The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kiamabara Secondary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Construction Of New Classrooms
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 2,896,000
- estimate
- Ksh 0
Magutu Road Project
- location
-
Magutu
(in Mathira)
- year first funded
- 2008
- action
- Grading&Murraming
- output
- -
- implementation status
- not known
- total cost
- Ksh 2,850,000
- estimate
- Ksh 0
Konyu Road Project
- location
-
Konyu
(in Mathira)
- year first funded
- 2008
- action
- Grading &Murraming
- output
- Roads
- implementation status
- On-Going
- total cost
- Ksh 2,750,000
- estimate
- Ksh 0
Gatina Ndima-Ini Road
- location
-
Konyu
(in Mathira)
- year first funded
- 2007
- action
- Murram/Gravelling
- output
- Good Roads
- implementation status
- Reallocation
- total cost
- Ksh 2,509,700
- estimate
- Ksh 0
Kiamabara Road Project
- location
-
Konyu
(in Mathira)
- year first funded
- 2007
- action
- Murram/Gravelling
- output
- Good Roads
- implementation status
- On-Going
- total cost
- Ksh 1,928,960
- estimate
- Ksh 0
Ruguru Comm Health Centre
- location
-
Ruguru
(in Mathira)
- year first funded
- 2005
- action
- Furniture, Equipment & Partiioning, Fencing Of Water Tank, Electricity, Completion Of Building
- output
- Healthy Comm.
- implementation status
- Complete
- total cost
- Ksh 1,679,000
- estimate
- Ksh 0
Ragati Road Project
- location
-
Magutu
(in Mathira)
- year first funded
- 2007
- action
- Road Improvement
- output
- Good Roads
- implementation status
- On-Going
- total cost
- Ksh 1,549,284
- estimate
- Ksh 0
Kanjuri Secondary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Dormitory Construction
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Konyu Water Project
- location
-
Konyu
(in Mathira)
- year first funded
- 2008
- action
- Water Provision
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Kirimukuyu Road Project
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2008
- action
- Gravelling Marrum/Rehabilitation
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Kaiyaba Dispensary
- location
-
Ngandu
(in Mathira)
- year first funded
- 2005
- action
- Purchase Of Equipment
- output
- Healthy Comm.
- implementation status
- Complete
- total cost
- Ksh 1,331,000
- estimate
- Ksh 0
Ngorano Water Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2008
- action
- Completion Of Tank And Protection Of Well
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Iruri Dispensary
- location
-
Ruguru
(in Mathira)
- year first funded
- 2003
- action
- Window, Door, Electricty, Furniture
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 1,147,000
- estimate
- Ksh 0
Wakamata Dispensary
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Equipment, Rehabilitation/Completion Of Laboratory
- output
- Healthy Comm.
- implementation status
- Complete
- total cost
- Ksh 1,070,000
- estimate
- Ksh 0
Ngurumo Dispensary
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2005
- action
- Equipment, Rehabilitation
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 1,067,000
- estimate
- Ksh 0
West Magutu
- location
-
Magutu
(in Mathira)
- year first funded
- 2006
- action
- n/a
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 1,046,500
- estimate
- Ksh 0
Chieni Road Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2007
- action
- Murram/Gravelling
- output
- Good Roads
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kieni Secondary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2007
- action
- Addition Of Classroom
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Magutu Water Project
- location
-
Magutu
(in Mathira)
- year first funded
- 2008
- action
- Water Provision
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Gakuyu Secondary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Construction- Class, Dining, Kitchen
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 965,500
- estimate
- Ksh 0
Iruri Irrwater Project
- location
-
Ruguru
(in Mathira)
- year first funded
- 2007
- action
- Laying Of Pipes, Fittings And Labour
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Gatina Dispensary
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Equipment, Rehabilitation
- output
- Health Service
- implementation status
- On-Going
- total cost
- Ksh 940,765
- estimate
- Ksh 0
Kianjogu Primary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2003
- action
- Toilets & Rehabilitation
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 895,000
- estimate
- Ksh 0
Ngorano Secondary School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2004
- action
- Laboratory Construction
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 879,000
- estimate
- Ksh 0
Karatina Road
- location
-
Karatina
(in Mathira)
- year first funded
- 2007
- action
- Murram/Gravelling
- output
- Good Roads
- implementation status
- Complete
- total cost
- Ksh 825,285
- estimate
- Ksh 0
Gaturiri Secondary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2006
- action
- Construction Of New Classrooms,
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 800,014
- estimate
- Ksh 0
Hiriga Primary School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2005
- action
- Construction Of New Classrooms,Toilets Construction
- output
- Education Promotion
- implementation status
- On-Going
- total cost
- Ksh 796,000
- estimate
- Ksh 0
Karura Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- Construction Of New Classrooms
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 790,281
- estimate
- Ksh 0
Mawasco
- location
-
Karatina
(in Mathira)
- year first funded
- 2005
- action
- Water Supply In Karatina
- output
- Water Availability
- implementation status
- Complete
- total cost
- Ksh 780,000
- estimate
- Ksh 0
Gathirathiru Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Gathehu Dispensary
- location
-
Magutu
(in Mathira)
- year first funded
- 2006
- action
- Renovation Of Exist Building,Addition Block&Building Of Toilet
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kiamabara Dispensary
- location
-
Konyu
(in Mathira)
- year first funded
- 2008
- action
- Purchasing Of Lab Equipment&Reagent
- output
- Health Service
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Gitunduti Police Post
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- Painting And Floor Cementing
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kiamariga Police Post
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Renovation Of Staff Houses
- output
- Security
- implementation status
- On-Going
- total cost
- Ksh 669,338
- estimate
- Ksh 0
Ruguru Road Project
- location
-
Ruguru
(in Mathira)
- year first funded
- 2009
- action
- Murram/Gravelling
- output
- Good Roads
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Gatondo Dispensary
- location
-
IriaIni West
(in Mathira)
- year first funded
- 2003
- action
- Security Doors And Plastering,Lboratory Construction.
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Sagana Irrwater Project
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Laying Of Pipes, Fittings & Labour
- output
- Water Availability
- implementation status
- On-Going
- total cost
- Ksh 625,000
- estimate
- Ksh 0
Ndundu-Ini Primary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2003
- action
- Electricity, Windows, Tank
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 613,000
- estimate
- Ksh 0
Higa Water Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2007
- action
- Laying Of Pipes/ Labour
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kimbiria Road Project
- location
-
Magutu
(in Mathira)
- year first funded
- 2009
- action
- Grading &Murraming
- output
- -
- implementation status
- not known
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kirimukuyu Water Project
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2008
- action
- Water Provision
- output
- Water
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ragati Water Project
- location
-
Magutu
(in Mathira)
- year first funded
- 2008
- action
- Water Provision
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Hiriga Secondary School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Tanks
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ragati Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- Toilets And Repair Of Exisitng Builds
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 580,000
- estimate
- Ksh 0
Kiamucheru Nursery School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Classes & Desk
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 555,000
- estimate
- Ksh 0
Ngorano Road Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2009
- action
- Grading&Murraming
- output
- -
- implementation status
- not known
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Hombe Forest Conservation
- location
-
Ruguru
(in Mathira)
- year first funded
- 2007
- action
- Reafforestaion
- output
- Environmental Conservation
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Thaithi Primary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Rehabilitation Of Classrooms
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 535,000
- estimate
- Ksh 0
Gatung'Ang'A Police Post
- location
-
Ngorano
(in Mathira)
- year first funded
- 2003
- action
- Amory /Construction Of Police Post
- output
- Security
- implementation status
- On-Going
- total cost
- Ksh 530,000
- estimate
- Ksh 0
Kianjogu Dispensary
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2006
- action
- Roof Repair,Construction Of Addition Block
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiamariga Secondary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Adm. Block
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ihiga Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Floor And Window Fixing
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 470,000
- estimate
- Ksh 0
Chieni Primary School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2005
- action
- Cementing Of Floor And Windows
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 465,000
- estimate
- Ksh 0
Kirigu Primary School
- location
-
Karatina
(in Mathira)
- year first funded
- 2004
- action
- Electricity Installation
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 457,000
- estimate
- Ksh 0
Market Stands
- location
-
Karatina
(in Mathira)
- year first funded
- 2005
- action
- Market Stands
- output
- Agri. Promotion
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Itiati Dispensary
- location
-
Ichuga
(in Mathira)
- year first funded
- 2003
- action
- Building Of Doctors Quarter,Renvotation And Painting
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Karembu Water Project
- location
-
Konyu
(in Mathira)
- year first funded
- 2007
- action
- Purchase Of Hydram
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kanjuri Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Floor Cementing Of Classrooms
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kiamabara Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Flooring, Toilets And Painting
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 445,000
- estimate
- Ksh 0
Kiamigwi Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Floor And Painting
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 440,000
- estimate
- Ksh 0
Kahara Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 430,000
- estimate
- Ksh 0
Karurumi Water Project
- location
-
Konyu
(in Mathira)
- year first funded
- 2007
- action
- Laying Of Pipes, Fittings And Labour
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 430,000
- estimate
- Ksh 0
Karindundu Dispensary
- location
-
Konyu
(in Mathira)
- year first funded
- 2006
- action
- Renovation Of Nursery To Dispensary
- output
- Health Service
- implementation status
- On-Going
- total cost
- Ksh 425,000
- estimate
- Ksh 0
Ndima-Ini Police Post
- location
-
Konyu
(in Mathira)
- year first funded
- 2006
- action
- Construction Of An Office,Finishing Of Uncombusted Areas
- output
- Security
- implementation status
- On-Going
- total cost
- Ksh 420,000
- estimate
- Ksh 0
Magutu Dispensary
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- A Church Project
- output
- -
- implementation status
- Stall Project
- total cost
- Ksh 415,000
- estimate
- Ksh 0
Kieni Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Renovation And Paiinting And Flooring
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 400,100
- estimate
- Ksh 0
Gathuthi Nursery School
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Class Completion
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kiangoma Primary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Rehabilitation Of Classrooms
- output
- Promote Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kianjau Primary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2003
- action
- Flooring, Cementing, Painting
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Gathehu Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- Tanks And Cement Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Sagana Primary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2003
- action
- Cementing & Flooring Of Classrooms
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 385,000
- estimate
- Ksh 0
Njathe-Ini Primary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Floor Window And Painting
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 370,000
- estimate
- Ksh 0
Kabiru-Ini Primary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Fixing Windows & Classes Rehab
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mung'Aria Polytechnic
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2005
- action
- Rehabilitation And Purchese Of Computer
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Karura Police Post
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Construction Of Police Post
- output
- Security
- implementation status
- On-Going
- total cost
- Ksh 336,000
- estimate
- Ksh 0
Gaturiri Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 335,000
- estimate
- Ksh 0
Magutu Secondary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Electrification/Rehabilitation
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 329,850
- estimate
- Ksh 0
Kahira-Ini Primary School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2005
- action
- Floor Cementing Windows
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 324,000
- estimate
- Ksh 0
Rware Primary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Painting, Floors And Plastering Windows
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 308,250
- estimate
- Ksh 0
Gatina Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2005
- action
- Rehabilitate Classes & Roof Painting
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 305,000
- estimate
- Ksh 0
Rwanyaga Nursery School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2003
- action
- Rehabilition Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 304,730
- estimate
- Ksh 0
Kabiru-Ini Secondary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2006
- action
- Construction Of Girls Hostel
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiongo Water Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2005
- action
- Laying Of Pipes
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chieni Dispensary
- location
-
Ngorano
(in Mathira)
- year first funded
- 2006
- action
- Renovation,Addition Of Dispensary Block
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiangengi Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Rehabilitation Of New Building
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Giakaibei Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Cementing Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ndima-Ini Dispensary
- location
-
Konyu
(in Mathira)
- year first funded
- 2008
- action
- Construction Of Maternity Ward
- output
- Health Service
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Karatina Polytechinic
- location
-
Karatina
(in Mathira)
- year first funded
- 2004
- action
- Boys Domitory Construction
- output
- Improvement Of Education
- implementation status
- Stall Project
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kirimara Secondary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2008
- action
- Renovation Of Laboratory
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nyana Electric Fence
- location
-
Ruguru
(in Mathira)
- year first funded
- 2006
- action
- Purchasing Treated Post
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiamariga Cattle Dip
- location
-
Ruguru
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Karatina Deb
- location
-
Karatina
(in Mathira)
- year first funded
- 2004
- action
- Gravelling Marrum/Rehabilitation
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 280,000
- estimate
- Ksh 0
Ndimaini Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Cementing & Minor Repairs, Paiiting
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 280,000
- estimate
- Ksh 0
Ngaini Secondary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Painting, Doors, Cementing
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 265,000
- estimate
- Ksh 0
Gatiko Primary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2005
- action
- Plastering
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 256,800
- estimate
- Ksh 0
Ruturu Water Project
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Water Tank
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 253,000
- estimate
- Ksh 0
Ngurumo Primary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation And Paint
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kagati Wendani Irrigation
- location
-
Ruguru
(in Mathira)
- year first funded
- 2007
- action
- Laying Of Pipes, Fittings And Labour
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Gitunduti Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Renovation- Classes Electric
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Maganjo Nursery School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2003
- action
- Cementing, Roof Repair
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 229,100
- estimate
- Ksh 0
Kiunjugi Nursery
- location
-
Magutu
(in Mathira)
- year first funded
- 2006
- action
- Repair Of Existing Building
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 223,400
- estimate
- Ksh 0
Iruri Primary School
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Windows Fixing & Class Rehab.
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Hombe Dam Consultancy
- location
-
Ruguru
(in Mathira)
- year first funded
- 2006
- action
- Assessment Fee
- output
- Water Provision
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ngorano Health Centre
- location
-
Ngorano
(in Mathira)
- year first funded
- 2004
- action
- Renvoation Of The Dispensary
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiahia Karurumo Water Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2004
- action
- Laying Of Pipes
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Hiriga Cattle Dip
- location
-
Ngorano
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ragati Tea Collection Centre
- location
-
Magutu
(in Mathira)
- year first funded
- 2007
- action
- Rehabilition Of The Centre
- output
- Agri. Promotion
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamuyu-Ini Polytechnic
- location
-
Magutu
(in Mathira)
- year first funded
- 2008
- action
- Installation Of Power,
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Gatei Dispensary
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Renovation
- output
- Healthy Comm.
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Karindundu Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Roof Repair And Putting Windows
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Gathugu Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Rehabilition Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kianjogu Secondary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Roof Plastering
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiangoma Secondary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Rehabilitation Of Classrooms
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kahutiini Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitate Classes &Painting Of Roofs
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 190,000
- estimate
- Ksh 0
Ngorano Primary School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2004
- action
- Floor Window And Painting
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 185,000
- estimate
- Ksh 0
Gikumbo Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Rehabilitation Of Classrooms
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Karie Water Point Project
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2005
- action
- Laying Of Pipes
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 155,000
- estimate
- Ksh 0
Wakamata Primary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Rehabilition Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Wakamata Coffee Bcentre
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2006
- action
- Electiricity And M,Etal Doors
- output
- Electrification
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kabiru-Ini Cattle Dip
- location
-
Ruguru
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ngorano Cattle Dip
- location
-
Ngorano
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Dip And Fencing
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Gikumbo Dispensary
- location
-
Magutu
(in Mathira)
- year first funded
- 2006
- action
- A Church Project
- output
- -
- implementation status
- Stall Project
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Karatina A Line
- location
-
Karatina
(in Mathira)
- year first funded
- 2008
- action
- Renovation Of Quarters
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ngaini Nursery School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ngaini Road Project
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2007
- action
- Murram/Gravelling
- output
- Good Roads
- implementation status
- On-Going
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kianganangu Cattle Dip
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Repair Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kianyange Cattle Dip
- location
-
Ngorano
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- On-Going
- total cost
- Ksh 135,000
- estimate
- Ksh 0
Gatei Cattle Dip
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- Repair
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 130,168
- estimate
- Ksh 0
Gathehu Tea Buying Centre
- location
-
Magutu
(in Mathira)
- year first funded
- 2006
- action
- Electrification
- output
- Agri. Promotion
- implementation status
- Complete
- total cost
- Ksh 125,700
- estimate
- Ksh 0
Sewage Covers
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Fix Sewage Covers
- output
- Clean Environ.
- implementation status
- Stalled
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Karatina Library
- location
-
Karatina
(in Mathira)
- year first funded
- 2004
- action
- Library Tent & Construction
- output
- Education Promotion
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 0
Mathira North Education Zone
- location
-
Ruguru
(in Mathira)
- year first funded
- 2006
- action
- Seminar
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 0
Ragati Cattle Dip
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- Clearing And Sewerage Con
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 0
Kieni Police Post
- location
-
Konyu
(in Mathira)
- year first funded
- 2006
- action
- Change Nursery To Admi. Office
- output
- Security
- implementation status
- On-Going
- total cost
- Ksh 110,000
- estimate
- Ksh 0
Sagana Cattle Dip
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Cattle Dip Renovation
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 0
Kagati Cattle Dip
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Rehabiltion Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ragati Wildlife Fence
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Electric Fence
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chieni Dairy
- location
-
Ngorano
(in Mathira)
- year first funded
- 2006
- action
- Constructiion Of Dairy
- output
- Agri. Promotion
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Karuthi Water Line
- location
-
Ngorano
(in Mathira)
- year first funded
- 2006
- action
- Laying Of Pipes
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiangonina Water Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2005
- action
- Laying Of Pipes
- output
- Water Provision
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Sagana/Maganjo Water Project
- location
-
Ngorano
(in Mathira)
- year first funded
- 2006
- action
- Laying Pipes
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kahira-Ini Primary School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2006
- action
- Cementing And Flooring
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Karatina Secondary School
- location
-
Karatina
(in Mathira)
- year first funded
- 2004
- action
- Constrution Of Boys Dormitory
- output
- Improvement Of Education
- implementation status
- Stall Project
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Karie Cattle Dip
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Plastering Of Walls
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Gakuyu Primary School
- location
-
Konyu
(in Mathira)
- year first funded
- 2006
- action
- Rehabilition Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Bushes Clearing At Ragati
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Clearing Of The Bush
- output
- Clean Environ.
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Gathehu Nursery School
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Rehabilitition Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Giakaibei Police Post
- location
-
Magutu
(in Mathira)
- year first funded
- 2008
- action
- Electrification
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Giakaibei Secondary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Grading Of The Field
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Gitunduti Daily Farmer
- location
-
Magutu
(in Mathira)
- year first funded
- 2008
- action
- Wall And Roofing
- output
- Productivity
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kamugoiri Bridge Sh Group
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Bridge
- output
- Good Roads
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kandara Kahari Water Project
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Buying Pipes And Laying Down
- output
- Water Provision
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiangengi Nursery
- location
-
Magutu
(in Mathira)
- year first funded
- 2005
- action
- Renovation Of Existing Building
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kindara/Kahari Water Project
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Renvoation Of Nursery To Dispensary
- output
- Water Provision
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Hombe Dam Consultancy
- location
-
Ruguru
(in Mathira)
- year first funded
- 2006
- action
- Consultation Fee For Hombe Dam
- output
- Water Provision
- implementation status
- Complete
- total cost
- Ksh 95,020
- estimate
- Ksh 0
Kamugoiri River Crossing
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Construction Of Bridge
- output
- Good Roads
- implementation status
- Complete
- total cost
- Ksh 78,000
- estimate
- Ksh 0
Githima Cattle Dip
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of The Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Stalled
- total cost
- Ksh 61,000
- estimate
- Ksh 0
Gitunduti Cattle Dip
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Repair
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Uruma Nursery School
- location
-
Konyu
(in Mathira)
- year first funded
- 2004
- action
- Rehabilitate Classes And Paint
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Itundu Dispensary
- location
-
IriaIni East
(in Mathira)
- year first funded
- 2006
- action
- Electrification
- output
- Healthy Comm.
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Gaikuyu Cattle Dp
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Repair
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kieni Cattle Dip
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Repair Of Existing Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mukore Cattle Dip
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Construction Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gathuthi Primary School
- location
-
Magutu
(in Mathira)
- year first funded
- 2006
- action
- Paintng And Roof Repair
- output
- Improvement Of Education
- implementation status
- Reallocation
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Giakaibei Cattle Dip
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Repair Of The Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gikumbo Cattle Dip
- location
-
Magutu
(in Mathira)
- year first funded
- 2003
- action
- Repair
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Karura Cattle Dip
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Repair
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gatunai Nursery School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2005
- action
- Renovation Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kirimukuyu Kplc
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2005
- action
- Electrification In Different Schools
- output
- Electrification
- implementation status
- Stalled
- total cost
- Ksh 46,600
- estimate
- Ksh 0
Ndima-Ini Cattle Dip
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Construction Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 45,000
- estimate
- Ksh 0
Gatina Cattle Dip
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 45,000
- estimate
- Ksh 0
Ngaini Primary School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2005
- action
- Electricity
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 41,600
- estimate
- Ksh 0
Mutathiini Nursery School
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 40,270
- estimate
- Ksh 0
Karindundu Nursery School
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Gate Fixing
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Iruri Cattle Dip
- location
-
Ruguru
(in Mathira)
- year first funded
- 2004
- action
- Rehabilitation Of Cattle Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Gaturiri Nursery School
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Gaturiri Cattle Dip
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Rehabilitation Of Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Raini Tea Collection Centre
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Electricity
- output
- Agri. Promotion
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Gathehu Cattle Dip
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Repair
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Karindundu Cattle Dip
- location
-
Konyu
(in Mathira)
- year first funded
- 2003
- action
- Repair Of The Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Gatiko Cattle Dip
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2004
- action
- Renovation Of Existing Building
- output
- Improvement Of Cattle Productivity
- implementation status
- On-Going
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Gatei Tea Collection Centre
- location
-
Magutu
(in Mathira)
- year first funded
- 2006
- action
- Electiricity Installation
- output
- Agri. Promotion
- implementation status
- Complete
- total cost
- Ksh 27,000
- estimate
- Ksh 0
Giakaibei Unity Sh Group
- location
-
Magutu
(in Mathira)
- year first funded
- 2004
- action
- Social Promotion
- output
- Social Group
- implementation status
- Complete
- total cost
- Ksh 23,000
- estimate
- Ksh 0
Ngorano Nursery School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2004
- action
- Rehabilitation Of Classrooms
- output
- Improvement Of Education
- implementation status
- On-Going
- total cost
- Ksh 21,900
- estimate
- Ksh 0
Gatung'Ang'A Nursery School
- location
-
Ngorano
(in Mathira)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improvement Of Education
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 0
Karindundu Chief's Office
- location
-
Konyu
(in Mathira)
- year first funded
- 2006
- action
- Furnitiure Of Office
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 0
Gatiko Dispensary
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2006
- action
- Renovation Of Rooms
- output
- Healthy Comm.
- implementation status
- Stalled
- total cost
- Ksh 20,000
- estimate
- Ksh 0
Karungaini Cattle Dip
- location
-
Kirimukuyu
(in Mathira)
- year first funded
- 2003
- action
- Renovation Of The Dip
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 11,000
- estimate
- Ksh 0
Assistant Chief Iruri
- location
-
Ruguru
(in Mathira)
- year first funded
- 2006
- action
- Furnitiure Of Office
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 0
Chieni Cattle Dip
- location
-
Ngorano
(in Mathira)
- year first funded
- 2004
- action
- Repair
- output
- Improvement Of Cattle Productivity
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 0