The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Itabua/ Muthatari Irrigation
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2004
- action
- Intake Construction/ Pipes Purchase
- output
- Improve Food Production
- implementation status
- Piped Laid 1 Km
- total cost
- Ksh 7,430,000
- estimate
- Ksh 80,000,000
Kiaga Irrigation
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2004
- action
- Intake Construction/ Pipes Purchase
- output
- Improve Food Production
- implementation status
- Piped Laid 1 Km
- total cost
- Ksh 6,230,000
- estimate
- Ksh 70,000,000
Kibugu/ Nguviu Irrigation Project
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Pipes Purchasing
- output
- Improve Food Production
- implementation status
- Intake Construction Pipes Laid 2..5 Km
- total cost
- Ksh 5,986,819
- estimate
- Ksh 40,000,000
Embu Dairy Socity
- location
-
Manyatta
(in Manyatta)
- year first funded
- 2006
- action
- Purchase Of 2 Vehicles, Coolers And Offices/Stores Construction
- output
- Improved Milk Transportation/ Improved Milk Quality
- implementation status
- 2 Vehicles Purchased
- total cost
- Ksh 3,000,000
- estimate
- Ksh 6,000,000
Schooleme- Kathangari- Mukangu Primary School Road
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2006
- action
- Grading & Gravelling
- output
- Easen Movement
- implementation status
- On- Going
- total cost
- Ksh 2,840,354
- estimate
- Ksh 4,000,000
Kanorori Youth Polytechnic
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2004
- action
- Workshops Construction
- output
- Learning Improvement
- implementation status
- 2 Workshops Complete
- total cost
- Ksh 2,550,000
- estimate
- Ksh 5,000,000
Thambana River- Mbuvori- Karau Health Centre
- location
-
Ngida
(in Manyatta)
- year first funded
- 2007
- action
- Grading & Gravelling
- output
- Easen Movement
- implementation status
- Yet To Commence
- total cost
- Ksh 2,500,000
- estimate
- Ksh 5,000,000
Karau Health Centre
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- X- Rays Theatre
- output
- Better Health Care
- implementation status
- Structure Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 5,000,000
Kithimu Police Post
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2005
- action
- Land Purchase/Construction
- output
- Security Improvement
- implementation status
- Yet To Start
- total cost
- Ksh 2,200,000
- estimate
- Ksh 5,000,000
Kibugu Police Post
- location
-
Nginda
(in Manyatta)
- year first funded
- 2005
- action
- Construction Of Staff Houses
- output
- Security Improvement
- implementation status
- On-Going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 3,000,000
Kithegi Health Centre
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2004
- action
- Maternity Ward Construction
- output
- Better Health Care
- implementation status
- 50% To Completion
- total cost
- Ksh 1,900,000
- estimate
- Ksh 3,500,000
Karurina- Gatituri Road
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2007
- action
- Grading & Gravelling
- output
- Easen Movement
- implementation status
- Yet To Commence
- total cost
- Ksh 1,800,000
- estimate
- Ksh 3,000,000
St. Christopher Day Sec- Nembure
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Laboratory Almost Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,500,000
St. Pauls Mbuvori Primary School
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Classroom/ Toilet Construction/ Land Purchase
- output
- Learning Imporvement
- implementation status
- Toilets Complete/ Classroom At Wall Stage
- total cost
- Ksh 1,575,000
- estimate
- Ksh 4,000,000
St. Marys Mukangu
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Improvement
- output
- Learning Improvent
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Muvandori Day Sec
- location
-
Nginda
(in Manyatta)
- year first funded
- 2003
- action
- Stroyed Classrooms
- output
- Learning Improvement
- implementation status
- Shutter Level
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,500,000
Stalphonse Day Sec
- location
-
Nginda
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,500,000
Kirigi Day Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,500,000
Kamama Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2007
- action
- Domitory,Dining Hall, Kitchen Rehabilitation
- output
- Learning Improvement
- implementation status
- On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 5,000,000
St. Joseph The Worker Kathuniri Day Sec
- location
-
Nginda
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- 10% T0 Completion
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,500,000
Karurina Dispensary
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2007
- action
- Dispensary Construction
- output
- Improved Health Provision
- implementation status
- Structure 10% To Completion
- total cost
- Ksh 1,300,000
- estimate
- Ksh 5,000,000
Kithiria /Kii Irrigation Project
- location
-
Nginda
(in Manyatta)
- year first funded
- 2005
- action
- Pipes Purchasing
- output
- Improve Food Production
- implementation status
- 50% To Completion
- total cost
- Ksh 1,300,000
- estimate
- Ksh 3,000,000
Kairuri Health Centre
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Medical Equipment S
- output
- Better Health
- implementation status
- 50% To Completion
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,500,000
Kithimu / Kithegi Water Society
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2006
- action
- Tank Construction
- output
- Increase Food Supply
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,500,000
St. Lukes Day Sec- Karurina
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2005
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Roofed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
Akithinguri Day Sec
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2005
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Mwara Bridge
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2006
- action
- Bridge Construction
- output
- Easen Movement
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
Gatunduri Day Sec
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 1,020,000
- estimate
- Ksh 1,500,000
Nembure Health Centre
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2004
- action
- Medical Equipments Purchased
- output
- Better Health Care
- implementation status
- Purchased Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,500,000
Kagumori Day Sec
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Ena / Tende Water Society
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2006
- action
- Intake Construction & Pipes
- output
- Food Improvement
- implementation status
- Pipes Purchased
- total cost
- Ksh 1,000,000
- estimate
- Ksh 5,000,000
Gichangai Irrigation Water Project
- location
-
Nginda
(in Manyatta)
- year first funded
- 2006
- action
- Purchase Of Pipes
- output
- Increase Food Supply
- implementation status
- Piped Laid Down
- total cost
- Ksh 1,000,000
- estimate
- Ksh 10,000,000
Gichegeri Water Project
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2007
- action
- Pipes Purchasing
- output
- Clean Water Provision
- implementation status
- 6 Km Pipes Laid Down
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
All Saints Kigari Day Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Roofed
- total cost
- Ksh 950,000
- estimate
- Ksh 1,600,000
Rukira Day Sec
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Learning Improvement
- implementation status
- 2 Classes Almost Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,600,000
Kathangariri- Muthiga Road
- location
-
Gaturi
(in Manyatta)
- year first funded
- 2007
- action
- Grading & Gravelling
- output
- Easen Movement
- implementation status
- Yet To Commence
- total cost
- Ksh 900,000
- estimate
- Ksh 3,000,000
Kiriari Day Sec
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2006
- action
- Stroyed Classrooms
- output
- Learning Improvement
- implementation status
- Walling Plus Pillars Stage
- total cost
- Ksh 900,000
- estimate
- Ksh 5,000,000
Gatwe Primary School
- location
-
Nginda
(in Manyatta)
- year first funded
- 2006
- action
- Storey Classroom Construction
- output
- Learning Improvenemt
- implementation status
- At Lintal Level
- total cost
- Ksh 892,000
- estimate
- Ksh 5,000,000
St. Marys Kiangima Sec
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2004
- action
- Construction Of Multi Purpose Hall
- output
- Social Activities Accomodation
- implementation status
- Roofed
- total cost
- Ksh 850,000
- estimate
- Ksh 2,000,000
Kangaru Mwondu Bridge
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2004
- action
- Bridge Construction
- output
- Easen Movement
- implementation status
- 30% To Completion
- total cost
- Ksh 818,000
- estimate
- Ksh 900,000
Tende Primary School
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Construction/ Land Purchase
- output
- Learning Improment
- implementation status
- 1 Class Complete/ Land Not Purchased
- total cost
- Ksh 790,000
- estimate
- Ksh 1,350,000
Dkairuri Day Secondary School
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2006
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Rintal Level
- total cost
- Ksh 750,000
- estimate
- Ksh 1,500,000
Kamviu Day Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2005
- action
- Laboratory Construction
- output
- Learning Improvement
- implementation status
- Rintal Level
- total cost
- Ksh 750,000
- estimate
- Ksh 1,500,000
Stbenedict- Kithimu Day Sec
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2003
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 750,000
Dkairuri Day Secondary School
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2003
- action
- 2 Classrooms Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 700,000
Gatondo Day Sec
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2003
- action
- 2 Classrooms Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 700,000
Akathangariri Primary School
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- 2 Classroom At Finishing Stage
- total cost
- Ksh 650,000
- estimate
- Ksh 700,000
Kigari/Gakundu Bridge
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2006
- action
- Construction
- output
- Easen Movement
- implementation status
- 30% To Completion
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Manyatta Resource & Cultural Centre
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Hall Construction
- output
- Improve Information
- implementation status
- Stalled
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Stbenendict Karau Day Sec
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- Learning Improvement
- implementation status
- 2 Classes Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,600,000
Kiangoci Primary School
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- 2 Classroom Almost Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 350,000
Stkarumiri Primary School
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Complete
- output
- Learning Improvement
- implementation status
- 2 Classes At Finishing Stg
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
Nembure Youth Ppolytechnic
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2004
- action
- Workshop Construction
- output
- Learning Improvememt
- implementation status
- 1 Workshop Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Achrist The King - Karuriri
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- 1 Class Complete
- total cost
- Ksh 575,000
- estimate
- Ksh 700,000
Runganga Day Sec
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2004
- action
- Storeyed Classrooms
- output
- Learning Improvement
- implementation status
- Wall Stage
- total cost
- Ksh 550,000
- estimate
- Ksh 3,000,000
St. Joseph Allamano Primary School
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- 2 Classrooom Almost Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 1,250,000
Ithangawe Primary School
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- 1 Class Complete/ 2 At Wall Stg
- total cost
- Ksh 530,000
- estimate
- Ksh 700,000
Kithegi Day Sec
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2007
- action
- Stoley Administration/Computer Lab
- output
- Learning Improvement
- implementation status
- Construction Materials Procured
- total cost
- Ksh 500,000
- estimate
- Ksh 4,500,000
Mikundu Bridge
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2006
- action
- Construction
- output
- Easen Movement
- implementation status
- 40% To Completion
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Runganga Primary School
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- 1 Class Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Kiandundu Secondary School
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Kibugu Health Centre
- location
-
Nginda
(in Manyatta)
- year first funded
- 2006
- action
- Male Ward Construction
- output
- Better Health Care
- implementation status
- Slab Level
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
A Kithungurir I Day Secondary School
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2003
- action
- Classroom
- output
- Learning Construction
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 350,000
Kithegi Day Sec
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Equipments
- output
- Learning Improvement
- implementation status
- Equipments Purchased
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Rianjagi Bridge
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Cutting Slope
- output
- Slope Easement
- implementation status
- Complete
- total cost
- Ksh 362,000
- estimate
- Ksh 500,000
Kamviu Day Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2003
- action
- Classroom/Toilet Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mbukori Bridge
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2005
- action
- Construction
- output
- Easen Movement
- implementation status
- 15% To Completion
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
St. Lukes Day Secondary -Karurina
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2003
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Angimari Primary School
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2003
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Matiru / Utheri Bridge
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Culverts
- output
- Easen Movement
- implementation status
- 10% To Completion
- total cost
- Ksh 343,000
- estimate
- Ksh 500,000
Gatituri Primary School
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2003
- action
- Classroom/ Toilet Construction
- output
- Learning Improvement
- implementation status
- Toilet Complete/ Classroom Roofed
- total cost
- Ksh 335,000
- estimate
- Ksh 350,000
Kavari Bridge
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2007
- action
- Bridge Construction
- output
- Easen Movement
- implementation status
- Materials Procured
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
St. Pauls Gakinduriri Primary School
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2003
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 350,000
St. Martha Gatoori Day Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2006
- action
- Repairs
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Stannes Girls Kiriari Sec
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2003
- action
- Dormitory Repairs
- output
- Shelter Improvement
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
All Saints Kigari Day Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2003
- action
- Electrifica-Tion
- output
- Learning Improvement
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Karau Police Post
- location
-
Nginda
(in Manyatta)
- year first funded
- 2006
- action
- Construction
- output
- Hightened Security
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Riamakunyi Bridge
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Bridge Construction
- output
- Easen Movement
- implementation status
- Complete
- total cost
- Ksh 292,000
- estimate
- Ksh 300,000
St. Joseph Ndunda Primary School
- location
-
Nginda
(in Manyatta)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- Roofed
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Rugumu Primary School
- location
-
Nginda
(in Manyatta)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Learning Improvement
- implementation status
- Roofed
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Gatunduri Primary School
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2007
- action
- Toilets Construction
- output
- Health Improvement
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gatondo Itabua Bridg
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2005
- action
- Construction
- output
- Easen Movement
- implementation status
- 15% To Completion
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Kamama Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2003
- action
- Laboratory Equipment S
- output
- Learning Improvement
- implementation status
- Equipments Purchased
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St. Joseph Gituri Day Sec
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2006
- action
- Laboratory Completion
- output
- Learning Improvements
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Itabua Day Sec
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2003
- action
- Tank Construction
- output
- Better Health Care
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Stadrews Primary School
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2007
- action
- Toilets Construction
- output
- Improvement Suntation
- implementation status
- Not Started
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kamavindi/Gatunduri Irrigation Schooleme
- location
-
Nginda
(in Manyatta)
- year first funded
- 2005
- action
- Storage Tank Construction
- output
- Improved Food Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwiria Valley Irrigation
- location
-
Nginda
(in Manyatta)
- year first funded
- 2005
- action
- Pipes Purchase
- output
- Improved Food Production
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gatondo Primary School
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Improved Learning
- implementation status
- Not Started
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Ngandori Youth C
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2006
- action
- Tree Planting
- output
- Environment Conservation
- implementation status
- Complete
- total cost
- Ksh 137,000
- estimate
- Ksh 50,000
Kithimu Environmental Net Work
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2006
- action
- Tree Planting
- output
- Environment Conservation
- implementation status
- Complete
- total cost
- Ksh 137,000
- estimate
- Ksh 50,000
Wamiti Kambevo Women Grp
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2006
- action
- Tree Planting
- output
- Environment Conservation
- implementation status
- Complete
- total cost
- Ksh 137,000
- estimate
- Ksh 50,000
Gaturi Umoja C
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2006
- action
- Tree Planting
- output
- Environment Conservation
- implementation status
- Complete
- total cost
- Ksh 137,000
- estimate
- Ksh 50,000
Ngida C
- location
-
Nginda
(in Manyatta)
- year first funded
- 2006
- action
- Tree Planting
- output
- Environment Conservation
- implementation status
- Complete
- total cost
- Ksh 137,000
- estimate
- Ksh 50,000
Gana C
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2006
- action
- Tree Planting
- output
- Environment Conservation
- implementation status
- Complete
- total cost
- Ksh 137,000
- estimate
- Ksh 50,000
Stangela Nguviu Girls Sec
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Dormitory Completion
- output
- Improved Learning
- implementation status
- Complete
- total cost
- Ksh 115,000
- estimate
- Ksh 150,000
Kenga Primary School
- location
-
Ruguru
(in Manyatta)
- year first funded
- 2007
- action
- Classroom Construction
- output
- Improve Learning
- implementation status
- Not Started
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Muvandori Primary School
- location
-
Nginda
(in Manyatta)
- year first funded
- 2004
- action
- Toilets Construction
- output
- Better Health Care
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiangima Primary School
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2004
- action
- Toilets Construction
- output
- Better Health Care
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kathangari Dispensary
- location
-
Ngandori
(in Manyatta)
- year first funded
- 2004
- action
- Electrifi-Cation
- output
- Better Health Care
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
District Officers Office - Nembure
- location
-
Gaturi South
(in Manyatta)
- year first funded
- 2006
- action
- Electrifica-Tion
- output
- Lighting
- implementation status
- Not Started
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kiethiga Road
- location
-
Mbeti North
(in Manyatta)
- year first funded
- 2007
- action
- Grading & Gravelling
- output
- Easen Movement
- implementation status
- Yet To Commence
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Ndatu Bridge
- location
-
Kithimu
(in Manyatta)
- year first funded
- 2007
- action
- Culverts/Access Path
- output
- Easen Movement
- implementation status
- Yet To Commence
- total cost
- Ksh 50,000
- estimate
- Ksh 600,000
St. Petrs Kathakwa Sec
- location
-
Nginda
(in Manyatta)
- year first funded
- 2007
- action
- Rehabilitation Of Classroom & Dining Hall
- output
- Improved Learning
- implementation status
- Complete
- total cost
- Ksh 25,000
- estimate
- Ksh 200,000