The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Bursary
- location
-
Mutito
(in Mutito)
- year first funded
- 2004
- action
- Bursary To Students
- output
- Fees Payment For Needy Students
- implementation status
- On Going
- total cost
- Ksh 28,794,540
- estimate
- Ksh 0
Rural Electrification
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Electrification Programme
- output
- Improve Supply Of Electricity
- implementation status
- On Going
- total cost
- Ksh 13,500,000
- estimate
- Ksh 0
Mbangulo Earth Dam
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 4,500,000
- estimate
- Ksh 0
Chuluni Kwa Ngindu/Maluma/Ithumula W/Project
- location
-
Nzambani
(in Mutito)
- year first funded
- 2003
- action
- Laying Of Water Pipes
- output
- Availability Water
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 0
Kyanika Secondary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 0
Ikyatine Dam
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2006
- action
- Surveying & Scooping Of Earth Dam
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
Malalani Secondary School
- location
-
Malalani
(in Mutito)
- year first funded
- 2005
- action
- Land &Construction Of 2 Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- Ongoing
- total cost
- Ksh 2,200,000
- estimate
- Ksh 0
Mwitika Mixed Day Secondary School
- location
-
Mwitika
(in Mutito)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Syokimu Earth Dam
- location
-
Nzambani
(in Mutito)
- year first funded
- 2008
- action
- Scooping Of Earth Dam
- output
- Availability Water
- implementation status
- Not Started
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Kavaani Secondary School
- location
-
Zombe
(in Mutito)
- year first funded
- 2003
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 0
Zombe Banda Sheds
- location
-
Zombe
(in Mutito)
- year first funded
- 2006
- action
- Constructions Of Sheds
- output
- Improve Shelter-Jua Kali
- implementation status
- Needs more funding
- total cost
- Ksh 1,750,000
- estimate
- Ksh 0
Kyamatu Secondary School
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 0
Aic Zombe Girls Secondary School
- location
-
Zombe
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Computer Lab& Renovation Of Dh
- output
- Improve It Knowledge
- implementation status
- On Going
- total cost
- Ksh 1,737,000
- estimate
- Ksh 0
Ikuyuni Secondary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- On Going
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Ndui Earth Dam
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Completion work in progress
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Chuluni Girls Secondary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Science &Computer Lab
- output
- Improve It Knowledge
- implementation status
- Complete
- total cost
- Ksh 1,537,000
- estimate
- Ksh 0
Kiini Yanzuu/Kangweni Water Project
- location
-
Nzambani
(in Mutito)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kavea Secondary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Purchase Of Land&Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- 2 Classes Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kalulu Kwa Munyalo Earth Dam
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2004
- action
- Scooping Of Earth Dam
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kanduti Polytechnic
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2003
- action
- Construction Of Classrooms & Admin Block
- output
- Technological Advancement
- implementation status
- Poly In Use
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Chuluni Dispensary
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Maternity Ward
- output
- Improved Health Care
- implementation status
- Awaiting Painting
- total cost
- Ksh 1,287,832
- estimate
- Ksh 0
Kakungu Dispensary
- location
-
Nzambani
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Kavuti Drift
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Drift
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Nzambani Secondary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Library And Equip Computer Lab
- output
- Improve It Knowledge
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kwa Tundu Secondary School
- location
-
Mutito
(in Mutito)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- Two Classes Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Muthungue Community Dispensary
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Kaliku Secondary School
- location
-
Kaliku
(in Mutito)
- year first funded
- 2003
- action
- Construction Of Classrooms
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Mwitika Dispensary
- location
-
Mwitika
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Maternity Ward
- output
- Improved Security
- implementation status
- Upto Roofing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Ngomano Kikuu Water Project
- location
-
Mwitika
(in Mutito)
- year first funded
- 2004
- action
- n/a
- output
- Availability Water
- implementation status
- Completion work in progress
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kanduti Secondary School
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kaluva Water Project
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2007
- action
- Laying Of Water Pipes
- output
- Availability Water
- implementation status
- Needs more funding
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kikingini Nzewani Pipeline
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Laying Of Water Pipes
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kyaango Secondary School
- location
-
Voo
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Improve Education Std
- implementation status
- Two Classes Constructed And Roofed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mathulini Polytechnic
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Technological Advancement
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mitaani Earth Dam
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mutito Boys Secondary School
- location
-
Mutito
(in Mutito)
- year first funded
- 2006
- action
- Renovation Of Classrooms
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Nzangathi Dispensary
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Nzangathi Earth Dam
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Completion work in progress
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Syombuku Polythechnic
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Land Purchase & Construction Of Classrooms
- output
- Technological Advancement
- implementation status
- Upto Lintel Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Voo Secondary School
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Computer Lab
- output
- Improve It Knowledge
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Vutu Earth Dam
- location
-
Mutito
(in Mutito)
- year first funded
- 2006
- action
- Scooping Of Earth Dam
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Endau Secondary School
- location
-
Endau
(in Mutito)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kaluva Secondary School
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Computer Lab
- output
- Improve It Knowledge
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kilonzo Secondary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Classrooms & Admin Block
- output
- Improve It Knowledge
- implementation status
- Complete
- total cost
- Ksh 900,017
- estimate
- Ksh 0
Mutito Girls Secondary School
- location
-
Mutito
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Chuluni Social Hall
- location
-
Nzambani
(in Mutito)
- year first funded
- 2005
- action
- Construction Of The Hall
- output
- Improved Community Services
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Itiko Dispensary
- location
-
Mutito
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Mbangulo Kamulu Road
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2006
- action
- Rehabilited Rural Access Road
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kyaango Dispensary
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Makongo Dispensary
- location
-
Mwitika
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Structure Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kangweni Polytechnic
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Purchase Of Land & Construction Of Classroom
- output
- Technological Advancement
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Katikoni Youth Polytechnic
- location
-
Mwitika
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Technological Advancement
- implementation status
- Upto Lintel
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kiongwe Dispensary
- location
-
Thua
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kalulu Dispensary
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Upto Lintel
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kasyonoo Drift
- location
-
Voo
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Drift
- output
- Improve Trans. System
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kunguluni Primary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Improve Education Std
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Yoonye Dispensary
- location
-
Mutito
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Roofing Done
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Endau Dispensary
- location
-
Endau
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Maternity Ward
- output
- Improved Health Care
- implementation status
- Upto Lintel
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kamale Youth Polytechnic
- location
-
Nzambani
(in Mutito)
- year first funded
- 2005
- action
- Land Purchase & Construction Of Classrooms
- output
- Technological Advancement
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Malalani Dispensary
- location
-
Malalani
(in Mutito)
- year first funded
- 2003
- action
- Construction Of Maternity Ward
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ikuyuni Dispensary
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ithangathi Primary School
- location
-
Zombe
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dormitory
- output
- Improve Education Std
- implementation status
- One Dormitory Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ngungi Secondary School
- location
-
Zombe
(in Mutito)
- year first funded
- 2005
- action
- Renovation Of Classrooms
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kikuu Dispensary
- location
-
Mwitika
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Awaiting Finishing
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kasangu Dispensary
- location
-
Voo
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Koumbuni Rock Catchment
- location
-
Mwitika
(in Mutito)
- year first funded
- 2005
- action
- Water Harvesting
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Chuluni Police Post
- location
-
Nzambani
(in Mutito)
- year first funded
- 2008
- action
- Construction Of Police Post
- output
- Improved Security
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kanduti Ndunga Road
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2007
- action
- Rehabilited Rural Access Road
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kanduu Earth Dam
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2005
- action
- Scooping Of Earth Dam
- output
- -
- implementation status
- To be completed on the next release
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kanzauwu-Kivuti-Kyamutivi Road
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2008
- action
- Rehabilited Rural Access Road
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kathande-Kaumu Road
- location
-
Zombe
(in Mutito)
- year first funded
- 2008
- action
- Rehabilited Rural Access Road
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kavutini Secondary School
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kinakoni Secondary School
- location
-
Voo
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Final touches
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kinakoni Youth Polytechnic
- location
-
Voo
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Technological Advancement
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kwa Amutei Dispensary
- location
-
Thua
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Upto Lintel
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kyamatu/Voo Thua River Drift
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- Completion work in progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Muthua/Kwa Katuni Water Pipeline
- location
-
Mutito
(in Mutito)
- year first funded
- 2004
- action
- Water Harvesting From A Hill
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mutito Police Project
- location
-
Mutito
(in Mutito)
- year first funded
- 2004
- action
- Land Purchase
- output
- Improved Security
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ngomano Kamulu Water Project
- location
-
Mwitika
(in Mutito)
- year first funded
- 2006
- action
- Laying Of Water Pipes
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Nzeeu Drift
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Drift
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Yanzuu Dispensary
- location
-
Nzambani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Maternity Ward
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ds Residential House Mwitika
- location
-
Mwitika
(in Mutito)
- year first funded
- 2008
- action
- Construction Oh D.Os Residential House
- output
- Improved Accomodation
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kanzauwu Dispensary
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Requires Finishing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kateke Primary School
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Nduluni Polytechnic
- location
-
Voo
(in Mutito)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Technological Advancement
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
St Nicholas Polythechnic
- location
-
Zombe
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Classrooms & Admin Block
- output
- Technological Advancement
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Ikisaya/Syou Polytechnic
- location
-
Malalani
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Classrooms & Admin Block
- output
- Technological Advancement
- implementation status
- Poly Opened
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Yongoni Water Project
- location
-
Endau
(in Mutito)
- year first funded
- 2005
- action
- Replacement Of Water Pipes
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Katumbi Dispensary
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Upto Wallplate
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Katumbu Dispensary
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2004
- action
- Completion Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kawala Polytechnic
- location
-
Kaliku
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Classrooms & Admin Block
- output
- Technological Advancement
- implementation status
- Upto Lintel
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kinanie Dispensary
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Upto Wallplate
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kyukuni Dispensary
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Roofing Done
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mutito Chief's Office
- location
-
Mutito
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Office
- output
- Improved Security
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Manyoeni Dispensary
- location
-
Kaliku
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Roofing Done
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kyaimu Dispensary
- location
-
Kaliku
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Roofing Done
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Matundu Dispensary
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Upto Lintel
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Twambui Dispensary
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Upto Wallplate
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Voo Chief's Office
- location
-
Voo
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Office & Ap Lines
- output
- Improved Security
- implementation status
- Requires Finishing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Voo Dispensary
- location
-
Voo
(in Mutito)
- year first funded
- 2003
- action
- Construction Of Maternity Ward
- output
- Improved Health Care
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Yiuku Dispensary
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Zombe Chief's Office
- location
-
Zombe
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Ap Lines
- output
- Improved Security
- implementation status
- One Room Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Zombe Mutito Road
- location
-
Zombe
(in Mutito)
- year first funded
- 2006
- action
- Rehabilited Rural Access Roads
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Emwaa Rock Catchment
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- Water Harvesting
- output
- Availability Water
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Zombe Education Office
- location
-
Zombe
(in Mutito)
- year first funded
- 2007
- action
- Construction Of The Office
- output
- Improve Education Std
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Zombe Complex Institute
- location
-
Zombe
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nzanzu Dispensary
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nzangathi Ngomango Road
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2006
- action
- Rehabilited Rural Access Road
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nzambani Chief's Office
- location
-
Nzambani
(in Mutito)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Completion work in progress
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ngungi Dispensary
- location
-
Zombe
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ngelani Dispensary
- location
-
Zombe
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mutito Youth Polytechnic
- location
-
Mutito
(in Mutito)
- year first funded
- 2003
- action
- Renovation And Purchase Of Equipments
- output
- Technological Advancement
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Munyuni Dispensary
- location
-
Voo
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mbaa Nginga Water Project
- location
-
Nzambani
(in Mutito)
- year first funded
- 2006
- action
- Laying Of Water Pipes
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Masasini Dispensary
- location
-
Mutito
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kinakoni Dispensary
- location
-
Voo
(in Mutito)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Structure Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kaliku Chief's Office
- location
-
Kaliku
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Office & Ap Lines
- output
- Improved Security
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Endau-Koinange Water Pipeline
- location
-
Endau
(in Mutito)
- year first funded
- 2004
- action
- Rehabilited Rural Access Road
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Zombe Polytechnic
- location
-
Zombe
(in Mutito)
- year first funded
- 2007
- action
- Renovation Of Classrooms
- output
- Technological Advancement
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kyamatu Cattle Dip
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2004
- action
- Renovation Of The Dip
- output
- Improved Livestock Health
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kwa Muthwa/Malalani Water Pipeline
- location
-
Malalani
(in Mutito)
- year first funded
- 2004
- action
- Laying Of Water Pipes
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kaliku Dispensary
- location
-
Kaliku
(in Mutito)
- year first funded
- 2004
- action
- Construction Of The Gate And Fencing
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Zombe Mwitika Road
- location
-
Zombe
(in Mutito)
- year first funded
- 2006
- action
- Rehabilited Rural Access Roads
- output
- Improve Trans. System
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Endau Polytechnic
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- Renovation
- output
- Technological Advancement
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kaluasi Secondary School
- location
-
Voo
(in Mutito)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Final touches
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamaembe Dispensary
- location
-
Thua
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Improved Health Care
- implementation status
- Upto Lintel
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kinanie Drift
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Drift
- output
- -
- implementation status
- To cater for contingent situations
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kisyuni Dispensary
- location
-
Voo
(in Mutito)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kyamatu Chief's Office
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2004
- action
- Construction Of Ap Lines
- output
- Improved Security
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Makuka Dispensary
- location
-
Endau
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Work in progress needs more funding
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mutito Primary School
- location
-
Mutito
(in Mutito)
- year first funded
- 2006
- action
- Construction Of Classrooms & Admin Block
- output
- Improve Education Std
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mwitika Chief's Office
- location
-
Mwitika
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Ap Lines
- output
- Improved Security
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
R Child Development Centre
- location
-
Nzambani
(in Mutito)
- year first funded
- 2008
- action
- Construction Of Facilities
- output
- Safe And Conducive Learning Environment
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kwa Ndulya Cattle Dip
- location
-
Voo
(in Mutito)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Plastering & painting needs to be done
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ititu Earth Dam
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- Scooping Of Earth Dam
- output
- -
- implementation status
- Completion of 1st phase
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kasunguni Dispensary
- location
-
Zombe
(in Mutito)
- year first funded
- 2004
- action
- Construction Of The Gate And Fencing
- output
- Improved Security
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kinui Earth Dam
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Classrooms re-roofed when strong winds bleWest it off
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kwa Tuli Earth Dam
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- At lintals stage
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kyululu Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering, Re-Roofing, Repaire Of Toilets
- output
- -
- implementation status
- Plastering & painting needs to be done
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Malalani Chief's Office
- location
-
Malalani
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Ap Lines
- output
- Improved Security
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mang'Ola Primary School
- location
-
Zombe
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Improve Education Std
- implementation status
- One Classroom Constructed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muthungue Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering, Re-Roofing, Repaire Of Toilets
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nzangathi Chief's Office
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Completion work in progress
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nzanzu Community Pharmancy
- location
-
Kyamatu
(in Mutito)
- year first funded
- 2004
- action
- Construction Of The Pharmancy
- output
- Improved Health Care
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Syelungu Earth Dam
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- Scooping Of Earth Dam
- output
- -
- implementation status
- Classrooms funded under normal & equipment installed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Thua Zombe Water Project
- location
-
Zombe
(in Mutito)
- year first funded
- 2006
- action
- Laying Of Water Pipes
- output
- Availability Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Utwiini Primary School
- location
-
Nzangathi
(in Mutito)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Uwu Cattle Dip
- location
-
Mutito
(in Mutito)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chuluni Pit Latrines
- location
-
Nzambani
(in Mutito)
- year first funded
- 2005
- action
- Construction Of Pit Latrine
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kwa Kilonzi Earth Dam
- location
-
Voo
(in Mutito)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- Gravelling – needs more funding
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Endau Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering, Re-Roofing, Repaire Of Toilets
- output
- -
- implementation status
- Final touches
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Yiuku Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering And Roofing Of A Classroom
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kikuu Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering And Flooring Of A Classroom
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Makuka Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering And Flooring Of A Classroom
- output
- -
- implementation status
- At initial stage needs more funding
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Malatani Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering And Flooring Of A Classroom
- output
- -
- implementation status
- Toilets funded under normal
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Makuka Pit Latrine
- location
-
Malalani
(in Mutito)
- year first funded
- 2007
- action
- Construction Of Pit Latrine
- output
- Improved Health Care
- implementation status
- Pit Latrines Dug
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Matundu Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering Of A Classroom
- output
- -
- implementation status
- Needs more funding
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Ndulikye Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering Of A Classroom
- output
- -
- implementation status
- Completion work in progress
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Zombe Primary School
- location
-
Zombe
(in Mutito)
- year first funded
- 2009
- action
- Plastering Of A Classroom
- output
- Improve Education Std
- implementation status
- On Going
- total cost
- Ksh 35,000
- estimate
- Ksh 0
Kathua Primary School
- location
-
(in Mutito)
- year first funded
- 2009
- action
- Plastering Of A Classroom
- output
- -
- implementation status
- At foundation stage
- total cost
- Ksh 35,000
- estimate
- Ksh 0