The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Moyale

Sololo Water Project

location
Sololo (in Moyale)
year first funded
2007
action
Supply Of Water From Walda To Sololo
output
Creating Access Of Water To Sololo Community
implementation status
Not Completed
total cost
Ksh 11,300,000
estimate
Ksh 5,000,000

Obbu Girls Secondary School

location
Sololo (in Moyale)
year first funded
2003
action
Construction Of Administra-Tion Block And Two Dormito-Ries And Three Classroomsand Laboratory.
output
To Establish A Girl Sec.
implementation status
Laboratory Completed Not In Use - Construction Of Classroom Funded In Fy09/10 Incomplete
total cost
Ksh 8,400,000
estimate
Ksh 7,900,000

Ele Borr Borehole

location
Walda (in Moyale)
year first funded
2007
action
Drilling Bore Hole Classroom
output
Creating Access Of Water To Ele Borr Community
implementation status
Not Completed
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Anona Borehole

location
Sololo (in Moyale)
year first funded
2007
action
Sinking Bore Hole
output
Creating Access To Anona
implementation status
Not Completed
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Manyatta Primary School

location
Manyatta (in Moyale)
year first funded
2003
action
Eight Classrooms And Adm Block Built
output
To Meet Educational Need
implementation status
Complete And In Use
total cost
Ksh 3,300,000
estimate
Ksh 3,300,000

Godoma Didiqo Primary School

location
Godoma (in Moyale)
year first funded
2003
action
Construction Of Two Classroom And Two Latrine
output
Meet Education Need
implementation status
Complete And In Use
total cost
Ksh 2,900,000
estimate
Ksh 2,900,000

Baliti Secondary Walda

location
Walda (in Moyale)
year first funded
2006
action
Construction Of Admin. Block And Classroom And Dormitory
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 2,800,000
estimate
Ksh 2,800,000

Holale Primary School

location
Butiye (in Moyale)
year first funded
2004
action
Three Classroom Adm Block Kitchen And Toilet Built
output
To Create Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 2,700,000
estimate
Ksh 2,700,000

Golole Dam

location
Golole (in Moyale)
year first funded
2008
action
Construction Of Dam
output
Access To Water
implementation status
Incomplete
total cost
Ksh 2,500,000
estimate
Ksh 0

Uran Godha Primary School

location
Uran (in Moyale)
year first funded
2003
action
Construction Of Classroom
output
To Meet On Going Education Demand
implementation status
Two Classroom Notcomplete And In Use Doors And Windows Not Fixedfurnishing Not Done
total cost
Ksh 2,500,000
estimate
Ksh 2,000,000

Sololo Dispensary

location
Sololo (in Moyale)
year first funded
2008
action
Construction Of Health Centre
output
Access To Health
implementation status
Incomplete
total cost
Ksh 2,500,000
estimate
Ksh 0

Qate Primary School

location
Qate (in Moyale)
year first funded
2003
action
Construction Ofclasses Adm.Block And Pitlatrine And One Classroom
output
Primary Education At The Location
implementation status
One Classroom Not Compelted - Doors And Windows Not Fixed And Furnihsing Not Done
total cost
Ksh 2,400,000
estimate
Ksh 2,400,000

Karbururi Primary School

location
Uran (in Moyale)
year first funded
2003
action
Construction Of Three Standard Class
output
To Meet Educational Demand
implementation status
Construction Of Classroom Funded In Fy09/10 Incomplete
total cost
Ksh 2,350,000
estimate
Ksh 1,850,000

Nana Primary School

location
Nana (in Moyale)
year first funded
2003
action
Construction Of Two Classrooms
output
To Meet Raising Education Demand
implementation status
Constraction Of Classroom Funded In Fy 09/10 Incomplete
total cost
Ksh 2,208,032
estimate
Ksh 1,600,000

Rawana Primary School

location
Rawana (in Moyale)
year first funded
2003
action
Construction Of Pry School(Lower Classes)
output
To Enhance Education Demand
implementation status
Complete And In Use
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Sessi Primary School

location
Central (in Moyale)
year first funded
2003
action
Three Administration Block Built
output
To Meet Educational Need
implementation status
Complete And In Use
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Grading Of Roads To Sololo Hospital

location
Sololo (in Moyale)
year first funded
2007
action
Grading Of Roads
output
Enhance Infrastructure
implementation status
Phase Ii Funded In Fy09/10 Incomplete
total cost
Ksh 2,200,000
estimate
Ksh 1,000,000

Funan Qumbi Primary School

location
Rawana (in Moyale)
year first funded
2003
action
Five Thousand Pieces Of Blocks Made - Construction Of One Classroom
output
To Meet Educational Need
implementation status
Project Halted Due To Insecurity - Classroom Project Compelte
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Uran Lataka Primary School

location
Uran (in Moyale)
year first funded
2008
action
Construction Of Three Classes
output
Access To Education
implementation status
Incomplete
total cost
Ksh 2,100,000
estimate
Ksh 0

Uran Lataka Maternity

location
Uran (in Moyale)
year first funded
2004
action
Construction Of Standard
output
Promote Health
implementation status
Complete And In Use
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Somare Primary School

location
Somare (in Moyale)
year first funded
2003
action
Two Classroom Built
output
To Enhance Education
implementation status
Construction Of One Classroom Not Done (09/10)
total cost
Ksh 1,847,169
estimate
Ksh 1,697,169

Godoma Maternity

location
Godoma (in Moyale)
year first funded
2004
action
Construction Of Standard Maternity
output
To Enhance Health
implementation status
Complete And In Use
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Moyale Girls Secondary School

location
Central (in Moyale)
year first funded
2004
action
Construction Of Administration Block
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 1,613,114
estimate
Ksh 1,613,114

Walda Maternity

location
Walda (in Moyale)
year first funded
2004
action
Construction Of Standard Maternity
output
Promote Health
implementation status
Complete And In Use
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Sololo Makutano Dispensary

location
Sololo (in Moyale)
year first funded
2003
action
Construction Of Dispensary
output
To Bring Improve Health Service For Community
implementation status
Complete And In Use
total cost
Ksh 1,520,000
estimate
Ksh 1,520,000

Bori River

location
Bori (in Moyale)
year first funded
2008
action
Rehabilitation Of River
output
Access To Water
implementation status
Incomplete
total cost
Ksh 1,500,000
estimate
Ksh 0

Manyatta Primary School

location
Manyatta (in Moyale)
year first funded
2008
action
Construction Of Administration Block
output
Access To Education
implementation status
Incomplete
total cost
Ksh 1,500,000
estimate
Ksh 0

Heilu Primary School

location
Heilu (in Moyale)
year first funded
2006
action
Construction Of Two Classrooms
output
Promote Education
implementation status
Not Complete
total cost
Ksh 1,400,000
estimate
Ksh 700,000

Df Maternity

location
Dambala Fachana (in Moyale)
year first funded
2003
action
Construction Of Standard Maternity
output
To Bring Improved Health Services Closer To Community
implementation status
Complete And In Use
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Madho Adhi Dispensary

location
Uran (in Moyale)
year first funded
2004
action
Construction Of Dispensary And The Equipment
output
To Improve Health Facility
implementation status
Complete And In Use
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Golole Maternity

location
Uran (in Moyale)
year first funded
2004
action
Construction Of Standard Maternity
output
To Bring Health Facility Within Community Reach
implementation status
Complete And In Use
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Dabel Dispensary

location
Dabel (in Moyale)
year first funded
2003
action
Construction Of Dispensary
output
To Bring Health Facility To The Community
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Anona Dispensary

location
Anona (in Moyale)
year first funded
2003
action
Construction Of Standard Dispensary
output
Promote Health
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Satellite Provision For Banale, Funan Qumbi And Bododa Communities

location
Walda, Funan, Qumbi, Bododa And Banale (in Moyale)
year first funded
2006
action
Provision Of Satellite Phones
output
Creating Provision Of Communication Tools
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Karbururi Water Tank

location
Sololo (in Moyale)
year first funded
2005
action
Tank Built
output
Access Water
implementation status
Completed And Not In Use
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Butiye Dispensary

location
Butiye (in Moyale)
year first funded
2003
action
Varnishing And Equipping
output
To Bring Health Services Nearer
implementation status
Complete And In Use
total cost
Ksh 1,150,000
estimate
Ksh 1,150,000

Waye Godha Irrigation

location
Uran (in Moyale)
year first funded
2004
action
Plots For 2 Groups Constructed Fenced And A Tank Built
output
To Boost Horticultural Gardening
implementation status
Complete And In Use
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Bori Maternity

location
Bori (in Moyale)
year first funded
2003
action
n/a
output
Creation Of Improved Health
implementation status
Complete Not Furnished And Not In Use
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Walda Community Dispensary

location
Walda (in Moyale)
year first funded
2004
action
Bringing Health Facilities Towards Walda Resident
output
To Access Health Facility
implementation status
Complete And In Use
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Uran Health Centre

location
Uran (in Moyale)
year first funded
2008
action
Construction Of Health Centre
output
Access To Health
implementation status
Incomplete
total cost
Ksh 1,000,000
estimate
Ksh 0

Karbururi Dispensary

location
Uran (in Moyale)
year first funded
2007
action
Construction Of Dispensary
output
Creating Access Of Health Facility To
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Funan Qumbi Admpolice

location
Walda (in Moyale)
year first funded
2007
action
Construction Of Ap Staff House
output
Creating Access To Securityfor Funan Qumbi Community
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Moyale Boys Secondary School

location
Butiye (in Moyale)
year first funded
2004
action
Construction Of Classroom
output
Promote Education Facility
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Waye Primary School

location
Uran (in Moyale)
year first funded
2006
action
Construction Of One Classroom
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Muslim Primary School

location
Central (in Moyale)
year first funded
2005
action
Admiistration Block Built
output
To Have Good And Efficient Teaching Facilities
implementation status
Completed And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Sololo Primary School

location
Sololo (in Moyale)
year first funded
2007
action
Construction Of Classroom
output
Promote Education
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Odda Maternity

location
Odda (in Moyale)
year first funded
2005
action
Construction Of Maternity
output
To Bring Health Facility Closer To The Community
implementation status
Funded
total cost
Ksh 800,000
estimate
Ksh 800,000

Manyatta Social Hall

location
Manyatta (in Moyale)
year first funded
2007
action
Construction Of Social Hall
output
Provision Of Education
implementation status
Incomplete
total cost
Ksh 800,000
estimate
Ksh 800,000

Butiye Store

location
Butiye (in Moyale)
year first funded
2007
action
Provison Of Storage Facility
output
Enhance Storage Hall
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Qilta Primary School

location
Qilta (in Moyale)
year first funded
2008
action
Construction Of One Class
output
Access To Education
implementation status
Incomplete
total cost
Ksh 750,000
estimate
Ksh 0

Df Social Hall

location
Dambala Fachana (in Moyale)
year first funded
2006
action
Building Social Hall
output
Provision Of Education
implementation status
Complete And In Use
total cost
Ksh 700,000
estimate
Ksh 700,000

Yaballo Primary School

location
Yaballo (in Moyale)
year first funded
2005
action
Construction Of Two Classrooms
output
To Bring Education Closer To Community
implementation status
Complete Classroom In Use Dispensary Not In Use
total cost
Ksh 700,000
estimate
Ksh 700,000

Walda Primary School

location
Walda (in Moyale)
year first funded
2006
action
Construction Of Two Classrooms
output
Promote Education
implementation status
Not Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Sololo Water Supply

location
Sololo (in Moyale)
year first funded
2004
action
Building Of Water Kiosk
output
Access Of Water
implementation status
Complete And In Use
total cost
Ksh 700,000
estimate
Ksh 700,000

Sololo Boys Secondary School

location
Sololo (in Moyale)
year first funded
2007
action
Reconstruction Of One Burnt Dormitory
output
Promote Education Facility
implementation status
Complete And In Use
total cost
Ksh 700,000
estimate
Ksh 700,000

Golole Social Hall

location
Uran (in Moyale)
year first funded
2006
action
Construction Of Social Hall
output
Provision Of Social Amenities
implementation status
Complete And In Use
total cost
Ksh 700,000
estimate
Ksh 700,000

Kinisa Primary School

location
Kinisa (in Moyale)
year first funded
2004
action
Construction Of Two Manonry Tanks Built And In Use 500,000Ltrs
output
To Provide Water For Primary School
implementation status
Purchase Of Desks Not Done (09/10)
total cost
Ksh 650,000
estimate
Ksh 500,000

Sololo Township

location
Sololo (in Moyale)
year first funded
2006
action
50 Desk Tables
output
Helping Sitting Facilities
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Godoma Primary School

location
Godoma (in Moyale)
year first funded
2007
action
Construction Of One Classroom
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Bori Primary School

location
Bori (in Moyale)
year first funded
2007
action
Reconstruction Of One Classroom And Fencing
output
Promote Education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Uran Godha Primary School

location
Uran (in Moyale)
year first funded
2008
action
Construction Of One Class
output
Access To Education
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Somare Primary School

location
Somare (in Moyale)
year first funded
2007
action
Construction Of One Classroom
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Construction Of Ap Post

location
Rawana (in Moyale)
year first funded
2005
action
Construction Of Ap Post
output
Enhance Security
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Banale Primary School

location
Walda (in Moyale)
year first funded
2007
action
Construction Of One Classroom
output
Promote Education For Nomadic
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Anona Primary School

location
Walda (in Moyale)
year first funded
2007
action
Construction Of One Classroom
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Ambalo Primary School

location
Ambalo (in Moyale)
year first funded
2007
action
Construction Of Classes
output
Promote Education
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Ramole Primary School

location
Sololo (in Moyale)
year first funded
2007
action
Construction Of Classroom
output
Promote Education Facilities
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Much Gura Primary School

location
Golole (in Moyale)
year first funded
2007
action
Construction Of One Classroom
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Heilu Maternity

location
Heilu (in Moyale)
year first funded
2003
action
Maternity Block Built 80% Complete
output
To Bring Health Services Nearer
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Golole Primary School

location
Golole (in Moyale)
year first funded
2008
action
Construction Of One Class
output
Access To Education
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 500,000

Godoma Didiko Borehole

location
Godoma (in Moyale)
year first funded
2008
action
Cdf Contribution To The Community
output
Access To Water
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Galma Primary School

location
Uran (in Moyale)
year first funded
2007
action
Construction Of One Classroom
output
Promote Education
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Dabel Secondary School

location
Dabel (in Moyale)
year first funded
2008
action
Community Distribution By Cdf
output
Access To Education
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Peace And Reconciliation

location
Sololo (in Moyale)
year first funded
2004
action
Facilitating Peace Process
output
Minimize Interclan Rivalry
implementation status
Facilitated
total cost
Ksh 300,000
estimate
Ksh 300,000

Dadach Elele Dam

location
Uran (in Moyale)
year first funded
2006
action
Construction Of Dam
output
Access Water Point
implementation status
Not Done
total cost
Ksh 300,000
estimate
Ksh 300,000

Ramole Earth Pan

location
Sololo (in Moyale)
year first funded
2006
action
Earth Pan Manually Constructed
output
To Give Water Point
implementation status
Completed And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Odda Water Supply

location
Odda (in Moyale)
year first funded
2003
action
Construction Of Water Kiosk
output
Access Of Water To The Resident Of Odda
implementation status
Complete
total cost
Ksh 220,000
estimate
Ksh 220,000

Moyale District Deeda Council

location
Sololo (in Moyale)
year first funded
2006
action
Awareness Creation On Environmental Conservation
output
To Conserve Environment
implementation status
Facilitated
total cost
Ksh 200,000
estimate
Ksh 200,000

Madho Furniture

location
Uran (in Moyale)
year first funded
2006
action
50 (Furniture) Desk
output
Helping Sitting Facilities
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Mado Adhi

location
Sololo (in Moyale)
year first funded
2007
action
Construction Of Classrooms
output
Promote Education
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 200,000

Purchase Of Unihuts - Rawana

location
Rawana (in Moyale)
year first funded
2006
action
Purchase Of Unihuts
output
To Develop Security
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000