The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Mutito

Bursary

location
Mutito (in Mutito)
year first funded
2004
action
Bursary To Students
output
Fees Payment For Needy Students
implementation status
On Going
total cost
Ksh 28,794,540
estimate
Ksh 0

Rural Electrification

location
Nzambani (in Mutito)
year first funded
2004
action
Electrification Programme
output
Improve Supply Of Electricity
implementation status
On Going
total cost
Ksh 13,500,000
estimate
Ksh 0

Mbangulo Earth Dam

location
Nzangathi (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Needs more funding
total cost
Ksh 4,500,000
estimate
Ksh 0

Chuluni Kwa Ngindu/Maluma/Ithumula W/Project

location
Nzambani (in Mutito)
year first funded
2003
action
Laying Of Water Pipes
output
Availability Water
implementation status
Complete
total cost
Ksh 4,000,000
estimate
Ksh 0

Kyanika Secondary School

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
Complete
total cost
Ksh 2,700,000
estimate
Ksh 0

Ikyatine Dam

location
Kyamatu (in Mutito)
year first funded
2006
action
Surveying & Scooping Of Earth Dam
output
Availability Water
implementation status
On Going
total cost
Ksh 2,500,000
estimate
Ksh 0

Malalani Secondary School

location
Malalani (in Mutito)
year first funded
2005
action
Land &Construction Of 2 Classrooms & Admin Block
output
Improve Education Std
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 0

Mwitika Mixed Day Secondary School

location
Mwitika (in Mutito)
year first funded
2003
action
Construction Of 4 Classrooms
output
Improve Education Std
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Syokimu Earth Dam

location
Nzambani (in Mutito)
year first funded
2008
action
Scooping Of Earth Dam
output
Availability Water
implementation status
Not Started
total cost
Ksh 2,000,000
estimate
Ksh 0

Kavaani Secondary School

location
Zombe (in Mutito)
year first funded
2003
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
Complete
total cost
Ksh 1,750,000
estimate
Ksh 0

Zombe Banda Sheds

location
Zombe (in Mutito)
year first funded
2006
action
Constructions Of Sheds
output
Improve Shelter-Jua Kali
implementation status
Needs more funding
total cost
Ksh 1,750,000
estimate
Ksh 0

Kyamatu Secondary School

location
Kyamatu (in Mutito)
year first funded
2004
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
Complete
total cost
Ksh 1,750,000
estimate
Ksh 0

Aic Zombe Girls Secondary School

location
Zombe (in Mutito)
year first funded
2004
action
Construction Of Computer Lab& Renovation Of Dh
output
Improve It Knowledge
implementation status
On Going
total cost
Ksh 1,737,000
estimate
Ksh 0

Ikuyuni Secondary School

location
Nzambani (in Mutito)
year first funded
2006
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 0

Ndui Earth Dam

location
Voo (in Mutito)
year first funded
2004
action
n/a
output
-
implementation status
Completion work in progress
total cost
Ksh 1,600,000
estimate
Ksh 0

Chuluni Girls Secondary School

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Science &Computer Lab
output
Improve It Knowledge
implementation status
Complete
total cost
Ksh 1,537,000
estimate
Ksh 0

Kiini Yanzuu/Kangweni Water Project

location
Nzambani (in Mutito)
year first funded
2007
action
n/a
output
-
implementation status
Needs more funding
total cost
Ksh 1,500,000
estimate
Ksh 0

Kavea Secondary School

location
Nzambani (in Mutito)
year first funded
2006
action
Purchase Of Land&Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
2 Classes Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Kalulu Kwa Munyalo Earth Dam

location
Nzangathi (in Mutito)
year first funded
2004
action
Scooping Of Earth Dam
output
Availability Water
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 0

Kanduti Polytechnic

location
Nzangathi (in Mutito)
year first funded
2003
action
Construction Of Classrooms & Admin Block
output
Technological Advancement
implementation status
Poly In Use
total cost
Ksh 1,350,000
estimate
Ksh 0

Chuluni Dispensary

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Maternity Ward
output
Improved Health Care
implementation status
Awaiting Painting
total cost
Ksh 1,287,832
estimate
Ksh 0

Kakungu Dispensary

location
Nzambani (in Mutito)
year first funded
2005
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 1,250,000
estimate
Ksh 0

Kavuti Drift

location
Nzambani (in Mutito)
year first funded
2006
action
Construction Of Drift
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 0

Nzambani Secondary School

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Library And Equip Computer Lab
output
Improve It Knowledge
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Kwa Tundu Secondary School

location
Mutito (in Mutito)
year first funded
2004
action
Construction Of 2 Classrooms & Admin Block
output
Improve Education Std
implementation status
Two Classes Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Muthungue Community Dispensary

location
Kyamatu (in Mutito)
year first funded
2004
action
Construction Of Dispensary
output
Improved Health Care
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 0

Kaliku Secondary School

location
Kaliku (in Mutito)
year first funded
2003
action
Construction Of Classrooms
output
Improve Education Std
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 0

Mwitika Dispensary

location
Mwitika (in Mutito)
year first funded
2004
action
Construction Of Maternity Ward
output
Improved Security
implementation status
Upto Roofing
total cost
Ksh 1,100,000
estimate
Ksh 0

Ngomano Kikuu Water Project

location
Mwitika (in Mutito)
year first funded
2004
action
n/a
output
Availability Water
implementation status
Completion work in progress
total cost
Ksh 1,100,000
estimate
Ksh 0

Kanduti Secondary School

location
Nzangathi (in Mutito)
year first funded
2007
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 0

Kaluva Water Project

location
Nzangathi (in Mutito)
year first funded
2007
action
Laying Of Water Pipes
output
Availability Water
implementation status
Needs more funding
total cost
Ksh 1,000,000
estimate
Ksh 0

Kikingini Nzewani Pipeline

location
Nzambani (in Mutito)
year first funded
2006
action
Laying Of Water Pipes
output
Availability Water
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 0

Kyaango Secondary School

location
Voo (in Mutito)
year first funded
2007
action
Construction Of Classrooms
output
Improve Education Std
implementation status
Two Classes Constructed And Roofed
total cost
Ksh 1,000,000
estimate
Ksh 0

Mathulini Polytechnic

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Classrooms
output
Technological Advancement
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 0

Mitaani Earth Dam

location
Endau (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Needs more funding
total cost
Ksh 1,000,000
estimate
Ksh 0

Mutito Boys Secondary School

location
Mutito (in Mutito)
year first funded
2006
action
Renovation Of Classrooms
output
Improve Education Std
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Nzangathi Dispensary

location
Nzangathi (in Mutito)
year first funded
2004
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Nzangathi Earth Dam

location
Nzangathi (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Completion work in progress
total cost
Ksh 1,000,000
estimate
Ksh 0

Syombuku Polythechnic

location
Nzambani (in Mutito)
year first funded
2006
action
Land Purchase & Construction Of Classrooms
output
Technological Advancement
implementation status
Upto Lintel Level
total cost
Ksh 1,000,000
estimate
Ksh 0

Voo Secondary School

location
Voo (in Mutito)
year first funded
2004
action
Construction Of Computer Lab
output
Improve It Knowledge
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Vutu Earth Dam

location
Mutito (in Mutito)
year first funded
2006
action
Scooping Of Earth Dam
output
-
implementation status
Needs more funding
total cost
Ksh 1,000,000
estimate
Ksh 0

Endau Secondary School

location
Endau (in Mutito)
year first funded
2003
action
Construction Of Classroom
output
Improve Education Std
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 0

Kaluva Secondary School

location
Nzangathi (in Mutito)
year first funded
2004
action
Construction Of Computer Lab
output
Improve It Knowledge
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 0

Kilonzo Secondary School

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Classrooms & Admin Block
output
Improve It Knowledge
implementation status
Complete
total cost
Ksh 900,017
estimate
Ksh 0

Mutito Girls Secondary School

location
Mutito (in Mutito)
year first funded
2006
action
Construction Of Classrooms
output
Improve Education Std
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Chuluni Social Hall

location
Nzambani (in Mutito)
year first funded
2005
action
Construction Of The Hall
output
Improved Community Services
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 0

Itiko Dispensary

location
Mutito (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 0

Mbangulo Kamulu Road

location
Nzangathi (in Mutito)
year first funded
2006
action
Rehabilited Rural Access Road
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 0

Kyaango Dispensary

location
Voo (in Mutito)
year first funded
2004
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 0

Makongo Dispensary

location
Mwitika (in Mutito)
year first funded
2004
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Structure Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kangweni Polytechnic

location
Nzambani (in Mutito)
year first funded
2004
action
Purchase Of Land & Construction Of Classroom
output
Technological Advancement
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Katikoni Youth Polytechnic

location
Mwitika (in Mutito)
year first funded
2005
action
Construction Of Classrooms
output
Technological Advancement
implementation status
Upto Lintel
total cost
Ksh 750,000
estimate
Ksh 0

Kiongwe Dispensary

location
Thua (in Mutito)
year first funded
2004
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Kalulu Dispensary

location
Nzangathi (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Upto Lintel
total cost
Ksh 700,000
estimate
Ksh 0

Kasyonoo Drift

location
Voo (in Mutito)
year first funded
2005
action
Construction Of Drift
output
Improve Trans. System
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Kunguluni Primary School

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Classrooms
output
Improve Education Std
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 0

Yoonye Dispensary

location
Mutito (in Mutito)
year first funded
2005
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Roofing Done
total cost
Ksh 700,000
estimate
Ksh 0

Endau Dispensary

location
Endau (in Mutito)
year first funded
2005
action
Construction Of Maternity Ward
output
Improved Health Care
implementation status
Upto Lintel
total cost
Ksh 700,000
estimate
Ksh 0

Kamale Youth Polytechnic

location
Nzambani (in Mutito)
year first funded
2005
action
Land Purchase & Construction Of Classrooms
output
Technological Advancement
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 0

Malalani Dispensary

location
Malalani (in Mutito)
year first funded
2003
action
Construction Of Maternity Ward
output
Improved Health Care
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Ikuyuni Dispensary

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Ithangathi Primary School

location
Zombe (in Mutito)
year first funded
2006
action
Construction Of Dormitory
output
Improve Education Std
implementation status
One Dormitory Complete
total cost
Ksh 600,000
estimate
Ksh 0

Ngungi Secondary School

location
Zombe (in Mutito)
year first funded
2005
action
Renovation Of Classrooms
output
Improve Education Std
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kikuu Dispensary

location
Mwitika (in Mutito)
year first funded
2005
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Awaiting Finishing
total cost
Ksh 550,000
estimate
Ksh 0

Kasangu Dispensary

location
Voo (in Mutito)
year first funded
2005
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 0

Koumbuni Rock Catchment

location
Mwitika (in Mutito)
year first funded
2005
action
Water Harvesting
output
Availability Water
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 0

Chuluni Police Post

location
Nzambani (in Mutito)
year first funded
2008
action
Construction Of Police Post
output
Improved Security
implementation status
Not Started
total cost
Ksh 500,000
estimate
Ksh 0

Kanduti Ndunga Road

location
Nzangathi (in Mutito)
year first funded
2007
action
Rehabilited Rural Access Road
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kanduu Earth Dam

location
Nzangathi (in Mutito)
year first funded
2005
action
Scooping Of Earth Dam
output
-
implementation status
To be completed on the next release
total cost
Ksh 500,000
estimate
Ksh 0

Kanzauwu-Kivuti-Kyamutivi Road

location
Nzangathi (in Mutito)
year first funded
2008
action
Rehabilited Rural Access Road
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kathande-Kaumu Road

location
Zombe (in Mutito)
year first funded
2008
action
Rehabilited Rural Access Road
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kavutini Secondary School

location
Nzangathi (in Mutito)
year first funded
2007
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kinakoni Secondary School

location
Voo (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Final touches
total cost
Ksh 500,000
estimate
Ksh 0

Kinakoni Youth Polytechnic

location
Voo (in Mutito)
year first funded
2005
action
Construction Of Classrooms
output
Technological Advancement
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kwa Amutei Dispensary

location
Thua (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Upto Lintel
total cost
Ksh 500,000
estimate
Ksh 0

Kyamatu/Voo Thua River Drift

location
Kyamatu (in Mutito)
year first funded
2003
action
n/a
output
-
implementation status
Completion work in progress
total cost
Ksh 500,000
estimate
Ksh 0

Muthua/Kwa Katuni Water Pipeline

location
Mutito (in Mutito)
year first funded
2004
action
Water Harvesting From A Hill
output
Availability Water
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Mutito Police Project

location
Mutito (in Mutito)
year first funded
2004
action
Land Purchase
output
Improved Security
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Ngomano Kamulu Water Project

location
Mwitika (in Mutito)
year first funded
2006
action
Laying Of Water Pipes
output
Availability Water
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Nzeeu Drift

location
Nzambani (in Mutito)
year first funded
2006
action
Construction Of Drift
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 0

Yanzuu Dispensary

location
Nzambani (in Mutito)
year first funded
2004
action
Construction Of Maternity Ward
output
Improved Health Care
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Ds Residential House Mwitika

location
Mwitika (in Mutito)
year first funded
2008
action
Construction Oh D.Os Residential House
output
Improved Accomodation
implementation status
Not Started
total cost
Ksh 500,000
estimate
Ksh 0

Kanzauwu Dispensary

location
Nzangathi (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Requires Finishing
total cost
Ksh 450,000
estimate
Ksh 0

Kateke Primary School

location
Nzambani (in Mutito)
year first funded
2006
action
Construction Of 1 Classroom
output
Improve Education Std
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Nduluni Polytechnic

location
Voo (in Mutito)
year first funded
2006
action
Construction Of 1 Classroom
output
Technological Advancement
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

St Nicholas Polythechnic

location
Zombe (in Mutito)
year first funded
2007
action
Construction Of Classrooms & Admin Block
output
Technological Advancement
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 0

Ikisaya/Syou Polytechnic

location
Malalani (in Mutito)
year first funded
2004
action
Construction Of Classrooms & Admin Block
output
Technological Advancement
implementation status
Poly Opened
total cost
Ksh 450,000
estimate
Ksh 0

Yongoni Water Project

location
Endau (in Mutito)
year first funded
2005
action
Replacement Of Water Pipes
output
Availability Water
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 0

Katumbi Dispensary

location
Endau (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Upto Wallplate
total cost
Ksh 400,000
estimate
Ksh 0

Katumbu Dispensary

location
Nzangathi (in Mutito)
year first funded
2004
action
Completion Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kawala Polytechnic

location
Kaliku (in Mutito)
year first funded
2006
action
Construction Of Classrooms & Admin Block
output
Technological Advancement
implementation status
Upto Lintel
total cost
Ksh 400,000
estimate
Ksh 0

Kinanie Dispensary

location
Endau (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Upto Wallplate
total cost
Ksh 400,000
estimate
Ksh 0

Kyukuni Dispensary

location
Kyamatu (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Roofing Done
total cost
Ksh 400,000
estimate
Ksh 0

Mutito Chief's Office

location
Mutito (in Mutito)
year first funded
2005
action
Construction Of Office
output
Improved Security
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Manyoeni Dispensary

location
Kaliku (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Roofing Done
total cost
Ksh 350,000
estimate
Ksh 0

Kyaimu Dispensary

location
Kaliku (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Roofing Done
total cost
Ksh 350,000
estimate
Ksh 0

Matundu Dispensary

location
Kyamatu (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Upto Lintel
total cost
Ksh 350,000
estimate
Ksh 0

Twambui Dispensary

location
Endau (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Upto Wallplate
total cost
Ksh 350,000
estimate
Ksh 0

Voo Chief's Office

location
Voo (in Mutito)
year first funded
2006
action
Construction Of Office & Ap Lines
output
Improved Security
implementation status
Requires Finishing
total cost
Ksh 350,000
estimate
Ksh 0

Voo Dispensary

location
Voo (in Mutito)
year first funded
2003
action
Construction Of Maternity Ward
output
Improved Health Care
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 0

Yiuku Dispensary

location
Endau (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Needs more funding
total cost
Ksh 350,000
estimate
Ksh 0

Zombe Chief's Office

location
Zombe (in Mutito)
year first funded
2005
action
Construction Of Ap Lines
output
Improved Security
implementation status
One Room Complete
total cost
Ksh 350,000
estimate
Ksh 0

Zombe Mutito Road

location
Zombe (in Mutito)
year first funded
2006
action
Rehabilited Rural Access Roads
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 0

Emwaa Rock Catchment

location
Voo (in Mutito)
year first funded
2004
action
Water Harvesting
output
Availability Water
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Zombe Education Office

location
Zombe (in Mutito)
year first funded
2007
action
Construction Of The Office
output
Improve Education Std
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Zombe Complex Institute

location
Zombe (in Mutito)
year first funded
2006
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Nzanzu Dispensary

location
Kyamatu (in Mutito)
year first funded
2006
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Nzangathi Ngomango Road

location
Nzangathi (in Mutito)
year first funded
2006
action
Rehabilited Rural Access Road
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Nzambani Chief's Office

location
Nzambani (in Mutito)
year first funded
2007
action
n/a
output
-
implementation status
Completion work in progress
total cost
Ksh 300,000
estimate
Ksh 0

Ngungi Dispensary

location
Zombe (in Mutito)
year first funded
2007
action
Construction Of Dispensary
output
Improved Health Care
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Ngelani Dispensary

location
Zombe (in Mutito)
year first funded
2004
action
Construction Of Dispensary
output
Improved Health Care
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Mutito Youth Polytechnic

location
Mutito (in Mutito)
year first funded
2003
action
Renovation And Purchase Of Equipments
output
Technological Advancement
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Munyuni Dispensary

location
Voo (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Needs more funding
total cost
Ksh 300,000
estimate
Ksh 0

Mbaa Nginga Water Project

location
Nzambani (in Mutito)
year first funded
2006
action
Laying Of Water Pipes
output
Availability Water
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Masasini Dispensary

location
Mutito (in Mutito)
year first funded
2007
action
Construction Of Dispensary
output
Improved Health Care
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Kinakoni Dispensary

location
Voo (in Mutito)
year first funded
2003
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Structure Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kaliku Chief's Office

location
Kaliku (in Mutito)
year first funded
2006
action
Construction Of Office & Ap Lines
output
Improved Security
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Endau-Koinange Water Pipeline

location
Endau (in Mutito)
year first funded
2004
action
Rehabilited Rural Access Road
output
Availability Water
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 0

Zombe Polytechnic

location
Zombe (in Mutito)
year first funded
2007
action
Renovation Of Classrooms
output
Technological Advancement
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 0

Kyamatu Cattle Dip

location
Kyamatu (in Mutito)
year first funded
2004
action
Renovation Of The Dip
output
Improved Livestock Health
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 0

Kwa Muthwa/Malalani Water Pipeline

location
Malalani (in Mutito)
year first funded
2004
action
Laying Of Water Pipes
output
Availability Water
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 0

Kaliku Dispensary

location
Kaliku (in Mutito)
year first funded
2004
action
Construction Of The Gate And Fencing
output
Improved Health Care
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Zombe Mwitika Road

location
Zombe (in Mutito)
year first funded
2006
action
Rehabilited Rural Access Roads
output
Improve Trans. System
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Endau Polytechnic

location
Endau (in Mutito)
year first funded
2006
action
Renovation
output
Technological Advancement
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kaluasi Secondary School

location
Voo (in Mutito)
year first funded
2007
action
n/a
output
-
implementation status
Final touches
total cost
Ksh 200,000
estimate
Ksh 0

Kamaembe Dispensary

location
Thua (in Mutito)
year first funded
2007
action
Construction Of Dispensary
output
Improved Health Care
implementation status
Upto Lintel
total cost
Ksh 200,000
estimate
Ksh 0

Kinanie Drift

location
Endau (in Mutito)
year first funded
2006
action
Construction Of Drift
output
-
implementation status
To cater for contingent situations
total cost
Ksh 200,000
estimate
Ksh 0

Kisyuni Dispensary

location
Voo (in Mutito)
year first funded
2007
action
n/a
output
-
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 0

Kyamatu Chief's Office

location
Kyamatu (in Mutito)
year first funded
2004
action
Construction Of Ap Lines
output
Improved Security
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 0

Makuka Dispensary

location
Endau (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Work in progress needs more funding
total cost
Ksh 200,000
estimate
Ksh 0

Mutito Primary School

location
Mutito (in Mutito)
year first funded
2006
action
Construction Of Classrooms & Admin Block
output
Improve Education Std
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Mwitika Chief's Office

location
Mwitika (in Mutito)
year first funded
2005
action
Construction Of Ap Lines
output
Improved Security
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

R Child Development Centre

location
Nzambani (in Mutito)
year first funded
2008
action
Construction Of Facilities
output
Safe And Conducive Learning Environment
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 0

Kwa Ndulya Cattle Dip

location
Voo (in Mutito)
year first funded
2007
action
n/a
output
-
implementation status
Plastering & painting needs to be done
total cost
Ksh 150,000
estimate
Ksh 0

Ititu Earth Dam

location
Voo (in Mutito)
year first funded
2004
action
Scooping Of Earth Dam
output
-
implementation status
Completion of 1st phase
total cost
Ksh 100,000
estimate
Ksh 0

Kasunguni Dispensary

location
Zombe (in Mutito)
year first funded
2004
action
Construction Of The Gate And Fencing
output
Improved Security
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kinui Earth Dam

location
Voo (in Mutito)
year first funded
2004
action
n/a
output
-
implementation status
Classrooms re-roofed when strong winds bleWest it off
total cost
Ksh 100,000
estimate
Ksh 0

Kwa Tuli Earth Dam

location
Kyamatu (in Mutito)
year first funded
2004
action
n/a
output
-
implementation status
At lintals stage
total cost
Ksh 100,000
estimate
Ksh 0

Kyululu Primary School

location
(in Mutito)
year first funded
2009
action
Plastering, Re-Roofing, Repaire Of Toilets
output
-
implementation status
Plastering & painting needs to be done
total cost
Ksh 100,000
estimate
Ksh 0

Malalani Chief's Office

location
Malalani (in Mutito)
year first funded
2005
action
Construction Of Ap Lines
output
Improved Security
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 0

Mang'Ola Primary School

location
Zombe (in Mutito)
year first funded
2007
action
Construction Of Classrooms
output
Improve Education Std
implementation status
One Classroom Constructed
total cost
Ksh 100,000
estimate
Ksh 0

Muthungue Primary School

location
(in Mutito)
year first funded
2009
action
Plastering, Re-Roofing, Repaire Of Toilets
output
-
implementation status
Needs more funding
total cost
Ksh 100,000
estimate
Ksh 0

Nzangathi Chief's Office

location
Nzangathi (in Mutito)
year first funded
2007
action
n/a
output
-
implementation status
Completion work in progress
total cost
Ksh 100,000
estimate
Ksh 0

Nzanzu Community Pharmancy

location
Kyamatu (in Mutito)
year first funded
2004
action
Construction Of The Pharmancy
output
Improved Health Care
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 0

Syelungu Earth Dam

location
Voo (in Mutito)
year first funded
2004
action
Scooping Of Earth Dam
output
-
implementation status
Classrooms funded under normal & equipment installed
total cost
Ksh 100,000
estimate
Ksh 0

Thua Zombe Water Project

location
Zombe (in Mutito)
year first funded
2006
action
Laying Of Water Pipes
output
Availability Water
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 0

Utwiini Primary School

location
Nzangathi (in Mutito)
year first funded
2007
action
n/a
output
-
implementation status
Needs more funding
total cost
Ksh 100,000
estimate
Ksh 0

Uwu Cattle Dip

location
Mutito (in Mutito)
year first funded
2006
action
n/a
output
-
implementation status
Needs more funding
total cost
Ksh 100,000
estimate
Ksh 0

Chuluni Pit Latrines

location
Nzambani (in Mutito)
year first funded
2005
action
Construction Of Pit Latrine
output
Improved Health Care
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kwa Kilonzi Earth Dam

location
Voo (in Mutito)
year first funded
2004
action
n/a
output
-
implementation status
Gravelling – needs more funding
total cost
Ksh 100,000
estimate
Ksh 0

Endau Primary School

location
(in Mutito)
year first funded
2009
action
Plastering, Re-Roofing, Repaire Of Toilets
output
-
implementation status
Final touches
total cost
Ksh 100,000
estimate
Ksh 0

Yiuku Primary School

location
(in Mutito)
year first funded
2009
action
Plastering And Roofing Of A Classroom
output
-
implementation status
Needs more funding
total cost
Ksh 50,000
estimate
Ksh 0

Kikuu Primary School

location
(in Mutito)
year first funded
2009
action
Plastering And Flooring Of A Classroom
output
-
implementation status
Needs more funding
total cost
Ksh 50,000
estimate
Ksh 0

Makuka Primary School

location
(in Mutito)
year first funded
2009
action
Plastering And Flooring Of A Classroom
output
-
implementation status
At initial stage needs more funding
total cost
Ksh 50,000
estimate
Ksh 0

Malatani Primary School

location
(in Mutito)
year first funded
2009
action
Plastering And Flooring Of A Classroom
output
-
implementation status
Toilets funded under normal
total cost
Ksh 50,000
estimate
Ksh 0

Makuka Pit Latrine

location
Malalani (in Mutito)
year first funded
2007
action
Construction Of Pit Latrine
output
Improved Health Care
implementation status
Pit Latrines Dug
total cost
Ksh 50,000
estimate
Ksh 0

Matundu Primary School

location
(in Mutito)
year first funded
2009
action
Plastering Of A Classroom
output
-
implementation status
Needs more funding
total cost
Ksh 35,000
estimate
Ksh 0

Ndulikye Primary School

location
(in Mutito)
year first funded
2009
action
Plastering Of A Classroom
output
-
implementation status
Completion work in progress
total cost
Ksh 35,000
estimate
Ksh 0

Zombe Primary School

location
Zombe (in Mutito)
year first funded
2009
action
Plastering Of A Classroom
output
Improve Education Std
implementation status
On Going
total cost
Ksh 35,000
estimate
Ksh 0

Kathua Primary School

location
(in Mutito)
year first funded
2009
action
Plastering Of A Classroom
output
-
implementation status
At foundation stage
total cost
Ksh 35,000
estimate
Ksh 0