The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Mwingi North

Ndatani Girls Secondary School

location
Mitamisyi (in Mwingi North)
year first funded
2005
action
Classrooms + Toilets And Administration Block
output
Built A Modern Girls School
implementation status
Classrooms, Toilets Complete
total cost
Ksh 5,900,000
estimate
Ksh 44,000,000

Kalatine Girls Secondary School

location
Kakuyu (in Mwingi North)
year first funded
2005
action
Construction Of 4 Classrooms, Administration Block + Dormitory
output
Build A Modern School
implementation status
4 Classes + Administration Block Complete So Far Ongoing
total cost
Ksh 5,400,000
estimate
Ksh 54,000,000

Mataka Mivukoni Road Drift

location
Mivukoni (in Mwingi North)
year first funded
2003
action
Construction Of Road Drift
output
Improve Transport
implementation status
Completed
total cost
Ksh 4,500,000
estimate
Ksh 5,500,000

Cdf Office Installation, Equipment & Operations

location
Mwingi (in Mwingi North)
year first funded
2003
action
Fund Salaries, Equip And Run Cdf Offices
output
Ensure Smooth Office Operations
implementation status
Ongoing
total cost
Ksh 3,868,224
estimate
Ksh 3,868,224

Kyuso Girls Secondary School

location
Kyuso (in Mwingi North)
year first funded
2005
action
Construction Of Classrooms, Dormitory, Staff House + Store/Kitchen
output
Promote Education
implementation status
Classes + Staff House Roofed. Ongoing
total cost
Ksh 3,500,000
estimate
Ksh 35,000,000

Usueni Secondary School

location
Musavani (in Mwingi North)
year first funded
2003
action
Construction Of Lab And Classes Completion
output
Avail Facilities To Schools
implementation status
Completed
total cost
Ksh 3,000,000
estimate
Ksh 2,900,000

Mivukoni Dispensary

location
Mivukoni (in Mwingi North)
year first funded
2004
action
Completion And Equipping Of Maternity Ward
output
Promote Safe Motherhood.
implementation status
Complete
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Tseikuru District Hospital Staff Houses

location
Tseikuru (in Mwingi North)
year first funded
2004
action
Construction Of The Housing Units As Per Plan Provided.
output
Provide Housing For Staff On Night Plan Provided
implementation status
Completed
total cost
Ksh 2,700,000
estimate
Ksh 2,700,000

Endui Borehole

location
Waita (in Mwingi North)
year first funded
2005
action
Drilling Equipping And Pipeline.
output
Avail Safe Drinking Water
implementation status
Complete And In Use
total cost
Ksh 2,700,000
estimate
Ksh 27,000,000

Nguni Secondary School

location
Nguni (in Mwingi North)
year first funded
2004
action
Construction Of A Dormitory And A Dining Hall
output
Avail Modern Boarding Facilities
implementation status
dining Hall To Be Painted
total cost
Ksh 2,550,000
estimate
Ksh 2,550,000

Katse Health Centre

location
Katse (in Mwingi North)
year first funded
2003
action
Construction of Ward, Kitchen Store And Laundry
output
Equip The Facility
implementation status
Complete And In Use
total cost
Ksh 2,535,033
estimate
Ksh 2,500,000

Kiseveni- Mathyakani Water Project

location
Mwingi (in Mwingi North)
year first funded
2003
action
Water Pipeline - Tank Nd Kiosk
output
Avail Safe Drinking Water
implementation status
Phase I Completed Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 2,700,000

Tseikuru Secondary School

location
Tseikuru (in Mwingi North)
year first funded
2005
action
Construction Of New Dormitory
output
Ease Congestion Among Borders And Renovation Of Classroom
implementation status
Completed
total cost
Ksh 2,500,000
estimate
Ksh 500,000

Kalonzo Secondary School

location
Kyuso (in Mwingi North)
year first funded
2004
action
Construction Of A dining Hall, Kitchen And Recreation Hall
output
Improve School Infrastructure
implementation status
Plastering & Painting To Be Done Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Kaela Secondary School

location
Kanzanzu (in Mwingi North)
year first funded
2004
action
Construction Of Lab And dining Hall
output
Avail Modern Boarding Facilities
implementation status
Completed
total cost
Ksh 2,250,410
estimate
Ksh 2,250,410

Ikuuni Piped Water Project

location
Mwingi (in Mwingi North)
year first funded
2007
action
Extension Of Water Pipeline
output
Avail Water
implementation status
Phase I & Ii Completed And In Use
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Gankanga Secondary School

location
Tharaka (in Mwingi North)
year first funded
2003
action
Construction Of Dormitory And Dining Hall
output
Avail Modern Facilities To The School
implementation status
Completed
total cost
Ksh 2,018,000
estimate
Ksh 2,018,000

Nzaini Primary School

location
Mitamisyi (in Mwingi North)
year first funded
2006
action
Construction Of Class
output
Improve Primary Education
implementation status
Completed
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Ngomeni SSchool

location
Ngomeni (in Mwingi North)
year first funded
2004
action
Construction Furnishing Of A Modern dining Hall.
output
Avail Modern Boarding Facilities
implementation status
Completed
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Mitamisyi Earth Dam

location
Mitamisyi (in Mwingi North)
year first funded
2006
action
Scooping Of Earth Dam
output
Access Safe Drinking Water
implementation status
Completed
total cost
Ksh 1,900,000
estimate
Ksh 900,000

Mukonga Health Centre

location
MukongA (in Mwingi North)
year first funded
2006
action
Construction Of Main Block + Latrines
output
Improve Healthcare
implementation status
Complete And In Use
total cost
Ksh 1,750,000
estimate
Ksh 1,750,000

Kivou Water Pipeline

location
Mwingi (in Mwingi North)
year first funded
2005
action
Water Pipeline Extension
output
Avail Safe Drinking Water
implementation status
Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Mathiakani Water Pipeline

location
Kanzanzu (in Mwingi North)
year first funded
2005
action
Water Pipeline Extension + Water Tank
output
Avail Safe Drinking Water
implementation status
Piping Not Completed
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Kwa Kasovi Water Pipeline

location
Mwingi (in Mwingi North)
year first funded
2005
action
Water Pipeline Extension
output
Avail Safe Drinking Water
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Katse Secondary School

location
Katse (in Mwingi North)
year first funded
2004
action
Construction of Of dining Hall
output
Avail Modern Boarding Facilities
implementation status
Complete And In Use
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Kwa Katungi Earth Dam

location
Nguni (in Mwingi North)
year first funded
2007
action
Construction of Earth Dam
output
Avail Water
implementation status
Complete And In Use
total cost
Ksh 1,500,000
estimate
Ksh 900,000

Masavi Girls

location
Nguni (in Mwingi North)
year first funded
2005
action
Laboratory + Dormitory Construction
output
Improve Science Teaching
implementation status
Dorm In Use
total cost
Ksh 1,500,000
estimate
Ksh 15,000,000

Tumana Earth Dam

location
Mitamisyi (in Mwingi North)
year first funded
2007
action
Build Earth Dam
output
Avail Water
implementation status
Completed And In Use
total cost
Ksh 1,500,000
estimate
Ksh 800,000

Kamusiliu Dispensary

location
Mitamisyi (in Mwingi North)
year first funded
2004
action
Completion Of The Main Wing, Toilets And Tanks.
output
Access Healthcare
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kamusiliu- Kyuso Road Drift

location
Mitamisyi (in Mwingi North)
year first funded
2003
action
Construction Of Road Drift
output
Improve Transport
implementation status
Completed
total cost
Ksh 1,500,000
estimate
Ksh 1,700,000

Mutigwa Earth Dam

location
Kyuso (in Mwingi North)
year first funded
2007
action
Desilting + Leveling Of The Dam
output
Avail Water
implementation status
Completed
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Kivou Day Secondary School

location
Mwingi (in Mwingi North)
year first funded
2006
action
Construction Of Classes
output
Improve Secondary Education
implementation status
2 Classrooms Complete
total cost
Ksh 1,500,000
estimate
Ksh 15,000,000

Nthangani Day School

location
Kanthungu (in Mwingi North)
year first funded
2006
action
Construction Of Classes
output
Improve Secondary Education
implementation status
2 Classes Complete And In Use
total cost
Ksh 1,450,000
estimate
Ksh 1,450,000

Mivukoni Secondary School

location
Mivukoni (in Mwingi North)
year first funded
2004
action
Construction Of dining Hall
output
Avail Modern Boarding Facilities
implementation status
Plastering & Painting Remaining
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

Yambyu Girls Secondary School

location
Mwingi (in Mwingi North)
year first funded
2006
action
Construction Of Adm. Block
output
Improve Administration In Schools
implementation status
Roofing To Be Done Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Kathonzweni Water Pipeline

location
Mwingi (in Mwingi North)
year first funded
2004
action
Laying Pipeline, Tank & 2 Water Kiosks.
output
Avail Safe Drinking Water
implementation status
Completed
total cost
Ksh 1,250,000
estimate
Ksh 1,200,000

Musila GaRoadens

location
Mwingi (in Mwingi North)
year first funded
2005
action
Construction Of A Pavilion And Landscaping
output
Avail Decent Recreational Facilities
implementation status
Pavilion Plastering & Painting 57Remaining
total cost
Ksh 1,250,000
estimate
Ksh 1,250,000

Kyulungwa Kavete Masaki Project

location
Waita (in Mwingi North)
year first funded
2006
action
Water Piping For Domestic Use
output
Access Safe Drinking Water
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Kyandoa Water Pipeline

location
Mwingi (in Mwingi North)
year first funded
2005
action
Water Pipeline Extension
output
Avail Safe Drinking Water
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Murwana Borehole

location
Endui (in Mwingi North)
year first funded
2007
action
Drill Borehole
output
Avail Water
implementation status
Drilled, Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Tyaa Kamuthale Secondary School

location
Kamuwongo (in Mwingi North)
year first funded
2003
action
Construction Of Dormitory + Install Generator
output
Avail Boarding Facilities
implementation status
Completed
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Kyuso-Ngaiie Road

location
Kyuso (in Mwingi North)
year first funded
2005
action
Drift Across Ikaaie River
output
Link Nguni To Kyuso
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,150,000

Ngomeni Rock Catchment

location
Ngomeni (in Mwingi North)
year first funded
2006
action
Construction Of Fence And Troughs
output
Secure The Water Facility
implementation status
70% Fencing Done
total cost
Ksh 1,100,000
estimate
Ksh 900,000

Mulangoni Health Centre

location
Masyungwa (in Mwingi North)
year first funded
2003
action
Build 7 Rooms Dispensary Block
output
Improve Healthcare
implementation status
Completed
total cost
Ksh 1,058,000
estimate
Ksh 1,700,000

Mutwangombe Polytechnic

location
Endui (in Mwingi North)
year first funded
2006
action
Construction Of Workshop
output
Improve Tech Education
implementation status
Complete And In Use
total cost
Ksh 1,050,000
estimate
Ksh 1,050,000

Ngongoni Dispensary

location
Tseikuru (in Mwingi North)
year first funded
2003
action
Construction Of Dispensary Block
output
Improve Health Care
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Kathungu Road Drift

location
Tseikuru (in Mwingi North)
year first funded
2005
action
Drift Across Nzunzulyo River
output
Link Kaningo To Tseikuru
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ngomeni - Kyuso Road Project

location
Mitamisyi (in Mwingi North)
year first funded
2004
action
Completion Of The Main Drift And Wings.
output
Link Ngomeni And Kyuso
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mandongoi Road Drift

location
Ngomeni (in Mwingi North)
year first funded
2005
action
Drift Across Yamwenze River
output
Link Mandongoi With Ngomeni
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kavaani Earth Dam

location
Ngomeni (in Mwingi North)
year first funded
2006
action
Scooping Of Earth Dam
output
Access Safe Drinking Water
implementation status
Complete & In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kyaangu Earth Dam

location
Nguni (in Mwingi North)
year first funded
2006
action
Scooping Of Earth Dam
output
Access Safe Drinking Water
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mwingi Boys

location
Mwingi (in Mwingi North)
year first funded
2005
action
Construction Of New Dormitory
output
Ease Congestion In Among Borders
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Friends Of Mwingi District Hospital

location
Mwingi (in Mwingi North)
year first funded
2006
action
Construction Of Hospital Ward
output
Improve Healthcare
implementation status
Suspended
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kyuso Water Supply Project

location
Kyuso (in Mwingi North)
year first funded
2007
action
Install Kplc Transformer
output
Access Safe Drinking Water
implementation status
Not Yet Installed, Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mwingi North Youth Centre

location
Kyuso (in Mwingi North)
year first funded
2007
action
Renovate Kyuso Stadium
output
Improve Sports
implementation status
Suspended
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mataka Day Secondary School

location
Mivukoni (in Mwingi North)
year first funded
2007
action
Build Classes
output
Improve Learning
implementation status
1 Class Completed
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Twimyua Day Secondary School

location
Mivukoni (in Mwingi North)
year first funded
2007
action
Build 2 Classes
output
Promote Learning
implementation status
Completed In Use
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Mumoni Dos Residence

location
Katse (in Mwingi North)
year first funded
2007
action
Build DoS Residence
output
Avail Boarding Services
implementation status
Structure Below Lintel Level Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Agriculture And Livestock Offices

location
Tharaka (in Mwingi North)
year first funded
2004
action
Construction Of Office Block, Seminar Room And Store.
output
Improve Extension Services
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kasevi Drift

location
Mwingi (in Mwingi North)
year first funded
2003
action
Completion Of Road Drift
output
Improve Transport
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Syonzola Earth Dam

location
Mitamisyi (in Mwingi North)
year first funded
2006
action
Scooping Of Earth Dam
output
Access Safe Drinking Water
implementation status
Completed
total cost
Ksh 985,000
estimate
Ksh 985,000

Karunga Secondary School

location
Mwingi (in Mwingi North)
year first funded
2004
action
Construction Of School Laboratory + Dormitory
output
Avail Boarding
implementation status
Laboratory Completed
total cost
Ksh 950,000
estimate
Ksh 950,000

Ngomeni Health Centre

location
Ngomeni (in Mwingi North)
year first funded
2006
action
Construction Of Hospital Ward
output
Improve Healthcare
implementation status
Plastering & Fittings Remaining
total cost
Ksh 950,000
estimate
Ksh 800,000

Kaliwa Day Secondary School

location
Mutanda (in Mwingi North)
year first funded
2006
action
Construction Of Classes
output
Improve Secondary Education
implementation status
2 Classes Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Nyanyaa Secondary School

location
Endui (in Mwingi North)
year first funded
2007
action
Build 2 Classrooms
output
Improve Learning
implementation status
1 Class Completed Ongoing
total cost
Ksh 900,000
estimate
Ksh 900,000

Ngolanya Earth Dam

location
Mitamisyi (in Mwingi North)
year first funded
2006
action
Scooping Of Earth Dam
output
Access Safe Drinking Water
implementation status
Completed
total cost
Ksh 900,000
estimate
Ksh 900,000

Munguu Day Secondary School

location
Waita (in Mwingi North)
year first funded
2006
action
Construction Of Classes
output
Improve Secondary Education
implementation status
2 Classrooms Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Itivanzou Tii Road Drift

location
Kamuwongo (in Mwingi North)
year first funded
2003
action
Construction Of Road Drift
output
Access Vital Town/Area
implementation status
Completed
total cost
Ksh 900,000
estimate
Ksh 900,000

Enziu Secondary School

location
Endui (in Mwingi North)
year first funded
2004
action
Completion And Equipping Of School Laboratory
output
Improve Science Teaching
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Kamuwongo Water Pipeline

location
Kyuso (in Mwingi North)
year first funded
2005
action
Water Pipeline Extension
output
Avail Safe Drinking Water
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Kaela Secondary School

location
Kanzanzu (in Mwingi North)
year first funded
2007
action
Build Administration Block
output
Equip Staff
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Kamuwongo Dispensary

location
Kamuwongo (in Mwingi North)
year first funded
2005
action
Completion Of Main Block
output
Access Health Care
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Kyuso Market Sheds

location
Kyuso (in Mwingi North)
year first funded
2004
action
Construction Of Market Sheds.
output
Avail Clean Market For Horticultural Products
implementation status
Complete And Not In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Matooni Dispensary

location
Kyuso (in Mwingi North)
year first funded
2006
action
Construction Of Main Block
output
Improve Healthcare
implementation status
Painting & Fittings To Be Done, Ongoing
total cost
Ksh 800,000
estimate
Ksh 800,000

Katuuni Tyaa Kamuthale Water Project

location
Kakuyu (in Mwingi North)
year first funded
2007
action
Extension Of Water Pipeline
output
Avail Water
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Masyungwa Dispensary

location
Masyungwa (in Mwingi North)
year first funded
2004
action
Completion Of The Maternity Ward And Kitchen
output
Improve Infrastructure
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 700,000

Kamathitu Day Secondary School

location
Katse (in Mwingi North)
year first funded
2007
action
Build 2 Classrooms
output
Improve Learning
implementation status
Completed
total cost
Ksh 780,000
estimate
Ksh 780,000

Muruu Rock EcoTourism

location
Kyuso (in Mwingi North)
year first funded
2007
action
Put Up Sanctuary
output
Promote Tourism
implementation status
Suspended
total cost
Ksh 750,000
estimate
Ksh 750,000

Ngomeni Conservancy Project

location
Ngomeni (in Mwingi North)
year first funded
2007
action
Put Up Sanctuary
output
Promote Tourism
implementation status
Suspended
total cost
Ksh 750,000
estimate
Ksh 750,000

Kaningo Secondary School

location
Masyungwa (in Mwingi North)
year first funded
2007
action
Build 2 Classrooms
output
Improve Learning
implementation status
Complete In Use
total cost
Ksh 750,000
estimate
Ksh 500,000

Tseikuru Market Sheds

location
Tseikuru (in Mwingi North)
year first funded
2006
action
Construction Of Market Stalls
output
Market For Fresh Produce
implementation status
Structures Below Lintel Level
total cost
Ksh 750,000
estimate
Ksh 1,500,000

Masyungwa Day Secondary School

location
Masyungwa (in Mwingi North)
year first funded
2007
action
Build 2 Classrooms
output
Improve Learning
implementation status
Finishing Remaining
total cost
Ksh 700,000
estimate
Ksh 500,000

Gai Day Secondary School

location
Kyuso (in Mwingi North)
year first funded
2006
action
Construction Of Classes
output
Improve Secondary Education
implementation status
1 Class Completed Ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Itivanzou Day SSchool

location
Kamuwongo (in Mwingi North)
year first funded
2006
action
Construction Of Classes
output
Improve Secondary Education
implementation status
One Fully Completed
total cost
Ksh 700,000
estimate
Ksh 700,000

Musavani Dispensary

location
Musavani (in Mwingi North)
year first funded
2007
action
Build Dispensary Block
output
Improve Health Services
implementation status
Walling Below Lintel Level
total cost
Ksh 700,000
estimate
Ksh 400,000

Nyaanyaa Dispensary

location
Endui (in Mwingi North)
year first funded
2003
action
Construction Of Dispensary
output
Avail Health Services
implementation status
Complete And In Use
total cost
Ksh 625,000
estimate
Ksh 650,000

Assistant Chiefs Offices At Gakombe, Kayenga Gachikogo

location
Tharaka (in Mwingi North)
year first funded
2007
action
Build Ass. Chiefs Office
output
Improve Security
implementation status
Roofing To Be Done Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Manzui Earth Dam

location
Mivukoni (in Mwingi North)
year first funded
2006
action
Scooping Of Earth Dam+ Building Gabions
output
Access Safe Drinking Water
implementation status
Completed
total cost
Ksh 550,000
estimate
Ksh 550,000

Ngaaie Dispensary

location
Kyuso (in Mwingi North)
year first funded
2007
action
Complete Dispensary Block
output
Improve Health Services
implementation status
Plastering & Floor To Be Done
total cost
Ksh 550,000
estimate
Ksh 550,000

Konyu Primary School

location
Kanthungu (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Roofing To Be Done
total cost
Ksh 500,000
estimate
Ksh 500,000

Kaundu Special Unit

location
Kakuyu (in Mwingi North)
year first funded
2006
action
Construction Of Dormitory
output
Improve Special Education
implementation status
At Slab Level Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Kyuso Youth Polytechnic

location
Kyuso (in Mwingi North)
year first funded
2007
action
Rehabilitate Workshops
output
Improve Skills
implementation status
Electricity Installation Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Dos Office Central Division

location
Mwingi (in Mwingi North)
year first funded
2007
action
Build Office Block
output
Improve Administration Services
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Waita Polytechnic Dormitory Girl

location
Waita (in Mwingi North)
year first funded
2004
action
Construction Of The Ward Dormitory Hall (Girls)
output
Avail Modern Boarding Facilities
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Enziu primary school

location
Endui (in Mwingi North)
year first funded
2006
action
Renovations Of Classrooms
output
Ease Learning
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Kalisasi Dispensary

location
Kanzanzu (in Mwingi North)
year first funded
2006
action
Completion Of Dispensary + Electrification
output
Improve Healthcare
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Ikuuni/Ndiani Road Drift

location
Mwingi (in Mwingi North)
year first funded
2003
action
Construction Of Road Drift
output
Link Ikuuni And Ndiani
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Waita Secondary School

location
Waita (in Mwingi North)
year first funded
2007
action
Build Science Laboratory
output
Improve Education
implementation status
Walling Structure T Be Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Matooni Day Secondary School

location
Kyuso (in Mwingi North)
year first funded
2007
action
Build Classrooms
output
Improve Learning
implementation status
Roofing To Be Done Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Twwua Water Project

location
Tharaka (in Mwingi North)
year first funded
2007
action
Pipes Rehabilitation
output
Avail Water
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Kathiani & Syumavuo FSchool

location
Tseikuru (in Mwingi North)
year first funded
2006
action
Class Renovation
output
Improve Feeder Schools
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Kandwia Dispensary

location
Kimangao (in Mwingi North)
year first funded
2007
action
Build Dispensary Block
output
Improve Health
implementation status
Plastering To Be Done
total cost
Ksh 350,000
estimate
Ksh 350,000

Enziu Secondary School

location
Endui (in Mwingi North)
year first funded
2007
action
Renovation Of 2 Classrooms
output
Promote Education
implementation status
Completed And In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Ngomeni Women Tree Nurseries

location
Ngomeni (in Mwingi North)
year first funded
2005
action
Community Nurseries In Nguni And Ngomeni
output
Improve Agro Forestry
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Tseikuru Airstrip

location
Tseikuru (in Mwingi North)
year first funded
2006
action
Completion Of Airstrip
output
Improve Transport
implementation status
ReLocated To New Site
total cost
Ksh 350,000
estimate
Ksh 700,000

Mitamisyi Dispensary

location
Mitamisyi (in Mwingi North)
year first funded
2005
action
Completion Of Dispensary Main Block
output
Access Health Care
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Musavani Primary School

location
Musavani (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Finishing To Be Done
total cost
Ksh 300,000
estimate
Ksh 300,000

Tseikuru Dos Residence

location
Tseikuru (in Mwingi North)
year first funded
2007
action
Renovations Of The Residence
output
Improve Security
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Kamayagi primary school

location
Tharaka (in Mwingi North)
year first funded
2006
action
Class Renovation
output
Ease Learning
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Mwingi Primary School

location
Mwingi (in Mwingi North)
year first funded
2007
action
Renovation Of 8 Classrooms
output
Improve Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Mwingi Cultural Centre

location
Mwingi (in Mwingi North)
year first funded
2006
action
Buying Equipment Build Center
output
Promote Culture
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Kamunyu Dispensarysry

location
Kanzanzu (in Mwingi North)
year first funded
2007
action
Build Dispensary Block
output
Improve Health
implementation status
Roofing Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Endui Hills Tree Project

location
Endui (in Mwingi North)
year first funded
2005
action
Community Tree Nursery In Endui
output
Improve Agro-Forestry
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Mandongoi PreSchool

location
Ngomeni (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 100,000

Kasiluni PreSchool

location
Ngomeni (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 100,000

Winoti And Kangoo Feeder School

location
Mitamisyi (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Winoti Roofing To Be Done
total cost
Ksh 300,000
estimate
Ksh 200,000

Kalisasi Primary School

location
Kanzanzu (in Mwingi North)
year first funded
2008
action
Facelift Of Classrooms
output
Improve Learning
implementation status
Complete
total cost
Ksh 260,000
estimate
Ksh 0

Mivukoni Ap Line ReAllocatio

location
Mivukoni (in Mwingi North)
year first funded
2008
action
Complete 3 Ap Line Blocks
output
Security
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Itulu Primary School

location
Kyuso (in Mwingi North)
year first funded
2007
action
Repair Classrooms Roof
output
Improve Learning
implementation status
Classrooms Repaired And In Use Completed
total cost
Ksh 220,000
estimate
Ksh 220,000

Nguni Locchiefs Office

location
Nguni (in Mwingi North)
year first funded
2006
action
Construction Of Chiefs Office
output
Improve Administration
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mathyakani Dispensary

location
Kanzanzu (in Mwingi North)
year first funded
2008
action
Complete Dispensary Block
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Manzui Dispensary

location
Mwingi (in Mwingi North)
year first funded
2007
action
Build Dispensary Block
output
Improve Health Services
implementation status
Walling Structure Not Completed
total cost
Ksh 200,000
estimate
Ksh 200,000

Kyambaa Primary School

location
Waita (in Mwingi North)
year first funded
2007
action
Build 1 Class
output
Improve Learning
implementation status
Roofing To Be Done Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Kangutha Primary School

location
Waita (in Mwingi North)
year first funded
2008
action
Facelift Of Classrooms
output
Improve Learning
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ap Line Kamuwongo

location
Kamuwongo (in Mwingi North)
year first funded
2007
action
Build Staff Offices
output
Enhance Staff Welfare
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kwa Vere Primary School

location
Mivukoni (in Mwingi North)
year first funded
2005
action
Construction Of Class
output
Improve Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kavutoni Primary School

location
Tseikuru (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Walling Structure To Be Completed
total cost
Ksh 200,000
estimate
Ksh 200,000

Mangulu Primary School

location
Masyungwa (in Mwingi North)
year first funded
2005
action
Construction Of Class
output
Improve Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Nzengeni Primary School

location
Nguni (in Mwingi North)
year first funded
2005
action
Construction Of Class
output
Improve Education
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kiia Dam

location
Endui (in Mwingi North)
year first funded
2004
action
Desilt Dam
output
Help Avail Water
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Township Green Water Project

location
Mwingi (in Mwingi North)
year first funded
2007
action
Tree Planting
output
Improve Environment
implementation status
Suspended
total cost
Ksh 150,000
estimate
Ksh 150,000

Kanyunga Dispensary

location
Mwingi (in Mwingi North)
year first funded
2007
action
To Install Solar Panel
output
Improve Health Services
implementation status
Installed And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Nzaalani Primary School

location
Kyuso (in Mwingi North)
year first funded
2007
action
Construction of Collapsed Latrines
output
Improve Hygiene
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Katumbi Borehole

location
Masyungwa (in Mwingi North)
year first funded
2007
action
Rehabilitation Of Sunken Pipes
output
Avail Water
implementation status
Repaired And In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Mandongoi Community Borehole

location
Ngomeni (in Mwingi North)
year first funded
2007
action
Piping And Installation Of Generator
output
Avail Water
implementation status
Completed
total cost
Ksh 135,000
estimate
Ksh 135,000

Kamwengi Feeder School

location
Kyuso (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Roofing To Be Done, Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Kakauni Primary School

location
Masyungwa (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Walling Structure Not Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mangombo Primary School

location
Ngomeni (in Mwingi North)
year first funded
2007
action
Build 1 Classroom
output
Improve Learning
implementation status
Roofing To Be Done
total cost
Ksh 100,000
estimate
Ksh 100,000

Ndatani Shallow Well

location
Ngomeni (in Mwingi North)
year first funded
2007
action
Rehabilitate The Well + Repair Hand Pump
output
Avail Water
implementation status
Repaired And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Ngongoni Assistant Chiefs Office

location
Tseikuru (in Mwingi North)
year first funded
2007
action
Build Office Block
output
Improve Security
implementation status
Roofing To Be Done
total cost
Ksh 100,000
estimate
Ksh 100,000

Kisole Primary School

location
Waita (in Mwingi North)
year first funded
2007
action
Rebuilt Collapsed Pit Latrines
output
Improve Health Care
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 100,000

Waita Health Centre

location
Waita (in Mwingi North)
year first funded
2007
action
Repair Broken Down Generator
output
Avail Power
implementation status
Repaired
total cost
Ksh 40,000
estimate
Ksh 50,000

Kaunguni Primary School

location
Endui (in Mwingi North)
year first funded
2007
action
Rebuilt Collapsed Pit Latrines
output
Improve Health Care
implementation status
Completed And In Use
total cost
Ksh 30,000
estimate
Ksh 50,000

Nguni Borehole

location
Nguni (in Mwingi North)
year first funded
2007
action
Repair Broken Down Afridev Pump Set
output
Avail Water
implementation status
Repaired
total cost
Ksh 30,000
estimate
Ksh 50,000