It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Mbooni

Kikima Water Project

location
Mbooni (in Mbooni)
year first funded
2003
action
Construction Pump House, Vip Latrine 5 No., Water Tank 50M, Genset & Pipes
output
Increased Water Resources
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 9,100,659
estimate
Ksh 9,100,659

Tawa Social Hall

location
Kiteta (in Mbooni)
year first funded
2003
action
Construction Hall, Electric Instal., Parking/Garage, Access Road, Office Equip Back Office & 1000 Chairs For Hall, Fencing & Gate.
output
Social Gathering
implementation status
Ongoing; Remaining Activity Starting 2008-2009: Purchase Back Office Equipment Install Ict Infrastructure Including Vsat Satellite For Internet, Install A Waiting Bay, Construct Parking (For Cars, Bicycle & Motorbikes), Improve Installed With C
total cost
Ksh 7,446,875
estimate
Ksh 10,153,675

Kisau Dispensary / Kisau Health Centre

location
Waia (in Mbooni)
year first funded
2003
action
Construction Wards Including Electrical Installation, Plumbing And Drainage.
output
Improved Health Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 3,710,890
estimate
Ksh 3,710,890

Utangwa Dispensary

location
Utangwa (in Mbooni)
year first funded
2004
action
Construction Health Facility (14 Rooms, 2 Flash Toilets, Furniture & Fittings)
output
Better Health
implementation status
Ongoing; Remaining Activity: Pit Latrines, Plumbing Septic Tank & Soak Pit, Electrical Wiring, Ceiling, Flooring, Waiting Area Benches, Furniture, Sanitary Facility, Water Tank, Lockers, Incenerator. Installed With Cdf Sign Post In November 20
total cost
Ksh 2,692,800
estimate
Ksh 4,264,200

Nthangu Water Project

location
Kako (in Mbooni)
year first funded
2004
action
Installation Of Water System; IntakeRepair Of Pipe Line, Construction of New Water Tanks
output
Improved Water Resource
implementation status
Ongoing; Completed Works:A)Intake Works (Isyukoni The Main Intake Completed With A Gigantic Slab For Protecting The Spring, Other Four Intakes Completed With Water Trough And Laying Of Pipes To Main Tank
total cost
Ksh 2,349,610
estimate
Ksh 38,963,085

Kitundu Dispensary

location
Kitundu (in Mbooni)
year first funded
2004
action
Construction Of Health Facility With A Maternity Wing; Equipping And Lab Reagents
output
Better Health
implementation status
Ongoing; Remaining Activity: Lab Reagents And Equipments. Installed With Cdf Sign Post In November 2007
total cost
Ksh 2,335,300
estimate
Ksh 2,696,300

Watuka Secondary School

location
Kako (in Mbooni)
year first funded
2004
action
Construction (2) Classroom (Form 1 & 2), (3) Pit Latrines (Boys, Girls, Staff), Admin Block Construction 2 Classrooms (Form 3 &4), Science Lab, Fencing.
output
Improved Education Facility
implementation status
A)Completeb)Ongoing;Remaining Activity:Complete Form 3 & 4, Constr. Science Lab., Fencing.Installed With Cdf Sign Post In November 2007
total cost
Ksh 2,200,000
estimate
Ksh 4,319,158

Kitundu Secondary School

location
Kitundu (in Mbooni)
year first funded
2004
action
Construction Of Girls Dorm; Pit Latrines, Bathrooms, Washing Bay, Electrical Wiring, 40 Double Deckers, and Plastic Tanks.
output
Imrpoved Education Facility
implementation status
Ongoing; Remaining Activity:Pur. Of Double Decker Steel Beds 40 Units Of 6?X2.5?, Purchase & Install A Plastic Water Tank, Pur. Generator For Dorm And C/Rooms.Installed With Cdf Sign Post In November 2007
total cost
Ksh 2,175,165
estimate
Ksh 4,341,080

Kandulyu Earth Dam

location
Kisau (in Mbooni)
year first funded
2006
action
Excavation, Water Kiosk, Cattle Trough, Check Dam, Toilet And Fence
output
Increased Water Resources
implementation status
Ongoing; Remaining Activity:Completion Of Fencing, Water Kiosk, Cattle Trough, Constr. Toilets.Installed With Cdf Sign Post In November 2007
total cost
Ksh 2,080,000
estimate
Ksh 3,305,710

Kako Secondary School

location
Kako (in Mbooni)
year first funded
2004
action
General School Renovation And Pur. 40 Beds And Staff Toilets Construction Of D/Hall, Kitchen, Food Store
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Flooring, Windows, Doors, Painting, Furniture.
total cost
Ksh 2,000,000
estimate
Ksh 2,250,345

Lungu Secondary School

location
Kisau (in Mbooni)
year first funded
2004
action
Construction (2) Classrooms Construction Of Science Laboratory
output
Improved Education Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,779,073
estimate
Ksh 0

Mbumbuni Earth Dam

location
Kisau (in Mbooni)
year first funded
2005
action
Excavation Of Dam, Fencing, Construction of Cattle Trough, Construction Of Water Kiosk, Gabions
output
Improved Water Resource
implementation status
Complete And In Use
total cost
Ksh 1,696,986
estimate
Ksh 1,678,260

Kaliani Dispensary, Kaliani Commucentr

location
Kithungo (in Mbooni)
year first funded
2004
action
Construction Health Facility, Furniture And Equipment
output
Better Health
implementation status
Ongoing; Remaining Activity: Pur. Of Equipments
total cost
Ksh 1,600,000
estimate
Ksh 1,856,503

Tulimani Youth Poly

location
Tulimani (in Mbooni)
year first funded
2004
action
Construction Of Boys Dorm
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Constr. Phase 2 And 3. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,550,000
estimate
Ksh 2,966,420

Muthwani Secondary School

location
Kisau (in Mbooni)
year first funded
2005
action
Construction (3) Classrooms, Office & Staff Room, (3) Pit Latrines, Kitchen, Pur. Furniture & Learning Facilities
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:A)Complete Constr. (3) C/Rooms (Form Ii To Iv), Office & Staff Rooms, 3 Pit Latrines, Kitchen, Pur. Furniture.B)Sci. Lab., Constr. & Equip A Science Lab.Including Certificate Of Completion From Public Works.Including
total cost
Ksh 1,505,951
estimate
Ksh 2,519,591

Iiani Community Dispensary

location
Tulimani (in Mbooni)
year first funded
2004
action
Construction Of Facility + Lab. Equipments, Solar Panel, Electric Wiring, furniture & staff House construction
output
Better Health
implementation status
Ongoing; Construction Of Facility Complete. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,501,500
estimate
Ksh 6,500,000

Mbooni Girls Secondary School

location
Mbooni (in Mbooni)
year first funded
2006
action
dining Hall Construction & Chairs
output
Enhanced Education
implementation status
Ongoing; Remaining Activity: Plumbing, Fittings And Chairs. Plumbing, Fittings And Chairs. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,467,600
estimate
Ksh 3,000,000

Nduluku Secondary School

location
Waia (in Mbooni)
year first funded
2005
action
Completion Of dining Hall.
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Complete dining Hall, Pur. (46) Tables And 271 Chairs.
total cost
Ksh 1,350,000
estimate
Ksh 1,400,000

Kikiini Secondary School

location
Mbooni (in Mbooni)
year first funded
2004
action
Construction Of Lab, Equip./Chemicals
output
Improved Education Facility
implementation status
Complete And In Use.Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,322,000
estimate
Ksh 1,322,000

Nzue River Drift

location
Kisau (in Mbooni)
year first funded
2006
action
Construction Of Drift
output
Improved Road Access
implementation status
Complete And In Use.Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,319,900
estimate
Ksh 1,619,900

Tulimani Girls Secondary School

location
Tulimani (in Mbooni)
year first funded
2003
action
Install Piping System in Borehole
output
Improved Water Supply
implementation status
Complete And In Use
total cost
Ksh 1,304,000
estimate
Ksh 2,945,479

Kisau / Waia Multi-Purpose Cooperative

location
Waia (in Mbooni)
year first funded
2004
action
Purchase Of A Cooler And A Generator (Lister 3 Phases, 1;5 K.V.A.) And Installation
output
Improved Agricultural Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Kiumi Water Project

location
Kitundu (in Mbooni)
year first funded
2004
action
Rehabilitation And Extension Of Water System
output
Improved Water Facility
implementation status
Ongoing; Remaining Activity: Extension Of Water System. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,220,000
estimate
Ksh 16,103,048

Ngai Secondary School

location
Kithungo (in Mbooni)
year first funded
2004
action
Construction Of Science Lab With Water System & Drainage, Gas Installation Fittings, Side Benches, Tables & Other Fittings
output
Improved Education Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,218,000
estimate
Ksh 1,218,112

Kyangoma Special Unit Known As Kyangoma Abc Primary School

location
Mbooni (in Mbooni)
year first funded
2004
action
Construction Of Dorm With Ablusion Block, 12 Toilets And Equipping With Beds And Mattresses
output
Improved School Facility
implementation status
Ongoing;Remaining Activity:Completing (2) Pit Latrines. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,216,546
estimate
Ksh 1,212,368

Mba Secondary School

location
Waia (in Mbooni)
year first funded
2004
action
Construction Of Boys Hostel, Abolution Blk, (2) Staff Houses, Water Tank 150M, BoyS Hostel Electrification, Hostel Equip
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,190,608
estimate
Ksh 39,439,205

Kyevutula / Mutunduini Drifts Drift

location
Kithungo (in Mbooni)
year first funded
2003
action
Fill Existing Drift With Hardcore & Cast Coverslab 200Mm Thick; Mutunduni Drift Extension & Finishing, Kyevutula Drift Finishing
output
Improved Road Facility
implementation status
Complete And In Use
total cost
Ksh 1,178,000
estimate
Ksh 1,178,000

Umanthi Earth Dam

location
Kitundu (in Mbooni)
year first funded
2006
action
Rehabilitation Of Dam/Weir To Size 170Ft (Length)X8Ft(Depth) X 250Ft (Width). Remaining Is 130Ft (Length)
output
Improved Water Facility
implementation status
Ongoing; Remaining Activity: Rehabilitation Of Dam To Another 41Ft, 41Ft And48 Ft In Length. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,100,000
estimate
Ksh 4,298,438

Wambiti Secondary School

location
Waia (in Mbooni)
year first funded
2004
action
Construction Of (2) Classrooms
output
Improved Education Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,054,800
estimate
Ksh 1,104,800

Kyamithenge Secondary School

location
Tulimani (in Mbooni)
year first funded
2005
action
Construction of Office Blk, kitchen and science lab + Purchase Of Lockers, Chairs, class Tables, and Text Books
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Complete Form 4, Science Lab. Installed With Cdf Sign Post In November 2007
total cost
Ksh 1,000,000
estimate
Ksh 1,725,730

Kiatineni Secondary School

location
Tulimani (in Mbooni)
year first funded
2004
action
Construction Of dining Hall And Kitchen
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Walling, Roofing, Windows, Painting, Plumbing, Drainage, Electrial Works.
total cost
Ksh 900,000
estimate
Ksh 4,001,360

Nyanya Earth Dam

location
Kisau (in Mbooni)
year first funded
2005
action
De-Silting And Expansion; Sanitation To Protect Against Contamination, Fencing, Meters, Gabions
output
Supply Of Clean Water To People And Livestock
implementation status
A)Complete And In Use B)Ongoing
total cost
Ksh 826,574
estimate
Ksh 1,696,874

Ngai Dispensary

location
Kithungo (in Mbooni)
year first funded
2005
action
Construction Of Laboratory, Equipping (Microscope, Refrigerator, Centrifuge, Others And Fencing
output
Improved Health Facility
implementation status
Complete And In Use
total cost
Ksh 810,239
estimate
Ksh 692,539

Kikima Farmers Social Hall

location
Mbooni (in Mbooni)
year first funded
2007
action
Renovation Kikima Social Hall
output
B)Improved Social Gathering Facility
implementation status
B)Ongoing, Remaining Activity: Completing Renovation. Installed With Cdf Sign Post In November 2007
total cost
Ksh 800,000
estimate
Ksh 882,600

Mbooni Boys Secondary School

location
Mbooni (in Mbooni)
year first funded
2006
action
Rehabilitation Of Dorm Water Harnessing, Electric Ext.
output
Enhanced Education Facility
implementation status
A)Complete B)Ongoing; Remaining Activity: Water Harnessing And Electric Ext.
total cost
Ksh 798,000
estimate
Ksh 1,510,822

Mutini Primary School

location
Kiteta (in Mbooni)
year first funded
2005
action
Construction 6 Classrooms And Admin Block
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Constr. Admin Blk.Installed With Cdf Sign Post In November 2007
total cost
Ksh 748,000
estimate
Ksh 1,196,550

Kikima Farmers Cooperative

location
Mbooni (in Mbooni)
year first funded
2006
action
n/a
output
-
implementation status
More funds needed
total cost
Ksh 700,000
estimate
Ksh 750,000

Kakuswi Youth Poly

location
Kiteta (in Mbooni)
year first funded
2006
action
Construction 3 Classrooms, Office Blk & Equip
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Finishing Foundation, Walling Of Class And Offices, Roofing, Doors And Windows, Plastering, Floor And Paint, Equipments.Installed With Cdf Sign Post In November 2007
total cost
Ksh 650,000
estimate
Ksh 2,590,000

Mukaatini Secondary School

location
Mbooni (in Mbooni)
year first funded
2004
action
Equip Chemistry And Biology Lab, Electrical Installation And Wiring The Whole School
output
Improved School Facility
implementation status
Installed With Cdf Sign Post In November 2007Ongoing;Remaining Activity:Electrical Installation Of Whole Compound, Lab Equipments.
total cost
Ksh 619,874
estimate
Ksh 1,411,831

Mbooni Aic Girls Secondary School

location
Mbooni (in Mbooni)
year first funded
2007
action
Construction Of Equipping Lab, Furniture
output
Improved School Facility
implementation status
Ongoing; Remaining Activity:Walling, Roofing, Fitting And Equipping`
total cost
Ksh 600,000
estimate
Ksh 24,338,475

Kitundu Primary School

location
Kitundu (in Mbooni)
year first funded
2007
action
Construction Of Dorm With (8No.) Bathrooms Renovation Of 6 Classrooms
output
Improved School Facilities
implementation status
A)Ongoing B)Ongoing; Remaining Activity: Constr. Dorm, Renovate 2Nd C/Room, Renovate 3Rd, 4Th, Fth And 6Th C/Rooms
total cost
Ksh 517,700
estimate
Ksh 3,562,500

Kusyongali Secondary School

location
Kithungo (in Mbooni)
year first funded
2007
action
Construction 2 Classrooms
output
Improved School Facility
implementation status
Ongoing;Remaining Activity:Flooring, Painting, Windows, Fittings.Installed With Cdf Sign Post In November 2007 Installed With Cdf Sign Post In November 2007
total cost
Ksh 500,000
estimate
Ksh 966,288

Mituvu Community Development Sand Dam

location
Kako (in Mbooni)
year first funded
2007
action
Construction Of Sand Dam (Excavation, Walling, Borehole, Water Trough, Water Tank Fixing & Piping, Water Pump Piping.
output
Improved Water Resource
implementation status
Ongoing;Remaining Activity: Complete Foundation, Walling, Constr. Borehole, Supervision, Construct Water Trough, Fix Plastic Tank & Piping, Certificate Of Completion, Contigencies/Retention.
total cost
Ksh 500,000
estimate
Ksh 2,602,194

Kilyungi Secondary School

location
Kitundu (in Mbooni)
year first funded
2007
action
Construction Of Science Lab (Block Model)
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Foundation & Construction
total cost
Ksh 500,000
estimate
Ksh 2,994,740

Itetani Community Dispensary

location
Itetani (in Mbooni)
year first funded
2007
action
Construction Of Health Facility
output
Better Health
implementation status
Ongoing; Remaining Activity: From Walling To Completion
total cost
Ksh 500,000
estimate
Ksh 356,545,961

Syanduini Catchment Dam

location
Tulimani (in Mbooni)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 1,046,760

Mbumbuni Water Project

location
Kisau (in Mbooni)
year first funded
2007
action
Piping Line 1-Kivani To Mukimwani Sec. School, Line 2- Kivani To Kithongo, Line 3-Iviani To Kithongo, (4) Kiosks Fencing Kinze Dam
output
Availability Of Drinking Water To Communal Water Points
implementation status
Ongoing;Remaining Activity: Piping Line 1 Has Just Started And Remaining Fencing Kinze Dam.
total cost
Ksh 451,800
estimate
Ksh 2,354,800

Utumoni Primary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Renovation Of Classrooms& Pur. Of Furniture
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Completion Of Renovation, Pur. Of Furniture
total cost
Ksh 451,340
estimate
Ksh 551,340

Kikuswi Secondary School

location
Waia (in Mbooni)
year first funded
2007
action
Construction Of 4 Classrooms,Construction And Equip. Lab.
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Constr. Form 1 To 4, Construt & Equip. Lab. Constr. Form 1 To 4, Construt & Equip. Lab.
total cost
Ksh 450,000
estimate
Ksh 1,776,240

Ngai Water Project

location
Kithungo (in Mbooni)
year first funded
2007
action
Water Weir/Intake, Piping Two Lines, Tanks Baseline Survey Survey And Design
output
Piping Water To Households Or The Nearest Communal Water Point
implementation status
Ongoing; Survey And Design In Progress
total cost
Ksh 450,000
estimate
Ksh 975,309

Kyuu Umeme Pamoja Project Electrical Installation At Kyuu Sub-Locatio

location
Mbooni (in Mbooni)
year first funded
2008
action
Electrical Installation At Kyuu Sub-Location By Kplc Cdf Contribution Is Sh.450,000, Community Contribution Is Sh.631,120
output
Bringing Electric Power Close To The People From The Main Distribution Of The Kplc
implementation status
New/Ongoing
total cost
Ksh 450,000
estimate
Ksh 1,081,120

Miau Secondary School

location
Waia (in Mbooni)
year first funded
2007
action
Construction 4 Classrooms And Toilets
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Completing 1St C/Room, Constructing 2Nd To 4Th C/Rooms, Constr. (3) Pit Latrines.
total cost
Ksh 450,000
estimate
Ksh 1,447,228

Kwa Kawasya Sand Dam

location
Kiteta (in Mbooni)
year first funded
2004
action
Construction Sand Dam
output
Improved Water Resource
implementation status
Complete And In Use
total cost
Ksh 425,000
estimate
Ksh 425,000

Uviluni Dispensary

location
Kako (in Mbooni)
year first funded
2006
action
Complete Existing Dispensary House, Construction of 4 Door Pit Latrines + 2 Door Staff Pit Latrine, Fencing, Equip Dispensary
output
Improved Health Facility
implementation status
Ongoing; Remaing Activity: Constr. (4) Door Public Pit Latrine, Constr. (2) Door Staff Pit Latrine, Constr. (4) Room Staff Quarters, Equipping. Installed With Cdf Sign Post In November 2007
total cost
Ksh 417,700
estimate
Ksh 1,302,750

Mukimwani Secondary School

location
Kisau (in Mbooni)
year first funded
2007
action
Construction Of (2) Classrooms
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Completion Of 1St C/Room, Construction Of 2Nd C/Room.Installed With Cdf Sign Post In November 2007
total cost
Ksh 400,000
estimate
Ksh 750,000

Tulimani Boys Secondary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Renovation Of Adult Literacy Blk, Construction 4 Classrooms
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Renovating Adult Literacy Block, Complete 1St C/Room, Constr. 2Nd To 4Th C/Room,
total cost
Ksh 400,000
estimate
Ksh 1,668,160

Kikima Farmers Cooperative Society

location
Mbooni (in Mbooni)
year first funded
2006
action
Purchase Of A Motorbike Dt 175 C.C. To Kikima Farmers Ai Services
output
Improved Dairy Ai (Artificial Insermination) Services
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Mataa Youth Polytechnic

location
Kitundu (in Mbooni)
year first funded
2007
action
Construction (2) Classrooms, (3) Room Admin Blk
output
Improved School Facility
implementation status
Ongoing;Remaining Activity: Complete 1St C/Room, Constr. 2Nd C/Room And Admin Block.
total cost
Ksh 400,000
estimate
Ksh 2,645,500

Kitondo Secondary School

location
Kisau (in Mbooni)
year first funded
2007
action
Construction Of Admin Blk
output
Improved Education Facility
implementation status
Ongoing Installed With Cdf Sign Post In November 2007
total cost
Ksh 400,000
estimate
Ksh 1,162,040

St. Patrick Youth Poly

location
Kako (in Mbooni)
year first funded
2006
action
Construction Girls Dorm Size 30X50Ft, Construction Boys Dorm Size 30X50Ft, Pur. Carpentry Tools, Pur. Tailoring Tools, Fencing The Compound.
output
Provision Of Technical Education
implementation status
Ongoing;Activity Done:Renovations And Fencing.Installed With Cdf Sign Post In November 2007
total cost
Ksh 400,000
estimate
Ksh 1,178,712

Kitongu Primary School

location
Kako (in Mbooni)
year first funded
2006
action
Construction (4) Classrooms, Admin Blk, (3) Toilet Blk, Desk For 4 Classrooms, Office Furniture,Compound Fencing, 2 Simple Gates, Purchase 2 Acre Plot.
output
Improved Education Facility
implementation status
Ongoing;Remaining Activity:Complete 1St & 2Nd C/Room, Constr. & Complete 3Rd & 4Th C/Room, Pur. Desks For (4) C/Rooms, Pur. Office Furniture, Fencing And Install A Simple Gate.Remaining Activity:Complete 1St & 2Nd C/Room, Installed With Cdf Sig
total cost
Ksh 400,000
estimate
Ksh 2,720,679

Ngaa Secondary School

location
Kiteta (in Mbooni)
year first funded
2007
action
Construction 4 Classrooms, Admin Blk, Toilets (3, For Boys, Girls & Staff)
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Complete 1St C/Room, Constr. 2Nd To 4Th C/Room, Constr. Admin Blk And Toilets.
total cost
Ksh 400,000
estimate
Ksh 2,900,000

Kyanguswi Primary School

location
Tulimani (in Mbooni)
year first funded
2006
action
Repair Of Classrooms
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Complete Renovation Of C/Rooms
total cost
Ksh 400,000
estimate
Ksh 562,600

Kwa Kyekuyu Sand Dam

location
Kiteta (in Mbooni)
year first funded
2004
action
Construction Sand Dam
output
Improved Water Resource
implementation status
Complete And In Use
total cost
Ksh 390,000
estimate
Ksh 390,000

Kwa Mutua Sand Dam

location
Kiteta (in Mbooni)
year first funded
2004
action
Construction Sand Dam
output
Improved Water Resource
implementation status
Complete And In Use
total cost
Ksh 360,500
estimate
Ksh 360,000

Kwa Kilele Sand Dam

location
Kiteta (in Mbooni)
year first funded
2004
action
Construction Sand Dam
output
Improved Water Resource
implementation status
Complete And In Use
total cost
Ksh 333,000
estimate
Ksh 333,000

Kisau Division Office Including Construction Of Kisau Dos Pit Latrine Item In Bq, See Next

location
Waia (in Mbooni)
year first funded
2007
action
Renovation Of Dos Office And Residential House (Including Ceiling, Spetic Tank, Plumbing, Watr Tank, Pit Latrine, Roofint, Etc, 10 Rooms)
output
Improved Administrative Facility
implementation status
Ongoing; Remaining Activity: A)Residential House (With 4 Bedroom, Sitting Room, Kitchen And Servant Quarters (2 Rooms) Remains Ceiling, Wiringb)10 Rooms Remains (2) Toilets At Dc Office And Residential House, Ceiling For 9 Offices Other Than Dc
total cost
Ksh 317,700
estimate
Ksh 1,624,663

Yumbuni Sand Dam

location
Kisau (in Mbooni)
year first funded
2007
action
Rehabilitate Sand Dam And Increase height by 7Ft
output
Increase Water Catchment
implementation status
Ongoing; Remaining Activity:Constr. And Increasethe Size Of Wall To Another 3Ft.
total cost
Ksh 300,000
estimate
Ksh 720,400

Kathamba Secondary School

location
Waia (in Mbooni)
year first funded
2007
action
Main Activity:Construction (4) Classrooms ;5M X 32M 90 Std Size, Admin Blk 9M X ;5M, Latrines (8)
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Complete 1St C/Room, Constr. 2Nd C/Room, Constr. Admin Blk, Constr. Latrine With (8) Rooms, Constr. 3Rd & 4Th C/Room.Complete 1St C/Room, Constr. 2Nd C/Room, Constr. Admin Blk, Constr. Latrine With (8) Rooms, Constr.
total cost
Ksh 300,000
estimate
Ksh 1,194,850

Songeni Secondary School

location
Kiteta (in Mbooni)
year first funded
2007
action
Construction Of Form 1 To 4, Admin. Block, Lab, 3 Pit Latrines
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Complete Form 1, Constr. Form 2 To 4, Constr. Admin Blk, Lab And (3) Pit Latrines.
total cost
Ksh 300,000
estimate
Ksh 1,901,460

Kakuswi Secondary School

location
Kiteta (in Mbooni)
year first funded
2004
action
Purchase Of Lab Chemical And Equip, Construction dining Hall And Electrical Installation
output
Improved Education Facility
implementation status
A)Complete B)Ongoing; Remaining Activity:
total cost
Ksh 300,000
estimate
Ksh 4,891,568

Utuneni Dispensary

location
Kiteta (in Mbooni)
year first funded
2007
action
Construction Of Health Facility, Equipping (Furniture) And Materials
output
Improved Health Facility
implementation status
Ongoing; Remaining Activity: Slab & Walling, Roofing, Plastering, Doors, Windows, Painting, Equipments
total cost
Ksh 300,000
estimate
Ksh 4,500,000

Nthunguni-Syiluni Road

location
Mbooni (in Mbooni)
year first funded
2008
action
Road Works Estimates For Unclassified Nthunguni-Syiluni Road
output
Improved Road Network
implementation status
New/Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,748,000

Kikima Secondary School

location
Mbooni (in Mbooni)
year first funded
2007
action
School Laboratory Fittings
output
Improved Education Facility
implementation status
Ongoing;Remaining Activity:Complete Lab Fittings.Installed With Cdf Sign Post In November 2007
total cost
Ksh 300,000
estimate
Ksh 617,492

Tawa Health Centre

location
Kiteta (in Mbooni)
year first funded
2007
action
Compound Fencing With 190 Metallic Posts, Binding Wire, Barbed Wire
output
Improved Health Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 295,000
estimate
Ksh 300,000

Mukio Cattle Dip

location
Kako (in Mbooni)
year first funded
2004
action
Renovation of Existing Dip (Replacement Of Roof, Construction Water Tank, Plastering, Fencing With Metal Poles, Purchase Of Arcaracide)
output
Constrol Of Pests
implementation status
B) 100% Complete And In Use A)Ongoing; Remaining Activity: Constr. Water Tank & Piping, Fencing And Plastering Of Dip.
total cost
Ksh 278,000
estimate
Ksh 1,057,600

Kako Ap Lines

location
Kako (in Mbooni)
year first funded
2005
action
Construction Ap Lines, Four Roomed House, Latrine/Bathroom
output
Improved Administrative Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 267,515
estimate
Ksh 539,684

Kyangondu Mixed Secondary School

location
Waia (in Mbooni)
year first funded
2007
action
Construction Of (4) Classrooms And (3) Pit Latrines.
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Completion Of 1St C/Room, Construction Of 2Nd To 4Th C/Room And 3 Pit Latrines
total cost
Ksh 250,000
estimate
Ksh 1,447,228

Tulimani Primary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Renovate (Plastering, Flooring) 7 Classrooms; Construct 3 Classrooms And Complete 1 Classroom
output
Improved Education Facility
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 177,400

Musau Imale Primary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Renovation Of Multipurpose Hall
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Plastering Outside The Hall, Round. Finishing Verandah, Fitting Windows With Glasses, Painting, Electrical Installation
total cost
Ksh 250,000
estimate
Ksh 800,930

Mukuku Secondary School

location
Waia (in Mbooni)
year first funded
2007
action
Construction (4) Classrooms, Admin Blk And (5) Toilets.
output
Improved Education Facility
implementation status
Ongoing;Remaining Activity:Complete 1St & 2Nd C/Room, Foundation & Complete 3Rd C/Room, Constr. (2) Toilets, Foundation & Complete 4Th C/Room, Constr. (3) Toilets, Constr. Admin. Blk, Supervision, Certificate Of Completion.
total cost
Ksh 250,000
estimate
Ksh 2,363,259

Waia Dispensary

location
Waia (in Mbooni)
year first funded
2008
action
Construction Staff Quarters, Electrical Works And Fencing Of Compound
output
Improved Health Facility
implementation status
New/Ongoing
total cost
Ksh 217,700
estimate
Ksh 1,682,820

Mutuni Dam

location
Tulimani (in Mbooni)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 676,000

Yandue Commdispensary

location
Yandue (in Mbooni)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 3,800,000

Tulimani Dispensary

location
Kalawani (in Mbooni)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 1,728,000

Kango Primary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Completion Of Adm. Blk (3) Rooms, Partly Done By Parents
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Roofing, Doors And Windows
total cost
Ksh 200,000
estimate
Ksh 570,630

Kitundu Ap Lines

location
Kitundu (in Mbooni)
year first funded
2008
action
Construction of Ap Lines
output
Improved Administrative Facility
implementation status
New/Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Mbanya/Mutondoini Irrigation Schooleme

location
Mbooni (in Mbooni)
year first funded
2007
action
Pipeline 110M And De-Silting Of Dam: Pipe Trenches, Silting Basin, Fencing Poles, Cut-Off Drain/Siltation Control)
output
Improved Water Source
implementation status
Ongoing; Remaining Activity: Pipint 110M, Desilting Of The Dam, Silting Basin, Fencing Poles, Siltation Control, Part Contribution By The Community
total cost
Ksh 200,000
estimate
Ksh 863,500

Ack Kyandote Secondary School

location
Kitundu (in Mbooni)
year first funded
2007
action
Construction 2 Classrooms With Blocks
output
Improved Education Facility
implementation status
Ongoing;Remaining Activity:Foundation, Walling And Completion.
total cost
Ksh 200,000
estimate
Ksh 1,598,400

Songeni Cattle Dip

location
Kiteta (in Mbooni)
year first funded
2007
action
Construction Of Cattle Dip
output
Control Of Pests
implementation status
Ongoing; Remaining Activity: Walling, Roofing.
total cost
Ksh 200,000
estimate
Ksh 581,070

Kisau Girls Secondary School

location
Kisau (in Mbooni)
year first funded
2008
action
Construction Of Dorm
output
Improved Education Facility
implementation status
New/Ongoing
total cost
Ksh 200,000
estimate
Ksh 2,667,437

Maia Water Project

location
Kiteta (in Mbooni)
year first funded
2005
action
Survey & Design, Pipes, Intake Scooping & Rehabilitation Of Intake
output
Improved Water Resources
implementation status
Ongoing;Remaining Activity:Rehabilitation Of Intake, Piping (Specify Route). Installed With Cdf Sign Post In November 2007
total cost
Ksh 187,860
estimate
Ksh 2,769,700

Kithoni Primary School

location
Kitundu (in Mbooni)
year first funded
2007
action
Renovate Classrooms
output
Improved School Facility
implementation status
Ongoing; Remaining Activity: Renovate C/Rooms Completed Is Std.6 And Std.3
total cost
Ksh 170,000
estimate
Ksh 462,750

Waia Ap Line

location
Waia (in Mbooni)
year first funded
2004
action
Construction Of Ap Lines (2)
output
Improved Administrative Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 170,000
estimate
Ksh 170,000

Kako Dispensary

location
Kako (in Mbooni)
year first funded
2005
action
Construction Of A Lab.
output
Improved Health Facility
implementation status
Complete And In Use. Installed With Cdf Sign Post In November 2007
total cost
Ksh 163,850
estimate
Ksh 163,850

Kwa Kavila Sand Dam

location
Kiteta (in Mbooni)
year first funded
2005
action
Construction Sand Dam
output
Improved Water Resource
implementation status
Complete And In Use
total cost
Ksh 157,200
estimate
Ksh 157,200

Kitithini SPrimary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Complete (2) Classrooms Started By Parents, Renovate (1) Classroom, Fencing
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity: Complete 1St & 2Nd C/Room, Plastering, Doors And Windows, Renovate (1) C/Room, Fencing.
total cost
Ksh 150,000
estimate
Ksh 480,680

Kiatineni Primary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Fencing School Compound, With Metallic Posts And Wire
output
Improved Education Facility
implementation status
Ongoing;Remaining Activity: Fencing Side And Back Of The School, Fencing Divisions Of The School And Instal (2) Major Gates.
total cost
Ksh 150,000
estimate
Ksh 290,200

Kyamithenge Primary School

location
Tulimani (in Mbooni)
year first funded
2007
action
Renovation Of Classrooms
output
Imrpoved Education Facility
implementation status
Ongoing Remaining Activity: Complete Renovations
total cost
Ksh 150,000
estimate
Ksh 31,536

Tawa Mixed Secondary School Previously Known As Kiambwa Mixe

location
Kiteta (in Mbooni)
year first funded
2004
action
Pur. Science Equipment And Equip Physics And Chemistry Lab Construction of (2) Classrooms
output
Improved Education Facility
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 1,274,203

Ukala Youth Polytechnic

location
Mbooni (in Mbooni)
year first funded
2007
action
Construction Classrooms, Pur. Equipment
output
Capacity Building On Technical Knowhow
implementation status
Ongoing;Remaining Activity:Walling, Roofing, Plastering, Doors, Wndows, Pur. Equipment
total cost
Ksh 150,000
estimate
Ksh 2,589,500

Kyuu Primary School

location
Mbooni (in Mbooni)
year first funded
2007
action
Renovation (16) Classrooms, Construction (2) Std. 4 & 5
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Renovate Std. 6 And Staffroom, Renovate Std1, 2,3,5,6,7, Constr. Std. 6 And 5, Constr. Pre-School.Installed With Cdf Sign Post In November 2007
total cost
Ksh 150,000
estimate
Ksh 2,091,600

Nzeveni Secondary School

location
Mbooni (in Mbooni)
year first funded
2008
action
Construction Of (3) Classrooms And (3) Offices
output
Improved Education Facility
implementation status
New/Ongoing; Current Activity:Foundation For 1St C/Room
total cost
Ksh 117,700
estimate
Ksh 1,867,000

Tulimani Chiefs Office

location
Tulimani (in Mbooni)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 117,700
estimate
Ksh 34,971,675

Tawa River Drift

location
Kiteta (in Mbooni)
year first funded
2008
action
Construction Drift
output
Improved Road Access
implementation status
New/Ongoing
total cost
Ksh 100,000
estimate
Ksh 798,970

Kyuu Secondary School

location
Mbooni (in Mbooni)
year first funded
2008
action
Equip. Lab, Install Gas And Water Syste
output
Improved Education Facility
implementation status
New/Ongoing
total cost
Ksh 100,000
estimate
Ksh 1,299,213

Mumani Mixed Secondary School

location
Kithungo (in Mbooni)
year first funded
2008
action
Constructions Of (4) Classrooms, Admin Blk And (4) Latrines
output
Improved Education Facility
implementation status
New/Ongoing: Current Activity: One C/Room Has Been Constructed From Borrowing From School Main Account. It Needs To Be Completed (Flooring, Plastering, Etc). Remaining Activity: Refund To Main Account, Constr. Form 2 To 4, Admin Blk And (4) La
total cost
Ksh 100,000
estimate
Ksh 42,326,108

Tawa Social Hall Land Acquisition

location
Kiteta (in Mbooni)
year first funded
2008
action
Pur. Of Land, 50X100Ft For Expansion Of Development Activities
output
Improved Administrative Activity
implementation status
New/Ongoing
total cost
Ksh 100,000
estimate
Ksh 550,000

Kiteta Education Office

location
Kiteta (in Mbooni)
year first funded
2008
action
Construction An Education Office With A Board Room, Store, Secretary Room And An Office.
output
Improved Administrative Facility
implementation status
New/Ongoing;Remaining Activity:Complete Foundation And Start Walling, Supervision By Public Works, Complete Roofing, Doors And Windows, Certificate Of Completion From Public Works.
total cost
Ksh 100,000
estimate
Ksh 957,300

Itulu Day Secondary School

location
Waia (in Mbooni)
year first funded
2007
action
Construction Of 4 Classrooms, Admin Blk And 10 Latrines.
output
Improved Education Facility
implementation status
Ongoing; Remaining Activity:Complete Form 1, Constr. Form 2 To 4, Constr. Adm. Blk., Constr. 10 Room Toilets.
total cost
Ksh 100,000
estimate
Ksh 2,522,457

Mavitini Primary School

location
Waia (in Mbooni)
year first funded
2008
action
Roofing (10) Classrooms, Plastering / Sanitation
output
Improved Education Facility
implementation status
New/Ongoing
total cost
Ksh 100,000
estimate
Ksh 1,182,000

Kinyee Secondary School

location
Mbooni (in Mbooni)
year first funded
2008
action
Renovation, Construction Pit Latrines, Construction General Laboratory, Construction 2 Classrooms For Form 3 And 4, Pur. Furniture
output
Imrpoved Education Facility
implementation status
New/Ongoing
total cost
Ksh 100,000
estimate
Ksh 3,223,481

Tawa Police Post

location
Kiteta (in Mbooni)
year first funded
2007
action
Construction Of Police Patrol Base With 3 Offices, Reception, Armoury And Purchase Of Flag Pur. Of Patrol Car Construction Police Lines, Combine With Civil Servant Quarters And Cdf Quarters, 8 Self Contained One Bedroom Flats And 2 Pur. (6) Acre
output
Improved Security
implementation status
A)Ongoing B)Ongoing C)Ongoing;Remaining Activity: Constr. Receiption, Cell And Armoury, Pur. Police Patrol Car, Staff Quarters, Purchase Of Land For A Police Station.Constr. Receiption, Cell And Armoury, Pur. Police Patrol Car, Staff Quarters,
total cost
Ksh 90,000
estimate
Ksh 7,290,000

Kisau Ds Pit Latrine

location
Kisau (in Mbooni)
year first funded
2006
action
Construction Of A Pit Latrine
output
Improved Administration Facility
implementation status
Complete And In Use
total cost
Ksh 60,000
estimate
Ksh 60,840

Kiteta Girls Secondary School

location
Kiteta (in Mbooni)
year first funded
2004
action
Pur. Lab. Equipment And Chemicals
output
Improved Education Facility
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Ititu Aic Secondary School

location
Kithungo (in Mbooni)
year first funded
2008
action
Construction Of (4) Classrooms, (4) Latrines And Admin Blk
output
Improved Education Facility
implementation status
New/Onoging
total cost
Ksh 50,000
estimate
Ksh 1,337,800

Utuneni Secondary School

location
Kiteta (in Mbooni)
year first funded
2004
action
Pur. Lab. Equipment And Chemicals
output
Improved Education Facility
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Tawa Girls Secondary School

location
Kiteta (in Mbooni)
year first funded
2004
action
Pur. Lab. Equipment And Chemicals
output
Improved Education Facility
implementation status
Complete And In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Tawa Borehole

location
Kiteta (in Mbooni)
year first funded
2005
action
Rehabilittion Of Borehole (Pur. Blocks For Water Tank, Pipes And Installation)
output
Improved Water System
implementation status
Complete And In Use
total cost
Ksh 40,000
estimate
Ksh 40,000

Kiambwa / Ndituni Cattle Dip

location
Kisau (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kakuswi Cattle Dip

location
Kisau (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kavatini Cattle Dip

location
Kithungo (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Nthungoni Cattle Dip

location
Mbooni (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Tuvilani Cattle Dip

location
Mbooni (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kaumoni Cattle Dip

location
Mbooni (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kiatineni Cattle Dip

location
Mbooni (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kithungo Cattle Dip

location
Kithungo (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kitonyi Cattle Dip

location
Kithungo (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kusyongali Cattle Dip

location
Kithungo (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kitundu Cattle Dip

location
Kitundu (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kavatini Cattle Dip

location
Kithungo (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Syuuni Cattle Dip

location
Tulimani (in Mbooni)
year first funded
2004
action
n/a
output
-
implementation status
not known
total cost
Ksh 28,000
estimate
Ksh 28,000

Mbumbuni Cattle Dip

location
Kisau (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kiluluini Cattle Dip

location
Kisau (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Mukimwani Cattle Dip

location
Kisau (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kinze Cattle Dip

location
Kisau (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Sakai Cattle Dip

location
Waia (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Nduluku Cattle Dip

location
Waia (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kavingo Cattle Dip

location
Waia (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kyangondu Cattle Dip

location
Waia (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Kasyelia Cattle Dip

location
Kiteta (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Ngoni Cattle Dip

location
Kisau (in Mbooni)
year first funded
2004
action
Purchase Of Arcaracide.
output
Control Disease Outbreak
implementation status
Complete And In Use
total cost
Ksh 28,000
estimate
Ksh 28,000

Mbooni Cdf Office At Tawa Social Hall

location
Kiteta (in Mbooni)
action
At The Back Office Of Tawa Social Hall
output
Constituency Development Office
implementation status
Installed With Cdf Sign Post In November 2007
total cost
Ksh 0
estimate
Ksh 0

Nthaani Secondary School

location
Kalawa (in Mbooni)
action
n/a
output
-
implementation status
not known
total cost
Ksh 0
estimate
Ksh 0