The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Arabia Dispensary Wards
- location
-
Arabia
(in Mandera East)
- year first funded
- 2003
- action
- Construction of General And Maternity Wards
- output
- General And Maternity Wards
- implementation status
- Complete; Not In Use
- total cost
- Ksh 9,000,000
- estimate
- Ksh 9,000,000
Lafey Secondary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2004
- action
- Construction of S/House, 2 Classrooms, Toilets
- output
- S/House, 2 Classrooms, Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 8,000,000
- estimate
- Ksh 15,000,000
Sala Dispensary
- location
-
Sala
(in Mandera East)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Roofed And Plastered.
- total cost
- Ksh 7,480,000
- estimate
- Ksh 6,480,000
Kalalio Dispensary Ward
- location
-
Khallalio
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Maternity And General Ward
- output
- Maternity And General Ward
- implementation status
- Complete; Not In Use
- total cost
- Ksh 7,400,000
- estimate
- Ksh 7,400,000
Warankara Dispensary
- location
-
Warankara
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete And In Use
- total cost
- Ksh 6,500,000
- estimate
- Ksh 6,500,000
Libahiya Dispensary
- location
-
Libeiya
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Maternity Ward
- output
- Maternity Ward
- implementation status
- Complete; Not In Use
- total cost
- Ksh 5,600,000
- estimate
- Ksh 5,600,000
Arabia Girls Secondary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2004
- action
- Construction of 2 Classrooms,Dormitory
- output
- 2 Classrooms,Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 5,215,000
- estimate
- Ksh 5,300,000
Lafey Secondary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2006
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Roofing Complete
- total cost
- Ksh 4,500,000
- estimate
- Ksh 4,500,000
Lafey Health Centre
- location
-
Lafey
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Foundation Level
- total cost
- Ksh 4,300,000
- estimate
- Ksh 9,000,000
Hareri Dispensary
- location
-
Hareri
(in Mandera East)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete And In Use
- total cost
- Ksh 4,100,000
- estimate
- Ksh 4,100,000
Lafey Secondary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 4,000,000
Hareri Secondary School
- location
-
Hareri
(in Mandera East)
- year first funded
- 2007
- action
- Construction of Staff House
- output
- Staff House
- implementation status
- At Lintel Level
- total cost
- Ksh 2,800,000
- estimate
- Ksh 3,900,000
Arabia Girls Secondary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2006
- action
- Construction of Staff House
- output
- Staff House
- implementation status
- Complete And In Use
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,600,000
Mandera Boys Day Sec
- location
-
Barwako
(in Mandera East)
- year first funded
- 2008
- action
- New School Construction
- output
- 2 Classrooms , Admin Block
- implementation status
- 2 C/Rooms Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 4,000,000
Aresa Primary School
- location
-
Aresa
(in Mandera East)
- year first funded
- 2006
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Hareri Secondary School
- location
-
Hareri
(in Mandera East)
- year first funded
- 2007
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Complete; Not In Use
- total cost
- Ksh 2,320,000
- estimate
- Ksh 3,600,000
Barmile/Hararkar Ground Water Tank
- location
-
Gari
(in Mandera East)
- year first funded
- 2007
- action
- Construction of U/G Water Tank
- output
- U/G Water Tank
- implementation status
- Stalled
- total cost
- Ksh 2,200,000
- estimate
- Ksh 3,000,000
Hareri Primary School
- location
-
Hareri
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete; Not In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Hareri Secondary School
- location
-
Hareri
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete; Not In Use
- total cost
- Ksh 1,880,000
- estimate
- Ksh 1,880,000
Lafey Secondary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2003
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 1,721,569
- estimate
- Ksh 1,721,569
Gari Primary School
- location
-
Gari
(in Mandera East)
- year first funded
- 2003
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Arabia Primary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 3 Classrooms; Dorm
- output
- 3Classrooms; Dorm
- implementation status
- Complete; Not In Use
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,650,000
Bulla Mpya Dispensary
- location
-
B/Mpya
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete And In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Neboi Dispensary Staff House
- location
-
Neboi
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Maternity Ward
- output
- Maternity Ward
- implementation status
- Complete; Not In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Gari Dam Disilting Inlet
- location
-
Gari
(in Mandera East)
- year first funded
- 2007
- action
- Inlet Desilting
- output
- Deeper Earth Dam
- implementation status
- Complete And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Fino Dispensary
- location
-
Fino
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Shafsahfey Dispensary
- location
-
Shafshafey
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Maternity Ward
- output
- Maternity Ward
- implementation status
- Complete; Not In Use
- total cost
- Ksh 1,340,000
- estimate
- Ksh 1,340,000
Hareri Hosle Dispensary
- location
-
H/Hosle
(in Mandera East)
- year first funded
- 2003
- action
- Construction of New Dispensary
- output
- New Dispensary
- implementation status
- Complete; Not In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Libahiya Primary School
- location
-
Libahiya
(in Mandera East)
- year first funded
- 2008
- action
- Completion-Plastering, Doors, Windows And Painting
- output
- Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Saro Hindi Primary School
- location
-
Sarohindi
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete; Not In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Neboi Dispensary
- location
-
Neboi
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Lafey Secondary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Lafey Upper Primary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 2 Classrooms;
- output
- 2 Classrooms;
- implementation status
- Complete; Not In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Warankara Primary School
- location
-
Gari
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Roofed And Plastered. Not Painted
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Boystown Primary School
- location
-
B/Jamuhuria
(in Mandera East)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,140,000
- estimate
- Ksh 1,140,000
Moi Girls Secondary School
- location
-
B/Mpya
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Alungu-Gof Dam Disilting
- location
-
Lafey
(in Mandera East)
- year first funded
- 2007
- action
- Desilting Inlet
- output
- Increaed Capacity
- implementation status
- Halfway Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Warankara Dispensary Water Connection
- location
-
Warankara
(in Mandera East)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Neboi Primary School
- location
-
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- At Foundation Level
- total cost
- Ksh 948,440
- estimate
- Ksh 1,000,000
Deb Primary School
- location
-
B/Jamuhuria
(in Mandera East)
- year first funded
- 2004
- action
- Construction of 3 Clsssrooms
- output
- 3 Clsssrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Kamor Primary School
- location
-
Kamor
(in Mandera East)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Neboi Dispensary Fencing
- location
-
Neboi
(in Mandera East)
- year first funded
- 2007
- action
- Erection of A Fence
- output
- Fencing
- implementation status
- Complete
- total cost
- Ksh 840,000
- estimate
- Ksh 840,000
Arabia Girls Secondary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Water Tanks
- output
- 2 Water Tanks
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Bambo Primary School
- location
-
Bambo
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Damasa Primary School
- location
-
Damasa
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Arabia Boys Secondary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2006
- action
- Furniture Making
- output
- Desks, Chairs
- implementation status
- Complete And In Use
- total cost
- Ksh 785,000
- estimate
- Ksh 785,000
Bulla Mpya Primary School
- location
-
B/Mpya
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Shafshafey Primary School
- location
-
Shafshafey
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Bulla Haji Primary School
- location
-
B/Haji
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Shafshafey Primary School
- location
-
Shafshafey
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Warankara Dispensary Underground W/T
- location
-
Warankara
(in Mandera East)
- year first funded
- 2007
- action
- Construction of U/G Water Tank
- output
- U/G Water Tank
- implementation status
- Complete; Not In Use
- total cost
- Ksh 708,000
- estimate
- Ksh 708,000
Arabia Primary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2008
- action
- Roof And Doors Renovation
- output
- Boys /Girls Dorm
- implementation status
- Not Started
- total cost
- Ksh 700,000
- estimate
- Ksh 1,200,000
Shafhsafey Water Tank Project
- location
-
Shafshafey
(in Mandera East)
- year first funded
- 2004
- action
- Construction of Water Tank
- output
- Water Tank
- implementation status
- Complete; Not In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Libahiya Maternity Sewage
- location
-
Libeiya
(in Mandera East)
- year first funded
- 2007
- action
- Construction of Construction
- output
- Construction
- implementation status
- Complete; Not In Use
- total cost
- Ksh 690,000
- estimate
- Ksh 690,000
Mandera Secondary School Class
- location
-
Central
(in Mandera East)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 670,000
- estimate
- Ksh 670,000
Aresa Dispensary
- location
-
Aresa
(in Mandera East)
- year first funded
- 2008
- action
- Completion From Lintel Level
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kamor Liban Primary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Complete; Not In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Gari Primary School Kitchen
- location
-
Gari
(in Mandera East)
- year first funded
- 2007
- action
- Construction of Kitchen
- output
- Kitchen
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Moi Girls Renovation
- location
-
B/Mpya
(in Mandera East)
- year first funded
- 2007
- action
- Dormitory Renovatin
- output
- Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Fino Primary School
- location
-
Fino
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete; Not In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Bulla Livestock Water Connection
- location
-
Shafshafey
(in Mandera East)
- year first funded
- 2006
- action
- Piping
- output
- Water Connection
- implementation status
- Complete And In Use
- total cost
- Ksh 520,000
- estimate
- Ksh 520,000
Omar Jilaow Primary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Roofed, Not Plastered
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gadudia Water Kiosk
- location
-
Khalalio
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Water Kiosk
- output
- Water Kiosk
- implementation status
- Not Started
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Bella Water Kiosk
- location
-
Khalalio
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Water Kiosk
- output
- Water Kiosk
- implementation status
- Not Started
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Lafey Upper Primary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Admini. Block
- output
- Admini. Block
- implementation status
- Not Started
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Lafey Primary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Buruburu Primary School
- location
-
Central
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Deb Primary School nursery
- location
-
B/Jamuhuria
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Bulla Mpya Primary School
- location
-
B/Mpya
(in Mandera East)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Kamor Primary School Classroom
- location
-
Kamor
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete; Not In Use
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Moi Girls
- location
-
B/Mpya
(in Mandera East)
- year first funded
- 2006
- action
- 3 Classroom Renovation
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 360,000
- estimate
- Ksh 360,000
Bur-Abor Wiosk
- location
-
Khalalio
(in Mandera East)
- year first funded
- 2008
- action
- Construction of Water Kiosk
- output
- Water Kiosk
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Omar Jilaow Primary School
- location
-
O/Jillow
(in Mandera East)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete; Not In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mandera Secondary School -Furniture
- location
-
Central
(in Mandera East)
- year first funded
- 2003
- action
- Furniture Making
- output
- Furniture
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lafey Secondary School
- location
-
Lafey
(in Mandera East)
- year first funded
- 2007
- action
- Making Of Desks And Chambers
- output
- Desks And Chambers
- implementation status
- Complete And In Use
- total cost
- Ksh 292,000
- estimate
- Ksh 292,000
Arabia Girls Secondary School
- location
-
Arabia
(in Mandera East)
- year first funded
- 2007
- action
- Making Of Desks And Chambers
- output
- Beds And Chambers
- implementation status
- Complete And In Use
- total cost
- Ksh 292,000
- estimate
- Ksh 292,000
Kalalio Dispensary Toilets
- location
-
Khallalio
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 4 Toilets
- output
- 4 Toilets
- implementation status
- Complete; Not In Use
- total cost
- Ksh 280,000
- estimate
- Ksh 280,000
Warankara Primary School
- location
-
Warankara
(in Mandera East)
- year first funded
- 2007
- action
- Provision Of Desks
- output
- Desks And Chambers
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Shafshafey Dispensary Furniture
- location
-
Shafshafey
(in Mandera East)
- year first funded
- 2007
- action
- Provision Of Chairs; Tables, Cabinet
- output
- Furniture
- implementation status
- Complete; Not In Use
- total cost
- Ksh 240,000
- estimate
- Ksh 240,000
Gari Primary School
- location
-
Gari
(in Mandera East)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Libahiya Maternity Ward Toilets
- location
-
Libeiya
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Toilets
- output
- 2 Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Bulla Haji Primary School
- location
-
Bulla Haji
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Toilets
- output
- 2 Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Gari Primary School
- location
-
Gari
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Toilets
- output
- 2 Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Sala Dispensary
- location
-
Sala
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Toilets
- output
- 2 Toilets
- implementation status
- Complete; Not In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Neboi Dispensary Toilets
- location
-
Neboi
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Toilets
- output
- 2 Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Warankara Dispensary Toilets
- location
-
Warankara
(in Mandera East)
- year first funded
- 2007
- action
- Construction of 2 Toilets
- output
- 2 Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Provision Of Power To Central Ap Houses
- location
-
Central
(in Mandera East)
- year first funded
- 2007
- action
- Electrical Installation
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Farey Primary School
- location
-
Farey
(in Mandera East)
- year first funded
- 2006
- action
- Construction of Semi-Permanent Classroom
- output
- Semi-Permanent Classroom
- implementation status
- Complete; Not In Use
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
Hareri Dispensary
- location
-
Hareri
(in Mandera East)
- year first funded
- 2006
- action
- Construction of 3 Toilets
- output
- 3 Toilets
- implementation status
- Complete And In Use
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Kamor Liban Primary School
- location
-
K/Liban
(in Mandera East)
- year first funded
- 2006
- action
- Construction of Semi-Permanent Classroom
- output
- Semi-Permanent Classroom
- implementation status
- Complete; Not In Use
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Township Primary School Desks
- location
-
Township
(in Mandera East)
- year first funded
- 2006
- action
- Provision Of Desks
- output
- 60 Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Kamor Primary School
- location
-
Kamor
(in Mandera East)
- year first funded
- 2006
- action
- Provision Of Desks
- output
- 55 Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 110,000
- estimate
- Ksh 110,000
Saro Hindi Shallow Well
- location
-
Sarohindi
(in Mandera East)
- year first funded
- 2005
- action
- Excavation
- output
- Shallow Well
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kabo Inlet Dissilting
- location
-
Kabo
(in Mandera East)
- year first funded
- 2005
- action
- Desilting Inlet
- output
- Deeper Earth Dam
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000