Water Pipe
- output
- Provide Regular Water Supply And Serve More People
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kathonzweni Dam
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2006
- action
- Fencing (Putting A Perimeter Fence Around The Dam)
- output
- To Check Unnecessary Encroachment Into The Dam Land
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Maumba Secondary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2005
- action
- Supply Of Laboratory Equipment And Construction Of Classrooms
- output
- Students Have An Equipped Laboratory And Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kwa- Mutula-Kwa-Uthuku
- location
-
Kakutha
(in Makueni)
- year first funded
- 2007
- action
- Rehabilitation
- output
- -
- implementation status
- Complete
- total cost
- Ksh 495,000
- estimate
- Ksh 0
Makasa
- location
-
Wolwa
(in Makueni)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 490,900
- estimate
- Ksh 490,900
Masamukye Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2003
- action
- Renovation Of 3 Classrooms
- output
- School Has Improve Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 490,000
- estimate
- Ksh 390,000
Yikivumbuand Dam Kwa Mbole Gabio
- location
-
Mweini
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A 9M Sand Dam Across River Mbole
- output
- Reduce Soil Erosion Provide Water And Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 405,000
- estimate
- Ksh 150,000
Mukameni Secondary School
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Four Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Matutu Sec
- location
-
Nguu
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mandoi Sec
- location
-
Muvau
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Classrooms, Dormitory, Lab And Electricity
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Kimuumo Secondary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2006
- action
- Construction Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kyemundu
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nguu Secondary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Makasa Primary School
- location
-
Wolwa
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- School Has Improve Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kitise Dispensary
- location
-
Kitise
(in Makueni)
- year first funded
- 2003
- action
- Supply And Installation Of Generator
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kathatu-Ng'Oi Road
- location
-
Kilili
(in Makueni)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Transport And Communication Is Improved
- implementation status
- Done
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mulala Ovc
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Construction
- output
- More Ovc Get Better Parental Care.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kathonzweni
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2008
- action
- Electrification And Expansion Of Offices
- output
- -
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Yeemulwa Sec
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2005
- action
- Installation Of A Solar And Completion Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kwa Muinde Sand Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Sand Dam Across The River
- output
- To Check Unnecessary Encroachment Into The Dam Land
- implementation status
- not known
- total cost
- Ksh 396,700
- estimate
- Ksh 230,000
Ack Josephs
- location
-
Kitise
(in Makueni)
- year first funded
- 2006
- action
- Construction And Equipping Of Lab
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 390,000
- estimate
- Ksh 390,000
Kyangwasi Sand Dam
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2007
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion, Sand Harvesting Clean Water
- implementation status
- Complete
- total cost
- Ksh 381,100
- estimate
- Ksh 150,000
Kiatine Primary School
- location
-
Nziu
(in Makueni)
- year first funded
- 2006
- action
- Renovation Of Buildings And Administration Block, Solar Installation.
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 370,000
- estimate
- Ksh 370,000
Mbitini Divisional Hqs
- location
-
Mulala
(in Makueni)
- year first funded
- 2008
- action
- Construction Of Office Block
- output
- -
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Muuani Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Ndunguni Dispensary
- location
-
Kikumini
(in Makueni)
- year first funded
- 2006
- action
- Completion Of Building
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kithumani Co-OpSecondary School
- location
-
Kakutha
(in Makueni)
- year first funded
- 2003
- action
- Revival
- output
- To Provide Small Farmers With Ease Accesses To Markets
- implementation status
- Complete
- total cost
- Ksh 345,000
- estimate
- Ksh 345,000
Nguma Primary School
- location
-
Mweini
(in Makueni)
- year first funded
- 2004
- action
- Construction Of Pre-School Building
- output
- School Has Improve Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 330,000
- estimate
- Ksh 330,000
Kyumbuni Primary School
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2006
- action
- Solar Power System And Flooring And Fitting Of Classroom
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Tumbuni Agro Forestry
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2008
- action
- Construction Of Sand Dam
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Vololo Dispensary
- location
-
(in Makueni)
- year first funded
- 2008
- action
- Completion Of Dispensary Buildings
- output
- -
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngomani Sand Dam
- location
-
Kalamba
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Sand Dam Across The River
- output
- Check Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kwakinyili Sand Dam
- location
-
Kithumba
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Sand Dam Across The River
- output
- Check Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 30,000
Kitise Borehole
- location
-
Kitise
(in Makueni)
- year first funded
- 2006
- action
- Drilling Of A Bore Hole Well
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sukuta Sand Dam
- location
-
Wolwa
(in Makueni)
- year first funded
- 2003
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 150,000
Ndwaani Secondary School
- location
-
Emali
(in Makueni)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
St. Joseph Sec
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2003
- action
- Roofing Of Four Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kanyonga Secondary School
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Matheani Secondary School
- location
-
Kithuki
(in Makueni)
- year first funded
- 2006
- action
- Construction And Equipping Of Lab
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mweini Secondary School
- location
-
Mweini
(in Makueni)
- year first funded
- 2004
- action
- Purchase And Supply Of Laboratory Equipment
- output
- School Has Improved Learning Facilities
- implementation status
- Supplied
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mwaani Mixed
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Classrooms A Laboratory And Electricity
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kanthuni Sec
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2007
- action
- Completion Of Girls Dormitory
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiliku Secondary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kwa Kalelo Primary School
- location
-
Kithuki
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Classroom Of Buildings
- output
- Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kikumini Small Home
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Fencing Of Compound, Purchase Of 20 Wheel Chairs And Painting Of Dorms.
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Senda Small Home
- location
-
Muvau
(in Makueni)
- year first funded
- 2007
- action
- Construction Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngoi Primary School
- location
-
Kilili
(in Makueni)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
K-Repemali
- location
-
Emali
(in Makueni)
- year first funded
- 2004
- action
- Complete Construction Of A Village Bank
- output
- Community Has Access To Affordable Financial Services.
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Matutu Dispensary
- location
-
Nguu
(in Makueni)
- year first funded
- 2006
- action
- Completion Of Building
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mumbuni Dispensary
- location
-
Wote
(in Makueni)
- year first funded
- 2005
- action
- Construction And Furnishing Of Pharmacy
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Muaani Kalambweni Road
- location
-
Kalamba
(in Makueni)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Transport And Communication Is Improved
- implementation status
- Done
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kimuumo Secondary School
- location
-
Wote
(in Makueni)
- year first funded
- 2008
- action
- n/a
- output
- School Has Improved Facilities
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kavuthu Primary School Sc
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- School Has Improved Facilities
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ng,Oi Primary School Sc
- location
-
Kilili
(in Makueni)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kanyililya
- location
-
Nguu
(in Makueni)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mangauni Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- n/a
- output
- School Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Utini Primary School
- location
-
Wolwa
(in Makueni)
- year first funded
- 2003
- action
- Renovation Of 3 Class
- output
- School Has Improve Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Matutu Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2003
- action
- Construction Of Classrooms And Purchase Of Desks.
- output
- School Has Improve Learning Facilities
- implementation status
- Done
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Uthangathi Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Solar System, Plastering 7 And Flooring 2 Rooms, Kitchen And Fixing 4 Steel Doors
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Ngangani Pri
- location
-
Mweini
(in Makueni)
- year first funded
- 2003
- action
- Construction Of 1 Room, Roofing Of 4 And Purchase Of 20 Desks
- output
- School Has Improve Learning Facilities
- implementation status
- Done
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Mbukani Primary School
- location
-
Wolwa
(in Makueni)
- year first funded
- 2003
- action
- Renovation Of 3 Class
- output
- School Has Improve Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Kitonyoni Dispensary
- location
-
Wote
(in Makueni)
- year first funded
- 2003
- action
- Furniture And Medical Equipment
- output
- Improved Health Services
- implementation status
- Equipment Supplied
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Tutini Primary School
- location
-
Wolwa
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Boys Latrines
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kyumbuni Sec
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kauma Gabion
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2003
- action
- Construction Of A Gabion Across The River
- output
- Check Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kikumini Dispensary
- location
-
Wote
(in Makueni)
- year first funded
- 2003
- action
- Rehabilitation And Extension Of The Local Dispensary.
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Yikivumbu Dispensary
- location
-
Mweini
(in Makueni)
- year first funded
- 2006
- action
- Medical Equipment
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kilili Dispensary
- location
-
Kilili
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Staff A House
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kawala Secondary School
- location
-
Nzaui
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of School Roofs
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Ack Kiteei
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2008
- action
- Roofing Of Classroom
- output
- School Has Improved Facilities
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kathonzweni Tannery
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2004
- action
- Rehabilitation Of Facility
- output
- Production Of Hides And Skins For Local Market.
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kathonzweni Diary Farmers
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2004
- action
- Putting A Perimeter Fence (Barbed Wire) Around The Diary.
- output
- Dairy Has Improved Security System
- implementation status
- Done
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Malivani Water Project
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Supply Of Pipes And Accessories
- output
- Provide Clean Piped Water
- implementation status
- On Going
- total cost
- Ksh 239,380
- estimate
- Ksh 240,000
Ngooto Primary School
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Installation Of A Water Tank And A Solar System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Ngosini Primary School
- location
-
Kikumini
(in Makueni)
- year first funded
- 2006
- action
- Installation Of Solar System And Renovation Of 8 Classrooms
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Kakutha Dispensary
- location
-
Kakutha
(in Makueni)
- year first funded
- 2003
- action
- Installation Of Water Tank, And Renovation Of The Building
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 214,000
- estimate
- Ksh 64,000
Mwanyani Dispensary
- location
-
Mulala
(in Makueni)
- year first funded
- 2004
- action
- Purchase And Supply Of Medical Equipment
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngetha Ypoly
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Institution Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kyemole Yoly
- location
-
Mavindini
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Institution Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nziu Youth Poly
- location
-
Kalamba
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Workshop
- output
- Institution Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mulangoni Primary School
- location
-
Kithumba
(in Makueni)
- year first funded
- 2007
- action
- Constructions Of Administration Block
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Katulani Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of 3 Classroom And Installation Of Solar To 2 Classes And Adm Block
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngetha Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ikangavya Pri
- location
-
Kalamba
(in Makueni)
- year first funded
- 2005
- action
- Flooring Classrooms And Making Of Desks
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 20,000
Kalaani Sec
- location
-
Kithumba
(in Makueni)
- year first funded
- 2007
- action
- Equipping Of Lab And Installation Of Water Tank
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mutyambua Library
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2007
- action
- Purchase And Supply Of Library Books
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kilili Secondary School
- location
-
Kilili
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwaani Borehole
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Installation Of Pumping Machine
- output
- To Provide Clean Drinking Water To Wote Town And Its Environs.
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mkndislwha
- location
-
Wote
(in Makueni)
- year first funded
- 2006
- action
- Support People Living With Hiv/Aids
- output
- Improved Health Services
- implementation status
- Done
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mweini Dispensary
- location
-
Mweini
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The Dispensary
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Muthwaani
- location
-
Kithumba
(in Makueni)
- year first funded
- 2007
- action
- Renovation And Fitting Of 8 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Katulye Dispensary
- location
-
(in Makueni)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mavindini Youth Polytechnic
- location
-
Mavindini
(in Makueni)
- year first funded
- 2008
- action
- Purchase Of Tools And Equipment
- output
- Polytechnic Has Learning And Training Facilities
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Uthasyo Primary School
- location
-
Wolwa
(in Makueni)
- year first funded
- 2008
- action
- n/a
- output
- School Has Improved Facilities
- implementation status
- More funds needed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nzeeni Primary School
- location
-
Kithumba
(in Makueni)
- year first funded
- 2008
- action
- Construction Of Girls Toilets
- output
- School Has Improved Facilities
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kathonzweni Cattle Dip
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Mutula Cattle Dip
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Katulani Cattle Dip
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Mithumoni Cattle Dip
- location
-
Nguu
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Mavindini C/Dip
- location
-
Mavindini
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Munathi Cattle Dip
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Yanthoko Cattle Dip
- location
-
Nziu
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kanthuni Cattle Dip
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Vololo Poultry Farm
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- n/a
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kilisa Dispensary
- location
-
Emali
(in Makueni)
- year first funded
- 2007
- action
- Rehabilitations
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Yekanga Dispensary
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Buildings
- output
- Improved Health Services
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kithuki Dispensary
- location
-
Kithuki
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Staff Rooms
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Masumba Dispensary
- location
-
Ithumba
(in Makueni)
- year first funded
- 2004
- action
- Medical Equipment
- output
- Improved Health Services
- implementation status
- Supplied
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Iiani Health Centre
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Construction Of Maternity Wing
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 2,074,400
Kiangini Dispensary
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2004
- action
- Purchase And Supply Of Medical Equipment
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kaathi Gnca Dispensary
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Medical Equipment And Partitioning Of Rooms
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kamunyii Bhole
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Construction Of Pump House And Supply Of Fuel.
- output
- Ensure Regular Water Supply To Community
- implementation status
- Complete
- total cost
- Ksh 182,000
- estimate
- Ksh 182,000
Wee Small Home
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Dormitories And Fencing Of Compound
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Nzueni Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of Buildings - Roofing 2 Classes And Store
- output
- School Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Kivandini Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2005
- action
- n/a
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Kwambiti Primary School
- location
-
Kithumba
(in Makueni)
- year first funded
- 2005
- action
- Plastering 5 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 18,000
Muthyoi Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2006
- action
- Solar Power System And Plastering And Flooring Classrooms
- output
- Staff Prepare Adequately, Access Media(Radio) Pupils Attend Morning And Evening Preps
- implementation status
- Complete
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Ng'Oi Secondary School
- location
-
Kilili
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Classroom And Installation Of Solar System
- output
- School Has Improved Learning Facilities Students Attend Evening Preps.
- implementation status
- Complete
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Mwasangombe Primary School
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2004
- action
- Renovation Of School And Installation Of A Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps.
- implementation status
- not known
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Kyemundu Primary School
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System Flooring And Plastering 1 Classroom
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps Evening Preps
- implementation status
- Complete
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Iiani Primary School
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System Construction Of Classroom
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Kanyililya
- location
-
Nguu
(in Makueni)
- year first funded
- 2003
- action
- Construction Of Classrooms And Purchase Of Desks
- output
- School Has Improve Learning Facilities
- implementation status
- not known
- total cost
- Ksh 170,000
- estimate
- Ksh 0
Muselele Nursery
- location
-
Mulala
(in Makueni)
- year first funded
- 2008
- action
- Construction Of Preschool Classroom
- output
- School Has Improved Facilities
- implementation status
- More funds needed
- total cost
- Ksh 165,000
- estimate
- Ksh 165,000
Mbulutini Sand Dam
- location
-
Wolwa
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Muia Mutiso Sand Dam
- location
-
Mweini
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Katangini Sand Dam
- location
-
Mweini
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kakili Sand Dam
- location
-
Ithumba
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Makasa Sand Dam
- location
-
Wolwa
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nthungui Rock Catchments
- location
-
Nguu
(in Makueni)
- year first funded
- 2006
- action
- Putting A Perimeter Fence Around The Catchments.
- output
- To Check Unnecessary Encroachment Into The Catchments
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kalumoni Gabion
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mwinga Gabion
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nduenguu Gabion
- location
-
Unoa
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kiatineni Sand Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mango Sand Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mulala Girls
- location
-
Mulala
(in Makueni)
- year first funded
- 2004
- action
- Construction Of Classroom Block
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Syaolwe Primary School
- location
-
Kilili
(in Makueni)
- year first funded
- 2006
- action
- Solar Power And Construction Of Pit Latrine
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mungetheele Primary School
- location
-
Nzaui
(in Makueni)
- year first funded
- 2006
- action
- Solar Power System Renovation Of Classroom
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kwa Kalui Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2006
- action
- Installation Of Solar And Renovation Of Classes
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ngunguuni Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System(
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mwisa Pri
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2006
- action
- Installation Of Solar System And Flooring And Plastering 3 Classes And Fitting One.
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kyase Primary School
- location
-
Kithuki
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System And
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kitende Primary School
- location
-
Ithumba
(in Makueni)
- year first funded
- 2006
- action
- Plastering And Flooring 3 Classrooms, Fitting 3 Wooden Doors, Purchase Of Office Furniture
- output
- School Has Improve Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Sia Primary School
- location
-
Muvau
(in Makueni)
- year first funded
- 2006
- action
- Installation Of Solar And Flooring And Fitting Of 2 Classrooms
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kivavi Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of Office
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Muvau Primary School
- location
-
Muvau
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kithoni Primary School
- location
-
Muvau
(in Makueni)
- year first funded
- 2007
- action
- Completion Of 2 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Metho Uvini Sand Dam
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kangondi Ypoly
- location
-
Wote
(in Makueni)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Institution Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kavuthu Dispensary
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2005
- action
- Purchase And Supply Of Medical Equipment
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ngosini Primary School
- location
-
Kikumini
(in Makueni)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kwangwasi Sand Dam
- location
-
Kilili
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Sand Dam.
- output
- Check Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Yandia River Sand Dam
- location
-
Mulala
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across Yandia River
- output
- Check Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Kwa Wambua Sell
- location
-
Emali
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Shallow Well
- output
- Community Have Access To Clean Water
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kwa Kimeu Gabio
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mungyani Sand Dam
- location
-
Kakutha
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Mutyambua Sand Dam
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kavuthu Sand Dam
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Iteta Sand Dam
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mwambwani Sand Dam
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Masue Sand Dam
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kaliini Sand Dam
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Yumbani Sand Dam
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ikuyuni Shallow Well
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 50,000
Kwa Kituto Sand Dam
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kavingoni Gabion
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kyase Gabion
- location
-
Kithuki
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Yembondo Gabion
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2004
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kimundi Gabion
- location
-
Kithuki
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Gabion Across The River
- output
- Reduce Soil Erosion Provide
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kathonzweni Fsa
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2004
- action
- Putting A Perimeter Fence (Barbed Wire) Around The Diary.
- output
- Institution Has Improved Security System
- implementation status
- Done
- total cost
- Ksh 132,000
- estimate
- Ksh 132,000
Mandoi Dip
- location
-
Wote
(in Makueni)
- year first funded
- 2003
- action
- Rehabilitation Of Existing Cattle Dips.
- output
- Community Have Improved Livestock Service
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Kamunyolo Dip
- location
-
Wote
(in Makueni)
- year first funded
- 2003
- action
- Rehabilitation Of Buildings
- output
- Community Receives Better Health Care
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Ngukuni Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2005
- action
- Renovation Of School Buildings And Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Kwa Kukui Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2006
- action
- Roofing Of School, Plastering And Flooring 2 Classes
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Mutini Primary School
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2006
- action
- Roofing Of School Building
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Silanga No
- location
-
Nguu
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 13,000
Ndulu Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Fitting Of Metal Doors And Windows In 4 Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Katangini Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2007
- action
- Renovating 8 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Muangeni Primary School
- location
-
Kithuki
(in Makueni)
- year first funded
- 2007
- action
- Plastering Flooring And Fitting 4 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Arun
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of 3 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngunu Primary School
- location
-
Muvau
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kimuumo Primary School
- location
-
Mumbuni
(in Makueni)
- year first funded
- 2007
- action
- Renovation (Flooring And Concrete Corridor ) For 5 Classes
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mathangathi Primary School
- location
-
Mavindini
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Boys And Girls Toilets
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mwalili Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Kitchen
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Matiliku Primary School
- location
-
Nzaui
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of A Classroom (Plastering, Fitting 4 Windows And Metal Door).
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mithumoni Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Pre-School
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Yekanga Primary School
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2007
- action
- Flooring 2 And Plastering 8 Classes
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kathoechnraining Tannery
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2007
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Katulani Poly
- location
-
Mweini
(in Makueni)
- year first funded
- 2006
- action
- Completion Of Classroom Building
- output
- Institution Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mutula Community Hall
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Construction
- output
- Community Has A Place For Social Activities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mbeeka Community Hall
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2007
- action
- Construction
- output
- Community Has A Place For Social Activities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngukuni Community Hall
- location
-
Kalamba
(in Makueni)
- year first funded
- 2007
- action
- Construction
- output
- Community Has A Place For Social Activities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mithumoni Ass Chiefs Of
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Completion Of Office And Construction Of Latrine
- output
- Improved Service Delivery.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mumbuni Chiefs Office
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Completion Of Building
- output
- Administration Is Brought Closer To The People.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Mutunga Gabion
- location
-
Mweini
(in Makueni)
- year first funded
- 2008
- action
- Construction Of Gabion
- output
- -
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mumbuni Cattle Dip
- location
-
Mumbuni
(in Makueni)
- year first funded
- 2008
- action
- Putting A Perimeter Fence (Barbed Wire) Around The Diary.
- output
- Dairy Has Improved Security System
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Mbele Swell
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwakaleli Dam
- location
-
Mulala
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Muvukoni Shallow Well
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Yiumoni Shallow Well
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Misolo Shallow Well
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nzauni Shallow Well
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Sanga Shallow Well
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Musungu Swell
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Kinyili Swell
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mindali Dam
- location
-
Mavindini
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mutulani Dam
- location
-
Kithuki
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwa Philip Dam
- location
-
Ithumba
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mavia Aume Primary School
- location
-
Nzaui
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Vulueni Primary School
- location
-
Kavuthu
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiliku Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mamuu Pri
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kwakaleli Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mavindini Primary School
- location
-
Mavindini
(in Makueni)
- year first funded
- 2005
- action
- n/a
- output
- School Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kanthiitu Primary School
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kaasya Primary School
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2005
- action
- n/a
- output
- School Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mikisi Primary School
- location
-
Mavindini
(in Makueni)
- year first funded
- 2005
- action
- n/a
- output
- School Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kithaathaini Primary School
- location
-
Mavindini
(in Makueni)
- year first funded
- 2005
- action
- Face Lifting Of The School Buildings
- output
- School Has Improved Learning Facilities
- implementation status
- Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Muangeni Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Floor, Plaster Of 3 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Isambani
- location
-
Kalamba
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngongweni Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Plastering And Flooring For 2 Classes & Fitting Doors And Windows Of 2 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ndubguni Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Flooring 4 And Fitting 7 Doors And Repairs Of Desks
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mbalani Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Solar System
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Ngutwa Primary School
- location
-
Wote
(in Makueni)
- year first funded
- 2007
- action
- Installation Of Solar System
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mweini Primary School
- location
-
Mweini
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Kitchen
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kiti Kyumu
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Fencing Of School With Metal Posts And Barbed Wire
- output
- School Has Improved Security
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Itaa Primary School
- location
-
Muvau
(in Makueni)
- year first funded
- 2007
- action
- n/a
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Aic Mutulani
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Improvement Of Power System In School
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mukame Wa Mbeu Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2007
- action
- Installation Of Solar To 3 Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Unoa Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Painting Of Roofs
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Malooi Primary School
- location
-
Nziu
(in Makueni)
- year first funded
- 2007
- action
- Purchase And Supply Of Desks
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Athiani Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Administration Block
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mwania Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2007
- action
- Renovating Of 1 Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mikauni Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2007
- action
- Flooring And Plastering 3 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kyemusoi
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Plastering Of 3 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Syethe Primary School
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Munyuni Primary School
- location
-
Kikumini
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of 1 Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kyunyu Primary School
- location
-
Mbuvo
(in Makueni)
- year first funded
- 2007
- action
- Repair (Roof) 2 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Ndatani Primary School
- location
-
Mweini
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Kitchen
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kilisa Primary School
- location
-
Muvau
(in Makueni)
- year first funded
- 2007
- action
- Rehabilitation Of 9 Classrooms And 1 Store
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Mungyani Primary School
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Nduundune
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of 6 Classrooms And Administration Block
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
St. Johns Malivani
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Installation Of Solar System
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Manzani Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2007
- action
- Flooring 2 And Plastering 8 Classes
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kivandini Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Wee Primary School
- location
-
Kilili
(in Makueni)
- year first funded
- 2007
- action
- n/a
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kasuvi Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Iviani Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2007
- action
- Renovation Of Classroom
- output
- School Has Improved Learning Facilities
- implementation status
- Complete.
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Mkndistrosp
- location
-
Wote
(in Makueni)
- year first funded
- 2004
- action
- Provide Funds Towards Hiv/Aids Activities
- output
- Improved Health Services
- implementation status
- Done
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Itaava Primary School
- location
-
Ithumba
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Itiani Primary School
- location
-
Nguu
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Itulu Primary School
- location
-
Ithumba
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kamuithi Primary School
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Ivinganzia Primary School
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kitumbai Primary School
- location
-
Mavindini
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Nzeveni Primary School
- location
-
Kanthuni
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kavumbu Primary School
- location
-
Kathonzweni
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kwa Mbaata Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kathuma Primary School
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kithumani Primary School
- location
-
Kakutha
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kyeni Primary School
- location
-
Mweini
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Senda Primary School
- location
-
Muvau
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Nthangu Primary School
- location
-
Unoa
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Makutano Pr
- location
-
Unoa
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Munathi Primary School
- location
-
Kitise
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar System
- output
- Dispensary Has Regular Power Supply And Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kalumbi Primary School
- location
-
Kakutha
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Katisaa Primary School
- location
-
Mulala
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kalima Primary School
- location
-
Emali
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Yumbani Primary School
- location
-
Kyemundu
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kilili Primary School
- location
-
Kilili
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Mbiuni Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kalembwani Primary School
- location
-
Kalamba
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Ndovea Primary School
- location
-
Nzaui
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Maatha Primary School
- location
-
Nzaui
(in Makueni)
- year first funded
- 2006
- action
- Supply And Installation Of Solar Power System
- output
- Staff Prepare Adequately, Access To Radio Pupils Hold Reps
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kambi Mawe Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Harambee Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kitooni Dam
- location
-
Unoa
(in Makueni)
- year first funded
- 2003
- action
- Scooping Of Mud And Disiliting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ngaku Shallow Well
- location
-
Mutyambua
(in Makueni)
- year first funded
- 2006
- action
- Construction Of A Shallow Well.
- output
- To Provide Drinking Water
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kithuki Zone
- location
-
Kithuki
(in Makueni)
- year first funded
- 2003
- action
- Purchase And Supply Of Desks
- output
- Pupils Have Sitting Facilities
- implementation status
- Supplied
- total cost
- Ksh 41,000
- estimate
- Ksh 41,000
Kalumbi Secondary School
- location
-
Ithumba
(in Makueni)
- year first funded
- 2007
- action
- Environmental Impact Assessment
- output
- Expand The School
- implementation status
- Complete
- total cost
- Ksh 9,480
- estimate
- Ksh 9,480
Kwa Muasa Earth Dam
- location
-
Unoa
(in Makueni)
- action
- Disilting And Rehabilitation
- output
- Provide Clean Water
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 0
Ndauni Sand Dam
- location
-
Kavuthu
(in Makueni)
- action
- Purchase And Supply Hardcore, Sand, Water And Ballast
- output
- Reduce Soil Erosion Sand Harvesting Clean Water
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 100,000
Kakuswi Dam
- location
-
Kanthuni
(in Makueni)
- action
- Scooping Of Mud And Disilting Of The Dam
- output
- Community Have Water For Domestic Use And Livestock
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 100,000
Muooni Kwa Kivoko Sand Da
- location
-
Emali
(in Makueni)
- action
- n/a
- output
- -
- implementation status
- poor West manship-non acountability
- total cost
- Ksh 0
- estimate
- Ksh 300,000
Mulato Sand Dam
- location
-
Kilili
(in Makueni)
- action
- Construction Of Sand Dam.
- output
- Check Soil Erosion Provide Sand Harvesting Grounds
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 550,000
Nguuh/Qs
- location
-
Nguu
(in Makueni)
- action
- Completion Of Administrative
- output
- Improved Service Delivery
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 300,000
Aic Kyumbe
- location
-
Mulala
(in Makueni)
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 0
Kambi Mawe Dispensary
- location
-
Wote
(in Makueni)
- action
- Expansion Of Dispensary
- output
- Improved Health Services
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 0
Kiuani Primary School
- location
-
Mbitini
(in Makueni)
- action
- Renovation Of 6 Classrooms
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 150,000
Mii Primary School
- location
-
Nguu
(in Makueni)
- action
- Construction Of 1 Classroom And Furnishing It
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 300,000
Kimundi primary School
- location
-
Unoa
(in Makueni)
- action
- Repair And Renovation Of Roofs
- output
- School Has Improved Learning Facilities
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 200,000
Mbole Drift
- location
-
Mweini
(in Makueni)
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion, Sand Harvesting Clean Water
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 0
Kakili Water Catchments
- location
-
Ithumba
(in Makueni)
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion, Sand Harvesting Clean Water
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 0
Matooni/Katheka S/Dam
- location
-
Mutyambua
(in Makueni)
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion, Sand Harvesting Clean Water
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 150,000
Kasevi Springs
- location
-
Nguu
(in Makueni)
- action
- Construction Of A Sand Dam Across The River
- output
- Reduce Soil Erosion, Sand Harvesting Clean Water
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 0
Nthangu Water Project
- location
-
Unoa
(in Makueni)
- action
- Supply Of And Laying Of Pipes And Accessories
- output
- Reduce Soil Erosion, Sand Harvesting Clean Water
- implementation status
- 100,000 ex- nyamagwa Boys - 2003/4
- total cost
- Ksh 0
- estimate
- Ksh 0