The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Migori

Anjego secondary School

location
Suna North (in Migori)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 8,700,000
estimate
Ksh 8,700,000

Kazadrack Mikuro Masara Godkwer road

location
Suna Lower (in Migori)
year first funded
2008
action
Opening &grading
output
Accessibiiltiy
implementation status
New
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Masara God Kweru Munyu Bridge

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of Accessibity
output
Accessibity
implementation status
New
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Ore Bridge

location
Suna Wasimbete (in Migori)
year first funded
2008
action
Construction of bridge
output
Accessibiiltiy
implementation status
New
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Sangla Nyamanga Korwa Kikoma Kahezron Road

location
Suna Nyabisawa (in Migori)
year first funded
2007
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 3,500,000
estimate
Ksh 3,500,000

Nyamilu Dam

location
Suna South (in Migori)
year first funded
2006
action
Rehabilitation
output
Dam
implementation status
Complete
total cost
Ksh 3,200,000
estimate
Ksh 3,200,000

Lwanda Otang Dam

location
Suna Raha (in Migori)
year first funded
2006
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 3,120,000
estimate
Ksh 3,120,000

Pundo Mariwa Dam

location
Suna North (in Migori)
year first funded
2009
action
Constructing dam
output
Water
implementation status
New
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Masara Dam

location
Suna South (in Migori)
year first funded
2007
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,800,000
estimate
Ksh 2,800,000

Ore Bridge

location
Suna Wasimbete (in Migori)
year first funded
2009
action
finishing
output
Accessibity
implementation status
Old
total cost
Ksh 2,700,000
estimate
Ksh 2,700,000

Kasunga Dam

location
Suna West (in Migori)
year first funded
2007
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,700,000
estimate
Ksh 2,700,000

Manyera Nyamasaria Road

location
Suna Wasimbete (in Migori)
year first funded
2006
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 2,700,000
estimate
Ksh 2,700,000

Malera Chungni Kokendi Road

location
Suba Nyabisawa (in Migori)
year first funded
2007
action
Construction of Road
output
Road
implementation status
80%Complete
total cost
Ksh 2,600,000
estimate
Ksh 2,600,000

Mirare Dam

location
Suna Wasibete (in Migori)
year first funded
2006
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,533,800
estimate
Ksh 2,533,800

Nyambeba Dam

location
Suna Lower (in Migori)
year first funded
2005
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,506,136
estimate
Ksh 2,026,136

Kona-Kogwan-Stella B Road

location
Suna Godjope (in Migori)
year first funded
2007
action
Construction of Road
output
Road
implementation status
80% Complete
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

God – Kwer (DIP) – Magacha Road

location
Suna Raha (in Migori)
year first funded
2005
action
Culverts Installation
output
Road
implementation status
On going
total cost
Ksh 2,400,000
estimate
Ksh 2,400,000

Nyasare Wasio Road

location
Suna Central (in Migori)
year first funded
2007
action
Construction of Road
output
Road
implementation status
80% Complete
total cost
Ksh 2,400,000
estimate
Ksh 2,400,000

Bondo Water Project

location
Suna South (in Migori)
year first funded
2004
action
Construction of Water
output
Water
implementation status
Complete
total cost
Ksh 2,300,000
estimate
Ksh 2,300,000

Nyabisawa Korwa Road

location
Suna Nyabisawa (in Migori)
year first funded
2006
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Migori Street Light

location
Suna Central (in Migori)
year first funded
2004
action
Power Installation
output
Electricity
implementation status
On going
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Midoti-Dugna Road

location
Suna Central (in Migori)
year first funded
2006
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Kakrao secondary School

location
Suna North (in Migori)
year first funded
2004
action
Construction of dining Hall, Power installation, Buying Fuel saving jikos
output
dining Hall, Electricity, Fuel Saving Jikos
implementation status
On going
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Duya Dam

location
Suna North (in Migori)
year first funded
2005
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,090,000
estimate
Ksh 2,090,000

Kopanga Dam

location
Suna West (in Migori)
year first funded
2004
action
Construction of Dam
output
Dam
implementation status
Complete
total cost
Ksh 2,013,200
estimate
Ksh 2,013,200

Bondo Nyabisawa Road

location
Suna South (in Migori)
year first funded
2007
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Giribe Dam

location
Suna West (in Migori)
year first funded
2008
action
Rehabilitation
output
Water
implementation status
Old
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Kakrao Ugari Road

location
Suna North (in Migori)
year first funded
2006
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Kahezron Kikoma Oboke road

location
Suna Nyabisawa (in Migori)
year first funded
2008
action
Opening &grading
output
Accessibiiltiy
implementation status
New
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Kowino Ndonyo Road

location
Suna South (in Migori)
year first funded
2005
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Abwao Secondary School

location
Suna Lower (in Migori)
year first funded
2008
action
Construction of Administ. Block
output
Administ. Block
implementation status
New
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Kadika Community Power Project

location
Suna Central (in Migori)
year first funded
2006
action
Power Installation
output
Electricity
implementation status
New
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Nyarongi Secondary School

location
Suna North (in Migori)
year first funded
2008
action
Construction of Lab.& Domitry
output
Lab.& Domitry
implementation status
New
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

God Ngoche primary School

location
Suna Rabuor (in Migori)
year first funded
2004
action
Renovation of 12 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Komego Siling Alara road

location
Suna East (in Migori)
year first funded
2008
action
Grading
output
Accessibiiltiy
implementation status
New
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Oruba secondary School

location
Suna Ragana (in Migori)
year first funded
2004
action
Construction of 6 Classrooms & Admin Block
output
Classrooms
implementation status
On going
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

St. Erin Raha secondary School

location
Suna Raha (in Migori)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
On going
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Nyabisawa Girls secondary Water Project

location
Suna Nyabisawa (in Migori)
year first funded
2007
action
Construction of Dam
output
Dam
implementation status
New
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Godkwer Magacha Road

location
Suna Lower (in Migori)
year first funded
2007
action
Rehabilitation
output
Road
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Migori Secondary School

location
Suna Central (in Migori)
year first funded
2005
action
Renovation of burned Dormitory and Construction of dining Hall
output
Dormitory and dining Hall
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Rayudhi primary School

location
Suna North (in Migori)
year first funded
2003
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Anjego Health Centre

location
Suba East (in Migori)
year first funded
2003
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Luanda-Obembo-Nyambona

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of Accessibity
output
Accessibity
implementation status
New
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Nyikendo Primary School

location
Suna North (in Migori)
year first funded
2005
action
Construction of 3 Classes
output
Classrooms
implementation status
On going
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Nyarongi Health Centre

location
Suba East (in Migori)
year first funded
2004
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Osingo secondary School

location
Suna East (in Migori)
year first funded
2004
action
Construction of Twin Laboratory
output
Twin Laboratory
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Moi Suba Girls secondary School

location
Suna Ragana (in Migori)
year first funded
2004
action
Construction of Kitchen, electricity & supply of fuel saving jikos
output
Kitchen, electricity, fuel saving jiko
implementation status
Complete
total cost
Ksh 1,070,000
estimate
Ksh 1,070,000

Kokendi primary School

location
Suna Lower (in Migori)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ngege secondary School

location
Suna Central (in Migori)
year first funded
2004
action
Construction of 5 Classes & Latrine
output
Classrooms and Latrine
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Nyangubo Primary School

location
Suna Ragana (in Migori)
year first funded
2005
action
Construction of 4 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 700,000

Nyaduong Secondary School

location
Suna God Jope (in Migori)
year first funded
2008
action
Construction of Administ. Block
output
Administ. Block
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Legio Maria Water Project

location
Suna Raha (in Migori)
year first funded
2007
action
Construction of Dam
output
Dam
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Nyaduong Secondary School

location
Suna God Jope (in Migori)
year first funded
2005
action
Construction of 3 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Abwao secondary School

location
Suna Lower (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 950,000
estimate
Ksh 950,000

Sagero - Ndonyo Road

location
Suna South (in Migori)
year first funded
2009
action
Opening & Grading
output
Accessibity
implementation status
New
total cost
Ksh 900,000
estimate
Ksh 900,000

Oboke - Kogallo Road

location
Suna Lower (in Migori)
year first funded
2009
action
Opening/Grading
output
Accessibity
implementation status
New
total cost
Ksh 900,000
estimate
Ksh 900,000

Sagegi secondary School

location
Suna Upper (in Migori)
year first funded
2003
action
Construction of 2 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 850,000

Nyambeche primary School

location
Suna Lower (in Migori)
year first funded
2003
action
Construction of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 850,000

Magongo Girirbe primary School

location
Suba West (in Migori)
year first funded
2004
action
Construction of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 850,000

Otacho Primary School

location
Suna North (in Migori)
year first funded
2005
action
Construction of 2 Classes &Renovation of 8 classes
output
Classrooms
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 800,000

Rabuor Taya primary School

location
Suna Rabuor (in Migori)
year first funded
2004
action
Construction of 3 classes & Admin Block
output
Classrooms/Admin Block
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Midoti Health Centre

location
Suna Rabuor (in Migori)
year first funded
2004
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 800,000
estimate
Ksh 800,000

Magina secondary School

location
Suna North (in Migori)
year first funded
2009
action
Construction of 3 classrooms
output
3 classrooms
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 800,000

Ochonge “A” Community water project

location
Suna West (in Migori)
year first funded
2009
action
sinking bore hole
output
Water
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 800,000

Osingo Polytechnic - Marienga –yadh ngima road

location
Suna east (in Migori)
year first funded
2009
action
Opening/Grading
output
Accessibity
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 800,000

Kisumu Ndogo Water Project

location
Suna God Jope (in Migori)
year first funded
2009
action
sinking bore hole
output
Water
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 800,000

Migori primary School

location
Suna Ragana (in Migori)
year first funded
2004
action
Renovation of 14 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Remo primary School

location
Suna Upper (in Migori)
year first funded
2004
action
Construction of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Kagare – Orua Ochiel Road

location
Suna Central (in Migori)
year first funded
2009
action
Opening
output
Accessibity
implementation status
New
total cost
Ksh 757,813
estimate
Ksh 757,813

God Jope Dispensary

location
Suna God Jope (in Migori)
year first funded
2003
action
Construction of twin nurse house
output
Nurse house
implementation status
On going
total cost
Ksh 750,000
estimate
Ksh 750,000

Kowino Bondo Road

location
Suna South (in Migori)
year first funded
2007
action
Construction of Road
output
Road
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Magacha Primary School

location
Suna Raha (in Migori)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 700,000

Kopanga – Giribe Boya Road Opening and grading 2.5 Km

location
Suna West (in Migori)
year first funded
2009
action
Opening & Grading
output
Accessibity
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Midoti Centre – Oluti Kobel Road

location
Suna Central (in Migori)
year first funded
2009
action
Opening/Grading
output
Accessibity
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Kowino Primary School

location
Suna Ragana (in Migori)
year first funded
2005
action
Construction of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Saro Health Centre

location
Suna Nyabisawa (in Migori)
year first funded
2005
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 700,000

Nyango secondary School

location
Suna Nyabisawa (in Migori)
year first funded
2005
action
Renovation of 6 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Onyalo secondary School

location
Suna Central (in Migori)
year first funded
2004
action
Renovation of 8 Classes and power installation
output
Classrooms and Electricity
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Obembo Primary School

location
Suna Lower (in Migori)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 700,000

Wasio Secondary School

location
Suna God Jope (in Migori)
year first funded
2004
action
Construction of 2 Classes
output
Classrooms
implementation status
On going
total cost
Ksh 700,000
estimate
Ksh 700,000

Bishop Okinda secondary School

location
Suna Ragana (in Migori)
year first funded
2005
action
Construction of 4 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Kadika Girls Secondary School

location
Suna Central (in Migori)
year first funded
2005
action
Construction of Twin Staff houses
output
Staff houses
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Bondo Secondary School

location
Suna South (in Migori)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Sagero Secondary School

location
Suna South (in Migori)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Sagero Ndonyo roar

location
Suna South (in Migori)
year first funded
2008
action
Grading
output
Accessibiiltiy
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Rangenya Bridge/Road Calvats

location
Suna North (in Migori)
year first funded
2009
action
Opening/Culverting
output
Accessibity
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Riamabombo Women Group

location
Suna Central (in Migori)
year first funded
2009
action
sinking bore hole
output
Water
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Ondong Dispensary

location
Suna Central (in Migori)
year first funded
2003
action
Construction of Dispensary
output
Dispensary
implementation status
On going
total cost
Ksh 650,000
estimate
Ksh 650,000

Mubachi Dam

location
Suna West (in Migori)
year first funded
2005
action
Construction of Water
output
Water
implementation status
Complete
total cost
Ksh 646,728
estimate
Ksh 646,728

Nyamongo Primary School

location
Suna Rabuor (in Migori)
year first funded
2005
action
Construction of 3 classes
output
Classrooms
implementation status
On going
total cost
Ksh 640,000
estimate
Ksh 640,000

Kisindi Police Post

location
Suna Upper (in Migori)
year first funded
2009
action
Construction of Police Post
output
Police Post
implementation status
new
total cost
Ksh 600,000
estimate
Ksh 600,000

St. Michael Nyarongi secondarySchools

location
Suna North (in Migori)
year first funded
2009
action
Plastering/Painig
output
Laboratory
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Pand Pieri Wuoth Ogik

location
Suna Ragana (in Migori)
year first funded
2008
action
Opening
output
Accessibity
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 0

Kimadui - Koruong’o -Nyamome Road Opening and grading 2.3 Km

location
Suna Ragana (in Migori)
year first funded
2009
action
Opening/Grading
output
Accessibity
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Wi – Arot Primary School

location
Suna Nyabisawa (in Migori)
year first funded
2005
action
Construction of 3 Classes
output
Classrooms
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Lichota Kojwang’ Primary School

location
Suna Central (in Migori)
year first funded
2005
action
Construction of 4 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 600,000

Nyamware Lochota Witharaga road

location
Suna Central (in Migori)
year first funded
2008
action
Grading
output
Accessibiiltiy
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Onyalo secondary

location
Suna Central (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Pand pieri wouth ogik road

location
Suna Ragana (in Migori)
year first funded
2008
action
Grading
output
Accessibiiltiy
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Wedugona kadika Girls obunga kondoro road

location
Suna Central (in Migori)
year first funded
2008
action
Opening
output
Accessibiiltiy
implementation status
New
total cost
Ksh 600,000
estimate
Ksh 600,000

Wuoth Ogik Primary School

location
Suna Rabuor (in Migori)
year first funded
2005
action
Construction of 2 classes
output
Classrooms
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 600,000

Kowiti primary School

location
Suna God Jope (in Migori)
year first funded
2005
action
Construction of 2 Classes
output
Classrooms
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 600,000

Marabiko primary School

location
Suna Lower (in Migori)
year first funded
2005
action
Construction of 2 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 600,000

Masara secondary School

location
Suna Lower (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Nyasoko primary School

location
Suna Lower (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 600,000
estimate
Ksh 600,000

Ragana primary School

location
Suna Ragana (in Migori)
year first funded
2004
action
n/a
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Kwa Secondary School

location
Suna Rabuor (in Migori)
year first funded
2005
action
Construction of Office block
output
Office block
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Nyasare Kagrado Bridge

location
Suna Central (in Migori)
year first funded
2005
action
Construction of Bridge
output
Bridge
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Lwala Giribe primary School

location
Suna West (in Migori)
year first funded
2004
action
Renovation of 10 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Korwa primary School

location
Suna Nyabisawa (in Migori)
year first funded
2004
action
Construction of 2 Classes & Latrine
output
Classrooms/Latrine
implementation status
Complete
total cost
Ksh 520,000
estimate
Ksh 520,000

Abwao primary School

location
Suna Lower (in Migori)
year first funded
2005
action
Renovation of 10 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Maliera primary School

location
Suna Lower (in Migori)
year first funded
2005
action
Construction of 2 Classrooms/ Admin Block
output
Classrooms/Admin Block
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Masara primary School

location
Suna Lower (in Migori)
year first funded
2005
action
Renovation of 10 Classes and Construction 2 classes
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kioru primary School

location
Suna Lower (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Milimani primary School

location
Suna Ragana (in Migori)
year first funded
2004
action
Construction of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Oruba primary School

location
Suna Ragana (in Migori)
year first funded
2006
action
Construction of 2 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Angang'a primary School

location
Suna East (in Migori)
year first funded
2004
action
Construction of 2 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyarombo D.O's Office

location
Suna South (in Migori)
year first funded
2007
action
Construction of House
output
House
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

God Jope D.E.O's

location
Suna Godjope (in Migori)
year first funded
2007
action
Construction of House
output
House
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Got kachola secondary

location
Suna God Jope (in Migori)
year first funded
2008
action
Construcvtion
output
2 Classrooms
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Kitabaye secondary

location
Suna Wasimbete (in Migori)
year first funded
2008
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Sagegi secondarySchool

location
Suna Upper (in Migori)
year first funded
2008
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

St. Julians ugari mixed secondary School

location
Suna Upper (in Migori)
year first funded
2008
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Ramoya Maranatha Primary School

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of 4 Classrooms
output
4 Clasrooms
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Kipingi B Bore Hole

location
Suna Lower (in Migori)
year first funded
2009
action
sinking bore hole
output
Water
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Wiga Raha Borehole

location
Suna Raha (in Migori)
year first funded
2009
action
sinking bore hole
output
Water
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyaduong secondary School

location
Suna god Jope (in Migori)
year first funded
2009
action
Construction of Library Block
output
Library Block
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 500,000

Lwanda Primary School

location
Suna Rabuor (in Migori)
year first funded
2005
action
Construction of 2 Classes
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Arombe Health Centre

location
Suna Lower (in Migori)
year first funded
2005
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Suna Rabuor Dispensary

location
Suna Rabuor (in Migori)
year first funded
2005
action
Construction of Dispensary
output
Dispensary
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Masaria Dispensary

location
Suna West (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

PinyOyie Nyamaharanga Dispensary

location
Suna West (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kitabaye \Buembu Dispensary

location
Suna Lower (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Sagero Primary School

location
Suna South (in Migori)
year first funded
2005
action
2 classes and Admin Block Constructed
output
Classes and Admin Block
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Eko primary School

location
Suna North (in Migori)
year first funded
2004
action
Construction of 2 Classes & 1 renovation
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Mancha primary School

location
Suba West (in Migori)
year first funded
2005
action
Construction of 2 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Boya primary School

location
Suba West (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 300,000

Ndonyo primary School

location
Suna South (in Migori)
year first funded
2005
action
Renovation of classes
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Vyalo primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of 3 Classrooms
output
-
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Magina primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 500,000

Midoti primary School

location
Suna Central (in Migori)
year first funded
2004
action
Construction of 2 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyamware Primary School

location
Suna Central (in Migori)
year first funded
2005
action
Renovation of 10 classes, fencing, gate installation
output
Classrooms, fence, gate
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kanyadera Primary School

location
Suna North (in Migori)
year first funded
2005
action
Construction of 2 Classes
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyamilu Primary School

location
Suna South (in Migori)
year first funded
2005
action
Construction of 2 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kilimanjaro Primary School

location
Suna God Jope (in Migori)
year first funded
2005
action
Construction of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Machicha primary School

location
Suna Wasimbete (in Migori)
year first funded
2004
action
Construction of 2 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Ombembo primary School

location
Suna Raha (in Migori)
year first funded
2005
action
Construction of 2 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyambona primary School

location
Suna Raha (in Migori)
year first funded
2006
action
Construction of 2 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Raha primary School

location
Suna Raha (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Kosege primary School

location
Suna Raha (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 500,000
estimate
Ksh 500,000

Sangla primary School

location
Suna Nyabisawa (in Migori)
year first funded
2004
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 450,000
estimate
Ksh 450,000

Kioru primary

location
Suna Lower (in Migori)
year first funded
2008
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Ogwedhi Health Centre

location
Suna Upper (in Migori)
year first funded
2009
action
Construction of Maternity Wing
output
Maternity Wing
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Nyango Secondary School

location
Suna Nyabisawa (in Migori)
year first funded
2009
action
Roofing, Pst/Paint.
output
4 Clasrooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

St. Joseph Ombo Primary School

location
Suna Central (in Migori)
year first funded
2005
action
Renovation of 20 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kokach primary School

location
Suna East (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 7

Malera Secondary School

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of Adminst. Block
output
Adminst. Block
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Bondo Nyironge Secondary School

location
Suna South (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Bishop Okinda Secondary School

location
Suna Rabuor (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

God Ngoche Secondary School

location
Suna Upper (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Osingo primary School

location
Suna East (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Ugari primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Kodila primary School

location
Suna East (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Mwache primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Nyailing'a primary School

location
Suna South (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Magoto primary School

location
Suna South (in Migori)
year first funded
2005
action
Construction of 2 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Mubachi primary School

location
Suba West (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Kopanga Ribe primary School

location
Suba West (in Migori)
year first funded
2005
action
Construction of 2 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Mapera primary School

location
Suna Central (in Migori)
year first funded
2005
action
Renovation of 10 classes
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kasinda Magoto Water Project

location
Suna South (in Migori)
year first funded
2007
action
Rehabilitation
output
Dam
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Kakrao-Ugari-Rayudhi Road

location
Suna North (in Migori)
year first funded
2007
action
Rehabilitation
output
Road
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Migori Primary School

location
Suna Central (in Migori)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Wasio Secondary School

location
Suna God Jope (in Migori)
year first funded
2009
action
Water supply
output
-
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Onyalo Secondary School

location
Suna Centrral (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

God Jope primary School

location
Suna God Jope (in Migori)
year first funded
2005
action
Construction of 4 Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Nyaduong primary School

location
Suna God Jope (in Migori)
year first funded
2006
action
Installation of Power
output
Electricity
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Kitabaye primary School

location
Suna Wasimbete (in Migori)
year first funded
2004
action
Construction of 2 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Sibuoche primary School

location
Suna Raha (in Migori)
year first funded
2005
action
Construction of 2 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Ogwedhi sigawa primary School

location
Suna Upper (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Sagegi primary Schooloo.

location
Suna Upper (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Chamabare primary School

location
Suna Lower (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Migori Muslim primary School

location
Suna Central (in Migori)
year first funded
2005
action
Construction of 2 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Witharaga primary School

location
Suna Central (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 400,000
estimate
Ksh 400,000

Ngege primary School

location
Suna Central (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Malera Secondary School

location
Suba West (in Migori)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Wadhlang'o Bridge

location
Suna East (in Migori)
year first funded
2006
action
Bridge Repair
output
Bridge
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Nyango primary School

location
Suna Nyabisawa (in Migori)
year first funded
2005
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Remo primary School

location
Suna Upper (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Ondong Dispensary

location
Suna Central (in Migori)
year first funded
2009
action
Plastering
output
Health facility
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Ochieng Orwa Primary School

location
Suna Central (in Migori)
year first funded
2005
action
Construction of 1 Class
output
Classroom
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 300,000

Kikoma primary School

location
Suna Nyabisawa (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kasembo primary School

location
Suna Nyabisawa (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyabisawa primary School

location
Suna Nyabisawa (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Magongo Ribe primary School

location
Suba West (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Giribe primary School

location
Suba West (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyamome primary School

location
Suna South (in Migori)
year first funded
2005
action
8 Classes renovated, fencing & Latrine done
output
Classes/Fence/Latrine
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Bondo primary School

location
Suna South (in Migori)
year first funded
2006
action
Construction of 2 Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Kakrao primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyarongi primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Rangenya primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Tinga primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of 2 Classes
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Warisya primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Anjego primary School

location
Suna North (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Wasio primary School

location
Suna God Jope (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Ore primary School

location
Suna Wasimbete (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kikonge primary School

location
Suna Raha (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kadika primary School

location
Suna Central (in Migori)
year first funded
2006
action
Construction of 3 Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Onyalo primary School

location
Suna Central (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
On going
total cost
Ksh 300,000
estimate
Ksh 400,000

Opasi primary School

location
Suna Rabuor (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kwa primary School

location
Suna Rabuor (in Migori)
year first funded
2006
action
Construction of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Got Kachacha Secondary School

location
SunaCentral (in Migori)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

God jope primary

location
Suna God Jope (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

kanyadera primary School

location
Suna North (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Suna South

location
Suna South (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Lichota Kajwang primary

location
Suna Central (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Lwanda primary

location
Suna Rabuor (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Mancha primary

location
Suna West (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyabeche primary

location
Suna Lower (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyamongo primary

location
Suna Centrral (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Wasio Primary School

location
Suna God Jope (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

St. Julians Ugari Secondary School

location
Suna North (in Migori)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 300,000

Wi Kwa Community School Project

location
Suna Rabuor (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Thidhna Community School Project

location
Suna Rabuor (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Sindianya Community School Project

location
Suna south (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Kadika Primary School

location
Suna Centrral (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Kokendi Primary School

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 200,000

Mwache Primary School

location
Suna North (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 200,000

Midoti Primary School

location
Suna Central (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Ochieng Orwa Primary School

location
Suna Central (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Mapera Secondary School

location
Suna Central (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Kwa Secondary School

location
suna Rabuor (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Magongo Ribe Secondary School

location
Suna West (in Migori)
year first funded
2009
action
Construction of Adminst. Block
output
Adminst. Block
implementation status
new
total cost
Ksh 300,000
estimate
Ksh 300,000

Sagero Secondary School

location
Suna South (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyikendo Girls Secondary

location
Suna North (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 0

Korwa Abuya Bore Hole

location
Suna North (in Migori)
year first funded
2009
action
sinking Medium well
output
Water
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Magacha Community Bore Hole

location
Suna Raha (in Migori)
year first funded
2009
action
Sinking shallow well
output
Water
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Anga’nga Primary School

location
suna East (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Ang’anga Primary School Feeder Road

location
Suna North (in Migori)
year first funded
2009
action
Opening Feder Rd
output
Accessibity
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Lela Community primary School

location
Suna South (in Migori)
year first funded
2003
action
2 Classes Constructed
output
Classrooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Otacho Community Village Polytechnic

location
Suna North (in Migori)
year first funded
2009
action
Construction of 2 classrooms
output
2 classrooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 500,000

Giribe Health Centre

location
Suna West (in Migori)
year first funded
2009
action
Construction of Nurse House
output
Nurse House
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Radienya Primary School Feeder Road

location
Suna Rabuor (in Migori)
year first funded
2009
action
Opening feedr Rd
output
Accessibity
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Nyarongi Health Centre

location
Suna North (in Migori)
year first funded
2009
action
Arrears & wiring
output
Health facility
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

OSINGO secondary School

location
Suna East (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 243,000
estimate
Ksh 243,000

KAKRAO SECONDARY School

location
Suna North (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 243,000
estimate
Ksh 243,000

Raha secondary School

location
Suna Raha (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 225,000
estimate
Ksh 225,000

Nyaduong Secondary School

location
Suna God Jope (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 221,500
estimate
Ksh 221,500

nyarongi secondary School

location
Suna North (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 221,500
estimate
Ksh 221,500

Kikoma primary School

location
Suna Nyabisawa (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 221,500
estimate
Ksh 221,500

Nyasoko primary

location
Suna Lower (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Raha primary

location
Suna Raha (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Wi Arot primary School

location
Suna Nyabisawa (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Wuoth Ogik Primary School road

location
Suna Rabuor (in Migori)
year first funded
2008
action
Opening Feeder Rd
output
Accessibiiltiy
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyambeche Primary School

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyamanga Giribe Community School

location
Suna West (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

St. Catherine Bonda Primary School

location
Suna North (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kotuga Community School

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

God Jope Primary School

location
suna god Jope (in Migori)
year first funded
2009
action
Plastering & paint.
output
4 Clasrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Marabiko Primary School

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

St. Joseph Ombo Primary School

location
Suna Central (in Migori)
year first funded
2009
action
Plastering & paint.
output
4 Clasrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kioru Primary School

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Lwala Giribe Primary School

location
Suna West (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Ngege Primary School

location
Suna Central (in Migori)
year first funded
2009
action
Plastering & paint.
output
4 Clasrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyamanga Primary School

location
Suna Nyabisawa (in Migori)
year first funded
2009
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Ogwedhi comm.animal market

location
suna Upper (in Migori)
year first funded
2008
action
Buying anmal Mkt Land
output
Reduce Poverty
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kowiti-Comm.Borehole

location
Suna God Jope (in Migori)
year first funded
2008
action
Sinking Bore Hole
output
Water
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

God jaluok-Comm.Borehole

location
Suna Ragana (in Migori)
year first funded
2008
action
Sinking Bore Hole
output
Water
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Malera Water project-maintinance

location
suna West (in Migori)
year first funded
2008
action
Rehabilitation
output
Water
implementation status
Old
total cost
Ksh 200,000
estimate
Ksh 200,000

Arombe Water project-maintainance

location
Suna West (in Migori)
year first funded
2008
action
Rehabilitation
output
Water
implementation status
Old
total cost
Ksh 200,000
estimate
Ksh 200,000

Wouth Ogik comm.water project

location
Suna Ragana (in Migori)
year first funded
2008
action
Sinking Bore Hole
output
Water
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyarongi Dispensary

location
Suna North (in Migori)
year first funded
2008
action
Construction of Health Facility
output
Health Facility
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

God Kwer Dispensary

location
Suna Raha (in Migori)
year first funded
2008
action
Construction of Health Facility
output
Health Facility
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Suna Rabuor Dispensary

location
Suna Rabuor (in Migori)
year first funded
2008
action
Construction of Health Facility
output
Health Facility
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Osingo community Dispensary

location
Suna East (in Migori)
year first funded
2008
action
Construction of Health Facility
output
Health Facility
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Abwao primary feeder road

location
Suna Lower (in Migori)
year first funded
2008
action
Opening Feeder Rd
output
Accessibiiltiy
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kanyadera School feeder road

location
Suna North (in Migori)
year first funded
2008
action
Opening Feeder Rd
output
Accessibiiltiy
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Oruba Kilisia Water Project

location
Suna Nyabisawa (in Migori)
year first funded
2009
action
Sinking shallow well
output
Water
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Ngochone Police Post

location
Suna South (in Migori)
year first funded
2009
action
Finishing of police post
output
Police Post
implementation status
new
total cost
Ksh 200,000
estimate
Ksh 200,000

Maembe Tatu Water Project

location
Suna Upper (in Migori)
year first funded
2009
action
Sinking shallow well
output
Water
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Masaria Health Centre

location
Suna Wasimbete (in Migori)
year first funded
2009
action
Plastering/Roofing
output
Health facility
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Osingo Health Centre

location
Suna East (in Migori)
year first funded
2006
action
Rehabilitation
output
Heath Centre
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Radienya School

location
Suna Central (in Migori)
year first funded
2007
action
Construction Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mapera Secondary

location
Suna Central (in Migori)
year first funded
2007
action
Construction oClassrooms
output
Classrooms
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyasare Primary School

location
Suna Central (in Migori)
year first funded
2007
action
Construction of Classrooms
output
Classrooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kamumbo FootPath

location
Suna Central (in Migori)
year first funded
2007
action
Rehabilitation
output
Road
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Eko primary School

location
Suna North (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Kikonge primary

location
Suna Lower (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Midoti primary School

location
Suna Central (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyako primary

location
Suna Ragana (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyambona primary

location
Suna Raha (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyamilu primary

location
Suna Nyabisawa (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 350,000

Nyangubo Primary

location
Suna Ragana (in Migori)
year first funded
2008
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

God Kwer Dispensary

location
Suna Raha (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Giribe Dispensary

location
Suna West (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Wi Arot primary Schoolfeeder road

location
suna Nyabisawa (in Migori)
year first funded
2009
action
Ditching/gravelling
output
Accessibity
implementation status
New
total cost
Ksh 156,000
estimate
Ksh 156,000

DEOs office

location
Suna Central (in Migori)
year first funded
2008
action
Electrification
output
Electricity
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 150,000

Nyamunda Community School Project

location
Suna Lower (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 300,000

Ogwedhi Dispensary

location
Suna Upper (in Migori)
year first funded
2008
action
Electrification
output
Electricity
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 150,000

Wi Arot feeder road

location
Suna Nyabisawa (in Migori)
year first funded
2008
action
Opening Feeder Rd
output
Accessibiiltiy
implementation status
New
total cost
Ksh 139,064
estimate
Ksh 139,064

Malera secondary School

location
Suna Lower (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 132,900
estimate
Ksh 132,900

Oruba mixed secondary school

location
suna Ragana (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 126,000
estimate
Ksh 126,000

Hera Community Tree Nursery

location
Suna Nyabisawa (in Migori)
year first funded
2009
action
tree nursery
output
Afforastation
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Makutano Dispensary

location
Suna Rabuor (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 100,000

Ogwedhi Dispensary

location
Upper Suna (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 100,000

Ragana Dispensary

location
Ragana Ward (in Migori)
year first funded
2007
action
Construction of Heath Centre
output
Heath Centre
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 100,000

Alara Primary School

location
Suna East (in Migori)
year first funded
2007
action
n/a
output
-
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Kadika Water Project

location
Suna Central (in Migori)
year first funded
2007
action
Rehabilitation
output
Dam
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ragana Dispensary

location
Suna Ragana (in Migori)
year first funded
2008
action
Fencing
output
Security
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Migori District Agric.Show

location
Suna Centrral (in Migori)
year first funded
2008
action
Show facilitation
output
increase prod.
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Pundo Apuoche ADC Primary School

location
Suna North (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 200,000

Wasio Primary School

location
Suna God Jope (in Migori)
year first funded
2009
action
Construction of 1 Classroom
output
1 Classroom
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyasoko Primary School

location
Suna Lower (in Migori)
year first funded
2009
action
Plastering & paint.
output
2 Classrooms
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Kitabaye Secondary School

location
Suna Wasimbete (in Migori)
year first funded
2009
action
Plastering & paint.
output
2 Classrooms
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

God Jajuok Water Project

location
Suna North (in Migori)
year first funded
2009
action
purchase pump
output
water
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyambeba Community Tree Nursery

location
Suna Central (in Migori)
year first funded
2009
action
tree nursery
output
Afforastation
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Neema Community Tree Nurery

location
suna East (in Migori)
year first funded
2009
action
tree nursery
output
Afforastation
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Sindule Community Tree Nurser

location
Suna North (in Migori)
year first funded
2009
action
tree nursery
output
Afforastation
implementation status
New
total cost
Ksh 80,271
estimate
Ksh 80,271

Wasa Community Tree Nursery

location
Suna south (in Migori)
year first funded
2009
action
tree nursery
output
Afforastation
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 50,000

Nyambeche primary School

location
suna Lower (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 50,000
estimate
Ksh 50,000

DEO's Office

location
Suna Central (in Migori)
year first funded
2003
action
Rehabilitation
output
Office block
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

NYARONGI PRIMARY School

location
Suna North (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 48,000
estimate
Ksh 48,000

Nyarongi primary School

location
Suna North (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 30,000
estimate
Ksh 30,000

Ramoya Primary School

location
Suna South (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 30,000
estimate
Ksh 30,000

Pundo Apuoch primarySchool

location
Suna North (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 30,000
estimate
Ksh 30,000

Nyamunda comm.Schoolproj.

location
Suna Lower (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 30,000
estimate
Ksh 30,000

Wuoth ogik primary School

location
Suna Rabuor (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 30,000
estimate
Ksh 30,000

Giribe Lwala Primary

location
Suna Lower (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 30,000
estimate
Ksh 30,000

ST. CATHERINE WARISIA primary School

location
suna North (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

NYAMOME PRIMARY School

location
Suna Nyabisawa (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

NYAMANGA GIRIBE COMM. School

location
Suna Lower (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

GIRIBE PRIMARY School

location
suna west (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

SANGLA PRIMARY School

location
Suna Nyabisawa (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

NYABISA PRIMARY School

location
Suna Nyabisawa (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

KORWA PRIMARY School

location
Suna West (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

TINGNA PRIMARY School

location
Suna North (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

NYASARE PRIMARY School

location
Suna North (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

MALERA PRIMARY School

location
Suna Lower (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

WI KWA COMMUNITY School

location
Suna Rabuor (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

THIDHNA COMMUNITY School

location
Suna Rabuor (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

ONYALO PRIMARY School

location
Suna Central (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

KWA PRIMARY School

location
Suna Rabuor (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

RAYUDHI PRIMARY School

location
Suna North (in Migori)
year first funded
2009
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000

Lela primary School

location
Suna South (in Migori)
year first funded
2008
action
Purchase Furnit.
output
Improve Learning
implementation status
New
total cost
Ksh 20,000
estimate
Ksh 20,000