The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Malewa West Water Project
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- Purchase Of Storage Tanks,Pipes Construction Of Water Kiosk &
- output
- Storage Tanks Bought
- implementation status
- On Going
- total cost
- Ksh 3,500,000
- estimate
- Ksh 1,000,000
Naivasha Girls Secondary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2006
- action
- New Dormitory
- output
- Enhanced Learning
- implementation status
- On-Going
- total cost
- Ksh 3,400,000
- estimate
- Ksh 1,000,000
Kamere Water Project
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2004
- action
- Purchase Pump & Piping
- output
- Increase Water Availability
- implementation status
- On Going
- total cost
- Ksh 2,850,000
- estimate
- Ksh 2,850,000
Kahuho Water Project
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Sinking Of Borehole
- output
- Useable
- implementation status
- On Going
- total cost
- Ksh 2,606,970
- estimate
- Ksh 2,606,970
Kinungi Secondary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2004
- action
- Complete Of Classroom,Staff Toilet &Adm Block
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 2,333,000
- estimate
- Ksh 2,333,000
Shindano /Mununga Water Project
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2007
- action
- Sinking Of Borehole
- output
- Useable Borehole
- implementation status
- On Going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,200,000
Maiella Police Post
- location
-
Maiella
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of A Police Post
- output
- Enhance Security
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 800,000
Gilgil Mortuary/Dispensary
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Renovation &Purchase Cold Room
- output
- Improve Health
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Matatu Bus Park
- location
-
Viwandani
(in Naivasha)
- year first funded
- 2008
- action
- Park Construction
- output
- Bus Park
- implementation status
- Ongoing
- total cost
- Ksh 1,903,093
- estimate
- Ksh 1,303,093
Kabati Electr Project
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2004
- action
- Lights Installation
- output
- Enhanced Security
- implementation status
- Complete & In Use
- total cost
- Ksh 1,775,000
- estimate
- Ksh 1,775,000
Munyu Ihindu Water Project
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Pump Set & Water Tank
- output
- Increase Water Availability
- implementation status
- Ongoing
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,000,000
Disability Info& Rescentre
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2005
- action
- Disability Theatre Centre
- output
- Improved Health
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kongasis Water Project
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2003
- action
- Generator Project
- output
- Generator Operating
- implementation status
- Complete
- total cost
- Ksh 1,420,000
- estimate
- Ksh 1,420,000
Gilgil Hospital
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2007
- action
- Installation Of Refrigeration Machine
- output
- Enhance Health
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Ngecho Keriko Astu
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2009
- action
- Land Purchase And Construction
- output
- Provision Of Security
- implementation status
- Land Purchase Is Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Naivasha Day Secondary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2004
- action
- Storey Classroom
- output
- Enhanced Learning
- implementation status
- Stalled
- total cost
- Ksh 1,300,000
- estimate
- Ksh 500,000
St Paul Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- Purchase Of 5 Acre Of Land
- output
- School Expansion
- implementation status
- On Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,000,000
Longonot Township Sec
- location
-
Longonot
(in Naivasha)
- year first funded
- 2005
- action
- Admission Block
- output
- Enhanced Learning
- implementation status
- Stalled
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,250,000
Kasarani Health Centre
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Enhance Health
- implementation status
- On Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,050,000
Karate Dispensary
- location
-
Malewa
(in Naivasha)
- year first funded
- 2005
- action
- Maternity Wing
- output
- Enhanced Better Delivery
- implementation status
- On Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,250,000
Moi Ndabi Secondary School
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms & Toilets
- output
- Enhance Education
- implementation status
- Ongoing
- total cost
- Ksh 1,250,000
- estimate
- Ksh 900,000
Gituuru Secondary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2004
- action
- Laboratory Completion
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 1,225,000
- estimate
- Ksh 1,225,000
Karunga Secondary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2004
- action
- Dining Hall And Kitchen
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Lake View Primary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2004
- action
- New Classroom
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 1,175,000
- estimate
- Ksh 1,175,000
Gathengera Water Project
- location
-
Malewa
(in Naivasha)
- year first funded
- 2003
- action
- Pump & Generator
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 950,000
Lorukaki Water Project
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Filter Tank,Storage Tank & Water Kiosk
- output
- Filter Tank
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Munanda Police Post
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of A Police Post
- output
- Enhance Security
- implementation status
- On Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 400,000
Tangi Tatu Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2008
- action
- Purchase Of Generator
- output
- Generator
- implementation status
- Ongoing
- total cost
- Ksh 1,010,000
- estimate
- Ksh 1,010,000
Nguguti Water Project
- location
-
Maiella
(in Naivasha)
- year first funded
- 2009
- action
- Power Connection For 3 Km
- output
- Water Supply
- implementation status
- Awaiting Disbursement 09/010
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Rerecua Water Project
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Engine & Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mamendi Water Project
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2004
- action
- Generator,Ctrl Panel,Cattle/Trough,Power House
- output
- Generator Operating
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Rubiri Primary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Moi Ndabi Dispensary
- location
-
MoiNdabi
(in Naivasha)
- year first funded
- 2006
- action
- Construction Of Opd Unit
- output
- Enhanced Security
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Moi Ndabi Serowater Project
- location
-
MoiNdabi
(in Naivasha)
- year first funded
- 2006
- action
- Bohe-Hole Rehab. Electricity & Filter Tank
- output
- Increase Water Availability
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Maai Mahiu Dispensary
- location
-
Maai Mahiu
(in Naivasha)
- year first funded
- 2006
- action
- Maternity Wing
- output
- Better Mc&H
- implementation status
- Stalled
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Naivasha Highway Primary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2004
- action
- 2 Classes
- output
- Enhanced Learning
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kipkunyo Primary School
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2008
- action
- 2 Classroom & Toilets
- output
- Classroom & Toilets
- implementation status
- 80% Complete
- total cost
- Ksh 993,096
- estimate
- Ksh 993,096
Viwandani Security Mast
- location
-
Viwandani
(in Naivasha)
- year first funded
- 2007
- action
- Election Of Floodlight,Installation Of Solar Panels, Wind Propelled
- output
- Enhance Security
- implementation status
- Stalled
- total cost
- Ksh 975,000
- estimate
- Ksh 975,000
Karagita Security Mast
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2007
- action
- Election Of Floodlight,Installation Of Solar Panels, Wind Propelled Generator
- output
- Enhance Security
- implementation status
- Stalled
- total cost
- Ksh 975,000
- estimate
- Ksh 975,000
Kongasis
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Security Mast
- output
- Security Mast
- implementation status
- Stalled
- total cost
- Ksh 975,000
- estimate
- Ksh 975,000
Gilgil Security Mast
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2007
- action
- Election Of Floodlight,Installation Of Solar Panels,Wind Propelled Generator
- output
- Enhance Security
- implementation status
- Stalled
- total cost
- Ksh 975,000
- estimate
- Ksh 975,000
Nyondia Secondary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2004
- action
- Construction Of Lab
- output
- Enhanced Learning
- implementation status
- Phase 1 Complete/On-Going
- total cost
- Ksh 973,000
- estimate
- Ksh 473,000
Maiella A Post
- location
-
Maiella
(in Naivasha)
- year first funded
- 2006
- action
- A.P Line Construction
- output
- Enhance Security
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Kekopey Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2003
- action
- Conservation Of Spring
- output
- Increase Water Availability
- implementation status
- Complete & In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Elementaita Dispensary
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Enhanced Health
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 450,000
Ndoroto Dispensary
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2008
- action
- Construction Of A Dispensary
- output
- Enhance Health
- implementation status
- Ongoing
- total cost
- Ksh 950,000
- estimate
- Ksh 400,000
Ereri Anti Stock Theft Post
- location
-
Longonot
(in Naivasha)
- year first funded
- 2006
- action
- Astu Post Construction
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 940,000
- estimate
- Ksh 940,000
Maraigushu Health Centre
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2003
- action
- Maternity Wing
- output
- Better Mc&H
- implementation status
- Complete
- total cost
- Ksh 920,000
- estimate
- Ksh 920,000
Kongasis Secondary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- 2 Classrooms
- implementation status
- On Going
- total cost
- Ksh 915,000
- estimate
- Ksh 700,000
Munyu Secondary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of 2 New Classroom
- output
- 2 New Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 700,000
Rubiri Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2007
- action
- Con. Of Add. Classes
- output
- 2 Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 700,000
Karagita Dispensary
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2004
- action
- Maternity Wing
- output
- Enhanced Better Delivery Services
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Community Hall & Dos Office
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2005
- action
- Completion Of DoS Office
- output
- Conducive Work Environ
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 740,000
Karunga Secondary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2007
- action
- Installation Of 20 Comp & Lab And Power Connection
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 878,603
- estimate
- Ksh 722,500
Kayole Apost
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2006
- action
- Construction Of An A.P Post
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 865,041
- estimate
- Ksh 500,000
Kagumu Primary School
- location
-
Morindati
(in Naivasha)
- year first funded
- 2008
- action
- Construction Of 2 Classroom
- output
- Classroom
- implementation status
- On-Going
- total cost
- Ksh 830,000
- estimate
- Ksh 700,000
Longonot Secondary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Computer Lab & 20 Computer
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 816,103
- estimate
- Ksh 660,000
Gituru Secondary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2007
- action
- Installation Of 20 Computer & Computer Lab & Solar Panel
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 807,403
- estimate
- Ksh 651,300
Karunga Water Project
- location
-
Karunga
(in Naivasha)
- year first funded
- 2004
- action
- Tap Water From The Springs
- output
- Increase Water Availability
- implementation status
- Stalled
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kasambara Road
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Road Grading
- output
- Graded Roads
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Naivasha East Water Project
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- Pump Set, Submersible Cables Pipes Control Panels, Generator & Cables.
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Munyu Secondary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2004
- action
- 1 Classroom Construction
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Mwiciringiri Water Project
- location
-
Longonot
(in Naivasha)
- year first funded
- 2004
- action
- Pipes Tank,Water Kiosk
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Lake Elementaita Secondary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Laboratory And Classroom
- output
- Enhance Learning
- implementation status
- Stalled
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Kahuho Secondary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Computerization
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 785,083
- estimate
- Ksh 628,980
Maai Mahiu Secondary School
- location
-
Maai Mahiu
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Computer Lab& Installation Of 20 Computer
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 780,803
- estimate
- Ksh 624,700
Ndabibi Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Pump, Repair Gen Built Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Gitare Secondary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Class & Office Block
- output
- Enhanced
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Maiella Township Primary School
- location
-
Maiella
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Admn. Block
- output
- Enhance Administration
- implementation status
- On Going
- total cost
- Ksh 740,000
- estimate
- Ksh 300,000
Nyonjoro Secondary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2007
- action
- Computer Lab & Installation 20 ComputerS
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 718,603
- estimate
- Ksh 562,500
Rumwe-Kenton-Kijabe Wp
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Purchase Of Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 713,000
- estimate
- Ksh 713,000
Biashara Kabati Road
- location
-
Biashara
(in Naivasha)
- year first funded
- 2008
- action
- Road Grading
- output
- Graded Roads
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Gilgil Site Kaburi Tree Planting
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2009
- action
- Planting Trees
- output
- Enhance Environment
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Marula Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Two Classroom
- output
- 2 Std Classroom
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
New Game Bridge Project
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2006
- action
- Construction Of Foot Bridge
- output
- Enhanced Livelihood
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 100,000
Kiambogo Secondary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Completion Of Dining Hall
- output
- Operational Dh
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mbaruk /Echariria Road
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Grading
- output
- Reduce Walking Distance
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Namcha Dispensary
- location
-
Maai Mahiu
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Enhance Health
- implementation status
- Stalled
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Mirera Sec
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2009
- action
- dining Hall Completion
- output
- Improve Quality Of Edu
- implementation status
- Awaiting Disbursement 09/010
- total cost
- Ksh 685,000
- estimate
- Ksh 685,000
Mwiciringiri Secondary School
- location
-
Mwiciringiri
(in Naivasha)
- year first funded
- 2007
- action
- Installations Of Comp & A Comp Lab
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 656,103
- estimate
- Ksh 500,000
Ndabibi Health Centre
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2006
- action
- Kitchen & Staff Quarter
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Eburru Secondary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Of Beds And Lab Project
- output
- Improved Learning
- implementation status
- Complete & In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Manera Primary School
- location
-
Lakeview
(in Naivasha)
- year first funded
- 2008
- action
- One Classroom & I Block Of Toilets
- output
- Classroom & Toilets
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 450,000
Maiella Township Sec
- location
-
Maiella
(in Naivasha)
- year first funded
- 2007
- action
- Computerization
- output
- Enhance Education
- implementation status
- Re-Allocated
- total cost
- Ksh 648,100
- estimate
- Ksh 648,100
Shindano Primary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Land 4 Hectares
- output
- Expanded
- implementation status
- Complete
- total cost
- Ksh 640,000
- estimate
- Ksh 640,000
Nyamathi Primary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Desk Project
- output
- Enhanced
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kahuho Secondary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2005
- action
- Generator Project
- output
- Generator Operating
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Gitare Water Project
- location
-
Karunga
(in Naivasha)
- year first funded
- 2004
- action
- On Going W/P
- output
- Increase Water Availability
- implementation status
- Stalled
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Thome Imani Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Ndabibi Central Primary School
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2006
- action
- 2 Classes
- output
- 2 Classroom
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Moi-Ndabi Chiefs Camp
- location
-
MoiNdabi
(in Naivasha)
- year first funded
- 2006
- action
- New Office &A.P Post Completion
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 300,000
Ngu Nyumu Primary School
- location
-
Maiella
(in Naivasha)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mugaa Dam
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2005
- action
- Construction Of A Dam
- output
- Increase Water Availability
- implementation status
- Stalled
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Karunga Chiefs Camp
- location
-
Karunga
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of A ChiefS Camp Office
- output
- Enhance Security & Administration
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 350,000
Kipruti Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2007
- action
- Purchase Of Pump & Piping
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Maua Primary School
- location
-
Olkaria
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction & Hall
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Shindano Primary School
- location
-
Malewa East
(in Naivasha)
- year first funded
- 2008
- action
- One Classroom Constructon
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Muteithia Polytechnic
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2008
- action
- Land Purchase
- output
- Polytechnic
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Langa Langa Secondary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2008
- action
- Land Purchase
- output
- Land
- implementation status
- Complete
- total cost
- Ksh 580,000
- estimate
- Ksh 580,000
Ngondi Water Project
- location
-
Maiella
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 575,000
- estimate
- Ksh 575,000
St Paul Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2004
- action
- Construction Toilets And Classroom
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 573,000
- estimate
- Ksh 573,000
Gatamaiyu Dispensary
- location
-
Malewa
(in Naivasha)
- year first funded
- 2004
- action
- Renovation Of The Dip
- output
- Improved Livestock Health
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Rubiri Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- 1 Std Classroom
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 350,000
Munanda Secondary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2004
- action
- Completion Of Office/Room &Labarotary.Classroom
- output
- Complete Office Room & Lab.
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 450,000
Mwega Water Project
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Booster Pump, Pipes &Ctr Panel
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 548,000
- estimate
- Ksh 548,000
Karate Patrol Base
- location
-
Malewa
(in Naivasha)
- year first funded
- 2006
- action
- Police Patrol Base Construction
- output
- Enhanced Security
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Malewa/Tarabete Water Project
- location
-
Malewa
(in Naivasha)
- year first funded
- 2006
- action
- Submersible Pump
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maraigushu Secondary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2004
- action
- Complete And Equip A Lab
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Milimani Water Project
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2004
- action
- Install Pump,Electricity & Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maiella Primary School
- location
-
Maiella
(in Naivasha)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maiella Township Primary School
- location
-
Maiella
(in Naivasha)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maiella Health Centre
- location
-
Maiella
(in Naivasha)
- year first funded
- 2003
- action
- Maternity Wing
- output
- Enhance Better Delivery Services
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
D Primary School
- location
-
Viwandani
(in Naivasha)
- year first funded
- 2007
- action
- Rehabilitation Of 20 Classes
- output
- 20Reh.
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gilgil Day Secondary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2007
- action
- Completion Of dining Hall
- output
- Std Dining Hall
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kamuyu Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2007
- action
- Renovation Of Classes
- output
- Renovated
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Shamba Boy Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2008
- action
- Rehabiltation Of Borehole
- output
- Borehole
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maraigushu Secondary School
- location
-
Maraigushu
(in Naivasha)
- year first funded
- 2009
- action
- Completion Of Administration Block
- output
- Office &Staff Accomodation
- implementation status
- Awaiting Disbursement 09/010
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Umoja Water Projectoljora
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Pipes
- output
- Enhance Water Supply
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Langa-Langa A/P
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- A.P Lines Project
- output
- Improved Security
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Kagumu Primary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2004
- action
- 1 Classroom& Desk
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gilgil Day Secondary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Dining Hall
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 650,000
Mbegi Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Purchase Of Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Jica Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Increase Water Availability
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ndabibi Primary School
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2005
- action
- 2 New Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mununga Primary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Text Books
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 480,000
- estimate
- Ksh 480,000
Rutere Primary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 480,000
- estimate
- Ksh 480,000
Masai Cultural Centre Water Project
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2006
- action
- Pipes & Plastic Tanks
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 470,000
- estimate
- Ksh 470,000
Mirera Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desk
- output
- 242 Desks
- implementation status
- Complete
- total cost
- Ksh 460,000
- estimate
- Ksh 460,000
Narasha Primary School
- location
-
Olkaria
(in Naivasha)
- year first funded
- 2008
- action
- Classroom & Toilets
- output
- Toilets ,Classroom
- implementation status
- Complete
- total cost
- Ksh 460,000
- estimate
- Ksh 460,000
Narasha Primary School
- location
-
Olkaria
(in Naivasha)
- year first funded
- 2008
- action
- Classroom& Toilets
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 460,000
- estimate
- Ksh 460,000
Satellite Primary School
- location
-
Maai Mahiu
(in Naivasha)
- year first funded
- 2008
- action
- One Classroom Constructon
- output
- Enhance Learning
- implementation status
- Stalled
- total cost
- Ksh 455,000
- estimate
- Ksh 455,000
Nyonjoro Secondary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2005
- action
- Classroom Completion
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Gilgil Motor Cycle Sheds
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2009
- action
- Construction Of Motor Cycle Sheds
- output
- Sheds
- implementation status
- Awaiting Disbursement 09/010
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Loldia Primary School
- location
-
Malewa West
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- 85% Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 400,000
Kikopey Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- 90% Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kamuyu Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2008
- action
- Purchase Of 3 Acre Land
- output
- Land
- implementation status
- Re-Allocated
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Longonot Township
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Completion Of Administration Block
- output
- Enhance Learning
- implementation status
- Stalled
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Naivasha Boarding Primary School
- location
-
Viwandani
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Std Classroom
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kiungu Borehole
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Water Tank
- output
- Increase Water Availability
- implementation status
- Complete & In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Miti Mingi Chiefs Office
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2006
- action
- Construction Of Office Block
- output
- Improved Services
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Ole Sultan Primary School
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Ndoroto Primary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2008
- action
- Rehabilitation Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 439,531
- estimate
- Ksh 439,531
Mithuri Highway /Kabati
- location
-
Biashara
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Culvert
- output
- Culvert
- implementation status
- On Going
- total cost
- Ksh 436,125
- estimate
- Ksh 436,125
Munyu Ihundu Police Post
- location
-
Longonot
(in Naivasha)
- year first funded
- 2005
- action
- Office Block
- output
- Enhance Learning
- implementation status
- On Going
- total cost
- Ksh 430,000
- estimate
- Ksh 430,000
Nyamathi Water Project
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Purchase Of Pumps
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 430,000
- estimate
- Ksh 430,000
Statrick Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- Classrooms
- implementation status
- Awaiting Disbursement 09/010
- total cost
- Ksh 430,000
- estimate
- Ksh 430,000
Viwandani Tree Planting
- location
-
Viwandani
(in Naivasha)
- year first funded
- 2008
- action
- Planting Trees
- output
- Environment Conservation Input 2000 Trees
- implementation status
- Output 1870 Trees
- total cost
- Ksh 430,000
- estimate
- Ksh 430,000
Longonot D
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2008
- action
- One Classroom Constructon
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 420,000
- estimate
- Ksh 350,000
Kisato Ecd
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- 90% Complete
- total cost
- Ksh 420,000
- estimate
- Ksh 420,000
Malewa Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- 1 Std Classroom
- implementation status
- On Going
- total cost
- Ksh 420,000
- estimate
- Ksh 270,000
Kamarura Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2005
- action
- Purchaseof Waterconnection Accessories
- output
- Increase Water Availability
- implementation status
- Complete & In Use
- total cost
- Ksh 420,000
- estimate
- Ksh 350,000
Naivasha Highway Primary School
- location
-
Biashara
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- On-Going
- total cost
- Ksh 420,000
- estimate
- Ksh 350,000
Ngecho Primary School
- location
-
Morindati
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- On-Going
- total cost
- Ksh 420,000
- estimate
- Ksh 350,000
Makongo Primary School
- location
-
Mitimingi
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 409,292
- estimate
- Ksh 339,292
Ndabibi Central Primary School
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- 1 Std Classroom
- implementation status
- On Going
- total cost
- Ksh 405,000
- estimate
- Ksh 350,000
Ngunyumu Primary School
- location
-
Maiella
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kasambara Primary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction of Classroom & Desk
- output
- 26 Desk,1 Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Maiella Road
- location
-
Maiella
(in Naivasha)
- year first funded
- 2007
- action
- Grading
- output
- Reduce Walking Distance
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Maiella Township Sec
- location
-
Maiella
(in Naivasha)
- year first funded
- 2007
- action
- Completion Of Three Classes
- output
- Completed Std Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Karunga Primary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2007
- action
- Renovation Of Classrooms
- output
- Renovated
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mwimbe S-H G Water Project
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nyakairu Primary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Milimani Primary School
- location
-
Lakeview
(in Naivasha)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Decongest Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mbombo Primary School
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2004
- action
- Completion Of A Class
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Meli Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
Jica Police Post
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Astu
- output
- Enhanced Security
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 350,000
Maiella Health Centre
- location
-
Maiella
(in Naivasha)
- year first funded
- 2008
- action
- Construction Of A Lab
- output
- Improve Community Health
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Muteithia Polytechnic
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2008
- action
- Fencing
- output
- Polytechnic
- implementation status
- Complete
- total cost
- Ksh 385,135
- estimate
- Ksh 385,135
Muriricua Primary School
- location
-
Mitimingi
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of A Class
- output
- 1 Std Classroom
- implementation status
- On Going
- total cost
- Ksh 380,000
- estimate
- Ksh 300,000
Naivasha East W
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2007
- action
- Purchase Of Tank And Piping
- output
- Tank,Pipped Water
- implementation status
- Stalled
- total cost
- Ksh 380,000
- estimate
- Ksh 380,000
Kekopey Police Station
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Toilet Staff Houses Project
- output
- Enhanced Security
- implementation status
- Complete
- total cost
- Ksh 370,000
- estimate
- Ksh 370,000
Kabati/Site Bridge
- location
-
Biashara
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of The Bridge
- output
- Reduce Walking Distance
- implementation status
- Complete
- total cost
- Ksh 355,000
- estimate
- Ksh 355,000
Kabati Primary School
- location
-
Biashara
(in Naivasha)
- year first funded
- 2007
- action
- Renovation Of Classrooms
- output
- Renovated
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Ngondi Primary School
- location
-
Maiella
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Ndibai Primary School
- location
-
Mitimingi
(in Naivasha)
- year first funded
- 2008
- action
- Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kabati Primary School
- location
-
Biashara
(in Naivasha)
- year first funded
- 2008
- action
- Construction Of Ecd
- output
- Enhance Learning
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Maraigushu Secondary School
- location
-
Maraigushu
(in Naivasha)
- year first funded
- 2008
- action
- Construction Of One Classroom
- output
- Enhance Education
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Karagita Dispensary
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2007
- action
- Purchase Of Water Pump
- output
- Water Pump
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Thugunui Secondary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- 1 Std Classroom
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gilgil Township
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- I Std. Classroom
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kangare Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gilgil Special
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Workshop Project
- output
- Enlighted Community
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Murindu Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Purchase Of Sch Land
- output
- Enhanced Learning
- implementation status
- Complete & In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Gilgil Library Services
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Purchase Of Books &Renoatxn Furnitures
- output
- Enhance Exam Peformance
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kanorero Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- On Going
- total cost
- Ksh 340,000
- estimate
- Ksh 300,000
Longonot Centre
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Connecting Bridge & Gabions
- output
- Reduce Walking Distance
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiambogo Secondary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Std.Ablution Block
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiambogo Primary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Construction of Of Ten Units Of Toilets
- output
- Std.Toilets Block
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngecho Secondary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Land
- output
- School Expansion
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kinamba Chiefs
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- ChiefS Camp Completion
- output
- Enhanced Administration
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Karai Water Project
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Narasha Primary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Karai Primary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kihoto Water Project
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2006
- action
- Purchase Of Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Thugunui Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- New Classroom
- output
- One Classroom
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Songoloi Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- New Classroom
- output
- One Classroom
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nagumu Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2004
- action
- Completion Of A Classroom
- output
- 1 Classroom
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Cypress Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Thome Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Improved Learning Enviro
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gilgil D Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Enhanced Learning
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
St. Patricks Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Enhanced Learning
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngecho Primary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2004
- action
- Completion Of A Class
- output
- Enhance Learning
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ngeteti Primary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2004
- action
- Completion Of A Class
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Karunga Health Centre
- location
-
Karunga
(in Naivasha)
- year first funded
- 2003
- action
- Rehabilitation Of Bld Into Health Center
- output
- Enhanced Health
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mitimingi Secondary School
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2004
- action
- Twin Classroom Project
- output
- 2 Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mugaa Primary School
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Makongo Primary School
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kiambogo Township Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2005
- action
- Completion Of A Class
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oljorai Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2004
- action
- Classroom Project
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kwa Shati Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Morop Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2004
- action
- Classroom Project
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kapkures Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- Stalled-90% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lady Ann Dalemere
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Dormitory
- output
- Enhanced Learning
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Milimani Water Project
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2009
- action
- Laying Down Pipes 2 Km
- output
- Distribution Of Water
- implementation status
- Awaiting Disbursement 09/010
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lakeview Primary School
- location
-
Lakeview
(in Naivasha)
- year first funded
- 2008
- action
- Rehabilitation Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kambi Somali Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Rehab. Of Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 290,000
- estimate
- Ksh 140,000
Kikopey Drainage
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2009
- action
- Draining Of Spring Water
- output
- Improved Sanitary
- implementation status
- Complete
- total cost
- Ksh 272,000
- estimate
- Ksh 272,000
N Gilgil Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2007
- action
- Desk& Classes Renovation &Desks Construction
- output
- 26 Desks
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Nyonjoro Secondary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2007
- action
- Completion Of Classrooms
- output
- Completed Std Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Milimani Primary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2004
- action
- Desk And Toilets
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Central Primary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2005
- action
- Water Project
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Corner Water Project
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Of Pipes
- output
- Laid Pipes
- implementation status
- Complete & In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Miti Mingi Primary School
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- I Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Namcha Dispensary
- location
-
Maai Mahiu
(in Naivasha)
- year first funded
- 2008
- action
- Completion Of Dispensary
- output
- Enhance Health
- implementation status
- Stalled
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Longonot Deb Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2008
- action
- Construction Of Toilets
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mwiciringiri Secondary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 241,710
- estimate
- Ksh 241,710
Good Faith Health Centre
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2004
- action
- Complete Of A Bldg
- output
- Enhance Health
- implementation status
- Stalled
- total cost
- Ksh 228,000
- estimate
- Ksh 228,000
Library /Viwandani Road
- location
-
Viwandani
(in Naivasha)
- year first funded
- 2008
- action
- Road Grading
- output
- Graded Roads
- implementation status
- Complete
- total cost
- Ksh 225,000
- estimate
- Ksh 225,000
Kasambara Primary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of A Toilets
- output
- Std.Toilets Block
- implementation status
- Complete
- total cost
- Ksh 223,118
- estimate
- Ksh 223,118
Gikindu Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 218,000
- estimate
- Ksh 218,000
Lake Elementaita Secondary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Std.Ablution Block
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwiciringiri Primary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2006
- action
- Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiptagwanyi Health Centre
- location
-
Miti Mingi
(in Naivasha)
- year first funded
- 2004
- action
- Purchase Of Equipment
- output
- Enhanced
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nuthu Cattle Dip
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Dip Rehab & Pump Repair
- output
- Increase Water
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Manera Primary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2005
- action
- Renovation
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ihindu Ecd Project
- location
-
Longonot
(in Naivasha)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Karema Secondary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2003
- action
- Classroom And Land
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kipkonyo Primary School
- location
-
MoiNdabi
(in Naivasha)
- year first funded
- 2006
- action
- New Toilets
- output
- Enhanced Learning
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gatamaiyu Water Project
- location
-
Malewa
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Of Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyondia Water Project
- location
-
Malewa
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Of Plastic Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kamayu Primary School
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Class Renovation
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Twendane Primary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Classroom
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiambogo A Post
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2005
- action
- A.P Houses
- output
- Enhance Security
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Tangi Tano Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2005
- action
- New Classroom
- output
- Enhance Learning
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Loldia Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- School Desk
- output
- 105 Desks
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Oljorai Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Std.Ablution Block
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St Johns Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Std.Ablution Block
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kabati/Site Road
- location
-
Biashara
(in Naivasha)
- year first funded
- 2008
- action
- Fixing Culverts
- output
- Culverts
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kipkunyo Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2008
- action
- Pump House
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Rutere Primary School
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2008
- action
- Toilets Construction
- output
- Toilets
- implementation status
- 85% On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyondia Primary School
- location
-
Malewa East
(in Naivasha)
- year first funded
- 2008
- action
- Classroom Construction
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Thugunui Primary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 105 Desks
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kinungi Primary School
- location
-
Mwiciringiri
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 105 Desks
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Munanda Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 105 Desks
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Huruma Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2007
- action
- Piping Water From Kipkonyo To Huruma
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ole Sultan Chiefs Camp
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Completion Of Houses
- output
- Completed Houses
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Munyu Primary School
- location
-
Lngonot
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Std.Ablution Block
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Karati Mugumoini Dam
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2006
- action
- Expansion
- output
- Increase Water Availability
- implementation status
- Stalled
- total cost
- Ksh 165,000
- estimate
- Ksh 165,000
St Johns Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2004
- action
- Construction Of Toilets Block, Desks
- output
- Enhanced
- implementation status
- Complete
- total cost
- Ksh 160,940
- estimate
- Ksh 160,940
Naivasha East Dairy Farmers Shg
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- A.I Kit Purchase
- output
- Improved Livestock Health
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Gitare Chiefs Office
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Office Construction
- output
- Conducive Working Envi. Administration
- implementation status
- Complete
- total cost
- Ksh 156,815
- estimate
- Ksh 156,815
Munengi Primary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2004
- action
- Toilet Project
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Gitare Cattle Dip
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Rehabilitation Of Cattle Dip
- output
- Improve Livestock Health
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nyakinyua Primary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2005
- action
- Class Renovation And Toilets
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Twendane Primary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Std.Ablution Block
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kagumu Primary School
- location
-
Morindati
(in Naivasha)
- year first funded
- 2008
- action
- Toilets Construction
- output
- Toilets
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Tangi Tatu Water Project
- location
-
MoiNdabi
(in Naivasha)
- year first funded
- 2006
- action
- Water Tanks
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Gitare Primary School
- location
-
Karunga
(in Naivasha)
- year first funded
- 2006
- action
- Desk
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kasambara Cattle Dip
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Rehabilitation Of A Dip
- output
- Improved L/Stockhealthh
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kiungururia Cattle Dip
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Rehabilitation Of Cattle Dip
- output
- Improvelivestock Health
- implementation status
- Complete & In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Maai Mahiu Primary School
- location
-
Maai Mahiu
(in Naivasha)
- year first funded
- 2004
- action
- Classroom Renovation
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kamuyu Water Project
- location
-
Hellsgate
(in Naivasha)
- year first funded
- 2008
- action
- Piping
- output
- Piped Water
- implementation status
- Stalled
- total cost
- Ksh 132,095
- estimate
- Ksh 132,095
Kinungi Primary School
- location
-
Maraigushu
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Toilets
- output
- Std.Ablution Block
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Kiu Water Project
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2006
- action
- Repair Of Generator
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 128,000
- estimate
- Ksh 128,000
Karima Primary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2005
- action
- Classes Reflooring
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 126,000
- estimate
- Ksh 126,000
Mirera Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2007
- action
- School Desk & Construction
- output
- Desks
- implementation status
- Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Ngeya Primary School
- location
-
Maai Mahiu
(in Naivasha)
- year first funded
- 2009
- action
- Rehabilitation Of School Toilets
- output
- Decongest Toilets
- implementation status
- 80% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
D Primary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2004
- action
- Guttering
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gakiu Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2006
- action
- Water Connection To The Main Pipe
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nagumu Water Project
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Of Pipes
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kipkonyo Water Project
- location
-
MoiNdabi
(in Naivasha)
- year first funded
- 2006
- action
- Engine Repair
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Corner Water Project
- location
-
Malewa
(in Naivasha)
- year first funded
- 2003
- action
- Construction of Concrete Water Tank
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Marula Primary School
- location
-
Malewa
(in Naivasha)
- year first funded
- 2007
- action
- School Desk
- output
- Enhance Learning
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ndibithi Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2007
- action
- Power Connection
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kariandusi Primary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 53 Desks
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiungururia Primary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 53 Desks
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Murindu Primary School
- location
-
Kiambogo
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 53 Desks
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiambogo Primary School
- location
-
Longonot
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 53 Desks
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Moi Ndabi Water Project
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2008
- action
- Power Connection
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kongoni Police Post
- location
-
Ndabibi
(in Naivasha)
- year first funded
- 2008
- action
- Block Toilets
- output
- Block Toilets
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kirima Conservation Project
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2006
- action
- Tree Nursery
- output
- Improved Environment
- implementation status
- Complete
- total cost
- Ksh 98,911
- estimate
- Ksh 98,911
Kabati Primary School
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2005
- action
- Toilets
- output
- Enhanced Learning
- implementation status
- Complete
- total cost
- Ksh 94,000
- estimate
- Ksh 94,000
Kamathatha Primary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 41 Desks
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Nyamathi Dispensary
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Painting Drainage &Fencing
- output
- Increase Water Availability
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kiungururia Primary School
- location
-
Gilgil
(in Naivasha)
- year first funded
- 2003
- action
- Purchase Water Tank, Flooring C/R
- output
- Increase Water Availability
- implementation status
- Complete & In Use
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Echariria Primary School
- location
-
Mbaruk
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 37 Desks
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Ngondi Primary School
- location
-
Maiella
(in Naivasha)
- year first funded
- 2007
- action
- Construction Of Desks
- output
- 37 Desks
- implementation status
- Complete
- total cost
- Ksh 69,860
- estimate
- Ksh 69,860
Mirera Primary School
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2008
- action
- Power Connection
- output
- Power
- implementation status
- Re-Allocation
- total cost
- Ksh 69,000
- estimate
- Ksh 69,000
Kiu Water Project
- location
-
HellS Gate
(in Naivasha)
- year first funded
- 2007
- action
- Purchase Of Avr
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 67,000
- estimate
- Ksh 67,000
Kinamba A P Post
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2004
- action
- Roofing Of The Post.
- output
- Improve Security
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Njonjoro Bridge
- location
-
Naivasha East
(in Naivasha)
- year first funded
- 2004
- action
- Complete And Construction of The Bridge
- output
- Reduce The Walking Distance
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Naivasha G Prison
- location
-
Naivasha Town
(in Naivasha)
- year first funded
- 2004
- action
- Purchase Of Examination
- output
- Enhance Exam Performance
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Nyamathi Cattle Dip
- location
-
Hells Gate
(in Naivasha)
- year first funded
- 2005
- action
- Rehabilitation Of Cattle Dip
- output
- Improvelivestock Health
- implementation status
- Complete
- total cost
- Ksh 100
- estimate
- Ksh 100,000
Langa Langa Water Project
- location
-
Karunga
(in Naivasha)
- action
- n/a
- output
- -
- implementation status
- More funds needed
- total cost
- Ksh 0
- estimate
- Ksh 0