The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Nakuru Town

Free Area Market

location
Lanet (in Nakuru Town)
year first funded
2006
action
Purchase Of Land And Costrauct A Modern Market
output
Tp Provide A Modern Market Facility
implementation status
The Project Has Been Constructed And Roofing Is In Progress
total cost
Ksh 14,000,000
estimate
Ksh 0

Mwariki East Borehole

location
Lanet (in Nakuru Town)
year first funded
2005
action
Drilling Of A Borehole, Water Pump House,Water Tank Construction & Facilitate Water Pipes Reticulation.
output
Boost Water Supply In The Area Due To Increased Settlement
implementation status
Borehole Drilled And Construction Of A Water Reservior Constructed.Water Pipe Reticulation In Progress.
total cost
Ksh 4,700,000
estimate
Ksh 5,000,000

Muguga Community Borehole

location
Lanet (in Nakuru Town)
year first funded
2006
action
Rehabilitation Of Borehole, Electrification,Construction Of Water Pump, Reservoir Tank, Distribution Kiosks & Piping
output
To Deal With Acute Shortage Of Water In The Area
implementation status
Borehole Rehabilitation,Cosntruction Of A Pump House,Water Pump Replacement Has Been Done.Construction Of A Water Reservior As Well As Piping Going On.The Public Is Currently Accessing Water From The Facility.
total cost
Ksh 4,500,000
estimate
Ksh 5,000,000

Mwariki East Secondary School

location
Lanet (in Nakuru Town)
year first funded
2005
action
Costruction Of Classrooms For Anew Secondary School.
output
To Enable The Residents Access Secondary Education In The Area Especially For The Dayscholars In The Area.
implementation status
A One Floor Storied Block Of Classes Constructed With Three Ground Floor Classrooms Constructed To Completion.
total cost
Ksh 4,000,000
estimate
Ksh 0

Muguga Primary School

location
Lanet (in Nakuru Town)
year first funded
2006
action
Construction Of Permanent Storied Classrooms To Replace The Semipermanent Ones
output
To Replace The Semipermanent Classrooms.
implementation status
The Project Is On Going, With Works On First Floor Having Commenced.
total cost
Ksh 4,000,000
estimate
Ksh 7,000,000

Kiratina Primary School

location
Lanet (in Nakuru Town)
year first funded
2007
action
Purchase Of Land For A New Primary School.
output
Putting Up A Primary School In The Area To Curb Incidences Of Accidents Involving Pupils Crosing The Nakuru Nairobi Highway To Access Education Facilities
implementation status
Not Yet Started
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Kapkures Dispensary

location
(in Nakuru Town)
year first funded
2008
action
Purchase Of Land For The Expansion Of The Dispensary
output
Increased Space For Expansion Of The Dispensary To Construct A Maternity Wing
implementation status
Land Bought
total cost
Ksh 3,400,000
estimate
Ksh 0

London Gioto Borehole

location
Kaptembwo (in Nakuru Town)
year first funded
2006
action
Drilling Of A Borehole, Water Pump House,Water Tank Construction & Facilitate Water Pipes Reticulation.
output
To Ease The Acute Shortage Of Water In The Area
implementation status
Water Tank Has Already Been Constructed
total cost
Ksh 3,300,000
estimate
Ksh 3,500,000

Nakuru Teachers Police Post

location
Lanet (in Nakuru Town)
year first funded
2004
action
Purchase Of Land To Expand On The Administration Block As Well As Put Officers Quarters
output
To Deal With Insecurity In The Kiti,Teachers And Its Environs.
implementation status
Two Adjacent Plots Purchased,The Extension Has Been Constructed Awaiting Plastering.
total cost
Ksh 3,013,624
estimate
Ksh 0

Lalwet Dispensary

location
Barut (in Nakuru Town)
year first funded
2004
action
Construction Of A Dispensaryblock
output
To Provide Health Care To The Residents Who Have Been Going A Long Distance For Health Care
implementation status
Complete And In Use
total cost
Ksh 2,549,120
estimate
Ksh 2,500,000

Mwariki East Dispensary

location
Lanet (in Nakuru Town)
year first funded
2005
action
Construction of A Dispensary Block,Septic Tank And Fencing.
output
To Provide A Health Facility Easily Accesible By Residents At A Short Distance.
implementation status
Eight Dispensary Rooms Have Been Completely Constructed And In Use.
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Section /Dog Section

location
Lanet (in Nakuru Town)
year first funded
2007
action
Grading And Repair Of Section 58/Dogsection
output
Upgrade Of The Road To Enhance Ease Of Movement In The Area And To Curb Dranage Problems.
implementation status
Phase 1 Of The Project Completed.
total cost
Ksh 2,074,260
estimate
Ksh 2,074,260

Provincial General Hospital

location
(in Nakuru Town)
year first funded
2008
action
Construction Of A Paediatric Ward
output
To Provide A Ward That Will Decongest The Paediatric Section In The Hospital
implementation status
Construction Is At Lintel Level
total cost
Ksh 2,000,000
estimate
Ksh 0

Nyamarutu Water Project

location
Lanet (in Nakuru Town)
year first funded
2007
action
Purchase Of Land,Construction Of A Water Tank And Piping
output
To Enable Water Reticulation More Easier
implementation status
Water Tank Has Already Been Constructed
total cost
Ksh 1,836,897
estimate
Ksh 2,000,000

Ainoptich Borehole

location
Barut (in Nakuru Town)
year first funded
2004
action
Rehabilitation Works At Borehole + Construction of A Water Reservoir & Purchase Of Booster Pump & Piping
output
To Enable Improved Reticulation And Output At The Borehole
implementation status
Rehabilitation Work Done.
total cost
Ksh 1,771,790
estimate
Ksh 1,900,000

Free Area Market

location
Lanet (in Nakuru Town)
year first funded
2009
action
Purchase Of Land And Costrauct A Modern Market
output
Tp Provide A Modern Market Facility
implementation status
The Project Has Been Constructed And Roofing Is In Progress
total cost
Ksh 1,538,000
estimate
Ksh 0

Mirugi Kariuki Primary School

location
Muguga (in Nakuru Town)
year first funded
2009
action
Completion Of Classrooms By Floor Screeeding, Roofing And Walling.
output
To Decongest The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 1,500,000
estimate
Ksh 0

Section Market Stalls

location
Lanet (in Nakuru Town)
year first funded
2008
action
Construction Of Sheds
output
Provide Better Working Conditions For The Hawkers.
implementation status
not known
total cost
Ksh 1,500,000
estimate
Ksh 0

Proposed Nakuru Polytechnic

location
Lanet (in Nakuru Town)
year first funded
2008
action
To Costruct Infrastructure For A Polytechnic(New)
output
To Provide Technical Training To Youths At Cheaper Rates.
implementation status
Not Started
total cost
Ksh 1,500,000
estimate
Ksh 0

Nairobi Road Secondary School

location
Lanet (in Nakuru Town)
year first funded
2008
action
Construction Of Classrooms To Start A Secondary School
output
A New Secondary School To Cater For The Needs Of The Rising Population I The Area
implementation status
The Construction Of Clasrooms On Going With Three Classrooms Past Lintel Level
total cost
Ksh 1,450,000
estimate
Ksh 7,000,000

Kamaasai Water Poject

location
Barut (in Nakuru Town)
year first funded
2007
action
And Covering Of Water Tank And Piping
output
To Ease Water Problem By Ensuring Clean Water Provision
implementation status
The Tank Has Been Repaired And Covered.The Use Of The Tank Has Already Commisioned And People Can Access Water From The Tank. Water Piping Is In Progress.
total cost
Ksh 1,300,000
estimate
Ksh 1,616,000

Pondamali Sewerage

location
Kaptembwo (in Nakuru Town)
year first funded
2006
action
Repair Of The Sewerage System
output
To Curb The Problem Of Sewerage Blockage And Overflow To The Adjacent Estate
implementation status
The Work Has Been Done But Most Of It Has Been Washed By Rainfall Ater Run Off
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Mwariki/Rhoda Secondary School

location
Kaptembwo (in Nakuru Town)
year first funded
2007
action
Construction Of Classrooms
output
To Start A New Secondary School In Rhoda Area
implementation status
Not Yet Started
total cost
Ksh 1,300,000
estimate
Ksh 0

Mogoon Secondary School

location
Lanet (in Nakuru Town)
year first funded
2004
action
Construction Of Two Classroom
output
To Cater For Increased Enrollment As Well As Phasing Out Dilapidated Facilities
implementation status
Two Completed
total cost
Ksh 1,034,000
estimate
Ksh 1,034,000

Ndimu Primary School

location
Lanet (in Nakuru Town)
year first funded
2004
action
Construction Of Three Class
output
To Cater For Increased Enrollment As Well As Phasing Out Dilapidated Facilities
implementation status
Two Clasrooms Complete.
total cost
Ksh 1,034,000
estimate
Ksh 1,034,000

Hilllcrest Secondary School

location
Lanet (in Nakuru Town)
year first funded
2004
action
Construction Of Three Classroom
output
To Decongestate The Available Facilities
implementation status
Two Classrooms Completed And In Use
total cost
Ksh 1,034,000
estimate
Ksh 285,000

Nakuru West Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2004
action
Construction Of Three Classrooms And A Headteachers Office
output
To Cater For Increased Enrollment As Well As Phasing Out Dilapidated Facilities
implementation status
Two Classrooms And A Headtecher Office Completed.The Third Clssroom Constructed But Requires Interior Wall Finishing
total cost
Ksh 1,028,000
estimate
Ksh 1,028,000

Barut Chiefs Office

location
Barut (in Nakuru Town)
year first funded
2004
action
To Finish The Stalled Chiefs Office
output
To Have The Chiefs Office Completed To Enhance Service Provision To The Locals
implementation status
Completed And In Use
total cost
Ksh 980,155
estimate
Ksh 480,155

Kelelwet Seconday School

location
Barut (in Nakuru Town)
year first funded
2009
action
Construction Of 2 Classrooms From The Ground
output
To Decongest The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 840,000
estimate
Ksh 0

Kaptembwo Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2005
action
Completio Of 3 Classrooms and block Of toilets
output
To Decongest The Available Facilities And To Phase Out The Semipermanent Classrooms.
implementation status
Two Classrooms And Thetoilet Block Complete And In Use.
total cost
Ksh 800,000
estimate
Ksh 1,100,000

LAnet School

location
Lanet (in Nakuru Town)
year first funded
2006
action
Construction Of A Classroom And An Administration Block
output
To Decongest The Available Classrooms And To Enable Enrollment Of More Pupils As Well As Provision Of A Modern Staff Room
implementation status
The Classroom Is Complete And In Use.Work On The Staffroom Is In Progress
total cost
Ksh 785,000
estimate
Ksh 785,000

Madaraka Primary School

location
(in Nakuru Town)
year first funded
2008
action
Construction Of Collapsible A Hall
output
For Use As A School Hall And Use By Public In Need O Hall Services
implementation status
Ongoing
total cost
Ksh 750,000
estimate
Ksh 750,000

Gioto-Nakuru Dumping Site

location
Kaptembwo (in Nakuru Town)
year first funded
2004
action
To Fence Off The Dumping Site To Allow For Rehabilitation Works As Well As Planting Tree Seedlings.
output
Rehabilitation Of This Site Used For Garbage Dumping, Turn It To A Green Green Park
implementation status
The Fencin Has Been Done As Well As The Sedlings Have Been Planted.However The Fence Has Been Vandalised
total cost
Ksh 750,000
estimate
Ksh 2,000,000

Uhuru Secondary School

location
(in Nakuru Town)
year first funded
2004
action
Construction Of Two Classroom
output
To Decongest The Available Facilities And To Enable More Enrollment Of Students
implementation status
Complete And In Use
total cost
Ksh 728,000
estimate
Ksh 364,000

Kaptembwo-Kapkures Bridge

location
(in Nakuru Town)
year first funded
2004
action
Construction Of A Bridge And Removal Of Logs That Were Being Used For The River Crossing
output
To Connect Nakuru-Njoro Road, Open Up The Area And Ease Transportation.
implementation status
Complete And In Use
total cost
Ksh 700,000
estimate
Ksh 0

Hyrax Sewerage

location
Lanet (in Nakuru Town)
year first funded
2006
action
Completion Of Hyrax Sewerage System Which Was Started By The Community.
output
To Enhance Sanitation In The Area By Way Of A Sewerage System
implementation status
Completed
total cost
Ksh 600,000
estimate
Ksh 700,000

Section /Naka

location
Lanet (in Nakuru Town)
year first funded
2006
action
Grading And Repair Of Section 58/Dogsection
output
Upgrade Of The Road To Enhance Ease Of Movement In The Area And To Curb Dranage Problems.
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 500,000

Heshima Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2005
action
Completion Of Multi Purpose Hall Started By Parents
output
For Use As A School Hall And Use By Public In Need O Hall Services
implementation status
The Hall Is In Use But Requires Plumbing And Minor Interior Finishing.
total cost
Ksh 500,000
estimate
Ksh 550,000

Ingobor Primary School

location
Barut (in Nakuru Town)
year first funded
2006
action
Construction Of An Administration Block
output
To Provide Staffrooms For The Staff
implementation status
Completed And In Use
total cost
Ksh 500,000
estimate
Ksh 0

Nakuru High Boys

location
Lanet (in Nakuru Town)
year first funded
2007
action
Purhase Of Water Tanks And Installation Of A Water Harvesting System
output
To Ease The Problem Of Water Storage In The School
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Muguga Chief's Office

location
Lanet (in Nakuru Town)
year first funded
2008
action
Construction Of A Chief'S Office
output
To Beef Up Security In The Area
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 500,000

Madaraka Primary School

location
Lanet (in Nakuru Town)
year first funded
2009
action
Completion Of A Hall Cum Classroom
output
For Use As A School Hall And Use By Public In Need O Hall Services
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 0

Tumaini Childrens Home

location
Barut (in Nakuru Town)
year first funded
2009
action
Construction Of A Tution Room
output
To Accommodate Children Who Are Orphans In The Socities
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 0

Moi Children Home

location
Viwanda (in Nakuru Town)
year first funded
2009
action
Construction Of A Tution Room
output
To Accommodate Children Who Are Orphans In The Socities
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 0

Kamnandi Water Project

location
Barut (in Nakuru Town)
year first funded
2009
action
Buying Of Reservior/ Supply Tanks And Raised Platform
output
To Enable Improved Reticulation And Output At The Borehole
implementation status
Funds Not Released
total cost
Ksh 500,000
estimate
Ksh 0

Boiboyet Water Project

location
Barut (in Nakuru Town)
year first funded
2009
action
Construction Of Two Water Kiosks
output
To Deal With Acute Shortage Of Water In The Area
implementation status
Funds Not Released
total cost
Ksh 500,000
estimate
Ksh 0

Muguga Chief's Office

location
Lanet (in Nakuru Town)
year first funded
2009
action
Construction Of A Chief'S Office
output
To Beef Up Security In The Area
implementation status
Funds Not Released
total cost
Ksh 450,000
estimate
Ksh 0

Nakuru East Primary School

location
Lanet (in Nakuru Town)
year first funded
2006
action
Construction Of A Staffroom
output
A Facility To Hose The Shool Staff
implementation status
Completed
total cost
Ksh 450,000
estimate
Ksh 450,000

Barut Chiefs Office

location
Barut (in Nakuru Town)
year first funded
2009
action
To Finish The Stalled Chiefs Office
output
To Have The Chiefs Office Completed To Enhance Service Provision To The Locals
implementation status
Completed And In Use
total cost
Ksh 450,000
estimate
Ksh 0

St. Marys Secondary School

location
Baharini (in Nakuru Town)
year first funded
2009
action
Construction Of A Classroom
output
To Decongest The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 420,000
estimate
Ksh 0

Nakuru Central Secondary School

location
Baharini (in Nakuru Town)
year first funded
2009
action
Construction Of A Classroom
output
To Decongest The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 420,000
estimate
Ksh 0

Uhuru Secondary School

location
Viwanda (in Nakuru Town)
year first funded
2009
action
Construction Of A Classroom
output
To Decongest The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 420,000
estimate
Ksh 0

Tumaini Secondary School

location
Kaptembwo (in Nakuru Town)
year first funded
2009
action
Construction Of A Classroom
output
To Decongest The Available Facilities
implementation status
Funds Not Released
total cost
Ksh 420,000
estimate
Ksh 0

Mogoon Secondary School

location
Barut (in Nakuru Town)
year first funded
2009
action
Construction Of A Classroom
output
To Decongest The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 420,000
estimate
Ksh 0

Teachers Police Post

location
Lanet (in Nakuru Town)
year first funded
2009
action
Completion Of The Police Administration
output
To Deal With Insecurity In The Kiti,Teachers And Its Environs.
implementation status
Funds Not Released
total cost
Ksh 400,000
estimate
Ksh 0

Kigonor Primary School

location
Barut (in Nakuru Town)
year first funded
2008
action
Construction Of A Classroom
output
To Decongestate The Available Facilities
implementation status
Ongoing
total cost
Ksh 385,000
estimate
Ksh 0

Tulwob Kugos A Project

location
Barut (in Nakuru Town)
year first funded
2008
action
Rehabilitation And Purchase Of Equipment For An Artificial Insermination Centre At Lalwet.
output
To Improve On Ais Services Across Lalwet And To Improve Livestock Breeds
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Kapkures Health Centre

location
Barut (in Nakuru Town)
year first funded
2009
action
Being Legal & Conveyance Fee For Land Trasfer Fee
output
To Provide Health Care To The Residents Who Have Been Going A Long Distance For Health Care
implementation status
Complete And In Use
total cost
Ksh 330,000
estimate
Ksh 0

LAnet School

location
Lanet (in Nakuru Town)
year first funded
2009
action
Completion Of Administration Block
output
To Provide Staffrooms For The Staff
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 0

Menengai Primary School

location
Lanet (in Nakuru Town)
year first funded
2006
action
Constructio Of Three Stair Cases
output
To Facilitate Use Of Facility
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Lion Hill Primary School

location
Lanet (in Nakuru Town)
year first funded
2005
action
Construction Of An Administration Block.
output
To Provide A Habitable Area For Use By School Staff
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 540,000

Kelelwet Secondary School

location
Barut (in Nakuru Town)
year first funded
2007
action
Construction Of A Classroom
output
To Increase Classrooms To Cater For Further Enrolment In The School.
implementation status
Complete And In Use.The Project Requires Minor Finishing
total cost
Ksh 300,000
estimate
Ksh 300,000

Kibowen Komen Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2007
action
Construction Of A Classroom
output
To Phase Out Dilapidated And Collapsing Classrooms.
implementation status
Completed And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kelelwet Cattle Dip

location
Barut (in Nakuru Town)
year first funded
2009
action
Rehabilitation Of Cattle Dip
output
-
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 0

Barut Primary School

location
Barut (in Nakuru Town)
year first funded
2006
action
Construction Of A Classroom
output
To Decongestate The Available Facilities
implementation status
Completed And In Use
total cost
Ksh 285,000
estimate
Ksh 285,000

Nakuru Teachers

location
Lanet (in Nakuru Town)
year first funded
2006
action
Construction Of A Classroom
output
To Decongest The Available Classrooms.
implementation status
Complete And In Use
total cost
Ksh 285,000
estimate
Ksh 285,000

Nairobi Road Primary School

location
Lanet (in Nakuru Town)
year first funded
2006
action
Construction Of A Classroom
output
To Decongestate The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 285,000
estimate
Ksh 285,000

Muslim Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2006
action
Construction Of A Classroom
output
To Phase Ou The Semipermanent Classrooms
implementation status
The Classroom Has Been Constructed And Requires Nternal Finishing Fo It To Be Put In Use
total cost
Ksh 285,000
estimate
Ksh 285,000

Ingobor Primary School

location
Barut (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Pit Latrine Block Construction
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities As Well Improving On Sanitation
implementation status
School Desks Procure & Pit Latrine Block Construction On Going
total cost
Ksh 280,800
estimate
Ksh 80,800

Nakuru West Secondary School

location
Kaptembwo (in Nakuru Town)
year first funded
2009
action
Upgrading Of The Staffroom
output
Better Working Areas For Teachers
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 0

Hyrax Primary School

location
Lanet (in Nakuru Town)
year first funded
2006
action
Construction Of A Toilet Block
output
To Decongestate The Available Facilities
implementation status
Completed And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Jamhuri Primary School

location
Lanet (in Nakuru Town)
year first funded
2006
action
Construction Of A Toilet Block
output
To Decongestate The Available Facilities
implementation status
Completed And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kiptenden Primary School

location
Barut (in Nakuru Town)
year first funded
2009
action
Upgrading Of The Staffroom
output
Better Working Areas For Teachers
implementation status
Funds Not Released
total cost
Ksh 200,000
estimate
Ksh 0

Kaloleni Primary School

location
Kaloleni (in Nakuru Town)
year first funded
2009
action
Upgrading Of The Staffroom
output
Better Working Areas For Teachers
implementation status
Funds Not Released
total cost
Ksh 200,000
estimate
Ksh 0

Mburu Gichua Primary School

location
Muguga (in Nakuru Town)
year first funded
2009
action
Upgrading Of The Staffroom
output
Better Working Areas For Teachers
implementation status
Funds Not Released
total cost
Ksh 200,000
estimate
Ksh 0

Muslim Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2009
action
Upgrading Of The Staffroom
output
Better Working Areas For Teachers
implementation status
Funds Not Released
total cost
Ksh 200,000
estimate
Ksh 0

Hyrax Primary School

location
Lanet (in Nakuru Town)
year first funded
2009
action
Upgrading Of The Staffroom
output
Better Working Areas For Teachers
implementation status
Funds Not Released
total cost
Ksh 200,000
estimate
Ksh 0

Nairobi Road Primary School

location
Muguga (in Nakuru Town)
year first funded
2009
action
Upgrading Of The Staffroom
output
Better Working Areas For Teachers
implementation status
Funds Not Released
total cost
Ksh 200,000
estimate
Ksh 0

Park View Primary School

location
Barut (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Pit Latrine Construction
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities As Well Improving On Sanitation
implementation status
Complete & In Use
total cost
Ksh 180,800
estimate
Ksh 230,800

Rhino Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks,Tables& Pit Latrine Blockconstruction
output
-
implementation status
Complete & In Use
total cost
Ksh 180,800
estimate
Ksh 180,800

Kiptenden Primary School

location
Barut (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Pit Latrine Block Construction
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities As Well Improving On Sanitation
implementation status
Complete & In Use
total cost
Ksh 180,800
estimate
Ksh 230,800

Madaraka Primary School

location
(in Nakuru Town)
year first funded
2003
action
Procure School Desks & Pit Latrine Block Construction
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities As Well Improving On Sanitation
implementation status
Complete & In Use
total cost
Ksh 180,800
estimate
Ksh 230,800

Mburu Gichua Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Pit Latrine Block Construction
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities As Well Improving On Sanitation
implementation status
Complete & In Use
total cost
Ksh 180,800
estimate
Ksh 230,800

Badili Mawazo Project

location
Kaptembwo (in Nakuru Town)
year first funded
2009
action
Support Project On Traditional Foodstuff
output
Educated Those Living With Hiv / Aids Ways Of Usind Traditional Foodstuff
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 0

Lalwet Cattle Trough

location
Barut (in Nakuru Town)
year first funded
2009
action
Construction Of A Community Water Trough For Animals
output
-
implementation status
Complete And In Use
total cost
Ksh 150,000
estimate
Ksh 0

Kelelwet Primary School

location
Barut (in Nakuru Town)
year first funded
2007
action
Construction Of A Toilet Block
output
To Decongestate The Available Facilities
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 150,000

Kelelwet Secondary School

location
Barut (in Nakuru Town)
year first funded
2009
action
Connection Of Electricity To The School
output
To Provide Electricty To The School
implementation status
Complete And In Use
total cost
Ksh 120,000
estimate
Ksh 0

Kelelwet Secondary School

location
Barut (in Nakuru Town)
year first funded
2009
action
Completion Of Toilet Block
output
To Decongest The Available Facilities
implementation status
Completed And In Use
total cost
Ksh 120,000
estimate
Ksh 0

Mogoon Primary School

location
Barut (in Nakuru Town)
year first funded
2003
action
Pit Latrine Block Costruction
output
To Improve On Sanitation.
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Muslim Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2003
action
Pit Latrine Block Costruction
output
To Improve On Sanitation.
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Naka Primary School

location
Lanet (in Nakuru Town)
year first funded
2004
action
To Enable Purchase Of Tables And Chairs
output
To Alleviate Shortage Caused By Increased Enrolment In Lower Primary.
implementation status
The Funiture Has Been Bought And Put To Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Nakuru East Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Pit Latrine Block Costruction
output
To Improve On Sanitation.
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Crater Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Pit Latrine Block Costruction
output
To Improve On Sanitation.
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Barut Primary School

location
Barut (in Nakuru Town)
year first funded
2003
action
Pit Latrine Block Costruction
output
To Improve On Sanitation.
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

LAnet School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Pit Latrine Block Costruction
output
To Improve On Sanitation.
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 150,000

Kibowen Komen Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Kimathi Primary School

location
(in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Koinange Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Lion Hill Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Nairobi Road Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Naka Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Nakuru Teachers Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Kelelwet Primary School

location
Barut (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Kigonor Primary School

location
Barut (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Eileen Ngochoch Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Heshima Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Hyrax Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Jamhuri Primary School

location
Lanet (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Kaptembwo Primary School

location
Kaptembwo (in Nakuru Town)
year first funded
2003
action
Procure School Desks & Tables
output
To Ease The Sitting Congestion Due To Lack Of Sufficient Sitting Facilities
implementation status
Complete & In Use
total cost
Ksh 80,800
estimate
Ksh 80,800

Ndimu Primary School

location
Muguga (in Nakuru Town)
year first funded
2009
action
Completion Of Classrooms By Roofing And Walling.
output
To Decongest The Available Facilities
implementation status
Complete And In Use
total cost
Ksh 60,000
estimate
Ksh 0

Kelelwet Cattle Crush

location
Barut (in Nakuru Town)
year first funded
2007
action
Construction Of A Water Crush
output
To Enable Ease Of Medication Of Livestock In The Area
implementation status
Complete And In Use
total cost
Ksh 36,650
estimate
Ksh 36,650