The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Nambale

Education Bursary

location
Nambale (in Nambale)
year first funded
2004
action
To Assist Needy Student
output
Low Dropouts In Institutions Of Learning
implementation status
Cheques
total cost
Ksh 30,693,591
estimate
Ksh 30,693,591

Nambale Cdf Office

location
Nambale (in Nambale)
year first funded
2008
action
Development Of A New Cdf Office
output
Condicive Working Environment
implementation status
On Going
total cost
Ksh 15,000,000
estimate
Ksh 15,000,000

Nasewa Secondary School

location
Nasewa (in Nambale)
year first funded
2004
action
Construction Of 4 Classroom, dining Hall, Library,Kitchen And Adm Office
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 4,172,645
estimate
Ksh 4,172,645

Kisoko Girls Secondary School

location
Nambale (in Nambale)
year first funded
2004
action
Equipping Of The Computer Lab,Classrooms, Library& Purchase Of School Bus
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 3,735,958
estimate
Ksh 3,735,958

Murende Secondary School

location
Nang'Oma (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms, Laboratory, Dining Hall & Fencing
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 3,645,000
estimate
Ksh 3,645,000

Madende Secondary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of Dormitory, Equipping Computer Lab And Purchase Of School Bus
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 3,600,884
estimate
Ksh 3,600,884

Electricity Project

location
Nambale (in Nambale)
year first funded
2008
action
Rural Electrification
output
Increase Income Opportunities
implementation status
not known
total cost
Ksh 3,500,000
estimate
Ksh 3,500,000

Mundika Secondary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Construction Of A Domitory And Equipping The Computer Lab.
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 2,919,435
estimate
Ksh 2,919,435

Mock Examinations/

location
Nambale (in Nambale)
year first funded
2005
action
Purchase Of Primary Schools
output
Good Academic
implementation status
Stalled
total cost
Ksh 2,906,000
estimate
Ksh 2,906,000

Igara Dispensary

location
Walatsi (in Nambale)
year first funded
2004
action
Construction Of Laboratory & Maternity Wing
output
Improved Health Facilities
implementation status
On Going
total cost
Ksh 2,900,000
estimate
Ksh 2,900,000

Esikinga Secondary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of 4 Classrooms, Administration Block, 60 Chairs, 60 Lockers, And Laboratory Construction.
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 2,886,122
estimate
Ksh 2,886,122

Musokoto Dispensary

location
Walatsi (in Nambale)
year first funded
2006
action
Construction Of Amenity Ward And Office
output
Improved Health Facilities
implementation status
On Going
total cost
Ksh 2,800,000
estimate
Ksh 2,800,000

Nambale Boys Secondary School

location
Nambale (in Nambale)
year first funded
2005
action
Construction Of A Class, Dormitory &Equipping Of A Computer Lab
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 2,719,435
estimate
Ksh 2,719,435

Lwanya Girls Secondary School

location
Lwanya (in Nambale)
year first funded
2004
action
Construction Of 1 Dormitory, 2 Class Rooms,1 Staff House And Equipping Computer Lab.
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 2,579,427
estimate
Ksh 2,579,427

Malanga Dispensary

location
Bukhayo Central (in Nambale)
year first funded
2005
action
Construction Of Maternity Wing
output
Improved Healthfacilities
implementation status
On Going
total cost
Ksh 2,470,000
estimate
Ksh 2,470,000

Munongo Dispensary

location
Bukhayo West (in Nambale)
year first funded
2004
action
Construction Of Maternity Wing
output
Improved Health Facilities
implementation status
On Going
total cost
Ksh 2,350,000
estimate
Ksh 2,350,000

Nasira Secondary School

location
Busibwabo (in Nambale)
year first funded
2004
action
Construction Of 4 Class & Adm Block
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 2,261,495
estimate
Ksh 2,261,495

Kapina Primary School

location
Bukhayo North (in Nambale)
year first funded
2004
action
Construction Of 5 Classrooms & Adm Office.
output
Condusive Learning Environment
implementation status
On Going
total cost
Ksh 2,255,400
estimate
Ksh 2,255,400

Nambale Health Centre

location
Nambale (in Nambale)
year first funded
2005
action
Construction Of Maternity Wing
output
Improved Health Facilities
implementation status
Ongoing
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Alungo Secondary School

location
Busibwabo (in Nambale)
year first funded
2006
action
Construction Of 4 Class And Laboratory
output
Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Frsimon Sibembe Secondary School

location
Bukhayo Central (in Nambale)
year first funded
2005
action
Construction Of 4 Classrooms
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Malanga Secondary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Construction Of 3 Classrooms,2 Staff Houses And Adm Block.
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Mabunge Secondary School

location
Nasewa (in Nambale)
year first funded
2006
action
Construction Of 3 Classrooms And Laboratory
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 2,073,519
estimate
Ksh 2,073,519

Katira Secondary School

location
Bukhayo North (in Nambale)
year first funded
2006
action
Construction Of 3 Classrooms And A Toilet
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 2,051,893
estimate
Ksh 2,051,893

Dulienge Primary School

location
Bukhayo North (in Nambale)
year first funded
2004
action
Construction Of 5 Classrooms & Adm Office.
output
Condusive Learning Environment
implementation status
On Going
total cost
Ksh 2,013,919
estimate
Ksh 2,013,919

Busibwabo Dispensary

location
Busibwabo (in Nambale)
year first funded
2004
action
Construction Of Maternity Wing And 2 Staff Houses
output
Improved Health Facilities
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Lwanya Secondary School Borehole & Water Project

location
Lwanya (in Nambale)
year first funded
2006
action
Drilling, Tank Installation And Pipe Installation In The School.
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Busende Secondary School

location
Lwanya (in Nambale)
year first funded
2006
action
Construction Of 3 Classrooms, Office/Store.
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,950,000
estimate
Ksh 1,950,000

Bugeng'I Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Renovation Of 3 Classroom, Construction Of 3 New Classrooms And Office
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 1,937,819
estimate
Ksh 1,937,819

Lung'A Secondary School

location
Nasewa (in Nambale)
year first funded
2007
action
Construction 3 Classes And Laboratory.
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,911,932
estimate
Ksh 1,911,932

Budokomi Mixed Secondary School

location
Bukhayo West (in Nambale)
year first funded
2006
action
Construction Of 1 Classrooms, Renovation Of Adm Block And 3 Class
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,910,712
estimate
Ksh 1,910,712

Lwanyange Dispensary

location
Bukhayo Central (in Nambale)
year first funded
2006
action
Construction Of Amenity Wing
output
Improved Health Facilities
implementation status
On Going
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Nambale Urban Secondary School

location
Nambale (in Nambale)
year first funded
2006
action
Construction Of 4 Classrooms A
output
Conducive Learningenvironment
implementation status
Ongoing
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Kisoko Water Supply

location
Nambale (in Nambale)
year first funded
2003
action
Pipe Laying & Repair Of Masonary Tank
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 1,865,052
estimate
Ksh 1,865,052

Lwanya Chief's Office

location
Lwanya (in Nambale)
year first funded
2006
action
Development Of Chief'S Office.
output
Security Improvement
implementation status
Stalled
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Matayos Health Centre

location
Nang'Oma (in Nambale)
year first funded
2005
action
Construction Of Hostels
output
Improve On Health Facilities
implementation status
Ongoing
total cost
Ksh 1,775,000
estimate
Ksh 1,775,000

Nasewa Health Centre

location
Nasewa (in Nambale)
year first funded
2005
action
Equiping The Facility & Construction Of Lab.
output
Improved Health Facilities
implementation status
Complete
total cost
Ksh 1,720,000
estimate
Ksh 1,720,000

Muyafwa Primary School

location
Nang'Oma (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom Adm Office Block And Renovation
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,698,800
estimate
Ksh 1,698,800

Igara Secondary School

location
Walatsi (in Nambale)
year first funded
2004
action
Construction Of Laboratory, Administration Block, Toilets & 4 Classrooms
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 1,689,180
estimate
Ksh 1,689,181

Bukalama Dispensary

location
Bukhayo West (in Nambale)
year first funded
2006
action
Construction Of Amenity Ward
output
Improved Health Facilities
implementation status
On Going
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Lupida Secondary School

location
Bukhayo North (in Nambale)
year first funded
2006
action
Construction Of 3 Classrooms And Administration Office
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Khwirale Centre Primary School

location
Walatsi (in Nambale)
year first funded
2007
action
Construction Of 4 Classrooms
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 1,550,000
estimate
Ksh 1,550,000

Ndambakana Water Supply

location
Bukhayo West (in Nambale)
year first funded
2003
action
Pipe Laying & Construction Of Water Kiosks
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 1,521,656
estimate
Ksh 1,521,656

Segero Power Line

location
Nambale (in Nambale)
year first funded
2008
action
Rural Electrification (Segero To Nambale).
output
Power And Energy
implementation status
On Going.
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Nambale A/C Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Purchase Of Disk, Renovationand Construction of 2 Classrooms
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 1,454,032
estimate
Ksh 1,454,032

Busibwabo Secondary School

location
Busibwabo (in Nambale)
year first funded
2006
action
Construction Of 4 Class & Laboratory
output
Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 1,438,000
estimate
Ksh 1,438,000

Nang'Oma Water Project

location
Nang'Oma (in Nambale)
year first funded
2003
action
Pipe Laying & Construction Of Water Tank
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 1,430,000
estimate
Ksh 1,430,000

Lupida Health Centre

location
Bukhayo North (in Nambale)
year first funded
2005
action
Construction Of Maternity Wing
output
Improved Health Facilities
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Nasira Water Project

location
Busibwabo (in Nambale)
year first funded
2007
action
Development Of New Water Project
output
Water & Sanitation
implementation status
Ongoing
total cost
Ksh 1,380,000
estimate
Ksh 1,380,000

Nambale Youth Poly

location
Nambale (in Nambale)
year first funded
2004
action
Purchase Of A Demonstrationengine And Workshop Construction.
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Nambale Water Supply

location
Nambale (in Nambale)
year first funded
2003
action
Drilling, Construction Of Power House And Pump Station
output
Water &
implementation status
Complete
total cost
Ksh 1,252,000
estimate
Ksh 1,252,000

Malanga Electricity

location
Bukhayo Central (in Nambale)
year first funded
2005
action
Rural Electrification
output
Increased Income Opportunities (Juakali)
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Khayo Secondary School

location
Bukhayo East (in Nambale)
year first funded
2007
action
Construction Of 3 Classrooms
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Elwanikha Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom, Purchase Of 50 Desks, 10 Chairs, Roofing Of 4 Classrooms And School Gate.
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 1,175,100
estimate
Ksh 1,175,100

Lung'A Primary School

location
Nasewa (in Nambale)
year first funded
2004
action
Construction Of 4 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,162,645
estimate
Ksh 1,162,645

St. Moses Sigwata Primary School

location
Lwanya (in Nambale)
year first funded
2006
action
Construction Of 2 Classrooms & Adm Office.
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,145,014
estimate
Ksh 1,145,014

Madibo Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of 3 Classrooms
output
Condusive Learningenvironment
implementation status
On Going
total cost
Ksh 1,143,300
estimate
Ksh 1,143,300

Igero Primary School

location
Lwanya (in Nambale)
year first funded
2004
action
Renovation And Construction Of 4 Classrooms And
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,135,700
estimate
Ksh 1,135,700

MwengeKhayo Culverts

location
Bukhayo East (in Nambale)
year first funded
2007
action
Bridge Construction
output
Increased Accessibility
implementation status
Stalled
total cost
Ksh 1,132,369
estimate
Ksh 1,132,369

Buyama Primary School

location
Nasewa (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom And Fencing School Compound
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,115,460
estimate
Ksh 1,115,460

Luliba Dispensary

location
Lwanya (in Nambale)
year first funded
2006
action
Construction Of Amenity Ward And Dispensary Office.
output
Improved Health Facilities
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Esirisia Mixed Secondary School

location
Bukhayo West (in Nambale)
year first funded
2006
action
Construction Of 2 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Igara-Khwirale Roads

location
Walatsi (in Nambale)
year first funded
2006
action
Roads Pot Holes Repair
output
Good Infrastructure And Net Working
implementation status
not known
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Busidibu Primary School

location
Busibwabo (in Nambale)
year first funded
2004
action
Purchase Of Desks And
output
Conducive Learning
implementation status
Complete
total cost
Ksh 1,096,107
estimate
Ksh 1,096,107

Rachomi Bridge

location
Nasewa (in Nambale)
year first funded
2007
action
Road Construction
output
Improved Infrastructure
implementation status
On Going
total cost
Ksh 1,075,256
estimate
Ksh 1,075,256

Buringala Borehole

location
Bukhayo West (in Nambale)
year first funded
2005
action
Drilling Borehole And Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 1,070,000
estimate
Ksh 1,070,000

Busibwabo Electricity

location
Busibwabo (in Nambale)
year first funded
2005
action
Rural Electrification
output
Increase Income Opportunities
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kapina Level Railway Crossing

location
Bukhayo North (in Nambale)
year first funded
2006
action
Construction Of Railway Level Crossing
output
Improved Accessibility In Road Network
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Matayos Youth Polytechnic

location
Nang'Oma (in Nambale)
year first funded
2005
action
Purchase Of Tools &Workshop Construction
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 950,000

Steugine Primary School

location
Nang'Oma (in Nambale)
year first funded
2004
action
Purchase Of Desks And Construction Of 2 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 940,400
estimate
Ksh 940,400

Nambere Primary School

location
Nang'Oma (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 936,192
estimate
Ksh 936,192

Buchami Borehole

location
Lwanya (in Nambale)
year first funded
2003
action
Drilling A Borehole &Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Nasewa Water Project

location
Nasewa (in Nambale)
year first funded
2006
action
Development Of Shallow Well,Spring Protection &Vip Latrines
output
Water And Sanitation
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 900,000

Namaindi Secondary School

location
Bukhayo East (in Nambale)
year first funded
2007
action
Laboratory Construction
output
Conducive Learningenvironment
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 900,000

Nambale Cotton Ginnery

location
Nambale (in Nambale)
year first funded
2007
action
Revitalization Of Cotton Ginnery.
output
Increased Income Opportunities.
implementation status
Stalled
total cost
Ksh 900,000
estimate
Ksh 900,000

Busende Primary School

location
Lwanya (in Nambale)
year first funded
2004
action
Construction Of 1 Class Room And Adm Office.
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 890,300
estimate
Ksh 890,300

Mwangaza Primary School

location
Walatsi (in Nambale)
year first funded
2007
action
Construction Of 2 Classrooms
output
Condusive Learning Environment
implementation status
On Going
total cost
Ksh 851,893
estimate
Ksh 851,893

Mujuru Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Fencing And Purchasing Of Desks And 1 Classroom Construction
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 851,075
estimate
Ksh 851,075

Bukalama Primary School

location
Buhkayo West (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom & Renovation Of 3 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 848,388
estimate
Ksh 848,388

Busabakhwa Primary School

location
Busibwabo (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms & Renovation
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 829,788
estimate
Ksh 829,788

Nasewa Primary School

location
Nasewa (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom And Purchase Of Desks.
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 827,900
estimate
Ksh 827,900

Nang'Oma Primary School

location
Nang'Oma (in Nambale)
year first funded
2004
action
Purchase Of Desks & 1 Classroom Construction
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 818,500
estimate
Ksh 818,500

Sianda Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Renovation Of 2 Classrooms, Purchase Of 25 Desks And Adm Block Construction
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 812,400
estimate
Ksh 812,400

Khayo Dispensary

location
Bukhayo East (in Nambale)
year first funded
2005
action
Installation Of Electricity.
output
Increased Income Opportunities (Jua Kali).
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 800,000

Ekisumo Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of A Gate And2 Classrooms
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 785,500
estimate
Ksh 785,500

Murende Primary School

location
Nang'Oma (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms & Fencing Of School Compound
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 777,600
estimate
Ksh 777,600

Nasira Rc Primary School

location
Busibwabo (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 761,188
estimate
Ksh 761,188

Budokomi Water Project

location
Bukhayo West (in Nambale)
year first funded
2006
action
Repair Of Pipeline And Electrical Works
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Lwanya Primary School

location
Lwanya (in Nambale)
year first funded
2004
action
Completion Of 1 Classroom And Adm Block
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 730,500
estimate
Ksh 730,500

Musokoto Deb Primary School

location
Walatsi (in Nambale)
year first funded
2004
action
Renovation Of 6 Classroom & Fencing
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 723,350
estimate
Ksh 723,350

Busibwabo Community Office

location
Busibwabo (in Nambale)
year first funded
2006
action
Construction Of The Community Office
output
Improved Service Delivery & Security
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 700,000

Siera Primary School

location
Bukhayo North (in Nambale)
year first funded
2004
action
Renovation Of 3 Classes, School Compound Fencing And Costruction Of Adm Block
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 694,600
estimate
Ksh 694,600

Mabunge A Primary School

location
Nasewa (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom And Purchase Of Desk
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 694,300
estimate
Ksh 694,300

Nasira Dispensary

location
Busibwabo (in Nambale)
year first funded
2008
action
Construction Of New Dispensary
output
Improved Health Facilities
implementation status
New
total cost
Ksh 691,992
estimate
Ksh 691,992

Buyofu Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Renovation Of 4 Classroms, 1 Classroom Construction
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 690,500
estimate
Ksh 690,500

Musokoto B Primary School

location
Walatsi (in Nambale)
year first funded
2004
action
Renovation Of 5 Classrooms & Construction Of 1 Classroom
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 670,650
estimate
Ksh 670,650

Kisoko Community Hospital

location
Nambale (in Nambale)
year first funded
2006
action
Completion Of Amenity Wards
output
Improved Health Facilities
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 650,000

Buringala Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Fencing & 1 Classroom Construction
output
Condusive Learning Environment
implementation status
On Going
total cost
Ksh 647,775
estimate
Ksh 647,775

Lwanyange Primary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Renovation Of 2 Classrooms And Construction Of 1 Class
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 612,000
estimate
Ksh 612,000

Luliba Primary School

location
Lwanya (in Nambale)
year first funded
2004
action
Renovation Of 4 Classroom
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 604,500
estimate
Ksh 604,500

Ikondokhera Bridge, Nayombe Bridge & Manyole Bridge

location
Nambale (in Nambale)
year first funded
2006
action
Construction Of Bridges
output
Increased Accessibility
implementation status
Stalled
total cost
Ksh 600,000
estimate
Ksh 600,000

Nasewa Chie's Office

location
Nasewa (in Nambale)
year first funded
2007
action
Extention Of Chief'S Office
output
Improved Security
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Buyofu Assistant Chief's Office

location
Bukhayo East (in Nambale)
year first funded
2007
action
Construction Of Chief'S Office
output
Improved Services Andsecurity Delivery
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Kisoko Boys Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Construction Of Administration Office
output
Conducive Learningenvironment
implementation status
Ongoing
total cost
Ksh 593,000
estimate
Ksh 593,000

Buyende Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 576,075
estimate
Ksh 576,075

Esikulu Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom And Adm Block.
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 558,275
estimate
Ksh 558,275

Malanga Primary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Fencing The School Compound And Renovations 3 Classes
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 557,913
estimate
Ksh 557,913

Esidende Poly

location
Bukhayo Central (in Nambale)
year first funded
2005
action
Construction Of Boys Dormitory
output
Condusive Learning Environment
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 550,000

Railway Crossing

location
Bukhayo North (in Nambale)
year first funded
2004
action
Construction Of Railway Level Crossing
output
Improved Accessibility In Road Network
implementation status
Complete
total cost
Ksh 542,871
estimate
Ksh 542,871

Otiiri Primary School

location
Walatsi (in Nambale)
year first funded
2004
action
Renovation Of 2 Classrooms & Fencing The Compound
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 539,963
estimate
Ksh 539,963

Esikulu Assistant Chief's Office

location
Bukhayo West (in Nambale)
year first funded
2007
action
Construction Of Assistant Chief'S Office
output
Improved Security Environment
implementation status
On Going
total cost
Ksh 530,000
estimate
Ksh 530,000

Emakina Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Renovation Of 1 Classroom, Purchaseof Desks & Construction Or 1 Classroom
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 529,900
estimate
Ksh 529,900

Esegero Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Renovation And Construction Of 1 Class
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 509,900
estimate
Ksh 509,900

Nambale Deb Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Renovation Of 3 Class
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 500,400
estimate
Ksh 500,400

Buyofu Dispensary

location
Bukhayo East (in Nambale)
year first funded
2009
action
Construction Of Amenity Wing
output
Incereased Healthfacilities
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 500,000

Khayo Polytechnic

location
Bukhayo East (in Nambale)
year first funded
2005
action
Construction Of A Workshop Andpurchase Of Tools
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Nasira Ac Primary School

location
Busibwabo (in Nambale)
year first funded
2004
action
Purchase Of Desks And Construction Of 1 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 494,088
estimate
Ksh 494,088

Kapina Primary School shallow Well

location
Bukhayo North (in Nambale)
year first funded
2005
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
On Going
total cost
Ksh 490,320
estimate
Ksh 490,320

Khwirale Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Fencing School Compound &Construction Of Theof The Gate Plus
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 483,100
estimate
Ksh 483,100

Okoa Mkt Shallow Well

location
Lwanya (in Nambale)
year first funded
2005
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 465,000
estimate
Ksh 465,000

Mwenge Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom Andpurchase Of Desks
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 420,300
estimate
Ksh 420,300

Munongo Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Renovation Of 1 Classroom & Fencing School Compound
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 417,175
estimate
Ksh 417,175

Alungo Primary School

location
Busibwabo (in Nambale)
year first funded
2004
action
Purchase Of Desks And 1 Classroom Construction
output
Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 409,575
estimate
Ksh 409,576

Tangakona Electricity

location
Nambale (in Nambale)
year first funded
2005
action
Rural Electrification
output
Increased Income Opportunities (Jua Kali)
implementation status
Stalled
total cost
Ksh 400,000
estimate
Ksh 400,000

Bukhayo Central Chief's Office

location
Bukhayo Central (in Nambale)
year first funded
2006
action
Construction Of Chief'S Office
output
Improved Services And Security
implementation status
Stalled
total cost
Ksh 400,000
estimate
Ksh 400,000

Kisoko Girls Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Renovation Of 1 Classroom & Construction Of 1 Class
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 390,200
estimate
Ksh 390,200

Indoli Primary School

location
Nasewa (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 381,400
estimate
Ksh 381,400

Malanga/Lelekwe /Makale Road

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Road Construction And Grading
output
Improved Road Condition
implementation status
Stalled
total cost
Ksh 370,000
estimate
Ksh 370,000

Mabunge Rc Primary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 365,419
estimate
Ksh 365,419

Madende Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom And Administration Office
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 365,300
estimate
Ksh 365,300

Khayo Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Renovation Of 3 Classrooms And Purchase Of Desks
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 358,400
estimate
Ksh 358,400

Emaolo Primary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Fencing The Schoolcompound
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 351,159
estimate
Ksh 351,159

Mungatsi Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom Andschool Gate
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 347,100
estimate
Ksh 347,100

Igara Primary School

location
Walatsi (in Nambale)
year first funded
2004
action
Renovation Of 3 Classrooms
output
Condusive Learning Environment
implementation status
On Going
total cost
Ksh 343,050
estimate
Ksh 343,050

Namaindi Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Purchase Of Desks 14 Lockers And Chairs, Classroom Renovation Fencing The School Compound & Gate
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 327,400
estimate
Ksh 327,400

Lupida Primary School

location
Bukhayo North (in Nambale)
year first funded
2004
action
Construction Of A Classroom And Renovation Of 1 Classroom
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 326,400
estimate
Ksh 326,400

Budokomi Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Renovation Of 3 Classrooms
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 324,900
estimate
Ksh 324,900

Esidende Primary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Renovation Of 4 Classrooms
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 323,800
estimate
Ksh 323,800

Busende & Luliba Shallow Wells

location
Lwanya (in Nambale)
year first funded
2004
action
Development Of New Shallow Wells & Pumps Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 321,400
estimate
Ksh 321,400

Katira Primary School

location
Bukhayo North (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms,
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 321,200
estimate
Ksh 321,200

Kaludeka Primary School

location
Walatsi (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 320,950
estimate
Ksh 320,950

Lung'A Assistant Chiefs Office

location
Nasewa (in Nambale)
year first funded
2009
action
Office Construction
output
Improve Service Delivary & Security
implementation status
not known
total cost
Ksh 311,000
estimate
Ksh 311,000

Mungore Shallow Well

location
Nang'Oma (in Nambale)
year first funded
2009
action
Water Point Development
output
Water & Sanitation
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Siirira Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2008
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Namaindi Clinic

location
Bukhayo East (in Nambale)
year first funded
2006
action
Constuction Of Amenity Ward
output
Increased Health Facilities
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Nasira Polytechnic

location
Busibwabo (in Nambale)
year first funded
2009
action
Development Of Education Centre
output
Increase Imployment Opportunities
implementation status
350,000 reallocation from other projects via CDF BOARD/KITUTU CHACHE/2008(16) DATED 5.11.08
total cost
Ksh 300,000
estimate
Ksh 300,000

Buyofu Bumwololo Road

location
Bukhayo East (in Nambale)
year first funded
2005
action
Grading Of The Road
output
Increased Accessibility
implementation status
Stalled
total cost
Ksh 300,000
estimate
Ksh 300,000

Mudembu Dispensary

location
Bukhayo East (in Nambale)
year first funded
2008
action
Construction Of A New Dispensary
output
Increased Healthfacilities
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Mundika Boys Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 272,375
estimate
Ksh 272,375

Musokoto 'B' Shallow Well

location
Walatsi (in Nambale)
year first funded
2006
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 263,250
estimate
Ksh 263,250

Siamakhanga Orphanage

location
Nang'Oma (in Nambale)
year first funded
2008
action
Construction Of A Classroom
output
Conducive Learning Environement
implementation status
Ongoing
total cost
Ksh 256,269
estimate
Ksh 256,269

Esikinga Primary School

location
Bukhayo East (in Nambale)
year first funded
2004
action
Renovation Of 4 Classrooms, Purchase Of 80 Desks And School Fencing
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 253,100
estimate
Ksh 253,100

Muyafwa Shallow Well

location
Nang'Oma (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 250,000

Chwili Shallow Well

location
Nang'Oma (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Luliba Shallow Well

location
Lwanya (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mabanga Shallow Well

location
Lwanya (in Nambale)
year first funded
2007
action
Development Of A New Shallow & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Ululo Shallow Well

location
Lwanya (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mundaya Shallow Well

location
Lwanya (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Muduma Shallow Well

location
Lwanya (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Benga Market Shallow Well

location
Walatsi (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Otekwa Shallow Well

location
Walatsi (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Khwirale Shallow Well

location
Bukhayo North (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Akudiet Shallow Well

location
Bukhayo North (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Mabunge Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2008
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Malanga Dip Mkt Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Sibembe East Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Madele Shallow Well

location
Nang'Oma (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well & Pump Installation
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Nansekho Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mukemo Ack Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Bukadanyi Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2006
action
Development Of A New Shallow Welland Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Lwanyange Dispensary Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2003
action
Development Of A New Shallow Welland Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Buyofu Mkt Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2006
action
Development Of A New Shallow Welland Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Esikinga Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2006
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
One off expense
total cost
Ksh 250,000
estimate
Ksh 250,000

Liyalala Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well& Pump Installation
output
Water And Sanitation
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Fuatana Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well& Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Manyole Primary School shallow Well

location
Nambale (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well& Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Syekunya Shallow Well

location
Nambale (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well& Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Kinjabi Shallow Well

location
Nambale (in Nambale)
year first funded
2009
action
n/a
output
-
implementation status
Foundattion only laid; funds embezzled
total cost
Ksh 250,000
estimate
Ksh 250,000

Maolo Catholic Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Esirisia Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 244,475
estimate
Ksh 244,475

Mundulusia Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Purchase Of Desks And Classroom Construction
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 242,275
estimate
Ksh 242,275

Esibembe Primary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Renovation Of 2 Classrooms &Purchase Of Desks
output
Condusive Learningenvironment
implementation status
Complete
total cost
Ksh 235,700
estimate
Ksh 235,700

Mundika Girls Primary School

location
Bukhayo West (in Nambale)
year first funded
2004
action
Construction Of 1 Classroom
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 225,200
estimate
Ksh 225,200

Khwirale Market Shallow Well

location
Walatsi (in Nambale)
year first funded
2005
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 215,000
estimate
Ksh 215,000

Siroba Shallow Well

location
Lwanya (in Nambale)
year first funded
2005
action
Development Of A New Shallow Well & Pump Installation.
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 215,000
estimate
Ksh 215,000

Kaludeka Shallow Well

location
Walatsi (in Nambale)
year first funded
2005
action
Development Of A New Shallow Well And Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 215,000
estimate
Ksh 215,000

Lelekwe Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2006
action
Development Of A New Shallow Welland Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Nang'Oma Chief's Office

location
Nang'Oma (in Nambale)
year first funded
2006
action
Completion Of Chiefs Office
output
Improved Service Delivery& Security
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Alungo Orphans School

location
Busibwabo (in Nambale)
year first funded
2008
action
Construction Of A Classroom
output
Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 200,000

Nang'Eni Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Development Of A New Shallow Well & Pump Installation
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 195,000
estimate
Ksh 195,000

Nambale Urban Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Purchase Of Desks And Renovationsof 2 Class
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 187,100
estimate
Ksh 187,100

Lupida Orphanage

location
Bukhayo North (in Nambale)
year first funded
2007
action
Construction Of 1 Classroom
output
Condusive Learning Environment
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Emukhuyu Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Renovation Of 2 Classrooms
output
Conducive Learningenvironment
implementation status
Complete
total cost
Ksh 148,600
estimate
Ksh 148,600

Nang'Eni Primary School

location
Bukhayo Central (in Nambale)
year first funded
2004
action
Renovation Of 2 Classrooms & Purchase Of Desks
output
Condusive Learning Environment
implementation status
Complete
total cost
Ksh 143,400
estimate
Ksh 143,400

Manyole Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Construction Of 2 Classrooms
output
Conducive Learning Environment
implementation status
Complete
total cost
Ksh 139,200
estimate
Ksh 139,200

Makutano Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2006
action
Development Of A New Shallow Well
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 130,000

Nasewa Tree Nursery

location
Nasewa (in Nambale)
year first funded
2006
action
Purchase Of Inputs.
output
Conserved Environment
implementation status
Complete
total cost
Ksh 120,000
estimate
Ksh 120,000

St. Martin's Primary School

location
Nambale (in Nambale)
year first funded
2004
action
Construction Of 1 Toilet & Renovation of 2 Classes.
output
Conducive Learningenvironment.
implementation status
Complete
total cost
Ksh 115,560
estimate
Ksh 115,560

Busibwabo Cattle Dip

location
Busibwabo (in Nambale)
year first funded
2005
action
Renovation Of The Cattle Dip
output
Control Of Pests Tsetse Flies
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Bumakunda Spring

location
Busibwabo (in Nambale)
year first funded
2007
action
Development Of A New Water Spring
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Nyibura Bridge And Its Approaches

location
Busibwabo (in Nambale)
year first funded
2006
action
Construction Of The Bridge
output
Improved Accessibility In Road Networks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Murende Cattle Dip

location
Nang'Oma (in Nambale)
year first funded
2005
action
Renovation Of The Cattle Dip
output
Pest Control (Tsetse Flies)
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ouma Spring

location
Nang'Oma (in Nambale)
year first funded
2008
action
Spring Protection
output
Water & Sanitation
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Buluma Spring

location
Nang'Oma (in Nambale)
year first funded
2008
action
Spring Protection
output
Water & Sanitation
implementation status
New
total cost
Ksh 100,000
estimate
Ksh 100,000

Okello Spring

location
Nang'Oma (in Nambale)
year first funded
2007
action
Development Of Water Spring
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Matayos Cattle Dip

location
Lwanya (in Nambale)
year first funded
2005
action
Renovation Of The Cattle Dip
output
Water & Sanitation
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Bamako Initiative Lupida

location
Bukhayo North (in Nambale)
year first funded
2007
action
Construction Of Dispensary Shop And Drugs Purchase
output
Improved Health Facilities
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Nakhabi Spring

location
Bukhayo East (in Nambale)
year first funded
2006
action
Spring Protection
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kisoko Shallow Well

location
Nambale (in Nambale)
year first funded
2009
action
Pump Replacement
output
Water & Sanitation.
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Kisoko Mission Borehole

location
Nambale (in Nambale)
year first funded
2004
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 87,000
estimate
Ksh 87,000

Kacheroi Shallow Well

location
Walatsi (in Nambale)
year first funded
2003
action
Pump Replacement And Cleaning Of The Shallow Well
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 85,500
estimate
Ksh 85,500

Busidibu Borehole

location
Nambale (in Nambale)
year first funded
2007
action
Replacement Of Water Pump
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Kayengai Shallow Well Musokoto 'B'

location
Walatsi (in Nambale)
year first funded
2008
action
Pump Installation
output
Water And Sanitation
implementation status
New
total cost
Ksh 80,000
estimate
Ksh 80,000

Ndubi Shallow Well Masieb

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Pump Replacement
output
Water And Sanitation
implementation status
Stalled
total cost
Ksh 80,000
estimate
Ksh 80,000

Maira 'A' Borehole

location
Bukhayo Central (in Nambale)
year first funded
2007
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Mungatsi Borehole

location
Bukhayo East (in Nambale)
year first funded
2005
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Emukhuyu Shallow Well

location
Nambale (in Nambale)
year first funded
2007
action
Replacement Of Water Pump
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Makale Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2005
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 79,800
estimate
Ksh 79,800

Maduwa Shallow Well

location
Nambale (in Nambale)
year first funded
2005
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 79,800
estimate
Ksh 79,800

Esegero Shallow Well

location
Nambale (in Nambale)
year first funded
2005
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 79,800
estimate
Ksh 79,800

Mabunge Rc Primary School Borehole

location
Bukhayo Central (in Nambale)
year first funded
2005
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 79,800
estimate
Ksh 79,800

Musoma Shallow Well

location
Bukhayo Central (in Nambale)
year first funded
2005
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 79,800
estimate
Ksh 79,800

Buloma Borehole

location
Busibwabo (in Nambale)
year first funded
2005
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 79,800
estimate
Ksh 79,800

Nakhoma Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2006
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Onoso Spring

location
Nang'Oma (in Nambale)
year first funded
2009
action
Spring Protection
output
Water & Sanitation
implementation status
Ongoing
total cost
Ksh 70,000
estimate
Ksh 70,000

Elwanikha Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2006
action
Pump Replacement
output
Water And Sanitation
implementation status
Stalled
total cost
Ksh 70,000
estimate
Ksh 70,000

Nasewa Primary School Borahole

location
Nasewa (in Nambale)
year first funded
2004
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 69,600
estimate
Ksh 69,600

Siriebo Spring

location
Nang'Oma (in Nambale)
year first funded
2004
action
Spring Protection
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 65,500
estimate
Ksh 65,500

Alungo Shallow Well

location
Busibwabo (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 65,000
estimate
Ksh 65,000

Nakhakina Shallow Well

location
Busibwabo (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 65,000
estimate
Ksh 65,000

Esegero Shallow Well

location
Nambale (in Nambale)
year first funded
2004
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 60,700
estimate
Ksh 60,700

Khayo Primary School Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,500
estimate
Ksh 60,500

Bugengi Shallow Well

location
Bukhayo West (in Nambale)
year first funded
2004
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,500
estimate
Ksh 60,500

Bukalama Shallow Well Esirisia

location
Bukhayo West (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,500
estimate
Ksh 60,500

Esidende Borehole

location
Bukhayo Central (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,500
estimate
Ksh 60,500

Madende Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,500
estimate
Ksh 60,500

Emasinde Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,500
estimate
Ksh 60,500

Nyaranga Shallow Well

location
Nasewa (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Ekisumo Ibanda Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2004
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Buyofu Primary School Borehole

location
Bukhayo East (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Makongeni Shallow Well

location
Nambale (in Nambale)
year first funded
2003
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Karungu Shallow Well

location
Bukhayo East (in Nambale)
year first funded
2004
action
Pump Replacement
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 60,000
estimate
Ksh 60,000

Tangakona Mkt Borehole

location
Nambale (in Nambale)
year first funded
2004
action
Pump Replaced
output
Water & Sanitation
implementation status
Complete
total cost
Ksh 58,000
estimate
Ksh 58,000

Mukhweso Spring

location
Nasewa (in Nambale)
year first funded
2005
action
Spring Protection
output
Water And Sanitation
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Assistant Chief's Office Mabunge

location
Nasewa (in Nambale)
year first funded
2006
action
Completion Of Ass. Chiefs Office
output
Improved Service Delive Ry And Security
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Mabunge Tree Nursery

location
Nasewa (in Nambale)
year first funded
2006
action
Purchase Of Inputs
output
Conserved Environment
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000