The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Mtc Kapsowar
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Solar Installation
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 4,500,000
- estimate
- Ksh 7,000,000
Chebara Youth Polytechnic
- location
-
Moi Ben
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Create Employment
- implementation status
- Not Yet Started
- total cost
- Ksh 3,531,178
- estimate
- Ksh 4,000,000
Lelan Secondary School
- location
-
Kapkochur
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of A Dormitory
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Not Plastered
- total cost
- Ksh 3,300,000
- estimate
- Ksh 5,000,000
Arror Secondary School
- location
-
Arror
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of A Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 5,000,000
Kamoi Secondary School
- location
-
Kamoi
(in Marakwet West)
- year first funded
- 2005
- action
- Adm.Block And One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed But Floor Not Plastered
- total cost
- Ksh 2,600,000
- estimate
- Ksh 5,000,000
Koisungur Secondary School
- location
-
Koisungur
(in Marakwet West)
- year first funded
- 2003
- action
- Plastering Flooring& Painting Renovation & 1 Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 1 Classroom &Renovation Complete.
- total cost
- Ksh 2,480,000
- estimate
- Ksh 6,000,000
St Teressa Koibarak Girls Secondary School
- location
-
Koibarak
(in Marakwet West)
- year first funded
- 2003
- action
- Plastering, Flooring And Painting
- output
- Increased Enrolment
- implementation status
- Admin Block Complete, I Classroom Ongoing
- total cost
- Ksh 2,224,503
- estimate
- Ksh 3,000,000
Kapcherop Mixed Secondary School
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2005
- action
- Construction Of 1 Classroom And Lab
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Classroom Complete And In Use, Lab To Be St
- total cost
- Ksh 2,200,000
- estimate
- Ksh 4,000,000
Hossen Mixed Day Secondary School
- location
-
Kipsaiya
(in Marakwet West)
- year first funded
- 2005
- action
- Construction Of A Dormitory & Kitchen
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Not Plastered
- total cost
- Ksh 2,180,000
- estimate
- Ksh 5,000,000
Chebai Secondary School
- location
-
Chebai
(in Marakwet West)
- year first funded
- 2004
- action
- Renovation Of Adm. Block And 2 Classrooms, Plastering Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Complete Class Only Roofed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,000,000
Kapsowar-Kapengong Road
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2009
- action
- Road Grading, Gravelling, Muraming And Putting Culverts
- output
- Improve Infrastructure
- implementation status
- On Going
- total cost
- Ksh 1,900,000
- estimate
- Ksh 0
Tunyo Health Centre
- location
-
Chemusan
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Closer Medical Services.
- implementation status
- Inuse
- total cost
- Ksh 1,900,000
- estimate
- Ksh 5,000,000
Chebulbai Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Dispensary Extension
- output
- Closer Medical Services.
- implementation status
- Ongoing/ In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 4,000,000
Chebororwa Health Centre
- location
-
Chebororwa
(in Marakwet West)
- year first funded
- 2003
- action
- Completion Of The Project
- output
- Closer Medical Services
- implementation status
- In Use
- total cost
- Ksh 1,629,000
- estimate
- Ksh 5,000,000
Kapterit Dispensary
- location
-
Kapterit
(in Marakwet West)
- year first funded
- 2003
- action
- Construction Of A Health Centre
- output
- Closer Medical Services
- implementation status
- Completion
- total cost
- Ksh 1,600,000
- estimate
- Ksh 3,000,000
Kimnai Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 1,572,000
- estimate
- Ksh 5,000,000
Kaptiony Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Health Centre
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 4,000,000
Chebororwa Secondary School
- location
-
(in Marakwet West)
- year first funded
- 2005
- action
- Renovation/One & Construction Of A Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Windows Not Fitted, Floor Not Done.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 5,000,000
Kondabilet Secondary School
- location
-
Chebororwa
(in Marakwet West)
- year first funded
- 2005
- action
- One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,480,000
- estimate
- Ksh 5,000,000
Barsumbat Secondary School
- location
-
Chesuman
(in Marakwet West)
- year first funded
- 2005
- action
- Construction Of A Laboratory (Twin)
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Not Plastered,
- total cost
- Ksh 1,480,000
- estimate
- Ksh 4,000,000
Educational Assesment And Resource Centre
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Resource Centre
- output
- Promote Education Standards
- implementation status
- To Start
- total cost
- Ksh 1,312,000
- estimate
- Ksh 2,500,000
Mugula Water Project
- location
-
Kapkochur
(in Marakwet West)
- year first funded
- 2007
- action
- Water Tank Construction
- output
- Closer Access To Clean Water
- implementation status
- Piping Done And Tanks Installed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 5,000,000
Cheptongei Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Construction
- implementation status
- To Be Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 4,000,000
Tunyo Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Mugurgoin Water Project
- location
-
Moi Ben
(in Marakwet West)
- year first funded
- 2003
- action
- Construction Of Intake And Piping
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,189,500
- estimate
- Ksh 5,000,000
Kaplenge Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- Complete And In Use
- total cost
- Ksh 1,150,000
- estimate
- Ksh 5,000,000
Santa Maria Girls Secondary School
- location
-
(in Marakwet West)
- year first funded
- 2005
- action
- Dormitory & Lab, Plastering, Flooring, Fixing Windows Panes
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Only Roofed
- total cost
- Ksh 1,138,840
- estimate
- Ksh 4,000,000
Sitoton Water Project
- location
-
Kuserwo
(in Marakwet West)
- year first funded
- 2006
- action
- Renovation And Construction Of Springs And Wells
- output
- Access To Water Services
- implementation status
- Complete And In Use
- total cost
- Ksh 1,105,868
- estimate
- Ksh 3,000,000
Lelan Girls Secondary School
- location
-
Lelan
(in Marakwet West)
- year first funded
- 2008
- action
- Completion Of Dormitory (Topping)
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Korongoi Dispensary
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Health Centre And Staff House
- output
- Closer Medical Services
- implementation status
- 90% Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 4,000,000
Kapsowar Dispensary
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2003
- action
- Construction Of Laboratory
- output
- Closer Medical Services
- implementation status
- In Use
- total cost
- Ksh 1,050,000
- estimate
- Ksh 5,000,000
Chemosong Water Project
- location
-
Lelan
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Water Tank
- output
- Closer Access To Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 6,000,000
Matira Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- Ongoing Project
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Sangurur Dispensary
- location
-
Koibarak
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 4,000,000
Kapkata Dispensary
- location
-
Arror
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of A Health Centre
- output
- Closer Medical Services
- implementation status
- In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 5,000,000
Kamoi Sub/Health Centre
- location
-
Kamoi
(in Marakwet West)
- year first funded
- 2003
- action
- Renovation
- output
- Closer Medical Services
- implementation status
- In Use
- total cost
- Ksh 960,000
- estimate
- Ksh 5,000,000
Kapsait Dispensary
- location
-
Lelan
(in Marakwet West)
- year first funded
- 2003
- action
- Buying Land
- output
- Closer Medical Services
- implementation status
- Ongoing.
- total cost
- Ksh 929,000
- estimate
- Ksh 5,000,000
Sinon Water Project
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2004
- action
- Construction of Water Tank
- output
- Closer Access To Water
- implementation status
- 80% Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 5,000,000
Kamaram Bridge
- location
-
Chebororwa
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Bridge
- output
- Improve On Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kokwongoi Water Project
- location
-
Cherangany
(in Marakwet West)
- year first funded
- 2004
- action
- Rehabilitation Of Wells
- output
- Close Access To Water
- implementation status
- Complete In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 4,000,000
Kibigos Water Project
- location
-
Koisungur
(in Marakwet West)
- year first funded
- 2004
- action
- Well Construction
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 4,000,000
Kapcherop Health Centre
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of 2 Health Officer Rooms
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kapsowar Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Not Plastered On Wall And Floor
- total cost
- Ksh 810,768
- estimate
- Ksh 1,000,000
Kapchelos Foot Bridge
- location
-
Kipsaiya
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Foot Bridge
- output
- Improve On Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kibirech Youth Polytechnic
- location
-
Kapkochur
(in Marakwet West)
- year first funded
- 2008
- action
- Plastering, Flooring And Shuttering
- output
- Create Employment
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Simat Water Project
- location
-
Cherangany
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Intakes/Water Tanks
- output
- Access To Clean Water
- implementation status
- In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 5,000,000
Saram Water Project
- location
-
Cherangany
(in Marakwet West)
- year first funded
- 2004
- action
- Rehabilitation Of Wells
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 5,000,000
Cheptongei Show Ground Kamok
- location
-
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Bridge
- output
- Improve Infrastructure
- implementation status
- -
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Koitilia Youth Polytechnic
- location
-
Arror
(in Marakwet West)
- year first funded
- 2008
- action
- Buying Of Land
- output
- Create Employment
- implementation status
- Not Yet Started
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Sumbeiywet Dispensary
- location
-
Moi Ben
(in Marakwet West)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 714,500
- estimate
- Ksh 5,000,000
Kokwongoi Health Centre
- location
-
Koisungur
(in Marakwet West)
- year first funded
- 2008
- action
- Extension
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Barsumbat Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Seret Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Kipsaiya Primary School
- location
-
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classrooms Complete
- total cost
- Ksh 625,000
- estimate
- Ksh 1,000,000
Lawich Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Kabarar Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed But Not Plastered
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Tenden Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Staff Houses
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 5,000,000
Kipsambach Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Construction Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Kapcherop Water Project
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2003
- action
- Wells Construction
- output
- Closer Water Services
- implementation status
- Complete
- total cost
- Ksh 529,000
- estimate
- Ksh 4,000,000
Karellach Water Project
- location
-
Arror
(in Marakwet West)
- year first funded
- 2003
- action
- Wells Construction And Renovation
- output
- Closer Access To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 529,000
- estimate
- Ksh 3,000,000
Embar Water Project
- location
-
Chesuman
(in Marakwet West)
- year first funded
- 2003
- action
- Construction Of Intake And Piping
- output
- Closer Access To Water
- implementation status
- Ongoing
- total cost
- Ksh 529,000
- estimate
- Ksh 2,000,000
Kapengong Primary School
- location
-
Kipsaiya
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 525,000
- estimate
- Ksh 1,000,000
Kapkochur Primary School
- location
-
Kapkochur
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kapsait Primary School
- location
-
Lelan
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Hossen Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classrooms Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kapsaina Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Ring Bean Level
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kolelach Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete 4 Classrooms
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kapcherop Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Koitugum Secondary School
- location
-
Cherangany
(in Marakwet West)
- year first funded
- 2009
- action
- Construction Of 2 Class Rooms And Blown Roof
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kapcherop Youth Polytechnic
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2008
- action
- Renovation & Equipment
- output
- Create Self Employment
- implementation status
- Equipments Bought, More Needed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Cheles Cattle Dip
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Improved Livestock Production
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
Sangurur Cattle Dip
- location
-
Koibarak
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kabelio Cattle Dip
- location
-
Chebororwa
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- 80% Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kipsetan Primary School
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Project
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Kapkanyar Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Class
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Complete Construction On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Kipsero Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Project
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Kapchepsar Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- To Be Floored, Plastered And Fixing Shutters
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Chesingei Primary School
- location
-
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete 4 Classrooms And In Use
- total cost
- Ksh 425,000
- estimate
- Ksh 1,000,000
Kamuseny Primary School
- location
-
Cherangany
(in Marakwet West)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 425,000
- estimate
- Ksh 1,000,000
Jemunada Dispensary
- location
-
Kuserwo
(in Marakwet West)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 407,000
- estimate
- Ksh 5,000,000
Kiplabai Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kapsowar Police Station
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- Not yet received funds
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Busieso Water Project
- location
-
Chebororwa
(in Marakwet West)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 5,000,000
Kokwongoi Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Plastering On Floor And Walls Not Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Chebai Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kapkanyar Cattle Dip
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- 80% Complete Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kaptalamwa Dispensary
- location
-
Kapkochur
(in Marakwet West)
- year first funded
- 2005
- action
- Flooring, Plastering And Painting Of Nurses Staff House
- output
- Closer Medical Services
- implementation status
- Extension
- total cost
- Ksh 360,000
- estimate
- Ksh 4,000,000
Kasubwa Primary School
- location
-
Koibarak
(in Marakwet West)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 2,000,000
Koitugum Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 4,000,000
Koitugum Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Project
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Kapkailel Cattle Dip
- location
-
Lelan
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- Started
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lochin Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Tembu Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Wall At Knee Level
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Cheles Primary School
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 340,000
- estimate
- Ksh 1,000,000
Mindililwo Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- To Be Plastered, Roofing Done
- total cost
- Ksh 303,081
- estimate
- Ksh 1,000,000
Litei Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete Renovation
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapchesewes Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- 4 Classrooms
- implementation status
- Roofed Not Plastered
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Sinon Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment
- implementation status
- 1 Classroom Complete The Other To Be Done
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kipsinot Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kamoi Primary School
- location
-
Kamoi
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Foundation Level
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kerer Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Project
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapterit Ap Line
- location
-
Kapterit
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Ap Houses
- output
- Reduce Insecurity
- implementation status
- 80% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kapterit/Kipsambach
- location
-
(in Marakwet West)
- year first funded
- 2009
- action
- Construction Of Bridge
- output
- Improve Infrastructure
- implementation status
- Not yet received funds
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kuserwa Water Project
- location
-
Kuserwo
(in Marakwet West)
- year first funded
- 2009
- action
- n/a
- output
- Access To Clean Water
- implementation status
- Amount increased from 100,000 to 539,762
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chebara/Bungwet Health
- location
-
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Health Centre
- output
- Closer Medical Services
- implementation status
- Staretd
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kapterit Secondary School
- location
-
Kapterit
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Increased Enrolment/Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chepkum Primary School
- location
-
Chesuman
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- I Classroom Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Cheptulon Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kimnai Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kamasat Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Metibelio Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kitonget Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Emkew Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- 3 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Jemunada Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Yemit Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- 2 Classrooms & Administration Block
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Sitoton Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of 2 Class RoomsClassroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Cheptongei Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kaplenge Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment/ Conducive Learning
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chebara Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chogoo Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapkoros Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Good Performance For Students
- implementation status
- To Be Started
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chebiemit Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kilima Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Project
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Nerkwo Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kaptomut Primary School
- location
-
Moiben
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kipteber Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Boroon Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Floor &Plastering
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kibigos Primary School
- location
-
Koisungur
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chemurgoi Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kaptiony Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed , Not Plastered
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Chebororwa Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapchebit Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kondabilet Primary School
- location
-
Chebororwa
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 4 Classroom Complete And 4 Classroom Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Tenden Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Windows Installed And Floors Plastered
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kapkata Primary School
- location
-
Arror
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Windows Fitted, But Not Plastered
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
Kapterit Primary School
- location
-
Kapterit
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Classrooms Complete And In Use.
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kipsaiya Dispensary
- location
-
Kipsaiya
(in Marakwet West)
- year first funded
- 2003
- action
- Construction
- output
- Closer Medical Services
- implementation status
- In Use
- total cost
- Ksh 279,000
- estimate
- Ksh 5,000,000
Kiplobotwo Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Dispensary
- output
- Extension Of Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kapsumai Primary School
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 240,000
- estimate
- Ksh 1,000,000
Kapterit Water Project
- location
-
Kapterit
(in Marakwet West)
- year first funded
- 2006
- action
- Construction Of Tank
- output
- Closer Access To Clean Water
- implementation status
- Complete In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kipsaiya Water Project
- location
-
Kipsaiya
(in Marakwet West)
- year first funded
- 2006
- action
- Piping
- output
- Closer Access To Water
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 5,000,000
Kapchelim Water Project
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Closer Access To Water
- implementation status
- Complete In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kondabilet Water Project
- location
-
Chebororwa
(in Marakwet West)
- year first funded
- 2009
- action
- n/a
- output
- Access To Clean Water
- implementation status
- Amount for f/y 07/08 reallocated as per letter of 2/12/08CDF BOARD/UGENYA/VOL II/12
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kapterit Cattle Dip
- location
-
Kapterit
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- Started
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kaptoror Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- Construction
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 5,000,000
Kondabilet Dispensary
- location
-
(in Marakwet West)
- year first funded
- 2006
- action
- n/a
- output
- Lighting
- implementation status
- Assessment to be done by MoPWest (Reallocation awaited.)
- total cost
- Ksh 150,000
- estimate
- Ksh 5,000,000
Koisungur Chiefs Office
- location
-
Koisungur
(in Marakwet West)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- Allocation for f/y 07/08 reallocated as per letter of 2/12/08CDF BOARD/UGENYA/VOL II/12
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kalbul Water Project
- location
-
Kamoi
(in Marakwet West)
- year first funded
- 2003
- action
- Spring Protection
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 120,000
- estimate
- Ksh 5,000,000
Marakwet West Cacc
- location
-
Kuserwo
(in Marakwet West)
- year first funded
- 2007
- action
- Hiv Awareness
- output
- Create Awareness
- implementation status
- Done
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Koitilial Primary School
- location
-
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Togota Cattle Dip
- location
-
Arror
(in Marakwet West)
- year first funded
- 2008
- action
- Renovation Cattle Dip
- output
- Increased Livestock Production
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kokwongoi Cattle Dip
- location
-
Koisungur
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- 40% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Bungwet Cattle Dip
- location
-
Moi Ben
(in Marakwet West)
- year first funded
- 2008
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- Started
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kapserbet Cattle Dip
- location
-
Kuserwo
(in Marakwet West)
- year first funded
- 2005
- action
- Renovation
- output
- Increased Livestock
- implementation status
- In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chebai Cattle Dip
- location
-
Chesuman
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increased Livestock Production
- implementation status
- 40% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Kapkanyar Bridge
- location
-
Sengwer
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Bridge
- output
- Improve Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Katkok Water Project
- location
-
Koibarak
(in Marakwet West)
- year first funded
- 2005
- action
- Installation Of Sub-Massive Pump
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 5,000,000
Kapsowar Youth Polytechnic
- location
-
Kapsowar
(in Marakwet West)
- year first funded
- 2007
- action
- Equipments/Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Nerkwo Small Homes
- location
-
Moi Ben
(in Marakwet West)
- year first funded
- 2007
- action
- Construction Of Special Toilets
- output
- Health Care
- implementation status
- In Use
- total cost
- Ksh 60,000
- estimate
- Ksh 0