The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Molo

NJUGUINI WATER PROJECT

location
KIHINGO (in Molo)
year first funded
2005
action
Drilling of borehole, water tank and pump
output
Sink a borehole &distribute clean water.
implementation status
On-going
total cost
Ksh 15,570,528
estimate
Ksh 1,000,000

Bursary

location
Molo (in Molo)
year first funded
2005
action
n/a
output
-
implementation status
Complete
total cost
Ksh 14,552,650
estimate
Ksh 0

GREEN DAM COMMUNITY PROJECT

location
ELBURGON (in Molo)
year first funded
2009
action
Disilting
output
Disilting of one dam
implementation status
complete
total cost
Ksh 10,000,000
estimate
Ksh 1,000,000

NJORO WATER USERS

location
NJORO (in Molo)
year first funded
2004
action
Drilling of borehole, water tank and pump
output
Sink a borehole &distribute clean water.
implementation status
On-going
total cost
Ksh 8,757,197
estimate
Ksh 10,000,000

TAYARI WATER

location
MOLO (in Molo)
year first funded
2004
action
Drilling of borehole, water tank and pump
output
Sink a borehole &distribute clean water.
implementation status
On-going
total cost
Ksh 7,844,860
estimate
Ksh 10,000,000

NGWATANIRO WATER PROJECT

location
MAU NAROK (in Molo)
year first funded
2005
action
Drilling of borehole, water tank and pump
output
Sink a borehole &distribute clean water. Half way filled tanks to prevent them from cracking.
implementation status
On-going
total cost
Ksh 5,211,260
estimate
Ksh 1,000,000

KENYATTA WATER

location
MOLO (in Molo)
year first funded
2005
action
Drilling of borehole, water tank and pump
output
Sink a borehole &distribute clean water.
implementation status
On-going
total cost
Ksh 4,951,200
estimate
Ksh 10,000,000

MAUCHE COMMUNITY WATER

location
MAUCHE (in Molo)
year first funded
2006
action
Drilling of borehole, water tank and pump
output
Sink a borehole &distribute clean water.
implementation status
On-going
total cost
Ksh 4,900,000
estimate
Ksh 10,000,000

KAPYEMIT WATER PROJECT

location
MAUCHE (in Molo)
year first funded
2008
action
Drilling of borehole,pump house and tank construction
output
One borehole sunk,pump house constructe&tank constructed
implementation status
On-going
total cost
Ksh 4,500,000
estimate
Ksh 4,000,000

VEHICLE

location
Molo (in Molo)
year first funded
2009
action
Purchase of one Toyoya Hilux Vehicle
output
One vehicle bought
implementation status
On-going
total cost
Ksh 4,200,000
estimate
Ksh 4,200,000

KASARANI WATER PROJECT

location
ELBURGON (in Molo)
year first funded
2005
action
Drilling of borehole, water tank and pump
output
Sink a borehole &distribute clean water.
implementation status
On-going
total cost
Ksh 4,100,000
estimate
Ksh 10,000,000

MOLO FEEDER ROAD PROGRAMME

location
Molo (in Molo)
year first funded
2004
action
Roads repairs bridge
output
Improved roads to make transport easier
implementation status
On-going
total cost
Ksh 4,000,000
estimate
Ksh 10,000,000

MAU NAROK SEC

location
MAU NAROK (in Molo)
year first funded
2005
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 3,800,000
estimate
Ksh 5,000,000

ELBURGON D.E.B(PROPOSED SECONDARY)

location
ELBURGON (in Molo)
year first funded
2004
action
Construction Of a Classroom and desks
output
Construction Of six Classrooms
implementation status
On-Going
total cost
Ksh 3,560,000
estimate
Ksh 5,000,000

JIRANI KIOO WATER PROJECT

location
KIHINGO (in Molo)
year first funded
2005
action
Drilling of borehole, water tank and pump.
output
Sink a borehole &distribute clean water.
implementation status
On-going
total cost
Ksh 3,531,494
estimate
Ksh 10,000,000

MAUNAROK WATER PROJECT

location
MAUNAROK (in Molo)
year first funded
2007
action
Purchase of submersible pump
output
Purchase of submersible pump
implementation status
Purchase of submersible pump
total cost
Ksh 3,350,000
estimate
Ksh 5,000,000

KIHINGO MUTIUME ROADS

location
KIHINGO (in Molo)
year first funded
2009
action
Roads repairs bridge
output
Improved roads to make transport easier
implementation status
On-going
total cost
Ksh 3,000,000
estimate
Ksh 6,000,000

GICHOBO BRIDGE

location
LARE (in Molo)
year first funded
2008
action
Bridge construction
output
Improved roads to make transport easier
implementation status
On-going
total cost
Ksh 2,914,511
estimate
Ksh 5,000,000

KIMANJI WATER PROJECT

location
NJORO (in Molo)
year first funded
2008
action
Drilling of borehole,pump house
output
One
implementation status
On-going
total cost
Ksh 2,800,000
estimate
Ksh 4,000,000

TAYARI SEC

location
MOLO (in Molo)
year first funded
2005
action
Construction Of Classroom
output
Construction Of six Classrooms
implementation status
On-Going
total cost
Ksh 2,800,000
estimate
Ksh 5,000,000

ERIITHIA NDARUGU WATER PROJECT

location
NJORO (in Molo)
year first funded
2008
action
Drilling of borehole,pump house
output
One borehole sunk
implementation status
On-going
total cost
Ksh 2,700,000
estimate
Ksh 35,000,000

Njoro D.E.B. SEC

location
NJORO (in Molo)
year first funded
2005
action
Construction Of Classrooms
output
Construction Of six Classrooms and 70 lockers
implementation status
On-Going
total cost
Ksh 2,600,000
estimate
Ksh 5,000,000

NJORO DAY SEC

location
NJORO (in Molo)
year first funded
2006
action
Construction Of 4 Classrooms
output
4 completed Classrooms
implementation status
On-Going
total cost
Ksh 2,400,000
estimate
Ksh 1,500,000

EASTLEIGH WATER

location
ELBURGON (in Molo)
year first funded
2005
action
Drilling of borehole andpump house construction
output
One
implementation status
On-going
total cost
Ksh 2,247,350
estimate
Ksh 5,000,000

NAISHI GAME WATER PROJECT

location
LARE (in Molo)
year first funded
2004
action
Drilling of borehole, water tank and pump
output
Sink a borehole to produce clean water
implementation status
No water was found
total cost
Ksh 1,982,000
estimate
Ksh 10,000,000

TURI WATER

location
TURI (in Molo)
year first funded
2003
action
Construction of water tank, pumps & pipes
output
One tank and pipes
implementation status
On -Going
total cost
Ksh 1,975,500
estimate
Ksh 10,000,000

NGORIGA WATER

location
KIHINGO (in Molo)
year first funded
2005
action
Water tank
output
One
implementation status
On-going
total cost
Ksh 1,800,000
estimate
Ksh 1,000,000

D.O’s HOUSE LARE

location
LARE (in Molo)
year first funded
2007
action
A three bed roomed residential house
output
A three bed roomed residential house
implementation status
On -Going
total cost
Ksh 1,616,094
estimate
Ksh 1,800,000

NJORO DISTRICT DVPT COMMITTEE

location
NJORO (in Molo)
year first funded
2008
action
Fencing of divisional H/Qs
output
One
implementation status
Complete
total cost
Ksh 1,550,000
estimate
Ksh 1,000,000

MONA SEC

location
MOLO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 1,520,000
estimate
Ksh 1,000,000

MUKOROMBOSI DISPENSARY

location
TURI (in Molo)
year first funded
2004
action
Purchase &Renovation Of A House To Be Used As A Maternity
output
Completed Maternity Wing
implementation status
On -Going
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

MATUIKU WATER PROJECT

location
ELBURGON (in Molo)
year first funded
2003
action
Construction of water tank, pumps & pipes
output
One tank and pipes
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 5,000,000

KIBUNJA primary School

location
MOLO (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 500,000

NAISHI Secondary

location
LARE (in Molo)
year first funded
2008
action
Construction Of Two Classroom
output
Construction Of Two Classroom
implementation status
Complete
total cost
Ksh 1,308,000
estimate
Ksh 500,000

PWANI DISPENSARY

location
LARE (in Molo)
year first funded
2004
action
Construction Of Maternity Wing
output
Completed Wing
implementation status
On -Going
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

KIHINGO HEALTH CENTRE

location
KIHINGO (in Molo)
year first funded
2004
action
Construction Of Maternity Wing And Finishing Out Patient Wing
output
Completed Maternity And Out Patient Wing
implementation status
On -Going
total cost
Ksh 1,250,000
estimate
Ksh 1,500,000

KIAMBIRIRIA HEALTH CENTRE

location
MOLO (in Molo)
year first funded
2004
action
Construction Of Out Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

MWIGITO primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 1,126,000
estimate
Ksh 320,000

MIANZINI SEC

location
ELBURGON (in Molo)
year first funded
2004
action
Construction of dormitory completion of computer class
output
Increased room for student accommodation
implementation status
On-Going
total cost
Ksh 1,126,000
estimate
Ksh 2,000,000

GICHOBO WATER PROJECT

location
LARE (in Molo)
year first funded
2004
action
Water pump, tank
output
Availability of clean water
implementation status
Pump complete tank to start
total cost
Ksh 1,100,000
estimate
Ksh 3,000,000

NDIMU primary School

location
ELBURGON (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 1,076,000
estimate
Ksh 500,000

SURURU SEC

location
MAU NAROK (in Molo)
year first funded
2004
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 1,070,000
estimate
Ksh 1,000,000

NDURIRI primary School

location
KIHINGO (in Molo)
year first funded
2006
action
Purchase Of Land
output
Purchase 3 Acres to buy 2 more acres to meet government requirement for school to be registered
implementation status
On-Going
total cost
Ksh 1,070,000
estimate
Ksh 500,000

MUKINYAI SEC

location
MOLO (in Molo)
year first funded
2004
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 1,020,000
estimate
Ksh 500,000

MWIGITO &BEESTON AP CAMP

location
NJORO (in Molo)
year first funded
2008
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 1,000,000
estimate
Ksh 0

BAGARIA DISPENSARY

location
BAGARIA (in Molo)
year first funded
2003
action
Construction Of Out Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

LIKIA DISPENSARY

location
MAUNAROK (in Molo)
year first funded
2004
action
Construction Of Out Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 950,000
estimate
Ksh 1,500,000

MAUNAROK A.S.T.U

location
MAUNAROK (in Molo)
year first funded
2004
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 950,000
estimate
Ksh 1,000,000

KIANJOYA SEC

location
MAUNAROK (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks,Electrical Installation
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 916,000
estimate
Ksh 1,500,000

NJORO KENYATTA BRIDGE

location
NJORO (in Molo)
year first funded
2005
action
Construction of bridge
output
Passable road
implementation status
Complete
total cost
Ksh 906,000
estimate
Ksh 906,000

KIMUNGUL DISPENSARY

location
KAPKEMBU (in Molo)
year first funded
2004
action
Construction Of Out Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 900,000
estimate
Ksh 1,500,000

MICHINDA SEC

location
ELBURGON (in Molo)
year first funded
2004
action
Construction of a dining hall
output
A competed dining hall
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 2,000,000

MUTHIGA D.E.B primary School

location
LARE (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 500,000

KAPKEMBU GIRLS SEC

location
KAPKEMBU (in Molo)
year first funded
2006
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 900,000
estimate
Ksh 500,000

RUMWE JORDAN BRIDGE

location
NJORO (in Molo)
year first funded
2008
action
Bridge construction
output
Improved roads to make transport easier
implementation status
On-going
total cost
Ksh 900,000
estimate
Ksh 2,000,000

NYAKIAMBI SEC

location
ELBURGON (in Molo)
year first funded
2003
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 890,000
estimate
Ksh 500,000

LARE ADULT EDUC

location
LARE (in Molo)
year first funded
2008
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 1,000,000

LARMUDIAC SEC

location
KIHINGO (in Molo)
year first funded
2006
action
Construction of toilets
output
Complete students toilets
implementation status
On- going
total cost
Ksh 800,000
estimate
Ksh 0

TAITA MAUCHE SEC

location
TUIYOTICH (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 1,500,000

MUTUMBURU primary School

location
KIHINGO (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 770,000
estimate
Ksh 500,000

NJOKERIO MWIHOTI WATER PROJECT

location
NJORO (in Molo)
year first funded
2007
action
Purchase of submersible pump
output
Purchase of submersible pump
implementation status
Purchase of submersible pump
total cost
Ksh 750,000
estimate
Ksh 2,000,000

MICHATHA MONA BRIDGE

location
TURI (in Molo)
year first funded
2008
action
Construction of bridge
output
Passable road
implementation status
On-going
total cost
Ksh 734,233
estimate
Ksh 0

NDEMI primary School

location
LARE (in Molo)
year first funded
2004
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 734,000
estimate
Ksh 100,000

NAISHI SEC

location
LARE (in Molo)
year first funded
2006
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 708,000
estimate
Ksh 500,000

MUTAMAYU POLICE POST

location
ELBURGON (in Molo)
year first funded
2005
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 700,000
estimate
Ksh 1,000,000

EWAAT SEC

location
TUIYOTICH (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 2,000,000

GICHOBO AP CAMP

location
NJORO (in Molo)
year first funded
2008
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 700,000
estimate
Ksh 1,000,000

NJORO DAY SEC

location
NJORO (in Molo)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 1,000,000

NAISHI Secondary

location
LARE (in Molo)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 1,000,000

MAUNAROK SEC

location
MAUNAROK (in Molo)
year first funded
2009
action
n/a
output
-
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 1,000,000

UPPER KAMWAGO WATER PROJECT

location
NJORO (in Molo)
year first funded
2005
action
Water tank
output
One
implementation status
On-going
total cost
Ksh 700,000
estimate
Ksh 10,000,000

MARIOSHONI SEC

location
MARIOSHONI (in Molo)
year first funded
2006
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 500,000

MWIGITO COMMUNITY WATER

location
NJORO (in Molo)
year first funded
2005
action
Water tank
output
One
implementation status
On-going
total cost
Ksh 680,000
estimate
Ksh 10,000,000

SOKORO primary School

location
ELBURGON (in Molo)
year first funded
2006
action
Construction Of A Tank, Reconstruction Of 4 Classes
output
Construction Of A Tank, complete classrooms
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 500,000

MWANGI MICHUKI primary School

location
ELBURGON (in Molo)
year first funded
2003
action
Cementing of 4 Classrooms and purchase of 40 desks. Purchase of 3 acres of land
output
Reduction of dust in the classrooms
implementation status
complete
total cost
Ksh 606,000
estimate
Ksh 180,000

GICHOBO DISPENSARY

location
LARE (in Molo)
year first funded
2006
action
Construction Of Out Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 600,000
estimate
Ksh 500,000

SAGAITIM BRIDGE

location
TURI (in Molo)
year first funded
2005
action
Construction of bridge
output
Passable road
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 700,000

MATHANGAUTA AP CAMP

location
MAUNAROK (in Molo)
year first funded
2008
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 600,000
estimate
Ksh 0

NDEFFO POLICE POST

location
KIHINGO (in Molo)
year first funded
2005
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 600,000
estimate
Ksh 1,000,000

NAISHI DISPENSARY

location
LARE (in Molo)
year first funded
2006
action
Construction Of Out Patient Wing
output
Construction Of Out Patient Wing
implementation status
On -Going
total cost
Ksh 600,000
estimate
Ksh 500,000

KIHONGE ECD

location
KIHINGO (in Molo)
year first funded
2008
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 600,000
estimate
Ksh 0

MUKUNGUGU primary School

location
MAUNAROK (in Molo)
year first funded
2003
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 586,000
estimate
Ksh 100,000

MILIMANI primary School

location
LARE (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 570,000
estimate
Ksh 500,000

LULUKWET primary School

location
MAUCHE (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 540,000
estimate
Ksh 0

KAMBALA primary School

location
MOLO (in Molo)
year first funded
2003
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
Complete
total cost
Ksh 528,600
estimate
Ksh 306,000

MUGUMO primary School

location
ELBURGON (in Molo)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 522,600
estimate
Ksh 0

ANALAT secondary School

location
MAUNAROK (in Molo)
year first funded
2003
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 510,000
estimate
Ksh 500,000

ELBURGON D.E.B primary

location
ELBURGON (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 506,000
estimate
Ksh 0

TURI FARMERS WATER PROJECT

location
ELBURGON (in Molo)
year first funded
2004
action
Construction of Water tank
output
One
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 700,000

CHESOEN WATER

location
SACHANGWAN (in Molo)
year first funded
2004
action
Purchase of pipes
output
314 Pipes
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

CHEPONDE WATER

location
ELBURGON (in Molo)
year first funded
2004
action
Purchase of pipes
output
314 Pipes
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 100,000

NGANOINI COMMUNITY GABION

location
LARE (in Molo)
year first funded
2008
action
Desilting
output
Drilling of borehole ,pump house
implementation status
One
total cost
Ksh 500,000
estimate
Ksh 2,000,000

KERIKO SEC

location
LARE (in Molo)
year first funded
2009
action
Construction Of 8 Classroom
output
One Complete Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 5,000,000

MUTARAKWA DISPENSARY

location
KIHINGO (in Molo)
year first funded
2009
action
Construction Of Out Patient Wing
output
Construction Of Out Patient Wing
implementation status
On -Going
total cost
Ksh 500,000
estimate
Ksh 2,000,000

WITIMA TRADING CENTRE

location
LARE (in Molo)
year first funded
2009
action
Supply of one transformer
output
One transformer supplied
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 500,000

ST.MARTIS SECONDARY School

location
LARE (in Molo)
year first funded
2009
action
Supply of one transformer
output
One transformer supplied
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 500,000

PIAVE SECONDARY School

location
NJORO (in Molo)
year first funded
2009
action
Supply of one transformer
output
One transformer supplied
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 500,000

NGANOINI WATER PROJECT

location
NJORO (in Molo)
year first funded
2009
action
Supply of one transformer
output
One transformer supplied
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 500,000

VEHICLE RUNNING EXPENSES

location
Molo (in Molo)
year first funded
2009
action
n/a
output
-
implementation status
On-going
total cost
Ksh 500,000
estimate
Ksh 500,000

KAPYEMIT POLICE POST

location
MOLO (in Molo)
year first funded
2008
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 500,000
estimate
Ksh 1,000,000

CHANDERA secondary Schoolhol

location
TURI (in Molo)
year first funded
2007
action
Construction Of Classroom
output
Complete classroom
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

ARIMI DISPENSARY

location
ELBURGON (in Molo)
year first funded
2005
action
Purchase &Renovation Of A House To Be Used As An Out-Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 500,000
estimate
Ksh 1,500,000

MWIGITO HEALTH CENTRE

location
NJORO (in Molo)
year first funded
2006
action
Construction Of Out Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 500,000
estimate
Ksh 500,000

KIHINGO AP CAMP

location
KIHINGO (in Molo)
year first funded
2006
action
Construction A.P houses
output
Construction A.P houses
implementation status
On -Going
total cost
Ksh 500,000
estimate
Ksh 500,000

BAGARIA SECONDARY School

location
LARE (in Molo)
year first funded
2007
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

MIRERA ECD

location
LARE (in Molo)
year first funded
2008
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 499,912
estimate
Ksh 500,000

TUMAINI SEC

location
MOLO (in Molo)
year first funded
2003
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 490,000
estimate
Ksh 300,000

NJORO TOWNSHIP primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 480,000
estimate
Ksh 350,000

SAKAITIMU primary School

location
TURI (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
complete
total cost
Ksh 470,000
estimate
Ksh 500,000

KIAMBIRIRIA primary School

location
MOLO (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 470,000
estimate
Ksh 500,000

MWENYERE primary School

location
LARE (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 470,000
estimate
Ksh 500,000

LARE primary School

location
MAUNAROK (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 500,000

PWANI POLICE POST

location
LARE (in Molo)
year first funded
2004
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 450,000
estimate
Ksh 1,000,000

SORTONOK primary School

location
MAUNAROK (in Molo)
year first funded
2005
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 500,000

TURI SULGWITA primary School

location
TURI (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 90 Desks
implementation status
Complete
total cost
Ksh 442,000
estimate
Ksh 500,000

TERET primary School

location
MAUCHE (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 440,000
estimate
Ksh 500,000

MOLO SUB-DISTRICT HOSPITAL

location
MOLO (in Molo)
year first funded
2006
action
Construction Of Out Patient Wing
output
To Reduce Congestion In The Maternity Ward
implementation status
On -Going
total cost
Ksh 438,000
estimate
Ksh 500,000

ST.STEPHEN primary School

location
ELBURGON (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 420,000
estimate
Ksh 500,000

MUTARAKWA primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 406,000
estimate
Ksh 406,000

KABURU WATER DAM

location
NJORO (in Molo)
year first funded
2008
action
Drilling of borehole,pump house
output
One
implementation status
On-going
total cost
Ksh 400,000
estimate
Ksh 3,000,000

ELBURGON CHIEFS OFFICE

location
ELBURGON (in Molo)
year first funded
2008
action
Renovation of chief office
output
renovation
implementation status
On -Going
total cost
Ksh 400,000
estimate
Ksh 500,000

MUKINYAI MURIMO SECURITY PROJECT

location
MOLO (in Molo)
year first funded
2009
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

KAMWAURA AP CAMP

location
NJORO (in Molo)
year first funded
2009
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

LUSIRU Secondary

location
LARE (in Molo)
year first funded
2009
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 1,000,000

MUTITU B MINI BRIDGE

location
KIHINGO (in Molo)
year first funded
2008
action
Bridge construction
output
Improved roads to make transport easier
implementation status
On-going
total cost
Ksh 400,000
estimate
Ksh 2,000,000

GATIMU COMMUNITY WATER

location
MAUNAROK (in Molo)
year first funded
2008
action
Drilling of borehole,pump house
output
One
implementation status
On-going
total cost
Ksh 400,000
estimate
Ksh 5,000,000

TIPIS AP CAMP

location
MAUNAROK (in Molo)
year first funded
2006
action
Construction of police houses
output
Construction Of Houses
implementation status
To -Start
total cost
Ksh 400,000
estimate
Ksh 1,000,000

METTA POLICE POST

location
MAUNAROK (in Molo)
year first funded
2005
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 400,000
estimate
Ksh 1,000,000

TARAKUET primary School

location
NJORO (in Molo)
year first funded
2007
action
Construction Of Classroom
output
One Complete Classroom
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

KAROGOE primary School

location
LARE (in Molo)
year first funded
2005
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 500,000

MUTARAKWA ECD

location
KIHINGO (in Molo)
year first funded
2008
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

P.C.E.A ELBURGON primary School

location
ELBURGON (in Molo)
year first funded
2003
action
Construction Of Toilets And Desks
output
Complete Toilets&45 Desks
implementation status
complete
total cost
Ksh 388,500
estimate
Ksh 500,000

GATIMU SEC

location
MAUNAROK (in Molo)
year first funded
2009
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 375,000
estimate
Ksh 1,000,000

NAISHI primary School

location
NAISHI (in Molo)
year first funded
2006
action
Plastering And Flooring 7 Classrooms
output
Plastered and floored Classrooms
implementation status
On-Going
total cost
Ksh 370,000
estimate
Ksh 0

ST.BREDANS primary School

location
TURI (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 370,000
estimate
Ksh 500,000

KAPYEMIT primary School

location
BAGARIA (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 370,000
estimate
Ksh 500,000

MOSOP primary School

location
TUIYOTICH (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 370,000
estimate
Ksh 500,000

KAPTICH primary School

location
SURURU (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 370,000
estimate
Ksh 500,000

CHESINGELE Secondary School

location
MOLO (in Molo)
year first funded
2005
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 370,000
estimate
Ksh 500,000

SINENDETDEMONSTRATION

location
LARE (in Molo)
year first funded
2005
action
Purchase of land
output
One
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

NEW CREATION

location
ELBURGON (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 500,000

GICHOBO SEC

location
LARE (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 500,000

KIANJOYA primary School

location
MAUNAROK (in Molo)
year first funded
2004
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 334,000
estimate
Ksh 100,000

ELBURGON SEC

location
ELBURGON (in Molo)
year first funded
2007
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 322,600
estimate
Ksh 0

NGUZU primary School

location
MOLO (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 320,000
estimate
Ksh 0

MAUCHE primary School

location
MAUCHE (in Molo)
year first funded
2005
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 320,000
estimate
Ksh 500,000

MAJIMINGI primary School

location
MAUNAROK (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 320,000
estimate
Ksh 500,000

NDARUGU primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 306,000
estimate
Ksh 320,000

MOTO primary School

location
MOLO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 306,000
estimate
Ksh 306,000

TENGECHA primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 306,000
estimate
Ksh 500,000

KIKAPU primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 306,000
estimate
Ksh 500,000

SUBUKU primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 306,000
estimate
Ksh 32,000

NDEGE primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Toilets &Iron sheets
output
Construction of 4 toilets
implementation status
Complete
total cost
Ksh 303,000
estimate
Ksh 300,000

MAUNNAROK HEALTH CENTRE

location
MAUNAROK (in Molo)
year first funded
2008
action
Construction Of Maternity Wing And Furnishing
output
Construction Of Maternity Wing And Furnishing Out Patient Wing
implementation status
On -Going
total cost
Ksh 300,000
estimate
Ksh 1,500,000

ST.JOSEPH primary School

location
ELBURGON (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

CHEPTOROI SEC

location
NJORO (in Molo)
year first funded
2007
action
Completion of administration block
output
Completed administration
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

GATIMU DISPENSARY

location
MAUNAROK (in Molo)
year first funded
2003
action
Purchase &Renovation Of A House To Be Used As An Out-Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 300,000
estimate
Ksh 500,000

KAMWAURA DISPENSARY

location
ELBURGON (in Molo)
year first funded
2006
action
Construction Of Out Patient Wing
output
Completed Out Patient Wing
implementation status
On -Going
total cost
Ksh 300,000
estimate
Ksh 500,000

METTA DISPENSARY

location
(in Molo)
year first funded
2008
action
Construction Of Out Patient Wing
output
Construction Of Out Patient Wing
implementation status
On -Going
total cost
Ksh 300,000
estimate
Ksh 0

MATUMAINI POLICE POST

location
MOLO (in Molo)
year first funded
2005
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

NYAKIAMBI WATER

location
ELBURGON (in Molo)
year first funded
2003
action
Lying of pipes
output
314 pipes
implementation status
On-going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

SACHANGWAN MUKINYAI WATER PROJECT

location
SACHANGWAN (in Molo)
year first funded
2007
action
Water piping
output
Water brought close to the community
implementation status
On -going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

ARIMI SELF HELP WATER PROJECT

location
ELBURGON (in Molo)
year first funded
2006
action
Water piping
output
Water brought close to the community
implementation status
On -going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

NJORO POLYTECHNIC

location
NJORO (in Molo)
year first funded
2008
action
Construction Of Toilets & Fencing
output
Complete student toilets&fenced
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 1,000,000

MOLO DISTRICT H/Q’s

location
MOLO (in Molo)
year first funded
2006
action
Renovation of offices
output
One
implementation status
On -Going
total cost
Ksh 300,000
estimate
Ksh 1,000,000

TERET SEC

location
MAUCHE (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 297,500
estimate
Ksh 500,000

Kapsorok Primary School

location
MOLO (in Molo)
year first funded
2004
action
Purchase Of 50 Iron sheets and rebuilding of a blown off class. Construction of a new Classroom
output
Purchase Of 50 Desks and repair of blown off class. A fully complete classroom
implementation status
Complete. New classrrom ongoing
total cost
Ksh 297,500
estimate
Ksh 100,000

NAROK primary School

location
MAUNAROK (in Molo)
year first funded
2003
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 286,000
estimate
Ksh 500,000

CHEPTOROI primary School

location
NJORO (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
Complete
total cost
Ksh 270,000
estimate
Ksh 500,000

MIANZINI primary School

location
TURI (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 270,000
estimate
Ksh 220,000

SINENDET primary School

location
LARE (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 270,000
estimate
Ksh 500,000

GWACATI primary School

location
MAUNAROK (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 270,000
estimate
Ksh 500,000

CHESATON primary School

location
NJORO (in Molo)
year first funded
2004
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
Complete
total cost
Ksh 270,000
estimate
Ksh 500,000

KUSUMEK primary School

location
MAUCHE (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 270,000
estimate
Ksh 0

NAROK NURSERY

location
MAUNAROK (in Molo)
year first funded
2005
action
Construction Of Classroom
output
Four Complete Classrooms
implementation status
On-Going
total cost
Ksh 270,000
estimate
Ksh 500,000

LARE VISION SEC

location
LARE (in Molo)
year first funded
2006
action
Construction Of a Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 270,000
estimate
Ksh 500,000

KAMBALA SEC

location
MOLO (in Molo)
year first funded
2006
action
Construction Of Classrooms
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 270,000
estimate
Ksh 500,000

NDIMU CATTLE DIP

location
ELBURGON (in Molo)
year first funded
2005
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 500,000

KIAMBIRIRIA AP CAMP

location
MOLO (in Molo)
year first funded
2009
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 250,000
estimate
Ksh 1,000,000

NJOKERIO RURAL ROAD

location
NJORO (in Molo)
year first funded
2007
action
Roads repairs bridge
output
Improved roads to make transport easier
implementation status
On-going
total cost
Ksh 250,000
estimate
Ksh 250,000

SINEDET WATER

location
LARE (in Molo)
year first funded
2005
action
Water tank
output
One
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 500,000

DARUMOLO WATER PROJECT

location
KIHINGO (in Molo)
year first funded
2004
action
Construction of water reservoir
output
One
implementation status
On -Going
total cost
Ksh 250,000
estimate
Ksh 1,000,000

NJORO COMMUNITY POLICING

location
NJORO (in Molo)
year first funded
2006
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 250,000
estimate
Ksh 1,000,000

WENDANI SEC

location
KIHINGO (in Molo)
year first funded
2006
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 500,000

MUTIUME primary School

location
MAUNAROK (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 500,000

MUTATE primary School

location
ELBURGON (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 500,000

KAIYABA primary School

location
NJORO (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 250,000
estimate
Ksh 500,000

NGANOINI COMMUNITY WATER

location
LARE (in Molo)
year first funded
2008
action
Desilting
output
Drilling of borehole ,pump house
implementation status
One
total cost
Ksh 247,000
estimate
Ksh 1,000,000

TRITAGOI primary School

location
NESSUIT (in Molo)
year first funded
2004
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 234,000
estimate
Ksh 0

AMANI primary School

location
NJORO (in Molo)
year first funded
2003
action
Construction Of Classroom &Iron sheets
output
Construction Of Classroom & 56 Iron sheets
implementation status
On-Going
total cost
Ksh 224,000
estimate
Ksh 100,000

MUTIRIMA primary School

location
KIHINGO (in Molo)
year first funded
2005
action
Construction Of Toilets
output
Construction of Toilets
implementation status
Complete
total cost
Ksh 220,000
estimate
Ksh 250,000

NGORIKA CATTLE DIP

location
LARE (in Molo)
year first funded
2004
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 300,000

SIGOR primary School

location
SURURU (in Molo)
year first funded
2005
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 500,000

CHANDERA NDENDERU B AP CAMP

location
TURI (in Molo)
year first funded
2008
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 200,000
estimate
Ksh 0

SULGWITA SEC

location
TURI (in Molo)
year first funded
2009
action
Construction Of two Classroom
output
2 Completed Classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

CHESINGELE primary School

location
MOLO (in Molo)
year first funded
2009
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 600,000

SACHANGWAN POLICE POST

location
MOLO (in Molo)
year first funded
2006
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 200,000
estimate
Ksh 1,000,000

SUBUKU CATTLE DIP

location
NJORO (in Molo)
year first funded
2004
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 190,000
estimate
Ksh 300,000

GWATANIRO primary School

location
MAUNAROK (in Molo)
year first funded
2003
action
Flooring Of Classroom&45 Desks
output
Flooring of 4 classrooms and 45 Desks
implementation status
complete
total cost
Ksh 170,000
estimate
Ksh 500,000

UTALII primary School

location
MAUNAROK (in Molo)
year first funded
2003
action
Purchase Of Iron sheets &Construction Of Classroom
output
Construction of Classroom
implementation status
On-Going
total cost
Ksh 163,000
estimate
Ksh 1,000,000

TUMAINI primary School

location
MOLO (in Molo)
year first funded
2004
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 160,968
estimate
Ksh 100,000

TAYARI primary School

location
MOLO (in Molo)
year first funded
2003
action
Renovation of Classroom &Desks
output
One Complete Classrooms and 45 Desks
implementation status
complete
total cost
Ksh 156,000
estimate
Ksh 200,000

TAGTECH primary School

location
NESSUIT (in Molo)
year first funded
2004
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 154,000
estimate
Ksh 0

MWISHO WA LAMI MULTU PURPOSE HALL

location
MAUNAROK (in Molo)
year first funded
2006
action
Construction of hall
output
One
implementation status
On-going
total cost
Ksh 150,000
estimate
Ksh 1,000,000

KOILONGET primary School

location
TERET (in Molo)
year first funded
2005
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 150,000
estimate
Ksh 500,000

MUKUNGUGU CATTLE DIP

location
NJORO (in Molo)
year first funded
2004
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 300,000

KIANJOYA CATTLE DIP

location
MAUNAROK (in Molo)
year first funded
2004
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 300,000

NJORO DIVISION DVPT COMMITTEE

location
NJORO (in Molo)
year first funded
2006
action
Fencing of divisional H/Qs
output
One
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 1,000,000

NGANOINI ASSISTANT CHIEF OFFICE

location
LARE (in Molo)
year first funded
2008
action
Construction of police houses
output
Construction Of Houses
implementation status
On -Going
total cost
Ksh 150,000
estimate
Ksh 0

WIIGUTHANIA YOUTH GROUP

location
LARE (in Molo)
year first funded
2008
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 150,000
estimate
Ksh 500,000

NJORO MOSQUE

location
NJORO (in Molo)
year first funded
2006
action
Construction of Classroom
output
One
implementation status
On-going
total cost
Ksh 150,000
estimate
Ksh 450,000

NJORO COMMUNITY TOILET

location
NJORO (in Molo)
year first funded
2006
action
Construction of toilets
output
One
implementation status
On-going
total cost
Ksh 150,000
estimate
Ksh 550,000

KENANA primary School

location
NJORO (in Molo)
year first funded
2004
action
Electricity Fittings
output
Well lighted School
implementation status
complete
total cost
Ksh 150,000
estimate
Ksh 500,000

ST.MARYS BOYS primary School

location
MOLO (in Molo)
year first funded
2004
action
Construction Of Classroom&Desks
output
One Complete Classrooms and 45 Desks
implementation status
On-Going
total cost
Ksh 120,000
estimate
Ksh 500,000

SIGAON primary School

location
NESSUIT (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 120,000
estimate
Ksh 500,000

MAHIGA primary School

location
MAUNAROK (in Molo)
year first funded
2004
action
Flooring Of Classroom
output
Flooring of 4 classrooms
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 500,000

WITIMA CATLE DIP

location
ELBURGON (in Molo)
year first funded
2006
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
On -Going
total cost
Ksh 106,400
estimate
Ksh 150,000

LARE ECD

location
LARE (in Molo)
year first funded
2007
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 103,000
estimate
Ksh 0

NJORO ECD

location
NJORO (in Molo)
year first funded
2007
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 103,000
estimate
Ksh 0

ELBURGON ECD

location
ELBURGON (in Molo)
year first funded
2007
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 103,000
estimate
Ksh 0

MAUCHE ECD

location
MAUCHE (in Molo)
year first funded
2007
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 103,000
estimate
Ksh 0

NGANOINI COMM.NURSERY

location
LARE (in Molo)
year first funded
2009
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

BELBUR CATTLE DIP

location
NJORO (in Molo)
year first funded
2004
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 300,000

THE GREEN DREAM

location
ELBURGON (in Molo)
year first funded
2008
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

MUKUNGUGU NURSERY

location
MAUNAROK (in Molo)
year first funded
2006
action
Construction Of Classroom
output
Two Complete Classrooms
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 750,000

NJORO D.E.B primary School

location
NJORO (in Molo)
year first funded
2004
action
Flooring Of Classroom
output
Flooring of 4 classrooms
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

ST.PETERS BOYS primary School

location
ELBURGON (in Molo)
year first funded
2003
action
Electricity Fittings
output
Well lighted Offices&Classrooms
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 500,000

KIRIRI primary School

location
LARE (in Molo)
year first funded
2005
action
Construction Of Toilets
output
Construction of Toilets
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 500,000

NESSUIT OGIEK SEC

location
NESSUIT (in Molo)
year first funded
2006
action
Construction Of Classroom
output
Construction Of one Classroom
implementation status
On-Going
total cost
Ksh 100,000
estimate
Ksh 0

KAPSITA DISPENSARY

location
ELBURGON (in Molo)
year first funded
2006
action
Construction Of Out Patient Wing
output
Construction Of Out Patient Wing
implementation status
On -Going
total cost
Ksh 100,000
estimate
Ksh 1,000,000

LARE HEALTH CENTRE

location
LARE (in Molo)
year first funded
2007
action
Construction Of Out Patient Wing
output
Construction Of Out Patient Wing
implementation status
On -Going
total cost
Ksh 100,000
estimate
Ksh 0

KIKAPU CATTLE DIP

location
NJORO (in Molo)
year first funded
2004
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 300,000

RAFIKI CATTLE DIP

location
TURI (in Molo)
year first funded
2004
action
Renovation of a cattle dip
output
Renovation of a cattle dip
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 300,000

SOSIOT WATER

location
NJORO (in Molo)
year first funded
2005
action
Purchase of water plot
output
One plot
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 500,000

KAIYABA WATER

location
NJORO (in Molo)
year first funded
2006
action
Purchase of pipes
output
200 Pipes
implementation status
On-going
total cost
Ksh 100,000
estimate
Ksh 250,000

KIGECHA DAM

location
KIHINGO (in Molo)
year first funded
2006
action
Fencing the dam
output
One
implementation status
On-going
total cost
Ksh 100,000
estimate
Ksh 100,000

BETTER ENVIRONMENT

location
NJORO (in Molo)
year first funded
2008
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

MWANGAZA YOUTH GROUP

location
TURI (in Molo)
year first funded
2007
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

KENYA INDIGENOUS TREE RESTORATION PROJECT

location
NJORO (in Molo)
year first funded
2009
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

WENDANI ENVIRONMENTAL GROUP

location
KIHINGO (in Molo)
year first funded
2009
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

NJORO OWY ENV.GROUP

location
NJORO (in Molo)
year first funded
2009
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

MUNYAKA SELF HELP GROUP

location
MOLO (in Molo)
year first funded
2009
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

GREENER MAU ENV GROUP

location
NJORO (in Molo)
year first funded
2009
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 500,000

VISION YOUTH GROUP

location
TURI (in Molo)
year first funded
2007
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 91,451
estimate
Ksh 500,000

ST. FRANCIS SEC

location
LARE (in Molo)
year first funded
2006
action
Purchase of books
output
Well equipped Library with books
implementation status
On-Going
total cost
Ksh 80,000
estimate
Ksh 500,000

SURURU primary School

location
MAUNAROK (in Molo)
year first funded
2006
action
Construction Of Classroom
output
One Complete Classrooms
implementation status
On-Going
total cost
Ksh 70,000
estimate
Ksh 680,000

ST.PETERS GIRLS primary School

location
ELBURGON (in Molo)
year first funded
2005
action
Construction Of Toilets
output
Construction of Toilets
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 0

GITHANJI DAM

location
LARE (in Molo)
year first funded
2005
action
Fencing the dam
output
One
implementation status
On-going
total cost
Ksh 50,000
estimate
Ksh 50,000

GICHOBO SEC

location
GICHOBO (in Molo)
year first funded
2006
action
Purchase of iron sheets
output
Construction of toilets
implementation status
On-Going
total cost
Ksh 50,000
estimate
Ksh 0

KIMUGUL primary School

location
MAUCHE (in Molo)
year first funded
2006
action
Purchase Of Desks
output
Purchase Of Desks
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 500,000

ANALAT primary School

location
MAUNAROK (in Molo)
year first funded
2003
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 36,000
estimate
Ksh 100,000

ROMBEI primary School

location
MARIOSHONI (in Molo)
year first funded
2004
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 34,000
estimate
Ksh 100,000

SIRYAT primary School

location
NESSUIT (in Molo)
year first funded
2004
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 34,000
estimate
Ksh 100,000

LARMUDIAC primary School

location
KIHINGO (in Molo)
year first funded
2003
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 34,000
estimate
Ksh 100,000

MARIOSHONI primary School

location
MARIOSHONI (in Molo)
year first funded
2003
action
Purchase Of Desks
output
Purchase Of 45 Desks
implementation status
Complete
total cost
Ksh 33,000
estimate
Ksh 100,000

MUKINYAI primary School

location
ELBURGON (in Molo)
year first funded
2004
action
Purchase Of Desks
output
Purchase Of 35 Desks
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 100,000

NESSUIT primary School

location
NESSUIT (in Molo)
year first funded
2003
action
Purchase Of Iron sheets
output
Purchase Of 42 Desks
implementation status
Complete
total cost
Ksh 16,500
estimate
Ksh 100,000

NDAVISSION WATER PROJECT

location
KIHINGO (in Molo)
year first funded
2005
action
Construction of water reservoir
output
One tank
implementation status
On-going
total cost
Ksh 10,000
estimate
Ksh 358,000

GREEN MOLO

location
Molo (in Molo)
action
Planting of trees
output
Good ground cover to prevent erosion of soil;
implementation status
complete
total cost
Ksh 0
estimate
Ksh 1,000,000