The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Anjego secondary School
- location
-
Suna North
(in Migori)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 8,700,000
- estimate
- Ksh 8,700,000
Kazadrack Mikuro Masara Godkwer road
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Opening &grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Masara God Kweru Munyu Bridge
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of Accessibity
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Ore Bridge
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2008
- action
- Construction of bridge
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Sangla Nyamanga Korwa Kikoma Kahezron Road
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,500,000
Nyamilu Dam
- location
-
Suna South
(in Migori)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 3,200,000
- estimate
- Ksh 3,200,000
Lwanda Otang Dam
- location
-
Suna Raha
(in Migori)
- year first funded
- 2006
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 3,120,000
- estimate
- Ksh 3,120,000
Pundo Mariwa Dam
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Constructing dam
- output
- Water
- implementation status
- New
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Masara Dam
- location
-
Suna South
(in Migori)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
Ore Bridge
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2009
- action
- finishing
- output
- Accessibity
- implementation status
- Old
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
Kasunga Dam
- location
-
Suna West
(in Migori)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
Manyera Nyamasaria Road
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
Malera Chungni Kokendi Road
- location
-
Suba Nyabisawa
(in Migori)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- 80%Complete
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,600,000
Mirare Dam
- location
-
Suna Wasibete
(in Migori)
- year first funded
- 2006
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,533,800
- estimate
- Ksh 2,533,800
Nyambeba Dam
- location
-
Suna Lower
(in Migori)
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,506,136
- estimate
- Ksh 2,026,136
Kona-Kogwan-Stella B Road
- location
-
Suna Godjope
(in Migori)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- 80% Complete
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
God – Kwer (DIP) – Magacha Road
- location
-
Suna Raha
(in Migori)
- year first funded
- 2005
- action
- Culverts Installation
- output
- Road
- implementation status
- On going
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Nyasare Wasio Road
- location
-
Suna Central
(in Migori)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- 80% Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Bondo Water Project
- location
-
Suna South
(in Migori)
- year first funded
- 2004
- action
- Construction of Water
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
Nyabisawa Korwa Road
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Migori Street Light
- location
-
Suna Central
(in Migori)
- year first funded
- 2004
- action
- Power Installation
- output
- Electricity
- implementation status
- On going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Midoti-Dugna Road
- location
-
Suna Central
(in Migori)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Kakrao secondary School
- location
-
Suna North
(in Migori)
- year first funded
- 2004
- action
- Construction of dining Hall, Power installation, Buying Fuel saving jikos
- output
- dining Hall, Electricity, Fuel Saving Jikos
- implementation status
- On going
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Duya Dam
- location
-
Suna North
(in Migori)
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,090,000
- estimate
- Ksh 2,090,000
Kopanga Dam
- location
-
Suna West
(in Migori)
- year first funded
- 2004
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 2,013,200
- estimate
- Ksh 2,013,200
Bondo Nyabisawa Road
- location
-
Suna South
(in Migori)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Giribe Dam
- location
-
Suna West
(in Migori)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Water
- implementation status
- Old
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kakrao Ugari Road
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Kahezron Kikoma Oboke road
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2008
- action
- Opening &grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Kowino Ndonyo Road
- location
-
Suna South
(in Migori)
- year first funded
- 2005
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Abwao Secondary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Construction of Administ. Block
- output
- Administ. Block
- implementation status
- New
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Kadika Community Power Project
- location
-
Suna Central
(in Migori)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Nyarongi Secondary School
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Construction of Lab.& Domitry
- output
- Lab.& Domitry
- implementation status
- New
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
God Ngoche primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2004
- action
- Renovation of 12 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Komego Siling Alara road
- location
-
Suna East
(in Migori)
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Oruba secondary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2004
- action
- Construction of 6 Classrooms & Admin Block
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
St. Erin Raha secondary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Nyabisawa Girls secondary Water Project
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- New
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Godkwer Magacha Road
- location
-
Suna Lower
(in Migori)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Migori Secondary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Renovation of burned Dormitory and Construction of dining Hall
- output
- Dormitory and dining Hall
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Rayudhi primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Anjego Health Centre
- location
-
Suba East
(in Migori)
- year first funded
- 2003
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Luanda-Obembo-Nyambona
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of Accessibity
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Nyikendo Primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2005
- action
- Construction of 3 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Nyarongi Health Centre
- location
-
Suba East
(in Migori)
- year first funded
- 2004
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Osingo secondary School
- location
-
Suna East
(in Migori)
- year first funded
- 2004
- action
- Construction of Twin Laboratory
- output
- Twin Laboratory
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Moi Suba Girls secondary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2004
- action
- Construction of Kitchen, electricity & supply of fuel saving jikos
- output
- Kitchen, electricity, fuel saving jiko
- implementation status
- Complete
- total cost
- Ksh 1,070,000
- estimate
- Ksh 1,070,000
Kokendi primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ngege secondary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2004
- action
- Construction of 5 Classes & Latrine
- output
- Classrooms and Latrine
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nyangubo Primary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 700,000
Nyaduong Secondary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2008
- action
- Construction of Administ. Block
- output
- Administ. Block
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Legio Maria Water Project
- location
-
Suna Raha
(in Migori)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nyaduong Secondary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Abwao secondary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Sagero - Ndonyo Road
- location
-
Suna South
(in Migori)
- year first funded
- 2009
- action
- Opening & Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Oboke - Kogallo Road
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Sagegi secondary School
- location
-
Suna Upper
(in Migori)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Nyambeche primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Magongo Girirbe primary School
- location
-
Suba West
(in Migori)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Otacho Primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classes &Renovation of 8 classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Rabuor Taya primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2004
- action
- Construction of 3 classes & Admin Block
- output
- Classrooms/Admin Block
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Midoti Health Centre
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2004
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Magina secondary School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Construction of 3 classrooms
- output
- 3 classrooms
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Ochonge “A” Community water project
- location
-
Suna West
(in Migori)
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Osingo Polytechnic - Marienga –yadh ngima road
- location
-
Suna east
(in Migori)
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kisumu Ndogo Water Project
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Migori primary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2004
- action
- Renovation of 14 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Remo primary School
- location
-
Suna Upper
(in Migori)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kagare – Orua Ochiel Road
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Opening
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 757,813
- estimate
- Ksh 757,813
God Jope Dispensary
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2003
- action
- Construction of twin nurse house
- output
- Nurse house
- implementation status
- On going
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Kowino Bondo Road
- location
-
Suna South
(in Migori)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Magacha Primary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kopanga – Giribe Boya Road Opening and grading 2.5 Km
- location
-
Suna West
(in Migori)
- year first funded
- 2009
- action
- Opening & Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Midoti Centre – Oluti Kobel Road
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kowino Primary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Saro Health Centre
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2005
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Nyango secondary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2005
- action
- Renovation of 6 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Onyalo secondary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2004
- action
- Renovation of 8 Classes and power installation
- output
- Classrooms and Electricity
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Obembo Primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Wasio Secondary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2004
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Bishop Okinda secondary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kadika Girls Secondary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Construction of Twin Staff houses
- output
- Staff houses
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Bondo Secondary School
- location
-
Suna South
(in Migori)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Sagero Secondary School
- location
-
Suna South
(in Migori)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Sagero Ndonyo roar
- location
-
Suna South
(in Migori)
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Rangenya Bridge/Road Calvats
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Opening/Culverting
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Riamabombo Women Group
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ondong Dispensary
- location
-
Suna Central
(in Migori)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On going
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Mubachi Dam
- location
-
Suna West
(in Migori)
- year first funded
- 2005
- action
- Construction of Water
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 646,728
- estimate
- Ksh 646,728
Nyamongo Primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2005
- action
- Construction of 3 classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 640,000
- estimate
- Ksh 640,000
Kisindi Police Post
- location
-
Suna Upper
(in Migori)
- year first funded
- 2009
- action
- Construction of Police Post
- output
- Police Post
- implementation status
- new
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
St. Michael Nyarongi secondarySchools
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Plastering/Painig
- output
- Laboratory
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Pand Pieri Wuoth Ogik
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Opening
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kimadui - Koruong’o -Nyamome Road Opening and grading 2.3 Km
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2009
- action
- Opening/Grading
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Wi – Arot Primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2005
- action
- Construction of 3 Classes
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Lichota Kojwang’ Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nyamware Lochota Witharaga road
- location
-
Suna Central
(in Migori)
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Onyalo secondary
- location
-
Suna Central
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Pand pieri wouth ogik road
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Grading
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Wedugona kadika Girls obunga kondoro road
- location
-
Suna Central
(in Migori)
- year first funded
- 2008
- action
- Opening
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Wuoth Ogik Primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kowiti primary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Marabiko primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Masara secondary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nyasoko primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Ragana primary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kwa Secondary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2005
- action
- Construction of Office block
- output
- Office block
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nyasare Kagrado Bridge
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Lwala Giribe primary School
- location
-
Suna West
(in Migori)
- year first funded
- 2004
- action
- Renovation of 10 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Korwa primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2004
- action
- Construction of 2 Classes & Latrine
- output
- Classrooms/Latrine
- implementation status
- Complete
- total cost
- Ksh 520,000
- estimate
- Ksh 520,000
Abwao primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2005
- action
- Renovation of 10 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maliera primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classrooms/ Admin Block
- output
- Classrooms/Admin Block
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Masara primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2005
- action
- Renovation of 10 Classes and Construction 2 classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kioru primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Milimani primary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Oruba primary School
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Angang'a primary School
- location
-
Suna East
(in Migori)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyarombo D.O's Office
- location
-
Suna South
(in Migori)
- year first funded
- 2007
- action
- Construction of House
- output
- House
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
God Jope D.E.O's
- location
-
Suna Godjope
(in Migori)
- year first funded
- 2007
- action
- Construction of House
- output
- House
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Got kachola secondary
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2008
- action
- Construcvtion
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kitabaye secondary
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sagegi secondarySchool
- location
-
Suna Upper
(in Migori)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
St. Julians ugari mixed secondary School
- location
-
Suna Upper
(in Migori)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ramoya Maranatha Primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of 4 Classrooms
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kipingi B Bore Hole
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Wiga Raha Borehole
- location
-
Suna Raha
(in Migori)
- year first funded
- 2009
- action
- sinking bore hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyaduong secondary School
- location
-
Suna god Jope
(in Migori)
- year first funded
- 2009
- action
- Construction of Library Block
- output
- Library Block
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Lwanda Primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Arombe Health Centre
- location
-
Suna Lower
(in Migori)
- year first funded
- 2005
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Suna Rabuor Dispensary
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Masaria Dispensary
- location
-
Suna West
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
PinyOyie Nyamaharanga Dispensary
- location
-
Suna West
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kitabaye \Buembu Dispensary
- location
-
Suna Lower
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sagero Primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2005
- action
- 2 classes and Admin Block Constructed
- output
- Classes and Admin Block
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Eko primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2004
- action
- Construction of 2 Classes & 1 renovation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mancha primary School
- location
-
Suba West
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Boya primary School
- location
-
Suba West
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Ndonyo primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2005
- action
- Renovation of classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Vyalo primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- -
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Magina primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Midoti primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2004
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyamware Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Renovation of 10 classes, fencing, gate installation
- output
- Classrooms, fence, gate
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kanyadera Primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyamilu Primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kilimanjaro Primary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Machicha primary School
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ombembo primary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyambona primary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Raha primary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kosege primary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sangla primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kioru primary
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ogwedhi Health Centre
- location
-
Suna Upper
(in Migori)
- year first funded
- 2009
- action
- Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nyango Secondary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- Roofing, Pst/Paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
St. Joseph Ombo Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Renovation of 20 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kokach primary School
- location
-
Suna East
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 7
Malera Secondary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of Adminst. Block
- output
- Adminst. Block
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Bondo Nyironge Secondary School
- location
-
Suna South
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Bishop Okinda Secondary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
God Ngoche Secondary School
- location
-
Suna Upper
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Osingo primary School
- location
-
Suna East
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ugari primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kodila primary School
- location
-
Suna East
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mwache primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nyailing'a primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Magoto primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mubachi primary School
- location
-
Suba West
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kopanga Ribe primary School
- location
-
Suba West
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mapera primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Renovation of 10 classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kasinda Magoto Water Project
- location
-
Suna South
(in Migori)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Dam
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kakrao-Ugari-Rayudhi Road
- location
-
Suna North
(in Migori)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Migori Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Wasio Secondary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2009
- action
- Water supply
- output
- -
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Onyalo Secondary School
- location
-
Suna Centrral
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
God Jope primary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nyaduong primary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2006
- action
- Installation of Power
- output
- Electricity
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kitabaye primary School
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sibuoche primary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ogwedhi sigawa primary School
- location
-
Suna Upper
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sagegi primary Schooloo.
- location
-
Suna Upper
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Chamabare primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Migori Muslim primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Witharaga primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ngege primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Malera Secondary School
- location
-
Suba West
(in Migori)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Wadhlang'o Bridge
- location
-
Suna East
(in Migori)
- year first funded
- 2006
- action
- Bridge Repair
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Nyango primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Remo primary School
- location
-
Suna Upper
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ondong Dispensary
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Plastering
- output
- Health facility
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ochieng Orwa Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2005
- action
- Construction of 1 Class
- output
- Classroom
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kikoma primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kasembo primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyabisawa primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Magongo Ribe primary School
- location
-
Suba West
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Giribe primary School
- location
-
Suba West
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamome primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2005
- action
- 8 Classes renovated, fencing & Latrine done
- output
- Classes/Fence/Latrine
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bondo primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kakrao primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyarongi primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Rangenya primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tinga primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Warisya primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Anjego primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Wasio primary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ore primary School
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kikonge primary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kadika primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Onyalo primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Opasi primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kwa primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Got Kachacha Secondary School
- location
-
SunaCentral
(in Migori)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
God jope primary
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
kanyadera primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Suna South
- location
-
Suna South
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lichota Kajwang primary
- location
-
Suna Central
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lwanda primary
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mancha primary
- location
-
Suna West
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyabeche primary
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamongo primary
- location
-
Suna Centrral
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Wasio Primary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
St. Julians Ugari Secondary School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Wi Kwa Community School Project
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Thidhna Community School Project
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sindianya Community School Project
- location
-
Suna south
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kadika Primary School
- location
-
Suna Centrral
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kokendi Primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Mwache Primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Midoti Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ochieng Orwa Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mapera Secondary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kwa Secondary School
- location
-
suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Magongo Ribe Secondary School
- location
-
Suna West
(in Migori)
- year first funded
- 2009
- action
- Construction of Adminst. Block
- output
- Adminst. Block
- implementation status
- new
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sagero Secondary School
- location
-
Suna South
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyikendo Girls Secondary
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Korwa Abuya Bore Hole
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- sinking Medium well
- output
- Water
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Magacha Community Bore Hole
- location
-
Suna Raha
(in Migori)
- year first funded
- 2009
- action
- Sinking shallow well
- output
- Water
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Anga’nga Primary School
- location
-
suna East
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ang’anga Primary School Feeder Road
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Opening Feder Rd
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lela Community primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2003
- action
- 2 Classes Constructed
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Otacho Community Village Polytechnic
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 classrooms
- output
- 2 classrooms
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Giribe Health Centre
- location
-
Suna West
(in Migori)
- year first funded
- 2009
- action
- Construction of Nurse House
- output
- Nurse House
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Radienya Primary School Feeder Road
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Opening feedr Rd
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Nyarongi Health Centre
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Arrears & wiring
- output
- Health facility
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
OSINGO secondary School
- location
-
Suna East
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 243,000
- estimate
- Ksh 243,000
KAKRAO SECONDARY School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 243,000
- estimate
- Ksh 243,000
Raha secondary School
- location
-
Suna Raha
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 225,000
- estimate
- Ksh 225,000
Nyaduong Secondary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 221,500
- estimate
- Ksh 221,500
nyarongi secondary School
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 221,500
- estimate
- Ksh 221,500
Kikoma primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 221,500
- estimate
- Ksh 221,500
Nyasoko primary
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Raha primary
- location
-
Suna Raha
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Wi Arot primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Wuoth Ogik Primary School road
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyambeche Primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyamanga Giribe Community School
- location
-
Suna West
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St. Catherine Bonda Primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kotuga Community School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
God Jope Primary School
- location
-
suna god Jope
(in Migori)
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Marabiko Primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St. Joseph Ombo Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kioru Primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lwala Giribe Primary School
- location
-
Suna West
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngege Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 4 Clasrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyamanga Primary School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ogwedhi comm.animal market
- location
-
suna Upper
(in Migori)
- year first funded
- 2008
- action
- Buying anmal Mkt Land
- output
- Reduce Poverty
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kowiti-Comm.Borehole
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2008
- action
- Sinking Bore Hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
God jaluok-Comm.Borehole
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Sinking Bore Hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Malera Water project-maintinance
- location
-
suna West
(in Migori)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Water
- implementation status
- Old
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Arombe Water project-maintainance
- location
-
Suna West
(in Migori)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Water
- implementation status
- Old
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Wouth Ogik comm.water project
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Sinking Bore Hole
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyarongi Dispensary
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
God Kwer Dispensary
- location
-
Suna Raha
(in Migori)
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Suna Rabuor Dispensary
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Osingo community Dispensary
- location
-
Suna East
(in Migori)
- year first funded
- 2008
- action
- Construction of Health Facility
- output
- Health Facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Abwao primary feeder road
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kanyadera School feeder road
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Oruba Kilisia Water Project
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- Sinking shallow well
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngochone Police Post
- location
-
Suna South
(in Migori)
- year first funded
- 2009
- action
- Finishing of police post
- output
- Police Post
- implementation status
- new
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Maembe Tatu Water Project
- location
-
Suna Upper
(in Migori)
- year first funded
- 2009
- action
- Sinking shallow well
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Masaria Health Centre
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2009
- action
- Plastering/Roofing
- output
- Health facility
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Osingo Health Centre
- location
-
Suna East
(in Migori)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Heath Centre
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Radienya School
- location
-
Suna Central
(in Migori)
- year first funded
- 2007
- action
- Construction Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mapera Secondary
- location
-
Suna Central
(in Migori)
- year first funded
- 2007
- action
- Construction oClassrooms
- output
- Classrooms
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyasare Primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kamumbo FootPath
- location
-
Suna Central
(in Migori)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Eko primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kikonge primary
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Midoti primary School
- location
-
Suna Central
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyako primary
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyambona primary
- location
-
Suna Raha
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyamilu primary
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Nyangubo Primary
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
God Kwer Dispensary
- location
-
Suna Raha
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Giribe Dispensary
- location
-
Suna West
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Wi Arot primary Schoolfeeder road
- location
-
suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- Ditching/gravelling
- output
- Accessibity
- implementation status
- New
- total cost
- Ksh 156,000
- estimate
- Ksh 156,000
DEOs office
- location
-
Suna Central
(in Migori)
- year first funded
- 2008
- action
- Electrification
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nyamunda Community School Project
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Ogwedhi Dispensary
- location
-
Suna Upper
(in Migori)
- year first funded
- 2008
- action
- Electrification
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Wi Arot feeder road
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2008
- action
- Opening Feeder Rd
- output
- Accessibiiltiy
- implementation status
- New
- total cost
- Ksh 139,064
- estimate
- Ksh 139,064
Malera secondary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 132,900
- estimate
- Ksh 132,900
Oruba mixed secondary school
- location
-
suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 126,000
- estimate
- Ksh 126,000
Hera Community Tree Nursery
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Makutano Dispensary
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ogwedhi Dispensary
- location
-
Upper Suna
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ragana Dispensary
- location
-
Ragana Ward
(in Migori)
- year first funded
- 2007
- action
- Construction of Heath Centre
- output
- Heath Centre
- implementation status
- On going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Alara Primary School
- location
-
Suna East
(in Migori)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kadika Water Project
- location
-
Suna Central
(in Migori)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ragana Dispensary
- location
-
Suna Ragana
(in Migori)
- year first funded
- 2008
- action
- Fencing
- output
- Security
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Migori District Agric.Show
- location
-
Suna Centrral
(in Migori)
- year first funded
- 2008
- action
- Show facilitation
- output
- increase prod.
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Pundo Apuoche ADC Primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Wasio Primary School
- location
-
Suna God Jope
(in Migori)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyasoko Primary School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kitabaye Secondary School
- location
-
Suna Wasimbete
(in Migori)
- year first funded
- 2009
- action
- Plastering & paint.
- output
- 2 Classrooms
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
God Jajuok Water Project
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- purchase pump
- output
- water
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyambeba Community Tree Nursery
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Neema Community Tree Nurery
- location
-
suna East
(in Migori)
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Sindule Community Tree Nurser
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 80,271
- estimate
- Ksh 80,271
Wasa Community Tree Nursery
- location
-
Suna south
(in Migori)
- year first funded
- 2009
- action
- tree nursery
- output
- Afforastation
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Nyambeche primary School
- location
-
suna Lower
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
DEO's Office
- location
-
Suna Central
(in Migori)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Office block
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
NYARONGI PRIMARY School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 48,000
- estimate
- Ksh 48,000
Nyarongi primary School
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Ramoya Primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Pundo Apuoch primarySchool
- location
-
Suna North
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Nyamunda comm.Schoolproj.
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Wuoth ogik primary School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Giribe Lwala Primary
- location
-
Suna Lower
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
ST. CATHERINE WARISIA primary School
- location
-
suna North
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
NYAMOME PRIMARY School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
NYAMANGA GIRIBE COMM. School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
GIRIBE PRIMARY School
- location
-
suna west
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
SANGLA PRIMARY School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
NYABISA PRIMARY School
- location
-
Suna Nyabisawa
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
KORWA PRIMARY School
- location
-
Suna West
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
TINGNA PRIMARY School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
NYASARE PRIMARY School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
MALERA PRIMARY School
- location
-
Suna Lower
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
WI KWA COMMUNITY School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
THIDHNA COMMUNITY School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
ONYALO PRIMARY School
- location
-
Suna Central
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
KWA PRIMARY School
- location
-
Suna Rabuor
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
RAYUDHI PRIMARY School
- location
-
Suna North
(in Migori)
- year first funded
- 2009
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Lela primary School
- location
-
Suna South
(in Migori)
- year first funded
- 2008
- action
- Purchase Furnit.
- output
- Improve Learning
- implementation status
- New
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000