The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Marakwet East

Mogil Dispensary

location
Mon (in Marakwet East)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 5,050,000
estimate
Ksh 0

Koibatek Water Project

location
Koibatek (in Marakwet East)
year first funded
2005
action
Intake And Pipe Laying
output
Water
implementation status
80% Complete
total cost
Ksh 4,600,000
estimate
Ksh 0

Kapyego Water Project

location
Kapyego (in Marakwet East)
year first funded
2004
action
Intake Construction And Water Supply
output
Clean Water
implementation status
90% Complete
total cost
Ksh 4,400,000
estimate
Ksh 0

Queen Of Peace Secondary School

location
Murkutwo (in Marakwet East)
year first funded
2004
action
Classrooms And Staffrooms
output
Classes And Staffrooms
implementation status
80% Complete
total cost
Ksh 3,600,000
estimate
Ksh 0

Kapyego Dispensary

location
Kapyego (in Marakwet East)
year first funded
2003
action
Construction Of Maternity
output
Maternity
implementation status
Complete
total cost
Ksh 3,100,000
estimate
Ksh 3,000,000

Chesoi-Kabiego Road Cleaning And Leveling

location
Chesoi (in Marakwet East)
year first funded
2008
action
Road Cleaning And Leveling
output
Good Road
implementation status
New Project
total cost
Ksh 2,500,000
estimate
Ksh 0

Embomir Primary School

location
Koibirir (in Marakwet East)
year first funded
2005
action
Construction Of 8 Classrooms
output
Complete Classrooms
implementation status
95% Complete
total cost
Ksh 2,500,000
estimate
Ksh 0

Kamogo Dispensary

location
Embolot (in Marakwet East)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 2,500,000
estimate
Ksh 0

Tot Health Centre

location
Koibirir (in Marakwet East)
year first funded
2003
action
Septic Tank(400,000)
output
Septic Tank
implementation status
60% Complete
total cost
Ksh 2,400,000
estimate
Ksh 2,500,000

Kaben Water Furrow

location
Kaben (in Marakwet East)
year first funded
2004
action
Intake Construction And Pipe Laying
output
Water
implementation status
Complete
total cost
Ksh 2,200,060
estimate
Ksh 2,200,060

St. Michael Secondary School

location
Embobut (in Marakwet East)
year first funded
2004
action
Construction Of Laboratory
output
Laboratory
implementation status
Complete
total cost
Ksh 2,200,000
estimate
Ksh 0

Kaptich Water Project

location
Kaptich (in Marakwet East)
year first funded
2004
action
Intake Construction And Pipe Laying
output
Clean Water
implementation status
70% Complete
total cost
Ksh 2,100,000
estimate
Ksh 0

Kapyego Police Post

location
Kapyego (in Marakwet East)
year first funded
2008
action
Office & Staff Houses
output
Complete Post
implementation status
New Project
total cost
Ksh 2,000,000
estimate
Ksh 0

Kapsowarmt

location
Kapsowar (in Marakwet East)
year first funded
2007
action
Building Lecture Rooms
output
Lecture Rooms
implementation status
85% Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Chesongoch Bridge

location
Murkutwo (in Marakwet East)
year first funded
2008
action
Bridge Construction
output
Passable Bridge
implementation status
New Project
total cost
Ksh 2,000,000
estimate
Ksh 0

Sambirir Girls Secondary School

location
Sambirir (in Marakwet East)
year first funded
2004
action
Construction Of Laboratory
output
Laboratory
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Mogil Secondary School

location
Mon (in Marakwet East)
year first funded
2007
action
Constructing Three Classrooms And One Office
output
Extension
implementation status
85% Complete
total cost
Ksh 1,850,000
estimate
Ksh 0

Mungwo Dispensary

location
Embobut (in Marakwet East)
year first funded
2005
action
Dispensary
output
Dispensary
implementation status
75% Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

StSecondary School Kapkondot

location
Mokoro (in Marakwet East)
year first funded
2006
action
Construction Of Dining Hall
output
Dining Hall
implementation status
75% Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Sangach Primary School

location
Endo (in Marakwet East)
year first funded
2004
action
Classrooms construction
output
Classrooms
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Liter Primary School

location
Kaben (in Marakwet East)
year first funded
2005
action
Construction Of 5 Classrooms
output
Classes
implementation status
90% Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Kapkobir Primary School

location
Mokoro (in Marakwet East)
year first funded
2005
action
Classrooms construction
output
Classrooms
implementation status
Complete
total cost
Ksh 1,450,000
estimate
Ksh 0

Kabetwo Dispensary

location
Mokoro (in Marakwet East)
year first funded
2003
action
Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 1,420,000
estimate
Ksh 0

Chechen Dispensary

location
Murkutwo (in Marakwet East)
year first funded
2006
action
Dispensary
output
Dispensary
implementation status
80% Complete
total cost
Ksh 1,400,000
estimate
Ksh 500,000

Chesawach Primary School

location
Koibirir (in Marakwet East)
year first funded
2004
action
Construction Of
output
Complete Classrooms
implementation status
90% Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Kabetwo Primary School

location
Mokoro (in Marakwet East)
year first funded
2006
action
Classrooms construction
output
Classrooms
implementation status
75% Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Kapchebau Secondary School

location
Embolot (in Marakwet East)
year first funded
2005
action
Completion Of Equipment
output
Working Lab
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Koibirir Piped Water

location
Koibirir (in Marakwet East)
year first funded
2006
action
Supply Of Piped Water
output
Clean Piped Water
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 0

Chebilil Primary School

location
Endo (in Marakwet East)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Chepkok Primary School

location
Sambirir (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Enough Classrooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Kaptobendo D Primary School

location
Kaptich (in Marakwet East)
year first funded
2005
action
Construction Of Classrooms
output
Enough Classrooms
implementation status
80% Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Chesewew Secondary School

location
Koibatek (in Marakwet East)
year first funded
2004
action
Construction Of Laboratory
output
Lab
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Endo Piped Water

location
Endo (in Marakwet East)
year first funded
2008
action
Purchase Of Pipes
output
Clean Water
implementation status
New
total cost
Ksh 1,100,000
estimate
Ksh 0

Maron Ap Line

location
Embobut (in Marakwet East)
year first funded
2008
action
Office Block
output
Complete Ap Line
implementation status
New Project
total cost
Ksh 1,000,000
estimate
Ksh 0

Tot Police Post

location
Koibirir (in Marakwet East)
year first funded
2008
action
Office Block
output
Complete Post
implementation status
80% Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Mogil Police Post

location
Mon (in Marakwet East)
year first funded
2007
action
Office Block
output
Complete Post
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Musuon Primary School

location
Sambirir (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Enough Classrooms
implementation status
80% Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kapchebau Secondary School

location
Embolot (in Marakwet East)
year first funded
2004
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Sambirir Boys Secondary School

location
Sambirir (in Marakwet East)
year first funded
2008
action
Construction Of Classrooms
output
Classrooms
implementation status
New Project
total cost
Ksh 1,000,000
estimate
Ksh 0

Kaptich Secondary School

location
Kaptich (in Marakwet East)
year first funded
2007
action
Constructing Four New Classroom
output
Extension
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Chesoi Community Water Project

location
Sambirir (in Marakwet East)
year first funded
2006
action
Piped Water
output
Clean Water
implementation status
75% Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Mogil Police Post

location
Mon (in Marakwet East)
year first funded
2007
action
Building Police Houses
output
Recent Chief?S Office
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kambaro Health Centre

location
Kaben (in Marakwet East)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 0

Kabetwo Dispensary

location
(in Marakwet East)
year first funded
2009
action
Building Staff Quarters
output
-
implementation status
(2004/5) classroom structure completed but no veranda, ventilation & not painted,
total cost
Ksh 1,000,000
estimate
Ksh 0

Kerio Valley Secondary School

location
Koibirir (in Marakwet East)
year first funded
2006
action
Completion Of Dormitory
output
Dormitory
implementation status
80% Complete
total cost
Ksh 957,674
estimate
Ksh 0

Kamasia Primary School

location
Kaptich (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
80% Complete
total cost
Ksh 950,000
estimate
Ksh 0

Chemworor Dispensary

location
Sambirir (in Marakwet East)
year first funded
2003
action
Building Maternity Wards
output
Wards
implementation status
50% Complete
total cost
Ksh 900,000
estimate
Ksh 1,500,000

Cheptobot Primary School

location
Kaptich (in Marakwet East)
year first funded
2006
action
Classrooms construction
output
Enough Classrooms
implementation status
50% Complete
total cost
Ksh 820,000
estimate
Ksh 0

Endiwa Primary School

location
Kipkener (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Classes
implementation status
90% Complete
total cost
Ksh 800,000
estimate
Ksh 0

St. Michael Primary School

location
Embobut (in Marakwet East)
year first funded
2006
action
Classrooms construction
output
Classrooms
implementation status
70% Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kibaron Dispensary

location
Kaben (in Marakwet East)
year first funded
2007
action
Building Dispensary
output
Dispensary
implementation status
30% Complete
total cost
Ksh 800,000
estimate
Ksh 1,600,000

Ndo Polytechnic

location
Endo (in Marakwet East)
year first funded
2006
action
Classrooms & Office
output
Classrooms & Office
implementation status
90% Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kerio Valley Technical Institute

location
Koibirir (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Classrooms
implementation status
30% Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kerio Valley Secondary School

location
(in Marakwet East)
year first funded
2009
action
Completing The Dormitory
output
-
implementation status
not known
total cost
Ksh 800,000
estimate
Ksh 0

Kamasia Dispensary

location
Kaptich (in Marakwet East)
year first funded
2003
action
Construction Of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 780,000
estimate
Ksh 0

Kapchemor Keldet Primary School

location
Kaptich (in Marakwet East)
year first funded
2006
action
Classrooms construction
output
Classrooms
implementation status
75% Complete
total cost
Ksh 640,000
estimate
Ksh 0

Kapchebau Secondary School

location
Embolot (in Marakwet East)
year first funded
2006
action
Equipments
output
4 Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Mugwo Primary School

location
Embobut (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Boroko Primary School

location
Embobut (in Marakwet East)
year first funded
2006
action
Classrooms construction
output
Classrooms
implementation status
75% Complete
total cost
Ksh 550,000
estimate
Ksh 0

Chemworo Water Furrow

location
Sambirir (in Marakwet East)
year first funded
2008
action
Digging And Creating Furrows
output
Clean Water
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 0

Chemworor Water Furrow

location
Sambirir (in Marakwet East)
year first funded
2008
action
Supply Of Piped Water
output
Clean Water
implementation status
70% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Toroko Primary School

location
Mokoro (in Marakwet East)
year first funded
2008
action
Building Classrooms And Desks
output
Classrooms And Desks
implementation status
New Project
total cost
Ksh 500,000
estimate
Ksh 0

Chemworor Primary School

location
Sambirir (in Marakwet East)
year first funded
2007
action
Construction Of Three Classrooms
output
Classrooms
implementation status
New Project
total cost
Ksh 500,000
estimate
Ksh 0

Chesoi Primary School

location
Sambirir (in Marakwet East)
year first funded
2007
action
Construction Of Three Classrooms
output
Classrooms
implementation status
New Project
total cost
Ksh 500,000
estimate
Ksh 0

Chesetan Primary School

location
Kibaimwa (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
85% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Mkewo Primary School

location
Embolot (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
80% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kapkuto Primary School

location
Sambirir (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
75% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kapchebau Primary School

location
Embolot (in Marakwet East)
year first funded
2006
action
Construction Of 4 Classrooms
output
Complete Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kapsicha Primary School

location
Sambirir (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Complete Classrooms
implementation status
75% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Meuno Primary School

location
Embolot (in Marakwet East)
year first funded
2006
action
Construction Of 4 Classrooms
output
Complete Classrooms
implementation status
85% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Tot Primary School

location
Koibirir (in Marakwet East)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
50% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Queen Of Peace Secondary School

location
(in Marakwet East)
year first funded
2009
action
Constructing Two New Permanent Classrooms
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Kapchebau Secondary School

location
(in Marakwet East)
year first funded
2009
action
Construction Of Laboratory
output
-
implementation status
required Kshs. 300,000.00 top up.
total cost
Ksh 500,000
estimate
Ksh 0

Kapsicha Primary School

location
(in Marakwet East)
year first funded
2009
action
Roofing Two Classrooms And Plastering
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Chesetan Primary School

location
(in Marakwet East)
year first funded
2009
action
Building Two New Classes
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Kapyego Primary School

location
Kapyego (in Marakwet East)
year first funded
2006
action
Preparing Desks
output
Desks
implementation status
95% Complete
total cost
Ksh 400,000
estimate
Ksh 100,000

Maron Primary School

location
Embobut (in Marakwet East)
year first funded
2006
action
Classrooms construction
output
Classrooms
implementation status
75% Complete
total cost
Ksh 400,000
estimate
Ksh 0

Mogil Sub-Disrict Hospital

location
(in Marakwet East)
year first funded
2009
action
Constructing Staff Quarters
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Kamogo Dispensary

location
(in Marakwet East)
year first funded
2009
action
Plastering,Fixing Doors
output
-
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 0

Chorwa Primary School

location
Embobut (in Marakwet East)
year first funded
2007
action
Building One Complete Class
output
Classroom
implementation status
New Project
total cost
Ksh 350,000
estimate
Ksh 0

Queen Of Peace Secondary School

location
Murkutwo (in Marakwet East)
year first funded
2006
action
Extension
output
Classrooms
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 50,000

Kararia Primary School

location
(in Marakwet East)
year first funded
2009
action
Erection Of Two Classrooms
output
-
implementation status
not known
total cost
Ksh 350,000
estimate
Ksh 0

Moror Primary School

location
(in Marakwet East)
year first funded
2009
action
Constructing One Class And One Office
output
-
implementation status
,
total cost
Ksh 300,000
estimate
Ksh 0

Moror Primary School

location
Embolot (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Chawis Primary School

location
Kapyego (in Marakwet East)
year first funded
2006
action
Classrooms construction
output
Classrooms
implementation status
90% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kerbut Primary School

location
Kipkener (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Maina Dispensary

location
Koibatek (in Marakwet East)
year first funded
2006
action
Roofing Community Dispensary
output
Dispensary
implementation status
85% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Marichor Dispensary

location
Embobut (in Marakwet East)
year first funded
2007
action
Finishing
output
-
implementation status
Rural Elec Authority
total cost
Ksh 300,000
estimate
Ksh 0

Mon Chiefs Office

location
Mon (in Marakwet East)
year first funded
2007
action
Erecting ChiefS Camp
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Sambirir Chiefs Office

location
Sambirir (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Murkutwo Chiefs Office

location
Murkutwo (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Koibirir Chiefs Office

location
Koibirir (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
85% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Embobut Chiefs Office

location
Embobut (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
85% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Mokorochiefs Office

location
Mokoro (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
75% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Embolot Chiefs Office

location
Embolot (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Koibatek Chiefs Office

location
Koibatek (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kaptich Chiefs Office

location
Kaptich (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kapyego Chiefs Office

location
Kapyego (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
`85% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kaben Chiefs Office

location
Kaben (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Endo Chiefs Ofiice

location
Endo (in Marakwet East)
year first funded
2007
action
Building ChiefS Office
output
Recent Chief?S Office
implementation status
80% Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Chemworor Primary School

location
(in Marakwet East)
year first funded
2009
action
Plastering & Painting
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Kabaldamet Primary School

location
Koibirir (in Marakwet East)
year first funded
2008
action
Building Classrooms
output
Classrooms
implementation status
New Project
total cost
Ksh 250,000
estimate
Ksh 0

Kasemoi Primary School

location
Koibirir (in Marakwet East)
year first funded
2008
action
Building Classrooms
output
Classrooms
implementation status
New Project
total cost
Ksh 250,000
estimate
Ksh 0

Kapkobil Primary School

location
(in Marakwet East)
year first funded
2009
action
Constructing One New Classroom
output
-
implementation status
requires Kshs. 100,000.00 to complete
total cost
Ksh 250,000
estimate
Ksh 0

Lukuget Primary School

location
(in Marakwet East)
year first funded
2009
action
Plastering Three Classrooms And Painting
output
-
implementation status
not known
total cost
Ksh 250,000
estimate
Ksh 0

Kapchogo Primary School

location
Kapyego (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Classrooms
implementation status
New Project
total cost
Ksh 200,000
estimate
Ksh 0

Marichor-Maron Dispensary

location
(in Marakwet East)
year first funded
2009
action
Plastering
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kaptora Pre-School

location
Mon (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kapkeny Pre-School

location
Mon (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Chemworor Pre-School

location
Sambirir (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Chesoi Pre-School

location
Sambirir (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Barberi Pre-School

location
Koibirir (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Tot Pre-School

location
Koibirir (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Murkutwo Pre School

location
Murkutwa (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Chesongoch Pre-School

location
Murkutwa (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Chechan Pre-School

location
Murkutwa (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kabetwa Pre-School

location
Mokoro (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Toroko Pre-School

location
Mokoro (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kamogo Pre-School

location
Embolot (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kapchebau Pre-School

location
Embolot (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Metpso Pre-School

location
Koibatek (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Koisabul Pre-School

location
Koibatek (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kapchelanga Pre-School

location
Kaptich (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mungwo Pre-School

location
Embobut (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kaptopendo Pre-School

location
Kaptich (in Marakwet East)
year first funded
2007
action
Constructing Nursery Schools
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Tebe Pre-School

location
Kapyego (in Marakwet East)
year first funded
2007
action
Constructing Nursery Schools
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Tangul Pre-School

location
Kapyego (in Marakwet East)
year first funded
2007
action
Constructing Nursery Schools
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Sambalat Pre-School

location
Kaben (in Marakwet East)
year first funded
2007
action
Constructing Nursery Schools
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Liter Pre-School

location
Kaben (in Marakwet East)
year first funded
2007
action
Constructing Nursery Schools
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Sangach Pre-School

location
Endo (in Marakwet East)
year first funded
2007
action
Constructing Nursery Schools
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Chebilil Pre-School

location
Endo (in Marakwet East)
year first funded
2007
action
Constructing Nursery Schools
output
Good Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Sambalat Primary School

location
Kaben (in Marakwet East)
year first funded
2006
action
Desks
output
Desks
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 100,000

Tinerwa Primary School

location
Kapyego (in Marakwet East)
year first funded
2007
action
Electing One Classroom
output
Classroom
implementation status
New Project
total cost
Ksh 200,000
estimate
Ksh 0

Kameloi Primary School

location
Kapyego (in Marakwet East)
year first funded
2007
action
Building Classrooms
output
Classrooms
implementation status
New Project
total cost
Ksh 200,000
estimate
Ksh 0

Embokongwa Water Project

location
Mon (in Marakwet East)
year first funded
2007
action
Purchase Of Pipes
output
-
implementation status
New Project
total cost
Ksh 200,000
estimate
Ksh 0

Chepket Water Furrow

location
Murkutwo (in Marakwet East)
year first funded
2008
action
Digging Furrows
output
Clean Water
implementation status
Started
total cost
Ksh 200,000
estimate
Ksh 0

Kalelach Kelat Cattle Dip

location
Kapyego (in Marakwet East)
year first funded
2006
action
Completion Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Embobut Cattle Dip

location
Embobut (in Marakwet East)
year first funded
2006
action
Construction Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Chesongoch Small Home

location
Murkutwo (in Marakwet East)
year first funded
2004
action
Kitchen And Water Tanks
output
Tank And Kitchen
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Meuno Primary School

location
(in Marakwet East)
year first funded
2009
action
Plastering Three Classrooms
output
-
implementation status
8 chairs & table, 1 teachers Table & chair not yet supplied
total cost
Ksh 200,000
estimate
Ksh 0

Kaptobendo Primary School

location
(in Marakwet East)
year first funded
2009
action
Painting Three Classrooms And Buying Desks
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Maina Dispensary

location
(in Marakwet East)
year first funded
2009
action
Plastering
output
-
implementation status
School has refused to occupy Provincial Admin & MoE will be involved
total cost
Ksh 200,000
estimate
Ksh 0

Endiwa Primary School

location
(in Marakwet East)
year first funded
2009
action
Plastering Three Classrooms
output
-
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 0

Kumbulul Primary School

location
Mon (in Marakwet East)
year first funded
2007
action
Finishing Constructed Classes
output
Classrooms
implementation status
Extension
total cost
Ksh 150,000
estimate
Ksh 0

Kapchebau Cattle Dip

location
Embolot (in Marakwet East)
year first funded
2006
action
Construction Of A Cattle Dip
output
Cattle Dip
implementation status
80% Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kerbut Primary School

location
(in Marakwet East)
year first funded
2009
action
Painting Two Classrooms And Equipping
output
-
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 0

Kapkuto Cattle Dip

location
Sambirir (in Marakwet East)
year first funded
2006
action
Construction Of Cattle Dip
output
Cattle Dips
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Wewo Cattle Dip

location
Embolot (in Marakwet East)
year first funded
2008
action
Renovation Of Cattle Dip
output
Cattle Dip
implementation status
Started
total cost
Ksh 100,000
estimate
Ksh 0

Kaptora Primary School

location
(in Marakwet East)
year first funded
2009
action
Plastering The Ecd Classroom & Equipping
output
-
implementation status
not painted, gables not plastered, no ventilation grills
total cost
Ksh 100,000
estimate
Ksh 0

Kapkeny Primary School

location
(in Marakwet East)
year first funded
2009
action
Plastering & Equipping One Classroom
output
-
implementation status
No block filling at roof, no ventilation grills no veranda & not painted & gables not plastered
total cost
Ksh 100,000
estimate
Ksh 0

Chawis Primary School

location
(in Marakwet East)
year first funded
2009
action
Purchase Of Doors And Windows
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Mureto Primary School

location
Sambirir (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Enough Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kapkein Primary School

location
Mokoro (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kapkeny Primary School

location
Mon (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kaptoben D Primary School

location
Kaptich (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Enough Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chesongoch Primary School

location
Murkutwo (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Work Done
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyirar Primary School

location
Koibatek (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chebirir Primary School

location
Endo (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chesetan Primary School

location
Kibaimwa (in Marakwet East)
year first funded
2006
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Liter Secondary School

location
Kaben (in Marakwet East)
year first funded
2007
action
Fencing The School Compound
output
Extension
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Cheptobot Primary School

location
Kaptich (in Marakwet East)
year first funded
2006
action
Environment Conservation
output
Trees
implementation status
Planted
total cost
Ksh 65,121
estimate
Ksh 0

Endiwa Primary School

location
Kipkener (in Marakwet East)
year first funded
2006
action
Environment Conservation
output
Trees
implementation status
Planted
total cost
Ksh 65,121
estimate
Ksh 0

St. Michael Secondary School

location
Embobut (in Marakwet East)
year first funded
2006
action
Buy Seedlings
output
Planting Trees
implementation status
Planted
total cost
Ksh 65,121
estimate
Ksh 0

Chesewew Secondary School

location
Koibatek (in Marakwet East)
year first funded
2006
action
Seedlings
output
Trees
implementation status
Planted
total cost
Ksh 65,121
estimate
Ksh 0

Kabetwa Cattle Dip

location
Mokoro (in Marakwet East)
year first funded
2006
action
Construction Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 65,121
estimate
Ksh 0

Kapyego Primary School

location
Kapyego (in Marakwet East)
year first funded
2006
action
Purchase Of Seedlings
output
Trees
implementation status
Planted
total cost
Ksh 65,121
estimate
Ksh 65,120

Chepkok Primary School

location
Sambirir (in Marakwet East)
year first funded
2006
action
Buy Seedlings
output
Good Environment
implementation status
Done
total cost
Ksh 65,000
estimate
Ksh 0

Liter Secondary School

location
Kaben (in Marakwet East)
year first funded
2006
action
Seedlings
output
Trees
implementation status
Planted
total cost
Ksh 55,300
estimate
Ksh 55,300

St Marys Mon Seconary School

location
Kabaimwa (in Marakwet East)
year first funded
2006
action
Environment Conservation
output
Planting Trees
implementation status
Planted
total cost
Ksh 54,500
estimate
Ksh 0

Kipyebo Primary School

location
Mon (in Marakwet East)
year first funded
2006
action
Environment Conservation(Seedlings)
output
Grown Trees
implementation status
Planted
total cost
Ksh 53,300
estimate
Ksh 0

Chesawach Primary School

location
Koibirir (in Marakwet East)
year first funded
2006
action
Buy Seedlings
output
Trees
implementation status
Done
total cost
Ksh 53,000
estimate
Ksh 0

Kapkobil Primary School

location
Mokoro (in Marakwet East)
year first funded
2006
action
Buy Seedlings
output
Trees
implementation status
Planted
total cost
Ksh 50,916
estimate
Ksh 0

Kamogo Cattle Dip

location
Embolot (in Marakwet East)
year first funded
2006
action
Construction Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Murkutwo Cattle Dip

location
Murkutwo (in Marakwet East)
year first funded
2006
action
Renovation Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kaptoben Dcattle Dip

location
Kaptich (in Marakwet East)
year first funded
2006
action
Completion Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Nyirar Cattle Dip

location
Koibatek (in Marakwet East)
year first funded
2006
action
Renovation Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Kamasia Cattle Dip

location
Kaptich (in Marakwet East)
year first funded
2006
action
Completion Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Cheptobot Cattle Dip

location
Kaptich (in Marakwet East)
year first funded
2006
action
Completion Of Cattle Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Sangach Primary School

location
Endo (in Marakwet East)
year first funded
2006
action
Buy Seedlings
output
Trees
implementation status
Planted
total cost
Ksh 26,400
estimate
Ksh 0