The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Bursary
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 26,199,582
- estimate
- Ksh 0
KELELWA BOREHOLE
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2004
- action
- Supply of electricity to the bore hole
- output
- Supply of electricity to the bore hole tov operationalize the borehole
- implementation status
- Power lines supplied to the bore hole.wiring to the powerhouse yet to be done
- total cost
- Ksh 9,630,892
- estimate
- Ksh 9,630,892
LOGIRI DAM
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2006
- action
- Costruction of a a major water dam
- output
- Three parts Water pan dams
- implementation status
- Project stalled due to ongoing legal suit
- total cost
- Ksh 7,200,000
- estimate
- Ksh 7,200,000
ADMINISTRATION
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 6,204,033
- estimate
- Ksh 0
CONSTITUENCY TRACTORS
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 6,000,000
- estimate
- Ksh 0
Emergency Funds
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 5,030,100
- estimate
- Ksh 0
NGEMSICHA DAM
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2007
- action
- Construction of a water pan to specifications of the Water Engineer, planting of grass and erection of a sign board
- output
- Complete Water Pan with sufficient water
- implementation status
- complete and in use
- total cost
- Ksh 2,900,000
- estimate
- Ksh 2,900,000
KOLOSWE DAM
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2007
- action
- Excavation ofa pan dam to provide clean water for animals and livestock
- output
- Complete Pan Dam
- implementation status
- The Pan Dam is complete and in use
- total cost
- Ksh 2,900,000
- estimate
- Ksh 2,900,000
CHEPNGERECHI DAM
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2007
- action
- Costruction of a water pan dam from excavation of top soil as per the Engineer's specifications
- output
- Water Dam with clean water for the residents
- implementation status
- Complete and in use
- total cost
- Ksh 2,900,000
- estimate
- Ksh 2,900,000
ASENWET DAM
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2007
- action
- Construction of a water Dam.
- output
- water Dam for human and cattle use
- implementation status
- complete and in use
- total cost
- Ksh 2,900,000
- estimate
- Ksh 2,900,000
KABARSUNYO DAM
- location
-
EMINING
(in Mogotio)
- year first funded
- 2007
- action
- Construction of a water Dam.
- output
- water Dam for human and cattle use
- implementation status
- complete but no water
- total cost
- Ksh 2,900,000
- estimate
- Ksh 2,900,000
ROSOGA SECONDARY
- location
-
ROSOGA
(in Mogotio)
- year first funded
- 2003
- action
- construction of 4 Classrooms,roofing of Classrooms blown by wind and purchase of desks
- output
- 4classrooms and desks
- implementation status
- 2classrooms complete,2classrooms require finishing(window,doors,wall and floor plastering) to be complete.Roofing of classrooms blown by wind complete and in use
- total cost
- Ksh 2,630,000
- estimate
- Ksh 0
SAGASAGIK SECONDARY
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2004
- action
- Construction of a new school(clssrooms,administration block,)
- output
- 4classrooms and An administration block housing staffrooms,Library and a computer room
- implementation status
- 2classes constructed and recquire finishing(plastering,doors,and windows) to be complete,Administration block construted to lintel level,Roofing materials are on site
- total cost
- Ksh 2,584,595
- estimate
- Ksh 1,200,000
SORE SECONDARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2005
- action
- construction of one Classroom
- output
- I classroom
- implementation status
- Yet to Commence
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
RECURRENT EXPENDITURE
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 2,439,566
- estimate
- Ksh 0
CHEPNGETUNY BOREHOLE
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2006
- action
- Drilling of a borehole to reach the water strata, purchase of pump and construction of pump house
- output
- Borehole and clean water
- implementation status
- Drillin was done, payments amounting to Ksh 1,249,000 made but no water was found. Funds amouinting to ksh 1,105,555 still available.
- total cost
- Ksh 2,354,555
- estimate
- Ksh 2,354,555
SIRWA SECONDARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2004
- action
- Construction of Administration block,dining hall and a toilet block,completion of three Classrooms
- output
- Administration block,dining hall and a toilet block,completion of three classrooms
- implementation status
- The 3classrooms,toilet block and administration block complete,Woden frame for the dining hall constructed.
- total cost
- Ksh 2,132,619
- estimate
- Ksh 0
KAPNOSGEI PRIMARY
- location
-
KAPNOSGEI
(in Mogotio)
- year first funded
- 2003
- action
- Construction of 2 Classrooms and an administration block
- output
- 2 classrooms and an administration block
- implementation status
- 2 classroom complete,1 classroom and administration block ongoing
- total cost
- Ksh 2,130,000
- estimate
- Ksh 1,630,000
SINENDE SECONDARY
- location
-
SINENDE
(in Mogotio)
- year first funded
- 2003
- action
- construction of 2 Classrooms and toilet block. Purchase of chairs, water tanks, 20 beds + Headteacher's quarter and fencing
- output
- 2classrooms,Purchase of :chairs,2skyplast water tanks,20bed,construction of a temporary Headteacher's quarter and fencing of the 20 acres school compound.
- implementation status
- 2classrooms complete,Purchase of :chairs,2skyplast @ 6000ltrs water tanks,20bed,construction of a temporary Headteacher's quarter and fencing of the 20 acres school compound.
- total cost
- Ksh 2,060,000
- estimate
- Ksh 950,000
TRAINING, MONITORING AND EVALUATION
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 2,006,551
- estimate
- Ksh 0
CONSTITUENCY OFFICE
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
CHOMIEK PRIMARY
- location
-
OLDEBES
(in Mogotio)
- year first funded
- 2004
- action
- Construction of two permanent Classrooms to replace the mad walled ones.
- output
- Two permanent clasrooms
- implementation status
- Two classrooms constructed to lintel level.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 4,000,000
REUBEN CHERUIYOT secondary
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2005
- action
- Construction of 4 Classrooms and a science lab
- output
- 4 classrooms and a science lab
- implementation status
- One classroom complete, another class needs floor plastering ,wall finishing, door fixing fixing, two other classes needs window and door fixing,floor and wall finishing.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 4,012,918
CHEMASUSU WATER PROJECT
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2008
- action
- Cofunded water project that entails water tapping, drainage to Mogotio Constituency for distribution and construction of storage tanks
- output
- Piped water
- implementation status
- New and yet to commence
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,000,000
CHEBEREN Secondary School
- location
-
CHEBEREN
(in Mogotio)
- year first funded
- 2003
- action
- Purchase of text books, Construction of 2 Classrooms, administration block, one staff room
- output
- 2 Classrooms, 4 rooms administration block, one staffroom
- implementation status
- Complete and in use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,600,000
NGENDALEL PRIMARY
- location
-
OLKOKWE
(in Mogotio)
- year first funded
- 2003
- action
- construction of 2 Classrooms and an administration block
- output
- 2classrooms and administration block
- implementation status
- 2classes constructed and recquires painting to be complete,Administration construted and recquires plastering,fixing of doors and windows
- total cost
- Ksh 1,812,226
- estimate
- Ksh 1,787,416
KIRIBOT PRIMARY
- location
-
KABUSWO
(in Mogotio)
- year first funded
- 2005
- action
- Construction of three permanent Classrooms from foundatuion
- output
- three classrooms
- implementation status
- One complete and in use, the other needs finishing works-plastering and two window. The third class to commence with funds from FY 2007/08 that has been disbursed to the PMC
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
MUGURIN secondary School
- location
-
SIMOTWE
(in Mogotio)
- year first funded
- 2005
- action
- Building of Classrooms and a toliet block
- output
- Four classrooms and a toilet block
- implementation status
- Two classrooms and the toilet block complete and in use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 6,000,000
LOMANIRA PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2003
- action
- constructin of 6 Classrooms, and a water tank
- output
- Six classrooms and a water tank
- implementation status
- 3classrooms complete,3 other classes needs finishing,windows and doors
- total cost
- Ksh 1,760,000
- estimate
- Ksh 1,649,200
KABURGEI PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2004
- action
- Construction of 2 Classrooms, boys toilet block and finishing 2 Classrooms (from Fixing the lintel)
- output
- 4classrooms and 6door boys toilet block
- implementation status
- 3 classrooms complete and in use,1 new classroom constructed to lintel level
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
OLDEBES DISPENSARY
- location
-
OLDEBES
(in Mogotio)
- year first funded
- 2004
- action
- Construction of a 8 room dispensary wing and a 6 door toilet
- output
- An Eight roomed dispensary wing
- implementation status
- Pending works include painting, plastering, fixing windows and doors and other finishing works
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,500,000
KAPCHELUGUNY PRIMARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2004
- action
- Construction of administration block 3 Classrooms and astaff room
- output
- An administration block 3classrooms and astaff room
- implementation status
- 1class and office complete,administration block and 1 classroom constructed to the lintel level.Roofing done to a class funded by PTA
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,900,000
KAMAR DISPENSARY
- location
-
KAMAR
(in Mogotio)
- year first funded
- 2004
- action
- Construction of 8 rooms dispensary consisting of a lab, doctors rooms and proposed matenity section
- output
- Completed Dispensary in line with Government standard requirments for dispensaries
- implementation status
- Complete and in not use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,087,000
KABUSWO PRIMARY
- location
-
KABUSWO
(in Mogotio)
- year first funded
- 2004
- action
- Construction of 14 units @8 beds per unit girls dormitory
- output
- 14 units @8 beds per unit girls dormitory
- implementation status
- The domitory has been constructed .The partitioning of the units, plastering and painting not done.
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
ENVIRONMENT
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,365,570
- estimate
- Ksh 0
KAPKEIN PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2003
- action
- completion of 4 Classrooms and construction of 2 new Classrooms
- output
- 6 classes
- implementation status
- 4classes complete,2require finishing(plastering),purchased furniture
- total cost
- Ksh 1,210,000
- estimate
- Ksh 1,000,000
NGUBERETI DAY SECONDARY
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2006
- action
- Construction five Classrooms and two staffrooms, kitchen and store
- output
- Five classrooms and two staffrooms, kitchen and store
- implementation status
- Partial renovations done and the project is ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
NGENDALEL DISPENSARY
- location
-
NGENDALEL
(in Mogotio)
- year first funded
- 2005
- action
- Construction of 4 rooms
- output
- 4 rooms
- implementation status
- the 4 rooms have been constructed and require finishing(wall,floor and veranda plastering, and windows and doors to be complete.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,972,732
KOIBARAK SECONDARY
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2004
- action
- construction of 2 Classrooms and an administration block
- output
- 2classrooms and administration block
- implementation status
- 2classrooms and 8roomed administration block constructed to lintel level
- total cost
- Ksh 1,160,000
- estimate
- Ksh 1,248,810
EMSOS PRIMARY
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2003
- action
- Construction of four Classrooms
- output
- 4 classrooms
- implementation status
- Construction of two classrooms upto 7th courses/Lintel level and requires finishing. Two other classrooms roofed but no plastering, doors and windows not fixed.
- total cost
- Ksh 1,130,000
- estimate
- Ksh 1,000,000
MUGUYUNI PRIMARY
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2003
- action
- Construction of newClassrooms and an administration block from lintel level
- output
- classrooms to replace the wooden ones and a 3 roomed administration block
- implementation status
- 3classrooms and administration block constructed and require wall and floor plastering and affixng of window anes.
- total cost
- Ksh 1,130,000
- estimate
- Ksh 906,510
BENONGOI PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2005
- action
- Purchase land and build new iron sheet walled Classrooms and toilets and fencing.
- output
- land and new iron sheet walled classrooms and toilets and fencing.
- implementation status
- Land bought-3acres,classrooms and toilet block constructed as well as fencing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
WASEGES DISPENSARY
- location
-
SINENDE
(in Mogotio)
- year first funded
- 2004
- action
- Construction of staff houses
- output
- Two Staff houses
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,800,000
LOMBALA PRIMARY
- location
-
ROSOGA
(in Mogotio)
- year first funded
- 2004
- action
- construction of 5 Classrooms
- output
- 5classrooms
- implementation status
- 2classroms constructed and roofed and require finishing,(wall and floor plastering,windows to b e fixed for the 5classrooms andfixing of doors to 2classrooms)
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
OLBOR DAM
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2006
- action
- Excavation of a water pan to supply water in the area
- output
- Complete Water Pan with sufficient water
- implementation status
- Partially complete and in use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,200,000
LENGNE DAM
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2006
- action
- Excavation of the pan dam to provide water to the residents
- output
- 25, 500 cubic meters functional dam
- implementation status
- Completed work is 8,000 cubic meters
- total cost
- Ksh 1,100,000
- estimate
- Ksh 4,677,634
KAPKARARAM ECD
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2005
- action
- Purchases of 5 acres land, construction of one Classroom, toilet and administration block
- output
- Classroom, toilet and administration block
- implementation status
- Ongoing-Construction upto lintel done. Requires completions works-roofing, plastering, fitting of doors and windows, walls and other finishing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,350,000
RERESIE DAM
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2006
- action
- Construction of a water Dam.
- output
- water Dam for human and cattle use
- implementation status
- Complete but not as it has no water(dries during dry spell)
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
MAJI MOTO HEALTH CENT
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2004
- action
- Construction of a seven roomed maternity wing in the dispensary
- output
- 7 rooms maternity wing
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
OTERIT PRIMARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2004
- action
- Construction of administration block and 3 Classrooms
- output
- An administration block and 3 classrooms
- implementation status
- Administration blok and 1 classroom complete,Two classrooms needs finishing.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
OINOPSOS PRIMARY
- location
-
CHEBEREN
(in Mogotio)
- year first funded
- 2005
- action
- Construction of three Classrooms
- output
- 3 Classrooms
- implementation status
- Ongoing work at lintel level
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
SPORTS
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
KABOGOR PRIMARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2003
- action
- Completion of two classes and Construction of two other Classrooms
- output
- four complete classrooms
- implementation status
- Two classes completed and construction for two new clases has been done upto lintel level
- total cost
- Ksh 1,035,000
- estimate
- Ksh 750,000
KAPKUNDUL PRIMARY
- location
-
SIMOTWE
(in Mogotio)
- year first funded
- 2005
- action
- construction of two Classrooms
- output
- Two permanent classrooms
- implementation status
- Two classrooms complete and in use
- total cost
- Ksh 1,020,000
- estimate
- Ksh 3,000,000
ST MARYS PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2008
- action
- Construction of one Classroom to meet the demand due to an influx of pupils into the school
- output
- one classroom
- implementation status
- New and yet to commence
- total cost
- Ksh 1,000,000
- estimate
- Ksh 952,910
OTERIT BOREHOLE PROJECT
- location
-
EMINING
(in Mogotio)
- year first funded
- 2009
- action
- construction of a storage tank to distribute water from newly drilled borehole in the area.
- output
- water tank for human and cattle use
- implementation status
- construction in progress
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
KOISARAM PRIMARY
- location
-
KISANANA
(in Mogotio)
- year first funded
- 2004
- action
- Construction of 6 semiparmanent Classrooms
- output
- 6 classrooms
- implementation status
- Cementing of floors, fixing windows and doors nots done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 6,800,000
MAJIMOTO SECONDARY
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2007
- action
- Construction of a science laboratory
- output
- Complete Science lab
- implementation status
- Ongoing funds have been disbursed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,590,190
RADAD SECONDARY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2007
- action
- Construction of 2 class for a new secondary and an office
- output
- Classroomsa nd office
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,759,046
KELELWA PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2005
- action
- Construction of three Classrooms and two small offices
- output
- Three classrooms and two offices
- implementation status
- Two and offices classrooms complete and in use. One classrooms requires fixing of windows and plastering
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
KURES PRIMARY
- location
-
ROSOGA
(in Mogotio)
- year first funded
- 2005
- action
- Construction of Administration block and Toilet Block,and Gate
- output
- Administration block and Toilet Block,and Gate
- implementation status
- Toilet Block and Gate complete,Administration block needs wall and floor finishing,windows and doors.
- total cost
- Ksh 900,000
- estimate
- Ksh 0
OLKOKWE DISPENSARY
- location
-
OLKOKWE
(in Mogotio)
- year first funded
- 2004
- action
- construction of 4 rooms
- output
- Four rooms Dispensary
- implementation status
- The 4 rooms have been constructed and requires wall and floor finishing(plastering),fixing of doors and windows ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 3,600,000
CHEMORGONG PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2006
- action
- Purchase of land,construction of Classrooms, store, 2 door toilet block,and school compound fencing
- output
- 2acres land,2classrooms,toilet block ,store and school compoun fencing
- implementation status
- 2acres of land bought,2 iron sheet walled classrooms constructed(earth floor) and a wooden store: toilet block in progress
- total cost
- Ksh 900,000
- estimate
- Ksh 0
TINGTINYON ECD/PRIMARY
- location
-
KAMAR
(in Mogotio)
- year first funded
- 2006
- action
- Completion of a semiparmaent Classroom and constuction of toilet
- output
- Classroom and Toilet
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 550,000
MUGURIN DISPENSARY
- location
-
SIMOTWE
(in Mogotio)
- year first funded
- 2003
- action
- Construction of a maternity wing and staff quarters.
- output
- Complete maternity wing and staff quarters
- implementation status
- The maternity is complete and in use whereas the staff quarters needs a further 1.6M for completion and fencing
- total cost
- Ksh 860,000
- estimate
- Ksh 0
NDARAMIANDE DAM
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2004
- action
- Construction of a water Dam to provide water to the people and livestock
- output
- Water Pan
- implementation status
- Stalled due to conflict between the community and the contractor who did the excavations for the dam
- total cost
- Ksh 843,786
- estimate
- Ksh 843,786
MUTARAN DAM
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2005
- action
- Excavation of the pan dam to specified levels and as per the Engineer's specifications
- output
- Completed pan dam and clean water
- implementation status
- Complete but no water
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
KAMONONG DAM
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2005
- action
- Construction of a water Dam.
- output
- water Dam for human and cattle use
- implementation status
- complete and in use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
KIPSOGON DISPENSARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2004
- action
- Costruction of a dispensary
- output
- Two wings @ 5 rooms each
- implementation status
- One wing complete, and foundation for the second wing has been started
- total cost
- Ksh 800,000
- estimate
- Ksh 1,398,609
LOGIRI ECD/PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2006
- action
- constructin of 2 Classrooms, 2rooms staff rooms
- output
- 2 classrooms, 2 rooms staff rooms
- implementation status
- Windows,doors,and plastering works are remaining
- total cost
- Ksh 800,000
- estimate
- Ksh 2,700,000
LELEN PRIMARY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2005
- action
- Construction of two permanent Classrooms
- output
- two classrooms
- implementation status
- complete
- total cost
- Ksh 800,000
- estimate
- Ksh 7,893,596
NGENTUI PRIMARY
- location
-
CHEBEREN
(in Mogotio)
- year first funded
- 2006
- action
- Roofing of four classes and store/office
- output
- four classes and an office
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 545,300
KABOGOR BRIDGE (TABACH COMMUNITY BRIDGE)
- location
-
EMINING
(in Mogotio)
- year first funded
- 2006
- action
- Construction of bridge linking Cheberen and Emining Locations
- output
- Completed Bridge
- implementation status
- Not yet Commenced as funding was not sufficient for any meaningful structure.
- total cost
- Ksh 800,000
- estimate
- Ksh 10,000,000
SORTI PRIMARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2004
- action
- Construction od 2 Classrooms and administration block
- output
- 2 classrooms and administration block
- implementation status
- Ongoing plastering and fitiing of doors and windows
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
KIMNGOROM DISPENSARY
- location
-
KIMNGOROM
(in Mogotio)
- year first funded
- 2006
- action
- Construction of an 8 rooms dispensary in line with the Ministry of health specifications consisting of a lab, doctors office, store and other offices
- output
- Fully oeprational dispensary
- implementation status
- Construction upto lintel done. Requires completions works-roofing, plastering, fitting of doors and windows, walls finishing, ceiling and equipment
- total cost
- Ksh 800,000
- estimate
- Ksh 2,000,000
CHEMUTUNG PRIMARY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2005
- action
- Construction of two Classrooms and administration block
- output
- Two classrooms and administration block
- implementation status
- two permanent classrooms constructed
- total cost
- Ksh 800,000
- estimate
- Ksh 754,649
KAPLELWO PRIMARY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2004
- action
- Construction of two permanent Classrooms
- output
- Two classrooms
- implementation status
- complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,570,070
OLDEBES PRIMARY
- location
-
OLDEBES
(in Mogotio)
- year first funded
- 2003
- action
- Repair works to 5 Classrooms(wall and floor finishing,fixing of windows and doors) and construction of a veranda.
- output
- Repaired classrooms
- implementation status
- 3 classroom fully repaired
- total cost
- Ksh 753,000
- estimate
- Ksh 2,700,000
MOLOS PRIMARY
- location
-
KAMAR
(in Mogotio)
- year first funded
- 2003
- action
- construction of Eight Classrooms and administration block
- output
- Administration block and eight classrooms completed.
- implementation status
- Administration block and 4 classrooms completed and in use.Two classrooms started and the other two not started
- total cost
- Ksh 730,000
- estimate
- Ksh 1,930,000
CHEMOINOI DISPENSARY
- location
-
KIMOSE
(in Mogotio)
- year first funded
- 2003
- action
- Construction of 4 rooms dispensary and 3 door toilet
- output
- Four rooms Dispensary and three door toilet
- implementation status
- Complete and in use
- total cost
- Ksh 715,000
- estimate
- Ksh 873,000
SORE PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 700,000
- estimate
- Ksh 0
ROSOGA PRIMARY
- location
-
ROSOGA
(in Mogotio)
- year first funded
- 2005
- action
- Constructin of an administration block
- output
- Administration block
- implementation status
- 3Roomed administration block constructed and in use and require plastering to be complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
KIPKITUR DISPENSARY
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2006
- action
- construction of a new dispensary
- output
- Four room wing, Toilets and Water Tank
- implementation status
- construction of the 4rooms to lintel level, construction from lintel level to roofing by LATF.Requires plastering of walls and floors and construction of toilets.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,352,574
KAPLAIMOI PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 700,000
- estimate
- Ksh 0
EMSOS DISPENSARY
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2006
- action
- Construction of 3 rooms dispensary
- output
- 3 roomed dispensary
- implementation status
- Construction done upto lintel level
- total cost
- Ksh 700,000
- estimate
- Ksh 0
CHEBUIYWO CATTLE DIP
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2007
- action
- Construction of a new Cattle Dip
- output
- Fully completed and operational Cattle Dip
- implementation status
- Ongoing and needs further funding for completion
- total cost
- Ksh 665,072
- estimate
- Ksh 750,270
LEGETETWET PRIMARY
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2003
- action
- Renovation of two Classrooms and construction of two new ones
- output
- Four complete classrooms
- implementation status
- Classrooms incomplete
- total cost
- Ksh 660,000
- estimate
- Ksh 1,360,000
RADAD PRIMARY School
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2003
- action
- Finishing of 4 Classrooms,library and administration block(plastering wall and floor),construction and roofing of veranda.
- output
- 4classrooms,library and administration block and veranda.
- implementation status
- Complete and in use
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
SORE DISPENSARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2004
- action
- Construction of 2units 1bedroom staff quarters and staff quarters'toilet block.
- output
- 2units 1bedroom staff quarters and staff quarters'toilet block.
- implementation status
- Staff quarters complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
KISANANA WATER PROJECT
- location
-
KISANANA
(in Mogotio)
- year first funded
- 2008
- action
- Purchase of the Borehole pumpset and set up
- output
- Functional Borehole that provides clean water to people and livestock
- implementation status
- Complete and in use
- total cost
- Ksh 650,000
- estimate
- Ksh 750,000
KABARBESI PRIMARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2003
- action
- Completion of two Classrooms from lintel level.
- output
- Two classrooms to be completed and put into use.
- implementation status
- The two classes complete and in use
- total cost
- Ksh 615,000
- estimate
- Ksh 800,000
CHEBIREBEI Primary School
- location
-
SINENDE
(in Mogotio)
- year first funded
- 2005
- action
- Construction of seven semipermanent Classrooms inclusive of of staff houses
- output
- seven semipermanent rooms
- implementation status
- complete and in use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
NGUBERETI WATER PROJECT
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2008
- action
- Construction of rising and distribution mains for piping water to the community, storage tanks and communal distribution points
- output
- Clean piped water
- implementation status
- New and yet to commence
- total cost
- Ksh 600,000
- estimate
- Ksh 7,234,810
KIPTOIM PRIMARY
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2005
- action
- Costruction of an administration block,purchase of administration block furniture and wiring the entire school
- output
- Administration block,administration block furniture and wiring the school
- implementation status
- Administration block requires ceiling to be complete,administration block furniture bought and wiring of the school done
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
KIPKIGEI PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2004
- action
- Construction of 8 iron sheet walled Classrooms and 2 staff
- output
- 8classrooms and 2 staffrooms
- implementation status
- 4classrooms,and 2 staffrooms completer,4classrooms require floor slab and veranda to be complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
EMINING DAY AND BOARDING PRIMARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2008
- action
- Construction of three Classrooms
- output
- three classrooms
- implementation status
- New and yet to commence
- total cost
- Ksh 600,000
- estimate
- Ksh 1,378,625
OTERIT KISIMA DAM
- location
-
EMINING
(in Mogotio)
- year first funded
- 2006
- action
- Construction of a water Dam
- output
- Water Dam for human and cattle use
- implementation status
- complete but poor workmanship evident
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
KAPKEIN DISPENSARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2005
- action
- Construction of six rooms
- output
- Six rooms
- implementation status
- Six rooms constructed to lintel level
- total cost
- Ksh 600,000
- estimate
- Ksh 0
WASEGES POLICE POST
- location
-
SINENDE
(in Mogotio)
- year first funded
- 2009
- action
- construction of a police station to curb security risks in the area.
- output
- police post
- implementation status
- Yet to Commence
- total cost
- Ksh 600,000
- estimate
- Ksh 0
NYALILBUCH PRIMARY
- location
-
SINENDE
(in Mogotio)
- year first funded
- 2009
- action
- Construction of seven semipermanent Classrooms inclusive of of staff houses
- output
- seven semipermanent rooms
- implementation status
- Yet to Commence
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
NDABIBI WATER PROJECT
- location
-
KISANANA
(in Mogotio)
- year first funded
- 2003
- action
- Construction of tank and piping of water to the tank
- output
- Pipes, Tank and clean water
- implementation status
- Pipes laid upto the tank, requires mot
- total cost
- Ksh 553,000
- estimate
- Ksh 1,053,000
KWIRINDOCHE ECD
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2006
- action
- Construction of semipermanent Classroom
- output
- one classroom
- implementation status
- Complete
- total cost
- Ksh 550,431
- estimate
- Ksh 1,061,960
KIPSOGON PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2009
- action
- Construction of three Classrooms and two small offices
- output
- Three classrooms and two offices
- implementation status
- Yet to Commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
SIRWA DISPENSARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2008
- action
- Completion of the dispensary, plastering and fixing doors and windows
- output
- Fully functional dispensary
- implementation status
- coplete and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
NGUSERO PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2008
- action
- Construction of a permanent Classroom
- output
- Classroom
- implementation status
- coplete classroom
- total cost
- Ksh 500,000
- estimate
- Ksh 1,400,000
MOGOTIO PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2006
- action
- Building of a toilet Block and a Classroom
- output
- 10 Door toilet block and 1 classroom
- implementation status
- Toilet block needs doors and painting for it to be complete,class not started
- total cost
- Ksh 500,000
- estimate
- Ksh 4,160,000
SAGASAGIK PRIMARY
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2008
- action
- Construction of an extra permanent Classroom
- output
- one classroom
- implementation status
- One complete and in use, the other needs finishing works-plastering and two window. The third class to commence with funds from FY 2007/08 that has been disbursed to the PMC
- total cost
- Ksh 500,000
- estimate
- Ksh 1,900,000
LOLBUGO ECD
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2008
- action
- Construction of three permanent Classrooms
- output
- Construction of three permanent classrooms
- implementation status
- construction in progress
- total cost
- Ksh 500,000
- estimate
- Ksh 1,600,000
KIPTOIM SECONDARY
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2009
- action
- Construction of three permanent Classrooms
- output
- Construction of three permanent classrooms
- implementation status
- Yet to Commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
LOIBUGO CATTLE DIP
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2005
- action
- Construction of a cattle dip
- output
- cattle dip
- implementation status
- construction works done and in use
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
KAPLELWO SECONDARY
- location
-
KOIBOS SOI
(in Mogotio)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
KIPTEWERET DAM
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2009
- action
- Excavation of a water pan to supply water in the area
- output
- coplete water pan and in use
- implementation status
- Yet to Commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
NAMBAWAN WATER PRO.
- location
-
KISANANA
(in Mogotio)
- year first funded
- 2005
- action
- Piping of water from borehole to the storage tank done using metal pipes
- output
- Purchase and laying of pipes to tank and distribution
- implementation status
- Pipes laid to the storage tank point. Requires more return pipes to drain water closer to the people
- total cost
- Ksh 500,000
- estimate
- Ksh 2,500,000
KISANANA PRIMARY
- location
-
KISANANA
(in Mogotio)
- year first funded
- 2009
- action
- Construction of 2 parmanent Classrooms
- output
- 2 classrooms
- implementation status
- ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
KISANANA SECONDARY
- location
-
KISANANA
(in Mogotio)
- year first funded
- 2008
- action
- Completion of Dining Hall
- output
- Dining Hall
- implementation status
- Yet to Commence
- total cost
- Ksh 500,000
- estimate
- Ksh 2,725,000
KIMOSE DISPENSARY
- location
-
KIMOSE
(in Mogotio)
- year first funded
- 2009
- action
- Construction of 4 rooms dispensary and 3 door toilet
- output
- Four rooms Dispensary and three door toilet
- implementation status
- Yet to Commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
KAMAR PRIMARY
- location
-
KAMAR
(in Mogotio)
- year first funded
- 2009
- action
- Construction of a Classroom
- output
- 1classroom
- implementation status
- Yet to Commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
MATEBEI PRIMARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2009
- action
- Construction od 2 Classrooms and administration block
- output
- 2 classrooms and administration block
- implementation status
- New and yet to commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
NATO PRIMARY School
- location
-
EMINING
(in Mogotio)
- year first funded
- 2005
- action
- Construction of a Classroom
- output
- 1classroom
- implementation status
- 1classroom consructed to lintel level
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
EMINING SECONDARY
- location
-
EMINING
(in Mogotio)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- Complete classroom
- implementation status
- New and yet to commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
EMINING HEALTH CENTER
- location
-
EMINING
(in Mogotio)
- year first funded
- 2008
- action
- Construction of maternity wing
- output
- three room meternity wink
- implementation status
- three room meternal child heath care constructed to roofing,blustering done.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,230,325
KAPLOGOS PRIMARY
- location
-
CHEBEREN
(in Mogotio)
- year first funded
- 2009
- action
- construction of new Classroom
- output
- Complete classroom
- implementation status
- New and yet to commence
- total cost
- Ksh 500,000
- estimate
- Ksh 0
KAPNGEMUI PRIMARY
- location
-
CHEBEREN
(in Mogotio)
- year first funded
- 2006
- action
- Construction on 1 Classroom upto roofing, Funding for FY07/08 used to build a new Classroom
- output
- Two classrooms
- implementation status
- One done upto roofing with no plastering done, windows and doors not fixed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
TIAN DISPENSARY
- location
-
CHEBEREN
(in Mogotio)
- year first funded
- 2006
- action
- Construction of six rooms dispensary
- output
- Complete six roomed dispensary
- implementation status
- Work ongoing currently at the lintel level
- total cost
- Ksh 486,000
- estimate
- Ksh 0
NOIWET DAY AND BOARDING PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2006
- action
- Emergency roofing of a blown off boys dormitory roof
- output
- Complete Dormitory
- implementation status
- Complete and in use
- total cost
- Ksh 485,000
- estimate
- Ksh 300,000
MUGURIN PRIMARY
- location
-
SIMOTWE
(in Mogotio)
- year first funded
- 2005
- action
- construction of a Classroom
- output
- One classroom
- implementation status
- Foundation constructed with four course laid down
- total cost
- Ksh 450,000
- estimate
- Ksh 400,000
NGUBERETI HEALTH CENTER
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2004
- action
- Purchase of equipment for the health center
- output
- Hospital Equipment supplied and a functional health center
- implementation status
- Equipment worth 250,000 purchased and in use. More equipment to be procured with Ksh 200,000 recently disbursed
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
NG’OSWET- CHEMOGOCH
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2005
- action
- Construction of a bridge and laying of two calverts
- output
- A bridge
- implementation status
- Complete and in use
- total cost
- Ksh 425,800
- estimate
- Ksh 425,800
ROSOGA DISPENSARY
- location
-
ROSOGA
(in Mogotio)
- year first funded
- 2009
- action
- construction of a new dispensary
- output
- new dispensary
- implementation status
- Yet to Commence
- total cost
- Ksh 400,000
- estimate
- Ksh 0
OLKOKWE PRIMARY
- location
-
OLKOKWE
(in Mogotio)
- year first funded
- 2006
- action
- Construction of two Classrooms and administration block
- output
- Two classrooms and administration block
- implementation status
- Construction done upto roofing. Finishing works and fixing of doors and windows yet to be done
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
KIBOTANY PRIMARY
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2classrooms
- implementation status
- 1classroom constructed and require window pane fixing,foundation of second classroom in progress
- total cost
- Ksh 400,000
- estimate
- Ksh 613,100
KOKWEN MOI PRIMARY
- location
-
SIMOTWE
(in Mogotio)
- year first funded
- 2009
- action
- construction of a Classroom
- output
- One classroom
- implementation status
- Constructon in progress
- total cost
- Ksh 400,000
- estimate
- Ksh 0
ST. MAXIMILIAN KOLBES PRIMARY
- location
-
SIMOTWE
(in Mogotio)
- year first funded
- 2004
- action
- Construction of a Classroom
- output
- One complete permanent classroom
- implementation status
- The classroom is complete though it needed good wall plastering and proper painting.
- total cost
- Ksh 400,000
- estimate
- Ksh 1,500,000
CHEMOGOCH PRIMARY
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2006
- action
- Renovation of Eight Classrooms and veranda(Windows,door,floor,fascia board,and Veranda)
- output
- Eight Completed Classrooms
- implementation status
- Partial renovation has already been done
- total cost
- Ksh 400,000
- estimate
- Ksh 4,200,000
KAPSOK PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2005
- action
- Iron sheet Walling of 7 Classrooms,floor cementing of 10 Classrooms and purchase of land
- output
- completion of 10 classrooms
- implementation status
- The ten classes completed,
- total cost
- Ksh 390,000
- estimate
- Ksh 0
TARABUNYAN CATTL. DIP
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2006
- action
- Renovation of the cattle dip,building and furnishing a store and construction of a water tank
- output
- The dip to be put in use and to have a water tank and a store
- implementation status
- Renovation,buiding and furnishing the store done,tank has been halfway constucted
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
NGENDALEL DAM
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2003
- action
- Desilting and an existing water dam
- output
- To bring the water dam back to gainfu community use.
- implementation status
- Complete and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
RADAD WATER SUPPLY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2005
- action
- Construction of a 50 M3 water tank
- output
- water tank with a capacity of 50M3
- implementation status
- construction works done,roofing in progress
- total cost
- Ksh 300,000
- estimate
- Ksh 0
LETOI ECD
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2007
- action
- Construction of an ECD classtrooms
- output
- two classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 469,921
CHEBARAN CATTLE DIP
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2007
- action
- Renovation of cattle dip and construction of store
- output
- Fully functional Cattle dip
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
KISANANA PRIMARY
- location
-
KISANANA
(in Mogotio)
- year first funded
- 2006
- action
- construction of 2 Classrooms
- output
- 2 classrooms
- implementation status
- 2classrooms constructed nine courses,lintel to be constructed, also pending are roofing, fininshing works, plastetring, fixtures and futtings
- total cost
- Ksh 300,000
- estimate
- Ksh 528,380
KAPNOSGEI DAM
- location
-
KAPNOSGEI
(in Mogotio)
- year first funded
- 2004
- action
- Desilting and expansion of an existing water dam
- output
- Expanded water Dam for human and cattle use
- implementation status
- Completed and in use
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
KIBULWE ECD
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2009
- action
- construction of Classroom
- output
- One complete permanent classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
KIPKITUR PRIMARY
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2005
- action
- Construction of a Classroom
- output
- 1classroom
- implementation status
- 1classroom constructed and require wall plastering ad fixing of window glasses(already bought)
- total cost
- Ksh 300,000
- estimate
- Ksh 1,556,120
NGEMBA MOI ECD-CHEBEREN
- location
-
CHEBEREN
(in Mogotio)
- year first funded
- 2007
- action
- Construction of an ECD classtroom
- output
- Complete classroom
- implementation status
- New and yet to commence
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
SIRWA PRIMARY
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2009
- action
- construction of 2 Classrooms
- output
- 2classrooms
- implementation status
- 2classrooms costructed and require finising(plaster works),window and doors
- total cost
- Ksh 250,000
- estimate
- Ksh 0
CHOMIEK WATER PROJECT
- location
-
OLDEBES
(in Mogotio)
- year first funded
- 2004
- action
- Purchase of pipes, Kentank 3,200 Litres, and Ballast
- output
- Piped water and complete storage tank
- implementation status
- Project delayed but in now almost complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
ASENWET ECD KAMAR
- location
-
KAMAR
(in Mogotio)
- year first funded
- 2007
- action
- Construction of one Classroom and a door Toilet
- output
- Classroom and Toilet
- implementation status
- Walling for Classroom not complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
KOBOBER ECD
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- One Classroom
- implementation status
- Yet to Commence
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
CHEPNYORGIN PRIMARY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2005
- action
- Renovation of 6 Classrooms and 2 staff
- output
- 6 classrooms and 2staffrooms.
- implementation status
- The 2 staffrooms are complete,renovation on four classrooms going on.
- total cost
- Ksh 200,000
- estimate
- Ksh 428,373
MOLOK PRIMARY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2005
- action
- Plastering of Administration block and office
- output
- Office
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,643,600
CHEPNGETUNY DIP
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2005
- action
- Renovation of cattle dip
- output
- cattle dip to be put to use
- implementation status
- Partial renovation and in use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
SOGEE WATER PROJECT
- location
-
SINENDE
(in Mogotio)
- year first funded
- 2008
- action
- Feasibility study to ascertain the potential of Sogee water project
- output
- Bills of quantity, design and technical report on the project
- implementation status
- New and yet to commence
- total cost
- Ksh 200,000
- estimate
- Ksh 0
MUGUYUNI FOOT BRIDGE
- location
-
KAPKECHUI
(in Mogotio)
- year first funded
- 2004
- action
- Construction of a footbridge
- output
- Footbridge to ease crosing the river at Muguyuni
- implementation status
- Brigde has been constructed and requires pillars to suspendthe bridge across the river
- total cost
- Ksh 183,369
- estimate
- Ksh 315,000
NGUBERETI CATTLE DIP
- location
-
NGUBERETI
(in Mogotio)
- year first funded
- 2007
- action
- Repairs and renovations
- output
- Cattle dip to be repaired and renovated
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
CHEBIREBEI WATER PROJ.
- location
-
SINENDE
(in Mogotio)
- year first funded
- 2005
- action
- Purchase of a pump, Construction of Tank and Fencing of the dam
- output
- Clean water for human and livestock use
- implementation status
- Complete and in use
- total cost
- Ksh 140,000
- estimate
- Ksh 0
TURKUP KEBEN ECD
- location
-
SIRWA
(in Mogotio)
- year first funded
- 2004
- action
- Construction of 1Iron sheet walled Classrooms, latrine block and fencing
- output
- 1Iron sheet walled classrooms, latrine block and fencing
- implementation status
- The classroom constructed and require floor slab,fencing has also been done
- total cost
- Ksh 140,000
- estimate
- Ksh 0
MOLOK DISPENSARY
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2003
- action
- Completion of the dispensary, plastering and fixing doors and windos
- output
- Complete dispensary
- implementation status
- Complete
- total cost
- Ksh 110,000
- estimate
- Ksh 2,135,000
MOGOTIO COMMUNITY ECD/ISLAM ECD
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2006
- action
- Construction of two Classrooms
- output
- Two classrooms
- implementation status
- Partial foundation for two classrooms
- total cost
- Ksh 100,000
- estimate
- Ksh 1,515,325
TINOSIEK ECD
- location
-
OLKOKWE
(in Mogotio)
- year first funded
- 2005
- action
- Construction of a semipermanent Classroom
- output
- One classroom
- implementation status
- complete and in use
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
KAMASAI ECD
- location
-
KAPNOSGEI
(in Mogotio)
- year first funded
- 2005
- action
- construction of 4 iron sheet walled clss
- output
- 4 iron sheet walled clssrooms.
- implementation status
- 4classrooms complete,purchased a water tank.
- total cost
- Ksh 100,000
- estimate
- Ksh 105,650
MAJI MOTO WATER SUPP.
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2007
- action
- Purchase of pipes t6o supply water to the storage tank
- output
- Pipes and clean water
- implementation status
- Awaiting funds
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
KABERGEI ECD
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2007
- action
- Construction of a semipermanent Classroom
- output
- one classroom
- implementation status
- Ye to commence
- total cost
- Ksh 70,000
- estimate
- Ksh 100,000
MUTARAN ECD
- location
-
KOIBOSSOI
(in Mogotio)
- year first funded
- 2006
- action
- Construction of an ECD Classroom
- output
- one classroom
- implementation status
- Complete
- total cost
- Ksh 50,431
- estimate
- Ksh 100,000
KIPTEWERET ECD
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2006
- action
- Construction of semipermanent Classroom
- output
- One Classroom
- implementation status
- Classroom constructed upto roofing but no plastering done.
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
AKOTORONGOT SANIT.
- location
-
LEMBUS MOGOTIO
(in Mogotio)
- year first funded
- 2006
- action
- Building of a toilet Block
- output
- Toilet Block
- implementation status
- Not started
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
SAGAAL DAM
- location
-
Mogotio
(in Mogotio)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
KAPNDASIM ECD
- location
-
KOIBOS
(in Mogotio)
- year first funded
- 2006
- action
- Construction of semipermanent Classroom
- output
- One Classroom
- implementation status
- Classroom constructed upto roofing but no plastering done.
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
KAMAR CHIEF’S OFFICE
- location
-
KAMAR
(in Mogotio)
- year first funded
- 2006
- action
- Completion of the Chief's Office walling and floor plastering
- output
- 3 roomed office consisting of Chief's office, store and Assistant chief's Office
- implementation status
- Completed and in use
- total cost
- Ksh 50,000
- estimate
- Ksh 400,000
MOLOS DISPENSARY
- location
-
KAMAR
(in Mogotio)
- year first funded
- 2005
- action
- Furnishing the dispensary, fitting of doors and windows and plastering the floors
- output
- Complete dispensary
- implementation status
- Complete and in use
- total cost
- Ksh 50,000
- estimate
- Ksh 1,600,000
BARTULGEL DAM
- location
-
LEMBUS KIPTOIM
(in Mogotio)
- year first funded
- 2007
- action
- completion of Fencing of an existing water dam
- output
- partial Fencing
- implementation status
- Fencing in progress
- total cost
- Ksh 45,000
- estimate
- Ksh 45,000
KAPYEMIT PRIMARY
- location
-
KOIBOS
(in Mogotio)
- action
- Construction of Classroom
- output
- One Classroom
- implementation status
- Construction upto roofing completed but finishings works and fixinmg of doors and windows not done.
- total cost
- Ksh 0
- estimate
- Ksh 660,000