The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Matuga

Kwale Hospital Maternity Wing

location
Golini (in Matuga)
year first funded
2007
action
Construction Of 1 New Maternity Wing.
output
Provision Of Hygienic Maternity Services.
implementation status
Complete
total cost
Ksh 18,642,963
estimate
Ksh 18,642,963

Kwale Dicece

location
Waa (in Matuga)
year first funded
2004
action
Construction And Equicping Of The Dicece.
output
Provision Of A Facility For Early Childhood Teachers' Training
implementation status
Complete
total cost
Ksh 10,294,132
estimate
Ksh 10,294,132

Shimba Hills Maternity Wing

location
Majimboni (in Matuga)
year first funded
2004
action
Construction Of New Maternity Ward.
output
Provision Of Hygienic Maternity Services.
implementation status
- 98% Complete .
total cost
Ksh 9,354,820
estimate
Ksh 9,604,820

Ng'Ombeni Dispensary Maternity Wing

location
Ng'Ombeni (in Matuga)
year first funded
2004
action
Construction Of New Maternity Ward.
output
Provision Of Hygienic Maternity Services.
implementation status
- 98% Complete .
total cost
Ksh 8,704,820
estimate
Ksh 9,204,820

Tiwi Maternity Wing

location
Tiwi (in Matuga)
year first funded
2004
action
Construction Of New Maternity Ward.
output
Provision Of Hygienic Maternity Services.
implementation status
- 98% Complete .
total cost
Ksh 8,454,820
estimate
Ksh 9,204,820

C Office Building

location
Golini (in Matuga)
year first funded
2004
action
Construction Of Cdf Office Building.
output
Provision Of Office Space & Facilities For Better Cdf Projects Management.
implementation status
Complete
total cost
Ksh 7,408,728
estimate
Ksh 7,408,728

Jorori Water Project

location
Tsimba (in Matuga)
year first funded
2004
action
Pvc For 15Km, Construction Of 1 (50M3) Tank & 2 Water Kiosks.
output
Provision Of Clean Water Supply To Joroni & Mazumalume Residents.
implementation status
Pipe Laying, Fitting & Backfilling Has Been Done For 8Km. Tank Construction Completed And 2 Water Kiosks Are In Place. 7Km Pipe Laying Is Yet To Be Done.
total cost
Ksh 6,182,960
estimate
Ksh 9,947,513

Kwale Secondary School Dormitory

location
Golini (in Matuga)
year first funded
2007
action
Construction of Ground Floor Of School Dormitory.
output
Provide Boarding Facility For Students.
implementation status
Fixig Doors And Window Frames Is Complete.
total cost
Ksh 6,030,000
estimate
Ksh 6,530,000

Matuga Dispensary

location
Waa (in Matuga)
year first funded
2009
action
Construction Of 1 New Dispensary.
output
Provision Of A Health Care Facility.
implementation status
Tendering Is In Process
total cost
Ksh 5,000,000
estimate
Ksh 6,500,000

Kizibe Maternity Wing

location
Mwaluphamba (in Matuga)
year first funded
2004
action
Construction Of New Maternity Ward.
output
Provision Of Hygienic Maternity Services.
implementation status
- 98% Complete .
total cost
Ksh 4,107,020
estimate
Ksh 4,607,020

Matuga Girls' Secondary School Water Project

location
Waa (in Matuga)
year first funded
2003
action
Pvc For ;61Km From Borehole No. 8 At Kombani To The School.
output
Provision Of Clean Water Supply To A Girls' Sec. School And Its Neighborhood.
implementation status
Complete And Water Is Available For Use In School.
total cost
Ksh 3,543,862
estimate
Ksh 3,543,862

Tsimba Secondary School

location
Tsimba (in Matuga)
year first funded
2007
action
Construction Of 1 School Laboratory.
output
Improve Learning Facilities.
implementation status
In Progress
total cost
Ksh 3,500,000
estimate
Ksh 4,800,000

Grader St Installment

location
Golini (in Matuga)
year first funded
2004
action
Procure A Grader.
output
Maintenance Of Murram Roads In The Constituency.
implementation status
Project Disbanded & Money Re-Allocated.
total cost
Ksh 3,500,000
estimate
Ksh 3,500,000

Golini/Vyongwani Water Project

location
Golini (in Matuga)
year first funded
2005
action
Pvc For 2Km.
output
Provision Of Clean Water Supply To Golini & Vyongwani Residents.
implementation status
Complete And Water Is Being Used.
total cost
Ksh 3,400,140
estimate
Ksh 3,400,140

Vuga / Bilashaka Water Project

location
Tsimba (in Matuga)
year first funded
2006
action
Pvc For 20Km.
output
Provision Of Clean Water Supply To Vuga & Bilashaka Residents.
implementation status
Complete
total cost
Ksh 3,289,050
estimate
Ksh 3,289,050

Magodzoni / Mwamivi Water Project

location
Tiwi (in Matuga)
year first funded
2006
action
Pvc For ;0Km, Construction Of 2 Water Kiosks And Installation Of 2 Plastic Water Tanks.
output
Provision Of Clean Water Supply To Magodzoni & Mwamivi Residents.
implementation status
Complete
total cost
Ksh 3,000,000
estimate
Ksh 3,500,000

Mbuguni Secondary School

location
Mbuguni (in Matuga)
year first funded
2009
action
Construction Of 3 New Classrooms
output
Improve Learning Facilities.
implementation status
Work Is Yet To Be Done.
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Mwaluvanga Water Project

location
Mwaluvanga (in Matuga)
year first funded
2007
action
Construction Of 1 Masonry Water Tank. (100M3) And Pipe Laying
output
Provision Ofclean Water Supply To Mwaluvanga Residents.
implementation status
Water Tank Is Complete And Pipe Laying Is In Progress
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Mlafyeni Water Project

location
Mwaluphamba (in Matuga)
year first funded
2004
action
Pvc For 12 Km.
output
Provision Of Clean Water Supply To Kajiweni And Mlafyeni Residents.
implementation status
Complete And In Use
total cost
Ksh 2,991,739
estimate
Ksh 2,991,739

Purchase Of Motor Vehicle

location
Golini (in Matuga)
year first funded
2006
action
Purchase Of 1 New Vehicle.
output
Facilitate Monitoring Of Cdf Projects..
implementation status
Complete & In Use.
total cost
Ksh 2,962,125
estimate
Ksh 3,000,000

Matuga Girls Dining Hall Roof

location
Waa (in Matuga)
year first funded
2006
action
Roofing, Plastering And Painting, Fixing Doors And Windows To D/H
output
Provision Of A Dining Facility To A Girls' Sec. School.
implementation status
Complete
total cost
Ksh 2,730,490
estimate
Ksh 2,730,490

Strategic Plan & Consultancy

location
Golini (in Matuga)
year first funded
2008
action
Prepare Strategic Plan For Matuga Constituency.
output
Give Direction In Achieving Constituency'S Goals
implementation status
Complete
total cost
Ksh 2,700,000
estimate
Ksh 2,700,000

Kiteje Dispensary

location
Ng'Ombeni (in Matuga)
year first funded
2007
action
Construction Of 1 New Dispensary.
output
Provision Of A Health Care Facility.
implementation status
Complete .
total cost
Ksh 2,550,000
estimate
Ksh 4,200,000

Kwale Medical Training College

location
Golini (in Matuga)
year first funded
2004
action
Construction Of 2 Hostels & Admin Block, Partitioning Of 1 Multipurpose Hall To Come Up With 4 Classrooms & Completion Of Ablution Blocks.
output
Facilitate Training Of Medical Personnel.
implementation status
Stalled.
total cost
Ksh 2,400,000
estimate
Ksh 2,900,000

Mangawani Secondary School Dormitory

location
Mangawani (in Matuga)
year first funded
2007
action
Construction Of 1 School Dormitory.
output
Improve Learning Facilities.
implementation status
Work Is Yet To Start.
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Mkongani Secondary School Dormitory

location
Mkongani (in Matuga)
year first funded
2007
action
Construction Of 1 School Dormitory.
output
Improve Learning Facilities.
implementation status
Work Is Yet To Start.
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Ziwani Primary School

location
Golini (in Matuga)
year first funded
2009
action
Construction Of 2 New Classrooms
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Kombani Secondary School

location
Waa (in Matuga)
year first funded
2009
action
Construction Of 2 New Classrooms
output
Improve Learning Facilities.
implementation status
In Progress
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Majimboni Water Project

location
Majimboni (in Matuga)
year first funded
2006
action
Pvc For 2Km, And Rehabilation Of Old Pipeline.
output
Provision Of Clean Water Supply To Majimboni Residents.
implementation status
Rehabilitation Of Old Pipeline Is Complete.
total cost
Ksh 2,000,000
estimate
Ksh 3,500,000

Shimba Hills Secondary School Dining Hall

location
Majimboni (in Matuga)
year first funded
2007
action
Repair & Re-Roofing The Existing Dh & Construction Of Dh Extension, Plastering & Painting.
output
Provision Of A Dining Facility To A Sec. School.
implementation status
Complete
total cost
Ksh 1,961,128
estimate
Ksh 2,000,000

Mazumalume Water Project

location
Tsimba (in Matuga)
year first funded
2008
action
Dig Water Borehole, Procure Genarator And Pipe Laying For 2Kms
output
Provision Of Clean Water Supply To The Residents.
implementation status
Work Is Yet To Commence
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Waa Boys Secondary School Dormitory

location
Waa (in Matuga)
year first funded
2008
action
Construction Of 1St Floor Of School Dormitory.
output
Provide Additional Boarding Facilities.
implementation status
Roofing Complete
total cost
Ksh 1,900,000
estimate
Ksh 2,718,300

Ziwani Water Project

location
Golini (in Matuga)
year first funded
2007
action
Pvc For 3Km & Construction Of 3 No. Standard Communal Water Kiosks. Installation Of 3 Plastic Water Tanks.
output
Provision Of Clean Water Supply To Gopha, Ziwani & Godoni & Villages.
implementation status
Ziwani And Godoni Lines Are Complete And Water Is Available..
total cost
Ksh 1,556,360
estimate
Ksh 1,600,000

Mkongani Secondary School Staff House

location
Mkongani (in Matuga)
year first funded
2007
action
Construction Of 1 School Staff House
output
Provide Housing Facilities To The Teaching Staff.
implementation status
Construction Yet To Be Done
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Staff House At Kibuyuni Dispensary

location
Mkongani (in Matuga)
year first funded
2007
action
Construction Of 1 Staff House.
output
Provision Of Housing Facility For The Clinical Officer/Nurse Residing Within The Dispensary
implementation status
In Progress
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Staff House At Kizibe Dispensary

location
Mwaluphamba (in Matuga)
year first funded
2007
action
Construction Of 1 Staff House.
output
Provision Of Housing Facility For The Clinical Officer/Nurse Residing Within The Dispensary
implementation status
Tendering In Progress
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Lukore Secondary School Library

location
Lukore (in Matuga)
year first funded
2007
action
Construction Of 1 New Library.
output
Improve Learning Facilities.
implementation status
Complete And In Use
total cost
Ksh 1,475,000
estimate
Ksh 2,000,000

Galana Primary School

location
Mbuguni (in Matuga)
year first funded
2007
action
Construction Of 2 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Tsimba / Kundutsi Water Project

location
Tsimba (in Matuga)
year first funded
2006
action
Pvc For 8Km.
output
Provision Of Clean Water Supply To Tsimba / Kundutsi Residents.
implementation status
Piping And Installation Of 2 Water Tanks Is Complete.
total cost
Ksh 1,268,980
estimate
Ksh 1,269,240

Mbweka Primary School

location
Waa (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 800,000

Mcdc Office Landscaping

location
Golini (in Matuga)
year first funded
2008
action
Landscaping Of The Cdfc Office Compound.
output
Beautifying The Office Compound
implementation status
Complete
total cost
Ksh 1,137,800
estimate
Ksh 1,137,800

Kaya-Tiwi Secondary School Laboratory

location
Tiwi (in Matuga)
year first funded
2003
action
Construction Of 1 Secondary School Laboratory.
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 1,046,276
estimate
Ksh 1,506,276

Golini Secondary School Laboratory

location
Golini (in Matuga)
year first funded
2004
action
Construction Of 1 Secondary School Laboratory.
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 1,040,555
estimate
Ksh 1,041,049

Godoni Primary School

location
Golini (in Matuga)
year first funded
2009
action
Construction Of 1 New Classroom
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kichakasimba Girls Secondary School Library

location
Mwaluvanga (in Matuga)
year first funded
2004
action
Construction Of 1 New Library.
output
Improve Learning Facilities.
implementation status
Complete And In Use.
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mwaluphamba Secondary School

location
Mwaluphamba (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kirewe Sec, School

location
Mwaluphamba (in Matuga)
year first funded
2009
action
Construction Of 1 New Classroom
output
Improve Learning Facilities.
implementation status
In Progress
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Stephen Kanja Secondary School

location
Majimboni (in Matuga)
year first funded
2009
action
Construction Of 1 New Classroom
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Furniture For Mcdc Office

location
Golini (in Matuga)
year first funded
2006
action
Equipping The Cdfc Office.
output
Provision Of Sitting Facilities For Office Staff And Visitors.
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Shimbahills Youth Polytechnic

location
Majimboni (in Matuga)
year first funded
2004
action
Purchase Tools & Equipment & Construction Of Generator
output
Provision Of Generator Room & Facilities For Technical Training.
implementation status
Complete & In Use.
total cost
Ksh 900,000
estimate
Ksh 900,000

Kichaka-Simba Girls Secondary School Water Borehole

location
Mwaluvanga (in Matuga)
year first funded
2004
action
Drilling 203Mm Water Borehole To A Depth Of 80M And Plumbing Works.
output
Provision Of Water To A Girls' Sec. School.
implementation status
Stalled
total cost
Ksh 900,000
estimate
Ksh 1,700,000

Ziwani Water Pipes & Fixtures Project

location
Golini (in Matuga)
year first funded
2003
action
Pvc For ;8Km.
output
Provision Of Clean Water To Ziwani Residents.
implementation status
Complete
total cost
Ksh 870,000
estimate
Ksh 1,926,360

Tserezani Secondary School

location
Mwaluphamba (in Matuga)
year first funded
2004
action
Completing Construction Of 3 Classrooms (Walling And Roofing)
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 850,000
estimate
Ksh 850,000

Mangawani Secondary School

location
Mangawani (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 850,000

Kichakasimba Girls' Secondary School

location
Mwaluvanga (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 850,000

Kajiweni Primary School

location
Mwaluphamba (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Miamba Primary School

location
Mkongani (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Tiwi Primary School

location
Tiwi (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mwaligulu Primary School

location
Tiwi (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Chai Primary School

location
Tiwi (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Yeje Primary School

location
Waa (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Jorori Primary School

location
Tsimba (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mtsangatamu Primary School

location
Mwaluphamba (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mwagodzo Primary School

location
Mwaluvanga (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Tiribe Primary School

location
Mwaluphamba (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Ziwani Primary School

location
Golini (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Vuga Primary School

location
Tsimba (in Matuga)
year first funded
2007
action
Replacing Old Classroom Roofs And Floors And General Facelift To 2No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mnyalatsoni Primary School

location
Mkongani (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Mkomba Primary School

location
Mkongani (in Matuga)
year first funded
2007
action
Construction Of 1 New Classroom
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Golini Secondary School Library

location
Golini (in Matuga)
year first funded
2003
action
Roofing Of 1 School Library.
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 773,235
estimate
Ksh 773,235

Shimba Hills Maternity Wing Equipment

location
Majimboni (in Matuga)
year first funded
2007
action
Equipping Maternity Ward
output
Provision Of Equipment For Rendering In-Patient And Out Patient Maternity Services.
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Tiwi Maternity Wing Equipment

location
Tiwi (in Matuga)
year first funded
2007
action
Equipping Maternity Ward
output
Provision Of Equipment For Rendering In-Patient And Out Patient Maternity Services.
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Mwaluphamba Secondary School

location
Mwaluphamba (in Matuga)
year first funded
2003
action
Construction Of 2 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 743,177
estimate
Ksh 743,177

Majimboni Chief's Office

location
Majimboni (in Matuga)
year first funded
2007
action
Construction Of 1 Chief'S Office.
output
Improve Provincial Administration Facilities.
implementation status
In Progress
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Tiwi Chief's Office

location
Tiwi (in Matuga)
year first funded
2007
action
Construction Of 1 Chief'S Office.
output
Improve Provincial Administration Facilities.
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Golini Chief's Office

location
Golini (in Matuga)
year first funded
2007
action
Construction Of 1 Chief'S Office.
output
Improve Provincial Administration Facilities.
implementation status
In Progress
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Mkongani Primary School

location
Mkongani (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Mcdfc Office Maintenance

location
Golini (in Matuga)
year first funded
2009
action
Repainting Of Office, Purchase And Installing Water Tank
output
Provide General Facelift To Office Building And Provision Of Rain Water Harvesting Facility.
implementation status
Yet To Be Done
total cost
Ksh 563,048
estimate
Ksh 56,304,835

Vertical Blinds For Mcdc Office

location
Golini (in Matuga)
year first funded
2007
action
Equipping The Cdfc Office.
output
Provision Of Window Facilities For Office.
implementation status
Complete & In Use.
total cost
Ksh 519,400
estimate
Ksh 519,400

Tsimba Water Tank

location
Tsimba (in Matuga)
year first funded
2007
action
Construction Of 1 Masonry Water Tank. (100M3)
output
Provision Of Water Storage Facility For Tsimba Residents.
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 2,500,000

Shimba Hills Secondary School

location
Majimboni (in Matuga)
year first funded
2003
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 469,018
estimate
Ksh 469,018

Kizibe Maternity Wing Equipment

location
Mwaluphamba (in Matuga)
year first funded
2007
action
Equipping Maternity Ward
output
Provision Of Equipment For Rendering In-Patient And Out Patient Maternity Services.
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Ng'Ombeni Maternity Wing Equipment

location
Ng'Ombeni (in Matuga)
year first funded
2007
action
Equipping Maternity Ward
output
Provision Of Equipment For Rendering In-Patient And Out Patient Maternity Services.
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Recurrent Expenditure

location
Golini (in Matuga)
year first funded
2009
action
Provide Maintenance To Vehicle And Office Equipment
output
Smooth Running Of Office
implementation status
In Progress
total cost
Ksh 448,968
estimate
Ksh 448,968

Mangawani Secondary School

location
Mangawani (in Matuga)
year first funded
2004
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 444,445
estimate
Ksh 444,445

Tsimba Secondary School

location
Tsimba (in Matuga)
year first funded
2004
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Golini Secondary School Water Project

location
Golini (in Matuga)
year first funded
2003
action
Construction Of 1 Water Tank .
output
Provision Of Water Storage Facility For The School.
implementation status
Stalled
total cost
Ksh 400,000
estimate
Ksh 400,000

Waa Girls Secondary School

location
Waa (in Matuga)
year first funded
2004
action
Equipping School Laboratory
output
Improve Learning Facilities.
implementation status
Complete & Equipment Are In Use.
total cost
Ksh 371,000
estimate
Ksh 371,495

Mangawani Cattle Dip

location
Mangawani (in Matuga)
year first funded
2006
action
Re-Roofing And Repair Of Drainage Yard Using Hardwood Timber & Fixing Wire Mesh
output
Provision Of Refurbished Facility For Better Animal Care`
implementation status
Complete
total cost
Ksh 360,000
estimate
Ksh 360,000

Lukore Cattle Dip

location
Lukore (in Matuga)
year first funded
2008
action
Buying & Fixing Of Hardwood Poles To Fence The Cattle Dip Compound Perimeter.
output
Provision Of Refurbished Facility For Better Animal Care`
implementation status
Tendering For The Works In Progress.
total cost
Ksh 300,000
estimate
Ksh 300,000

Mkokoni Primary School

location
Waa (in Matuga)
year first funded
2004
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 300,000
estimate
Ksh 300,000

Kwale Primary School

location
Golini (in Matuga)
year first funded
2004
action
Construction Of 2 New Class
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 300,000
estimate
Ksh 300,000

Kirewe Sec, School

location
Mwaluphamba (in Matuga)
year first funded
2009
action
Acquire 60 Secondary School Chairs And Lockers.
output
Provision Of Sitting Facilities For Secondary School Students.
implementation status
Chairs And Lockers Are Yet To Be Acquired
total cost
Ksh 300,000
estimate
Ksh 300,000

Renovation Of Magwasheni Dispensary

location
Mangawani (in Matuga)
year first funded
2007
action
Re-Roofing, Repair And Painting Of The Dispensary.
output
Provision Of Re-Furbished Dispensary For Better Discharge Of Medical Services.
implementation status
Renovation Is Yet To Be Done
total cost
Ksh 300,000
estimate
Ksh 300,000

Kichakasimba Girls' Secondary School

location
Mwaluvanga (in Matuga)
year first funded
2003
action
Purchase 10Kva Diesel Generator.
output
Provision Of Power Supply.
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Tserezani Secondary School

location
Mwaluphamba (in Matuga)
year first funded
2008
action
Acquire 50 Secondary School Chairs & Lockers.
output
Provision Of Sitting Facilities For Secondary School Students.
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mkongani Secondary School

location
Mkongani (in Matuga)
year first funded
2003
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Waa Boys Secondary School library

location
Waa (in Matuga)
year first funded
2004
action
Rehabilitate Existing Old Kitchen Block Into A Library
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 225,000
estimate
Ksh 225,000

Lunguma Primary School

location
Golini (in Matuga)
year first funded
2003
action
Re-Roofing And Flooring Of 3 Class
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete And In Use.
total cost
Ksh 225,000
estimate
Ksh 225,000

Tsimba Secondary School

location
Tsimba (in Matuga)
year first funded
2005
action
Acquire 50 Secondary School Chairs And Lockers.
output
Provision Of Sitting Facilities For Secondary School Students.
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ambmwakwere Secondary School

location
Mwaluphamba (in Matuga)
year first funded
2008
action
Acquire 40 Secondary School Chairs & Lockers.
output
Provision Of Sitting Facilities For Secondary School Students.
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Tserezani Primary School

location
Mwaluphamba (in Matuga)
year first funded
2007
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 150,000
estimate
Ksh 250,000

Mwagodzo Primary School

location
Mwaluvanga (in Matuga)
year first funded
2004
action
Acquire 70 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Muungano Primary School

location
Tiwi (in Matuga)
year first funded
2003
action
Re-Roofing & Flooring Of 2 Class
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 125,000
estimate
Ksh 125,000

Tiwi Primary School

location
Tiwi (in Matuga)
year first funded
2003
action
Re-Roofing Of 2 Classrooms
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 125,000
estimate
Ksh 125,000

Mwagodzo Primary School

location
Mwaluvanga (in Matuga)
year first funded
2003
action
Re-Roofing And Flooring Of 2 No Classrooms
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 125,000
estimate
Ksh 125,000

Magwasheni Primary School

location
Mangawani (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kiteje Dispensary Equipment

location
Ng'Ombeni (in Matuga)
year first funded
2008
action
Equipping Dispensary
output
Provision Of Dispensary Equipment For Rendering Outpatient Medical Care Services
implementation status
Complete.
total cost
Ksh 100,000
estimate
Ksh 100,000

Mbweka Primary School

location
Waa (in Matuga)
year first funded
2003
action
Re-Roofing & Flooring Of 2 Class
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 100,000
estimate
Ksh 100,000

Miatsani Primary School

location
Mwaluphamba (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mlafyeni Primary School

location
Mwaluphamba (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Miamba Primary School

location
Mkongani (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mkomba Primary School

location
Mkongani (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Burani Primary School

location
Mwaluphamba (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kizibe Primary School

location
Mwaluphamba (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mangawani Primary School

location
Mangawani (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kichakasimba Primary School

location
Mwaluvanga (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mwapala Primary School

location
Majimboni (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kipambani Primary School

location
Majimboni (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Shimbahills Primary School

location
Majimboni (in Matuga)
year first funded
2004
action
Acquire 50 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Yeje Primary School

location
Waa (in Matuga)
year first funded
2003
action
Acquire 55 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 97,500
estimate
Ksh 97,500

Mazumalume Village Water Project

location
Tsimba (in Matuga)
year first funded
2006
action
Construction Of A Water Tank
output
Provision Of Clean Water Supply To Mazumalume Residents.
implementation status
Complete But Not In Use.
total cost
Ksh 95,810
estimate
Ksh 95,810

Tiwi Primary School

location
Tiwi (in Matuga)
year first funded
2004
action
Acquire 40 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Jorori Primary School

location
Tsimba (in Matuga)
year first funded
2004
action
Acquire 40 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Chai Primary School

location
Tiwi (in Matuga)
year first funded
2004
action
Flooring & Fixing Of 1 Door & 3 Window Grills To 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 75,000
estimate
Ksh 75,000

Mnyalatsoni Primary School

location
Mkongani (in Matuga)
year first funded
2004
action
Re-Roofing & Flooring Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 75,000
estimate
Ksh 75,000

Mwachema Primary School

location
Tiwi (in Matuga)
year first funded
2004
action
Re-Roofing, Plastering & Painting Of 4 Class Buying & Fixing 4 Door Grills.
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete
total cost
Ksh 75,000
estimate
Ksh 300,000

Vuga Primary School

location
Tsimba (in Matuga)
year first funded
2004
action
Re-Roofing & Flooring Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 75,000
estimate
Ksh 75,000

Yeje Primary School

location
Waa (in Matuga)
year first funded
2004
action
Re-Roofing & Flooring Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 75,000
estimate
Ksh 75,000

Shimba Hills Cattle Dip

location
Majimboni (in Matuga)
year first funded
2004
action
Re-Roofing Of The Cattle Dip & Fixing Of Hardwood Poles & Timber In The Drainage Yard.
output
Provision Of Refurbished Facility For Better Animal Care`
implementation status
Complete And In Use.
total cost
Ksh 75,000
estimate
Ksh 175,000

Mwaluvanga Cattle Dip

location
Mwaluvanga (in Matuga)
year first funded
2004
action
Re-Roofing, And Replacing Some Of The Hardwood Timber In The Drainage Yard.
output
Provision Of Refurbished Facility For Better Animal Care`
implementation status
Complete
total cost
Ksh 75,000
estimate
Ksh 75,000

Mwapala Primary School

location
Majimboni (in Matuga)
year first funded
2004
action
Re-Roofing Of 1 Classroom
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 75,000
estimate
Ksh 75,000

Mkomba Primary School

location
Mkongani (in Matuga)
year first funded
2004
action
Re-Roofing & Flooring Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 75,000
estimate
Ksh 75,000

Muungano Primary School

location
Tiwi (in Matuga)
year first funded
2003
action
Acquire 46 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 69,000
estimate
Ksh 69,000

Vuga Primary School

location
Tsimba (in Matuga)
year first funded
2003
action
Acquire 40 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Lunguma Primary School

location
Golini (in Matuga)
year first funded
2003
action
Acquire 40 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Mwachema Primary School

location
Tiwi (in Matuga)
year first funded
2003
action
Acquire 40 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Mwachema Primary School

location
Tiwi (in Matuga)
year first funded
2004
action
Acquire 30 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Mbweka Primary School

location
Waa (in Matuga)
year first funded
2003
action
Acquire 36 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 54,000
estimate
Ksh 54,000

Chongolo Primary School

location
Tiwi (in Matuga)
year first funded
2003
action
Renovation Of 1 Classroom
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Project Disbanded & Money Re-Allocated.
total cost
Ksh 50,000
estimate
Ksh 50,000

Magwasheni Primary School

location
Mangawani (in Matuga)
year first funded
2003
action
Re-Roofing, Plastering & Painting Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Mtsangatamu Primary School

location
Mwaluphamba (in Matuga)
year first funded
2003
action
Flooring And Plastering Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kajiweni Primary School

location
Mwaluphamba (in Matuga)
year first funded
2003
action
Flooring Of 2 Existing Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kichakasimba Primary School

location
Mwaluvanga (in Matuga)
year first funded
2003
action
Re-Roofing & Flooring Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Makobe Primary School

location
Majimboni (in Matuga)
year first funded
2003
action
Renovation Of 1 Classroom
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Project Disbanded & Money Re-Allocated.
total cost
Ksh 50,000
estimate
Ksh 50,000

Mtsamviani Primary School

location
Mkongani (in Matuga)
year first funded
2003
action
Platsering, Fixing Door And Windows To 1 Class
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Bowa Primary School

location
Waa (in Matuga)
year first funded
2003
action
Re-Roofing Of 1 Classroom
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete And In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Mkokoni Primary School

location
Waa (in Matuga)
year first funded
2003
action
Re-Roofing & Flooring Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete And In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Vyongwani Dispensary

location
Golini (in Matuga)
year first funded
2004
action
Purchase 10 Hospital Beds.
output
Provision Of Observation Facilities.
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kwale Primary School

location
Golini (in Matuga)
year first funded
2003
action
Re-Roofing Of 1 Classroom
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Miatsani Primary School

location
Mwaluphamba (in Matuga)
year first funded
2003
action
Flooring, Plastering & Painting Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Mlafyeni Primary School

location
Mwaluphamba (in Matuga)
year first funded
2003
action
Re-Roofing Of 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Mzinji Primary School

location
Mkongani (in Matuga)
year first funded
2003
action
Re-Roofing And Fixing 4 Windows To 1 Class
output
Provision Of Refurbished Classroom For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Golini Primary School

location
Golini (in Matuga)
year first funded
2003
action
Acquire 25 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 37,500
estimate
Ksh 37,500

Kombani Primary School

location
Waa (in Matuga)
year first funded
2003
action
Acquire 25 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 37,500
estimate
Ksh 37,500

Mwamgunga Primary School

location
Tsimba (in Matuga)
year first funded
2003
action
Acquire 25 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
No Desks Were Bought Instead Money Was Used To Construct 1 Students' Toilet Which Is Complete & In Use.
total cost
Ksh 37,500
estimate
Ksh 37,500

Chirimani Primary School

location
Tsimba (in Matuga)
year first funded
2003
action
Acquire 25 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
No Desks Were Bought Instead Money Was Used To Construct 1 Students' Toilet Which Is Complete & In Use.
total cost
Ksh 37,500
estimate
Ksh 37,500

Ziwani Primary School

location
Golini (in Matuga)
year first funded
2003
action
Acquire 25 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 37,500
estimate
Ksh 37,500

Vyongwani Primary School

location
Golini (in Matuga)
year first funded
2003
action
Acquire 23 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 34,500
estimate
Ksh 34,500

Bilashaka Primary School

location
Tsimba (in Matuga)
year first funded
2003
action
Acquire 23 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
No Desks Were Bought Instead Money Was Used To Dig & Construct 1 Staff Pit Latrine Which Is Complete.
total cost
Ksh 34,500
estimate
Ksh 34,500

Mteza Primary School

location
Mbuguni (in Matuga)
year first funded
2003
action
Acquire 20 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Mbuguni Primary School

location
Mbuguni (in Matuga)
year first funded
2003
action
Acquire 20 Primary School Desks.
output
Provision Of Sitting Facilities For Primary School Children.
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Tsimba-Vyongwani-Lunguma Road Project

location
Golini (in Matuga)
action
Supply And Spread Of Gravel For Spot Gravelling
output
Provide Reliable Transport & Communication.
implementation status
Complete & In Use.
total cost
Ksh 0
estimate
Ksh 484,000

Bowa Primary School

location
Waa (in Matuga)
action
Re-Roofing, Flooring And Plastering/Painting Of 3 Classrooms
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete And In Use.
total cost
Ksh 0
estimate
Ksh 1,039,571

Mwagodzo Primary School

location
Mwaluvanga (in Matuga)
action
Re-Roofing Of 4 Classrooms, Repair Wall Cracks & Fix Concrete Pillars.
output
Provision Of Refurbished Classrooms For Better Learning.
implementation status
Complete & In Use.
total cost
Ksh 0
estimate
Ksh 130,000

Miamba Primary School

location
Mkongani (in Matuga)
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 0
estimate
Ksh 261,981

Yeje Primary School

location
Waa (in Matuga)
action
Construction Of 1 New Class
output
Improve Learning Facilities.
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 472,619

Mirihini Primary School

location
Mwaluphamba (in Matuga)
action
Construction Of 2 New Class
output
Improve Learning Facilities.
implementation status
Complete & In Use.
total cost
Ksh 0
estimate
Ksh 831,500

Mwachema Borehole

location
Tiwi (in Matuga)
action
Provide Borehole Spare Parts & Repair.
output
Provision Of Water Supply For Domestic Use.
implementation status
Complete And In Use.
total cost
Ksh 0
estimate
Ksh 33,333