The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Mwala
Bursary Fund
- location
-
Mwala
(in Mwala)
- year first funded
- 2004
- action
- Awarding Bursary To Needy
- output
- Improved Education
- implementation status
- Kshs 600,000 Re allocated to Ahero Sub District Hospital theatre project Ref. CDF BOARD/NYANDO/VOL.II/39
- total cost
- Ksh 19,304,566
- estimate
- Ksh 0
Cement For Sub-Surface Dams For Sub Surface Locations
- location
-
Mwala
(in Mwala)
- year first funded
- 2005
- action
- Supply Of Cement To All The Sub-.Location Construction of Sub Surface Dams
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 10,970,012
- estimate
- Ksh 0
Emergencies
- location
-
Mwala
(in Mwala)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 8,172,595
- estimate
- Ksh 0
Administration
- location
-
Mwala
(in Mwala)
- year first funded
- 2004
- action
- Office Running And Staff Salaries
- output
- Improved Administr- Tion
- implementation status
- not known
- total cost
- Ksh 8,165,316
- estimate
- Ksh 0
Emergency
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 5,180,100
- estimate
- Ksh 0
Electrification
- location
-
Mwala
(in Mwala)
- year first funded
- 2009
- action
- Electrification
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 5,000,000
- estimate
- Ksh 0
Primary School s In Mwala Constituency
- location
-
Mwala
(in Mwala)
- year first funded
- 2004
- action
- Supply Of10 Chairs,20 Desks &2 Tables To All Primaryschools In
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 4,200,000
- estimate
- Ksh 0
Secondary Schools - computers
- location
-
Mwala
(in Mwala)
- year first funded
- 2005
- action
- Supply Of Computers To All Sec. Schools
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 3,900,000
- estimate
- Ksh 0
Secondary Schools
- location
-
Mwala
(in Mwala)
- year first funded
- 2006
- action
- Supply Of Generators To Sec. Schools
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 3,500,000
- estimate
- Ksh 0
Ikalaasa Dispensary
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A New Dispensary
- output
- Improved Health Care
- implementation status
- Building Half Way Done. No Doors,No Windows And Not Plastered
- total cost
- Ksh 2,950,000
- estimate
- Ksh 0
Kitile Secondary School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A New School
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 2,750,000
- estimate
- Ksh 0
Kaiani Dispensary
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- Improved Health Care
- implementation status
- Dispensary Complete And Operational.
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
Muthetheni Earth Dam
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Land Owners Compensation
- output
- Improve Water Access
- implementation status
- Not Started
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
Kilala Secondary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2006
- action
- Construction Of Anew School
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 2,300,000
- estimate
- Ksh 0
Nyaani Secondary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2004
- action
- Completion Of Stalled Building And Fencing Of School Compound. Construction Of 3 Toilets
- output
- Improved Education
- implementation status
- Construction Done Up To Roofing
- total cost
- Ksh 2,214,280
- estimate
- Ksh 0
New District Headquarters Land
- location
-
Makutano
(in Mwala)
- year first funded
- 2006
- action
- Acquire Land For District Hqs
- output
- Improve
- implementation status
- Complete Service Delivery
- total cost
- Ksh 2,200,000
- estimate
- Ksh 0
Kwa Kala Dispensary
- location
-
Yathui
(in Mwala)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- Improved Health Care
- implementation status
- Building Not Yet Plastered ,No Equipment Bought.
- total cost
- Ksh 2,114,285
- estimate
- Ksh 0
Muthetheni Dam
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Land Owners Compensation
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 2,100,000
- estimate
- Ksh 0
Masilu Dam
- location
-
Miu
(in Mwala)
- year first funded
- 2006
- action
- Scooping Of Reservoir And Consturction Of Embankment
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Nthwanguu Dispensary
- location
-
Kibauni
(in Mwala)
- year first funded
- 2005
- action
- Construction Of A Dispensary
- output
- Improved Health Care
- implementation status
- not known
- total cost
- Ksh 1,900,000
- estimate
- Ksh 0
Kwa Malu Earth Dam
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A New Dam
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,814,560
- estimate
- Ksh 0
Muthetheni Police Post
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Ap Line
- output
- Improved Security
- implementation status
- Administration Block Complete But Not Occupied
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Maweli Secondary School
- location
-
Makutano
(in Mwala)
- year first funded
- 2004
- action
- Sinking Of A Borehole
- output
- Improved Water Access
- implementation status
- Borehole Drilled By M.O.W, Cdf Funds Used For Piping And Equipping School Lab
- total cost
- Ksh 1,714,285
- estimate
- Ksh 0
Kaloleni Dispensary
- location
-
Mwala
(in Mwala)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- Improved Health Care
- implementation status
- Dispensary Complete And In Use But Lacks Equipment
- total cost
- Ksh 1,714,285
- estimate
- Ksh 0
Kwa Kitoo Dam
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2008
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Kwa Luvai Dam
- location
-
Makutano
(in Mwala)
- year first funded
- 2008
- action
- Desilting And Expansion
- output
- Improved Water Access
- implementation status
- Complete And In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Mang'Olota Dam
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Kyamatula Secondary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A New School
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Kavumbu Dispensary
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A New Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 1,674,973
- estimate
- Ksh 0
Kwa Ngoma Drift
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Drift
- output
- Improved Transport
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Wakaela Secondary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2005
- action
- Construction Of A Laboratory
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Kionyweni Water Project
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2005
- action
- Servicing Of Pump Engine Construction& Sinking Ofwater Sumpsand Installation of Supply Pipes
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,592,000
- estimate
- Ksh 0
Mwala Youth Affairs
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,574,920
- estimate
- Ksh 0
Musaalani Dam
- location
-
Vyulya
(in Mwala)
- year first funded
- 2003
- action
- Desilt, Construction Ruct A Spill- Way, Concrete Sillfive Gabionsdraw-Off Point & Trough
- output
- Improved Water Access
- implementation status
- All Works Done
- total cost
- Ksh 1,554,000
- estimate
- Ksh 0
Mukolekya Dam
- location
-
Miu
(in Mwala)
- year first funded
- 2004
- action
- Desilting Of Reservoir, Construction Of Embankment And Concrete Sills
- output
- Improved Water Access
- implementation status
- Desilting And Spillway Done. Fence ,Draw-Off Point And Cattle Troughs Not Done
- total cost
- Ksh 1,510,296
- estimate
- Ksh 0
Kiketa Dam
- location
-
Kibauni
(in Mwala)
- year first funded
- 2004
- action
- Desilting Of Reservoir, Construction Of Spill Way And Embankment
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,510,296
- estimate
- Ksh 0
Kimuuni Secondary School
- location
-
Miu
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A New School
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kibauni Water Project
- location
-
Kibauni
(in Mwala)
- year first funded
- 2008
- action
- Construction Storage Tanks & Piping
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kwa Muutu Dam
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kavumbu Dispensary
- location
-
Masii
(in Mwala)
- year first funded
- 2008
- action
- Construction Of Dispensary
- output
- Improved Health
- implementation status
- Prolect Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Etikoni Secondary School
- location
-
Kathama
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Science Laboratory
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kwa Muiu Dam
- location
-
Yathui
(in Mwala)
- year first funded
- 2009
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Reallocation Kwa Muiu Dam
- location
-
Yathui
(in Mwala)
- year first funded
- 2008
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Project Complete And In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Kwa Mbinda Dam
- location
-
Makutano
(in Mwala)
- year first funded
- 2008
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,395,500
- estimate
- Ksh 0
Muthetheni Mixed Secondary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A New School
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Konza Dam
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2004
- action
- Desilting Of Reservoir, Embnkment And Spill Way
- output
- Improved Water Access
- implementation status
- Desilted, Concrete Sill Construction And Spill Way Cut.
- total cost
- Ksh 1,314,285
- estimate
- Ksh 0
Kikaso Secondary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Improved Education
- implementation status
- Project Not Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Yathui Borehole
- location
-
Yathui
(in Mwala)
- year first funded
- 2009
- action
- Drilling & Equipping
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Kwa Mulei Dam
- location
-
Yathui
(in Mwala)
- year first funded
- 2008
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Kwa Masoa Dam
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2008
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Mango Dispensary
- location
-
Mango
(in Mwala)
- year first funded
- 2005
- action
- Construction Of A Maternity
- output
- Improved Health Care
- implementation status
- not known
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Kwa Matu Dam
- location
-
Vyulya
(in Mwala)
- year first funded
- 2008
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Muthei Borehole
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Drilling & Equipping
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kwanyange Earth Dam
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kitile Dam
- location
-
Kibauni
(in Mwala)
- year first funded
- 2009
- action
- Desilting
- output
- Improved Water Access
- implementation status
- not known
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Ngamba Water Project
- location
-
Miu
(in Mwala)
- year first funded
- 2008
- action
- Purchase Of Water Pump &Piping
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kwa Maondu Dam
- location
-
Vyulya
(in Mwala)
- year first funded
- 2009
- action
- Desilting
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
St. Joseph's Mwala Youth Polytechnic
- location
-
Mwala
(in Mwala)
- year first funded
- 2004
- action
- Electricity Supply To The Institution
- output
- Improved Education
- implementation status
- Not Complete. Funds Not Enough
- total cost
- Ksh 1,188,038
- estimate
- Ksh 0
Muusini Secondary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2004
- action
- Construction of A Lab.Classroom &Generator
- output
- Improved Education
- implementation status
- 2 Classrooms And Generator House Complete And In Use. Lab Not Equipped
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Kibauni Secondary School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2005
- action
- Construction Of 2 Classes Classrooms
- output
- Improved Education
- implementation status
- 1 Classroom Complete And In Use, The Other Half Way Complete.
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Kwa Mukeka Dam
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2004
- action
- Repair Of Breached Section Of Theembankmenttrimming Ofspill Way.Construction of Communitywater Point.
- output
- Improved Water Access
- implementation status
- Worksnot Well Done
- total cost
- Ksh 1,106,308
- estimate
- Ksh 0
Mukuyuni Drifts
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2004
- action
- Drift Construction
- output
- Improved Transport
- implementation status
- Work Done To Completion
- total cost
- Ksh 1,106,285
- estimate
- Ksh 0
Kilembwa Secondary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2006
- action
- Roofing And Plastering Of Science Lab.
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Katheka Secondary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Science Laboratory
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Wamunyu Water Project
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2008
- action
- Construction Storage Tanks
- output
- Improved Water
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kwa Mwatu Dam
- location
-
Masii
(in Mwala)
- year first funded
- 2005
- action
- Scooping Of Reservoir And Consturction Of Embankment
- output
- Improve Water Access
- implementation status
- Works Not Started
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Women Self Help Groups
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 1,049,947
- estimate
- Ksh 0
Tree Planting
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- Tree Planting
- output
- Improved Soil Conservation
- implementation status
- Complete
- total cost
- Ksh 1,049,946
- estimate
- Ksh 0
Kwa Kimotho Dam
- location
-
Masii
(in Mwala)
- year first funded
- 2004
- action
- Embankment Spill Way & Concrete Sills
- output
- Improved Water Access
- implementation status
- Work Done Satisfactorily
- total cost
- Ksh 1,014,285
- estimate
- Ksh 0
Ndethye Nitethye
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2004
- action
- Buying And Laying Of Pipes
- output
- Improved Food Production
- implementation status
- Pipes Bought But Not Layed Down
- total cost
- Ksh 1,010,296
- estimate
- Ksh 0
Mithanga Secondary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2004
- action
- Construction Of A Lab.
- output
- Improved Education
- implementation status
- Lab. Complete And In Use.
- total cost
- Ksh 1,010,292
- estimate
- Ksh 0
Kunikila - Masaw'A Water Project
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2009
- action
- Drilling & Equipping
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mutanda Dam
- location
-
Yathui
(in Mwala)
- year first funded
- 2006
- action
- Scooping Of Reservoir And
- output
- Improve Water Access
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kwa Kisau Dam
- location
-
Mwala
(in Mwala)
- year first funded
- 2006
- action
- Scooping Of Reservoir And Consturction Of Embankment
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Makiliva Dam
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2005
- action
- Scooping Of Dam
- output
- Improve Water Access
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mbiuni Irrigation Schooleme
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2004
- action
- Construction Of Furrows For Irrigation
- output
- Improved Food Production
- implementation status
- Work Done And Water In Use.Rehabilitation
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kaliambeu Dispensary
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2005
- action
- Completion Of A Building For Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kitumbi Dam
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2005
- action
- Desilting And Cutting A Spill Way
- output
- Improve Water Supply
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kwa Maua Dam
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2006
- action
- Scooping Of Reservoir And Consturction Of Embankment
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kwa Mutune Dam
- location
-
Makutano
(in Mwala)
- year first funded
- 2006
- action
- Scooping Of Reservoir And Consturction Of Embankment
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Wamunyu Water Project Kituiu Area
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2008
- action
- Construction Storage Tanks & Piping
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kikulumi Earth Dam
- location
-
Miu
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Matulani Secondary School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Classrm
- output
- Not Started
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mililuni Dam
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- Scooping Of Dam
- output
- Improved Water Access
- implementation status
- Work Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mbaani Dam
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2004
- action
- Scooping Of Reservoir, Trimming Of Spill Way
- output
- Improved Water Access
- implementation status
- Work Done To Completion
- total cost
- Ksh 996,011
- estimate
- Ksh 0
Kunikila Secondary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2008
- action
- Construction Of A Laboratory
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kiuwanzukini Secondary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- Construction Of A Classroom & Office Block
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Katithi Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2006
- action
- Construction Of Classroom & Office Block
- output
- Improved Education
- implementation status
- 2 Classrooms & Office Block Complete & In Use 2 More Classrooms Half Way Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Ukalani Secondary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A New School
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
St. Joseph's Kasolongo Secondary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Improved Education
- implementation status
- Project Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Mwala Mixed Secondary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Mango Secondary School
- location
-
Mango
(in Mwala)
- year first funded
- 2005
- action
- Construction Of A Dormitory
- output
- Improved Education
- implementation status
- Building Half Way Done
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Reallocation Kisaki Police Post
- location
-
Masii
(in Mwala)
- year first funded
- 2008
- action
- Construction Of A Police Post
- output
- Improved Security
- implementation status
- Project Not Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kwa Nyika Dam
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2003
- action
- Scooping Of Dam
- output
- Improved Water Access
- implementation status
- Work Done
- total cost
- Ksh 892,000
- estimate
- Ksh 0
Mbaikini Secondary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Ngamba Secondary School
- location
-
Miu
(in Mwala)
- year first funded
- 2008
- action
- Construction Classroom & Office Block
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Miu Secondary School
- location
-
Miu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Classrooms Complete Work Still Going On In Dormitories
- total cost
- Ksh 800,000
- estimate
- Ksh 0
St. Mark's Secondary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kwa Kivukui Water Project
- location
-
Mwala
(in Mwala)
- year first funded
- 2004
- action
- Desilting Of Reservoir, Embankment Spill Way And Concrete Sills
- output
- Improved Water Access
- implementation status
- Work Done To Completion
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Muthetheni Dam
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2008
- action
- Piping
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Vyulya Health Centre
- location
-
Vyulya
(in Mwala)
- year first funded
- 2004
- action
- Contruction, Put A Fence, Gate,Gutters, Dig A Septic Tank And Put Shelves
- output
- Improved Health Care
- implementation status
- Work Done And Facilities In Use.
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kathiiani Primary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Muthei Secondary School
- location
-
Masii
(in Mwala)
- year first funded
- 2005
- action
- Biulding Of Water Tank
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Nzololo Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Class
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Muthetheni Girl's Secondary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2006
- action
- Construction & Equipping Of A Library
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kiundwani Secondary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2005
- action
- Renovation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Miu Dispensary
- location
-
Miu
(in Mwala)
- year first funded
- 2003
- action
- By Lab. Equipments, Solar Panel& Construct-Ed Maternitywing Of Thedispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 742,000
- estimate
- Ksh 0
Monitoring & Evaluation
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- Facilitation Of M & E
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 709,970
- estimate
- Ksh 0
Tulila Dispensary
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Maternity Ward
- output
- Improved Health Care
- implementation status
- Not Started
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kwa Nthula Dam
- location
-
Makutano
(in Mwala)
- year first funded
- 2003
- action
- Scooping Of Dam
- output
- Improved Water Access
- implementation status
- Desilting Complete But Spill Way Not Cut
- total cost
- Ksh 700,000
- estimate
- Ksh 0
St. John's Kangii Secondary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2005
- action
- Construction Of A Kitchen & Dining Hall
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kikelenzu Secondary School
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- Construction Of Library And &Science Lab
- output
- Improved Education
- implementation status
- Science Lab. Complete And Library Incomplete Due To Lack Of Funds
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Mbaani Secondary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2006
- action
- Construction Of Teachers House
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Muthetheni Water Project
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2006
- action
- Rehabilitation Works
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kyamutwii Polytechnic
- location
-
Makutano
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Polytechnic
- output
- Improved Education
- implementation status
- Building Half Way Done
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Bishop Ndingi Secondary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kavunyu Primary School
- location
-
Mango
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 0
King'Uutheni Dam
- location
-
Yathui
(in Mwala)
- year first funded
- 2003
- action
- Scooping Of Dam
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 692,000
- estimate
- Ksh 0
Masii Youth Polytechnic
- location
-
Masii
(in Mwala)
- year first funded
- 2003
- action
- Purchase Of Workshop Tools And Equipments
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 692,000
- estimate
- Ksh 0
Ikalaasa D Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2008
- action
- Works Rehabilitation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 0
St. Marks Kundu Secondary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Science Laboratory
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Vyulya Drift
- location
-
Vyulya
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Drift
- output
- Improved Transport
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kawaa Borehole
- location
-
Masii
(in Mwala)
- year first funded
- 2008
- action
- Piping
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ngomano Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mithuluni Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kyethivo Girls Secondary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Of A Generator
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kivalani Primary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2004
- action
- Construction Of 3 Room Office Block And Rehabilitate 3 Classrooms
- output
- Improved Education
- implementation status
- Office Block Ready And In Use.Rehabilitation Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kithuluni - Kitula - Vyulya Road
- location
-
Vyulya
(in Mwala)
- year first funded
- 2008
- action
- Grading
- output
- Improved Transport
- implementation status
- not known
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Matuu Borehole
- location
-
Miu
(in Mwala)
- year first funded
- 2009
- action
- Water Distribution
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kyaitha Borehole
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Water Distribution
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Katulani - Kibauni Road
- location
-
Kibauni
(in Mwala)
- year first funded
- 2009
- action
- Manual
- output
- Improved Transport
- implementation status
- Not Started
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mathunthini Primary School
- location
-
Makutano
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kithangaini Water Project
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- Scooping Of Dam
- output
- Improved Water Access
- implementation status
- Work Done
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kyanganga Primary School
- location
-
Mango
(in Mwala)
- year first funded
- 2006
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mulu Secondary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Dining Hall
- output
- Improved Education
- implementation status
- Project Not Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Maiani Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kituneni - Kundu Road
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2008
- action
- Grading Manual
- output
- Improved Transport
- implementation status
- not known
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Katulani dispensary
- location
-
Kibauni
(in Mwala)
- year first funded
- 2003
- action
- Purchase of laboratory equipments
- output
- improved health care
- implementation status
- refrigerator, hot- aroven, microscope & solar system bought. not in use due to lack of electricity
- total cost
- Ksh 592,000
- estimate
- Ksh 0
Ulaani Primary School
- location
-
Kathama
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 545,000
- estimate
- Ksh 0
Motor Bike & Local Transport
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- Facilitation Of Transport
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 524,973
- estimate
- Ksh 0
Uvanga Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 517,604
- estimate
- Ksh 0
Embui Secondary School
- location
-
Makutano
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Utithini Primary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiteteni Primary School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kathama APrimary School
- location
-
Masii
(in Mwala)
- year first funded
- 2005
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kithiiani Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kwa Kioli Dam
- location
-
Yathui
(in Mwala)
- year first funded
- 2005
- action
- Scooping Of Reservoir Manually
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Musaalani Dam
- location
-
Mwala
(in Mwala)
- year first funded
- 2005
- action
- Scooping Of Reservoir Manually
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Tulila Polytechnic
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kyamutwii Primary School
- location
-
Makutano
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Utithini Secondary School
- location
-
Miu
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A New School
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lema Girls' Secondary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Library
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Katulani Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A New Pri. School
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Makutano - Kyamutwii Road
- location
-
Makutano
(in Mwala)
- year first funded
- 2008
- action
- Manual Grading
- output
- Improved Transport
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Katulani - Kibauni Road
- location
-
Kibauni
(in Mwala)
- year first funded
- 2008
- action
- Manual Grading
- output
- Improved Transport
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Muthetheni - Kithianio Road
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2008
- action
- Manual Grading
- output
- Improved Transport
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mango Dispensary
- location
-
Mango
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kabaa Day Secondary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Office & Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kwa Ndoo Secondary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Office & Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Vyulya Girls Secondary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Dining Hall
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Makaalu Secondary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Improved Education
- implementation status
- Project Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mang'Olota Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kitooni SSchool
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Completion Of Diining Hall
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kikaso Water Project
- location
-
Yathui
(in Mwala)
- year first funded
- 2008
- action
- Reviving The Project
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kwa Nguta Water Ptoject
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiundwani Dispensary
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Maweli Dispensary
- location
-
Makutano
(in Mwala)
- year first funded
- 2003
- action
- Purchase & Installation Of Solar-Panel And Accessories
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 492,000
- estimate
- Ksh 0
Kibau Secondary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2008
- action
- Construction Of A Classroom & Office Block
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kiuukuni Secondary School
- location
-
Miu
(in Mwala)
- year first funded
- 2008
- action
- Construction Classroom & Office Block
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Masii Secondary School
- location
-
(in Mwala)
- year first funded
- 2008
- action
- Construction Of A Classroom
- output
- -
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kikulumi Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kyeengai Primary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kyeni Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Vyulya Youth Polytechnic
- location
-
Vyulya
(in Mwala)
- year first funded
- 2005
- action
- Purchase Of Tools
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Konza Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kandumbu Primary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Toyota Polytechnic
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2005
- action
- Construction Of Boys' Dormitory
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kwa Kaluu Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kaiani Dispensary
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2008
- action
- Fencing
- output
- Improved Education
- implementation status
- Project Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Yondoni Borehole
- location
-
Yathui
(in Mwala)
- year first funded
- 2008
- action
- Water Distribution
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kavumbu Secondary School
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Equipping Of Science Laboratory
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kilembwa Secondary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2009
- action
- Equipping Of Science Laboratory
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Vyulya Girls Secondary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Utithi Primary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kwa Kisau Primary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kwamwonga Primary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ikalaasa Dispensary
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Wamunyu Health Centre
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mululini Dam
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Miu Water Project
- location
-
Miu
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mulau Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kaitha Primary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kwa Mutia Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Class
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kyamatula Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2004
- action
- Renovation Of 5 Classes Purchase & Installation Of Gate
- output
- -
- implementation status
- Complete
- total cost
- Ksh 367,607
- estimate
- Ksh 0
Muusini Dispensary
- location
-
Vyulya
(in Mwala)
- year first funded
- 2005
- action
- Renovation Of Dispensary
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Malata S
- location
-
Vyulya
(in Mwala)
- year first funded
- 2009
- action
- Construction Os Sub Service Dams
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kombe Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2009
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mavitini Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2008
- action
- Works Construction
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Makutano DPrimary School
- location
-
Makutano
(in Mwala)
- year first funded
- 2009
- action
- Renovation Of Hall.
- output
- Improved Education
- implementation status
- Project Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kundu Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2009
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kyanda Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2008
- action
- Of A Classroom Construction
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kwa Komu Sub-Surface Dam
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2003
- action
- Construction Of Sub- Surface Dam
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kwa Kakungi Dam
- location
-
Masii
(in Mwala)
- year first funded
- 2004
- action
- Scooping Of The Reservoir
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kanzau Dam
- location
-
Kibauni
(in Mwala)
- year first funded
- 2005
- action
- Scooping Of Reservoir Manually
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kabaa Juakali Shades
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2005
- action
- Construction Of Jua Kali Shades
- output
- Improved Income Genetarion
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kilembwa Dispensary
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2006
- action
- Completion Of A Building
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nguluni Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2006
- action
- Construction Of Administration Block
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Katheka Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2006
- action
- Construction Of Classroom And Toilets
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ngunyumu Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kithangaini Secondary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Classrm
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
St. Tephen's Secondary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kangondi Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mithini Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2008
- action
- Construction Of A New Classroom
- output
- Improved Education
- implementation status
- Project Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Masii Township Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mamiloki Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kavumbu Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nunga Primary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2009
- action
- Classroom Renovation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mavindini Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2009
- action
- Renovation Of Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Miu DPrimary School
- location
-
Miu
(in Mwala)
- year first funded
- 2009
- action
- Renovation Of Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kikaso Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2007
- action
- Fencing Of School
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Iiani Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2009
- action
- Renovation Of Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kwa Kavili Pre School
- location
-
Yathui
(in Mwala)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Muusini Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2009
- action
- Classroom Renovation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Vyulya Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kitula Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kituamba Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kombe Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2008
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kyethivo Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2008
- action
- Works Rehabilitation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kyanda Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mutendeu Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kyambusya Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ukalani Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- Not Started
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kisola Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kisinzini Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2008
- action
- Works Rehabilitation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kivalani Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2009
- action
- Renovation Classrooms
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mbiuni Police Post
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2009
- action
- Completion Of Building
- output
- Improved Security
- implementation status
- Not Started
- total cost
- Ksh 250,000
- estimate
- Ksh 0
D's Office Yathui
- location
-
Yathui
(in Mwala)
- year first funded
- 2005
- action
- Renovation Of Office
- output
- Improved Administr- Tion
- implementation status
- not known
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kiundwani Primary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2004
- action
- Build A Water Tank And Bought Another
- output
- Improved Water Access - Improved Education
- implementation status
- Complete
- total cost
- Ksh 217,604
- estimate
- Ksh 0
Kithiano Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2009
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kyambuthu Drift
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mililuni Water Project
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kabaa Jua Kali Shades
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kitumbi Water Tank
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kombe Water Project
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kwa Muka Dam
- location
-
Kibauni
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Uvaini Borehole
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Yathui Chiefs' Office
- location
-
Yathui
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ilani Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mwala Girls Secondary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kivani Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2003
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ikalaasa Secondary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2005
- action
- Construction Of 2 Classes And Library
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ngamba Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Miondoni Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kyalavo Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Yamalwa Primary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kikaso Water Project
- location
-
Yathui
(in Mwala)
- year first funded
- 2005
- action
- Installation Of Machine, Rehabilitation Of System And Extension Of Water Line
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kilala Dispensary
- location
-
Ngomano
(in Mwala)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mithini APrimary School
- location
-
Masii
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Classroom Classroom
- output
- Improved Education
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kitange Primary School
- location
-
Mango
(in Mwala)
- year first funded
- 2006
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2006
- action
- Construction Of Administr- Ation Block
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Embui Primary School
- location
-
Makutano
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kivauni Primary School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kituiu Primary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mwala Deb Primary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kalia Kundu Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kitile Primary School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kikuyuni Sub-Surface
- location
-
Masii
(in Mwala)
- year first funded
- 2004
- action
- Construction Of Sub-Surface Dam Across Mikuyuni River
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 196,000
- estimate
- Ksh 0
Kyawango Dispensary
- location
-
Mwala
(in Mwala)
- year first funded
- 2003
- action
- Solar Panel Installation & Purchase Of Equipment
- output
- Improved Health Care
- implementation status
- not known
- total cost
- Ksh 192,000
- estimate
- Ksh 0
Makaalu Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 189,500
- estimate
- Ksh 0
Vyulya Water Project
- location
-
Vyulya
(in Mwala)
- year first funded
- 2007
- action
- Provide Water
- output
- Improved Water
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 0
Mbiuni Educational Office
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2005
- action
- Construction Of Offices
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 0
Mbiuni Health Centre
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2003
- action
- Fencing And Installation Of Gate
- output
- Improved Security In The Health
- implementation status
- not known
- total cost
- Ksh 170,000
- estimate
- Ksh 0
Uvaini Cattle Dip
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- -
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Miu Water Project
- location
-
Miu
(in Mwala)
- year first funded
- 2009
- action
- Completion Of Distribution
- output
- Improved Water Access
- implementation status
- Not Started
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kikuumini Primary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Matuu Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kwa Ndotio Sub-Surface
- location
-
Yathui
(in Mwala)
- year first funded
- 2003
- action
- Construction Of A Sub-Surface Dam
- output
- Improved Water Access
- implementation status
- Complete
- total cost
- Ksh 142,000
- estimate
- Ksh 0
Kiundwani Cattle Dip
- location
-
Kibauni
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 134,973
- estimate
- Ksh 0
Maaweli Cattle Dip
- location
-
Makutano
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 130,000
- estimate
- Ksh 0
Uvaini Cattle Dip
- location
-
Makutano
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 130,000
- estimate
- Ksh 0
Kwasyowai Cattle Dip
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 130,000
- estimate
- Ksh 0
Kiukuni Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2004
- action
- Renovation Of 10 Classes Fixing Doors In 8 Classes And 3 Offices
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 117,607
- estimate
- Ksh 0
Kasengela Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 117,607
- estimate
- Ksh 0
Kyambusya Nursery School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2008
- action
- Works
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 100,083
- estimate
- Ksh 0
Muthei Pre School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kyuluni Primary School
- location
-
Mango
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kalau Primary School
- location
-
Kathama
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Miini Primary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- Classrooms Renovation
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
St. Mary's Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kithangaini Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kituneni Primary School
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Wetaa Primary School
- location
-
Mango
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
King'Atuani Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kyenthei Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mikuyuni Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muusini Primary School
- location
-
Vyulya
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ikalaasa Chiefs' Office
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kibauni Chiefs'' Office
- location
-
Kibauni
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Miu Chiefs' Office
- location
-
Miu
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mululini Dam
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kangii Cattle Dip
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kilembwa Cattle Dip
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ithumo Cattle Dip
- location
-
Kibauni
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Yoani Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muthei Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kasolongo Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kangii Cattle Dip
- location
-
Mwala
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mwaasua Primary School
- location
-
Wamunyu
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ngangani Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kikulumi Polytechnic
- location
-
Miu
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kwavenge Primary School
- location
-
Mango
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kyaimu Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kithuia Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muangoni Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mutula Primary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mukuyuni Primary School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kyoani Primary School
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiuukuni Primary School
- location
-
Miu
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muthetheni Health Centre
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2005
- action
- Construction Of A Cattle Waiting Bay
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
D's Office Mwala
- location
-
Mwala
(in Mwala)
- year first funded
- 2005
- action
- Electricity Installation
- output
- Improved Admininst- Tion
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ngenda Youth Polytechnic
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kibauni Youth Polytechnic
- location
-
Kibauni
(in Mwala)
- year first funded
- 2006
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Inyiola Nursery School
- location
-
Kibauni
(in Mwala)
- year first funded
- 2006
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Bamako Health Project
- location
-
Mwala
(in Mwala)
- year first funded
- 2006
- action
- Purchase Of Bicycles And First Aid Kits
- output
- Improved Health Care
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kisaani Primary School
- location
-
Makutano
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Lema Primary School
- location
-
Yathui
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kamuya Primary School
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muthetheni Primary School
- location
-
Muthetheni
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Itulu Cattle Dip
- location
-
Ikalaasa
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kyalavo Primary School
- location
-
Ngomano
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nguluni Primary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mango Primary School
- location
-
Mango
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Works
- output
- Improved Education
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mbiuni Chiefs' Office
- location
-
Mbiuni
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kyawango Cattle Dip
- location
-
Mwala
(in Mwala)
- year first funded
- 2005
- action
- Rehabilitation Of A Cattle Dip
- output
- Improved Livestock Production
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Masii Girls Secondary School
- location
-
Masii
(in Mwala)
- year first funded
- 2007
- action
- Rehabilitation Works
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Makutano Chiefs' Office
- location
-
Makutano
(in Mwala)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nyaani Line Kiumo Water
- location
-
Makutano
(in Mwala)
- action
- Piping Construction
- output
- Access Improved
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 0
Akatheka School
- location
-
Vyulya
(in Mwala)
- action
- Of A Classroom Rehabilitation
- output
- Improved Education
- implementation status
- On-Going
- total cost
- Ksh 0
- estimate
- Ksh 0
Ilinge Primary School
- location
-
Masii
(in Mwala)
- action
- Renovation Of Classrooms
- output
- Improved Education
- implementation status
- Project On-Going
- total cost
- Ksh 0
- estimate
- Ksh 0