The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Njumbi Mioro Road
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Tarmaking
- output
- Minimize Accident
- implementation status
- Complete
- total cost
- Ksh 5,576,492
- estimate
- Ksh 5,000,000
Kiria-Ini Girls Sec
- location
-
Kiru
(in Mathioya)
- year first funded
- 2003
- action
- Dormitory Const
- output
- Sch. To Accommodate More Students
- implementation status
- On-Going
- total cost
- Ksh 4,163,740
- estimate
- Ksh 3,000,000
Kamune Water Project
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2005
- action
- Drilling Borehole
- output
- Minimize Water Problems
- implementation status
- Complete
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,718,000
Kiru Water Project
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Drilling Borehole
- output
- Provide Water On The Lower Mathioya
- implementation status
- Complete
- total cost
- Ksh 3,150,000
- estimate
- Ksh 3,620,000
Nyakianga Health Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2003
- action
- Construction Maternity Ward
- output
- Provision Of Maternity Services
- implementation status
- On-Going
- total cost
- Ksh 3,022,000
- estimate
- Ksh 1,350,825
Mathioya Water Schooleme
- location
-
Njumbi / Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Pipes
- output
- Provide Water Nearer To The People
- implementation status
- On-Going
- total cost
- Ksh 3,000,000
- estimate
- Ksh 118,912,567
Warugara Kihari Road
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Accesibility Of Feeder Roads
- implementation status
- On-Going
- total cost
- Ksh 2,274,150
- estimate
- Ksh 0
Kiambuthia Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2004
- action
- Lab Construction
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,060,000
Gitugi Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2004
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 2,075,000
- estimate
- Ksh 12,000,000
Wambwe Primary School Exte
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Classroom Construction
- output
- Reduce Congestion
- implementation status
- On-Going
- total cost
- Ksh 2,050,500
- estimate
- Ksh 2,500,000
Kiriko Mixed Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Classrooms Construction
- output
- Min Congestion
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 3,800,000
Mioro Secondary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Lab
- output
- To Put Up Stalled Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,950,000
- estimate
- Ksh 2,238,000
Jkairo Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2004
- action
- Adm. Block Construction
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 1,933,146
- estimate
- Ksh 2,614,641
Gaithunu Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Classrooms Construction
- output
- To Reduce Congestion
- implementation status
- On-Going
- total cost
- Ksh 1,870,500
- estimate
- Ksh 1,563,000
Kambara Gakuyu Fbridge
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Ease Movement
- implementation status
- Condemned
- total cost
- Ksh 1,856,900
- estimate
- Ksh 859,900
Matuto Secondary Sc
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2004
- action
- Lab Construction
- output
- Improve Science Subject
- implementation status
- On-Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
Kamune Secondary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Lab Construction
- output
- Improve Sch. Performance
- implementation status
- On-Going
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,444,000
Mihuti Primary School Ext
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 1,610,356
- estimate
- Ksh 7,100,000
Mugono Bridge
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2006
- action
- Construction
- output
- More Access
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Kihari Water Project
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Provision Of Water For Domestic Use
- implementation status
- On-Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,200,000
Gitugi Dispensary
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2003
- action
- Renovation &Lab Construction
- output
- To Offer More Medical Facilities
- implementation status
- Complete
- total cost
- Ksh 1,587,620
- estimate
- Ksh 1,420,400
Kiamuturi Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 1,550,000
- estimate
- Ksh 4,576,000
Wahundura Secondary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2003
- action
- Tank Construction
- output
- To Minimize Strikes Due To Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 1,535,000
- estimate
- Ksh 709,000
Gikoe Secondary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2003
- action
- Lab Construction
- output
- Reduce Congestion
- implementation status
- On-Going
- total cost
- Ksh 1,512,000
- estimate
- Ksh 860,739
Karunge Police Post
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- To Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 5,300,000
Kiambuthia Dispensary
- location
-
Kiru
(in Mathioya)
- year first funded
- 2003
- action
- Staff House Construction
- output
- 24 Hours Services
- implementation status
- Complete
- total cost
- Ksh 1,484,620
- estimate
- Ksh 1,845,000
Mananga Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Home Sci Room Construction
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,693,000
Karugiro Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Classes Construction
- output
- To Accormodate Sch Population
- implementation status
- On-Going
- total cost
- Ksh 1,385,000
- estimate
- Ksh 1,086,000
Kamune Appost
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- To Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,400,000
Thuita Secool
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Laboratory
- output
- Im,Prove School Performance
- implementation status
- On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 2,308,000
Kamacharia Secondary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Staff House Construction
- output
- Encourage Evening Classes
- implementation status
- On-Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,374,454
Kagongo Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- To Put Up Stalled Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,640,000
Kamacharia Dispensary
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- To Minimize Long Trekking
- implementation status
- Complete
- total cost
- Ksh 1,281,970
- estimate
- Ksh 798,000
Kagumoini Police Post
- location
-
Kiru
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- Security Enhancement
- implementation status
- On-Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,460,000
Thuita Youth Poly
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2005
- action
- Tools
- output
- To Offer More Courses.
- implementation status
- On-Going
- total cost
- Ksh 1,220,500
- estimate
- Ksh 2,510,000
Kiambuthia Gikoe Fbridge
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- To Reduce Incidence Of Drowning
- implementation status
- Stalled
- total cost
- Ksh 1,203,900
- estimate
- Ksh 858,900
Runyeki Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2003
- action
- Lab Construction
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 1,185,000
- estimate
- Ksh 1,300,000
Ruru Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Classroom Construction
- output
- To Put Up Stalled Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,743,240
Ruiru Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Minimize Cong.
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,562,865
Rau Youth Polytech
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- To Offer More Courses
- implementation status
- On-Going
- total cost
- Ksh 1,062,500
- estimate
- Ksh 1,215,000
Iruri Secondary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Home Sci Class Construction
- output
- Improve On Home Science Subject
- implementation status
- On-Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 3,325,200
Nyangiti Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2004
- action
- Leveling Play Ground & Renovation
- output
- Enable Pple Participate In Curriculum Activity
- implementation status
- On-Going
- total cost
- Ksh 1,040,000
- estimate
- Ksh 456,550
Karangi Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2003
- action
- Pipes & Construction Of Reservoir
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 1,036,500
- estimate
- Ksh 915,806
Kiriti Community Hall
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- Meeting Hall
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,300,000
Githugi - Rukono Bridge
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- Ease Movement
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,075,810
Gondo Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,950,000
Mutito Youth Poly
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction/ Tools
- output
- To Offer Technical Courses
- implementation status
- On-Going
- total cost
- Ksh 971,856
- estimate
- Ksh 6,800,000
Kiriti Mixed Secondary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Staff House Construction
- output
- To Give Maximum Attention To The Students
- implementation status
- On-Going
- total cost
- Ksh 930,290
- estimate
- Ksh 1,205,272
Githendu Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,345,298
Gitongu Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2004
- action
- Staffhouses Construction
- output
- Encorage Evening Classes
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
Gacharage-Ini Dispensary
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Expansion Of Dispensary
- implementation status
- On-Going
- total cost
- Ksh 849,620
- estimate
- Ksh 400,000
Gitugi Mixed Sec
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Lab Construction
- output
- To Improve On Sciences
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 909,000
Kiria-Ini Mixed Sec
- location
-
Kiru
(in Mathioya)
- year first funded
- 2004
- action
- Renovation & Construction
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 1,444,000
Kiria-Ini Dispensary
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Lab Construction
- output
- Offer Laboratory Test
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 400,000
Gitugi Girls Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Library Construction
- output
- To Improve Sch. Performance
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 7,732,000
Rari Water Project
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2005
- action
- Construction Tank & Pipes
- output
- Minimize Water Problems
- implementation status
- Complete
- total cost
- Ksh 796,150
- estimate
- Ksh 500,000
Njumbi Secondary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Murraming & Burnt Dorm Renovation
- output
- To Improve On Cleaning & Hygiene
- implementation status
- Complete
- total cost
- Ksh 773,083
- estimate
- Ksh 1,051,600
Gachiriro Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Classrooms Construction
- output
- Min Congestion
- implementation status
- On-Going
- total cost
- Ksh 767,290
- estimate
- Ksh 2,010,000
Rau Dispensary
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Construction
- output
- To Minimize Long Trekking
- implementation status
- Complete
- total cost
- Ksh 763,670
- estimate
- Ksh 1,600,000
Kiamuturi Dispensary
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Construction
- output
- Expansion Of Dispensary
- implementation status
- On-Going
- total cost
- Ksh 750,000
- estimate
- Ksh 4,240,000
Gikindu Youth Poly
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- To Accommodate More People
- implementation status
- On-Going
- total cost
- Ksh 749,000
- estimate
- Ksh 1,600,000
Iruri Dispensarysery
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2003
- action
- Renovation
- output
- To Minimize Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 745,620
- estimate
- Ksh 1,259,600
Githua Youth Poly
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2005
- action
- Tools
- output
- To Offer More Courses
- implementation status
- On-Going
- total cost
- Ksh 730,000
- estimate
- Ksh 365,000
Kambara Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2004
- action
- Books & Equipments
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 702,290
- estimate
- Ksh 2,060,000
Kaimahindu Hydroelecricity
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Supply Of Elecricity
- output
- Better Living Stardard
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 8,000,000
Mumbuini Footbridge
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2007
- action
- Construction
- output
- Improved Mobility
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kora Dispensary
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Dispensary Construction
- output
- Improved Health Standards
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Gitugi Gakurwe Fbridge
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Ease Movement
- implementation status
- On-Going
- total cost
- Ksh 660,028
- estimate
- Ksh 218,828
Kiamuturi Kairo Fbridge
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Ease Movement
- implementation status
- On-Going
- total cost
- Ksh 650,150
- estimate
- Ksh 651,750
Mioro Youth Poly
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Offer Technical Courses
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 1,200,000
Nyakianga Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Adm Block Construction
- output
- To Put Up Stalled Classrooms
- implementation status
- On-Going
- total cost
- Ksh 647,000
- estimate
- Ksh 440,000
Kagwanja Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 630,000
- estimate
- Ksh 2,190,000
Mathioya Day Mixed
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2007
- action
- Toilets &Lab Renovation
- output
- Security Enhancement
- implementation status
- Toilet-Complete Lab-Ongoing
- total cost
- Ksh 620,000
- estimate
- Ksh 1,620,000
Yakarengo Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction Adm Block
- output
- To Ease Congestion
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 4,008,000
Umbui Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2004
- action
- Renovation
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Kiru Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Text Books
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 2,600,000
Wanjohi Youth Poly
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Electrification
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 3,000,000
Wambwe Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 2,500,000
Nguru-Ini Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Adm. Block Construction
- output
- To Put Up Stalled Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,234,063
Kambara Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 4,115,000
Kairi Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,102,240
Kambara - Nyangiti Road
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Drainage System
- output
- More Acess
- implementation status
- On-Going
- total cost
- Ksh 592,856
- estimate
- Ksh 2,337,170
JPrimary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2003
- action
- Construction Of Classrooms
- output
- Minimize Congestion In Classes
- implementation status
- On-Going
- total cost
- Ksh 591,000
- estimate
- Ksh 4,659,000
Mugumoini - Kiamahindu Road
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2007
- action
- Construction
- output
- Improve On Mobility
- implementation status
- On-Going
- total cost
- Ksh 590,000
- estimate
- Ksh 590,000
Mukui Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 555,000
- estimate
- Ksh 1,520,000
Ngechu Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2006
- action
- Classrooms Construction
- output
- To Reduce Congestion
- implementation status
- On-Going
- total cost
- Ksh 553,500
- estimate
- Ksh 1,520,000
Kiru Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Classroom Construction
- output
- Good Learning Environment
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 3,900,000
Kihuro Secondary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2004
- action
- Lab Equipment & Text Bks
- output
- Improve Sch. Performance
- implementation status
- On-Going
- total cost
- Ksh 540,000
- estimate
- Ksh 400,000
Kairo Dispensary
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Dispensary Construction
- output
- Offer Health Services
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 750,000
Ngutu Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Minimize Conj.
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 4,968,750
Kirungu Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2007
- action
- Construction
- output
- To Replace A Fallen Classes
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mugumo-Ini Gatangu Road
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- More Access
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kora Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 3,380,000
Gititu Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 2,710,000
Mananga Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2005
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 3,980,000
Kiriko Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
New City - Mananga Road
- location
-
Kiru
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Mora Acess
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gatunguru Secondary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Lab Construction
- output
- Carry Out Science Practical
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 3,454,260
Gikoe Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,950,295
Mathioya - Kigetho Road
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- More Acess
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kiria-Ini Police Station
- location
-
Kiru
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Security Enhancement
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 100,000
Mioro Police Post
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,744,498
Kaganjo Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Class Room Construction
- output
- Improve Performance
- implementation status
- Complete
- total cost
- Ksh 433,146
- estimate
- Ksh 1,520,000
Kagumo-Ini Dispensarysery
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Contruction
- output
- To Offer Medical Services
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Nyangiti Dispensarysery
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2007
- action
- Construction
- output
- To Offer More Medical Facilities
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Gataragwa Nursery
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction & Renovation
- output
- To Ease Long Trekkking
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 425,560
Kanjahi Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 3,000,000
Gakambura Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 5,000,000
Nyakianga Police Station
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Constructionpolice Houses
- output
- Minimise Conjestion
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kiawanjumbi Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kagongo B Nursery School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2007
- action
- Construction
- output
- To Put Up Stalled Classrooms
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Karunge Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- To Ease Congestion
- implementation status
- On-Going
- total cost
- Ksh 392,856
- estimate
- Ksh 1,235,300
Iruri Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2007
- action
- Toilet Construction
- output
- To Improve On Sanitation
- implementation status
- Complete
- total cost
- Ksh 355,000
- estimate
- Ksh 355,000
Muthangari Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Library Const
- output
- Improve On Language
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 776,200
Kiria-Ini Public Toilets
- location
-
Kiru
(in Mathioya)
- year first funded
- 2008
- action
- n/a
- output
- Enviromental Conservation
- implementation status
- New
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kanjama Dispensarysery
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Electrification
- output
- To Offer Medical Services
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Gitugi Chiefs Camp
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 1,950,000
Gitongu Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- dining Hallconstruction
- output
- Students dining Hall
- implementation status
- On-Going
- total cost
- Ksh 339,285
- estimate
- Ksh 4,912,088
Rukono Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 330,000
- estimate
- Ksh 2,286,979
Kahindu -Ini Hydroelectricity
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Supply Of Elecricit
- output
- Better Living Stardard
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 14,069,360
Mihuti Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2007
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 874,000
Kanoro Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 4,600,000
Karunge Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 5,800,000
Lower Gitugi Wrojec
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Provide Water To Lower Gitugi Dry Area
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,230,000
Ngutu Ict Centre
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Renovation
- output
- Community Computers
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kairo Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 6,550,000
Kiria-Ini Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,930,000
Kagio-Ini Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,800,000
Njumbi Primary School Exten
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Njumbi Primary School Renovation
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Mioro Primary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 4,800,000
Mioro Dispensarysery
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Expansion Of Dispensary
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 1,940,400
Nyangiti A Post
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- To Minimize Insecurity
- implementation status
- Complete and in use.
- total cost
- Ksh 292,856
- estimate
- Ksh 4,160,000
Mihuti Karunge Fbridge
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Ease Movement
- implementation status
- Complete
- total cost
- Ksh 282,230
- estimate
- Ksh 210,230
Ruru Mukaro Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 280,000
- estimate
- Ksh 890,479
Kamacharia Tac Hall
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2005
- action
- Construction
- output
- Meeting Hall
- implementation status
- On-Going
- total cost
- Ksh 280,000
- estimate
- Ksh 280,000
Githugi Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 280,000
- estimate
- Ksh 1,363,704
Kiamuturi Secondary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Lab Equipments
- output
- Carry Out Science Practical
- implementation status
- On-Going
- total cost
- Ksh 280,000
- estimate
- Ksh 1,668,956
Ngutu A Post
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- To Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 253,579
- estimate
- Ksh 2,750,150
Gikindu Kandabibi Irrigation Proj
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Water For Irrigation
- output
- Improve Food Productivity
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 8,857,830
Kiru Chiefs Office
- location
-
Kiru
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Effectivenes
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,340,000
Kairi Police Post
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Constuction
- output
- To Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 3,000,000
Kambara Youth Poly
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2003
- action
- Tools
- output
- To Offer More Courses
- implementation status
- Complete
- total cost
- Ksh 242,500
- estimate
- Ksh 500,000
Mathioya Coffee Fseedlings
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2004
- action
- Seedlings
- output
- Offer Coffee Seedlings
- implementation status
- Complete
- total cost
- Ksh 237,039
- estimate
- Ksh 300,000
Matuto Dispensarysery
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Laboratory
- output
- Improve Science Subject
- implementation status
- On-Going
- total cost
- Ksh 226,196
- estimate
- Ksh 748,000
Thuita Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Plaster&Floor
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 225,000
- estimate
- Ksh 3,834,000
D Office Rehabilitation
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Good Working Environment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mihuti Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- To Ease Congestion
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,400,000
Chui Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 547,050
Kiganjo Nursery School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2007
- action
- Construction
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kiuu Primary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 2,358,950
Mihuti Appost
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- To Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,816,423
Gikindu Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Renovatio
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 4,450,000
Kiriithiru Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Tank&Water Harvest
- output
- Minimise Water Problem
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 7,362,000
Kamune Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Floor & Paint
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,782,330
Thuita Assistant Chief Office
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Constuction
- output
- Effectivenes
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 630,000
Wahundura A Post Gachib
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Constuction
- output
- To Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kiambuthia Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Kihari Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- 0N-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kiria-Ini A Houses
- location
-
Kiru
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Security Enhancement
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 3,340,000
Gikoe Youth Polytechnic
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Offer Technical Courses
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Kihuro Primary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2007
- action
- Toilet Construction Emergency
- output
- Emergency
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Chui A Post
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- To Minimize Insecurity
- implementation status
- On-Going
- total cost
- Ksh 166,660
- estimate
- Ksh 166,660
Kagumo-Ini Cattle Dip
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- To Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Kangunu Cattle Dip
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 220,000
Wahundura Youth Polytechnic
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Lab Equioments
- output
- Better Medical Services
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 1,298,300
Wahundura Dispensarysery
- location
-
Kmacharia
(in Mathioya)
- year first funded
- 2008
- action
- Lab Equipments
- output
- Laboratory Services
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 775,902
Mioro Cattle Dip
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 282,680
Ngamba Secondary School
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Laboratory
- output
- Good Performance In Sci Subjects
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 678,040
Gitugi Location Culvert
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2008
- action
- Drainage System
- output
- More Acess
- implementation status
- On-Going
- total cost
- Ksh 136,000
- estimate
- Ksh 136,000
Kamacharia Location Culvert
- location
-
Kamacharia
(in Mathioya)
- year first funded
- 2008
- action
- Drainage System
- output
- More Acess
- implementation status
- On-Going
- total cost
- Ksh 136,000
- estimate
- Ksh 136,000
Kiru Location Culvert
- location
-
Kiru
(in Mathioya)
- year first funded
- 2008
- action
- Drainage System
- output
- More Acess
- implementation status
- On-Going
- total cost
- Ksh 136,000
- estimate
- Ksh 136,000
Njumbi Location Culverts
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Drainage System
- output
- More Acess
- implementation status
- On-Going
- total cost
- Ksh 136,000
- estimate
- Ksh 136,000
Rumathi Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 121,000
- estimate
- Ksh 121,000
Chui Cattle Dip
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 150,000
Kiambuthia Cattle Dip
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- To Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 344,600
Kiria-Ini Cattle Dip
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- To Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 181,639
Nyangiti Cattle Dip
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 120,000
Thuitu Cattle Dip
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 120,000
Kambara Cattle Dip
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 200,000
Wamukurwe Cattle Dip
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- To Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 110,000
Kanjama Cattle Dip
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Renovation
- output
- To Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 222,419
Kagumo Cattle Dip
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2007
- action
- Renovation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Gitugi Mixed Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Performance
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Matuto Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Performance
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 843,229
Gitongu Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Performance
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 772,293
Kagumo-Ini Primary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2007
- action
- Renovation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Njajara -Kora Footbridge
- location
-
Kiru
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- More Acess
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Runyeki Secondary School
- location
-
Gitugi
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Performance
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mananga Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Perfomance
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 100,000
Jkairo Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Performance
- implementation status
- On-Going
- total cost
- Ksh 90,000
- estimate
- Ksh 500,040
Kiria-Ini Mixed Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Performance
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 100,000
Kiriko Mixed Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Perfomance
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 771,978
Kiambuthia Secondary School
- location
-
Kiru
(in Mathioya)
- year first funded
- 2006
- action
- Text Books
- output
- Improve Perfomance
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 513,620
Kinguri Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Tank Construction
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 80,000
- estimate
- Ksh 472,010
Irindi Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Intake
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 80,000
- estimate
- Ksh 272,900
Gatheruka Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Well
- output
- Provision Of Cklean Water
- implementation status
- On-Going
- total cost
- Ksh 80,000
- estimate
- Ksh 945,340
Kiamuturi Cattle Dip
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Minimize Tick Bone Diseases
- implementation status
- Complete
- total cost
- Ksh 75,000
- estimate
- Ksh 309,900
Kiawanjumbi Nursary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 60,000
- estimate
- Ksh 286,786
Kariuko Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Well
- output
- Provision Of Cklean Water
- implementation status
- On-Going
- total cost
- Ksh 57,199
- estimate
- Ksh 472,110
Merere-Ini Nursary School
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Good Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 654,428
Merere-Ini Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 447,150
Gatoboka Water Project
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Pipes
- output
- Minimize Water Shortage
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
Kiriko Tea Copllection Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 30,000
- estimate
- Ksh 150,000
Kamari Tea Collection Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Kamwathi Tea Collection Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 30,000
- estimate
- Ksh 300,000
Gachegotea Collection Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 30,000
- estimate
- Ksh 590,000
Thuguri Tea Collection Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 30,000
- estimate
- Ksh 150,000
Kigumo Tea Collection Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 30,000
- estimate
- Ksh 260,000
Riverside Tea Collection Centre
- location
-
Njumbi
(in Mathioya)
- year first funded
- 2008
- action
- Construction
- output
- Avoid Long Trekking
- implementation status
- On-Going
- total cost
- Ksh 30,000
- estimate
- Ksh 90,000
Lower Gitugi Water Wells
- location
-
Gitugi
(in Mathioya)
- action
- Duplication
- output
- -
- implementation status
- Stalled Duplication
- total cost
- Ksh 0
- estimate
- Ksh 1,230,000