The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Mwala

Bursary Fund

location
Mwala (in Mwala)
year first funded
2004
action
Awarding Bursary To Needy
output
Improved Education
implementation status
Kshs 600,000 Re allocated to Ahero Sub District Hospital theatre project Ref. CDF BOARD/NYANDO/VOL.II/39
total cost
Ksh 19,304,566
estimate
Ksh 0

Cement For Sub-Surface Dams For Sub Surface Locations

location
Mwala (in Mwala)
year first funded
2005
action
Supply Of Cement To All The Sub-.Location Construction of Sub Surface Dams
output
Improved Water Access
implementation status
Complete
total cost
Ksh 10,970,012
estimate
Ksh 0

Emergencies

location
Mwala (in Mwala)
year first funded
2004
action
n/a
output
-
implementation status
not known
total cost
Ksh 8,172,595
estimate
Ksh 0

Administration

location
Mwala (in Mwala)
year first funded
2004
action
Office Running And Staff Salaries
output
Improved Administr- Tion
implementation status
not known
total cost
Ksh 8,165,316
estimate
Ksh 0

Emergency

location
Mwala (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
Complete
total cost
Ksh 5,180,100
estimate
Ksh 0

Electrification

location
Mwala (in Mwala)
year first funded
2009
action
Electrification
output
-
implementation status
Ongoing
total cost
Ksh 5,000,000
estimate
Ksh 0

Primary School s In Mwala Constituency

location
Mwala (in Mwala)
year first funded
2004
action
Supply Of10 Chairs,20 Desks &2 Tables To All Primaryschools In
output
Improved Education
implementation status
Complete
total cost
Ksh 4,200,000
estimate
Ksh 0

Secondary Schools - computers

location
Mwala (in Mwala)
year first funded
2005
action
Supply Of Computers To All Sec. Schools
output
Improved Education
implementation status
Complete
total cost
Ksh 3,900,000
estimate
Ksh 0

Secondary Schools

location
Mwala (in Mwala)
year first funded
2006
action
Supply Of Generators To Sec. Schools
output
Improved Education
implementation status
Complete
total cost
Ksh 3,500,000
estimate
Ksh 0

Ikalaasa Dispensary

location
Ikalaasa (in Mwala)
year first funded
2006
action
Construction Of A New Dispensary
output
Improved Health Care
implementation status
Building Half Way Done. No Doors,No Windows And Not Plastered
total cost
Ksh 2,950,000
estimate
Ksh 0

Kitile Secondary School

location
Kibauni (in Mwala)
year first funded
2006
action
Construction Of A New School
output
Improved Education
implementation status
Complete
total cost
Ksh 2,750,000
estimate
Ksh 0

Kaiani Dispensary

location
Wamunyu (in Mwala)
year first funded
2004
action
Construction Of A Dispensary
output
Improved Health Care
implementation status
Dispensary Complete And Operational.
total cost
Ksh 2,500,000
estimate
Ksh 0

Muthetheni Earth Dam

location
Muthetheni (in Mwala)
year first funded
2009
action
Land Owners Compensation
output
Improve Water Access
implementation status
Not Started
total cost
Ksh 2,500,000
estimate
Ksh 0

Kilala Secondary School

location
Ngomano (in Mwala)
year first funded
2006
action
Construction Of Anew School
output
Improved Education
implementation status
not known
total cost
Ksh 2,300,000
estimate
Ksh 0

Nyaani Secondary School

location
Muthetheni (in Mwala)
year first funded
2004
action
Completion Of Stalled Building And Fencing Of School Compound. Construction Of 3 Toilets
output
Improved Education
implementation status
Construction Done Up To Roofing
total cost
Ksh 2,214,280
estimate
Ksh 0

New District Headquarters Land

location
Makutano (in Mwala)
year first funded
2006
action
Acquire Land For District Hqs
output
Improve
implementation status
Complete Service Delivery
total cost
Ksh 2,200,000
estimate
Ksh 0

Kwa Kala Dispensary

location
Yathui (in Mwala)
year first funded
2004
action
Construction Of A Dispensary
output
Improved Health Care
implementation status
Building Not Yet Plastered ,No Equipment Bought.
total cost
Ksh 2,114,285
estimate
Ksh 0

Muthetheni Dam

location
Muthetheni (in Mwala)
year first funded
2009
action
Land Owners Compensation
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 2,100,000
estimate
Ksh 0

Masilu Dam

location
Miu (in Mwala)
year first funded
2006
action
Scooping Of Reservoir And Consturction Of Embankment
output
Improved Water Access
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Nthwanguu Dispensary

location
Kibauni (in Mwala)
year first funded
2005
action
Construction Of A Dispensary
output
Improved Health Care
implementation status
not known
total cost
Ksh 1,900,000
estimate
Ksh 0

Kwa Malu Earth Dam

location
Mwala (in Mwala)
year first funded
2007
action
Construction Of A New Dam
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,814,560
estimate
Ksh 0

Muthetheni Police Post

location
Muthetheni (in Mwala)
year first funded
2006
action
Construction Of A Ap Line
output
Improved Security
implementation status
Administration Block Complete But Not Occupied
total cost
Ksh 1,800,000
estimate
Ksh 0

Maweli Secondary School

location
Makutano (in Mwala)
year first funded
2004
action
Sinking Of A Borehole
output
Improved Water Access
implementation status
Borehole Drilled By M.O.W, Cdf Funds Used For Piping And Equipping School Lab
total cost
Ksh 1,714,285
estimate
Ksh 0

Kaloleni Dispensary

location
Mwala (in Mwala)
year first funded
2004
action
Construction Of A Dispensary
output
Improved Health Care
implementation status
Dispensary Complete And In Use But Lacks Equipment
total cost
Ksh 1,714,285
estimate
Ksh 0

Kwa Kitoo Dam

location
Wamunyu (in Mwala)
year first funded
2008
action
Desilting
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 0

Kwa Luvai Dam

location
Makutano (in Mwala)
year first funded
2008
action
Desilting And Expansion
output
Improved Water Access
implementation status
Complete And In Use
total cost
Ksh 1,700,000
estimate
Ksh 0

Mang'Olota Dam

location
Muthetheni (in Mwala)
year first funded
2009
action
Desilting
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,700,000
estimate
Ksh 0

Kyamatula Secondary School

location
Yathui (in Mwala)
year first funded
2006
action
Construction Of A New School
output
Improved Education
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 0

Kavumbu Dispensary

location
Masii (in Mwala)
year first funded
2006
action
Construction Of A New Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 1,674,973
estimate
Ksh 0

Kwa Ngoma Drift

location
Mbiuni (in Mwala)
year first funded
2007
action
Construction Of A Drift
output
Improved Transport
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 0

Wakaela Secondary School

location
Wamunyu (in Mwala)
year first funded
2005
action
Construction Of A Laboratory
output
Improved Education
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 0

Kionyweni Water Project

location
Muthetheni (in Mwala)
year first funded
2005
action
Servicing Of Pump Engine Construction& Sinking Ofwater Sumpsand Installation of Supply Pipes
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,592,000
estimate
Ksh 0

Mwala Youth Affairs

location
Mwala (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,574,920
estimate
Ksh 0

Musaalani Dam

location
Vyulya (in Mwala)
year first funded
2003
action
Desilt, Construction Ruct A Spill- Way, Concrete Sillfive Gabionsdraw-Off Point & Trough
output
Improved Water Access
implementation status
All Works Done
total cost
Ksh 1,554,000
estimate
Ksh 0

Mukolekya Dam

location
Miu (in Mwala)
year first funded
2004
action
Desilting Of Reservoir, Construction Of Embankment And Concrete Sills
output
Improved Water Access
implementation status
Desilting And Spillway Done. Fence ,Draw-Off Point And Cattle Troughs Not Done
total cost
Ksh 1,510,296
estimate
Ksh 0

Kiketa Dam

location
Kibauni (in Mwala)
year first funded
2004
action
Desilting Of Reservoir, Construction Of Spill Way And Embankment
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,510,296
estimate
Ksh 0

Kimuuni Secondary School

location
Miu (in Mwala)
year first funded
2006
action
Construction Of A New School
output
Improved Education
implementation status
not known
total cost
Ksh 1,500,000
estimate
Ksh 0

Kibauni Water Project

location
Kibauni (in Mwala)
year first funded
2008
action
Construction Storage Tanks & Piping
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,500,000
estimate
Ksh 0

Kwa Muutu Dam

location
Mwala (in Mwala)
year first funded
2008
action
Desilting
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Kavumbu Dispensary

location
Masii (in Mwala)
year first funded
2008
action
Construction Of Dispensary
output
Improved Health
implementation status
Prolect Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Etikoni Secondary School

location
Kathama (in Mwala)
year first funded
2006
action
Construction Of A Science Laboratory
output
Improved Education
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 0

Kwa Muiu Dam

location
Yathui (in Mwala)
year first funded
2009
action
Desilting
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,400,000
estimate
Ksh 0

Reallocation Kwa Muiu Dam

location
Yathui (in Mwala)
year first funded
2008
action
Desilting
output
Improved Water Access
implementation status
Project Complete And In Use
total cost
Ksh 1,400,000
estimate
Ksh 0

Kwa Mbinda Dam

location
Makutano (in Mwala)
year first funded
2008
action
Desilting
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,395,500
estimate
Ksh 0

Muthetheni Mixed Secondary School

location
Muthetheni (in Mwala)
year first funded
2007
action
Construction Of A New School
output
Improved Education
implementation status
On-Going
total cost
Ksh 1,350,000
estimate
Ksh 0

Konza Dam

location
Ikalaasa (in Mwala)
year first funded
2004
action
Desilting Of Reservoir, Embnkment And Spill Way
output
Improved Water Access
implementation status
Desilted, Concrete Sill Construction And Spill Way Cut.
total cost
Ksh 1,314,285
estimate
Ksh 0

Kikaso Secondary School

location
Yathui (in Mwala)
year first funded
2007
action
Construction Of Classroom
output
Improved Education
implementation status
Project Not Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Yathui Borehole

location
Yathui (in Mwala)
year first funded
2009
action
Drilling & Equipping
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,300,000
estimate
Ksh 0

Kwa Mulei Dam

location
Yathui (in Mwala)
year first funded
2008
action
Desilting
output
Improved Water Access
implementation status
Complete And In Use
total cost
Ksh 1,300,000
estimate
Ksh 0

Kwa Masoa Dam

location
Mbiuni (in Mwala)
year first funded
2008
action
Desilting
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Mango Dispensary

location
Mango (in Mwala)
year first funded
2005
action
Construction Of A Maternity
output
Improved Health Care
implementation status
not known
total cost
Ksh 1,300,000
estimate
Ksh 0

Kwa Matu Dam

location
Vyulya (in Mwala)
year first funded
2008
action
Desilting
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Muthei Borehole

location
Masii (in Mwala)
year first funded
2009
action
Drilling & Equipping
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,200,000
estimate
Ksh 0

Kwanyange Earth Dam

location
Masii (in Mwala)
year first funded
2009
action
Desilting
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,200,000
estimate
Ksh 0

Kitile Dam

location
Kibauni (in Mwala)
year first funded
2009
action
Desilting
output
Improved Water Access
implementation status
not known
total cost
Ksh 1,200,000
estimate
Ksh 0

Ngamba Water Project

location
Miu (in Mwala)
year first funded
2008
action
Purchase Of Water Pump &Piping
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,200,000
estimate
Ksh 0

Kwa Maondu Dam

location
Vyulya (in Mwala)
year first funded
2009
action
Desilting
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,200,000
estimate
Ksh 0

St. Joseph's Mwala Youth Polytechnic

location
Mwala (in Mwala)
year first funded
2004
action
Electricity Supply To The Institution
output
Improved Education
implementation status
Not Complete. Funds Not Enough
total cost
Ksh 1,188,038
estimate
Ksh 0

Muusini Secondary School

location
Vyulya (in Mwala)
year first funded
2004
action
Construction of A Lab.Classroom &Generator
output
Improved Education
implementation status
2 Classrooms And Generator House Complete And In Use. Lab Not Equipped
total cost
Ksh 1,150,000
estimate
Ksh 0

Kibauni Secondary School

location
Kibauni (in Mwala)
year first funded
2005
action
Construction Of 2 Classes Classrooms
output
Improved Education
implementation status
1 Classroom Complete And In Use, The Other Half Way Complete.
total cost
Ksh 1,150,000
estimate
Ksh 0

Kwa Mukeka Dam

location
Mbiuni (in Mwala)
year first funded
2004
action
Repair Of Breached Section Of Theembankmenttrimming Ofspill Way.Construction of Communitywater Point.
output
Improved Water Access
implementation status
Worksnot Well Done
total cost
Ksh 1,106,308
estimate
Ksh 0

Mukuyuni Drifts

location
Mbiuni (in Mwala)
year first funded
2004
action
Drift Construction
output
Improved Transport
implementation status
Work Done To Completion
total cost
Ksh 1,106,285
estimate
Ksh 0

Kilembwa Secondary School

location
Wamunyu (in Mwala)
year first funded
2006
action
Roofing And Plastering Of Science Lab.
output
Improved Education
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 0

Katheka Secondary School

location
Vyulya (in Mwala)
year first funded
2006
action
Construction Of A Science Laboratory
output
Improved Education
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 0

Wamunyu Water Project

location
Wamunyu (in Mwala)
year first funded
2008
action
Construction Storage Tanks
output
Improved Water
implementation status
On-Going
total cost
Ksh 1,100,000
estimate
Ksh 0

Kwa Mwatu Dam

location
Masii (in Mwala)
year first funded
2005
action
Scooping Of Reservoir And Consturction Of Embankment
output
Improve Water Access
implementation status
Works Not Started
total cost
Ksh 1,100,000
estimate
Ksh 0

Women Self Help Groups

location
Mwala (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
Not Started
total cost
Ksh 1,049,947
estimate
Ksh 0

Tree Planting

location
Mwala (in Mwala)
year first funded
2008
action
Tree Planting
output
Improved Soil Conservation
implementation status
Complete
total cost
Ksh 1,049,946
estimate
Ksh 0

Kwa Kimotho Dam

location
Masii (in Mwala)
year first funded
2004
action
Embankment Spill Way & Concrete Sills
output
Improved Water Access
implementation status
Work Done Satisfactorily
total cost
Ksh 1,014,285
estimate
Ksh 0

Ndethye Nitethye

location
Wamunyu (in Mwala)
year first funded
2004
action
Buying And Laying Of Pipes
output
Improved Food Production
implementation status
Pipes Bought But Not Layed Down
total cost
Ksh 1,010,296
estimate
Ksh 0

Mithanga Secondary School

location
Vyulya (in Mwala)
year first funded
2004
action
Construction Of A Lab.
output
Improved Education
implementation status
Lab. Complete And In Use.
total cost
Ksh 1,010,292
estimate
Ksh 0

Kunikila - Masaw'A Water Project

location
Mbiuni (in Mwala)
year first funded
2009
action
Drilling & Equipping
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 0

Mutanda Dam

location
Yathui (in Mwala)
year first funded
2006
action
Scooping Of Reservoir And
output
Improve Water Access
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kwa Kisau Dam

location
Mwala (in Mwala)
year first funded
2006
action
Scooping Of Reservoir And Consturction Of Embankment
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Makiliva Dam

location
Mbiuni (in Mwala)
year first funded
2005
action
Scooping Of Dam
output
Improve Water Access
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Mbiuni Irrigation Schooleme

location
Mbiuni (in Mwala)
year first funded
2004
action
Construction Of Furrows For Irrigation
output
Improved Food Production
implementation status
Work Done And Water In Use.Rehabilitation
total cost
Ksh 1,000,000
estimate
Ksh 0

Kaliambeu Dispensary

location
Muthetheni (in Mwala)
year first funded
2005
action
Completion Of A Building For Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kitumbi Dam

location
Muthetheni (in Mwala)
year first funded
2005
action
Desilting And Cutting A Spill Way
output
Improve Water Supply
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kwa Maua Dam

location
Ikalaasa (in Mwala)
year first funded
2006
action
Scooping Of Reservoir And Consturction Of Embankment
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kwa Mutune Dam

location
Makutano (in Mwala)
year first funded
2006
action
Scooping Of Reservoir And Consturction Of Embankment
output
Improved Water Access
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Wamunyu Water Project Kituiu Area

location
Wamunyu (in Mwala)
year first funded
2008
action
Construction Storage Tanks & Piping
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 0

Kikulumi Earth Dam

location
Miu (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 0

Matulani Secondary School

location
Kibauni (in Mwala)
year first funded
2007
action
Construction Of A Classrm
output
Not Started
implementation status
not known
total cost
Ksh 1,000,000
estimate
Ksh 0

Mililuni Dam

location
Masii (in Mwala)
year first funded
2006
action
Scooping Of Dam
output
Improved Water Access
implementation status
Work Done
total cost
Ksh 1,000,000
estimate
Ksh 0

Mbaani Dam

location
Muthetheni (in Mwala)
year first funded
2004
action
Scooping Of Reservoir, Trimming Of Spill Way
output
Improved Water Access
implementation status
Work Done To Completion
total cost
Ksh 996,011
estimate
Ksh 0

Kunikila Secondary School

location
Mbiuni (in Mwala)
year first funded
2008
action
Construction Of A Laboratory
output
Improved Education
implementation status
On-Going
total cost
Ksh 950,000
estimate
Ksh 0

Kiuwanzukini Secondary School

location
Mwala (in Mwala)
year first funded
2008
action
Construction Of A Classroom & Office Block
output
Improved Education
implementation status
On-Going
total cost
Ksh 950,000
estimate
Ksh 0

Katithi Primary School

location
Vyulya (in Mwala)
year first funded
2006
action
Construction Of Classroom & Office Block
output
Improved Education
implementation status
2 Classrooms & Office Block Complete & In Use 2 More Classrooms Half Way Complete
total cost
Ksh 900,000
estimate
Ksh 0

Ukalani Secondary School

location
Muthetheni (in Mwala)
year first funded
2007
action
Construction Of A New School
output
Improved Education
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

St. Joseph's Kasolongo Secondary School

location
Masii (in Mwala)
year first funded
2007
action
Construction Of 2 Classrooms
output
Improved Education
implementation status
Project Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 0

Mwala Mixed Secondary School

location
Mwala (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Mango Secondary School

location
Mango (in Mwala)
year first funded
2005
action
Construction Of A Dormitory
output
Improved Education
implementation status
Building Half Way Done
total cost
Ksh 900,000
estimate
Ksh 0

Reallocation Kisaki Police Post

location
Masii (in Mwala)
year first funded
2008
action
Construction Of A Police Post
output
Improved Security
implementation status
Project Not Complete
total cost
Ksh 900,000
estimate
Ksh 0

Kwa Nyika Dam

location
Wamunyu (in Mwala)
year first funded
2003
action
Scooping Of Dam
output
Improved Water Access
implementation status
Work Done
total cost
Ksh 892,000
estimate
Ksh 0

Mbaikini Secondary School

location
Wamunyu (in Mwala)
year first funded
2007
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 0

Ngamba Secondary School

location
Miu (in Mwala)
year first funded
2008
action
Construction Classroom & Office Block
output
Improved Education
implementation status
On-Going
total cost
Ksh 800,000
estimate
Ksh 0

Miu Secondary School

location
Miu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Classrooms Complete Work Still Going On In Dormitories
total cost
Ksh 800,000
estimate
Ksh 0

St. Mark's Secondary School

location
Mbiuni (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
not known
total cost
Ksh 800,000
estimate
Ksh 0

Kwa Kivukui Water Project

location
Mwala (in Mwala)
year first funded
2004
action
Desilting Of Reservoir, Embankment Spill Way And Concrete Sills
output
Improved Water Access
implementation status
Work Done To Completion
total cost
Ksh 800,000
estimate
Ksh 0

Muthetheni Dam

location
Muthetheni (in Mwala)
year first funded
2008
action
Piping
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 800,000
estimate
Ksh 0

Vyulya Health Centre

location
Vyulya (in Mwala)
year first funded
2004
action
Contruction, Put A Fence, Gate,Gutters, Dig A Septic Tank And Put Shelves
output
Improved Health Care
implementation status
Work Done And Facilities In Use.
total cost
Ksh 800,000
estimate
Ksh 0

Kathiiani Primary School

location
Wamunyu (in Mwala)
year first funded
2006
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Muthei Secondary School

location
Masii (in Mwala)
year first funded
2005
action
Biulding Of Water Tank
output
Improved Education
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Nzololo Primary School

location
Mbiuni (in Mwala)
year first funded
2007
action
Construction Of A Class
output
Improved Education
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Muthetheni Girl's Secondary School

location
Muthetheni (in Mwala)
year first funded
2006
action
Construction & Equipping Of A Library
output
Improved Education
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Kiundwani Secondary School

location
Ngomano (in Mwala)
year first funded
2005
action
Renovation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Miu Dispensary

location
Miu (in Mwala)
year first funded
2003
action
By Lab. Equipments, Solar Panel& Construct-Ed Maternitywing Of Thedispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 742,000
estimate
Ksh 0

Monitoring & Evaluation

location
Mwala (in Mwala)
year first funded
2008
action
Facilitation Of M & E
output
-
implementation status
On-Going
total cost
Ksh 709,970
estimate
Ksh 0

Tulila Dispensary

location
Ikalaasa (in Mwala)
year first funded
2009
action
Construction Of Maternity Ward
output
Improved Health Care
implementation status
Not Started
total cost
Ksh 700,000
estimate
Ksh 0

Kwa Nthula Dam

location
Makutano (in Mwala)
year first funded
2003
action
Scooping Of Dam
output
Improved Water Access
implementation status
Desilting Complete But Spill Way Not Cut
total cost
Ksh 700,000
estimate
Ksh 0

St. John's Kangii Secondary School

location
Mwala (in Mwala)
year first funded
2005
action
Construction Of A Kitchen & Dining Hall
output
Improved Education
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Kikelenzu Secondary School

location
Masii (in Mwala)
year first funded
2006
action
Construction Of Library And &Science Lab
output
Improved Education
implementation status
Science Lab. Complete And Library Incomplete Due To Lack Of Funds
total cost
Ksh 700,000
estimate
Ksh 0

Mbaani Secondary School

location
Muthetheni (in Mwala)
year first funded
2006
action
Construction Of Teachers House
output
Improved Education
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Muthetheni Water Project

location
Muthetheni (in Mwala)
year first funded
2006
action
Rehabilitation Works
output
Improved Water Access
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Kyamutwii Polytechnic

location
Makutano (in Mwala)
year first funded
2006
action
Construction Of A Polytechnic
output
Improved Education
implementation status
Building Half Way Done
total cost
Ksh 700,000
estimate
Ksh 0

Bishop Ndingi Secondary School

location
Mwala (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Kavunyu Primary School

location
Mango (in Mwala)
year first funded
2006
action
Construction Of A Classroom
output
Improved Education
implementation status
On-Going
total cost
Ksh 700,000
estimate
Ksh 0

King'Uutheni Dam

location
Yathui (in Mwala)
year first funded
2003
action
Scooping Of Dam
output
Improved Water Access
implementation status
Complete
total cost
Ksh 692,000
estimate
Ksh 0

Masii Youth Polytechnic

location
Masii (in Mwala)
year first funded
2003
action
Purchase Of Workshop Tools And Equipments
output
Improved Education
implementation status
Complete
total cost
Ksh 692,000
estimate
Ksh 0

Ikalaasa D Primary School

location
Ikalaasa (in Mwala)
year first funded
2008
action
Works Rehabilitation
output
Improved Education
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 0

St. Marks Kundu Secondary School

location
Mbiuni (in Mwala)
year first funded
2009
action
Construction Of Science Laboratory
output
Improved Education
implementation status
On-Going
total cost
Ksh 650,000
estimate
Ksh 0

Vyulya Drift

location
Vyulya (in Mwala)
year first funded
2007
action
Construction Of A Drift
output
Improved Transport
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 0

Kawaa Borehole

location
Masii (in Mwala)
year first funded
2008
action
Piping
output
Improved Water Access
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Ngomano Primary School

location
Yathui (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Mithuluni Primary School

location
Miu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kyethivo Girls Secondary School

location
Muthetheni (in Mwala)
year first funded
2005
action
Rehabilitation Of A Generator
output
Improved Education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kivalani Primary School

location
Ngomano (in Mwala)
year first funded
2004
action
Construction Of 3 Room Office Block And Rehabilitate 3 Classrooms
output
Improved Education
implementation status
Office Block Ready And In Use.Rehabilitation Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kithuluni - Kitula - Vyulya Road

location
Vyulya (in Mwala)
year first funded
2008
action
Grading
output
Improved Transport
implementation status
not known
total cost
Ksh 600,000
estimate
Ksh 0

Matuu Borehole

location
Miu (in Mwala)
year first funded
2009
action
Water Distribution
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 600,000
estimate
Ksh 0

Kyaitha Borehole

location
Masii (in Mwala)
year first funded
2009
action
Water Distribution
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 600,000
estimate
Ksh 0

Katulani - Kibauni Road

location
Kibauni (in Mwala)
year first funded
2009
action
Manual
output
Improved Transport
implementation status
Not Started
total cost
Ksh 600,000
estimate
Ksh 0

Mathunthini Primary School

location
Makutano (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kithangaini Water Project

location
Masii (in Mwala)
year first funded
2006
action
Scooping Of Dam
output
Improved Water Access
implementation status
Work Done
total cost
Ksh 600,000
estimate
Ksh 0

Kyanganga Primary School

location
Mango (in Mwala)
year first funded
2006
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Mulu Secondary School

location
Yathui (in Mwala)
year first funded
2007
action
Construction Of A Dining Hall
output
Improved Education
implementation status
Project Not Complete
total cost
Ksh 600,000
estimate
Ksh 0

Maiani Primary School

location
Masii (in Mwala)
year first funded
2006
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kituneni - Kundu Road

location
Mbiuni (in Mwala)
year first funded
2008
action
Grading Manual
output
Improved Transport
implementation status
not known
total cost
Ksh 600,000
estimate
Ksh 0

Katulani dispensary

location
Kibauni (in Mwala)
year first funded
2003
action
Purchase of laboratory equipments
output
improved health care
implementation status
refrigerator, hot- aroven, microscope & solar system bought. not in use due to lack of electricity
total cost
Ksh 592,000
estimate
Ksh 0

Ulaani Primary School

location
Kathama (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 545,000
estimate
Ksh 0

Motor Bike & Local Transport

location
Mwala (in Mwala)
year first funded
2008
action
Facilitation Of Transport
output
-
implementation status
Not Started
total cost
Ksh 524,973
estimate
Ksh 0

Uvanga Primary School

location
Ikalaasa (in Mwala)
year first funded
2004
action
Construction Of A Classroom
output
Improved Education
implementation status
On-Going
total cost
Ksh 517,604
estimate
Ksh 0

Embui Secondary School

location
Makutano (in Mwala)
year first funded
2009
action
Construction Of Classrooms
output
Improved Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Utithini Primary School

location
Mwala (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kiteteni Primary School

location
Kibauni (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Kathama APrimary School

location
Masii (in Mwala)
year first funded
2005
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kithiiani Primary School

location
Yathui (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kwa Kioli Dam

location
Yathui (in Mwala)
year first funded
2005
action
Scooping Of Reservoir Manually
output
Improved Water Access
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Musaalani Dam

location
Mwala (in Mwala)
year first funded
2005
action
Scooping Of Reservoir Manually
output
Improved Water Access
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Tulila Polytechnic

location
Ikalaasa (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Health Care
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kyamutwii Primary School

location
Makutano (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Utithini Secondary School

location
Miu (in Mwala)
year first funded
2007
action
Construction Of A New School
output
Improved Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Lema Girls' Secondary School

location
Yathui (in Mwala)
year first funded
2007
action
Construction Of A Library
output
Improved Education
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Katulani Primary School

location
Ikalaasa (in Mwala)
year first funded
2007
action
Construction Of A New Pri. School
output
Improved Education
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Makutano - Kyamutwii Road

location
Makutano (in Mwala)
year first funded
2008
action
Manual Grading
output
Improved Transport
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Katulani - Kibauni Road

location
Kibauni (in Mwala)
year first funded
2008
action
Manual Grading
output
Improved Transport
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Muthetheni - Kithianio Road

location
Muthetheni (in Mwala)
year first funded
2008
action
Manual Grading
output
Improved Transport
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Mango Dispensary

location
Mango (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Kabaa Day Secondary School

location
Mbiuni (in Mwala)
year first funded
2009
action
Construction Of Office & Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Kwa Ndoo Secondary School

location
Mwala (in Mwala)
year first funded
2009
action
Construction Of Office & Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Vyulya Girls Secondary School

location
Vyulya (in Mwala)
year first funded
2009
action
Construction Of Dining Hall
output
Improved Education
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Makaalu Secondary School

location
Yathui (in Mwala)
year first funded
2009
action
Construction Of Classroom
output
Improved Education
implementation status
Project Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 0

Mang'Olota Primary School

location
Miu (in Mwala)
year first funded
2009
action
Construction Of A Classroom
output
Improved Education
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Kitooni SSchool

location
Masii (in Mwala)
year first funded
2009
action
Completion Of Diining Hall
output
Improved Education
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 0

Kikaso Water Project

location
Yathui (in Mwala)
year first funded
2008
action
Reviving The Project
output
Improved Water Access
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kwa Nguta Water Ptoject

location
Mbiuni (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Kiundwani Dispensary

location
Ikalaasa (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Maweli Dispensary

location
Makutano (in Mwala)
year first funded
2003
action
Purchase & Installation Of Solar-Panel And Accessories
output
Improved Health Care
implementation status
Complete
total cost
Ksh 492,000
estimate
Ksh 0

Kibau Secondary School

location
Mwala (in Mwala)
year first funded
2008
action
Construction Of A Classroom & Office Block
output
Improved Education
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Kiuukuni Secondary School

location
Miu (in Mwala)
year first funded
2008
action
Construction Classroom & Office Block
output
Improved Education
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Masii Secondary School

location
(in Mwala)
year first funded
2008
action
Construction Of A Classroom
output
-
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 0

Kikulumi Primary School

location
Miu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Kyeengai Primary School

location
Wamunyu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kyeni Primary School

location
Ikalaasa (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Vyulya Youth Polytechnic

location
Vyulya (in Mwala)
year first funded
2005
action
Purchase Of Tools
output
Improved Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Konza Primary School

location
Ikalaasa (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Kandumbu Primary School

location
Mwala (in Mwala)
year first funded
2006
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Toyota Polytechnic

location
Wamunyu (in Mwala)
year first funded
2005
action
Construction Of Boys' Dormitory
output
Improved Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kwa Kaluu Primary School

location
Vyulya (in Mwala)
year first funded
2007
action
Construction Of Classroom
output
Improve Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kaiani Dispensary

location
Wamunyu (in Mwala)
year first funded
2008
action
Fencing
output
Improved Education
implementation status
Project Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 0

Yondoni Borehole

location
Yathui (in Mwala)
year first funded
2008
action
Water Distribution
output
Improved Water Access
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kavumbu Secondary School

location
Masii (in Mwala)
year first funded
2009
action
Equipping Of Science Laboratory
output
Improved Education
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Kilembwa Secondary School

location
Wamunyu (in Mwala)
year first funded
2009
action
Equipping Of Science Laboratory
output
Improved Education
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Vyulya Girls Secondary School

location
Vyulya (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Utithi Primary School

location
Mwala (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Kwa Kisau Primary School

location
Mwala (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Kwamwonga Primary School

location
Mwala (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 400,000
estimate
Ksh 0

Ikalaasa Dispensary

location
Ikalaasa (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Wamunyu Health Centre

location
Wamunyu (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Mululini Dam

location
Wamunyu (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Miu Water Project

location
Miu (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Mulau Primary School

location
Masii (in Mwala)
year first funded
2006
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kaitha Primary School

location
Wamunyu (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kwa Mutia Primary School

location
Mbiuni (in Mwala)
year first funded
2007
action
Construction Of A Class
output
Improved Education
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kyamatula Primary School

location
Yathui (in Mwala)
year first funded
2004
action
Renovation Of 5 Classes Purchase & Installation Of Gate
output
-
implementation status
Complete
total cost
Ksh 367,607
estimate
Ksh 0

Muusini Dispensary

location
Vyulya (in Mwala)
year first funded
2005
action
Renovation Of Dispensary
output
Improved Health Care
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Malata S

location
Vyulya (in Mwala)
year first funded
2009
action
Construction Os Sub Service Dams
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 350,000
estimate
Ksh 0

Kombe Primary School

location
Mbiuni (in Mwala)
year first funded
2009
action
Classrooms Renovation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Mavitini Primary School

location
Miu (in Mwala)
year first funded
2008
action
Works Construction
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Makutano DPrimary School

location
Makutano (in Mwala)
year first funded
2009
action
Renovation Of Hall.
output
Improved Education
implementation status
Project Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 0

Kundu Primary School

location
Mbiuni (in Mwala)
year first funded
2009
action
Classrooms Renovation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kyanda Primary School

location
Vyulya (in Mwala)
year first funded
2008
action
Of A Classroom Construction
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kwa Komu Sub-Surface Dam

location
Ikalaasa (in Mwala)
year first funded
2003
action
Construction Of Sub- Surface Dam
output
Improved Water Access
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kwa Kakungi Dam

location
Masii (in Mwala)
year first funded
2004
action
Scooping Of The Reservoir
output
Improved Water Access
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kanzau Dam

location
Kibauni (in Mwala)
year first funded
2005
action
Scooping Of Reservoir Manually
output
Improved Water Access
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kabaa Juakali Shades

location
Mbiuni (in Mwala)
year first funded
2005
action
Construction Of Jua Kali Shades
output
Improved Income Genetarion
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Kilembwa Dispensary

location
Wamunyu (in Mwala)
year first funded
2006
action
Completion Of A Building
output
Improved Health Care
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Nguluni Primary School

location
Yathui (in Mwala)
year first funded
2006
action
Construction Of Administration Block
output
Improved Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Katheka Primary School

location
Vyulya (in Mwala)
year first funded
2006
action
Construction Of Classroom And Toilets
output
Improved Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Ngunyumu Primary School

location
Mbiuni (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Kithangaini Secondary School

location
Masii (in Mwala)
year first funded
2007
action
Construction Of A Classrm
output
Improve Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

St. Tephen's Secondary School

location
Masii (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kangondi Primary School

location
Vyulya (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Mithini Primary School

location
Masii (in Mwala)
year first funded
2008
action
Construction Of A New Classroom
output
Improved Education
implementation status
Project Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Masii Township Primary School

location
Masii (in Mwala)
year first funded
2009
action
Classrooms Renovation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Mamiloki Primary School

location
Masii (in Mwala)
year first funded
2009
action
Classrooms Renovation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kavumbu Primary School

location
Masii (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Nunga Primary School

location
Wamunyu (in Mwala)
year first funded
2009
action
Classroom Renovation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Mavindini Primary School

location
Miu (in Mwala)
year first funded
2009
action
Renovation Of Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Miu DPrimary School

location
Miu (in Mwala)
year first funded
2009
action
Renovation Of Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kikaso Primary School

location
Yathui (in Mwala)
year first funded
2007
action
Fencing Of School
output
Improved Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Iiani Primary School

location
Miu (in Mwala)
year first funded
2009
action
Renovation Of Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kwa Kavili Pre School

location
Yathui (in Mwala)
year first funded
2009
action
Construction Of Classroom
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Muusini Primary School

location
Vyulya (in Mwala)
year first funded
2009
action
Classroom Renovation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Vyulya Primary School

location
Vyulya (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kitula Primary School

location
Vyulya (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kituamba Primary School

location
Mbiuni (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Kombe Primary School

location
Mbiuni (in Mwala)
year first funded
2008
action
Rehabilitation Works
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kyethivo Primary School

location
Muthetheni (in Mwala)
year first funded
2008
action
Works Rehabilitation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kyanda Primary School

location
Vyulya (in Mwala)
year first funded
2009
action
Construction Of A Classroom
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Mutendeu Primary School

location
Muthetheni (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kyambusya Primary School

location
Muthetheni (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Ukalani Primary School

location
Muthetheni (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
Not Started
total cost
Ksh 300,000
estimate
Ksh 0

Kisola Primary School

location
Muthetheni (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kisinzini Primary School

location
Yathui (in Mwala)
year first funded
2008
action
Works Rehabilitation
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Kivalani Primary School

location
Ikalaasa (in Mwala)
year first funded
2009
action
Renovation Classrooms
output
Improved Education
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Mbiuni Police Post

location
Mbiuni (in Mwala)
year first funded
2009
action
Completion Of Building
output
Improved Security
implementation status
Not Started
total cost
Ksh 250,000
estimate
Ksh 0

D's Office Yathui

location
Yathui (in Mwala)
year first funded
2005
action
Renovation Of Office
output
Improved Administr- Tion
implementation status
not known
total cost
Ksh 250,000
estimate
Ksh 0

Kiundwani Primary School

location
Ngomano (in Mwala)
year first funded
2004
action
Build A Water Tank And Bought Another
output
Improved Water Access - Improved Education
implementation status
Complete
total cost
Ksh 217,604
estimate
Ksh 0

Kithiano Primary School

location
Muthetheni (in Mwala)
year first funded
2009
action
Classrooms Renovation
output
Improved Education
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 0

Kyambuthu Drift

location
Wamunyu (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Mililuni Water Project

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kabaa Jua Kali Shades

location
Mbiuni (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kitumbi Water Tank

location
Muthetheni (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kombe Water Project

location
Muthetheni (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kwa Muka Dam

location
Kibauni (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Uvaini Borehole

location
Masii (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Yathui Chiefs' Office

location
Yathui (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Ilani Primary School

location
Miu (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
Not Started
total cost
Ksh 200,000
estimate
Ksh 0

Mwala Girls Secondary School

location
Mwala (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kivani Primary School

location
Ikalaasa (in Mwala)
year first funded
2003
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Ikalaasa Secondary School

location
Ikalaasa (in Mwala)
year first funded
2005
action
Construction Of 2 Classes And Library
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Ngamba Primary School

location
Miu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Miondoni Primary School

location
Yathui (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kyalavo Primary School

location
Ikalaasa (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Yamalwa Primary School

location
Ngomano (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kikaso Water Project

location
Yathui (in Mwala)
year first funded
2005
action
Installation Of Machine, Rehabilitation Of System And Extension Of Water Line
output
Improved Water Access
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kilala Dispensary

location
Ngomano (in Mwala)
year first funded
2005
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Mithini APrimary School

location
Masii (in Mwala)
year first funded
2006
action
Construction Of A Classroom Classroom
output
Improved Education
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kitange Primary School

location
Mango (in Mwala)
year first funded
2006
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Primary School

location
Vyulya (in Mwala)
year first funded
2006
action
Construction Of Administr- Ation Block
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Embui Primary School

location
Makutano (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kivauni Primary School

location
Kibauni (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improve Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kituiu Primary School

location
Wamunyu (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Mwala Deb Primary School

location
Mwala (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kalia Kundu Primary School

location
Mbiuni (in Mwala)
year first funded
2007
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kitile Primary School

location
Kibauni (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Kikuyuni Sub-Surface

location
Masii (in Mwala)
year first funded
2004
action
Construction Of Sub-Surface Dam Across Mikuyuni River
output
Improved Water Access
implementation status
Complete
total cost
Ksh 196,000
estimate
Ksh 0

Kyawango Dispensary

location
Mwala (in Mwala)
year first funded
2003
action
Solar Panel Installation & Purchase Of Equipment
output
Improved Health Care
implementation status
not known
total cost
Ksh 192,000
estimate
Ksh 0

Makaalu Primary School

location
Yathui (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 189,500
estimate
Ksh 0

Vyulya Water Project

location
Vyulya (in Mwala)
year first funded
2007
action
Provide Water
output
Improved Water
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 0

Mbiuni Educational Office

location
Mbiuni (in Mwala)
year first funded
2005
action
Construction Of Offices
output
Improved Education
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 0

Mbiuni Health Centre

location
Mbiuni (in Mwala)
year first funded
2003
action
Fencing And Installation Of Gate
output
Improved Security In The Health
implementation status
not known
total cost
Ksh 170,000
estimate
Ksh 0

Uvaini Cattle Dip

location
Masii (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Miu Water Project

location
Miu (in Mwala)
year first funded
2009
action
Completion Of Distribution
output
Improved Water Access
implementation status
Not Started
total cost
Ksh 150,000
estimate
Ksh 0

Kikuumini Primary School

location
Ngomano (in Mwala)
year first funded
2006
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Matuu Primary School

location
Muthetheni (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Kwa Ndotio Sub-Surface

location
Yathui (in Mwala)
year first funded
2003
action
Construction Of A Sub-Surface Dam
output
Improved Water Access
implementation status
Complete
total cost
Ksh 142,000
estimate
Ksh 0

Kiundwani Cattle Dip

location
Kibauni (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 134,973
estimate
Ksh 0

Maaweli Cattle Dip

location
Makutano (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 130,000
estimate
Ksh 0

Uvaini Cattle Dip

location
Makutano (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 130,000
estimate
Ksh 0

Kwasyowai Cattle Dip

location
Mbiuni (in Mwala)
year first funded
2008
action
n/a
output
-
implementation status
not known
total cost
Ksh 130,000
estimate
Ksh 0

Kiukuni Primary School

location
Ikalaasa (in Mwala)
year first funded
2004
action
Renovation Of 10 Classes Fixing Doors In 8 Classes And 3 Offices
output
Improved Education
implementation status
Complete
total cost
Ksh 117,607
estimate
Ksh 0

Kasengela Primary School

location
Ikalaasa (in Mwala)
year first funded
2004
action
Construction Of A Classroom
output
Improved Education
implementation status
Complete
total cost
Ksh 117,607
estimate
Ksh 0

Kyambusya Nursery School

location
Muthetheni (in Mwala)
year first funded
2008
action
Works
output
Improved Education
implementation status
On-Going
total cost
Ksh 100,083
estimate
Ksh 0

Muthei Pre School

location
Kibauni (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improve Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kyuluni Primary School

location
Mango (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kalau Primary School

location
Kathama (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Miini Primary School

location
Wamunyu (in Mwala)
year first funded
2007
action
Classrooms Renovation
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

St. Mary's Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kithangaini Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kituneni Primary School

location
Mwala (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Wetaa Primary School

location
Mango (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

King'Atuani Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kyenthei Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Mikuyuni Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Muusini Primary School

location
Vyulya (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Ikalaasa Chiefs' Office

location
Ikalaasa (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kibauni Chiefs'' Office

location
Kibauni (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Miu Chiefs' Office

location
Miu (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Mululini Dam

location
Wamunyu (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kangii Cattle Dip

location
Mwala (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kilembwa Cattle Dip

location
Wamunyu (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Ithumo Cattle Dip

location
Kibauni (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Yoani Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Muthei Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kasolongo Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kangii Cattle Dip

location
Mwala (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Mwaasua Primary School

location
Wamunyu (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Ngangani Primary School

location
Yathui (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kikulumi Polytechnic

location
Miu (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kwavenge Primary School

location
Mango (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kyaimu Primary School

location
Miu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kithuia Primary School

location
Miu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Muangoni Primary School

location
Yathui (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Mutula Primary School

location
Ngomano (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Mukuyuni Primary School

location
Kibauni (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kyoani Primary School

location
Ikalaasa (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kiuukuni Primary School

location
Miu (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Muthetheni Health Centre

location
Muthetheni (in Mwala)
year first funded
2005
action
Construction Of A Cattle Waiting Bay
output
Improved Health Care
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

D's Office Mwala

location
Mwala (in Mwala)
year first funded
2005
action
Electricity Installation
output
Improved Admininst- Tion
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Ngenda Youth Polytechnic

location
Muthetheni (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kibauni Youth Polytechnic

location
Kibauni (in Mwala)
year first funded
2006
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Inyiola Nursery School

location
Kibauni (in Mwala)
year first funded
2006
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Bamako Health Project

location
Mwala (in Mwala)
year first funded
2006
action
Purchase Of Bicycles And First Aid Kits
output
Improved Health Care
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kisaani Primary School

location
Makutano (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Lema Primary School

location
Yathui (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kamuya Primary School

location
Mbiuni (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improve Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Muthetheni Primary School

location
Muthetheni (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improve Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Itulu Cattle Dip

location
Ikalaasa (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Kyalavo Primary School

location
Ngomano (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Nguluni Primary School

location
Masii (in Mwala)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Mango Primary School

location
Mango (in Mwala)
year first funded
2005
action
Rehabilitation Works
output
Improved Education
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Mbiuni Chiefs' Office

location
Mbiuni (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Kyawango Cattle Dip

location
Mwala (in Mwala)
year first funded
2005
action
Rehabilitation Of A Cattle Dip
output
Improved Livestock Production
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Masii Girls Secondary School

location
Masii (in Mwala)
year first funded
2007
action
Rehabilitation Works
output
Improve Education
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 0

Makutano Chiefs' Office

location
Makutano (in Mwala)
year first funded
2006
action
n/a
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Nyaani Line Kiumo Water

location
Makutano (in Mwala)
action
Piping Construction
output
Access Improved
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 0

Akatheka School

location
Vyulya (in Mwala)
action
Of A Classroom Rehabilitation
output
Improved Education
implementation status
On-Going
total cost
Ksh 0
estimate
Ksh 0

Ilinge Primary School

location
Masii (in Mwala)
action
Renovation Of Classrooms
output
Improved Education
implementation status
Project On-Going
total cost
Ksh 0
estimate
Ksh 0