It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kaliluni Earth Dam
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 4,891,023
- estimate
- Ksh 0
Kasina Institute
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 3,500,000
- estimate
- Ksh 0
Kavaini Earthdam
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 3,053,820
- estimate
- Ksh 0
Migwani Sub District Hosp
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2003
- action
- Construction of Morgue
- output
- Morgue
- implementation status
- Complete
- total cost
- Ksh 3,053,333
- estimate
- Ksh 0
Ukasi Secondary School -Borehole
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2003
- action
- Drilling
- output
- Bore Hole
- implementation status
- Complete
- total cost
- Ksh 2,750,000
- estimate
- Ksh 0
Kakunike Girls Secondary School
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 6 Classrooms
- output
- 6 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 2,410,000
- estimate
- Ksh 0
Mandove Primary School -Classroom
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of 8 Classrooms
- output
- 8 Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Kitulani Sec-Classrooms
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Nguutani Sec-Dining
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 0
Wingemi Secondary School -Classroom
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Mumbuni Earth Dam Construction
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 0
Mui Sec-Kitchen & Dining Hall
- location
-
Mui
(in Mwingi South)
- year first funded
- 2003
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Complete
- total cost
- Ksh 1,635,000
- estimate
- Ksh 0
Precious Blood Secondary School -Tyaa C/Room
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,520,000
- estimate
- Ksh 0
Kyamwea Earth Dam
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dam
- output
- Dam
- implementation status
- Not Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Nuu Sec-Classroom & Dorm
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2003
- action
- Construction of 2 Class/Dorm
- output
- 2 Class/Dorm
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Tyaa Borehole-Piping To Mumbuni Mkt
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Pipeline
- output
- Pipeline
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kavaini Sec-Science Lab
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Lab
- output
- Lab
- implementation status
- Ongoing
- total cost
- Ksh 1,450,000
- estimate
- Ksh 0
Kaai Girls-Laboratory
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Kavindu Youth Poly-Carpentry Workshop
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Workshop
- output
- Workshop
- implementation status
- Ongoing
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Mwingi Puplic Park Upgrading
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Park
- output
- Park
- implementation status
- Complete
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Nzalae Sec-Classroom
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Nguuni Earthdam
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 1,345,435
- estimate
- Ksh 0
Musuani Sec-Dining Hall
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Ongoing
- total cost
- Ksh 1,330,000
- estimate
- Ksh 0
Mui Dispensary-Maternity Ward
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Ward
- output
- Ward
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Mathuki Girls Secondary -Classrooms
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classroom
- output
- 4 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Ngaani Secondary School -C/Rooms
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Mwambiu Secondary School -C/Rooms
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,270,000
- estimate
- Ksh 0
Kavuvwani Dispensary
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Nzatani Dispensary-Maternity Ward
- location
-
Nzeluni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Ward
- output
- Ward
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Nyaani Secondary School - C/Room
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Mwingi Makuka Drift
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Drift
- output
- Drift
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Muangeni Secondary School Classrooms
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Mui Boys Secondary School Laboratory
- location
-
Mui
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Kitulani Sec-Science Lab
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Lab
- output
- Lab
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kakululo Dispensary Maternity Ward
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Ward
- output
- Ward
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kanyekini Dispensary
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kyamboo Pri Renovation
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 8 Classrooms
- output
- 8 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,195,000
- estimate
- Ksh 0
Katuyu Girls Secondary C/Rooms
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Musovo Dispensary-Construction
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Ukasi Secondary School -Classroom
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Ilalu Subsirface Dam
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Mulinde Dispensary
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 1,110,000
- estimate
- Ksh 0
Ukasi Dispensary-Maternuty Ward
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Mung'Alu Dispensary
- location
-
Nzeluni
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kikiini Dispensary
- location
-
Nzauni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Disp
- output
- Disp
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Catholic Church N Vocational Training -Genset
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2007
- action
- Wiring/Gen.
- output
- Genset
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kaliluni Sec-Classroom
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kiomo Secondary School -Classroom
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kairungu Secondary School -Classroom
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kalitini Secondary Renovation-Dorm & Lab
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of 4 Classroom
- output
- 4 Classroom
- implementation status
- Complete
- total cost
- Ksh 1,095,000
- estimate
- Ksh 0
Itong'Olani Health Centre Maternity Construction
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Ward
- output
- Ward
- implementation status
- Complete
- total cost
- Ksh 1,070,000
- estimate
- Ksh 0
Mui Youth Poly Workshop
- location
-
Mui
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of W/Shop
- output
- W/Shop
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Nzeluni Dispensarye-Maternity Ward
- location
-
Nzeluni
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Ward
- output
- Ward
- implementation status
- Ongoing
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Nuu Secondary School -Generator &Wiring
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Genset
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Mumbuni Secondary -Classroom
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Kisovo Secondary School -Dining &Tank
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Ndaluni Sec-Dorm
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dormitory
- output
- Dorm
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Mwalili Subsurface Dam
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Katisaa Sub Surfacedam
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Muthioni Secondary C/Rooms
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kaai Sec-Dorm
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Katalwa Secondary -Lab
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Lab
- output
- Lab
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Thonzweni Dispensaryesary
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kasevi Dispensary
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mulilni Dispensary-Construction
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Itheng'Eli Dispensary
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 998,000
- estimate
- Ksh 0
Kaikungu Dispensary
- location
-
Nzauni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 995,000
- estimate
- Ksh 0
Nzauni Dispensary
- location
-
Nzauni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 995,000
- estimate
- Ksh 0
Kamulalani Primary School
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 4 Classroom
- output
- 4 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 960,000
- estimate
- Ksh 0
Mui Boys Secondary School Wiring & Genset
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Genset
- output
- Genset
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Itumbi Dispensary
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Syomung'Ele Primary School C/Room Renov
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Yatwa Dispensary-Maternity Ward
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Ward
- output
- Ward
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kwa Munyanzu Primary School C/Room Renov
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete
- total cost
- Ksh 940,000
- estimate
- Ksh 0
Katalwa Secondary -Dining Hall & Tank
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Complete
- total cost
- Ksh 930,000
- estimate
- Ksh 0
Itoloni Girls Sec-Library
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Library
- output
- Library
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 0
Migwani Sub District Hosp-Male WoRoad
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Ward
- output
- Ward
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Mathuki Health Centreentre -Maternity Ward
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Maternity
- output
- Maternity
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Yumbu Secondary School
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 4 Classroom
- output
- 4 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Karura Dispensary
- location
-
Kyethani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Nduvani Dispensary -Construction
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kilulu Dispensary
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Mathunzini Dispensary
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Disp
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Nzalae Dispensary
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Thitani-Kasanga Water Prj-Piping
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Pipeline
- output
- Pipeline
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Mbondoni Primary School Classrooms
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 860,000
- estimate
- Ksh 0
Muyuni Dispensary-Maternity
- location
-
Mui
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Maternity
- output
- Maternity
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kyamwenze Girls -Generator & Wiring
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- PurcaHouse
- output
- Genset
- implementation status
- Purchased
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Katithini Dispensary
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Lundi Dispensary-Maternity Construction
- location
-
Mui
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Maternity
- output
- Maternity
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Katoteni Sec-Dining&Kitachen
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kairungu Borehole
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2005
- action
- Piping
- output
- Pipeline
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kyamboo Sec-Lab
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Lab
- output
- Lab
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Migwani Special Unit-Dorm
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dorm
- output
- Dorm
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kavisu Dispensary
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kiomo Dispensary Construction
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 810,000
- estimate
- Ksh 0
Thokkoa Secondary School -Lab Construction
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Lab.
- output
- Lab.
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Ngongoni Sec-Borehole Piping
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Pipeline
- output
- Pipeline
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Nyaani Dispensary-Maternity Ward
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Ward
- output
- Ward
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kavisu Primary School -Classroom
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Ngangani Primary School C/Room Renov
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kaai Girls Secondary Classrooms
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Katalwa Secondary -Classroom
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kailitin Secondary School -Generator & Wiiring
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Genset
- output
- Genset
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kiio Secondary -Dorm
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dorm
- output
- Dorm
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kakongo Secondary School - C/Room
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Musuani Sec-Dorm
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dorm
- output
- Dorm
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kalanga Primary School -Classroom
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kyamboo Sec-Dorm
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dormitory
- output
- Dorm
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kisovo Sec-Lab
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Lab
- output
- Lab
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Ngongoni Sec-Generator
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2005
- action
- Purchase
- output
- Genset
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Katoteni Sec-Generator
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2005
- action
- Purchase
- output
- Genset
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kwa Kavoo Dispensary
- location
-
Nzeluni
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kavaini Sec-Classroom
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kanyaa Ikomoa Dfift
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Drift
- output
- Drift
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kasanga Secondary School -C/Rooms
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Mwambiu Dispensary
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 730,000
- estimate
- Ksh 0
Mbia Primary School Classrooms
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 720,000
- estimate
- Ksh 0
Kathita Primary School misai Road
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 720,000
- estimate
- Ksh 0
Nuu-Kimongo Road
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Nguuni Primary School C/Room Renov
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Ngiluni Primary School classroom Renov
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 /Room
- output
- 4 /Room
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kitumbi Polytechnic-Workshop
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Workshop
- output
- Workshop
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Migwani Poly-Electrical Workshop
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Workshop
- output
- W/Shop
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kalembwa Primary School -Classroom
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Ongoing
- output
- Ongoing
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kyamwenze Sec-Dorm
- location
-
Mui
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dormitory
- output
- Dorm
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Mwingi Youth Poly Workshop
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of W/Shop
- output
- W/Shop
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Mbondoni Dispensary
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 680,000
- estimate
- Ksh 0
Yumbu Dispensary -Completion
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 675,000
- estimate
- Ksh 0
Kaai Secondary School -Fencing &Gate
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2008
- action
- Fencing
- output
- Fencing/Gate
- implementation status
- Ongoing
- total cost
- Ksh 660,000
- estimate
- Ksh 0
Kalanga Secondary School
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kea Dispensary
- location
-
Nzauni
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Itoloni Dispensary
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kaai-Kalesi Road
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Musonoke Primary School - Classrooms
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Thokoa Sec-Classroom
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kalanga Dispensary
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Ngongoni Sec-Dorm
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kangilwa Primary School -Classrooms
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 2 Classroom
- output
- 2 Classroom
- implementation status
- Complete
- total cost
- Ksh 604,000
- estimate
- Ksh 0
Wingemi Dispensarylaboratory
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ukasi Saranjevo Secondary School
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Dormetory
- output
- Dormetory
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Wingemi Dispensary-Maternity Ward
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Ward
- output
- Ward
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mbondoni Secondary School
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kang'Au River Catchment
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Water
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
St Marys Secondary School - Ngongoni
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kasavani Secondary School -C/Rooms
- location
-
Nzauni
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kisovo -Itheng'Eli Road Construction
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 560,000
- estimate
- Ksh 0
Minyini-Mutulu Water Tank
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Tanks
- output
- Tanks
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kavoko Sub Surface Dam
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of S.S.Dam
- output
- S.S.Dam
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kyome Girls -Classroom
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Ndaluni Primary School C/Room Renovation
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2008
- action
- Renovate
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Lundi Dispensary
- location
-
Mui
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Desks For All Primary School -Mui Loc
- location
-
Mui
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Desks
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Nzawa Health Centre-Maternity Ward
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Ward
- output
- Ward
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Thitani Health Centre -Wiring
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Wiring
- output
- Wiring
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Desks For All Primary School -Wingemi
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2005
- action
- Making
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kavaliki Primary School -Classrooms
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 2 Classroom
- output
- 2 Classroom
- implementation status
- Complete
- total cost
- Ksh 504,880
- estimate
- Ksh 0
Misuu Sub Surface Dam
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2008
- action
- Not Started
- output
- S S Dam
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kavuko Subsurface Dam
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Tuvaani Dispensary-Maternity Ward
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Ward
- output
- Ward
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mulinde Secondary School -C/Rooms
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kanyaa Ikomoa Subsurface Dam
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dam
- output
- Dam
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kalitini Water Project
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Completion of phase 1
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kwa Katuliku Sub Surface Dam
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kaunzuu Water Project
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Syomiku Primary School -C/Room
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Katalwa Borehole-Piping Tokatalwa Mkt
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mutyangome Dispensary-Completion
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mwingi Baptist Youth Poly
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2004
- action
- Wiring
- output
- Wiring
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Manguva Water Project
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ngongoni Secondary School -Lab
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kanyaa A Camp Staff House
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of House
- output
- House
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ivuusya Dispensary
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Koimo Secondary School -Admlock
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Adm.Block
- output
- Adm.Block
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sosoma Primary School -Classroom
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mbondoni Water Tank/Kiosk
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiio Secondary Dining Hall
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Dining Hall
- output
- Dining Hall
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Uvaita Primary School -Classroom
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Munyuni Secondary School -C/Rooms
- location
-
Mui
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kamutisya Commuity Water Tank
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Desks For All Primary School s-Kyome Loc
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Desks
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Sosoma Cattle Dip-Construction
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Cattle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kanyaa Dispensary
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Desks For Primary Schools
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2005
- action
- Making
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kaai Girls Secondary School -Dorm
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Dormerty
- output
- Dormerty
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Desks For Primary Schools
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2005
- action
- Making
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 430,000
- estimate
- Ksh 0
Itiko Dispensary-Completion
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 425,000
- estimate
- Ksh 0
Mitia Cattle Dip-Construction
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Cattle Dip
- output
- Cattle Dip
- implementation status
- Not Started
- total cost
- Ksh 420,000
- estimate
- Ksh 0
Mbondoni Primary School -Water Tank
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 410,000
- estimate
- Ksh 0
Kalitini Primary School
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2009
- action
- Renovate
- output
- 8 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kimongo Primary School
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2009
- action
- Renovate
- output
- 2 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ikomoa Sub Surfacedam
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kwa Nzulwa Water Tank
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kavalyani Primary School C/Room Renov
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Adm.Block
- output
- Adm.Block
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kamutisya Primary School
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Migwani Deb Primary School
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2009
- action
- Renovate
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kalikoni Primary School Classrooms
- location
-
Mui
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ngungi Secondary School - C /Rooms
- location
-
Mui
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 4 Classrooms
- output
- 4 C /Rooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Katalwa Secondary School - Admblock
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Adm Block
- output
- Adm Block
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mumbuni Secondary School
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Lab
- output
- Lab
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kavuoni Primary School C/Room Renov
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Misai -Kathita Drift
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Drift
- output
- Drift
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Syumakethe Primary School -Classroom Renovation
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Thitan Mkt Water Tank
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ndeleke Primary School -C/Rooms
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Myuuni Rock Catchment
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Water
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 389,000
- estimate
- Ksh 0
Kwa Mwinzi Water Prj
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 380,000
- estimate
- Ksh 0
Kairungu Dispensary
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Disp
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 380,000
- estimate
- Ksh 0
Katoteni Health Centre-Wiring /Connection
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2008
- action
- Wiring
- output
- Wirng
- implementation status
- Complete
- total cost
- Ksh 370,000
- estimate
- Ksh 0
Thokoa Secondary School admlock
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Adm.Block
- output
- Adm.Block
- implementation status
- Ongoing
- total cost
- Ksh 360,000
- estimate
- Ksh 0
Wikithuki Dispensary-Completion
- location
-
Kyethani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Wikitoo Primary School
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Precious Blood Secondary School -Tyaa Lab
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 330,000
- estimate
- Ksh 0
Mumbuni Dispensary
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 330,000
- estimate
- Ksh 0
Kyusyani Dispensary-Completion
- location
-
Thaana Nzau
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 325,000
- estimate
- Ksh 0
Mukooni Shallow Well-Sinking
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Digging
- output
- Well
- implementation status
- Stalled
- total cost
- Ksh 325,000
- estimate
- Ksh 0
Syumakethe Primary School -Kiswiini Water Projxten
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Pipeline
- output
- Pipeline
- implementation status
- Complete
- total cost
- Ksh 310,000
- estimate
- Ksh 0
Mutyangome Dispensarymaternity
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2008
- action
- Renovation
- output
- Maternity
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Desks For Primary Schools
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2005
- action
- Making
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Syimuu Primary School -Desks & C/Rooms
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Winzyeei Health Centre-Wiring
- location
-
Thaana Nzau
(in Mwingi South)
- year first funded
- 2008
- action
- Wiring
- output
- Disp
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kaliluni Water Project Extension
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Pipeline
- output
- Pipeline
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nguutani Catholic Dispensaryonstruction
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ngongoni Dispensary
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kwakisasi Sam
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of S.S.Dam
- output
- S.S.Dam
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nguluma Primary School -C/Room
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 2 Classroooms
- output
- 2 Classroooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ithambwa Ngau Secondary C/Lassrooms
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kyome Community Water Tank
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Tank
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kamulewa Primary School C/Room Renov
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Yumbu Dispensary Piping
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of Reallocated
- output
- Reallocated
- implementation status
- Piping
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kisungula Primary School -C/Rooms
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Precious Blood Secondary School -Tyaa-Lockers
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2008
- action
- Pyrchase
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 280,000
- estimate
- Ksh 0
Yatwa Ukasi Security Road
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Road
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mwalale Shallow Well
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2005
- action
- Digging
- output
- Well
- implementation status
- Failed
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kavindu Dispensary-Kitchen & Drainage
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Kitchen
- output
- Kitchen
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mavui Dispensary
- location
-
Thaana Nzau
(in Mwingi South)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tulimani Primary School C/Room Renov
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mutyangome Dispensaryfencing /Gate
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2008
- action
- Fencing
- output
- Fencing/Gate
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kateiko Special Unity C/Room
- location
-
Mui
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mwembeni Shallow Well
- location
-
Mui
(in Mwingi South)
- year first funded
- 2005
- action
- n/a
- output
- Well
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mukusyoni Shallow Well
- location
-
Mui
(in Mwingi South)
- year first funded
- 2005
- action
- Digging
- output
- Well
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Muyuni Dispensary
- location
-
Mui
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Disp
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Thokoa Sec- Electrification
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2008
- action
- Ongoing
- output
- Wiring
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Nzia Shallow Well
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Digging
- output
- Well
- implementation status
- Stalled
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Ulaa Cattle-Dip
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2008
- action
- Renovate
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kavuvwani Health Centre
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2004
- action
- Construction of health centerentre
- output
- H/Centre
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mathuki Health Centre Laboratory
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Apperators
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Itioko Dispensary -Fencing
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2008
- action
- Fencing
- output
- Fencing
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 0
Mbau Primary School C/Room Renov
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 230,000
- estimate
- Ksh 0
Kiumoni Primary School C/Room Renov
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 220,000
- estimate
- Ksh 0
Desks For Primary Schools
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2005
- action
- Construction of Desks
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nuu Special Unit -Furniture's
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Funiture/S
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ndandini Shallow Well
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2006
- action
- Digging
- output
- Well
- implementation status
- Complete
- total cost
- Ksh 190,000
- estimate
- Ksh 0
Kaombe Shallow Well
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2006
- action
- Digging
- output
- Well
- implementation status
- Complete
- total cost
- Ksh 190,000
- estimate
- Ksh 0
Ngongoni Dispensary -Wiring /Connection
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2008
- action
- Wiring
- output
- Wirng
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 0
Muyuni Shallow Well -Sinking
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Digging
- output
- Well
- implementation status
- Stalled
- total cost
- Ksh 175,000
- estimate
- Ksh 0
Mbondoni Secondary School -Lockers
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2008
- action
- Purchased
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 168,000
- estimate
- Ksh 0
Karura Dispensary -Latrines
- location
-
Kyethani
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Latrines
- output
- Latrines
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kairungu Primary School C/Room Renov
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kalanga Dispensary-Fencing /Gate
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2008
- action
- Fencing
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ngiluni Dispensary-Fencing /Gate
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2008
- action
- Fencing
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kwanikwa Sam
- location
-
Mui
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of S.S.Dam
- output
- S.S.Dam
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kisovo Secondary School -Wiring
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- To Connect
- output
- Power
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mumbuni Sec,School-Wiring
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- To Connect
- output
- Power
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mumbuni Dispensary-Wiring
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Connect
- output
- Power
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kaikungu Dispensary -Furniture's
- location
-
Nzauni
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Furnitures
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kasanga Deb Secondary School -Wiring
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2009
- action
- Construction of Power
- output
- Power
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kanyaa Dispensary-Wiring
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2009
- action
- Connect
- output
- Power
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ukasi Primary School C/Room Renov
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kiomo Secondary School -Lockers
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Kakunike Secondary School -Lockers
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Kaliluni Secondary School lockers
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Purchased
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Ithambwngao Secondary School -Lockers
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Purchased
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Nzalae Secondary School -Lockers
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Purchased
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Muangeni Secondary School -Lockers
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2008
- action
- Lockers
- output
- Purchase
- implementation status
- Ongoing
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Muangeni Secondary School Lockers
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Purchase
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Wingemi Secondary School --Lockers
- location
-
Wingemi
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Kitulani Secondary School -Lockers
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Locker
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Mumbuni Secondary School Lockers
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Muthioni Sec-Lockers
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Ongoing
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Kairungu Secondary School -Lockers
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2008
- action
- Construction of Lockers
- output
- Lockers
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Mutyangome Dispensary-Plastic Tank
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tanks
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Kyome Girls -Electrification
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2007
- action
- Wiring
- output
- Wiring
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Wikithuki Dispensary-Furnitures/Shelves
- location
-
Kyethani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitures
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Mulinde Dispensary-Furnitures
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitures
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Karura Dispensary-Purchase Of Furnituers
- location
-
Kyethani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitutrs
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kasevi Dispensary- Furnitures
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitures
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kanyekini Dispensary-Furnitures
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitures
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kalanga Dispensary-Furnitures
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitures
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ngiluni Dispensary-Furnitures
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitures
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nduvani Dispensary- Furnitures
- location
-
Mui
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Funitures
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kilulu Dispensary-Funiters
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furniture
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Itheng'Eli Dispensary-Furnitures
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furniture
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Katithini Dispensary- Furnitures
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2008
- action
- Renovation
- output
- Furnitures
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kwa Nzivo Shallow Well Hand Pump
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Pump
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nzauni Secondary School -Furnitures
- location
-
Nzauni
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Furnitures
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mung'Alu Dispensary-Furniture's
- location
-
Nzeluni
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Furnture'S
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kwa Kavoo Dispensary-Furniture's
- location
-
Nzeluni
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Furnture'S
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Musovo Dispensary-Furniture's
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Furnitures
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muukuni Shallow Well Hand Pump
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2007
- action
- Purchased
- output
- Installed
- implementation status
- Complete
- total cost
- Ksh 85,896
- estimate
- Ksh 0
Ngongoni Shallow Well Hand Pump
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Pump
- implementation status
- Complete
- total cost
- Ksh 85,000
- estimate
- Ksh 0
Ikomoashallow Well Hand Pump
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Pump
- implementation status
- Complete
- total cost
- Ksh 85,000
- estimate
- Ksh 0
Ithen'Geli Dispensary -Water Tank
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- W /Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kilulu Dispensary-Funiters
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- W /Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Nuu Hills Nursery Water Tank
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Water Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kavaini Secondary School -Lockers
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Locker
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Mulinde Dispensary-Water Tank
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Water Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Thonzweni Dispensaryesary-Water Tank
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Water Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Mbondoni Dispensary-Water Tank
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- W /Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Mbondoni Secondary School -Water Tank
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- W /Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Muliluni Dispensary Water Tamk
- location
-
Kiomo
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- W/ Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kasevi Dispensarysaty -Water Tank
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- Water Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kanyekini Dispensary W/Tank
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- W/Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Nduvani Dispensary -Water Tank
- location
-
Mui
(in Mwingi South)
- year first funded
- 2009
- action
- Purchase
- output
- W/ Tank
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kalembwa Primary School -Water Tank
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Purchased
- implementation status
- Coimplte
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Itiko Dispensary -Water Tank
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2008
- action
- Wtank
- output
- Purchase
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Mbau Primary School Water Tank
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Purchased
- implementation status
- Purchased
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Mavui Dispensary Water Tank
- location
-
Thaana Nzau
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Nuu Vocational Training -Plastic Tank
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tanks
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Ukasi Secondary Water Tank
- location
-
Ukasi
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kavaini Sec-Water Tank
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kitulani Sec-Water Tank
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Nuu Secondary School tank
- location
-
Nuu
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Katoteni Sec-Water Tank
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Ngongoni Sec-Water Tank
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Complete
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kalitini Secondary Water Tank
- location
-
Kalitini
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Musuani Sec-Water Tank
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Ndaluni Sec-Water Tak
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Mandove Primary School -Classroom
- location
-
Mbuvu
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kyamboo Sec-Water Tank
- location
-
Migwani
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Mui Boys Secondary School Water Tank
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kyamwenze Sec-Watertank
- location
-
Mui
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kisovo Secondary School - Water Tank
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tank
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kaai Girls Secondary Water Tank
- location
-
Mutyangome
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Tanks
- implementation status
- Purchased
- total cost
- Ksh 55,485
- estimate
- Ksh 0
Kasanga Primary School C/Room Renov
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mwika-Nesa Tree Nursery Sroup
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2006
- action
- Planting
- output
- Nursery
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mutwaathi Poly Furniture
- location
-
Mumbuni
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Furniture
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kyome Dispensary-Fridge
- location
-
Kyome
(in Mwingi South)
- year first funded
- 2006
- action
- Purchase
- output
- Fridge
- implementation status
- Purchased
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mayatima Self Help Help Group
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2006
- action
- Planting
- output
- Nursery
- implementation status
- Failed
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Faith Agro Forest Nursary
- location
-
Mwingi
(in Mwingi South)
- year first funded
- 2006
- action
- Planting
- output
- Nursery
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kavaini Primary School -Desks
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Making
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 0
Kilela Primary School -Desks
- location
-
Thitani
(in Mwingi South)
- year first funded
- 2006
- action
- Making
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 0
Mavui Dispensary Shelves
- location
-
Thaana Nzau
(in Mwingi South)
- year first funded
- 2007
- action
- Purchase
- output
- Shelves
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 0
Katuyu Girls Sec-Lockers
- location
-
Nguutani
(in Mwingi South)
- year first funded
- 2008
- action
- Purchase
- output
- Lockers
- implementation status
- Purchased
- total cost
- Ksh 140
- estimate
- Ksh 0