The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Bursary
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- used
- total cost
- Ksh 25,409,132
- estimate
- Ksh 0
Jego Girls Secondary School Ngozi Girl
- location
-
Vanga
(in Msambweni)
- year first funded
- 2003
- action
- Dormitory, Septic Tank To Completion.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 10,770,000
- estimate
- Ksh 10,770,000
Mwambao- Fikirini-Kibuyini-Shimonikm
- location
-
Pongwe/Kidimu
(in Msambweni)
- year first funded
- 2008
- action
- Road Construction
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 10,000,000
- estimate
- Ksh 14,000,000
Diani Health Centre Gombat
- location
-
Diani
(in Msambweni)
- year first funded
- 2003
- action
- Equipping With The Balance Of Kshs.431,000 To Be Done + The Moh Kwale To Avail Staff
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 9,564,000
- estimate
- Ksh 10,000,000
Constituency Office Kanan
- location
-
Pongwe/Kidimu
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of An Office+ Perimeter Wall
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 9,500,000
- estimate
- Ksh 17,000,000
Emergency
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- used
- total cost
- Ksh 9,454,166
- estimate
- Ksh 0
Administration
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- used
- total cost
- Ksh 7,327,012
- estimate
- Ksh 0
10 Msambweni Schools - computers
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2006
- action
- Supply Of Computers To Ten Schools.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 7,200,000
- estimate
- Ksh 7,200,000
Mkwiro -Wasini Water Project
- location
-
Pongwe/ Kidimu
(in Msambweni)
- year first funded
- 2006
- action
- Construction Of Jabias
- output
- -
- implementation status
- Mkwiro Complete
- total cost
- Ksh 4,600,000
- estimate
- Ksh 4,600,000
Lunga - Lunga Health Centre
- location
-
LungaLunga
(in Msambweni)
- year first funded
- 2003
- action
- Equipping Of The Health Centre Done.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 4,500,000
- estimate
- Ksh 4,500,000
Mwananyamala Dispensary
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2005
- action
- Complete Purchase Of Equipment For The Hospital.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 4,400,000
- estimate
- Ksh 2,500,000
Mwereni Secondary School
- location
-
Mwereni
(in Msambweni)
- year first funded
- 2003
- action
- Construction Of A Dormitory And A Septic Tank.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 4,100,000
- estimate
- Ksh 4,300,000
Pongwe/ Kidimu Water Project
- location
-
Pongwe/ Kidimu
(in Msambweni)
- year first funded
- 2004
- action
- Piping And Installation Of A Pump
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,700,000
Mwalewa - Ngathini - Juakali Water Project
- location
-
Vanga
(in Msambweni)
- year first funded
- 2005
- action
- Pipes Extension
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,600,000
- estimate
- Ksh 3,600,000
Mrima Water Project
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2005
- action
- Pipes Extension And Purchase Of Two Tanks.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,500,000
- estimate
- Ksh 3,900,000
Kikoneni Secondary School
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2004
- action
- A Lab. And A Girls Dormitory
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,300,000
- estimate
- Ksh 3,300,000
Double Cabin X
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- Purchase Of A Vehicle.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,200,000
- estimate
- Ksh 3,200,000
Godo Dispensary
- location
-
LungaLunga
(in Msambweni)
- year first funded
- 2005
- action
- Equipping Done
- output
- -
- implementation status
- Completed
- total cost
- Ksh 3,000,000
- estimate
- Ksh 300,000,000
Msambweni Secondary School
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of Admin.Block
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
Shimoni Secondary School
- location
-
Pongwe/ Kidimu
(in Msambweni)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms & Admn.Block-Phase 1 Together With Toilets At Supply Of School Furniture.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 14,000,000
Zigira Road Drift
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2008
- action
- Road Construction
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Jego - Kiwegu Electrification Project
- location
-
Vanga
(in Msambweni)
- year first funded
- 2005
- action
- Erection Of Poles And Transformer
- output
- -
- implementation status
- Completed
- total cost
- Ksh 2,463,000
- estimate
- Ksh 2,463,000
Bumbuni Water Project
- location
-
Vanga
(in Msambweni)
- year first funded
- 2006
- action
- Pipe Extensions
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Mwabungu Mwamu Primary School
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- -
- implementation status
- Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Gombato Secondary School
- location
-
Diani
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of A Class N An Office
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Muhaka Secondary School
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of A Class N An Office
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Vanga- Lunga Lunga Road
- location
-
Lunga Lunga
(in Msambweni)
- year first funded
- 2007
- action
- Gravelling, Murraming And Culverting
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Strategic Plan Workshop, Website Documentation And Launchin
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- Preparation And Launching Of A Strategic Plan
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Bongwe-Shamu Primary School
- location
-
Diani
(in Msambweni)
- year first funded
- 2006
- action
- Construction Of Two Classrooms And Power
- output
- -
- implementation status
- Shamu Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Mwena -Mchongo Bridge
- location
-
Vanga
(in Msambweni)
- year first funded
- 2006
- action
- Putting Up A Passage Bridge
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Perani / LPrimary School
- location
-
Lunga Lunga
(in Msambweni)
- year first funded
- 2006
- action
- Two Classrooms
- output
- -
- implementation status
- Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Mwananyamala Secondary School
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2005
- action
- Construction Of A Hall
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Kona Ya Musashamu Electrification Project
- location
-
Diani
(in Msambweni)
- year first funded
- 2005
- action
- Erection Of Poles And Transformer
- output
- -
- implementation status
- Completed
- total cost
- Ksh 1,745,800
- estimate
- Ksh 1,745,800
Recurrent Expenditure
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- used
- total cost
- Ksh 1,724,453
- estimate
- Ksh 0
Milalani Primary School
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2005
- action
- Construction Of 3 Classroom To Completion
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Lunga-Lunga Secondary School
- location
-
Lunga Lunga
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- -
- implementation status
- On- Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Masimbani Primary School
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Mivumoni Secondary School
- location
-
Mivumoni
(in Msambweni)
- year first funded
- 2007
- action
- Bus Deposit.
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,600,000
Mbuwani Primary School
- location
-
Diani
(in Msambweni)
- year first funded
- 2005
- action
- Construction Of 3 Classroom To Completion
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Store At Red Cross
- location
-
Diani
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of A Store And An Office.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 14,001,485
Desk Project
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2004
- action
- Supply Of Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,347,000
- estimate
- Ksh 1,347,000
Mzizima Dispensary
- location
-
P/Kidimu
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of A Staff House
- output
- -
- implementation status
- On- Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Vanga Primary School
- location
-
Vanga
(in Msambweni)
- year first funded
- 2005
- action
- Renovation Of The School
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Vitsangalaweniphase Water Pan
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2008
- action
- Scooping Of Water Harvesting Pan
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Fahamuni Primary School
- location
-
Kingwede/ Shirazi
(in Msambweni)
- year first funded
- 2005
- action
- Construction Of 3 Classroom To Completion
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Ngozi Girls Secondary School
- location
-
Vanga
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of A Septic Tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,170,000
- estimate
- Ksh 1,170,000
Murraming At Shimoni Matatu Terminus
- location
-
P/Kidimu
(in Msambweni)
- year first funded
- 2007
- action
- Putting Murram At Shimoni
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 4,000,000
Sports Activities
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- used
- total cost
- Ksh 1,149,636
- estimate
- Ksh 0
Monitoring And Evaluation
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- used
- total cost
- Ksh 1,149,636
- estimate
- Ksh 0
Kinondo Secondary School
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of One Class
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 1,140,000
- estimate
- Ksh 1,140,000
Lunga Lunga Plunge Dip
- location
-
LungaLunga
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of A Cattle Dip
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Shirazi Primary School
- location
-
Kingwede / Shirazi
(in Msambweni)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- -
- implementation status
- 2 Classrooms Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Shimoni Road
- location
-
P/Kidimu
(in Msambweni)
- year first funded
- 2007
- action
- Gravelling, Murraming And Culverting
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Diani Beach Road
- location
-
Diani
(in Msambweni)
- year first funded
- 2007
- action
- Gravelling, Murraming And Culverting
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mwena Primary School
- location
-
(in Msambweni)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Usage of emergency
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mkwambani Primary School
- location
-
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Msambweni Primary School
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mwandeo Primary School
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Vitsangalewani Primary School
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mabambarani Primary School
- location
-
L/Lunga
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mtumwa Primary School
- location
-
Mwereni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Not Yet Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Magombani Primary School
- location
-
Mwereni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Not Yet Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kilimangodo Primary School
- location
-
Mwereni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- On- Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Makojoni Naserian Primary School
- location
-
L/Lunga
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- On- Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mpakani Police Housing Project
- location
-
L/Lunga
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of Police Houses To Completion
- output
- -
- implementation status
- Complete
- total cost
- Ksh 985,288
- estimate
- Ksh 9,852,875
Land Kwale/Ukunda For Building Gombato Secondary School
- location
-
Diani
(in Msambweni)
- year first funded
- 2008
- action
- Purchase Of Land For The School
- output
- -
- implementation status
- Complete
- total cost
- Ksh 908,542
- estimate
- Ksh 908,542
Kidzumbani Primary School
- location
-
Mivumoni
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of A Class N Renovation
- output
- -
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Mamba Primary School
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of Administration Block
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Maledi Primary School
- location
-
Mwena
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- On- Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Recurrent Expenditure
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- Meeting The Expenses For The Vehicle
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Jego Primary School
- location
-
Vanga
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Diani Secondary School
- location
-
Diani
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kinondo Secondary School
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kingwede Primary School
- location
-
Kingwede/ Shirazi
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Milalani Primary School
- location
-
(in Msambweni)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Usage of emergency
- total cost
- Ksh 758,300
- estimate
- Ksh 0
Kibuyuni Primary School
- location
-
Pongwe/ Kidimu
(in Msambweni)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Short Plunge Dip Msong
- location
-
Mwereni
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of Short Cattle Dip
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Bidinimole Primary School
- location
-
Mwereni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Not Yet Started
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kidzumbani Primary School
- location
-
Mivumoni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- C0Mplete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Mwazaro Nursery
- location
-
Pongwe/Kidimu
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kiwambale Nursery
- location
-
Pongwe/ Kidimu
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Deos Office
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of An Office.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Tree Nursery Vingujini
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2008
- action
- Constructor Of Water Tower
- output
- -
- implementation status
- On- Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kikoneni Water Project
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2007
- action
- Drilling Of A Borehole
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kidzumbani Borehole
- location
-
Mivumoni
(in Msambweni)
- year first funded
- 2005
- action
- Construction Of A Borehole
- output
- -
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Majoreni Health Centre
- location
-
Pongwe/ Kidimu
(in Msambweni)
- year first funded
- 2003
- action
- Equipping Of The Health Centre.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
School Desks Jomo Kenyatta Memorial Primary School Schooloo
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- Purchase Of Desks For The School
- output
- -
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Kichukwa Mkwaju School For The Disabled
- location
-
P/Kidimu
(in Msambweni)
- year first funded
- 2007
- action
- Construction Of One Class
- output
- -
- implementation status
- Complete
- total cost
- Ksh 441,448
- estimate
- Ksh 441,448
Kiruku Secondary School Furnitur
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2008
- action
- Supply Of School Furniture.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 440,000
- estimate
- Ksh 440,000
Kinondo Water Project
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2003
- action
- Drilling Of A Borehole
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Miivumoni Water Project
- location
-
Mivumoni
(in Msambweni)
- year first funded
- 2007
- action
- Drilling Of A Borehole
- output
- -
- implementation status
- Not - Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kinondo Community Health Centre Power Installatio
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2007
- action
- Purchase Of A Transformer
- output
- -
- implementation status
- Not Yet Started
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kikoneni Water Project
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2003
- action
- Drilling Of A Borehole
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Msambweni Water Project
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2003
- action
- Drilling Of A Borehole.
- output
- -
- implementation status
- Complete.
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Dzombo Primary School
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2003
- action
- Construction Of A Class
- output
- -
- implementation status
- Complete
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Vanga Water Project
- location
-
Vanga
(in Msambweni)
- year first funded
- 2003
- action
- Drilling Of A Borehole
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kinondo Secondary School Computer La
- location
-
Kinondo
(in Msambweni)
- year first funded
- 2007
- action
- Converting A Class To Computer Lab
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mwangwei Primary School Installatio
- location
-
P/Kidimu
(in Msambweni)
- year first funded
- 2007
- action
- Purchase Of A Transformer
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mwauga Purchase Of A Transforme
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2007
- action
- Purchase Of A Transformer
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kivuleni Purchase Of A Transforme
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2007
- action
- Purchase Of A Transformer.
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tsuini-Miungoni Water Project
- location
-
Vanga
(in Msambweni)
- year first funded
- 2005
- action
- Pipes Extension
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kikoneni Health Centre
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2004
- action
- Equipping Of Centre
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tsuini Foot Bridgevang
- location
-
Vanga
(in Msambweni)
- year first funded
- 2008
- action
- Repairing And Strengthening
- output
- -
- implementation status
- Complete
- total cost
- Ksh 287,409
- estimate
- Ksh 28,740,925
Cross Constituency Visit
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Not Yet Started
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Franz Josef Mamba Secondary School Computer La
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2007
- action
- Converting A Class To Computer Lab
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Msambweni Secondary School Computer La
- location
-
Msambweni
(in Msambweni)
- year first funded
- 2007
- action
- Converting A Class To Computer Lab
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kikoneni Secondary School Computer La
- location
-
Kikoneni
(in Msambweni)
- year first funded
- 2007
- action
- Converting A Class To Computer Lab
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Cattle Crush Pens
- location
-
Mwereni
(in Msambweni)
- year first funded
- 2008
- action
- Construction Of 4 Cattle Crush Pens
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwananyamala Secondary School Computer La
- location
-
Dzombo
(in Msambweni)
- year first funded
- 2007
- action
- Converting A Class To Computer Lab
- output
- -
- implementation status
- Not Yet Started
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mivumoni Secondary School Computer La
- location
-
Mivumoni
(in Msambweni)
- year first funded
- 2007
- action
- Converting A Class To Computer Lab
- output
- -
- implementation status
- Not Yet Started
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwamambi Primary School
- location
-
Diani
(in Msambweni)
- year first funded
- 2008
- action
- Renovation
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000