The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Loita Secondary School
- location
-
Loita
(in Narok South)
- year first funded
- 2003
- action
- Construction of two (2) Classrooms, Dining Hall Kitchen and Ablution block
- output
- Provision of learning facilities & accom.
- implementation status
- not known
- total cost
- Ksh 4,700,000
- estimate
- Ksh 4,700,000
Ololulunga secondary
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2005
- action
- Construction of 3 classrooms and Two Dormitories
- output
- Provision of learning facilities & accomodation facilities
- implementation status
- not known
- total cost
- Ksh 4,614,417
- estimate
- Ksh 4,614,417
Siana Borehole
- location
-
Siana
(in Narok South)
- year first funded
- 2005
- action
- Drill a borehole, equip it and do piping
- output
- Provide water to people and livestock
- implementation status
- This is now called kijirjir water project
- total cost
- Ksh 4,300,000
- estimate
- Ksh 4,300,000
Ololulunga District Hospital
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2003
- action
- Construction of health center, Maternity Ward, pit latrines and purchase of storage tank and beds, admin block
- output
- Provide preventives and Complete and in use curative services.
- implementation status
- The admin block will need Kshs. 1.750,000 for completion as the initial kshs 2 million is not enough for a standard admin block with septic tank.
- total cost
- Ksh 4,218,241
- estimate
- Ksh 2,218,241
Sogoo water project
- location
-
Sogoo
(in Narok South)
- year first funded
- 2004
- action
- Sinking of borehole, equipping it and piping
- output
- Provide clean water to people and livestock
- implementation status
- Reqested for KPLC quotation for transformer under rural electrification program to run the pump instead of acquiring a generator
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,700,000
Aitong Pr. School
- location
-
Aitong
(in Narok South)
- year first funded
- 2003
- action
- Construction of two (2) Classrooms,and dormitory, FY 2008/09 Construction of 2 units staff house
- output
- Provision of learning facilities & accommodation
- implementation status
- FY 2008/09 Kshs 450,000 re-allocted from a classroom to 2 units staff house
- total cost
- Ksh 3,000,000
- estimate
- Ksh 2,550,000
Entasekera -mausa Road
- location
-
Loita
(in Narok South)
- year first funded
- 2006
- action
- Grading of Road
- output
- Provide road transport
- implementation status
- More funds needed for gravelling & routine maintenance
- total cost
- Ksh 3,000,000
- estimate
- Ksh 2,000,000
Ngiito Secondary School
- location
-
Mulot
(in Narok South)
- year first funded
- 2005
- action
- Construction of Dormitory and one laboratory in FY 2008/09 & 2009/10
- output
- Provision of Accomodation & laboratory facilities
- implementation status
- Fy 2008/09 kshs. 900,000 was re-allocated from two classrooms to construction of a laboratory
- total cost
- Ksh 2,900,000
- estimate
- Ksh 2,900,000
Naroosura secondary School.
- location
-
Naroosura
(in Narok South)
- year first funded
- 2003
- action
- Construction of four (4) Classrooms, Dining Hall Kitchen and Ablution block
- output
- Provision of learning facilities & accom.
- implementation status
- not known
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,700,000
Naroosura Health Centre
- location
-
Naroosura
(in Narok South)
- year first funded
- 2007
- action
- Build Doctors’ house and a ward.shs 5m is for construction of a ward 2008/09
- output
- Provide accommodation to staff & ward for in-patients
- implementation status
- Allocated sh. 450,000 in FY 2009/10 for completion of a doctor's house.
- total cost
- Ksh 2,550,000
- estimate
- Ksh 2,550,000
Junction C11-Ntuka Olosirwa road
- location
-
Ntuka
(in Narok South)
- year first funded
- 2009
- action
- Grading works
- output
- Make the road passable
- implementation status
- not known
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Mulot Dispensary
- location
-
Mulot
(in Narok South)
- year first funded
- 2007
- action
- Build observation Rm and store & Toilets
- output
- Provide better health facility which is near to the community
- implementation status
- Phase II is on going
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
Siana Boarding Primary School
- location
-
Siana
(in Narok South)
- year first funded
- 2005
- action
- Construction of 3 Classrooms & a dormitory in FY 2009/10
- output
- Provision of learning facilities
- implementation status
- More funds needed for additional classrooms
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Sogoo Secondary School
- location
-
Sogoo
(in Narok South)
- year first funded
- 2006
- action
- Construction of a dining hall (2006/07) & Dormitory (Fy 09/10)(Phase I)
- output
- Provide conducive learning facilities
- implementation status
- not known
- total cost
- Ksh 2,100,000
- estimate
- Ksh 900,000
Olchoro secondary School
- location
-
Olchorro
(in Narok South)
- year first funded
- 2004
- action
- Construction of four (4) Classrooms
- output
- Provision of learning facilities
- implementation status
- The needs more funding for additional classrooms, lab, admin block and toilets.
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,100,000
Ilmotiok secondary
- location
-
Ilmotiok
(in Narok South)
- year first funded
- 2005
- action
- Construction of classrooms
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Olmesutie-Enkisero Sompu road
- location
-
Olmesutie
(in Narok South)
- year first funded
- 2009
- action
- Grading works
- output
- Make the road passable
- implementation status
- Regular maintenance is required
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Morijo Loita Dispensary
- location
-
Morijo Loita
(in Narok South)
- year first funded
- 2007
- action
- Build treatment &observation Rooms(Fy 07/08) & Staff house (Fy 2009/10)
- output
- Provide better health facility to the community and more so to expectant mothers
- implementation status
- Benefitted from sh. 20M stimulus upgrading.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,500,000
Ole maleto water project
- location
-
Aitong
(in Narok South)
- year first funded
- 2005
- action
- Build a water pan
- output
- Provide water to people and livestock
- implementation status
- not known
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Enelerai secondary School
- location
-
Enelerai
(in Narok South)
- year first funded
- 2003
- action
- Construction of two (2) Classrooms & lab
- output
- Provision of learning facilities
- implementation status
- Need more Funding for Dining hall and Dormitories
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Ilkerin loita pr.
- location
-
Ilkerin
(in Narok South)
- year first funded
- 2005
- action
- Construction of dormitory and one Classroom in Fy 2008/09
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,650,000
Melelo secondary School
- location
-
Melelo
(in Narok South)
- year first funded
- 2004
- action
- Construction of dormitory and one Classroom in FY 2008/09
- output
- Provision of decent accommodation 7 conducive learning environment
- implementation status
- The school needs more funding for a tank & plumbing works.
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,100,000
Chepinyiny -Olchoro road
- location
-
Mulot
(in Narok South)
- year first funded
- 2007
- action
- Grading and culvert works
- output
- Provide better accessibility of the locality
- implementation status
- Regular maintenance works is recommended
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Olchoro-Oiruwua Mogoiyuet Road
- location
-
Olchoro
(in Narok South)
- year first funded
- 2009
- action
- Grading works
- output
- Make the road passable
- implementation status
- Activity has been changed from grading works to culvert works as the KeRRA (min. of roads) did grading
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Melelo-Olashapani Bridge
- location
-
Melelo
(in Narok South)
- year first funded
- 2006
- action
- Build a footbridge
- output
- Make the bridge usable
- implementation status
- not known
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Ntuka pr.
- location
-
Ntuka .
(in Narok South)
- year first funded
- 2005
- action
- Construction of dormitory and one Classroom in Fy 2008/09
- output
- Provision of decent accommodation & learning facility
- implementation status
- not known
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Olosiyio primary School
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2006
- action
- Construction of a staff house & a dormitory in Fy 2009/10
- output
- Provide accommodation facilities to teachers & pupils
- implementation status
- not known
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Ole Ntutu pr
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2005
- action
- Construction of Classrooms,dorm,roofing
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Loita health community Health centre
- location
-
Loita
(in Narok South)
- year first funded
- 2009
- action
- Kitchen construction
- output
- Provide proper cooking are for in-patients
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ormusereji Pri
- location
-
Lemek
(in Narok South)
- year first funded
- 2007
- action
- Construct one classroom & adminstration block in FY 2009/10
- output
- Provision of learning facility
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Enkiu primary
- location
-
Ntuka
(in Narok South)
- year first funded
- 2007
- action
- Construction of two 2 classrooms
- output
- Provision of learning facility
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nkori- Nkori Rongena Road
- location
-
Rongena
(in Narok South)
- year first funded
- 2006
- action
- Grading of Road and culverts works
- output
- Provide road transport
- implementation status
- More funds needed for gravelling
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Rongena dispensary
- location
-
Rongena
(in Narok South)
- year first funded
- 2006
- action
- Construction of treatment rooms
- output
- Provision of health facilities
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ole Nkuluo water Pan
- location
-
Ole Nkuluo
(in Narok South)
- year first funded
- 2004
- action
- Desliting the dam
- output
- Provide water to people and livestock.
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Endoinyo Narasha water project
- location
-
Olkinyei
(in Narok South)
- year first funded
- 2009
- action
- Water tank acquisition
- output
- Provide water for both inhabitants & animals
- implementation status
- not known
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Marinwa primary
- location
-
Mulot
(in Narok South)
- year first funded
- 2008
- action
- Construct two classrooms
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Esinoni Primary
- location
-
Esinoni .
(in Narok South)
- year first funded
- 2005
- action
- Construction of one Classroom
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 850,000
- estimate
- Ksh 400,000
Esinoni primary
- location
-
Esinoni
(in Narok South)
- year first funded
- 2006
- action
- Construction of Two classrooms
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Oloirien pr.
- location
-
Oloirien.
(in Narok South)
- year first funded
- 2005
- action
- Construction of two Classrooms
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Ntuka primary School
- location
-
Ntuka
(in Narok South)
- year first funded
- 2004
- action
- Construction of two (2) Classrooms
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Kimogoro-Nkaroni Road
- location
-
Mulot
(in Narok South)
- year first funded
- 2006
- action
- Road opening
- output
- Make the road wide and passable
- implementation status
- not known
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Meroni water projet
- location
-
Naroosura
(in Narok South)
- year first funded
- 2004
- action
- Construction of storage tank and pipe works
- output
- Provide water to people and livestock.
- implementation status
- More funds needed to lay more pipes
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Olchorro- onyoike water
- location
-
Olchorro onyoike
(in Narok South)
- year first funded
- 2006
- action
- Desilting of Dam
- output
- Provide clean water to people and livestock
- implementation status
- not known
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Junction – Olemegili Road
- location
-
Loita
(in Narok South)
- year first funded
- 2007
- action
- Grading and culvert works
- output
- Provide better accessibility of the locality
- implementation status
- Regular maintenance works is recommended
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Mulot AP line
- location
-
Mulot
(in Narok South)
- year first funded
- 2006
- action
- Construction of AP line
- output
- Provide accommodation facilities to police
- implementation status
- Allocated sh.284,000 in Fy 2009/10 for finishing.waiting for funds in the 2nd half for 09/10
- total cost
- Ksh 784,000
- estimate
- Ksh 1,000,000
Ololulunga -ereteti road
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2009
- action
- Grading works
- output
- Make the road passable
- implementation status
- not known
- total cost
- Ksh 730,000
- estimate
- Ksh 730,000
Chepkerip water project
- location
-
Mulot
(in Narok South)
- year first funded
- 2004
- action
- Build water tank
- output
- Provide water to people and livestock.
- implementation status
- More funds needed to lay more pipes
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Olkinyei water project
- location
-
Olkinyei
(in Narok South)
- year first funded
- 2006
- action
- Doing water piping
- output
- Provide clean water to people and livestock
- implementation status
- This is now called Empura and they are now doing a water tank and comm. Water point
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Ntuka water project
- location
-
Ntuka
(in Narok South)
- year first funded
- 2006
- action
- Construction of borehole
- output
- Provide clean water to people and livestock
- implementation status
- not known
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Oloonkerin primary
- location
-
Lemek
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provide accomodation facilities for the staff
- implementation status
- Kshs.130,000 re-allocated from Ololulunga -Ereteti Road in FY 2009/10, balance of Ksh. 600,000 to go to olaabai footbridge.
- total cost
- Ksh 580,000
- estimate
- Ksh 450,000
Laluk Engine/Pump House
- location
-
Mulot
(in Narok South)
- year first funded
- 2007
- action
- Build an Engine house,
- output
- Provide clean water for people and livestock
- implementation status
- Needs more funding to make it fully operational.
- total cost
- Ksh 570,000
- estimate
- Ksh 400,000
Olmesutie Primary School
- location
-
Olmesutie
(in Narok South)
- year first funded
- 2009
- action
- Construction of one classroom
- output
- Provide conducive learning facilities
- implementation status
- not known
- total cost
- Ksh 550,000
- estimate
- Ksh 550,000
Osupuko Oirobi pr.
- location
-
Osupuko
(in Narok South)
- year first funded
- 2005
- action
- Construction of staff house
- output
- Improve working environment of the staff
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Entiapiri primary
- location
-
Naroosura
(in Narok South)
- year first funded
- 2007
- action
- Construct one classroom
- output
- Provision of learning facility
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Pimbiniet primary
- location
-
Enelerai
(in Narok South)
- year first funded
- 2007
- action
- Construct one classroom
- output
- Provision of learning facility
- implementation status
- CDFC re-allocated funds coz there is NGO building for them
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Olengaji Nabo Pri
- location
-
Melelo
(in Narok South)
- year first funded
- 2007
- action
- Construct one classroom
- output
- Provision of learning facility
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kosika primary
- location
-
Naroosura
(in Narok South)
- year first funded
- 2007
- action
- Construct one classroom
- output
- Provision of learning facility
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Koitamugul Pri
- location
-
Mulot
(in Narok South)
- year first funded
- 2007
- action
- Construct one classroom
- output
- Provision of learning facility
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Milimani primary
- location
-
Mulot
(in Narok South)
- year first funded
- 2007
- action
- Construct one classroom
- output
- Provision of learning facility
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mulot police station
- location
-
Mulot
(in Narok South)
- year first funded
- 2006
- action
- Construction of D O’ s office
- output
- Provide accommodation facilities
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chebinyiny primary
- location
-
Mulot
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Esinoni Primary School
- location
-
Esinoni
(in Narok South)
- year first funded
- 2009
- action
- Construction of one classroom
- output
- Provide conducive learning facilities
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Oloisuisho Ololulunga Primary School
- location
-
Ololululnga
(in Narok South)
- year first funded
- 2009
- action
- Construction of one classroom
- output
- Provide conducive learning facilities
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Oldany Primary School
- location
-
Mulot
(in Narok South)
- year first funded
- 2009
- action
- Provide conducive learning facilities
- output
- Provide conducive learning environment for the pupils
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Oloenai Nursery
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Segemik primary
- location
-
Mulot
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Olooretet primary
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Mausa primary
- location
-
Loita
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- This is the remotest part of the constituency.Pmc is making plans to start construction
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Oltilele primary (Enkutoto)
- location
-
Naroosura
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- Formerly Enkutoto primary school.
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Kilaanda primary
- location
-
Mulot
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Olonini primary
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Olpukoti primary
- location
-
Melelo
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Ole kasale –morloo primary
- location
-
Osupuko
(in Narok South)
- year first funded
- 2008
- action
- Construct one classroom
- output
- Provision of conducive learning environment
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Chepkutbei Spring protection
- location
-
Mulot
(in Narok South)
- year first funded
- 2007
- action
- Do Spring protection
- output
- To provide clean water for the people and avoid contamination
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nkaimurunya Engine House
- location
-
Nkaimurunya
(in Narok South)
- year first funded
- 2007
- action
- Build an Engine house
- output
- Provide clean water for people and livestock
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Letukunyi Engine house
- location
-
Maji moto
(in Narok South)
- year first funded
- 2007
- action
- Build an Engine house
- output
- Provide clean water for people and livestock
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Lemisigio Engine/Pump Hse
- location
-
Olderkesi
(in Narok South)
- year first funded
- 2007
- action
- Build an Engine/Pump house
- output
- Provide clean water for people and livestock
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Iltumaro Engine/Pump Hse
- location
-
Olderkesi
(in Narok South)
- year first funded
- 2007
- action
- Build an Engine/Pump house
- output
- Provide clean water for people and livestock
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Enkeju Aro Engine/Pump Hse
- location
-
Loita
(in Narok South)
- year first funded
- 2007
- action
- Build an Engine/Pump house
- output
- Provide clean water for people and livestock
- implementation status
- Was changed to build Two cattle troughs and some piping coz there was Engine hse already
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olenkuluo primary
- location
-
Olenkuluo
(in Narok South)
- year first funded
- 2006
- action
- Construction of a classroom
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Aganga Primary School
- location
-
Mulot
(in Narok South)
- year first funded
- 2006
- action
- Construction of a classroom
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Naromoru primary
- location
-
Naromoru
(in Narok South)
- year first funded
- 2006
- action
- Construction of a classroom
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sagamian secondary School
- location
-
Sagamian
(in Narok South)
- year first funded
- 2005
- action
- Construction of one classroom
- output
- Provision of learning facilities
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olorte primarySchool
- location
-
Olorte
(in Narok South)
- year first funded
- 2004
- action
- Construction of one (1) Class
- output
- Provision of learning facilities
- implementation status
- More funds needed for additional classrooms
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Naserian primary School
- location
-
Oloirien
(in Narok South)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Provision of learning facilities
- implementation status
- More funds needed for additional classrooms
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Olkirankauo Engine/Pump House
- location
-
Maji Moto
(in Narok South)
- year first funded
- 2007
- action
- Build an Engine house
- output
- Provide clean water for people and livestock
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Ololulunga division
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2009
- action
- Purchase of sports kitty
- output
- Support youth sports
- implementation status
- not known
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Osupuko division
- location
-
Osupuko
(in Narok South)
- year first funded
- 2009
- action
- Purchase of sports kitty
- output
- Support youth sports
- implementation status
- not known
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Tree planting in mulot division
- location
-
Mulot
(in Narok South)
- year first funded
- 2009
- action
- Tree planting
- output
- `
- implementation status
- not known
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Loita division
- location
-
Loita
(in Narok South)
- year first funded
- 2009
- action
- Purchase of sports kitty
- output
- Support youth sports
- implementation status
- not known
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Lekurukin water source
- location
-
Loita
(in Narok South)
- year first funded
- 2009
- action
- Tree planting
- output
- Environmental Afforeststion
- implementation status
- not known
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Enkongu Enkare Water Project
- location
-
Naroosura
(in Narok South)
- year first funded
- 2009
- action
- Tree planting
- output
- Environmental Afforeststion
- implementation status
- not known
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Olchoro -Onyokie Water source
- location
-
Loita
(in Narok South)
- year first funded
- 2009
- action
- Tree planting
- output
- Environmental Afforeststion
- implementation status
- not known
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Ololulunga Secondary School
- location
-
Ololulunga
(in Narok South)
- year first funded
- 2009
- action
- Tree planting
- output
- Environmental Afforeststion
- implementation status
- not known
- total cost
- Ksh 125,000
- estimate
- Ksh 250,000