The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Education Bursary
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2004
- action
- To Assist Needy Students
- output
- High Sch. Completion Rates
- implementation status
- On Going
- total cost
- Ksh 26,987,257
- estimate
- Ksh 0
Emergency
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2004
- action
- For Emergency Situations
- output
- Disusters Addressed
- implementation status
- On Going
- total cost
- Ksh 12,837,833
- estimate
- Ksh 0
Kimobo/Kamtiong Water Project
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2004
- action
- Protection Of Catchment, Construction Of Tanks & Laying Of Pipes
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 9,000,000
- estimate
- Ksh 9,000,000
Office Adimin
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2004
- action
- Management & Supervision
- output
- Project Completion
- implementation status
- On Going
- total cost
- Ksh 7,594,998
- estimate
- Ksh 7,594,998
Kapsokwony Divisional Office
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Offices & Staff Housing
- output
- Do'S Office & Staff Quarters
- implementation status
- Office Block Complete, Shutters To Be Fitted
- total cost
- Ksh 6,200,000
- estimate
- Ksh 6,200,000
Kapsokwony Secondary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2004
- action
- Renovation Of 9 Classrooms & Dining Hall. Construction Of Dormitory
- output
- Classrooms
- implementation status
- Renovation Completed.
- total cost
- Ksh 6,000,000
- estimate
- Ksh 6,000,000
Cheptais Secondary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2005
- action
- School Bus & Construction, Computers
- output
- Bus & Classrooms, & Dormitory
- implementation status
- Bus & Computers Bought.
- total cost
- Ksh 5,500,000
- estimate
- Ksh 5,500,000
Moi Kaptama Elecproject
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2005
- action
- Installation Of Electricity, School Bus, Contruction Of Classrooms
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 5,300,000
- estimate
- Ksh 5,300,000
Kapkateny Secondary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction & School Bus
- output
- Classrooms
- implementation status
- Bus Bought, Dormitory Not Completed.
- total cost
- Ksh 5,000,000
- estimate
- Ksh 5,000,000
Kopsiro Health Centre
- location
-
Chepyuk
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction, Purchase Of Ambulance
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 4,900,000
- estimate
- Ksh 4,900,000
Chebich Fcs
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2005
- action
- Coffee Machine, Buildings & Drying Beds
- output
- Machines & Drying Beds
- implementation status
- Coffee Machine Bought, Building & Drying Beds Constructed
- total cost
- Ksh 3,800,000
- estimate
- Ksh 3,800,000
Maintenance Of Office Equipment
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2008
- action
- Recurrent Expenditure
- output
- Efficient Equipment
- implementation status
- On Going
- total cost
- Ksh 3,140,047
- estimate
- Ksh 3,140,047
Cdf Office Construction
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2008
- action
- Land & Construction Of Office
- output
- Office
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Kapsambu Primary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 3 Lassrooms
- output
- Classrooms
- implementation status
- On Going, Shutters To Be Fitted, And Flooring To Be Done
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Kipsis Girls Secondary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction Of Laboratory, Land Purchase & Construction Of Classrooms
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,600,000
Kaptama D's Office
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Offices
- output
- Do'S Office
- implementation status
- On Going
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Monitoring & Evaluation
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2003
- action
- Management & Supervision
- output
- Project Completion
- implementation status
- On Going
- total cost
- Ksh 2,186,600
- estimate
- Ksh 2,186,600
St. Marks Kipchira Secondary School
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of 5 Classrooms & Office, & Laboratory
- output
- Classrooms
- implementation status
- Completed & In Use
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Marigo Water Supply
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2008
- action
- Protection Of Water Intake & Laying Of Pipes
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Environmental Activities
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2008
- action
- Support Of Environmental Activities
- output
- Trees
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 2,086,600
- estimate
- Ksh 2,086,600
Sports Activities
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2008
- action
- Support Of Sports Activities
- output
- Improve Sports Talent
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 2,070,937
- estimate
- Ksh 2,070,937
Chebwek Primary School
- location
-
Chepkube
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- One Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Toroso Secondary School
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2008
- action
- Completion Of Dining Hall
- output
- Dining Hall
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kibuk Girls Secondary School
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Dining Hall
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kaptalelio Primary School
- location
-
Kongit
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of 5 Classrooms
- output
- Classrooms
- implementation status
- 3 Complete, 2 Built Upto Lintel Level
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Chesito Secondary School
- location
-
Kaboywo
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Chesikaki Secondary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kibuk Water Supply
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2005
- action
- Supply Of Water
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Bugaa Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of 7 Classrooms & 1 Acre Of Land
- output
- Classrooms & Land
- implementation status
- Classrooms Constructed But Shutters & Plastering Not Done. Land Yet To Purchase
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,750,000
Kapsambu Dispensary
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction Of 6 Rooms
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Kamenjo Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Dispensary & Land Purchase
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Terem Secondary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Chemoge Secondary School
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of Laboratory & Purchase Of Land
- output
- Complete Laboratory & Land
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Kaborom Community Dispensary
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,539,547
- estimate
- Ksh 1,539,547
Wasio Deb Primary School
- location
-
Chepkube
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Terem SaPrimary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2003
- action
- Contruction Of 4 Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Rural Electrification Authority
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2009
- action
- Marching Fund Rural Electrification
- output
- -
- implementation status
- 2 classrooms roofed at lintal
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Mulatiwa Secondary School
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms & Dining Hall
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kipsoen Primary School
- location
-
Kamuneru
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Completed, But Floors & Plastering Not Done
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kimobo Primary School
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2006
- action
- Renovation Of 4 Classrooms & Construction Of 2 Others
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kimabole Friends Secondary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kim Girls Kapkota
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2003
- action
- Electrification
- output
- Electricity
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kaptama Health Centre
- location
-
Kongit
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Not Commenced, Funds Yet To Be Disbursed.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kapsokwony District Hospital
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Wards
- output
- Drying Beds
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kaboywo Health Centre
- location
-
Kaboywo
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Wards
- output
- Health Centre
- implementation status
- Completed , Yet To Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Cheptonon Primary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going Complete, Shutters Not Fitted. Another One Not Started.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Chelilde Primary School
- location
-
Kaboywo
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of 8 Classrooms & Admin Block
- output
- Classrooms
- implementation status
- Classroms Built, Floors Not Plastered, Painting, Shutters & Verandah Not Done.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Banantega Primary School
- location
-
Emia
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Chepkerer Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Chesiywo Primary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction & 1 Acre Of Land
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Sendera S Secondary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Classrooms- Completion Of Dining Hall
- output
- Classrooms
- implementation status
- Complete, Shutters Not Fitted & Flooring Not Done
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Kimaswa Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,398,481
- estimate
- Ksh 1,398,481
Toywondet Primary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Classrooms Built, Plastering Not Done
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Toywondet Water Project
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2003
- action
- Supply Of Water
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Kamenjo Dispensary
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- 50% Of Building Completed & In Use, Others Require Plastering & Shutters.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Kaborom Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,250,000
Makunga Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms & Lightening Arrestors
- output
- Classrooms & Arrestors
- implementation status
- Completed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,250,000
Rwanda Community Dispensary
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,215,088
- estimate
- Ksh 1,215,088
Kapkuseng' Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of Classrooms & Purchase Of Land
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Kipsabula Primary School
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms & Purchase Of Land
- output
- Classrooms
- implementation status
- Clasrooms Built, Shutters, Verandah, & Painting Not Done.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Constituency Development Fund Committee
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2009
- action
- Training And Capacity Building
- output
- -
- implementation status
- To be fuded from second instalment
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Chepkoya Primary School
- location
-
Kongit
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Mulatiwa Primary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction & Renovation Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Kongit Secondary School
- location
-
Kongit
(in Mt Elgon)
- year first funded
- 2003
- action
- Renovation Of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Kaberua Primary School
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bishop Okiring Secondary School
- location
-
Kamuneru
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction Of Dormitory
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chelebei Primary School
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2006
- action
- Renovation Of 3 Classrooms
- output
- Classrooms
- implementation status
- Renovation Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chelebei Secondary School
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms & Staff Room
- output
- Classrooms
- implementation status
- Buildings Completed, Shutters Not Fitted, Floor Plastering, Painting Not Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chemuses Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Classrooms Built, Shutters, Plastering & Verandah Not Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Cheptais Community College
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- 2 Acres Of Land & Construction Of Classrooms
- output
- -
- implementation status
- To be fuded from second instalment
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Cheromis Rc Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chesikaki Rc Primary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chesito Primary School
- location
-
Kaboywo
(in Mt Elgon)
- year first funded
- 2004
- action
- Renovation Of 5 Class
- output
- Classrooms
- implementation status
- Completed, But Floors Of Two Of Them Not Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Elgon Water Supply
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2008
- action
- Purchase Of Pipes
- output
- Water
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kaboywo Primary School
- location
-
Kaboywo
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Funded
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kaboywo Secondary School
- location
-
Kaboywo
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kamosong Primary School
- location
-
Chepkube
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kapkateny Dispensary
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kapkateny Primary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kapsokwony Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kewabrang' Primary School
- location
-
Kongit
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Classrooms Built, Floor Slab, Plastering, Verandah & Shutters To Be Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kibuk Primary School
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Complete, But No Shutters
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kimabole Secondary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- School Bus Project
- output
- -
- implementation status
- At initial stage
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kimobo Friends Secondary School
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2006
- action
- Renovation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kipsis Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Koshok Dipsensary
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction Of Rooms
- output
- Dispensary
- implementation status
- On Going Built Upto Lintel Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nomorio Rc Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Sango Primary School
- location
-
Kamuneru
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Tendet Primary School
- location
-
Elgon
(in Mt Elgon)
- year first funded
- 2005
- action
- Renovation Of 4 Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kaptalelio Health Centre
- location
-
Kongit
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 947,714
- estimate
- Ksh 947,714
Juakali Shades
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2005
- action
- Revolving Fund
- output
- -
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Kipyeto Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Classrooms & Purchase Of Land
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Bukonoi Primary School
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2004
- action
- Renovation Of 5 Classrooms & Construction Of Administration Block, & Electrification
- output
- Renovated Classrooms & Admin Block
- implementation status
- Classrooms Renovation Complete, Admin Block Not Built
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Chongeywo Primary School
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going One Constructed, Another Not Started.
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Kubra Dispensary
- location
-
Emia
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of Rooms
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Chesikaki Health Centre
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Staff Quarters
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Sasur Coffee Factory
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Drying Beds
- output
- Drying Beds
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Murwani Primary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Chemworemwo Dispensary
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Rooms
- output
- Dispensary
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Chemondi Pri, School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction Of Classroom & Purchase One Acre Of Land
- output
- Classrooms
- implementation status
- On Going, Land Not Bought
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Kapkateny Sacho Bridge
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2009
- action
- Construction Of Foot Bridge
- output
- -
- implementation status
- Funded
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kiptii Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- 1 Acre Of Land & Construction Of Classroom
- output
- -
- implementation status
- Laboratory funded under normal
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Sambocho Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Epuri Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kaptegantet Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Chesinende Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kapchebon Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kamuneru Health Centre
- location
-
Kamuneru
(in Mt Elgon)
- year first funded
- 2003
- action
- Construction
- output
- Dispensary & Staff Quarters
- implementation status
- Dispensary Complete & In Use, Staff House Not Complete.
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kimerin S A Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- -
- implementation status
- Classrooms funded under normal
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kimama Primary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms & Office
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kibumet Primary School
- location
-
Chepyuk
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kibei S A Primary School
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Classrooms Built, Floor Slab, Plastering, Verandah & Shutters To Be Done
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaptunguruwo Primary School
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaptola Secondary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- -
- implementation status
- Classrooms funded under normal
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaptola Secondary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of Laboratory
- output
- Classrooms
- implementation status
- Completed, But Flooring, Plastering Not Done. Shutters Not Fitted.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaptola Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2007
- action
- Renovation Of Six Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaptoboi Primary School
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaptama Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2006
- action
- Renovation Of Ten Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kapsesoi S A Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kapkuseng Dispensary
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction
- output
- Dispensary
- implementation status
- Funded
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kapkurongo Primary School
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Classrooms
- implementation status
- Classroms Built, Floors Not Plastered, Painting, Shutters & Verandah Not Done.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kapkota Dispensary
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Rooms
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kamurwani Dispensary
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Rooms
- output
- Dispensary
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kamenjo Health Centre
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2009
- action
- 1 Acre Of Land & Construction Of Staff House
- output
- -
- implementation status
- Funded
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaimugul Primary School
- location
-
Chepyuk
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kabukwo Primary School
- location
-
Chepyuk
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Computer Software
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2009
- action
- Pmc Accounting Data Capture And Reporting.
- output
- -
- implementation status
- To be fuded from second instalment
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chesikaki Primary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction
- output
- Classrooms
- implementation status
- Almost to completion
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Cherongos Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Cheptais Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chemworemwo Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chemweisus Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chemses R C Primary School
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2005
- action
- Renovation Of 5 Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chemoikuut Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Deo''s Office
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Office
- output
- Office
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chepukat Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Walanga Primary School
- location
-
Chepkube
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete, Shutters Not Fitted.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tulwo Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tuikut Dispensary
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- Electrification & Construction Of Maternity Ward
- output
- -
- implementation status
- Completion work in progress
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
St. Johns Secondary School
- location
-
Chepyuk
(in Mt Elgon)
- year first funded
- 2005
- action
- To Complete 4 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sirgoi Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Just Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sacho Primary School
- location
-
Kamuneru
(in Mt Elgon)
- year first funded
- 2005
- action
- Renovation Of 5 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Namatutoa Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- Land & Construction
- output
- -
- implementation status
- Laboratory funded under normal
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mulukhu Primary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mosindet Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Just Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Masaek Primary School
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Marigo Primary School
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Marigo Dispensary
- location
-
Sasur
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Rooms
- output
- Dispensary
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Koshok Primary School
- location
-
Nomorio
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kongit Primary School
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2007
- action
- Construction
- output
- Classrooms
- implementation status
- Normal funding for classroom construction
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kisongo Youth Polytechnic
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Classroom
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kipsikirok Primary School
- location
-
Chepyuk
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Classrooms Built, Shutters, Plastering & Verandah Not Done
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kimkung Sda Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction & Renovation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chemoge Primary School
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chemoge Dispensary
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2008
- action
- Construction Of Rooms
- output
- Dispensary
- implementation status
- New, Project Funds Not Disbursed.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Cheiptais Health Centre
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chebich Primary School
- location
-
Kapkateny
(in Mt Elgon)
- year first funded
- 2005
- action
- Construction Of 5 Classrooms
- output
- Classrooms
- implementation status
- Classrooms Constructed But Shutters, Floors & Plastering Not Done.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaptama Milk Cooler
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2009
- action
- Overhaul Of Plant
- output
- -
- implementation status
- Laboratory equipments installed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Cheromis Primary School
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2009
- action
- 2 Acres Of Land
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Peresten Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- 2 Acres Of Land
- output
- -
- implementation status
- Laboratory funded under normal
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Chepkube Dispensary
- location
-
Chepkube
(in Mt Elgon)
- year first funded
- 2004
- action
- Construction
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Equiping Livestock Farmers Centre
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2009
- action
- Artificial Insemination Equipment & Egg Incubator
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kimabole Primary School
- location
-
Chesikaki
(in Mt Elgon)
- year first funded
- 2004
- action
- Renovation & Electrification
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Chebombai Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2009
- action
- 1 Acre Of Land
- output
- -
- implementation status
- Not satiffactory subject to audit
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kipchiria Primary School
- location
-
Chemoge
(in Mt Elgon)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- One Complete, Other Does Not Have Shutters & Plasterung Not Done
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kaptaleleo Baptist Primary School
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2009
- action
- 1 Acre Of Land
- output
- Land
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Cheptais Sda Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2009
- action
- 1 Acre Of Land
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kaboywo Dispensary
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2009
- action
- One Acre Of Land
- output
- -
- implementation status
- Re-allocated
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Cheptais S A Primary School
- location
-
Cheptais
(in Mt Elgon)
- year first funded
- 2004
- action
- Renovation
- output
- Renovated Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kaboywo Water Project
- location
-
Kaboywo
(in Mt Elgon)
- year first funded
- 2004
- action
- Design Works
- output
- Drawings
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Soef Youth Cbo
- location
-
Kapsokwony
(in Mt Elgon)
- year first funded
- 2004
- action
- Purchase Of DuSt. Bins
- output
- Dustbins
- implementation status
- Completed
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Bondeni Voluntary Self Help Group
- location
-
Kaptama
(in Mt Elgon)
- year first funded
- 2004
- action
- Tree Planting
- output
- Trees
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 35,000
Kamuneru Environment & Dev Group
- location
-
Kamuneru
(in Mt Elgon)
- year first funded
- 2004
- action
- Tree Planting
- output
- Trees
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 35,000
Amani Youth Cbo
- location
-
Chongeywo
(in Mt Elgon)
- year first funded
- 2004
- action
- Tree Planting
- output
- Trees
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 35,000
Nema - Mt Elgon
- location
-
Mt. Elgon
(in Mt Elgon)
- year first funded
- 2004
- action
- Dissemination Of Environmental Knowledge
- output
- Environmental Awareness
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Kamenjo Primary School
- location
-
Kaptama
(in Mt Elgon)
- action
- Construction Of Classrooms
- output
- -
- implementation status
- Re-allocated
- total cost
- Ksh 0
- estimate
- Ksh 0
Kapkoto Primary School
- location
-
Sasur
(in Mt Elgon)
- action
- Construction
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 0
- estimate
- Ksh 0