The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Narok North

Enabelibeli Health Centre

location
Enabelibel (in Narok North)
year first funded
2004
action
Construction of staff houses (4) in number self contained and renovation of maternity ward
output
-
implementation status
Complete and in use.
total cost
Ksh 4,000,000
estimate
Ksh 6,000,000

Olokurto secondary School

location
Olokurto (in Narok North)
year first funded
2004
action
Construction of Dormitory and ablution block and beds
output
Provision of accom. Facilities.
implementation status
Complete and in use.
total cost
Ksh 3,500,000
estimate
Ksh 3,500,000

Sosian Water Project.

location
Mosiro (in Narok North)
year first funded
2004
action
Construction of 2 water tanks and pipe work to consumers
output
Provision of water to consumers and livestock.
implementation status
Complete and in use
total cost
Ksh 3,000,000
estimate
Ksh 7,000,000

Nailogilog Dam

location
Keekonyokie (in Narok North)
year first funded
2004
action
Desilting of Dam
output
Provision of water for Domestic and livestock use.
implementation status
60% Complete
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Sosian Water Project

location
Mosiro (in Narok North)
year first funded
2006
action
Completion of Piping
output
Provision of piped water to consumers
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Olchorro secondary School

location
Olchorro (in Narok North)
year first funded
2003
action
Renovations of Classrooms, Adm. Block, Generator room Dormitory and plumbing and electrical works.
output
Improved learning facilities.
implementation status
Complete and in use
total cost
Ksh 1,680,000
estimate
Ksh 1,680,000

Iloiboti Water Tank

location
Keekonyokie (in Narok North)
year first funded
2004
action
Construction of storage tank and pipe works to consumers
output
Provision of water to consumers and livestock.
implementation status
Complete and in use.
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Katakala Pr. School

location
Nkareta (in Narok North)
year first funded
2003
action
Renovations of Classrooms, Con. 2 new Classrooms Adm. Block, and staff houses
output
Improved learning facilities
implementation status
Complete and in use
total cost
Ksh 1,140,000
estimate
Ksh 1,140,000

Purko Sheep ranch – road drift

location
Entiyani (in Narok North)
year first funded
2006
action
Construction of Road Drift and Grading 4km of the road
output
Provision of better roads and communications
implementation status
On Going 98% complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Narasha Water Project

location
Enoosupukia (in Narok North)
year first funded
2006
action
Pipe Extension
output
Provision of piped water to consumers
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 10,000,000

Olepunyua Water Proj

location
Ntulele (in Narok North)
year first funded
2006
action
Construction and Extension
output
Provision of piped water to consumers
implementation status
Ongoing 80% complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Nkoirienito Dispen.

location
Enoosupukia (in Narok North)
year first funded
2006
action
Construction of Staff House
output
Provision of accom. Facilities.
implementation status
completed and in use.
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enooseyia Health Centreentre

location
Ildamat (in Narok North)
year first funded
2006
action
Construction of Maternity wing
output
Provision of better health facilities
implementation status
On going 98% Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Eneengetia secondary School

location
Enabelbel (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Provision learning facilities.
implementation status
Complete awaiting Hand over
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ntimama Ridge Pri

location
Olchorro (in Narok North)
year first funded
2006
action
Construction of 1 Dormitory
output
Provision of accom. Facilities.
implementation status
Complete awaiting handover
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Olorropil Secondary School

location
Olorropil (in Narok North)
year first funded
2004
action
Construction of Dormitory and ablution block
output
Provision of accom. Facilities
implementation status
Complete and in use.
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Olpusimoru Secondary School

location
Olpusimoru (in Narok North)
year first funded
2004
action
Construction of two (2) Classrooms
output
Provision learning facilities.
implementation status
Complete and in use.
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Laiser Dispensary

location
Entontol (in Narok North)
year first funded
2007
action
Construction of a Staff House
output
Provision of accom. Facilities.
implementation status
On going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Olpusimoru secondary School

location
Olpusimoru (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Provision of accom. Facilities
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ilaiser Dispensary

location
Entontol (in Narok North)
year first funded
2005
action
Construction of Dispensary
output
Provision of preventive and curative services to Wananchi
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Ongata Naado Health Centre

location
Mosiro (in Narok North)
year first funded
2005
action
Construction of Health center
output
Provision of preventive and curative services to Wananchi.
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Sakutiek Health Centre

location
Upper Melili (in Narok North)
year first funded
2005
action
Construction of Health center
output
Provision of preventive and curative services to Wananchi
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Moi primary School

location
Enabelibel (in Narok North)
year first funded
2005
action
Construction of staff houses and renovation of Classrooms
output
Pro. Of learning Acc. facilities
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Nkareta secondary School

location
Nkareta (in Narok North)
year first funded
2004
action
Construction of Dormitory
output
Provision of Accomd. facilities
implementation status
Complete and in use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Entiyan Secondary School

location
Entiyani (in Narok North)
year first funded
2004
action
Construction of two (2) Classrooms
output
Provision learning facilities.
implementation status
Complete and in use.
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Enasampulai Prim. School

location
Upper Melili (in Narok North)
year first funded
2007
action
Construction of 2 Class
output
Pro. Of learning facilities
implementation status
Completed and in use
total cost
Ksh 900,000
estimate
Ksh 900,000

Nailogilog primary School

location
Keekonyokie (in Narok North)
year first funded
2007
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Completed and in use
total cost
Ksh 900,000
estimate
Ksh 900,000

N/ Enkare Polytechnic

location
Keekonyokie (in Narok North)
year first funded
2007
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
At tendering
total cost
Ksh 900,000
estimate
Ksh 900,000

Medungi Primary

location
Olokurto (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Enarau Primary School

location
Olokurto (in Narok North)
year first funded
2004
action
Construction of three (3) Classrooms
output
Improved learning facilities
implementation status
2 classrooms Complete and in use.
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Ole Polos Pr. School.

location
Olokurto (in Narok North)
year first funded
2004
action
Construction of two (2) Classrooms
output
Provision of learning facilities
implementation status
Complete and in use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Shapaltarakwa primary School

location
Olokurto (in Narok North)
year first funded
2005
action
Construction of 2 Classrooms
output
Prov. Of good learning facilities
implementation status
Complete and in use
total cost
Ksh 800,000
estimate
Ksh 800,000

Naituyupaki primary School

location
Olokurto (in Narok North)
year first funded
2005
action
Construction of 3 Classrooms
output
Prov. Of good learning facilities
implementation status
2 classrooms complete and in use
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Oloonkabobok primary School

location
Entontol (in Narok North)
year first funded
2005
action
Construction of 2 Classrooms
output
Prov. Of good learning facilities
implementation status
95% Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Ole Naeku primary School

location
Enabelibel (in Narok North)
year first funded
2005
action
Construction of water tank and Renovation of 4 Classrooms
output
Pro. Of learning facilities
implementation status
Complete and in use
total cost
Ksh 800,000
estimate
Ksh 800,000

Ilpolton primary School

location
olokurto (in Narok North)
year first funded
2005
action
Construction of 2 Classrooms
output
Pro.of learning facilities
implementation status
Complete and in use
total cost
Ksh 800,000
estimate
Ksh 800,000

Olorropil Primary

location
Olorropil (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Complete and in use
total cost
Ksh 800,000
estimate
Ksh 800,000

Entontol primary School

location
Entontol (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Complete and in use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Oloolorten Primary

location
Entontol (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Nkokolani Primary

location
Olokurto (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Complete and in use
total cost
Ksh 800,000
estimate
Ksh 800,000

Oloika Primary

location
Ntulele (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Complete and in use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Topoti Primary

location
Olorropil (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Nchura Eabori Primary

location
Nkareta (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Pro. Of learning facilities
implementation status
Complete and in use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Oloolongoi Primary School

location
Olpusimoru (in Narok North)
year first funded
2006
action
Construction of 2 Classrooms
output
Provision learning facilities.
implementation status
Ongoing 90% complete
total cost
Ksh 800,000
estimate
Ksh 800,000

Enabelbel Health Centre

location
Enabelbel (in Narok North)
year first funded
2007
action
Purchase of beds and beddings /water
output
Provision of better health facilities
implementation status
At tendering
total cost
Ksh 800,000
estimate
Ksh 800,000

Olchorro Health Centre

location
Olchorro (in Narok North)
year first funded
2005
action
Construction of Mortuary
output
Provision of Mortuary services
implementation status
Ongoing 15% Complete
total cost
Ksh 791,628
estimate
Ksh 791,628

Olooltoto Primary

location
Nkareta (in Narok North)
year first funded
2006
action
Purchase of Kitchen Boilers & Dining Furniture
output
Easy food management process.
implementation status
Complete and in use.
total cost
Ksh 600,000
estimate
Ksh 600,000

Erusia Pr. School

location
Entontol (in Narok North)
year first funded
2004
action
Purchase of Desks and Construction One (1) Classroom
output
Provision of learning facilities
implementation status
Desks purchased
total cost
Ksh 600,000
estimate
Ksh 600,000

Oloikumukum Water

location
Mosiro (in Narok North)
year first funded
2006
action
Fencing of the Dam
output
Provision of water to consumers & livestock
implementation status
Tendering
total cost
Ksh 505,654
estimate
Ksh 505,654

Ratia Ridge Primary School

location
Entontol (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Complete and in use.
total cost
Ksh 450,000
estimate
Ksh 450,000

Entinki primary School

location
Upper Melili (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Completed and in use
total cost
Ksh 450,000
estimate
Ksh 450,000

Olokirikirai primary

location
Enabelbel (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Completed and in use
total cost
Ksh 450,000
estimate
Ksh 450,000

Ole Ngape primary School

location
Olpusimoru (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Completed and in use
total cost
Ksh 450,000
estimate
Ksh 450,000

Lelongo – Ilkirragarien primary School

location
Keekonyokie (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
On going 70% complete.
total cost
Ksh 450,000
estimate
Ksh 450,000

Ndurumet primarySchool

location
Mosiro (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Completed.
total cost
Ksh 450,000
estimate
Ksh 450,000

Enarau Primary School

location
Olokurto (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Completed.
total cost
Ksh 450,000
estimate
Ksh 450,000

Empaash primary School

location
Suswa (in Narok North)
year first funded
2007
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Ongoing 85% complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Olemwanik Primary

location
Olchoro (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Complete awaiting handing over.
total cost
Ksh 400,000
estimate
Ksh 400,000

Nairenke Primary

location
Olchoro (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Complete and in use.
total cost
Ksh 400,000
estimate
Ksh 400,000

Iloboti Water Project

location
Keekonyokie (in Narok North)
year first funded
2005
action
Laying of pipes
output
Provision of pipe water to Wananchi and animals
implementation status
Complete and in use (phase 1)
total cost
Ksh 400,000
estimate
Ksh 400,000

Naituyupaki primary School

location
Olokurto (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Ongoing 95% complete.
total cost
Ksh 400,000
estimate
Ksh 400,000

Enarau primary School

location
Olokurto (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Olopirik primarySchool

location
Olokurto (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kukenik primarySchool

location
Olokurto (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Olokuseroi Primary School

location
Nkareta (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Complete and in use
total cost
Ksh 400,000
estimate
Ksh 400,000

Olekoonyo primarySchool

location
Ntulele (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
On going 95% Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Olenoosiria primary School

location
Entiyani (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Complete and in Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Olelusie Primary School

location
Entontol (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Erusiai Primary School

location
Entontol (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Provision learning facilities.
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Olendeem primary School

location
Olchorro (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
Ongoing 95% Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Ilmolelian Primary

location
Entiyani (in Narok North)
year first funded
2006
action
Construction of 1 Classroom
output
Pro. Of learning facilities
implementation status
98% Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Emergency funds

location
Keekonyokie (in Narok North)
year first funded
2003
action
Renovations of Classrooms, Adm. Block.
output
Restored learning facilities
implementation status
Complete and in use
total cost
Ksh 300,000
estimate
Ksh 300,000

Iloiboti water Project

location
Keekonyokie (in Narok North)
year first funded
2007
action
Piping
output
Provision of piped water to consumers
implementation status
Completed.
total cost
Ksh 200,000
estimate
Ksh 200,000

Enabelbel water Project

location
Enabelbel (in Narok North)
year first funded
2007
action
Repair of Pipes and Generator Room
output
Provision of piped water to consumers
implementation status
On going
total cost
Ksh 200,000
estimate
Ksh 200,000

Lelong Water

location
Keekonyokie (in Narok North)
year first funded
2007
action
Construction of cattle trough
output
Provision of water to Livestock
implementation status
On going
total cost
Ksh 100,000
estimate
Ksh 100,000