The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Mathioya

Njumbi Mioro Road

location
Njumbi (in Mathioya)
year first funded
2005
action
Tarmaking
output
Minimize Accident
implementation status
Complete
total cost
Ksh 5,576,492
estimate
Ksh 5,000,000

Kiria-Ini Girls Sec

location
Kiru (in Mathioya)
year first funded
2003
action
Dormitory Const
output
Sch. To Accommodate More Students
implementation status
On-Going
total cost
Ksh 4,163,740
estimate
Ksh 3,000,000

Kamune Water Project

location
Kamacharia (in Mathioya)
year first funded
2005
action
Drilling Borehole
output
Minimize Water Problems
implementation status
Complete
total cost
Ksh 3,700,000
estimate
Ksh 3,718,000

Kiru Water Project

location
Kiru (in Mathioya)
year first funded
2006
action
Drilling Borehole
output
Provide Water On The Lower Mathioya
implementation status
Complete
total cost
Ksh 3,150,000
estimate
Ksh 3,620,000

Nyakianga Health Centre

location
Njumbi (in Mathioya)
year first funded
2003
action
Construction Maternity Ward
output
Provision Of Maternity Services
implementation status
On-Going
total cost
Ksh 3,022,000
estimate
Ksh 1,350,825

Mathioya Water Schooleme

location
Njumbi / Gitugi (in Mathioya)
year first funded
2006
action
Pipes
output
Provide Water Nearer To The People
implementation status
On-Going
total cost
Ksh 3,000,000
estimate
Ksh 118,912,567

Warugara Kihari Road

location
Kiru (in Mathioya)
year first funded
2006
action
Rehabilitation
output
Accesibility Of Feeder Roads
implementation status
On-Going
total cost
Ksh 2,274,150
estimate
Ksh 0

Kiambuthia Secondary School

location
Kiru (in Mathioya)
year first funded
2004
action
Lab Construction
output
Improve Performance
implementation status
On-Going
total cost
Ksh 2,200,000
estimate
Ksh 2,060,000

Gitugi Primary School

location
Gitugi (in Mathioya)
year first funded
2004
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 2,075,000
estimate
Ksh 12,000,000

Wambwe Primary School Exte

location
Njumbi (in Mathioya)
year first funded
2004
action
Classroom Construction
output
Reduce Congestion
implementation status
On-Going
total cost
Ksh 2,050,500
estimate
Ksh 2,500,000

Kiriko Mixed Secondary School

location
Kiru (in Mathioya)
year first funded
2005
action
Classrooms Construction
output
Min Congestion
implementation status
On-Going
total cost
Ksh 2,000,000
estimate
Ksh 3,800,000

Mioro Secondary School

location
Njumbi (in Mathioya)
year first funded
2004
action
Lab
output
To Put Up Stalled Classrooms
implementation status
On-Going
total cost
Ksh 1,950,000
estimate
Ksh 2,238,000

Jkairo Secondary School

location
Kiru (in Mathioya)
year first funded
2004
action
Adm. Block Construction
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,933,146
estimate
Ksh 2,614,641

Gaithunu Primary School

location
Kamacharia (in Mathioya)
year first funded
2004
action
Classrooms Construction
output
To Reduce Congestion
implementation status
On-Going
total cost
Ksh 1,870,500
estimate
Ksh 1,563,000

Kambara Gakuyu Fbridge

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction
output
Ease Movement
implementation status
Condemned
total cost
Ksh 1,856,900
estimate
Ksh 859,900

Matuto Secondary Sc

location
Gitugi (in Mathioya)
year first funded
2004
action
Lab Construction
output
Improve Science Subject
implementation status
On-Going
total cost
Ksh 1,800,000
estimate
Ksh 2,000,000

Kamune Secondary School

location
Kamacharia (in Mathioya)
year first funded
2004
action
Lab Construction
output
Improve Sch. Performance
implementation status
On-Going
total cost
Ksh 1,650,000
estimate
Ksh 2,444,000

Mihuti Primary School Ext

location
Gitugi (in Mathioya)
year first funded
2005
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 1,610,356
estimate
Ksh 7,100,000

Mugono Bridge

location
Kamacharia (in Mathioya)
year first funded
2006
action
Construction
output
More Access
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Kihari Water Project

location
Kiru (in Mathioya)
year first funded
2005
action
Pipes
output
Provision Of Water For Domestic Use
implementation status
On-Going
total cost
Ksh 1,600,000
estimate
Ksh 2,200,000

Gitugi Dispensary

location
Gitugi (in Mathioya)
year first funded
2003
action
Renovation &Lab Construction
output
To Offer More Medical Facilities
implementation status
Complete
total cost
Ksh 1,587,620
estimate
Ksh 1,420,400

Kiamuturi Water Project

location
Njumbi (in Mathioya)
year first funded
2005
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 1,550,000
estimate
Ksh 4,576,000

Wahundura Secondary School

location
Kamacharia (in Mathioya)
year first funded
2003
action
Tank Construction
output
To Minimize Strikes Due To Water Shortage
implementation status
On-Going
total cost
Ksh 1,535,000
estimate
Ksh 709,000

Gikoe Secondary School

location
Njumbi (in Mathioya)
year first funded
2003
action
Lab Construction
output
Reduce Congestion
implementation status
On-Going
total cost
Ksh 1,512,000
estimate
Ksh 860,739

Karunge Police Post

location
Gitugi (in Mathioya)
year first funded
2004
action
Construction
output
To Minimize Insecurity
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 5,300,000

Kiambuthia Dispensary

location
Kiru (in Mathioya)
year first funded
2003
action
Staff House Construction
output
24 Hours Services
implementation status
Complete
total cost
Ksh 1,484,620
estimate
Ksh 1,845,000

Mananga Secondary School

location
Kiru (in Mathioya)
year first funded
2005
action
Home Sci Room Construction
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,450,000
estimate
Ksh 1,693,000

Karugiro Primary School

location
Kamacharia (in Mathioya)
year first funded
2004
action
Classes Construction
output
To Accormodate Sch Population
implementation status
On-Going
total cost
Ksh 1,385,000
estimate
Ksh 1,086,000

Kamune Appost

location
Kamacharia (in Mathioya)
year first funded
2004
action
Construction
output
To Minimize Insecurity
implementation status
On-Going
total cost
Ksh 1,350,000
estimate
Ksh 1,400,000

Thuita Secool

location
Kamacharia (in Mathioya)
year first funded
2004
action
Laboratory
output
Im,Prove School Performance
implementation status
On-Going
total cost
Ksh 1,350,000
estimate
Ksh 2,308,000

Kamacharia Secondary School

location
Kamacharia (in Mathioya)
year first funded
2004
action
Staff House Construction
output
Encourage Evening Classes
implementation status
On-Going
total cost
Ksh 1,300,000
estimate
Ksh 2,374,454

Kagongo Primary School

location
Njumbi (in Mathioya)
year first funded
2004
action
Construction
output
To Put Up Stalled Classrooms
implementation status
On-Going
total cost
Ksh 1,300,000
estimate
Ksh 1,640,000

Kamacharia Dispensary

location
Kamacharia (in Mathioya)
year first funded
2004
action
Construction
output
To Minimize Long Trekking
implementation status
Complete
total cost
Ksh 1,281,970
estimate
Ksh 798,000

Kagumoini Police Post

location
Kiru (in Mathioya)
year first funded
2004
action
Construction
output
Security Enhancement
implementation status
On-Going
total cost
Ksh 1,250,000
estimate
Ksh 2,460,000

Thuita Youth Poly

location
Kamacharia (in Mathioya)
year first funded
2005
action
Tools
output
To Offer More Courses.
implementation status
On-Going
total cost
Ksh 1,220,500
estimate
Ksh 2,510,000

Kiambuthia Gikoe Fbridge

location
Kiru (in Mathioya)
year first funded
2005
action
Construction
output
To Reduce Incidence Of Drowning
implementation status
Stalled
total cost
Ksh 1,203,900
estimate
Ksh 858,900

Runyeki Secondary School

location
Gitugi (in Mathioya)
year first funded
2003
action
Lab Construction
output
Improve Performance
implementation status
On-Going
total cost
Ksh 1,185,000
estimate
Ksh 1,300,000

Ruru Primary School

location
Njumbi (in Mathioya)
year first funded
2004
action
Classroom Construction
output
To Put Up Stalled Classrooms
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 2,743,240

Ruiru Primary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction
output
Minimize Cong.
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 1,562,865

Rau Youth Polytech

location
Kamacharia (in Mathioya)
year first funded
2005
action
Construction
output
To Offer More Courses
implementation status
On-Going
total cost
Ksh 1,062,500
estimate
Ksh 1,215,000

Iruri Secondary School

location
Kamacharia (in Mathioya)
year first funded
2004
action
Home Sci Class Construction
output
Improve On Home Science Subject
implementation status
On-Going
total cost
Ksh 1,050,000
estimate
Ksh 3,325,200

Nyangiti Primary School

location
Gitugi (in Mathioya)
year first funded
2004
action
Leveling Play Ground & Renovation
output
Enable Pple Participate In Curriculum Activity
implementation status
On-Going
total cost
Ksh 1,040,000
estimate
Ksh 456,550

Karangi Water Project

location
Njumbi (in Mathioya)
year first funded
2003
action
Pipes & Construction Of Reservoir
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 1,036,500
estimate
Ksh 915,806

Kiriti Community Hall

location
Njumbi (in Mathioya)
year first funded
2004
action
Construction
output
Meeting Hall
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,300,000

Githugi - Rukono Bridge

location
Njumbi (in Mathioya)
year first funded
2004
action
Construction
output
Ease Movement
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,075,810

Gondo Water Project

location
Njumbi (in Mathioya)
year first funded
2005
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 1,000,000
estimate
Ksh 1,950,000

Mutito Youth Poly

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction/ Tools
output
To Offer Technical Courses
implementation status
On-Going
total cost
Ksh 971,856
estimate
Ksh 6,800,000

Kiriti Mixed Secondary School

location
Njumbi (in Mathioya)
year first funded
2005
action
Staff House Construction
output
To Give Maximum Attention To The Students
implementation status
On-Going
total cost
Ksh 930,290
estimate
Ksh 1,205,272

Githendu Primary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 1,345,298

Gitongu Secondary School

location
Gitugi (in Mathioya)
year first funded
2004
action
Staffhouses Construction
output
Encorage Evening Classes
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 1,500,000

Gacharage-Ini Dispensary

location
Njumbi (in Mathioya)
year first funded
2005
action
Construction
output
Expansion Of Dispensary
implementation status
On-Going
total cost
Ksh 849,620
estimate
Ksh 400,000

Gitugi Mixed Sec

location
Gitugi (in Mathioya)
year first funded
2005
action
Lab Construction
output
To Improve On Sciences
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 909,000

Kiria-Ini Mixed Sec

location
Kiru (in Mathioya)
year first funded
2004
action
Renovation & Construction
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 1,444,000

Kiria-Ini Dispensary

location
Kiru (in Mathioya)
year first funded
2005
action
Lab Construction
output
Offer Laboratory Test
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 400,000

Gitugi Girls Secondary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Library Construction
output
To Improve Sch. Performance
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 7,732,000

Rari Water Project

location
Kamacharia (in Mathioya)
year first funded
2005
action
Construction Tank & Pipes
output
Minimize Water Problems
implementation status
Complete
total cost
Ksh 796,150
estimate
Ksh 500,000

Njumbi Secondary School

location
Njumbi (in Mathioya)
year first funded
2005
action
Murraming & Burnt Dorm Renovation
output
To Improve On Cleaning & Hygiene
implementation status
Complete
total cost
Ksh 773,083
estimate
Ksh 1,051,600

Gachiriro Primary School

location
Kiru (in Mathioya)
year first funded
2005
action
Classrooms Construction
output
Min Congestion
implementation status
On-Going
total cost
Ksh 767,290
estimate
Ksh 2,010,000

Rau Dispensary

location
Kamacharia (in Mathioya)
year first funded
2004
action
Construction
output
To Minimize Long Trekking
implementation status
Complete
total cost
Ksh 763,670
estimate
Ksh 1,600,000

Kiamuturi Dispensary

location
Njumbi (in Mathioya)
year first funded
2006
action
Construction
output
Expansion Of Dispensary
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 4,240,000

Gikindu Youth Poly

location
Kamacharia (in Mathioya)
year first funded
2005
action
Construction
output
To Accommodate More People
implementation status
On-Going
total cost
Ksh 749,000
estimate
Ksh 1,600,000

Iruri Dispensarysery

location
Kamacharia (in Mathioya)
year first funded
2003
action
Renovation
output
To Minimize Long Trekking
implementation status
On-Going
total cost
Ksh 745,620
estimate
Ksh 1,259,600

Githua Youth Poly

location
Kamacharia (in Mathioya)
year first funded
2005
action
Tools
output
To Offer More Courses
implementation status
On-Going
total cost
Ksh 730,000
estimate
Ksh 365,000

Kambara Secondary School

location
Gitugi (in Mathioya)
year first funded
2004
action
Books & Equipments
output
Improve Performance
implementation status
On-Going
total cost
Ksh 702,290
estimate
Ksh 2,060,000

Kaimahindu Hydroelecricity

location
Njumbi (in Mathioya)
year first funded
2008
action
Supply Of Elecricity
output
Better Living Stardard
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 8,000,000

Mumbuini Footbridge

location
Kamacharia (in Mathioya)
year first funded
2007
action
Construction
output
Improved Mobility
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 700,000

Kora Dispensary

location
Kiru (in Mathioya)
year first funded
2007
action
Dispensary Construction
output
Improved Health Standards
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Gitugi Gakurwe Fbridge

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction
output
Ease Movement
implementation status
On-Going
total cost
Ksh 660,028
estimate
Ksh 218,828

Kiamuturi Kairo Fbridge

location
Njumbi (in Mathioya)
year first funded
2005
action
Construction
output
Ease Movement
implementation status
On-Going
total cost
Ksh 650,150
estimate
Ksh 651,750

Mioro Youth Poly

location
Njumbi (in Mathioya)
year first funded
2005
action
Construction
output
Offer Technical Courses
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 1,200,000

Nyakianga Primary School

location
Njumbi (in Mathioya)
year first funded
2004
action
Adm Block Construction
output
To Put Up Stalled Classrooms
implementation status
On-Going
total cost
Ksh 647,000
estimate
Ksh 440,000

Kagwanja Primary School

location
Kamacharia (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 630,000
estimate
Ksh 2,190,000

Mathioya Day Mixed

location
Njumbi (in Mathioya)
year first funded
2007
action
Toilets &Lab Renovation
output
Security Enhancement
implementation status
Toilet-Complete Lab-Ongoing
total cost
Ksh 620,000
estimate
Ksh 1,620,000

Yakarengo Primary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction Adm Block
output
To Ease Congestion
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 4,008,000

Umbui Primary School

location
Kiru (in Mathioya)
year first funded
2004
action
Renovation
output
Improve Performance
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 800,000

Kiru Secondary School

location
Kiru (in Mathioya)
year first funded
2005
action
Text Books
output
Improve Performance
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 2,600,000

Wanjohi Youth Poly

location
Kiru (in Mathioya)
year first funded
2007
action
Electrification
output
Improve Performance
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 3,000,000

Wambwe Primary School

location
Njumbi (in Mathioya)
year first funded
2004
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 2,500,000

Nguru-Ini Primary School

location
Njumbi (in Mathioya)
year first funded
2004
action
Adm. Block Construction
output
To Put Up Stalled Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 1,234,063

Kambara Primary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 4,115,000

Kairi Primary School

location
Kamacharia (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 1,102,240

Kambara - Nyangiti Road

location
Gitugi (in Mathioya)
year first funded
2008
action
Drainage System
output
More Acess
implementation status
On-Going
total cost
Ksh 592,856
estimate
Ksh 2,337,170

JPrimary School

location
Kamacharia (in Mathioya)
year first funded
2003
action
Construction Of Classrooms
output
Minimize Congestion In Classes
implementation status
On-Going
total cost
Ksh 591,000
estimate
Ksh 4,659,000

Mugumoini - Kiamahindu Road

location
Njumbi (in Mathioya)
year first funded
2007
action
Construction
output
Improve On Mobility
implementation status
On-Going
total cost
Ksh 590,000
estimate
Ksh 590,000

Mukui Primary School

location
Kamacharia (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 555,000
estimate
Ksh 1,520,000

Ngechu Primary School

location
Kamacharia (in Mathioya)
year first funded
2006
action
Classrooms Construction
output
To Reduce Congestion
implementation status
On-Going
total cost
Ksh 553,500
estimate
Ksh 1,520,000

Kiru Primary School

location
Kiru (in Mathioya)
year first funded
2005
action
Classroom Construction
output
Good Learning Environment
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 3,900,000

Kihuro Secondary School

location
Kamacharia (in Mathioya)
year first funded
2004
action
Lab Equipment & Text Bks
output
Improve Sch. Performance
implementation status
On-Going
total cost
Ksh 540,000
estimate
Ksh 400,000

Kairo Dispensary

location
Kiru (in Mathioya)
year first funded
2007
action
Dispensary Construction
output
Offer Health Services
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 750,000

Ngutu Primary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction
output
Minimize Conj.
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 4,968,750

Kirungu Primary School

location
Kamacharia (in Mathioya)
year first funded
2007
action
Construction
output
To Replace A Fallen Classes
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Mugumo-Ini Gatangu Road

location
Kamacharia (in Mathioya)
year first funded
2008
action
Rehabilitation
output
More Access
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kora Primary School

location
Kiru (in Mathioya)
year first funded
2005
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 3,380,000

Gititu Primary School

location
Kiru (in Mathioya)
year first funded
2005
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 2,710,000

Mananga Primary School

location
Kiru (in Mathioya)
year first funded
2005
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 3,980,000

Kiriko Primary School

location
Kiru (in Mathioya)
year first funded
2007
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 3,000,000

New City - Mananga Road

location
Kiru (in Mathioya)
year first funded
2008
action
Rehabilitation
output
Mora Acess
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Gatunguru Secondary School

location
Njumbi (in Mathioya)
year first funded
2008
action
Lab Construction
output
Carry Out Science Practical
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 3,454,260

Gikoe Primary School

location
Njumbi (in Mathioya)
year first funded
2006
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 1,950,295

Mathioya - Kigetho Road

location
Njumbi (in Mathioya)
year first funded
2008
action
Rehabilitation
output
More Acess
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kiria-Ini Police Station

location
Kiru (in Mathioya)
year first funded
2008
action
Rehabilitation
output
Security Enhancement
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 100,000

Mioro Police Post

location
Njumbi (in Mathioya)
year first funded
2005
action
Construction
output
Minimize Insecurity
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 1,744,498

Kaganjo Primary School

location
Kiru (in Mathioya)
year first funded
2006
action
Class Room Construction
output
Improve Performance
implementation status
Complete
total cost
Ksh 433,146
estimate
Ksh 1,520,000

Kagumo-Ini Dispensarysery

location
Kiru (in Mathioya)
year first funded
2007
action
Contruction
output
To Offer Medical Services
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 2,000,000

Nyangiti Dispensarysery

location
Gitugi (in Mathioya)
year first funded
2007
action
Construction
output
To Offer More Medical Facilities
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Gataragwa Nursery

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction & Renovation
output
To Ease Long Trekkking
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 425,560

Kanjahi Primary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 3,000,000

Gakambura Primary School

location
Gitugi (in Mathioya)
year first funded
2005
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 5,000,000

Nyakianga Police Station

location
Njumbi (in Mathioya)
year first funded
2008
action
Constructionpolice Houses
output
Minimise Conjestion
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kiawanjumbi Water Project

location
Njumbi (in Mathioya)
year first funded
2005
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Kagongo B Nursery School

location
Njumbi (in Mathioya)
year first funded
2007
action
Construction
output
To Put Up Stalled Classrooms
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Karunge Secondary School

location
Gitugi (in Mathioya)
year first funded
2008
action
Construction Of Classrooms
output
To Ease Congestion
implementation status
On-Going
total cost
Ksh 392,856
estimate
Ksh 1,235,300

Iruri Primary School

location
Kamacharia (in Mathioya)
year first funded
2007
action
Toilet Construction
output
To Improve On Sanitation
implementation status
Complete
total cost
Ksh 355,000
estimate
Ksh 355,000

Muthangari Primary School

location
Njumbi (in Mathioya)
year first funded
2006
action
Library Const
output
Improve On Language
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 776,200

Kiria-Ini Public Toilets

location
Kiru (in Mathioya)
year first funded
2008
action
n/a
output
Enviromental Conservation
implementation status
New
total cost
Ksh 350,000
estimate
Ksh 350,000

Kanjama Dispensarysery

location
Kiru (in Mathioya)
year first funded
2007
action
Electrification
output
To Offer Medical Services
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 500,000

Gitugi Chiefs Camp

location
Gitugi (in Mathioya)
year first funded
2008
action
Construction
output
-
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 1,950,000

Gitongu Secondary School

location
Gitugi (in Mathioya)
year first funded
2008
action
dining Hallconstruction
output
Students dining Hall
implementation status
On-Going
total cost
Ksh 339,285
estimate
Ksh 4,912,088

Rukono Water Project

location
Njumbi (in Mathioya)
year first funded
2005
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 330,000
estimate
Ksh 2,286,979

Kahindu -Ini Hydroelectricity

location
Njumbi (in Mathioya)
year first funded
2008
action
Supply Of Elecricit
output
Better Living Stardard
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 14,069,360

Mihuti Primary School

location
Gitugi (in Mathioya)
year first funded
2007
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 874,000

Kanoro Primary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 4,600,000

Karunge Primary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 5,800,000

Lower Gitugi Wrojec

location
Gitugi (in Mathioya)
year first funded
2005
action
Pipes
output
Provide Water To Lower Gitugi Dry Area
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,230,000

Ngutu Ict Centre

location
Gitugi (in Mathioya)
year first funded
2008
action
Renovation
output
Community Computers
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Kairo Primary School

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 6,550,000

Kiria-Ini Primary School

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,930,000

Kagio-Ini Primary School

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,800,000

Njumbi Primary School Exten

location
Njumbi (in Mathioya)
year first funded
2005
action
Construction
output
Avoid Long Trekking
implementation status
Stalled
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Njumbi Primary School Renovation

location
Njumbi (in Mathioya)
year first funded
2006
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 400,000

Mioro Primary School

location
Njumbi (in Mathioya)
year first funded
2006
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 4,800,000

Mioro Dispensarysery

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Expansion Of Dispensary
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 1,940,400

Nyangiti A Post

location
Gitugi (in Mathioya)
year first funded
2008
action
Construction
output
To Minimize Insecurity
implementation status
Complete and in use.
total cost
Ksh 292,856
estimate
Ksh 4,160,000

Mihuti Karunge Fbridge

location
Gitugi (in Mathioya)
year first funded
2005
action
Construction
output
Ease Movement
implementation status
Complete
total cost
Ksh 282,230
estimate
Ksh 210,230

Ruru Mukaro Water Project

location
Njumbi (in Mathioya)
year first funded
2005
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 280,000
estimate
Ksh 890,479

Kamacharia Tac Hall

location
Kamacharia (in Mathioya)
year first funded
2005
action
Construction
output
Meeting Hall
implementation status
On-Going
total cost
Ksh 280,000
estimate
Ksh 280,000

Githugi Water Project

location
Njumbi (in Mathioya)
year first funded
2005
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 280,000
estimate
Ksh 1,363,704

Kiamuturi Secondary School

location
Njumbi (in Mathioya)
year first funded
2008
action
Lab Equipments
output
Carry Out Science Practical
implementation status
On-Going
total cost
Ksh 280,000
estimate
Ksh 1,668,956

Ngutu A Post

location
Gitugi (in Mathioya)
year first funded
2008
action
Construction
output
To Minimize Insecurity
implementation status
On-Going
total cost
Ksh 253,579
estimate
Ksh 2,750,150

Gikindu Kandabibi Irrigation Proj

location
Kamacharia (in Mathioya)
year first funded
2008
action
Water For Irrigation
output
Improve Food Productivity
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 8,857,830

Kiru Chiefs Office

location
Kiru (in Mathioya)
year first funded
2008
action
Construction
output
Effectivenes
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 1,340,000

Kairi Police Post

location
Kamacharia (in Mathioya)
year first funded
2008
action
Constuction
output
To Minimize Insecurity
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 3,000,000

Kambara Youth Poly

location
Gitugi (in Mathioya)
year first funded
2003
action
Tools
output
To Offer More Courses
implementation status
Complete
total cost
Ksh 242,500
estimate
Ksh 500,000

Mathioya Coffee Fseedlings

location
Njumbi (in Mathioya)
year first funded
2004
action
Seedlings
output
Offer Coffee Seedlings
implementation status
Complete
total cost
Ksh 237,039
estimate
Ksh 300,000

Matuto Dispensarysery

location
Gitugi (in Mathioya)
year first funded
2008
action
Laboratory
output
Improve Science Subject
implementation status
On-Going
total cost
Ksh 226,196
estimate
Ksh 748,000

Thuita Primary School

location
Kamacharia (in Mathioya)
year first funded
2008
action
Plaster&Floor
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 225,000
estimate
Ksh 3,834,000

D Office Rehabilitation

location
Njumbi (in Mathioya)
year first funded
2005
action
Rehabilitation
output
Good Working Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mihuti Secondary School

location
Gitugi (in Mathioya)
year first funded
2008
action
Construction Of Classrooms
output
To Ease Congestion
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,400,000

Chui Primary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 547,050

Kiganjo Nursery School

location
Gitugi (in Mathioya)
year first funded
2007
action
Construction
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 500,000

Kiuu Primary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 2,358,950

Mihuti Appost

location
Gitugi (in Mathioya)
year first funded
2008
action
Construction
output
To Minimize Insecurity
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,816,423

Gikindu Primary School

location
Kamacharia (in Mathioya)
year first funded
2008
action
Renovatio
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 4,450,000

Kiriithiru Primary School

location
Kamacharia (in Mathioya)
year first funded
2008
action
Tank&Water Harvest
output
Minimise Water Problem
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 7,362,000

Kamune Primary School

location
Kamacharia (in Mathioya)
year first funded
2008
action
Floor & Paint
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,782,330

Thuita Assistant Chief Office

location
Kamacharia (in Mathioya)
year first funded
2008
action
Constuction
output
Effectivenes
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 630,000

Wahundura A Post Gachib

location
Kamacharia (in Mathioya)
year first funded
2008
action
Constuction
output
To Minimize Insecurity
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 500,000

Kiambuthia Primary School

location
Kiru (in Mathioya)
year first funded
2007
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Kihari Primary School

location
Kiru (in Mathioya)
year first funded
2007
action
Renovation
output
Good Learning Environment
implementation status
0N-Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kiria-Ini A Houses

location
Kiru (in Mathioya)
year first funded
2008
action
Rehabilitation
output
Security Enhancement
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 3,340,000

Gikoe Youth Polytechnic

location
Njumbi (in Mathioya)
year first funded
2008
action
Rehabilitation
output
Offer Technical Courses
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 2,000,000

Kihuro Primary School

location
Kamacharia (in Mathioya)
year first funded
2007
action
Toilet Construction Emergency
output
Emergency
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 180,000

Chui A Post

location
Gitugi (in Mathioya)
year first funded
2008
action
Construction
output
To Minimize Insecurity
implementation status
On-Going
total cost
Ksh 166,660
estimate
Ksh 166,660

Kagumo-Ini Cattle Dip

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
To Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 160,000

Kangunu Cattle Dip

location
Njumbi (in Mathioya)
year first funded
2006
action
Rehabilitation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 220,000

Wahundura Youth Polytechnic

location
Kamacharia (in Mathioya)
year first funded
2008
action
Lab Equioments
output
Better Medical Services
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 1,298,300

Wahundura Dispensarysery

location
Kmacharia (in Mathioya)
year first funded
2008
action
Lab Equipments
output
Laboratory Services
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 775,902

Mioro Cattle Dip

location
Njumbi (in Mathioya)
year first funded
2006
action
Rehabilitation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 282,680

Ngamba Secondary School

location
Kamacharia (in Mathioya)
year first funded
2008
action
Laboratory
output
Good Performance In Sci Subjects
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 678,040

Gitugi Location Culvert

location
Gitugi (in Mathioya)
year first funded
2008
action
Drainage System
output
More Acess
implementation status
On-Going
total cost
Ksh 136,000
estimate
Ksh 136,000

Kamacharia Location Culvert

location
Kamacharia (in Mathioya)
year first funded
2008
action
Drainage System
output
More Acess
implementation status
On-Going
total cost
Ksh 136,000
estimate
Ksh 136,000

Kiru Location Culvert

location
Kiru (in Mathioya)
year first funded
2008
action
Drainage System
output
More Acess
implementation status
On-Going
total cost
Ksh 136,000
estimate
Ksh 136,000

Njumbi Location Culverts

location
Njumbi (in Mathioya)
year first funded
2008
action
Drainage System
output
More Acess
implementation status
On-Going
total cost
Ksh 136,000
estimate
Ksh 136,000

Rumathi Water Project

location
Njumbi (in Mathioya)
year first funded
2008
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 121,000
estimate
Ksh 121,000

Chui Cattle Dip

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 150,000

Kiambuthia Cattle Dip

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
To Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 344,600

Kiria-Ini Cattle Dip

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
To Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 181,639

Nyangiti Cattle Dip

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 120,000

Thuitu Cattle Dip

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 120,000

Kambara Cattle Dip

location
Gitugi (in Mathioya)
year first funded
2006
action
Renovation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 200,000

Wamukurwe Cattle Dip

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
To Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 110,000

Kanjama Cattle Dip

location
Kiru (in Mathioya)
year first funded
2006
action
Renovation
output
To Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 222,419

Kagumo Cattle Dip

location
Gitugi (in Mathioya)
year first funded
2007
action
Renovation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Gitugi Mixed Secondary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Performance
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Matuto Secondary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Performance
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 843,229

Gitongu Secondary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Performance
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 772,293

Kagumo-Ini Primary School

location
Kiru (in Mathioya)
year first funded
2007
action
Renovation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 400,000

Njajara -Kora Footbridge

location
Kiru (in Mathioya)
year first funded
2008
action
Construction
output
More Acess
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 150,000

Runyeki Secondary School

location
Gitugi (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Performance
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mananga Secondary School

location
Kiru (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Perfomance
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 100,000

Jkairo Secondary School

location
Kiru (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Performance
implementation status
On-Going
total cost
Ksh 90,000
estimate
Ksh 500,040

Kiria-Ini Mixed Secondary School

location
Kiru (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Performance
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 100,000

Kiriko Mixed Secondary School

location
Kiru (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Perfomance
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 771,978

Kiambuthia Secondary School

location
Kiru (in Mathioya)
year first funded
2006
action
Text Books
output
Improve Perfomance
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 513,620

Kinguri Water Project

location
Njumbi (in Mathioya)
year first funded
2008
action
Tank Construction
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 80,000
estimate
Ksh 472,010

Irindi Water Project

location
Njumbi (in Mathioya)
year first funded
2008
action
Intake
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 80,000
estimate
Ksh 272,900

Gatheruka Water Project

location
Njumbi (in Mathioya)
year first funded
2008
action
Well
output
Provision Of Cklean Water
implementation status
On-Going
total cost
Ksh 80,000
estimate
Ksh 945,340

Kiamuturi Cattle Dip

location
Njumbi (in Mathioya)
year first funded
2006
action
Rehabilitation
output
Minimize Tick Bone Diseases
implementation status
Complete
total cost
Ksh 75,000
estimate
Ksh 309,900

Kiawanjumbi Nursary School

location
Njumbi (in Mathioya)
year first funded
2008
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 60,000
estimate
Ksh 286,786

Kariuko Water Project

location
Njumbi (in Mathioya)
year first funded
2008
action
Well
output
Provision Of Cklean Water
implementation status
On-Going
total cost
Ksh 57,199
estimate
Ksh 472,110

Merere-Ini Nursary School

location
Njumbi (in Mathioya)
year first funded
2008
action
Rehabilitation
output
Good Learning Environment
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 654,428

Merere-Ini Water Project

location
Njumbi (in Mathioya)
year first funded
2008
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 447,150

Gatoboka Water Project

location
Njumbi (in Mathioya)
year first funded
2008
action
Pipes
output
Minimize Water Shortage
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 500,000

Kiriko Tea Copllection Centre

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Avoid Long Trekking
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 150,000

Kamari Tea Collection Centre

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Avoid Long Trekking
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 100,000

Kamwathi Tea Collection Centre

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Avoid Long Trekking
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 300,000

Gachegotea Collection Centre

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Avoid Long Trekking
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 590,000

Thuguri Tea Collection Centre

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Avoid Long Trekking
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 150,000

Kigumo Tea Collection Centre

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Avoid Long Trekking
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 260,000

Riverside Tea Collection Centre

location
Njumbi (in Mathioya)
year first funded
2008
action
Construction
output
Avoid Long Trekking
implementation status
On-Going
total cost
Ksh 30,000
estimate
Ksh 90,000

Lower Gitugi Water Wells

location
Gitugi (in Mathioya)
action
Duplication
output
-
implementation status
Stalled Duplication
total cost
Ksh 0
estimate
Ksh 1,230,000