The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Mbita

Mbita Secondary School

location
Gembe West (in Mbita)
year first funded
2004
action
Construction of 2 Classrooms, A Dormitory And A Library
output
2 Classrooms, A Dormitory And A Library
implementation status
On Going
total cost
Ksh 7,000,000
estimate
Ksh 1,000,000

Waondo Secondary School

location
Gembe East (in Mbita)
year first funded
2003
action
Construction of Dormitory, Lab Equipments, Lockers
output
Dormitory, Lab Equipments, Lockers
implementation status
Complete
total cost
Ksh 6,321,710
estimate
Ksh 1,820,000

Nyamasare Secondary School

location
Gembe West (in Mbita)
year first funded
2003
action
Construction And Renovation
output
Staff House, Dormitory, Student Lockers, Beds, Text Books, Lab Equipment, 75Classrooms
implementation status
On Going
total cost
Ksh 4,213,997
estimate
Ksh 1,000,000

Cdf Offices

location
Gembe West (in Mbita)
year first funded
2005
action
Construction Of The Office And Purchase Of Furniture
output
Office Block And Equipments
implementation status
On Going
total cost
Ksh 3,691,338
estimate
Ksh 2,000,000

Ngodhe Mixed Secondary School

location
Gembe East (in Mbita)
year first funded
2004
action
Construction And Purchases
output
3 Classrooms, Lab Equipment, Student Lockers, Tuition, Teachers Chairs
implementation status
On Going
total cost
Ksh 2,740,460
estimate
Ksh 700,000

Sena Secondary School

location
Mfangano East (in Mbita)
year first funded
2005
action
Construction And Purchases
output
3 Classrooms, Lab Equipments, Student Lockers, Chairs And Teachers Chairs.
implementation status
On Going
total cost
Ksh 2,690,460
estimate
Ksh 800,000

Wandiji Secondary School

location
Lambwe East (in Mbita)
year first funded
2003
action
Construction And Purchase Of Books
output
2 Classrooms, An Administration And Books
implementation status
Complete
total cost
Ksh 2,496,460
estimate
Ksh 1,000,000

Electricity Supply Waondo Youth Poly

location
Gembe East (in Mbita)
year first funded
2005
action
The Amount Was Reallocated To The Environment Facilities And A Needy School
output
-
implementation status
On Going
total cost
Ksh 2,250,000
estimate
Ksh 2,250,000

St Williams Osodo Secondary School

location
Gembe Central (in Mbita)
year first funded
2003
action
Construction And Purchases Of Generator, Lab Equipments And Text Books
output
Classrooms, Generator, And Lab Equipment
implementation status
Complete
total cost
Ksh 2,229,460
estimate
Ksh 1,000,000

Lambwe Secondary School

location
Lambwe West (in Mbita)
year first funded
2003
action
Construction And Purchases
output
Dormitory Water Tank, Lab Equipments And Books
implementation status
Complete
total cost
Ksh 2,100,000
estimate
Ksh 1,000,000

Uozi Mixed Secondary School

location
Mfangano South (in Mbita)
year first funded
2004
action
Construction And Purchases
output
2 Classrooms, Lab Equipments, Student Beds
implementation status
Complete
total cost
Ksh 2,051,710
estimate
Ksh 700,000

Kanyasangra Dam

location
Lambwe West (in Mbita)
year first funded
2006
action
Construction Of The Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Kochino Dam

location
Lambwe West (in Mbita)
year first funded
2006
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Kongili Dam

location
Lambwe East (in Mbita)
year first funded
2006
action
Construction Of The Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Tinga Dam

location
Gembe East (in Mbita)
year first funded
2006
action
Construction Of The Dam
output
Dam
implementation status
On Going
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Abururu Dam

location
Gembe Central (in Mbita)
year first funded
2006
action
Construction Of The Dam
output
Dam
implementation status
On Going
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Waware Mixed Secondary School

location
Rusinga East (in Mbita)
year first funded
2004
action
Construction And Purchases
output
2 Classrooms, Administration Block, Student Lockers, Desks And Lab Equioments
implementation status
On Going
total cost
Ksh 1,940,460
estimate
Ksh 700,000

Waware Secondary School

location
Rusinga East (in Mbita)
year first funded
2005
action
Construction of Administration Block
output
Administration Block
implementation status
On Going
total cost
Ksh 1,740,460
estimate
Ksh 500,000

Ogongo Health C

location
Lambwe West (in Mbita)
year first funded
2004
action
Construction of Male And Female Wards
output
Male And Female Wards
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 1,200,000

Mbita Health C

location
Gembe West (in Mbita)
year first funded
2004
action
Purchase Of Land
output
Land
implementation status
Complete
total cost
Ksh 1,653,930
estimate
Ksh 1,653,930

Kamasengre Secondary School

location
Rusinga West (in Mbita)
year first funded
2005
action
Construction of Classrooms And Lab Equipment
output
Classrooms And Lab Equipment
implementation status
On Going
total cost
Ksh 1,646,460
estimate
Ksh 250,000

Kakimba Secondary School

location
Mfangano North (in Mbita)
year first funded
2004
action
Construction of Dormitory And Lab Equipments
output
Dormitory And Lab Equipments
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Soklo Health C

location
Mfangano North (in Mbita)
year first funded
2004
action
Construction Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 800,000

Waondo Vilpolytech

location
Gembe East (in Mbita)
year first funded
2004
action
Construction of Dormitory And Electricity
output
Dormitory And Electricity
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 800,000

Usao Health C

location
Gembe East (in Mbita)
year first funded
2004
action
Renovation Of Health Center
output
Treatment Block
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 800,000

Kitare Health Cwater Project

location
Gembe East (in Mbita)
year first funded
2005
action
Construction of Water And Ward
output
Water And Ward
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,000,000

Yokia Health C

location
Mfangano North (in Mbita)
year first funded
2004
action
Construction Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Kitare Health C

location
Gembe East (in Mbita)
year first funded
2004
action
Drilling Of A Borehole And Construction Of Ward
output
Borehole And Ward
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Nge Kendi Water Supply

location
Gembe East (in Mbita)
year first funded
2005
action
Drilling Of A Bore Hole
output
Borehole
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Waringa Primary School

location
Lambwe West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 896,000
estimate
Ksh 396,000

Ponge Health C

location
Gembe Central (in Mbita)
year first funded
2004
action
Construction Of Maternity Wing
output
Maternity Wing
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Nyamaji Dispensary

location
Gembe East (in Mbita)
year first funded
2004
action
Construction of Staff House
output
Staff House
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Lambwe Dispensary

location
Lambwe West (in Mbita)
year first funded
2004
action
Construction of 2Staff Houses
output
2Staff Houses
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Tom Mboya Health C

location
Rusinga West (in Mbita)
year first funded
2004
action
Renovation Of Health Center
output
Treatment Block
implementation status
Stopped
total cost
Ksh 800,000
estimate
Ksh 800,000

Sena Health C

location
Mfangano West (in Mbita)
year first funded
2004
action
Construction Of Maternity Wing
output
Treatment Block
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Wakula Health C

location
Mfangano West (in Mbita)
year first funded
2004
action
Construction Of Maternity Wing
output
Maternity Wing
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Ugina Health

location
Mfangano South (in Mbita)
year first funded
2004
action
Renovation Of Hospital.
output
Treatment Block
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Wakiaga Vilpolytech

location
Rusinga East (in Mbita)
year first funded
2004
action
Construction of Dormitory
output
Dormitory
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Ponge Primary School

location
Gembe Central (in Mbita)
year first funded
2005
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 796,000
estimate
Ksh 396,000

Wanga Primary School

location
Gembe West (in Mbita)
year first funded
2005
action
Construction of
output
-
implementation status
On Going
total cost
Ksh 796,000
estimate
Ksh 396,000

Wanga Primary School

location
Gembe West (in Mbita)
year first funded
2004
action
Construction And Renovation
output
Tuition Block, Classroom
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 250,000

Got Kopolo Primary School

location
Lambwe West (in Mbita)
year first funded
2004
action
Construction Of Classrooms
output
4 Classrooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 200,000

Tom Mboya Secondary School

location
Rusinga West (in Mbita)
year first funded
2005
action
Construction of Dining Hall, Lab Equipment, Water
output
Dining Hall, Lab Equipment, Water
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Ngodhe S Primary School

location
Rusinga West (in Mbita)
year first funded
2005
action
Construction Of An Administration Block
output
Administration
implementation status
On Going
total cost
Ksh 596,000
estimate
Ksh 396,000

Got Nyasumbi Primary School

location
Lambwe East (in Mbita)
year first funded
2005
action
Construction of 3 Classroom
output
3 Classroom
implementation status
Complete
total cost
Ksh 596,000
estimate
Ksh 396,000

Kombe Primary School

location
Gembe West (in Mbita)
year first funded
2005
action
Renovation
output
4 Classrooms
implementation status
On Going
total cost
Ksh 596,000
estimate
Ksh 396,000

Sindo Health Centre

location
Gwasii (in Mbita)
year first funded
2006
action
Completion Of Wards
output
District Hospital
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Electricity Supply Charles Lwanga Youth Poly

location
Gembe West (in Mbita)
year first funded
2005
action
Electrification Of The Institution
output
Electricity
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Agiro Primary School

location
Rusinga West (in Mbita)
year first funded
2004
action
Renovation
output
2 Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 200,000

Waregi Primary School

location
Rusinga East (in Mbita)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 200,000

Wanga Primary School

location
Gembe West (in Mbita)
year first funded
2006
action
Repair Of Blown Off Roof. Construction Of Tuition Blcok
output
Classrooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 100,000

Soklo Primary School

location
Mfangano North (in Mbita)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Wanyama Primary School

location
Rusinga West (in Mbita)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Angiya Dispensary

location
Gembe West (in Mbita)
year first funded
2005
action
Construction of Staff House
output
Staff House
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Obalwanda Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Got Kopolo Primary School

location
Lambwe West (in Mbita)
year first funded
2007
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 396,000

Usao Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Got Kopolo Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Ogando Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Sikri Jerusalem Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Wanga Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Kagungu Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Kamsama Primary School

location
Gembe East (in Mbita)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Chamakowa Primary School

location
Gembe Central (in Mbita)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Usungu Primary School

location
Gembe East (in Mbita)
year first funded
2006
action
Completion Of Classrooms Initiated By Cdf
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Kamayoge Primary School

location
Rusinga West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Kisui Primary School

location
Gembe West (in Mbita)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Ugina Primary School

location
Mfangano South (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Wakula Primary School

location
Mfangano West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Kitenyi Primary School

location
Mfangano East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Lianda Primary School

location
Rusinga East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Wakondo Primary School

location
Rusinga East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Temo Primary School

location
Rusinga West (in Mbita)
year first funded
2005
action
Construction of Tuition Block
output
Tuition Block
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Uya Primary School

location
Rusinga West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Nyasumbi Primary School

location
Gembe Central (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Olweya Primary School

location
Gembe Central (in Mbita)
year first funded
2005
action
Construction of Tuition Block
output
Tuition Block
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Waondo Primary School

location
Gembe East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Kamsama Primary School

location
Gembe East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Powo Primary School

location
Gembe East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Uwi Primary School

location
Gembe East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Nyamaji Primary School

location
Lambwe East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Paga Primary School

location
Lambwe East (in Mbita)
year first funded
2005
action
Construction Of Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Ndhuru Primary School

location
Lambwe East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Kisaka Primary School

location
Lambwe East (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Aringo Primary School

location
Lambwe West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Kiwari Primary School

location
Mfangano North (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Nyawiya Primary School

location
Gembe East (in Mbita)
year first funded
2005
action
Construction O
output
Sick Bay
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Nyahera Primary School

location
Mfangano North (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 396,000
estimate
Ksh 396,000

Waondo Primary School

location
Gembe East (in Mbita)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 395,480
estimate
Ksh 200,000

Waondo Primary School

location
Gembe East (in Mbita)
year first funded
2006
action
Construction Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 395,480
estimate
Ksh 395,480

Sulwe Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Takawiri Dispensary

location
Mfangano East (in Mbita)
year first funded
2006
action
Completion Of The Treatment Ward
output
Ward
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Obalwanda Dispensary

location
Gembe Central (in Mbita)
year first funded
2005
action
Construction Of A Staff House
output
Staff House
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Takawiri Dispensary

location
Mfangano East (in Mbita)
year first funded
2005
action
Completion Of Treatment Block
output
Treatment Block
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyasanja Primary School

location
Lambwe West (in Mbita)
year first funded
2007
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 396,000

Wasamo Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Urianda Primary School

location
Lambwe East (in Mbita)
year first funded
2004
action
Renovation
output
Classroom
implementation status
Complete
total cost
Ksh 280,000
estimate
Ksh 280,000

Genge Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kagungu Preparatory

location
Mfangano South (in Mbita)
year first funded
2004
action
Renovation
output
2 Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Owich Primary School

location
Lambwe East (in Mbita)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mbita Point IntSchool

location
Gembe West (in Mbita)
year first funded
2005
action
Purchase Of Computer And Photocopier
output
Computer And Photocopier
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Christ Gift Academy

location
Gembe West (in Mbita)
year first funded
2005
action
Construction of Hall
output
Hall
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Usungu Primary School

location
Gembe West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyakweri Primary School

location
Mfangano West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Usare Primary School

location
Gembe West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kaswanga Primary School

location
Rusinga West (in Mbita)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyamasare Primary School

location
Gembe West (in Mbita)
year first funded
2006
action
Construction of A Classroom
output
A Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mbita Primary School

location
Gembe West (in Mbita)
year first funded
2006
action
Renovation
output
5 Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ngodhe Primary School

location
Gembe East (in Mbita)
year first funded
2006
action
Completion Of Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Lianda Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kombe Primary School

location
(in Mbita)
year first funded
2007
action
Construction Of Tuition Block
output
Tuition Block
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kamato Primary School

location
Lambwe West (in Mbita)
year first funded
2006
action
Repair Of Blown Off Roof
output
-
implementation status
Complete
total cost
Ksh 194,000
estimate
Ksh 194,000

Luanda Beach

location
Gembe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Public Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Kiumba Beach

location
Rusinga West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Public Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Mirunda Beach

location
Gembe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Public Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Mbita Town Market

location
Gembe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Public Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Alero Beach

location
Gembe East (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Public Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 0

Kaugege Beach

location
Gembe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Public Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Ogongo Market

location
Lambwe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Toilet
implementation status
On Going
total cost
Ksh 180,000
estimate
Ksh 180,000

Luanda Rombo Beach

location
Gembe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Utajo Beach

location
Rusinga East (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Kipasi Market

location
Lambwe East (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Toilet
implementation status
On Going
total cost
Ksh 180,000
estimate
Ksh 180,000

Nyachebe Beach

location
Gembe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Koguna Beach

location
Gembe West (in Mbita)
year first funded
2006
action
Construction Of A Toilet
output
Public Toilet
implementation status
Stalled
total cost
Ksh 180,000
estimate
Ksh 180,000

Ramba Youth Polytechnic

location
Mfangano East (in Mbita)
year first funded
2006
action
Purchase Of A Solar System
output
Solar Power
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Alero Primary School

location
Gembe East (in Mbita)
year first funded
2006
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Tabla Beach

location
Gembe West (in Mbita)
year first funded
2006
action
Renovation
output
Fish Banda
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyamanga Primary School

location
Gembe West (in Mbita)
year first funded
2005
action
Purchase Of Desks
output
Desks
implementation status
Complete
total cost
Ksh 91,571
estimate
Ksh 91,571

Gethsamani Primary School

location
Mfangano North (in Mbita)
year first funded
2004
action
For The Purchase Of Maize And Beans To Support The School Children
output
-
implementation status
Complete
total cost
Ksh 83,333
estimate
Ksh 83,333

Mauta B

location
Mfangano South (in Mbita)
year first funded
2006
action
Construction of Fish Banda
output
Fish Banda
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Kirindo Day Mixed Secondary School

location
Gembe West (in Mbita)
action
Construction of Tuition Block
output
Tuition Block
implementation status
On Going
total cost
Ksh 0
estimate
Ksh 500,000

Rapora Primary School

location
Lambwe West (in Mbita)
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 396,000