The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Muhoroni

Magare Secondary School

location
North Eastkano (in Muhoroni)
year first funded
2004
action
Classroom & Lab Office Construction
output
-
implementation status
On Going
total cost
Ksh 4,560,000
estimate
Ksh 3,350,000

Nyangoma Secondary School

location
Nyangoma (in Muhoroni)
year first funded
2003
action
Lab & Lib Construction
output
-
implementation status
On Going
total cost
Ksh 4,410,000
estimate
Ksh 3,800,000

Mariwa Secondary School

location
God Nyithindo (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 4,200,000
estimate
Ksh 3,600,000

Menara Secondary School

location
Koru (in Muhoroni)
year first funded
2004
action
Lab&Dom Construction
output
-
implementation status
On Going
total cost
Ksh 4,200,000
estimate
Ksh 3,700,000

Oduwo Secondary School

location
Tamu (in Muhoroni)
year first funded
2004
action
Class/Adm/Lab Construction
output
-
implementation status
On Going
total cost
Ksh 4,100,000
estimate
Ksh 3,600,000

Koru Clinic

location
Koru (in Muhoroni)
year first funded
2003
action
Clinic & Staff House Bldg Construction
output
-
implementation status
On Going
total cost
Ksh 3,295,000
estimate
Ksh 3,035,000

Ogen Secondary School

location
Chemelil (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 3,100,000
estimate
Ksh 2,500,000

Olik Oliero Secondary School

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,750,000
estimate
Ksh 1,300,000

Oginga Odinga Secondary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom & Admin Block Construction
output
-
implementation status
On Going
total cost
Ksh 2,750,000
estimate
Ksh 2,000,000

Soghor Secondary School

location
Tamu (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,700,000
estimate
Ksh 2,400,000

Ngeny' Secondary School

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,695,000
estimate
Ksh 2,000,000

God Abuoro Secondary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom & Admin Block Construction
output
-
implementation status
On Going
total cost
Ksh 2,600,000
estimate
Ksh 2,000,000

Ombeyi Secondary School

location
Ombeyi North (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,580,000
estimate
Ksh 2,180,000

Nyangore Footbridge

location
Chemelil (in Muhoroni)
year first funded
2004
action
Bridge Construction
output
-
implementation status
Complete
total cost
Ksh 2,565,000
estimate
Ksh 2,565,000

Kibigori Secondary School

location
Chemelil (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,550,000
estimate
Ksh 1,950,000

Muhoroni Secondary School

location
Muhoroni (in Muhoroni)
year first funded
2004
action
Multipurpose Hall Cons
output
-
implementation status
On Going
total cost
Ksh 2,480,000
estimate
Ksh 2,180,000

Ngere Kagoro Secondary School

location
Nyangoma (in Muhoroni)
year first funded
2004
action
Admin. Block Construction
output
-
implementation status
On Going
total cost
Ksh 2,475,000
estimate
Ksh 2,080,000

Fort Tenan Health Clinic

location
Fort Ternan (in Muhoroni)
year first funded
2003
action
Maternity Ward & Placenta Pit Const
output
-
implementation status
On Going
total cost
Ksh 2,450,000
estimate
Ksh 2,150,000

Miwani Secondary School

location
Miwani (in Muhoroni)
year first funded
2004
action
Multipurp Hall Cons
output
-
implementation status
On Going
total cost
Ksh 2,380,000
estimate
Ksh 2,080,000

Koru Secondary School

location
Koru (in Muhoroni)
year first funded
2004
action
Dom Construction
output
-
implementation status
Complete
total cost
Ksh 2,380,000
estimate
Ksh 2,080,000

Nyakoko Secondary School

location
North Eastkano (in Muhoroni)
year first funded
2003
action
Library Constuction
output
-
implementation status
On Going
total cost
Ksh 2,380,000
estimate
Ksh 2,080,000

Township Primary School

location
Muhoroni (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,366,000
estimate
Ksh 1,966,000

St. Augustine Kandege Secondary School

location
Fort Ternan (in Muhoroni)
year first funded
2004
action
Staff House, Dom, Class, Construction
output
-
implementation status
On Going
total cost
Ksh 2,280,000
estimate
Ksh 1,980,000

Achego Secondary School

location
Tamu (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,280,000
estimate
Ksh 1,980,000

Our Queen Of Peace Secondary School

location
Muhoroni (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 2,050,000
estimate
Ksh 1,300,000

Ruke Primary School

location
Muhoroni (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,991,000
estimate
Ksh 1,691,000

Cappuchin Franciscan Masogo Girls Secondary School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Lockers/Construction
output
-
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Miwani West Water Project

location
Miwani (in Muhoroni)
year first funded
2003
action
Purchase And Instalation Of Water Pump
output
-
implementation status
On Going
total cost
Ksh 1,550,000
estimate
Ksh 1,550,000

Mutuala Primary School

location
Muhoroni (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,541,000
estimate
Ksh 1,241,000

Kipturi Primary School

location
God Nyithindo (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,350,000
estimate
Ksh 1,100,000

Tamu Health Centre

location
Tamu (in Muhoroni)
year first funded
2003
action
Staff House/ Water/Electric
output
-
implementation status
On Going
total cost
Ksh 1,275,000
estimate
Ksh 700,000

Jaber Primary School

location
God Nyithindo (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,250,000
estimate
Ksh 1,050,000

Tonde Primary School

location
God Nyithindo (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,250,000
estimate
Ksh 1,050,000

Nyangoma Water Project

location
Nyangoma (in Muhoroni)
year first funded
2008
action
Borehole Construction
output
-
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 700,000

Nyando Primary School

location
Koru (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,025,000
estimate
Ksh 735,000

Muhoroni District Headquarter

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
To Start
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Gul Primary School

location
Chemelil (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 850,000

Muhoroni Factory Primary School

location
God Nyithindo (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 800,000

Chiefs Office

location
Muhoroni (in Muhoroni)
year first funded
2005
action
Office Construction
output
-
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 950,000

Archbishop Okoth College Of Technology

location
Koru (in Muhoroni)
year first funded
2008
action
Renovation /Extention/ Equipment
output
-
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Soghor Primary School

location
Tamu (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 971,430
estimate
Ksh 721,430

Saoset Water Project

location
Fort Ternan (in Muhoroni)
year first funded
2004
action
Borehole Construction
output
-
implementation status
Complete
total cost
Ksh 930,000
estimate
Ksh 700,000

Miwani Section Iii Primary School

location
Miwani (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 925,000
estimate
Ksh 675,000

Oroba Primary School

location
Chemelil (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 890,000
estimate
Ksh 700,000

Kisure Primary School

location
Miwani (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 600,000

Koru Township Primary School

location
Koru (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 790,000
estimate
Ksh 790,000

Karunga Primary School

location
Miwani (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 750,000
estimate
Ksh 650,000

Nyakoko Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 737,000
estimate
Ksh 562,000

Kibigori Railways Primary School

location
Chemelil (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 725,000
estimate
Ksh 625,000

School Desks

location
North Eastkano (in Muhoroni)
year first funded
2004
action
Supply Of Desks
output
-
implementation status
Complete
total cost
Ksh 720,000
estimate
Ksh 720,000

Kibigori Primary School

location
Chemelil (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 705,000
estimate
Ksh 605,000

Ogwedhi Primary School

location
Koru (in Muhoroni)
year first funded
2006
action
Land Purchase,Construction
output
-
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

Makindu Dispensary

location
Nyangoma (in Muhoroni)
year first funded
2003
action
Marternity Construction &Beds
output
-
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 400,000

Nyarenda Primary School

location
Nyangoma (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 400,000

Cheptuiyet Primary School

location
Fort Ternan (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 690,000
estimate
Ksh 490,000

Kipchoria Primary School

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 690,000
estimate
Ksh 490,000

Miwani Estate Health Clinic

location
Miwani (in Muhoroni)
year first funded
2003
action
Dispensary Constr, Furniture & Water Sink
output
-
implementation status
On Going
total cost
Ksh 675,000
estimate
Ksh 675,000

Ngere Kagoro Police Post

location
Nyangoma (in Muhoroni)
year first funded
2005
action
Office Construction
output
-
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 500,000

Nyatao Secondary School

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Construction/Lab Equipments
output
-
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 650,000

God Nyithindo Primary School Electrification

location
God Nyithindo (in Muhoroni)
year first funded
2004
action
Electrification
output
-
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 550,000

Osembe Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 640,000
estimate
Ksh 540,000

Homalimekipsamwe Primary School

location
Fort Ternan (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 640,000
estimate
Ksh 540,000

Mikiria Primary School

location
Nyangoma (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 635,000
estimate
Ksh 360,000

Kware Primary School

location
Tamu (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 621,430
estimate
Ksh 421,430

Obago Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 616,663
estimate
Ksh 426,363

Masara Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 610,000
estimate
Ksh 410,000

Chiefs Office Construction

location
God Nyithindo (in Muhoroni)
year first funded
2007
action
Office Construction
output
-
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 300,000

Magare Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Pipes &Tank Installation
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Nyakungru Dispensary

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Dispensary Construction
output
-
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 450,000

Nyangore Primary School

location
Chemelil (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 450,000

Nyalenya Primary School

location
Nyangoma (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 425,000

Kandege Primary School

location
Fort Ternan (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 590,000
estimate
Ksh 390,000

Tamu Central Primary School

location
Tamu (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 575,000
estimate
Ksh 450,000

Orenge Primary School

location
Ombeyi North (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 570,000
estimate
Ksh 370,000

Mitando Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 560,000
estimate
Ksh 410,000

Nyangoto Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 560,000
estimate
Ksh 410,000

Kigoche Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 560,000
estimate
Ksh 410,000

Oduwo Primary School

location
Tamu (in Muhoroni)
year first funded
2003
action
Toilet/Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 555,000
estimate
Ksh 380,000

Ogen Dispensary

location
Chemelil (in Muhoroni)
year first funded
2004
action
Staff House Construction
output
-
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 400,000

Cheptuiyet Dispensary

location
Fort Ternan (in Muhoroni)
year first funded
2007
action
Dispensary Construct.
output
-
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 350,000

Muhoroni Hospital Water

location
Muhoroni (in Muhoroni)
year first funded
2004
action
Supply Of Water
output
-
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 300,000

Muhoroni Water Association

location
Tamu (in Muhoroni)
year first funded
2004
action
Water Supply
output
-
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 550,000

Nyangoma Health Centre

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Construction Of Maternity Wing
output
-
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 400,000

Chemelil Market Dispensary

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Construction Of Maternity Wing
output
-
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 400,000

Saoset Primary School

location
Fort Ternan (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 540,000
estimate
Ksh 540,000

Nyatao Primary School

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 539,000
estimate
Ksh 389,000

Kiliti Primary School

location
Ombeyi North (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 520,000
estimate
Ksh 370,000

Ombeyi Primary School

location
Ombeyi North (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 520,000
estimate
Ksh 370,000

Obiayo Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 510,000
estimate
Ksh 510,000

Wagai Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 510,000
estimate
Ksh 510,000

Bacho Primary School

location
Ombeyi South (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 510,000
estimate
Ksh 510,000

Kibos Prison Primary School

location
Miwani (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Miwani Division Resource Centre

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Round About Water Project

location
Chemelil (in Muhoroni)
year first funded
2004
action
Pipe Costruction
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyangoma Village Polytechnic

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Renovation And Equipment
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyangoma Water Project

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Pipe Laying
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Miwani Estate Primary School

location
Miwani (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 400,000

Masogo/Waware Youth Polytechnic

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Class/Adm Construction
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Ngula Primary School

location
Nyangoma (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Minyange Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 490,000
estimate
Ksh 390,000

Ramula Primary School

location
Ombeyi North (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 470,000
estimate
Ksh 370,000

Thurbie Primary School

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 465,000
estimate
Ksh 315,000

Ogilo Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 459,419
estimate
Ksh 346,363

Kibigori Police Post

location
Chemelil (in Muhoroni)
year first funded
2005
action
Ap Line Construction
output
-
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Jagir Singh Primary School

location
Miwani (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 350,000

Ngere Kagoro Water Project

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Pipes Installation
output
-
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 100,000

Education Improvement

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Ogwodo Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 447,363
estimate
Ksh 364,363

Yago Dispensary

location
Tamu (in Muhoroni)
year first funded
2007
action
Dispensary Construction
output
-
implementation status
On Going
total cost
Ksh 446,430
estimate
Ksh 321,430

Orago Primary School

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 445,000
estimate
Ksh 295,000

Kolang' Primary School

location
Nyangoma (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 440,000
estimate
Ksh 290,000

Oneno Nam Primary School

location
Tamu (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 435,000
estimate
Ksh 300,000

Sanda Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 431,563
estimate
Ksh 336,363

Pawteng Primary School

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 429,000
estimate
Ksh 279,000

Sangayo Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 426,663
estimate
Ksh 336,363

Ngeny' Primary School

location
Nyangoma (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 425,000
estimate
Ksh 425,000

Soghor Dispensary

location
Tamu (in Muhoroni)
year first funded
2007
action
Dispensary Construction
output
-
implementation status
On Going
total cost
Ksh 421,430
estimate
Ksh 221,430

Lwala Primary School

location
Tamu (in Muhoroni)
year first funded
2003
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 421,430
estimate
Ksh 421,430

Mashambani Dispensary

location
Tamu (in Muhoroni)
year first funded
2007
action
Dispensary Construction
output
-
implementation status
On Going
total cost
Ksh 421,420
estimate
Ksh 221,420

Okwach Primary School

location
Nyangoma (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 420,000
estimate
Ksh 320,000

Magare Primary School

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 416,363
estimate
Ksh 286,363

Wambi Primary School

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 409,419
estimate
Ksh 296,363

Ngiti Primary School

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 409,419
estimate
Ksh 296,363

Chiefs Office Extension

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Extension Of Chief'S Office
output
-
implementation status
On Going
total cost
Ksh 402,000
estimate
Ksh 202,000

Cheptuiyet Nursery Schoolwater Project

location
Fort Ternan (in Muhoroni)
year first funded
2008
action
Well Construction
output
-
implementation status
To Be Funded
total cost
Ksh 400,000
estimate
Ksh 200,000

God Nyithindo Primary School

location
God Nyithindo (in Muhoroni)
year first funded
2005
action
Fencing
output
-
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Kibos School For The Blind

location
Miwani (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 300,000

Kibigori Dispensary

location
Chemelil (in Muhoroni)
year first funded
2004
action
Clinic Construction
output
-
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

God Ruke Primary School Water Project

location
Muhoroni (in Muhoroni)
year first funded
2008
action
Borehole Construction
output
-
implementation status
To Be Funded
total cost
Ksh 400,000
estimate
Ksh 200,000

Tamu Primary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 396,430
estimate
Ksh 221,430

Omanyi Primary School

location
North Eastkano (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 390,000
estimate
Ksh 200,000

Nyakungru Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 382,363
estimate
Ksh 299,363

Olik Oliero Primary School

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 375,000
estimate
Ksh 300,000

Osiri Migere Primary School

location
Nyangoma (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 374,000
estimate
Ksh 374,000

Milenye Primary School

location
Nyangoma (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 370,000
estimate
Ksh 370,000

Rangombe Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 370,000
estimate
Ksh 300,000

Educational Improvement

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Lab& Comp Equip
output
-
implementation status
Complete
total cost
Ksh 360,000
estimate
Ksh 360,000

Oyani Primary School

location
Koru (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 360,000
estimate
Ksh 360,000

Kowawa Police Post

location
Tamu (in Muhoroni)
year first funded
2008
action
Office Construction
output
-
implementation status
To Be Funded
total cost
Ksh 350,000
estimate
Ksh 200,000

Mashambani Primary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 250,000

Tonde Water Project

location
God Nyithindo (in Muhoroni)
year first funded
2004
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 350,000

Kopere Police Post

location
Chemelil (in Muhoroni)
year first funded
2008
action
Police Post Construction
output
-
implementation status
To Be Funded
total cost
Ksh 350,000
estimate
Ksh 200,000

Chemelil B Primary School

location
Chemelil (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 350,000

Assistant Chiefs' Office

location
Koru (in Muhoroni)
year first funded
2007
action
Office Construction
output
-
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 200,000

Purchase Of Land Ongalo Primary School

location
Koru (in Muhoroni)
year first funded
2007
action
Land Purchase
output
-
implementation status
To Be Reallocated
total cost
Ksh 350,000
estimate
Ksh 350,000

Nyakoko Stream Drainage

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Desiltation
output
-
implementation status
Complete
total cost
Ksh 330,000
estimate
Ksh 130,000

Osengteti Primary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 200,000

Ngeny Special School

location
Nyangoma (in Muhoroni)
year first funded
2009
action
D. Construction
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Mariwa Secondary School Water Project

location
God Nyithindo (in Muhoroni)
year first funded
2008
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Yago Primary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 200,000

Makindu Primary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 200,000

God Abuoro Primary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 200,000

Educational Improvement

location
Chemelil (in Muhoroni)
year first funded
2007
action
Lab Equip
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Nyakoko Oroba Drainage

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Flood Control
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Kabonyo Village Miwani West

location
Miwani (in Muhoroni)
year first funded
2009
action
Transformer
output
-
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Kabar West Catlle Dip Land Purchase

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Rehabilitation
output
-
implementation status
Complete
total cost
Ksh 296,000
estimate
Ksh 296,000

Wuok Nursery /Primary School

location
Chemelil (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 295,000
estimate
Ksh 145,000

Ang'Ogo Primary School

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 295,000
estimate
Ksh 295,000

Amilo Primary School

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 290,000
estimate
Ksh 220,000

Kodhiambo Primary School

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 286,000
estimate
Ksh 236,000

Gatundu Village Nursery/Pri

location
Tamu (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 270,000
estimate
Ksh 70,000

St. Johns' Primary School

location
Koru (in Muhoroni)
year first funded
2006
action
Desks/Toilet Construction
output
-
implementation status
Complete
total cost
Ksh 270,000
estimate
Ksh 70,000

Ogwedhi Primary School foot Bridge

location
Koru (in Muhoroni)
year first funded
2007
action
Footbridge Construction
output
-
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 100,000

Achego Primary School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Muhoroni Primary School

location
God Nyithindo (in Muhoroni)
year first funded
2005
action
Fencing
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Educational Improvement

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Laboratory Equipping
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mdemp - Kibigori Settlement

location
Chemelil (in Muhoroni)
year first funded
2009
action
Silt/Veg Removal
output
-
implementation status
To Start
total cost
Ksh 250,000
estimate
Ksh 250,000

Kibigori Muslim Community School

location
Chemelil (in Muhoroni)
year first funded
2008
action
Classroom Construction
output
-
implementation status
To Be Funded
total cost
Ksh 250,000
estimate
Ksh 250,000

Ogen Primary School

location
Chemelil (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 200,000

Ngere Kagoro Cattle Dip

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Renovation
output
-
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 50,000

Sanitary Facilities In Primary School

location
North Eastkano (in Muhoroni)
year first funded
2003
action
Pit Latrine Construction
output
-
implementation status
Complete
total cost
Ksh 245,000
estimate
Ksh 245,000

Kasongo Health Centre

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Toilet Facility/Disp Bldg
output
-
implementation status
On Going
total cost
Ksh 235,000
estimate
Ksh 235,000

Rapogi Community Water Project

location
Chemelil (in Muhoroni)
year first funded
2007
action
Well Contruction
output
-
implementation status
On Going
total cost
Ksh 225,000
estimate
Ksh 125,000

Sidho Owee Comwater Project

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 225,000
estimate
Ksh 225,000

Nyangore Nursery School

location
Chemelil (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 220,000
estimate
Ksh 70,000

Makiindu Primary School Water Project

location
Tamu (in Muhoroni)
year first funded
2008
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Simbi Luora Primary School

location
Nyangoma (in Muhoroni)
year first funded
2004
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Holo Community Water Project

location
Tamu (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
To Start
total cost
Ksh 200,000
estimate
Ksh 20,000

Chief's Office Construction/Elect

location
Tamu (in Muhoroni)
year first funded
2006
action
Office Construction
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 150,000

St. Claudio Kowiti Primary School

location
Tamu (in Muhoroni)
year first funded
2008
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Achego Primary School water Project

location
Tamu (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Chiefs Office Construction

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Office Consteruction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Kagai Water Project

location
Fort Ternan (in Muhoroni)
year first funded
2007
action
Pipes Installation
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Koru Hospital Generator

location
Koru (in Muhoroni)
year first funded
2007
action
Purchase Of Generator
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Pombo Water Project

location
God Nyithindo (in Muhoroni)
year first funded
2008
action
Well Construction
output
-
implementation status
To Be Funded
total cost
Ksh 200,000
estimate
Ksh 200,000

Mdemp-Oroba/Miwani Estate

location
Miwani (in Muhoroni)
year first funded
2009
action
Drainage/Veg Removal
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Kibos Nubian Nursery

location
Miwani (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Mdemp-Nyakoko/Ogandi

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Drainage Work
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Mdemp-Sangayo/Obago

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Drainage Work
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Mdemp-Siala/Abwao

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Drainage Work
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Sanda Community Irrigation Project

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Irrigation
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Masogo Health Centre

location
North Eastkano (in Muhoroni)
year first funded
2004
action
Repair Works
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Wuok Primary School

location
Chemelil (in Muhoroni)
year first funded
2008
action
Classroom Construction
output
-
implementation status
To Be Funded
total cost
Ksh 200,000
estimate
Ksh 200,000

Kibigori Cattle Dip

location
Chemelil (in Muhoroni)
year first funded
2008
action
Dip Construction
output
-
implementation status
To Be Funded
total cost
Ksh 200,000
estimate
Ksh 200,000

Profayiecho Kibigori Nursery School

location
Chemelil (in Muhoroni)
year first funded
2008
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 100,000

Apidi Nursery

location
Chemelil (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 75,000

Katuk Community Water Project

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
To Start
total cost
Ksh 200,000
estimate
Ksh 200,000

Geno Community Water Project

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
To Start
total cost
Ksh 200,000
estimate
Ksh 200,000

Masaka Community Water Project

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
To Start
total cost
Ksh 200,000
estimate
Ksh 200,000

Mdemp-Kamagaga/Owee Village

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Silt/Veg Removal
output
-
implementation status
To Start
total cost
Ksh 200,000
estimate
Ksh 200,000

Chemelil Market Police Post

location
Nyangoma (in Muhoroni)
year first funded
2007
action
construction Of Police Post Bldn
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Ngere Kagoro Primary School

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 100,000

Ogen Nursery School

location
Chemelil (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 185,000
estimate
Ksh 75,000

Desks/Students Lockers

location
Chemelil (in Muhoroni)
year first funded
2007
action
Purchase Of Lockers/Chairs
output
-
implementation status
On Going
total cost
Ksh 185,000
estimate
Ksh 185,000

Nyalelbuch Water Project

location
Fort Ternan (in Muhoroni)
year first funded
2004
action
Shalowest Well Construction
output
-
implementation status
Complete
total cost
Ksh 175,000
estimate
Ksh 100,000

Sanda Water Project

location
North Eastkano (in Muhoroni)
year first funded
2005
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 170,000
estimate
Ksh 170,000

Osiri Migere Primary School Water Project

location
Nyangoma (in Muhoroni)
year first funded
2005
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 170,000
estimate
Ksh 170,000

Minyange Primary School water Project

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 170,000
estimate
Ksh 170,000

Sugarbelt Nursery School

location
Chemelil (in Muhoroni)
year first funded
2006
action
Classroom & Toilet Rehabilitation
output
-
implementation status
Complete
total cost
Ksh 165,000
estimate
Ksh 165,000

Ramanda Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 160,370
estimate
Ksh 60,370

Oyani Nursery School

location
Koru (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 160,000
estimate
Ksh 160,000

Bondo Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Ogen Dispensary Water Project

location
Chemelil (in Muhoroni)
year first funded
2006
action
Well Contruction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Menara Primary School

location
Koru (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Education Improvement[Menara]

location
Koru (in Muhoroni)
year first funded
2006
action
Lab Equipment
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

St. Augustine Kandege Secondary School Water Project

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Electric Power Kandege

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Purchase Of Generator
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Jua Kali Compound Fence

location
Muhoroni (in Muhoroni)
year first funded
2007
action
Fencing
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Mariwa Primary School

location
God Nyithindo (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Education Improvement

location
God Nyithindo (in Muhoroni)
year first funded
2006
action
Lab Equipment
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Simbi Luora Primary School Water Project

location
Nyangoma (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

St. Joseph Ngula Primary School Water Proj

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Makindu Dispensary Water Proj

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Okwach Primary School water Project

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Mibasi Community Water

location
Nyangoma (in Muhoroni)
year first funded
2008
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Nyadundo Primary School

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
To Start
total cost
Ksh 150,000
estimate
Ksh 150,000

Mikiria Community Water Project

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
To Start
total cost
Ksh 150,000
estimate
Ksh 150,000

Lockers And Chairs

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Purchasechairs/Lockers
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Siala Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Ogilo Primary School water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Ngiti Primary School water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Waware Primary School water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Kaktai Water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Ramanda Water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Ogwodo Primary School water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Wagunga Obago Water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Well & Pump Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Sanitary Facility

location
Chemelil (in Muhoroni)
year first funded
2004
action
Public Toilet Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 50,000

Abwao Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Okiro Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

North Kamrika Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Kunya Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Mumbo Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Siboga Nyamawa Community Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Jagir Singh Primary School water Project

location
Miwani (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Nyangeta Police Post Water Project

location
Miwani (in Muhoroni)
year first funded
2008
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Jacob Ombara Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 145,000
estimate
Ksh 70,000

Kambaria Water Project

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 140,000
estimate
Ksh 140,000

Masogo Cattle Dip

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Dip Construction
output
-
implementation status
On Going
total cost
Ksh 136,667
estimate
Ksh 80,000

Livestock{Catle Dip}

location
Koru (in Muhoroni)
year first funded
2006
action
Construction Of Cattle Dip
output
-
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 130,000

Tree Planting

location
Nyangoma (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 112,695
estimate
Ksh 112,695

Tree Planting

location
North Eastkano (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 112,695
estimate
Ksh 112,695

Amilo Cattle Dip

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Dip Construction
output
-
implementation status
Complete
total cost
Ksh 110,000
estimate
Ksh 60,000

Tree Planting

location
Tamu (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 100,130
estimate
Ksh 90,130

Jaramogi Oginga Odinga Secondary School Electrification

location
Tamu (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Kamarawa Water Project

location
Nyangoma (in Muhoroni)
year first funded
2005
action
Laying Of Pipes
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ngere Kamarawa Nursery

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Classroom Construction
output
-
implementation status
To Start
total cost
Ksh 100,000
estimate
Ksh 0

Ng'Eny Secondary School Footbridge

location
Nyangoma (in Muhoroni)
year first funded
2008
action
Footbridge Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

God Nyithindo Primary School Foot Bridge

location
God Nyithindo (in Muhoroni)
year first funded
2008
action
Footbridge Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Owee Apida Nursery School

location
Nyangoma (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
To Start
total cost
Ksh 100,000
estimate
Ksh 100,000

Rapogi Nursery

location
Chemelil (in Muhoroni)
year first funded
2005
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Chiefs Office Construction

location
Chemelil (in Muhoroni)
year first funded
2006
action
Office Rehabilitation
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kibigori Secondary School

location
Chemelil (in Muhoroni)
year first funded
2008
action
Purchase Of Laboratory Equipment
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Kibigori Secondary School Electrification

location
Chemelil (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Mwai Abiero Secondary School Electrification

location
Chemelil (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Bicycyle Taxi Waiting Shed Point -C/ Round Abount

location
Chemelil (in Muhoroni)
year first funded
2009
action
2 Sheds Construction
output
-
implementation status
To Start
total cost
Ksh 100,000
estimate
Ksh 100,000

D's House

location
North Eastkano (in Muhoroni)
year first funded
2004
action
House Constrution
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Ogwodo Primary School foot Bridge

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Foot Bridge Constrution
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Rangombe Primary School Drainage Ditch

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Ditch Construction
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kunya Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Abwao Foot Bridge

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Foot Bridge
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Mumbo Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Siala Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Abwao Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Bondo Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Kamrika Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Komieri Water Project

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Joy Nursery School

location
Miwani (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

School Desks At Kibos P Pr

location
Miwani (in Muhoroni)
year first funded
2006
action
Purchase Of Desks
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kibos School Blind

location
Miwani (in Muhoroni)
year first funded
2007
action
Purchase Of Brail Equip
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Muhoroni Youth

location
Muhoroni (in Muhoroni)
year first funded
2006
action
Field Rehabilitation
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 50,000

Agriculture

location
Fort Ternan (in Muhoroni)
year first funded
2007
action
Purchase Of Equipment
output
-
implementation status
Yet To Be Funded
total cost
Ksh 100,000
estimate
Ksh 100,000

Cattle Dip Karos

location
Fort Ternan (in Muhoroni)
year first funded
2007
action
Rehabilitation
output
-
implementation status
Yet To Be Funded
total cost
Ksh 100,000
estimate
Ksh 100,000

Cheptuiyet Nursery School

location
Fort Ternan (in Muhoroni)
year first funded
2008
action
Classconsrtuction
output
-
implementation status
To Be Funded
total cost
Ksh 100,000
estimate
Ksh 100,000

Menara Secondary School Electrification

location
Koru (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Okwach Primary School Footbridge

location
Nyangoma (in Muhoroni)
year first funded
2008
action
Footbridge Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Tamu Water Association

location
Tamu (in Muhoroni)
year first funded
2009
action
Electrification
output
-
implementation status
To Start
total cost
Ksh 100,000
estimate
Ksh 0

Makindu Primary School footbridge

location
Tamu (in Muhoroni)
year first funded
2007
action
Footbridge Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Oduwo Primary School water Project

location
Tamu (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Mashambani Primary School Water Project

location
Tamu (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Lwala Primary School water Project

location
Tamu (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Achego Girls Electrification

location
Tamu (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Songor Secondary School Electrification

location
Tamu (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Holo Nursery School

location
Chemelil (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 90,000

Nyang Nursery School

location
Chemelil (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 90,000
estimate
Ksh 90,000

Saoset BNursery School

location
Fort Ternan (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 90,000
estimate
Ksh 90,000

Olasi Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 80,000
estimate
Ksh 80,000

Nyakoko Primary School Culvert

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Culvet Construction
output
-
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Nyakoko Primary School water Project

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Tank Instalation
output
-
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Chiefs Office Construction

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Office Construction
output
-
implementation status
On Going
total cost
Ksh 80,000
estimate
Ksh 80,000

Kibuon Nursery School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 80,000
estimate
Ksh 80,000

Kipchorian Water Project

location
Fort Ternan (in Muhoroni)
year first funded
2009
action
Well Construction
output
-
implementation status
To Start
total cost
Ksh 75,000
estimate
Ksh 75,000

Medicinal Drugs

location
North Eastkano (in Muhoroni)
year first funded
2003
action
Supply Of Drugs
output
-
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Yago Nursery School

location
Tamu (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 70,000
estimate
Ksh 70,000

Lailai Water Project

location
Muhoroni (in Muhoroni)
year first funded
2008
action
Borehole Construction
output
-
implementation status
To Be Funded
total cost
Ksh 70,000
estimate
Ksh 70,000

Wambi Primary School water Project

location
North Eastkano (in Muhoroni)
year first funded
2006
action
Well Construction
output
-
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Tree Planting

location
Chemelil (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 64,275
estimate
Ksh 64,275

Wagunga Obago Nursery

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 60,000
estimate
Ksh 60,000

Odiyo Wange Nursery School

location
Tamu (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Sibuor Ochoria Nursery School

location
Koru (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 60,000
estimate
Ksh 60,000

Mibasi Nursery School

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Tree Planting

location
God Nyithindo (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 53,420
estimate
Ksh 53,420

Bicycle Taxi Waiting Shed

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Waiting Shed Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Koru Muungano Market Enrp

location
Koru (in Muhoroni)
year first funded
2007
action
Market Rehabilitation
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Oyani Primary School foot Bridge

location
Koru (in Muhoroni)
year first funded
2007
action
Footbridge Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Kagai Nursery School

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Kipchorian Nursery

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Kambi Awendo Nursery

location
Fort Ternan (in Muhoroni)
year first funded
2007
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Desks

location
Fort Ternan (in Muhoroni)
year first funded
2007
action
Purchase Of Desks
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Kipchui Nursery

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Saoset Nuersry

location
Fort Ternan (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Muhoroni Police Post Electrification

location
Muhoroni (in Muhoroni)
year first funded
2009
action
Electrification
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle/Matatu Waiting Shed Point At Mhr Stage

location
Muhoroni (in Muhoroni)
year first funded
2009
action
Shed Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle Taxi Waiting/Picking Sheds At Orego

location
God Nyithindo (in Muhoroni)
year first funded
2008
action
Waiting Shed Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Agroforestry- Orego Tn

location
God Nyithindo (in Muhoroni)
year first funded
2007
action
Tree Nursery Management
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Lwala Primary School footbridge

location
Tamu (in Muhoroni)
year first funded
2007
action
Footbridge Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Oduwo Nursery School

location
Tamu (in Muhoroni)
year first funded
2006
action
Classroom Construction
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle Taxi Waiting Shed Point At Achego

location
Tamu (in Muhoroni)
year first funded
2009
action
Shed Construction
output
-
implementation status
To Start
total cost
Ksh 50,000
estimate
Ksh 50,000

Student Lockers

location
Nyangoma (in Muhoroni)
year first funded
2007
action
Purchasechairs/Lockers
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle Taxi Waiting Shed Point

location
Koru (in Muhoroni)
year first funded
2009
action
Shed Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle Taxi Waiting Sheds At Kibigori Mrk Centre

location
Chemelil (in Muhoroni)
year first funded
2008
action
Waiting Shed Construction
output
-
implementation status
To Be Funded
total cost
Ksh 50,000
estimate
Ksh 50,000

Kibigori Railways Primary School Footbridge

location
Chemelil (in Muhoroni)
year first funded
2007
action
Footbridge Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

St. Benedict Nyangoma Secondary School Electrification

location
Nyangoma (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Ngere Kagoro Secondary School Electrification

location
Nyangoma (in Muhoroni)
year first funded
2008
action
School Electrification
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Wambi Primary School footbridge

location
North Eastkano (in Muhoroni)
year first funded
2007
action
Construction of Wooden Bridge
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle Taxi Shed At Masogo

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Repair Works
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle Taxi Shed At Kasongo

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Shed Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Olik Oliero Primary School Culvert

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Culvet Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Bicycle Taxi Waiting Shed In Miwani Estate

location
Miwani (in Muhoroni)
year first funded
2008
action
Shed Construction
output
-
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

MtNursery School Miwani

location
Miwani (in Muhoroni)
year first funded
2009
action
Desks
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Milimani Nursery School

location
Miwani (in Muhoroni)
year first funded
2009
action
Desks
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Miwani Staff Quarters Nursery School

location
Miwani (in Muhoroni)
year first funded
2009
action
Desks
output
-
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 50,000

Tree Planting

location
Miwani (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 47,993
estimate
Ksh 47,993

Tree Planting Schools

location
Koru (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 47,992
estimate
Ksh 47,992

Achego Ap Line Electrification

location
Tamu (in Muhoroni)
year first funded
2009
action
Electrification
output
-
implementation status
To Start
total cost
Ksh 40,000
estimate
Ksh 40,000

Nyakoko Primary School Toilet

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Toilet Construction
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Kunya Nursery School Toilet

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Toilet Construction
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Amilo Primary School Footbridge

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Foot Bridge Constrution
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Omanyi Primary School Foot Bridge

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Foot Bridge construction
output
-
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Tree Planting

location
Fort Ternan (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 27,138
estimate
Ksh 27,138

Chief's Office Furniture

location
North Eastkano (in Muhoroni)
year first funded
2008
action
Purchase Of Furniture
output
-
implementation status
Complete
total cost
Ksh 25,000
estimate
Ksh 10,000

Sanitary Facility At Chief's Office

location
North Eastkano (in Muhoroni)
year first funded
2003
action
Pit Latrine Construction
output
-
implementation status
Complete
total cost
Ksh 25,000
estimate
Ksh 25,000

Tree Planting

location
Muhoroni (in Muhoroni)
year first funded
2004
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 21,283
estimate
Ksh 21,283

Omanyi Nursery School

location
North Eastkano (in Muhoroni)
year first funded
2009
action
Construction
output
-
implementation status
On Going
total cost
Ksh 20,000
estimate
Ksh 20,000

St. Augustine Kandege Secondary School Tree Planting

location
Fort Ternan (in Muhoroni)
year first funded
2008
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 5,000
estimate
Ksh 5,000

Homa Lime Primary School Tree Planting

location
Fort Ternan (in Muhoroni)
year first funded
2008
action
Planting Of Trees
output
-
implementation status
Complete
total cost
Ksh 5,000
estimate
Ksh 5,000