The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
    It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
    
    
        
            
            Anjego secondary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 8,700,000
- estimate
- Ksh 8,700,000
 
    
        
            
            Kazadrack Mikuro Masara Godkwer road
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening &grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
 
    
        
            
            Masara God Kweru Munyu Bridge
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Accessibity
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
 
    
        
            
            Ore Bridge
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of bridge
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
 
    
        
            
            Sangla Nyamanga Korwa Kikoma Kahezron Road
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
 
    
        
            
            Nyamilu Dam
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 3,200,000
- estimate
- Ksh 3,200,000
 
    
        
            
            Lwanda Otang Dam
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 3,120,000
- estimate
- Ksh 3,120,000
 
    
        
            
            Pundo Mariwa Dam
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Constructing dam
- output
- Water
- implementation status
- New
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
 
    
        
            
            Masara Dam
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
 
    
        
            
            Ore Bridge
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2009
- action
- finishing
- output
- Accessibity
- implementation status
- Old
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
 
    
        
            
            Kasunga Dam
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
 
    
        
            
            Manyera Nyamasaria Road
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
 
    
        
            
            Malera Chungni Kokendi Road
            
            
                - location
- 
                        Suba Nyabisawa
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- 80%Complete
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,600,000
 
    
        
            
            Mirare Dam
            
            
                - location
- 
                        Suna Wasibete
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,533,800
- estimate
- Ksh 2,533,800
 
    
        
            
            Nyambeba Dam
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,506,136
- estimate
- Ksh 2,026,136
 
    
        
            
            Kona-Kogwan-Stella B Road
            
            
                - location
- 
                        Suna Godjope
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- 80% Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
 
    
        
            
            God – Kwer (DIP) – Magacha Road
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2005
- action
- Culverts Installation
- output
- Road
- implementation status
- On going
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
 
    
        
            
            Nyasare Wasio Road
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- 80% Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
 
    
        
            
            Bondo Water Project
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Water
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
 
    
        
            
            Nyabisawa Korwa Road
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
 
    
        
            
            Migori Street Light
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2004
- action
- Power Installation
- output
- Electricity
- implementation status
- On going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
 
    
        
            
            Midoti-Dugna Road
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
 
    
        
            
            Kakrao secondary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of dining Hall, Power installation, Buying Fuel saving jikos
- output
- dining Hall, Electricity, Fuel Saving Jikos
- implementation status
- On going
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
 
    
        
            
            Duya Dam
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,090,000
- estimate
- Ksh 2,090,000
 
    
        
            
            Kopanga Dam
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,013,200
- estimate
- Ksh 2,013,200
 
    
        
            
            Bondo Nyabisawa Road
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Giribe Dam
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2008
- action
- Rehabilitation
- output
- Water
- implementation status
- Old
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
 
    
        
            
            Kakrao Ugari Road
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
 
    
        
            
            Kahezron Kikoma Oboke road
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening &grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
 
    
        
            
            Kowino Ndonyo Road
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
 
    
        
            
            Abwao Secondary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of Administ. Block
- output
- Administ. Block
- implementation status
- New
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
 
    
        
            
            Kadika Community Power Project
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
 
    
        
            
            Nyarongi Secondary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of Lab.& Domitry
- output
- Lab.& Domitry
- implementation status
- New
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
 
    
        
            
            God Ngoche primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2004
- action
- Renovation of 12 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
 
    
        
            
            Komego Siling Alara road
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
 
    
        
            
            Oruba secondary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 6 Classrooms & Admin Block
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
 
    
        
            
            St. Erin Raha secondary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
 
    
        
            
            Nyabisawa Girls secondary Water Project
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- New
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Godkwer Magacha Road
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2007
- action
- Rehabilitation
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Migori Secondary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of burned Dormitory and Construction of dining Hall
- output
- Dormitory and dining Hall
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Rayudhi primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Anjego Health Centre
            
            
                - location
- 
                        Suba East
                        (in Migori)
                    
- year first funded
- 2003
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Luanda-Obembo-Nyambona
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Accessibity
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
 
    
        
            
            Nyikendo Primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 3 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
 
    
        
            
            Nyarongi Health Centre
            
            
                - location
- 
                        Suba East
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
 
    
        
            
            Osingo secondary School
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Twin Laboratory
- output
- Twin Laboratory
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
 
    
        
            
            Moi Suba Girls secondary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Kitchen, electricity & supply of fuel saving jikos
- output
- Kitchen, electricity, fuel saving jiko
- implementation status
- Complete
- total cost
- Ksh 1,070,000
- estimate
- Ksh 1,070,000
 
    
        
            
            Kokendi primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Ngege secondary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 5 Classes & Latrine
- output
- Classrooms and Latrine
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Nyangubo Primary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 700,000
 
    
        
            
            Nyaduong Secondary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of Administ. Block
- output
- Administ. Block
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Legio Maria Water Project
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Nyaduong Secondary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
 
    
        
            
            Abwao secondary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
 
    
        
            
            Sagero - Ndonyo Road
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening & Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
 
    
        
            
            Oboke - Kogallo Road
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
 
    
        
            
            Sagegi secondary School
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
 
    
        
            
            Nyambeche primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
 
    
        
            
            Magongo Girirbe primary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
 
    
        
            
            Otacho Primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classes &Renovation of 8 classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Rabuor Taya primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 3 classes & Admin Block
- output
- Classrooms/Admin Block
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Midoti Health Centre
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Magina secondary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 3 classrooms
- output
- 3 classrooms
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Ochonge “A” Community water project
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Osingo Polytechnic - Marienga –yadh ngima road
            
            
                - location
- 
                        Suna east
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Kisumu Ndogo Water Project
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Migori primary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2004
- action
- Renovation of 14 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Remo primary School
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
 
    
        
            
            Kagare – Orua Ochiel Road
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 757,813
- estimate
- Ksh 757,813
 
    
        
            
            God Jope Dispensary
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2003
- action
- Construction of twin nurse house
- output
- Nurse house
- implementation status
- On going
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
 
    
        
            
            Kowino Bondo Road
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
 
    
        
            
            Magacha Primary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Kopanga – Giribe Boya Road Opening and grading 2.5 Km
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening & Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Midoti Centre – Oluti Kobel Road
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Kowino Primary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Saro Health Centre
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Nyango secondary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of 6 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Onyalo secondary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2004
- action
- Renovation of 8 Classes and power installation
- output
- Classrooms and Electricity
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Obembo Primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Wasio Secondary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Bishop Okinda secondary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Kadika Girls Secondary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Twin Staff houses
- output
- Staff houses
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Bondo Secondary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Sagero Secondary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Sagero Ndonyo roar
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Rangenya Bridge/Road Calvats
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening/Culverting
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Riamabombo Women Group
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
 
    
        
            
            Ondong Dispensary
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On going
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
 
    
        
            
            Mubachi Dam
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Water
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 646,728
- estimate
- Ksh 646,728
 
    
        
            
            Nyamongo Primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 3 classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 640,000
- estimate
- Ksh 640,000
 
    
        
            
            Kisindi Police Post
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Police Post
- output
- Police Post
- implementation status
- new
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            St. Michael Nyarongi secondarySchools
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering/Painig
- output
- Laboratory
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Pand Pieri Wuoth Ogik
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 0
 
    
        
            
            Kimadui - Koruong’o -Nyamome Road Opening and grading 2.3 Km
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Wi – Arot Primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 3 Classes
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Lichota Kojwang’ Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Nyamware Lochota Witharaga road
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Onyalo secondary
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Pand pieri wouth ogik road
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Wedugona kadika Girls obunga kondoro road
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Wuoth Ogik Primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Kowiti primary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Marabiko primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Masara secondary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Nyasoko primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Ragana primary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Kwa Secondary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Office block
- output
- Office block
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Nyasare Kagrado Bridge
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
 
    
        
            
            Lwala Giribe primary School
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2004
- action
- Renovation of 10 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
 
    
        
            
            Korwa primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 2 Classes & Latrine
- output
- Classrooms/Latrine
- implementation status
- Complete
- total cost
- Ksh 520,000
- estimate
- Ksh 520,000
 
    
        
            
            Abwao primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of 10 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Maliera primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms/ Admin Block
- output
- Classrooms/Admin Block
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Masara primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of 10 Classes and Construction 2 classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Kioru primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Milimani primary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Oruba primary School
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Angang'a primary School
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Nyarombo D.O's Office
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of House
- output
- House
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            God Jope D.E.O's
            
            
                - location
- 
                        Suna Godjope
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of House
- output
- House
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Got kachola secondary
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construcvtion
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Kitabaye secondary
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Sagegi secondarySchool
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            St. Julians ugari mixed secondary School
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Ramoya Maranatha Primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 4 Classrooms
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Kipingi B Bore Hole
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Wiga Raha Borehole
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Nyaduong secondary School
            
            
                - location
- 
                        Suna god Jope
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Library Block
- output
- Library Block
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Lwanda Primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Arombe Health Centre
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Suna Rabuor Dispensary
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Masaria Dispensary
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            PinyOyie Nyamaharanga Dispensary
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Kitabaye \Buembu Dispensary
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Sagero Primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2005
- action
- 2 classes and Admin Block Constructed
- output
- Classes and Admin Block
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Eko primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 2 Classes & 1 renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Mancha primary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Boya primary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
 
    
        
            
            Ndonyo primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Vyalo primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- -
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Magina primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Midoti primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Nyamware Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of 10 classes, fencing, gate installation
- output
- Classrooms, fence, gate
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Kanyadera Primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Nyamilu Primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Kilimanjaro Primary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Machicha primary School
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Ombembo primary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Nyambona primary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Raha primary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Kosege primary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
 
    
        
            
            Sangla primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
 
    
        
            
            Kioru primary
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Ogwedhi Health Centre
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Nyango Secondary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- Roofing, Pst/Paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            St. Joseph Ombo Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of 20 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kokach primary School
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 7
 
    
        
            
            Malera Secondary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Adminst. Block
- output
- Adminst. Block
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Bondo Nyironge Secondary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Bishop Okinda Secondary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            God Ngoche Secondary School
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Osingo primary School
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Ugari primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kodila primary School
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Mwache primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Nyailing'a primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Magoto primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Mubachi primary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kopanga Ribe primary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Mapera primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Renovation of 10 classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kasinda Magoto Water Project
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2007
- action
- Rehabilitation
- output
- Dam
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kakrao-Ugari-Rayudhi Road
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2007
- action
- Rehabilitation
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Migori Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Wasio Secondary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2009
- action
- Water supply
- output
- -
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Onyalo Secondary School
            
            
                - location
- 
                        Suna Centrral
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            God Jope primary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Nyaduong primary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2006
- action
- Installation of Power
- output
- Electricity
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Kitabaye primary School
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Sibuoche primary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Ogwedhi sigawa primary School
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Sagegi primary Schooloo.
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Chamabare primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Migori Muslim primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Witharaga primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Ngege primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Malera Secondary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
 
    
        
            
            Wadhlang'o Bridge
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2006
- action
- Bridge Repair
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
 
    
        
            
            Nyango primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
 
    
        
            
            Remo primary School
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Ondong Dispensary
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering
- output
- Health facility
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Ochieng Orwa Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2005
- action
- Construction of 1 Class
- output
- Classroom
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kikoma primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kasembo primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Nyabisawa primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Magongo Ribe primary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Giribe primary School
            
            
                - location
- 
                        Suba West
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Nyamome primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2005
- action
- 8 Classes renovated, fencing & Latrine done
- output
- Classes/Fence/Latrine
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Bondo primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kakrao primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Nyarongi primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Rangenya primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Tinga primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Warisya primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Anjego primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Wasio primary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Ore primary School
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kikonge primary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kadika primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Onyalo primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
 
    
        
            
            Opasi primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kwa primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Got Kachacha Secondary School
            
            
                - location
- 
                        SunaCentral
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            God jope primary
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            kanyadera primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Suna South
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Lichota Kajwang primary
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Lwanda primary
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Mancha primary
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Nyabeche primary
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Nyamongo primary
            
            
                - location
- 
                        Suna Centrral
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Wasio Primary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            St. Julians Ugari Secondary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Wi Kwa Community School Project
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Thidhna Community School Project
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Sindianya Community School Project
            
            
                - location
- 
                        Suna south
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kadika Primary School
            
            
                - location
- 
                        Suna Centrral
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kokendi Primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
 
    
        
            
            Mwache Primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
 
    
        
            
            Midoti Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Ochieng Orwa Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Mapera Secondary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Kwa Secondary School
            
            
                - location
- 
                        suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Magongo Ribe Secondary School
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Adminst. Block
- output
- Adminst. Block
- implementation status
- new
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Sagero Secondary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Nyikendo Girls Secondary
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
 
    
        
            
            Korwa Abuya Bore Hole
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- sinking Medium well
- output
- Water
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Magacha Community Bore Hole
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2009
- action
- Sinking shallow well
- output
- Water
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Anga’nga Primary School
            
            
                - location
- 
                        suna East
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Ang’anga Primary School Feeder Road
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening Feder Rd
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
 
    
        
            
            Lela Community primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2003
- action
- 2 Classes Constructed
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Otacho Community Village Polytechnic
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 classrooms
- output
- 2 classrooms
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
 
    
        
            
            Giribe Health Centre
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of Nurse House
- output
- Nurse House
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Radienya Primary School Feeder Road
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Opening feedr Rd
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            Nyarongi Health Centre
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Arrears & wiring
- output
- Health facility
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
 
    
        
            
            OSINGO secondary School
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 243,000
- estimate
- Ksh 243,000
 
    
        
            
            KAKRAO SECONDARY School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 243,000
- estimate
- Ksh 243,000
 
    
        
            
            Raha secondary School
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 225,000
- estimate
- Ksh 225,000
 
    
        
            
            Nyaduong Secondary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 221,500
- estimate
- Ksh 221,500
 
    
        
            
            nyarongi secondary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 221,500
- estimate
- Ksh 221,500
 
    
        
            
            Kikoma primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 221,500
- estimate
- Ksh 221,500
 
    
        
            
            Nyasoko primary
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Raha primary
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Wi Arot primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Wuoth Ogik Primary School road
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyambeche Primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyamanga Giribe Community School
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            St. Catherine Bonda Primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Kotuga Community School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            God Jope Primary School
            
            
                - location
- 
                        suna god Jope
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Marabiko Primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            St. Joseph Ombo Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Kioru Primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Lwala Giribe Primary School
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Ngege Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyamanga Primary School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Ogwedhi comm.animal market
            
            
                - location
- 
                        suna Upper
                        (in Migori)
                    
- year first funded
- 2008
- action
- Buying anmal Mkt Land
- output
- Reduce Poverty
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Kowiti-Comm.Borehole
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2008
- action
- Sinking Bore Hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            God jaluok-Comm.Borehole
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Sinking Bore Hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Malera Water project-maintinance
            
            
                - location
- 
                        suna West
                        (in Migori)
                    
- year first funded
- 2008
- action
- Rehabilitation
- output
- Water
- implementation status
- Old
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Arombe Water project-maintainance
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2008
- action
- Rehabilitation
- output
- Water
- implementation status
- Old
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Wouth Ogik comm.water project
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Sinking Bore Hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyarongi Dispensary
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            God Kwer Dispensary
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Suna Rabuor Dispensary
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Osingo community Dispensary
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Abwao primary feeder road
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Kanyadera School feeder road
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Oruba Kilisia Water Project
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- Sinking shallow well
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Ngochone Police Post
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2009
- action
- Finishing of police post
- output
- Police Post
- implementation status
- new
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Maembe Tatu Water Project
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2009
- action
- Sinking shallow well
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Masaria Health Centre
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering/Roofing
- output
- Health facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Osingo Health Centre
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2006
- action
- Rehabilitation
- output
- Heath Centre
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Radienya School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Mapera Secondary
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction oClassrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyasare Primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Kamumbo FootPath
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2007
- action
- Rehabilitation
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Eko primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Kikonge primary
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Midoti primary School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyako primary
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyambona primary
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Nyamilu primary
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
 
    
        
            
            Nyangubo Primary
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            God Kwer Dispensary
            
            
                - location
- 
                        Suna Raha
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Giribe Dispensary
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
 
    
        
            
            Wi Arot primary Schoolfeeder road
            
            
                - location
- 
                        suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- Ditching/gravelling
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 156,000
- estimate
- Ksh 156,000
 
    
        
            
            DEOs office
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2008
- action
- Electrification
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Nyamunda Community School Project
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
 
    
        
            
            Ogwedhi Dispensary
            
            
                - location
- 
                        Suna Upper
                        (in Migori)
                    
- year first funded
- 2008
- action
- Electrification
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
 
    
        
            
            Wi Arot feeder road
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 139,064
- estimate
- Ksh 139,064
 
    
        
            
            Malera secondary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 132,900
- estimate
- Ksh 132,900
 
    
        
            
            Oruba mixed secondary school
            
            
                - location
- 
                        suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 126,000
- estimate
- Ksh 126,000
 
    
        
            
            Hera Community Tree Nursery
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Makutano Dispensary
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Ogwedhi Dispensary
            
            
                - location
- 
                        Upper Suna
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Ragana Dispensary
            
            
                - location
- 
                        Ragana Ward
                        (in Migori)
                    
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Alara Primary School
            
            
                - location
- 
                        Suna East
                        (in Migori)
                    
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Kadika Water Project
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2007
- action
- Rehabilitation
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Ragana Dispensary
            
            
                - location
- 
                        Suna Ragana
                        (in Migori)
                    
- year first funded
- 2008
- action
- Fencing
- output
- Security
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Migori District Agric.Show
            
            
                - location
- 
                        Suna Centrral
                        (in Migori)
                    
- year first funded
- 2008
- action
- Show facilitation
- output
- increase prod.
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Pundo Apuoche ADC Primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
 
    
        
            
            Wasio Primary School
            
            
                - location
- 
                        Suna God Jope
                        (in Migori)
                    
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Nyasoko Primary School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Kitabaye Secondary School
            
            
                - location
- 
                        Suna Wasimbete
                        (in Migori)
                    
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            God Jajuok Water Project
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- purchase pump
- output
- water
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Nyambeba Community Tree Nursery
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Neema Community Tree Nurery
            
            
                - location
- 
                        suna East
                        (in Migori)
                    
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
 
    
        
            
            Sindule Community Tree Nurser
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 80,271
- estimate
- Ksh 80,271
 
    
        
            
            Wasa Community Tree Nursery
            
            
                - location
- 
                        Suna south
                        (in Migori)
                    
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
 
    
        
            
            Nyambeche primary School
            
            
                - location
- 
                        suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
 
    
        
            
            DEO's Office
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2003
- action
- Rehabilitation
- output
- Office block
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
 
    
        
            
            NYARONGI PRIMARY School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 48,000
- estimate
- Ksh 48,000
 
    
        
            
            Nyarongi primary School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
 
    
        
            
            Ramoya Primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
 
    
        
            
            Pundo Apuoch primarySchool
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
 
    
        
            
            Nyamunda comm.Schoolproj.
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
 
    
        
            
            Wuoth ogik primary School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
 
    
        
            
            Giribe Lwala Primary
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
 
    
        
            
            ST. CATHERINE WARISIA primary School
            
            
                - location
- 
                        suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            NYAMOME PRIMARY School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            NYAMANGA GIRIBE COMM. School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            GIRIBE PRIMARY School
            
            
                - location
- 
                        suna west
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            SANGLA PRIMARY School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            NYABISA PRIMARY School
            
            
                - location
- 
                        Suna Nyabisawa
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            KORWA PRIMARY School
            
            
                - location
- 
                        Suna West
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            TINGNA PRIMARY School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            NYASARE PRIMARY School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            MALERA PRIMARY School
            
            
                - location
- 
                        Suna Lower
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            WI KWA COMMUNITY School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            THIDHNA COMMUNITY School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            ONYALO PRIMARY School
            
            
                - location
- 
                        Suna Central
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            KWA PRIMARY School
            
            
                - location
- 
                        Suna Rabuor
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            RAYUDHI PRIMARY School
            
            
                - location
- 
                        Suna North
                        (in Migori)
                    
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
 
    
        
            
            Lela primary School
            
            
                - location
- 
                        Suna South
                        (in Migori)
                    
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000