The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
    It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    
    
        
            
            Constituency Bursary Fund
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Assist The Needy And Bright The Students From Malindi
 
                - output
 
                    - To Enhance Literacy Rate
 
                - implementation status
 
                    - Well Utilized
 
                - total cost
 
                    - Ksh 30,801,463
 
                - estimate
 
                    - Ksh 15
 
            
         
    
        
            
            Grader Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Purchase Of Motor Grader
 
                - output
 
                    - To Open Up Rural Roads
 
                - implementation status
 
                    - Purchased And Delivered
 
                - total cost
 
                    - Ksh 19,400,000
 
                - estimate
 
                    - Ksh 20,000,000
 
            
         
    
        
            
            Emergency Funds
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Attending Any Emergency In The Constitution
 
                - output
 
                    - Alleviate Poverty In The Community
 
                - implementation status
 
                    - Well Utilized
 
                - total cost
 
                    - Ksh 10,813,562
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Malindi Constituency Office
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of A Constituency Office
 
                - output
 
                    - To Improve On Service Delivery
 
                - implementation status
 
                    - At Tendering Stage
 
                - total cost
 
                    - Ksh 10,000,000
 
                - estimate
 
                    - Ksh 11,000,000
 
            
         
    
        
            
            Marikano Primary School
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of School
 
                - output
 
                    - Increase Enrolment/ Conducive Learning Environment
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 9,211,460
 
                - estimate
 
                    - Ksh 921,460
 
            
         
    
        
            
            Office Administration
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Facilitate Office Operation
 
                - output
 
                    - To Enhance Service Provision
 
                - implementation status
 
                    - Well Utilized
 
                - total cost
 
                    - Ksh 8,565,042
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Watamu Road
            
            
                - location
 
                    - 
                        Watamu
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Laying Of Cabro Block And Construction Of A Drainage System
 
                - output
 
                    - To Improve On Accessibility Of The Area
 
                - implementation status
 
                    - Under Construction
 
                - total cost
 
                    - Ksh 7,000,000
 
                - estimate
 
                    - Ksh 30,000,000
 
            
         
    
        
            
            Watamu Dispensary
            
            
                - location
 
                    - 
                        Watamu
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Dispensary
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 6,008,476
 
                - estimate
 
                    - Ksh 6,000,000
 
            
         
    
        
            
            Meny Heart Secondary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction A Complete Secondary School
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - 3 Classrooms, Administration Block & Laboratory Complete
 
                - total cost
 
                    - Ksh 6,000,000
 
                - estimate
 
                    - Ksh 15,000,000
 
            
         
    
        
            
            Tractor Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Purchase Of A Tractor
 
                - output
 
                    - To Improve On Food Production Through Mechanized Farming
 
                - implementation status
 
                    - 1 Tractor Purchased And In Use
 
                - total cost
 
                    - Ksh 6,000,000
 
                - estimate
 
                    - Ksh 10,000
 
            
         
    
        
            
            Takaye Gahaleni Water Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of A Water Pipeline
 
                - output
 
                    - To Improve On Sanitation
 
                - implementation status
 
                    - 2.1Km Complete, 4 Water Kiosks And 9 Chambers  Complete
 
                - total cost
 
                    - Ksh 5,756,159
 
                - estimate
 
                    - Ksh 13,132,802
 
            
         
    
        
            
            Equipping Dispensary Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Equipping Of Dispensaries
 
                - output
 
                    - To Improve Health Service To The Community
 
                - implementation status
 
                    - Equipments Purchased & Delivered To Dmoh For Distribution
 
                - total cost
 
                    - Ksh 5,500,000
 
                - estimate
 
                    - Ksh 2,200,000
 
            
         
    
        
            
            Monitoring And Evaluation & Capacity Building
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Assist In Monitoring Of Projects
 
                - output
 
                    - To Ensure That The Value Of The Money Allocated Is Realized
 
                - implementation status
 
                    - Well Utilized
 
                - total cost
 
                    - Ksh 5,250,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Jilore Secondary School , Dormitory
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Dormitory
 
                - output
 
                    - To Increase Enrolment
 
                - implementation status
 
                    - 90% Complete
 
                - total cost
 
                    - Ksh 5,200,000
 
                - estimate
 
                    - Ksh 3,600,000
 
            
         
    
        
            
            Shella To Qubra Masjid Road
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Drainage System & Laying Of Cabro Blocks
 
                - output
 
                    - To Improve On Hygiene
 
                - implementation status
 
                    - Work Ongoing
 
                - total cost
 
                    - Ksh 5,000,000
 
                - estimate
 
                    - Ksh 7,000,000
 
            
         
    
        
            
            Robert Macri Secondary School
            
            
                - location
 
                    - 
                        Watamu
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Secondary School
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - 3 Classrooms Completed And In Use Two Toilets  Under Construction
 
                - total cost
 
                    - Ksh 4,488,736
 
                - estimate
 
                    - Ksh 11,000,000
 
            
         
    
        
            
            Lucas Baya Maitha Secondary School
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of 2 Classroom & Administration Block
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - 4 Classrooms And Administration Block Complete. Toilets Under Construction
 
                - total cost
 
                    - Ksh 4,400,000
 
                - estimate
 
                    - Ksh 10,000,000
 
            
         
    
        
            
            Kibokoni Secondary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Laboratory
 
                - output
 
                    - Provide Conducive Learning Environment
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 4,160,000
 
                - estimate
 
                    - Ksh 4,000,000
 
            
         
    
        
            
            Matolani Dispensary Staff Quarter
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Twin Staff Quarter
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 4,070,396
 
                - estimate
 
                    - Ksh 3,000,000
 
            
         
    
        
            
            Barani Secondary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Administration Block
 
                - output
 
                    - Improve On Learning Environment
 
                - implementation status
 
                    - Phase I Of Administration Block Completed
 
                - total cost
 
                    - Ksh 3,780,000
 
                - estimate
 
                    - Ksh 4,000,000
 
            
         
    
        
            
            Ganda Secondary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of 2 Classrooms And Two Toilets
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - 5 Acre Land Purchased And 2  Classrooms Completed, 2 Toilets Under Construction
 
                - total cost
 
                    - Ksh 3,600,000
 
                - estimate
 
                    - Ksh 0
 
            
         
    
        
            
            Constituency Desk Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of Desks For School
 
                - output
 
                    - Increase Enrolment/ Conducive Learning Environment
 
                - implementation status
 
                    - 2772 Desks Made And Delivered To Various Schools
 
                - total cost
 
                    - Ksh 3,460,000
 
                - estimate
 
                    - Ksh 320,000
 
            
         
    
        
            
            Gede Special Unit
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Dining Hall
 
                - output
 
                    - Enhance Hygiene
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 3,292,307
 
                - estimate
 
                    - Ksh 3,020,350
 
            
         
    
        
            
            Sosobora Girimacha Water Project
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of A Water Pipeline From Sosobora To Kasuhanzala
 
                - output
 
                    - To Improve On Sanitation
 
                - implementation status
 
                    - 1 Water Tank Constructed And A 4Km Pipeline
 
                - total cost
 
                    - Ksh 3,250,000
 
                - estimate
 
                    - Ksh 7,000,000
 
            
         
    
        
            
            Sabaki Dispensary
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Upgrading Of The Dispensary
 
                - output
 
                    - Construction Of A Type 1 Dispensary
 
                - implementation status
 
                    - 95% Of Work Complete
 
                - total cost
 
                    - Ksh 2,900,000
 
                - estimate
 
                    - Ksh 3,000,000
 
            
         
    
        
            
            Gede Dispensary
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of A Female Ward
 
                - output
 
                    - To Improve On Human Health Care
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 2,892,063
 
                - estimate
 
                    - Ksh 5,500,000
 
            
         
    
        
            
            Madunguni Dispensary Staff Quarter
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of Twin Staff Quarter
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - 90% Of Work Complete
 
                - total cost
 
                    - Ksh 2,700,000
 
                - estimate
 
                    - Ksh 4,800,000
 
            
         
    
        
            
            Upweoni Primary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Five Classrooms
 
                - output
 
                    - Increase Enrolment/ Conducive Learning Environment
 
                - implementation status
 
                    - Five Classroom And 75 Desks Complete
 
                - total cost
 
                    - Ksh 2,700,000
 
                - estimate
 
                    - Ksh 3,200,000
 
            
         
    
        
            
            Kakuyuni Primary School Toilets
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Rehabilitation Of The Polytechnic
 
                - output
 
                    - To Improve On Hygiene Conditions
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 2,500,000
 
                - estimate
 
                    - Ksh 3,000,000
 
            
         
    
        
            
            Constituency Office Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Purchase Of Office Equipments
 
                - output
 
                    - To Address Administrative Needs
 
                - implementation status
 
                    - Different Furniture And Equipments Purchased
 
                - total cost
 
                    - Ksh 2,371,212
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Mijomboni Dispensary Staff Quarter
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of A Twin Staff Quarter
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 2,300,000
 
                - estimate
 
                    - Ksh 3,000,000
 
            
         
    
        
            
            Madunguni Dispensary
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Dispensary
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete And Operating
 
                - total cost
 
                    - Ksh 2,300,000
 
                - estimate
 
                    - Ksh 3,800,000
 
            
         
    
        
            
            Bofu Bore Water Project
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Drilling Of Boreholes
 
                - output
 
                    - To Improve On Water Availability To The People
 
                - implementation status
 
                    - Two Bore Holes Drilled But No Water
 
                - total cost
 
                    - Ksh 2,150,000
 
                - estimate
 
                    - Ksh 3,000,000
 
            
         
    
        
            
            Kakoneni Nursery School
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Two Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Completed And In Use
 
                - total cost
 
                    - Ksh 2,125,165
 
                - estimate
 
                    - Ksh 1,133,035
 
            
         
    
        
            
            Kavunyalalo Primary School
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of 3 Classrooms
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 2,125,165
 
                - estimate
 
                    - Ksh 2,400,000
 
            
         
    
        
            
            Watamu Primary School
            
            
                - location
 
                    - 
                        Watamu
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Renovation Of School
 
                - output
 
                    - To Improve On  Learning Environment
 
                - implementation status
 
                    - 12 Classroom Block Renovated
 
                - total cost
 
                    - Ksh 2,000,000
 
                - estimate
 
                    - Ksh 4,500,000
 
            
         
    
        
            
            Langobaya Ds Office
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of A DoS Office
 
                - output
 
                    - To Improve On Service Delivery / Security
 
                - implementation status
 
                    - Work At Tendering Stage
 
                - total cost
 
                    - Ksh 2,000,000
 
                - estimate
 
                    - Ksh 4,500,000
 
            
         
    
        
            
            Gede Secondary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Renovation Of The Entire School
 
                - output
 
                    - Provide Conducive Learning Environment
 
                - implementation status
 
                    - 11 Classrooms Renovated
 
                - total cost
 
                    - Ksh 2,000,000
 
                - estimate
 
                    - Ksh 3,000,000
 
            
         
    
        
            
            Recurrent Expenditure
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Finance Recurrent Expenditure
 
                - output
 
                    - -
 
                - implementation status
 
                    - Well Utilized
 
                - total cost
 
                    - Ksh 1,850,882
 
                - estimate
 
                    - Ksh 1,850,882
 
            
         
    
        
            
            Canon Mweri Secondary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Classroom, Toilets & Desks
 
                - output
 
                    - Improve Learning Environment / Sanitation
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 1,600,000
 
                - estimate
 
                    - Ksh 2,500,000
 
            
         
    
        
            
            Sir Ali Primary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Rehabilitation Of Six Classrooms
 
                - output
 
                    - Create Conducive Learning Environment
 
                - implementation status
 
                    - Work Completed And Classes In Use.
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Chakama Squatters Settlement Schooleme
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Subdivision Of Land
 
                - output
 
                    - Settlement Of Squatters
 
                - implementation status
 
                    - 80% Of Work Done
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Purchase Of Step Down Transformers
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Purchase 4 Step Down Transformers
 
                - output
 
                    - To Light Rural Areas Within The Constituency
 
                - implementation status
 
                    - 3 Transformers Installed And Operational. 1 Electricity Line Under Constriction
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 15,000,000
 
            
         
    
        
            
            Langobaya Dispensary
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Dispensary
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete And Operational
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 1,700,000
 
            
         
    
        
            
            Sabaki Dispensary
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Dispensary
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Matolani Dispensary
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of A Dispensary
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete And Operational
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Mijomboni Dispensary
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2003
 
                
                - action
 
                    - Construction Of A Dispensary
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete And Operational
 
                - total cost
 
                    - Ksh 1,500,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Dabaso Primary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Installing Electricity & Construction Of Administration Block
 
                - output
 
                    - Enhance Security Of The School
 
                - implementation status
 
                    - Electricity Installed & Administration Block At Gable  Level
 
                - total cost
 
                    - Ksh 1,350,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Kanani Primary School
            
            
                - location
 
                    - 
                        Watamu
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Three Classrooms
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,200,000
 
                - estimate
 
                    - Ksh 1,200,000
 
            
         
    
        
            
            Kanyangwa Water Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Water Pipeline
 
                - output
 
                    - To Improve On Sanitation
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,200,000
 
                - estimate
 
                    - Ksh 1,200,000
 
            
         
    
        
            
            Kwa Upanga Primary School
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Two Classrooms
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Two Classrooms Completed And In Use
 
                - total cost
 
                    - Ksh 1,100,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Girimacha Primary School
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Two Classrooms
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,050,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Msabaha Tuva Pipeline Water Project
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of A Water Pipeline From Msabaha To Tuva
 
                - output
 
                    - To Provide Water To The People Within The Area
 
                - implementation status
 
                    - 1.7Km Pipeline Constructed. Work On Going
 
                - total cost
 
                    - Ksh 1,050,000
 
                - estimate
 
                    - Ksh 650,000
 
            
         
    
        
            
            Chembe Kibambamche Settlement Schooleme
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Land Sub Divisional Adjudication
 
                - output
 
                    - -
 
                - implementation status
 
                    - 95% Of Work Complete. Awaiting Action From The Ministry Of Lands
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 2,500,000
 
            
         
    
        
            
            Majivuni Primary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of 1 Classrooms
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Completed And In Use
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Jilore Secondary School
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Kulalu Primary School
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of Two Classrooms
 
                - output
 
                    - Increase School Enrolment
 
                - implementation status
 
                    - Two Classrooms And An Office Completed
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Constituency Strategic Plan
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Preparation Of A Constituency Strategic Plan
 
                - output
 
                    - -
 
                - implementation status
 
                    - Final Draft Ready
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 3,500,000
 
            
         
    
        
            
            Jimba Gede Settlement Schooleme
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Land Sub Divisional Adjudication
 
                - output
 
                    - -
 
                - implementation status
 
                    - 95% Of Work Complete. Awaiting Action From The Ministry Of Lands
 
                - total cost
 
                    - Ksh 1,000,000
 
                - estimate
 
                    - Ksh 2,800,000
 
            
         
    
        
            
            Mmangani Water Project
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of A Water Pipeline
 
                - output
 
                    - Providing Water To Mmangani People
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 930,000
 
                - estimate
 
                    - Ksh 930,000
 
            
         
    
        
            
            Bofu Primary School
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Two Classrooms
 
                - output
 
                    - Improve Learning Environment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 900,000
 
                - estimate
 
                    - Ksh 200,000
 
            
         
    
        
            
            Mmangani Primary School
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of 2 Classrooms
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - 2 Classroom Completed And In Use Without Plaster And Floor
 
                - total cost
 
                    - Ksh 900,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Kwa Upanga Primary School
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of 5 Classrooms
 
                - output
 
                    - Increase Enrolment/ Conducive Learning Environment
 
                - implementation status
 
                    - Complete Through Partnership With Parents
 
                - total cost
 
                    - Ksh 850,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Shakahola Primary School
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Renovation Of 5 Classrooms Blown Off By Wind
 
                - output
 
                    - Increase Enrolment/ Conducive Learning Environment
 
                - implementation status
 
                    - 3  Classrooms Completely Rehabilitated And In Use
 
                - total cost
 
                    - Ksh 850,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Mida Primary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of One Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 850,000
 
                - estimate
 
                    - Ksh 850,000
 
            
         
    
        
            
            Kizingo Water Project
            
            
                - location
 
                    - 
                        Watamu
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Water Pipeline
 
                - output
 
                    - To Improve On Sanitation
 
                - implementation status
 
                    - project is condemed
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Ganda Primary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 800,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Milimani Nursery School
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of A Nursery School
 
                - output
 
                    - Improve Learning Environment
 
                - implementation status
 
                    - Complete And Operation
 
                - total cost
 
                    - Ksh 750,000
 
                - estimate
 
                    - Ksh 750,000
 
            
         
    
        
            
            Manyeso Dairy Cooperative Society
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Purchase Of A Pasteurizer
 
                - output
 
                    - -
 
                - implementation status
 
                    - Purchased And Handed To The Society
 
                - total cost
 
                    - Ksh 700,000
 
                - estimate
 
                    - Ksh 700,000
 
            
         
    
        
            
            Kikombethele Squatter Settlement Schooleme
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Settlement Of Over 600 People
 
                - output
 
                    - Issuing Of Title Deeds To The Over 600 People To Legalize Ownership
 
                - implementation status
 
                    - 98% Of Work Complete. Awaiting Allotment Letters From Ministry Of Lands
 
                - total cost
 
                    - Ksh 690,000
 
                - estimate
 
                    - Ksh 570,000
 
            
         
    
        
            
            Town Nursery School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Renovation Of Nursery School
 
                - output
 
                    - Improve The Learning Environment
 
                - implementation status
 
                    - Completed
 
                - total cost
 
                    - Ksh 650,000
 
                - estimate
 
                    - Ksh 650,000
 
            
         
    
        
            
            Malindi Secondary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Dormitory.
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Completed And In Use
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Tractor Trailer Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Purchase Of Tractor Trailer
 
                - output
 
                    - To Assist In Transportation Of Farm Produce
 
                - implementation status
 
                    - Purchased
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Ganda Dispensary
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Renovation Of Dispensary
 
                - output
 
                    - Complete Renovation Of A Dormitory
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 690,000
 
            
         
    
        
            
            Kakoneni Girls Secondary School
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Completed And In Use
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Kakuyuni Boys Secondary School
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Completed And In Use
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Mbaraka Chembe Primary School
            
            
                - location
 
                    - 
                        Watamu
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete And In  Use
 
                - total cost
 
                    - Ksh 600,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Kavunyalalo Primary School & School Toilets
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Toilets
 
                - output
 
                    - Improve Sanitation
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 524,034
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Kavunyalalo Toilets
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Toilets For Primary School
 
                - output
 
                    - To Provide Conducive Learning Environment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 524,034
 
                - estimate
 
                    - Ksh 524,034
 
            
         
    
        
            
            Environment Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Planting Of Trees At Langobaya DoS Office And Mongotini
 
                - output
 
                    - Improve On The Environment
 
                - implementation status
 
                    - On Going
 
                - total cost
 
                    - Ksh 500,060
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Central Primary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Completed And In Use
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mshongoleni Dispensary
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of A Dispensary
 
                - output
 
                    - To Bring Health Service Closer To The Community
 
                - implementation status
 
                    - Work On Going
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 3,500,000
 
            
         
    
        
            
            Kakuyuni Dispensary
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Renovation Of Leaking Roof And Electricity Installation
 
                - output
 
                    - To Improve On The Working Condition Of The Dispensary Staff
 
                - implementation status
 
                    - Work On Going
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 1,500,000
 
            
         
    
        
            
            Majivuni Primary School
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Hawe Wanje Primary School
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Balaga Primary School
            
            
                - location
 
                    - 
                        Chakama
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Baguo Primary School
            
            
                - location
 
                    - 
                        Mijomboni
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2009
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - To Increase Enrolment
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 800,000
 
            
         
    
        
            
            Milimani Youth Project
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Assist Youth Start Business
 
                - output
 
                    - Assist Youth Start Income Generation Activities
 
                - implementation status
 
                    - Ongoing
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 600,000
 
            
         
    
        
            
            Muyeye Area Pipeline Water Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of Water Pipeline For Muyeye Area
 
                - output
 
                    - To Provide Water To The People Within The Area
 
                - implementation status
 
                    - At Tendering Stage
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mekatilili Secondary School
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Construction Of 4 Classrooms
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Not Started
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 2,400,000
 
            
         
    
        
            
            Malindi Tourist Market
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Installation Of Electricity In The Market
 
                - output
 
                    - To Improve On Security In The Market
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Shononeka Water Project
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of 2Km Line
 
                - output
 
                    - To Address Water Needs Of The People
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Kakoneni Girls Secondary School
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Renovation Of A Dormitory
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Malimo Dispensary
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of A Dispensary Toilet
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mekatilili Secondary School
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Purchase Of Laboratory Equipments
 
                - output
 
                    - Provide Conducive Learning Environment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Yembe Primary School
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 750,000
 
            
         
    
        
            
            Msabaha Primary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of A Toilet
 
                - output
 
                    - Improve Sanitation
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 500,000
 
            
         
    
        
            
            Mkangagani Primary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of 1 Classroom
 
                - output
 
                    - Increase Enrolment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 500,000
 
                - estimate
 
                    - Ksh 750,000
 
            
         
    
        
            
            Hgm Primary School Toilets
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Construction Of Pupils Toilets
 
                - output
 
                    - To Provide Conducive Learning Environment
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 475,000
 
                - estimate
 
                    - Ksh 466,995
 
            
         
    
        
            
            Purchase Of Four Motor Bikes
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Purchase Of 4 Motor Bikes For Chiefs
 
                - output
 
                    - To Easy Monitoring Of Cdf Projects
 
                - implementation status
 
                    - Not Yet Purchased
 
                - total cost
 
                    - Ksh 450,000
 
                - estimate
 
                    - Ksh 1,200,000
 
            
         
    
        
            
            Constituency Sports Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Assisting Various Sports Team With Uniforms And Sports Equipments
 
                - output
 
                    - To Improve On Sporting Skills For The Youth
 
                - implementation status
 
                    - Various Teams Benefitted From The Kitty
 
                - total cost
 
                    - Ksh 368,000
 
                - estimate
 
                    - Ksh 368,000
 
            
         
    
        
            
            Pishi Mwenga Primary School Water Project
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Connection Of Water Pipeline To School
 
                - output
 
                    - To Improve On Sanitation
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 763,800
 
            
         
    
        
            
            Karima Primary School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Renovation Of Six Classrooms
 
                - output
 
                    - Increase Enrolment/ Conducive Learning Environment
 
                - implementation status
 
                    - Classrooms Renovated & In Use
 
                - total cost
 
                    - Ksh 300,000
 
                - estimate
 
                    - Ksh 300,000
 
            
         
    
        
            
            Ganda Primary School Toilets
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Renovation Of Toilets
 
                - output
 
                    - To Improve On Hygiene Conditions
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 294,700
 
                - estimate
 
                    - Ksh 294,700
 
            
         
    
        
            
            Kakuyuni Primary School Toilets
            
            
                - location
 
                    - 
                        Goshi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Construction Of Toilets
 
                - output
 
                    - To Improve On Hygiene Conditions
 
                - implementation status
 
                    - Complete And In Use
 
                - total cost
 
                    - Ksh 294,700
 
                - estimate
 
                    - Ksh 294,700
 
            
         
    
        
            
            Gede Youth Polytechnic
            
            
                - location
 
                    - 
                        Ganda
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2004
 
                
                - action
 
                    - Installation And Electrification Of The Polytechnic
 
                - output
 
                    - To Improve Learning Environment
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 260,000
 
                - estimate
 
                    - Ksh 260,000
 
            
         
    
        
            
            Kisumu Ndogo Roads
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Rehabilitation Of Roads
 
                - output
 
                    - To Improve On Accessibility Of The Area
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 250,000
 
                - estimate
 
                    - Ksh 250,000
 
            
         
    
        
            
            Kakoneni Primary School Water Project
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Connection Of Water To School
 
                - output
 
                    - To Improve On Sanitation
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 660,980
 
            
         
    
        
            
            Langobaya Dispensary Staff Quarter
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Construction Of A Twin Quarter.
 
                - output
 
                    - Improve On Human Health Care
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 200,000
 
                - estimate
 
                    - Ksh 2,000,000
 
            
         
    
        
            
            Kisumu Ndogo Water Project
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - n/a
 
                - output
 
                    - To Address Water Needs Of The People
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 166,000
 
                - estimate
 
                    - Ksh 166,000
 
            
         
    
        
            
            Malindi Handcraft Cooperation
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2005
 
                
                - action
 
                    - Purchase Of Electric Generator
 
                - output
 
                    - To Provide Electric Power To Improve On Security
 
                - implementation status
 
                    - Purchased And  Installed
 
                - total cost
 
                    - Ksh 162,500
 
                - estimate
 
                    - Ksh 162,500
 
            
         
    
        
            
            Jilore Primary School Toilets
            
            
                - location
 
                    - 
                        Jilore
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2008
 
                
                - action
 
                    - Renovation Of Toilets
 
                - output
 
                    - To Improve On Hygienic Conditions
 
                - implementation status
 
                    - Complete
 
                - total cost
 
                    - Ksh 120,000
 
                - estimate
 
                    - Ksh 120,000
 
            
         
    
        
            
            Mijomboni Primary School
            
            
                - location
 
                    - 
                        Gede
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2007
 
                
                - action
 
                    - Purchase And Installation Of A Solar Panel
 
                - output
 
                    - Enhance Security/ Conducive Learning Environment
 
                - implementation status
 
                    - Purchased And Installed
 
                - total cost
 
                    - Ksh 110,000
 
                - estimate
 
                    - Ksh 110,000
 
            
         
    
        
            
            Langobaya Irrigation Project
            
            
                - location
 
                    - 
                        Langobaya
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Purchase Of A Water Pump
 
                - output
 
                    - To Increase Food Production Through Farm Irrigation
 
                - implementation status
 
                    - Purchased & Installed
 
                - total cost
 
                    - Ksh 100,000
 
                - estimate
 
                    - Ksh 1,000,000
 
            
         
    
        
            
            Nusra Technical School
            
            
                - location
 
                    - 
                        Malindi
                        (in Malindi)
                    
 
                
                - year first funded
 
                    - 2006
 
                
                - action
 
                    - Equipping Of The School
 
                - output
 
                    - To Enhance Technical Knowledge To The Youth
 
                - implementation status
 
                    - Purchased Equipments & Handed Over To School
 
                - total cost
 
                    - Ksh 40,000
 
                - estimate
 
                    - Ksh 400,000