The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Ndatani Girls Secondary School
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2005
- action
- Classrooms + Toilets And Administration Block
- output
- Built A Modern Girls School
- implementation status
- Classrooms, Toilets Complete
- total cost
- Ksh 5,900,000
- estimate
- Ksh 44,000,000
Kalatine Girls Secondary School
- location
-
Kakuyu
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms, Administration Block + Dormitory
- output
- Build A Modern School
- implementation status
- 4 Classes + Administration Block Complete So Far Ongoing
- total cost
- Ksh 5,400,000
- estimate
- Ksh 54,000,000
Mataka Mivukoni Road Drift
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Road Drift
- output
- Improve Transport
- implementation status
- Completed
- total cost
- Ksh 4,500,000
- estimate
- Ksh 5,500,000
Cdf Office Installation, Equipment & Operations
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2003
- action
- Fund Salaries, Equip And Run Cdf Offices
- output
- Ensure Smooth Office Operations
- implementation status
- Ongoing
- total cost
- Ksh 3,868,224
- estimate
- Ksh 3,868,224
Kyuso Girls Secondary School
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of Classrooms, Dormitory, Staff House + Store/Kitchen
- output
- Promote Education
- implementation status
- Classes + Staff House Roofed. Ongoing
- total cost
- Ksh 3,500,000
- estimate
- Ksh 35,000,000
Usueni Secondary School
- location
-
Musavani
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Lab And Classes Completion
- output
- Avail Facilities To Schools
- implementation status
- Completed
- total cost
- Ksh 3,000,000
- estimate
- Ksh 2,900,000
Mivukoni Dispensary
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2004
- action
- Completion And Equipping Of Maternity Ward
- output
- Promote Safe Motherhood.
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Tseikuru District Hospital Staff Houses
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of The Housing Units As Per Plan Provided.
- output
- Provide Housing For Staff On Night Plan Provided
- implementation status
- Completed
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
Endui Borehole
- location
-
Waita
(in Mwingi North)
- year first funded
- 2005
- action
- Drilling Equipping And Pipeline.
- output
- Avail Safe Drinking Water
- implementation status
- Complete And In Use
- total cost
- Ksh 2,700,000
- estimate
- Ksh 27,000,000
Nguni Secondary School
- location
-
Nguni
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of A Dormitory And A Dining Hall
- output
- Avail Modern Boarding Facilities
- implementation status
- dining Hall To Be Painted
- total cost
- Ksh 2,550,000
- estimate
- Ksh 2,550,000
Katse Health Centre
- location
-
Katse
(in Mwingi North)
- year first funded
- 2003
- action
- Construction of Ward, Kitchen Store And Laundry
- output
- Equip The Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 2,535,033
- estimate
- Ksh 2,500,000
Kiseveni- Mathyakani Water Project
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2003
- action
- Water Pipeline - Tank Nd Kiosk
- output
- Avail Safe Drinking Water
- implementation status
- Phase I Completed Ongoing
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,700,000
Tseikuru Secondary School
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of New Dormitory
- output
- Ease Congestion Among Borders And Renovation Of Classroom
- implementation status
- Completed
- total cost
- Ksh 2,500,000
- estimate
- Ksh 500,000
Kalonzo Secondary School
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of A dining Hall, Kitchen And Recreation Hall
- output
- Improve School Infrastructure
- implementation status
- Plastering & Painting To Be Done Ongoing
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Kaela Secondary School
- location
-
Kanzanzu
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of Lab And dining Hall
- output
- Avail Modern Boarding Facilities
- implementation status
- Completed
- total cost
- Ksh 2,250,410
- estimate
- Ksh 2,250,410
Ikuuni Piped Water Project
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2007
- action
- Extension Of Water Pipeline
- output
- Avail Water
- implementation status
- Phase I & Ii Completed And In Use
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Gankanga Secondary School
- location
-
Tharaka
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Dormitory And Dining Hall
- output
- Avail Modern Facilities To The School
- implementation status
- Completed
- total cost
- Ksh 2,018,000
- estimate
- Ksh 2,018,000
Nzaini Primary School
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Class
- output
- Improve Primary Education
- implementation status
- Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Ngomeni SSchool
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Furnishing Of A Modern dining Hall.
- output
- Avail Modern Boarding Facilities
- implementation status
- Completed
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Mitamisyi Earth Dam
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2006
- action
- Scooping Of Earth Dam
- output
- Access Safe Drinking Water
- implementation status
- Completed
- total cost
- Ksh 1,900,000
- estimate
- Ksh 900,000
Mukonga Health Centre
- location
-
MukongA
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Main Block + Latrines
- output
- Improve Healthcare
- implementation status
- Complete And In Use
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,750,000
Kivou Water Pipeline
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2005
- action
- Water Pipeline Extension
- output
- Avail Safe Drinking Water
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Mathiakani Water Pipeline
- location
-
Kanzanzu
(in Mwingi North)
- year first funded
- 2005
- action
- Water Pipeline Extension + Water Tank
- output
- Avail Safe Drinking Water
- implementation status
- Piping Not Completed
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Kwa Kasovi Water Pipeline
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2005
- action
- Water Pipeline Extension
- output
- Avail Safe Drinking Water
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Katse Secondary School
- location
-
Katse
(in Mwingi North)
- year first funded
- 2004
- action
- Construction of Of dining Hall
- output
- Avail Modern Boarding Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Kwa Katungi Earth Dam
- location
-
Nguni
(in Mwingi North)
- year first funded
- 2007
- action
- Construction of Earth Dam
- output
- Avail Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 900,000
Masavi Girls
- location
-
Nguni
(in Mwingi North)
- year first funded
- 2005
- action
- Laboratory + Dormitory Construction
- output
- Improve Science Teaching
- implementation status
- Dorm In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 15,000,000
Tumana Earth Dam
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2007
- action
- Build Earth Dam
- output
- Avail Water
- implementation status
- Completed And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 800,000
Kamusiliu Dispensary
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2004
- action
- Completion Of The Main Wing, Toilets And Tanks.
- output
- Access Healthcare
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kamusiliu- Kyuso Road Drift
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Road Drift
- output
- Improve Transport
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,700,000
Mutigwa Earth Dam
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Desilting + Leveling Of The Dam
- output
- Avail Water
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kivou Day Secondary School
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- Improve Secondary Education
- implementation status
- 2 Classrooms Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 15,000,000
Nthangani Day School
- location
-
Kanthungu
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- Improve Secondary Education
- implementation status
- 2 Classes Complete And In Use
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Mivukoni Secondary School
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of dining Hall
- output
- Avail Modern Boarding Facilities
- implementation status
- Plastering & Painting Remaining
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,500,000
Yambyu Girls Secondary School
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Adm. Block
- output
- Improve Administration In Schools
- implementation status
- Roofing To Be Done Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Kathonzweni Water Pipeline
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2004
- action
- Laying Pipeline, Tank & 2 Water Kiosks.
- output
- Avail Safe Drinking Water
- implementation status
- Completed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,200,000
Musila GaRoadens
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of A Pavilion And Landscaping
- output
- Avail Decent Recreational Facilities
- implementation status
- Pavilion Plastering & Painting 57Remaining
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,250,000
Kyulungwa Kavete Masaki Project
- location
-
Waita
(in Mwingi North)
- year first funded
- 2006
- action
- Water Piping For Domestic Use
- output
- Access Safe Drinking Water
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Kyandoa Water Pipeline
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2005
- action
- Water Pipeline Extension
- output
- Avail Safe Drinking Water
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Murwana Borehole
- location
-
Endui
(in Mwingi North)
- year first funded
- 2007
- action
- Drill Borehole
- output
- Avail Water
- implementation status
- Drilled, Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Tyaa Kamuthale Secondary School
- location
-
Kamuwongo
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Dormitory + Install Generator
- output
- Avail Boarding Facilities
- implementation status
- Completed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
Kyuso-Ngaiie Road
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2005
- action
- Drift Across Ikaaie River
- output
- Link Nguni To Kyuso
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,150,000
Ngomeni Rock Catchment
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Fence And Troughs
- output
- Secure The Water Facility
- implementation status
- 70% Fencing Done
- total cost
- Ksh 1,100,000
- estimate
- Ksh 900,000
Mulangoni Health Centre
- location
-
Masyungwa
(in Mwingi North)
- year first funded
- 2003
- action
- Build 7 Rooms Dispensary Block
- output
- Improve Healthcare
- implementation status
- Completed
- total cost
- Ksh 1,058,000
- estimate
- Ksh 1,700,000
Mutwangombe Polytechnic
- location
-
Endui
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Workshop
- output
- Improve Tech Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,050,000
Ngongoni Dispensary
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Dispensary Block
- output
- Improve Health Care
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Kathungu Road Drift
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2005
- action
- Drift Across Nzunzulyo River
- output
- Link Kaningo To Tseikuru
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ngomeni - Kyuso Road Project
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2004
- action
- Completion Of The Main Drift And Wings.
- output
- Link Ngomeni And Kyuso
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mandongoi Road Drift
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2005
- action
- Drift Across Yamwenze River
- output
- Link Mandongoi With Ngomeni
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kavaani Earth Dam
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2006
- action
- Scooping Of Earth Dam
- output
- Access Safe Drinking Water
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kyaangu Earth Dam
- location
-
Nguni
(in Mwingi North)
- year first funded
- 2006
- action
- Scooping Of Earth Dam
- output
- Access Safe Drinking Water
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mwingi Boys
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of New Dormitory
- output
- Ease Congestion In Among Borders
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Friends Of Mwingi District Hospital
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Hospital Ward
- output
- Improve Healthcare
- implementation status
- Suspended
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kyuso Water Supply Project
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Install Kplc Transformer
- output
- Access Safe Drinking Water
- implementation status
- Not Yet Installed, Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mwingi North Youth Centre
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Renovate Kyuso Stadium
- output
- Improve Sports
- implementation status
- Suspended
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mataka Day Secondary School
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2007
- action
- Build Classes
- output
- Improve Learning
- implementation status
- 1 Class Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Twimyua Day Secondary School
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2007
- action
- Build 2 Classes
- output
- Promote Learning
- implementation status
- Completed In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Mumoni Dos Residence
- location
-
Katse
(in Mwingi North)
- year first funded
- 2007
- action
- Build DoS Residence
- output
- Avail Boarding Services
- implementation status
- Structure Below Lintel Level Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Agriculture And Livestock Offices
- location
-
Tharaka
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of Office Block, Seminar Room And Store.
- output
- Improve Extension Services
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kasevi Drift
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2003
- action
- Completion Of Road Drift
- output
- Improve Transport
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Syonzola Earth Dam
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2006
- action
- Scooping Of Earth Dam
- output
- Access Safe Drinking Water
- implementation status
- Completed
- total cost
- Ksh 985,000
- estimate
- Ksh 985,000
Karunga Secondary School
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of School Laboratory + Dormitory
- output
- Avail Boarding
- implementation status
- Laboratory Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Ngomeni Health Centre
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Hospital Ward
- output
- Improve Healthcare
- implementation status
- Plastering & Fittings Remaining
- total cost
- Ksh 950,000
- estimate
- Ksh 800,000
Kaliwa Day Secondary School
- location
-
Mutanda
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- Improve Secondary Education
- implementation status
- 2 Classes Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Nyanyaa Secondary School
- location
-
Endui
(in Mwingi North)
- year first funded
- 2007
- action
- Build 2 Classrooms
- output
- Improve Learning
- implementation status
- 1 Class Completed Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Ngolanya Earth Dam
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2006
- action
- Scooping Of Earth Dam
- output
- Access Safe Drinking Water
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Munguu Day Secondary School
- location
-
Waita
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- Improve Secondary Education
- implementation status
- 2 Classrooms Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Itivanzou Tii Road Drift
- location
-
Kamuwongo
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Road Drift
- output
- Access Vital Town/Area
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Enziu Secondary School
- location
-
Endui
(in Mwingi North)
- year first funded
- 2004
- action
- Completion And Equipping Of School Laboratory
- output
- Improve Science Teaching
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kamuwongo Water Pipeline
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2005
- action
- Water Pipeline Extension
- output
- Avail Safe Drinking Water
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kaela Secondary School
- location
-
Kanzanzu
(in Mwingi North)
- year first funded
- 2007
- action
- Build Administration Block
- output
- Equip Staff
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kamuwongo Dispensary
- location
-
Kamuwongo
(in Mwingi North)
- year first funded
- 2005
- action
- Completion Of Main Block
- output
- Access Health Care
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kyuso Market Sheds
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of Market Sheds.
- output
- Avail Clean Market For Horticultural Products
- implementation status
- Complete And Not In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Matooni Dispensary
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Main Block
- output
- Improve Healthcare
- implementation status
- Painting & Fittings To Be Done, Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Katuuni Tyaa Kamuthale Water Project
- location
-
Kakuyu
(in Mwingi North)
- year first funded
- 2007
- action
- Extension Of Water Pipeline
- output
- Avail Water
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Masyungwa Dispensary
- location
-
Masyungwa
(in Mwingi North)
- year first funded
- 2004
- action
- Completion Of The Maternity Ward And Kitchen
- output
- Improve Infrastructure
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Kamathitu Day Secondary School
- location
-
Katse
(in Mwingi North)
- year first funded
- 2007
- action
- Build 2 Classrooms
- output
- Improve Learning
- implementation status
- Completed
- total cost
- Ksh 780,000
- estimate
- Ksh 780,000
Muruu Rock EcoTourism
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Put Up Sanctuary
- output
- Promote Tourism
- implementation status
- Suspended
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Ngomeni Conservancy Project
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2007
- action
- Put Up Sanctuary
- output
- Promote Tourism
- implementation status
- Suspended
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Kaningo Secondary School
- location
-
Masyungwa
(in Mwingi North)
- year first funded
- 2007
- action
- Build 2 Classrooms
- output
- Improve Learning
- implementation status
- Complete In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 500,000
Tseikuru Market Sheds
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Market Stalls
- output
- Market For Fresh Produce
- implementation status
- Structures Below Lintel Level
- total cost
- Ksh 750,000
- estimate
- Ksh 1,500,000
Masyungwa Day Secondary School
- location
-
Masyungwa
(in Mwingi North)
- year first funded
- 2007
- action
- Build 2 Classrooms
- output
- Improve Learning
- implementation status
- Finishing Remaining
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Gai Day Secondary School
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- Improve Secondary Education
- implementation status
- 1 Class Completed Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Itivanzou Day SSchool
- location
-
Kamuwongo
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- Improve Secondary Education
- implementation status
- One Fully Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Musavani Dispensary
- location
-
Musavani
(in Mwingi North)
- year first funded
- 2007
- action
- Build Dispensary Block
- output
- Improve Health Services
- implementation status
- Walling Below Lintel Level
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Nyaanyaa Dispensary
- location
-
Endui
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Avail Health Services
- implementation status
- Complete And In Use
- total cost
- Ksh 625,000
- estimate
- Ksh 650,000
Assistant Chiefs Offices At Gakombe, Kayenga Gachikogo
- location
-
Tharaka
(in Mwingi North)
- year first funded
- 2007
- action
- Build Ass. Chiefs Office
- output
- Improve Security
- implementation status
- Roofing To Be Done Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Manzui Earth Dam
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2006
- action
- Scooping Of Earth Dam+ Building Gabions
- output
- Access Safe Drinking Water
- implementation status
- Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Ngaaie Dispensary
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Complete Dispensary Block
- output
- Improve Health Services
- implementation status
- Plastering & Floor To Be Done
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Konyu Primary School
- location
-
Kanthungu
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Roofing To Be Done
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kaundu Special Unit
- location
-
Kakuyu
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Dormitory
- output
- Improve Special Education
- implementation status
- At Slab Level Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kyuso Youth Polytechnic
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Rehabilitate Workshops
- output
- Improve Skills
- implementation status
- Electricity Installation Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Dos Office Central Division
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2007
- action
- Build Office Block
- output
- Improve Administration Services
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Waita Polytechnic Dormitory Girl
- location
-
Waita
(in Mwingi North)
- year first funded
- 2004
- action
- Construction Of The Ward Dormitory Hall (Girls)
- output
- Avail Modern Boarding Facilities
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Enziu primary school
- location
-
Endui
(in Mwingi North)
- year first funded
- 2006
- action
- Renovations Of Classrooms
- output
- Ease Learning
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kalisasi Dispensary
- location
-
Kanzanzu
(in Mwingi North)
- year first funded
- 2006
- action
- Completion Of Dispensary + Electrification
- output
- Improve Healthcare
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ikuuni/Ndiani Road Drift
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2003
- action
- Construction Of Road Drift
- output
- Link Ikuuni And Ndiani
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Waita Secondary School
- location
-
Waita
(in Mwingi North)
- year first funded
- 2007
- action
- Build Science Laboratory
- output
- Improve Education
- implementation status
- Walling Structure T Be Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Matooni Day Secondary School
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Build Classrooms
- output
- Improve Learning
- implementation status
- Roofing To Be Done Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Twwua Water Project
- location
-
Tharaka
(in Mwingi North)
- year first funded
- 2007
- action
- Pipes Rehabilitation
- output
- Avail Water
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kathiani & Syumavuo FSchool
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2006
- action
- Class Renovation
- output
- Improve Feeder Schools
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kandwia Dispensary
- location
-
Kimangao
(in Mwingi North)
- year first funded
- 2007
- action
- Build Dispensary Block
- output
- Improve Health
- implementation status
- Plastering To Be Done
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Enziu Secondary School
- location
-
Endui
(in Mwingi North)
- year first funded
- 2007
- action
- Renovation Of 2 Classrooms
- output
- Promote Education
- implementation status
- Completed And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Ngomeni Women Tree Nurseries
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2005
- action
- Community Nurseries In Nguni And Ngomeni
- output
- Improve Agro Forestry
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Tseikuru Airstrip
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2006
- action
- Completion Of Airstrip
- output
- Improve Transport
- implementation status
- ReLocated To New Site
- total cost
- Ksh 350,000
- estimate
- Ksh 700,000
Mitamisyi Dispensary
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2005
- action
- Completion Of Dispensary Main Block
- output
- Access Health Care
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Musavani Primary School
- location
-
Musavani
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Finishing To Be Done
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tseikuru Dos Residence
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2007
- action
- Renovations Of The Residence
- output
- Improve Security
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamayagi primary school
- location
-
Tharaka
(in Mwingi North)
- year first funded
- 2006
- action
- Class Renovation
- output
- Ease Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mwingi Primary School
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2007
- action
- Renovation Of 8 Classrooms
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mwingi Cultural Centre
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2006
- action
- Buying Equipment Build Center
- output
- Promote Culture
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamunyu Dispensarysry
- location
-
Kanzanzu
(in Mwingi North)
- year first funded
- 2007
- action
- Build Dispensary Block
- output
- Improve Health
- implementation status
- Roofing Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Endui Hills Tree Project
- location
-
Endui
(in Mwingi North)
- year first funded
- 2005
- action
- Community Tree Nursery In Endui
- output
- Improve Agro-Forestry
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mandongoi PreSchool
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Kasiluni PreSchool
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Winoti And Kangoo Feeder School
- location
-
Mitamisyi
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Winoti Roofing To Be Done
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Kalisasi Primary School
- location
-
Kanzanzu
(in Mwingi North)
- year first funded
- 2008
- action
- Facelift Of Classrooms
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 0
Mivukoni Ap Line ReAllocatio
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2008
- action
- Complete 3 Ap Line Blocks
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Itulu Primary School
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Repair Classrooms Roof
- output
- Improve Learning
- implementation status
- Classrooms Repaired And In Use Completed
- total cost
- Ksh 220,000
- estimate
- Ksh 220,000
Nguni Locchiefs Office
- location
-
Nguni
(in Mwingi North)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- Improve Administration
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mathyakani Dispensary
- location
-
Kanzanzu
(in Mwingi North)
- year first funded
- 2008
- action
- Complete Dispensary Block
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Manzui Dispensary
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2007
- action
- Build Dispensary Block
- output
- Improve Health Services
- implementation status
- Walling Structure Not Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kyambaa Primary School
- location
-
Waita
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Class
- output
- Improve Learning
- implementation status
- Roofing To Be Done Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kangutha Primary School
- location
-
Waita
(in Mwingi North)
- year first funded
- 2008
- action
- Facelift Of Classrooms
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ap Line Kamuwongo
- location
-
Kamuwongo
(in Mwingi North)
- year first funded
- 2007
- action
- Build Staff Offices
- output
- Enhance Staff Welfare
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kwa Vere Primary School
- location
-
Mivukoni
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of Class
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kavutoni Primary School
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Walling Structure To Be Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mangulu Primary School
- location
-
Masyungwa
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of Class
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nzengeni Primary School
- location
-
Nguni
(in Mwingi North)
- year first funded
- 2005
- action
- Construction Of Class
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiia Dam
- location
-
Endui
(in Mwingi North)
- year first funded
- 2004
- action
- Desilt Dam
- output
- Help Avail Water
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Township Green Water Project
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2007
- action
- Tree Planting
- output
- Improve Environment
- implementation status
- Suspended
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kanyunga Dispensary
- location
-
Mwingi
(in Mwingi North)
- year first funded
- 2007
- action
- To Install Solar Panel
- output
- Improve Health Services
- implementation status
- Installed And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nzaalani Primary School
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Construction of Collapsed Latrines
- output
- Improve Hygiene
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Katumbi Borehole
- location
-
Masyungwa
(in Mwingi North)
- year first funded
- 2007
- action
- Rehabilitation Of Sunken Pipes
- output
- Avail Water
- implementation status
- Repaired And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mandongoi Community Borehole
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2007
- action
- Piping And Installation Of Generator
- output
- Avail Water
- implementation status
- Completed
- total cost
- Ksh 135,000
- estimate
- Ksh 135,000
Kamwengi Feeder School
- location
-
Kyuso
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Roofing To Be Done, Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kakauni Primary School
- location
-
Masyungwa
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Walling Structure Not Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mangombo Primary School
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2007
- action
- Build 1 Classroom
- output
- Improve Learning
- implementation status
- Roofing To Be Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ndatani Shallow Well
- location
-
Ngomeni
(in Mwingi North)
- year first funded
- 2007
- action
- Rehabilitate The Well + Repair Hand Pump
- output
- Avail Water
- implementation status
- Repaired And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngongoni Assistant Chiefs Office
- location
-
Tseikuru
(in Mwingi North)
- year first funded
- 2007
- action
- Build Office Block
- output
- Improve Security
- implementation status
- Roofing To Be Done
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kisole Primary School
- location
-
Waita
(in Mwingi North)
- year first funded
- 2007
- action
- Rebuilt Collapsed Pit Latrines
- output
- Improve Health Care
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Waita Health Centre
- location
-
Waita
(in Mwingi North)
- year first funded
- 2007
- action
- Repair Broken Down Generator
- output
- Avail Power
- implementation status
- Repaired
- total cost
- Ksh 40,000
- estimate
- Ksh 50,000
Kaunguni Primary School
- location
-
Endui
(in Mwingi North)
- year first funded
- 2007
- action
- Rebuilt Collapsed Pit Latrines
- output
- Improve Health Care
- implementation status
- Completed And In Use
- total cost
- Ksh 30,000
- estimate
- Ksh 50,000
Nguni Borehole
- location
-
Nguni
(in Mwingi North)
- year first funded
- 2007
- action
- Repair Broken Down Afridev Pump Set
- output
- Avail Water
- implementation status
- Repaired
- total cost
- Ksh 30,000
- estimate
- Ksh 50,000