The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Ndhiwa Cdf Office At Ndhiwa
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of Office Block
- output
- Improved Administrative Facilities To The Cdf
- implementation status
- Construction Of Office Block Complete.
- total cost
- Ksh 4,074,250
- estimate
- Ksh 4,500,000
Maranyona Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increases
- implementation status
- 3 Classrooms Completed And In Use. One Classroom Roofed And In Use And 60% Of Work Complete.
- total cost
- Ksh 3,300,000
- estimate
- Ksh 1,800,000
Mirogi River Bridge
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Bridge Construction
- output
- Improved Communication Network
- implementation status
- 25% Of Construction Work Done
- total cost
- Ksh 3,000,000
- estimate
- Ksh 6,000,000
St. Philip’s Wayaga secondary school - lab
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Science Lab
- output
- Students Able To Learn Science Subjects
- implementation status
- Science Lab Construction Completed Except Painting Sanitary Fitting
- total cost
- Ksh 3,000,000
- estimate
- Ksh 1,600,000
Sare River Bridge
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Bridge Construction
- output
- Improved Communication Network For The Community
- implementation status
- ? Of Construction Work Done.
- total cost
- Ksh 3,000,000
- estimate
- Ksh 5,000,000
Ndhiwa Sub district hospital
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Wards
- output
- Improved Quality Health Services
- implementation status
- 1 Ward At Skeleton Structure Level & 1 Ward Plastered Both Inside & Outside Walls & Steel Doors And Windows Fitted.
- total cost
- Ksh 2,100,000
- estimate
- Ksh 2,500,000
Maram Dispensary
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Treatment Rooms And Ward
- output
- Ease Access To Medical Services For The Community.
- implementation status
- 8 Rooms Have Been Done. The Skeleton Of Two Wings Are At Roofing Level.
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,200,000
Aluor Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms, Science Lab And Administration Office
- output
- Increase In Students Enrollment
- implementation status
- 4 Complete Classrooms And In Use Science Lab 90% Work Complete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,800,000
Ototo Secondary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of A Dormitory
- output
- Increase In Students Enrollment
- implementation status
- Twin Dormitory 90% Complete Twin Teachers Houses Complete One Classroom Roofed & One At Slab Level
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,400,000
Malela H / Centre
- location
-
K Kologi
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Treatment Rooms, Wards And Staff Houses
- output
- Availability Of Medical Services For The Community
- implementation status
- Maternity Rooms, Wards Office Rooms
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,700,000
Ratanga Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Administration Block
- output
- Improved Administration Facilities For Management.
- implementation status
- Admin. Block Complete & Painting Done And In Use.
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,200,000
Ratanga Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 6 Classrooms
- output
- -
- implementation status
- 5 Skeleton Classrooms Roofed
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,700,000
St. Marys Nyamogo Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Laboratory
- output
- Students Able To Take Science Subjects In Kcse.
- implementation status
- The Laboratory Is At Skeleton Structure And Has Been Roofed.
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,600,000
Kobodo Primary School
- location
-
K Kologi
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Increase In Students
- implementation status
- 2 Classrooms Complete And 2 Skeleton Classrooms Roofed
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,800,000
Kwamo Dispensary
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of Treatment Rooms & Staff Houses
- output
- Availability Of Health Services To The Community
- implementation status
- Treatment Rooms Complete & Staff Houses Outstanding.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,500,000
Kome Secondary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Classrooms Completed And In Use. And The Other Two Classrooms
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,200,000
Andiwo Secondary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Increase In Students Enrollment
- implementation status
- Laboratory Has Been Roofed And In Walls Plastered
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,600,000
St. Mary’s Nyamogo secondary school
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increases
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,600,000
Goyo Primary School
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 7 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 7 Skeleton Structured Classrooms Roofed.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,100,000
Unga Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 6 Class
- output
- Pupils Enrolment Increase
- implementation status
- Construction Of 6 Classrooms Are 80% Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,700,000
Manywanda Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 6 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 5 Skeleton Classrooms Roofed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,500,000
Ogango Secondary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Science Lab
- output
- Increase In Students Enrollment
- implementation status
- Construction Complete And In Use.
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,500,000
Koguta Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 5 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 7 Skeleton Classrooms And Admin Block Roofed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,500,000
Rapedhi Secondary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Students Able To Take Science Subjects
- implementation status
- Lab Roofed. Inside Walls Plastered.
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,600,000
Amoyo Health Centre
- location
-
East Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Treatment Room
- output
- Availability Of Health Services To The Community
- implementation status
- 5 Treatment Rooms Complete And In Use. Doctor?S House At Gable Level
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,800,000
Langi Secondary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Increase In Students Enrolment
- implementation status
- 2 Classrooms Roofed And Final Touches In Progress
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,600,000
Ratil Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- -
- implementation status
- 3 Classrooms Completed And Final Touches In Progress.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Wanjawa Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms & Admin. Block
- output
- Pupils Enrollment Increase
- implementation status
- 5 Skeleton Classrooms Roofed. & 1 Skeleton Administration Block Roofed.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,700,000
Kadhola Health Centre
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of Treatment Room And Staff Houses
- output
- Availability Of Health Services To The Community
- implementation status
- 3 Treatment Rooms Roofed. The Other 3 Rooms At Foundation Level.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,600,000
Rarage Secondary School Water Project
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Drilling Of Borehole
- output
- Availability Of Clean Water For The Students.
- implementation status
- Geo-Survey Done And Driller Identified And Contracted
- total cost
- Ksh 1,175,130
- estimate
- Ksh 100,000
Wi – Odielo Water Project
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2005
- action
- Drilling Of Borehole & Installation Of Water Pump
- output
- Availability Of Clean Water For Community
- implementation status
- Drilling Completed, Awaiting Water Pump Installation
- total cost
- Ksh 1,103,130
- estimate
- Ksh 1,000,000
Rakoro Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 4 Skeleton Classrooms In Final Stages Of Construction
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Rarage Secondary School
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 4 Skeleton Classrooms Roofed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,800,000
Ndiwa Institute of Technology
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Availability Of Technological Learning Equipments
- implementation status
- Fencing And Renovation Work Complete And In Use.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,800,000
Lwanda Kawuor Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Twin Lab Building
- output
- Students Able To Learn Science Subjects
- implementation status
- ? Of The Work Completed.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,400,000
Otange Health Centre
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 4 Treatment Rooms & Doctors Houses.
- output
- Availability Of 4 Health Services
- implementation status
- Treatment Rooms Complete. Staff House Outstanding.
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
St. Philip's Wayaga secondary Water project
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Drilling Of Borehole
- output
- Availability Of Clean Water For The Community
- implementation status
- Geo Survey Done And Driller Identified And Contracted
- total cost
- Ksh 1,065,130
- estimate
- Ksh 1,600,000
Jabagre Primary School
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 4 Skeleton Classrooms Roofed
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,800,000
Wachara Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Science Laboratory & Store
- output
- Students Enrolment Increases
- implementation status
- Laboratory And Store Complete And In Use.
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,000,000
Mirogi Girls Secondary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Administration Block
- output
- Adequate Administration Facilities
- implementation status
- Administration Block Roofed, Final Touches In Progress
- total cost
- Ksh 1,050,000
- estimate
- Ksh 2,000,000
Agudo Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 6 Classrooms
- output
- Increase In Students Enrollments
- implementation status
- 6 Skeleton Classrooms Roofed
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,800,000
St. Mary's Nyamogo Water Project
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Drilling Of Bore Hole
- output
- Pupils Enrollment Increase
- implementation status
- Geo Survey Done And Drilling Complete And Water Pump Installed. In Use.
- total cost
- Ksh 1,049,700
- estimate
- Ksh 1,000,000
Maranga Primary School
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- Two Classrooms At Windowest Cill Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 900,000
Osure Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 6 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 6 Classrooms Roofed And Final Touches In Progress
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,800,000
Ojode Unga Secondary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Goyo River Bridge
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Opening Of The Road
- output
- Improved Communication Network
- implementation status
- Work Stalled
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Otange Primary School
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- -
- implementation status
- 2 Classrooms Completed Except Painting Outstanding
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Oridi Community Health Centre
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Treatment Room And Staff Houses
- output
- Availability Of Health Services.
- implementation status
- Treatment Facility Roofed.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bongu Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrollment Increase
- implementation status
- Complete Except Painting.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Luanda Awiti Dispensary
- location
-
West Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Treatment Room And Staff Houses
- output
- Availability Of Health Services To The Community.
- implementation status
- Construction Of Treatment Rooms Fencing The Compound Done.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Nyamanga Secondary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Student Enrolment Increases
- implementation status
- Construction Work At Lintel Level.
- total cost
- Ksh 956,206
- estimate
- Ksh 1,000,000
Mbani Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 4 Skeleton Classrooms Roofed
- total cost
- Ksh 950,000
- estimate
- Ksh 1,200,000
Ober Kabuoch Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of 5 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 5 Skeleton Classrooms Roofed
- total cost
- Ksh 950,000
- estimate
- Ksh 1,500,000
Magina Girls Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Construction Of Computer Lab
- output
- Increase In Students Enrollment.
- implementation status
- Computer Lab 90% Of Work Completed And Its In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 1,300,000
Ojodeh Pala Secondary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed, One Newest Classroom At Windowest Cill Level
- total cost
- Ksh 950,000
- estimate
- Ksh 120,000
Kanyangasi Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Classrooms Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 700,000
Ndhiwa Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 4 Skeleton Classrooms Roofed, Steel Doors & Windows Fitted.
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Lwanda Kobita Dispensary
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Treatment Rooms
- output
- Ease Access To Health Services For The Community
- implementation status
- 4 Skeleton Treatment Rooms Roofed
- total cost
- Ksh 900,000
- estimate
- Ksh 1,600,000
Miranga Secondary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Drilling Of Borehole & Installation Of Water Pump
- output
- Community Access To Clean Water
- implementation status
- Drilling Complete & Water Pump Installed And In Use.
- total cost
- Ksh 890,500
- estimate
- Ksh 1,000,000
Bondo Water Project
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Drilling Of Borehole & Installation Of Water Pump.
- output
- Availability Of Clean Water For Community
- implementation status
- Geo Survey Done. Drilling Done.
- total cost
- Ksh 860,130
- estimate
- Ksh 1,000,000
Minya Primary School
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 1 Skeleton Classroom Roofed, And
- total cost
- Ksh 850,000
- estimate
- Ksh 800,000
Got Kojowi Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Dormitory
- output
- Students Enrolment Increases
- implementation status
- One Girl?S Dormitory Completed.
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
Saramba Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Two Class
- output
- Increase In Students Enrollment
- implementation status
- 3 Skeleton Classrooms Roofed
- total cost
- Ksh 850,000
- estimate
- Ksh 13,500,000
E/Kwabwai Chief’s Camp
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Administration Block
- output
- Availability Of Administrative Services To The Community
- implementation status
- Construction Of Administration Block 2/3 Of The Work Completed
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
Kongo Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Mariri Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- One Classroom Roofed At Foundation Level
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Mirogi _ Koduogo Oboch Road
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Road Opening, Grading And Sport Murraming
- output
- Improved Communication Network For The Community.
- implementation status
- The Road Opened Up.
- total cost
- Ksh 800,000
- estimate
- Ksh 3,500,000
Kamasi Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 3 Skeleton Classrooms Roofed And One Classroom And Administration Block At Lintel Level.
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Nguku Dispensary
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Treatment Rooms
- output
- Availability Of Health Services
- implementation status
- Skeleton Treatment Rooms Roofed.
- total cost
- Ksh 800,000
- estimate
- Ksh 1,800,000
Mbani Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Students Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Completed. One Classroom At Lintel Level.
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Nyarandi Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Opanga Primary School
- location
-
West Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Classrooms In Final Stage Of Construction.
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
Ndhiwa sacco soc.
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Nmc Gave Authority To Reallocate Funds
- output
- Access To Savings And Credit Facilities.
- implementation status
- Funds Reallocated To Ratanga Cdf Office.
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Bwanda Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed And Final Touches In Progress
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Dago Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 3 Skeletons Classrooms Roofed And Two Skeleton Classrooms At Windowest Cill Level
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Abuoro Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Class
- output
- Pupils Enrolment Increase
- implementation status
- One Classroom Roofed One At Foundation Level.
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Kobodo Health Centre
- location
-
K Kologi
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 10 Treatment Rooms
- output
- Availability Of Health Services To The Community
- implementation status
- Construction At Windowest Level
- total cost
- Ksh 800,000
- estimate
- Ksh 1,800,000
Kaumo Primary School
- location
-
K Kologi
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Classrooms Roofed
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Ombo Dispensary
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Treatment Rooms
- output
- Availability Of Medical Services For The Community
- implementation status
- Construction Work At Lintel Level
- total cost
- Ksh 800,000
- estimate
- Ksh 2,000,000
Poya Primary School
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Kamolo Primary School
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Ongeng Primary School
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 3 Skeleton Classrooms Roofed.
- total cost
- Ksh 800,000
- estimate
- Ksh 1,500,000
Ogingo Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- not known
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Unga – Rapedhi Road
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Road Grading And Sport Murraming
- output
- Improved Communication Network
- implementation status
- Kshs. 500,000 Was Reallocated To Ndhiwa Resource Centre.
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
Kowuor Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 4 Skeleton Classrooms Roofed
- total cost
- Ksh 793,923
- estimate
- Ksh 900,000
Rarage Primary School
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- ?
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Unga Dispensary
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Treatment Rooms And Staff Houses
- output
- Availability Of Medical Services For The Community.
- implementation status
- Construction Of Treatment Rooms Completed Not In Use.
- total cost
- Ksh 750,000
- estimate
- Ksh 1,700,000
Rambusi Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Increase Student Enrolment
- implementation status
- 3 Skeleton Classrooms Roofed One Classroom At Windowest Cill Level.
- total cost
- Ksh 750,000
- estimate
- Ksh 1,800,000
Mawega Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 750,000
- estimate
- Ksh 1,350,000
Ojodeh Misita Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed.
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Ariri Primary School
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Workmanship Poor
- implementation status
- Two Skeleton Classrooms Roofed
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Sasi Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Ralang Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Nguku Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Otange Secondary School
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms At Ring Beam
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Dunga Primary School
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Repair Of Falling Classrooms Walls.
- output
- Increase In Pupils Enrolment
- implementation status
- 1 Skeleton Classroom Roofed Other Classrooms Repaired.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Omako Koth Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- One Classroom Roofed One At Lintel, One At Windowest Cill Level.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,350,000
Ochol Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Repair Of Damaged Classes By Wind
- output
- Continuity In Learning
- implementation status
- Repair Of The Classrooms Blown Off By Wind Complete And In Use.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,300,000
Kome Dispensary
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Treatment Rooms And Staff Houses
- output
- Availability Of Health Services To The Community
- implementation status
- 3 Treatment Rooms Roofed. Inside Walls Plastered & Steel Doors And Windowest Fitted.
- total cost
- Ksh 700,000
- estimate
- Ksh 1,800,000
Arembe Primary School
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- Three Skeleton Classrooms Roofed
- total cost
- Ksh 650,000
- estimate
- Ksh 1,350,000
Yago Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 1 Skeleton Classrooms Roofed And One At Lintel
- total cost
- Ksh 650,000
- estimate
- Ksh 800,000
Rairi Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 650,000
- estimate
- Ksh 900,000
Anding'o Pala Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Two Class
- output
- Increase In Students Enrollments
- implementation status
- 3 Skeleton Classrooms Roofed And One Skeleton At Gable Level
- total cost
- Ksh 650,000
- estimate
- Ksh 1,350,000
Ruga Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed. One At Lintel Level. One At Foundation Level.
- total cost
- Ksh 650,000
- estimate
- Ksh 1,800,000
Kaguria Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 3 Skeleton Classrooms Roofed
- total cost
- Ksh 650,000
- estimate
- Ksh 13,500,000
Ponge Dispensary
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Staff Quarters
- output
- Availability Of Health Services To The Community
- implementation status
- Twin Staff Houses Of 2 Bedrooms Each
- total cost
- Ksh 615,001
- estimate
- Ksh 900,000
Nyamos Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- -
- implementation status
- 3 Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 1,350,000
Ogango Mixed Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Admin. Block
- output
- Safe And Comfortable Admin. Facilities.
- implementation status
- ? Of The Construction Works Completed.
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Okota Mixed Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Twin Teachers Quarters
- output
- Availability Of Teachers In School Compound.
- implementation status
- Twin Teachers? Houses Roofed.
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Bwanda Primary School
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Randhore H/ Centre
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Treatment Rooms
- output
- Availability Of Health Services
- implementation status
- Construction At Windowest Cill Level.
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Riat Police Post
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Police Quarters
- output
- Availability Of Security
- implementation status
- 4 Rooms Roofed And Complete. 3 More Rooms At Slab Level.
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Oridi Primary School
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Nyarongi Parish Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- Two Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Nyarongi Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Koga Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Rapedhi Primary School
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrollment Increase
- implementation status
- 2 Classrooms Roofed And Complete And In Use.
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
Got Kojowi Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Repair Of Classrooms Destroyed By Wind
- output
- Continuity In Learning Restored
- implementation status
- One Classroom Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Nyandemra Primary School
- location
-
West Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- Four Skeleton Classrooms Roofed, One Classroom At Roofing Level
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Osure Secondary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Students Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Rangenya Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed.
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
Buche Primary School
- location
-
K Kologi
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrolment
- implementation status
- Two Skeleton Classrooms Roofed.
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Nyarath Primary School
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Classrooms Constructed And Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Koduol Primary School
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- Construction Of 3 Classes In Final Stage
- total cost
- Ksh 600,000
- estimate
- Ksh 1,350,000
Magina Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Wirakuom Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Classrooms Complete Except Painting & Glasses Outstanding
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Pala Boya Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Renovation Of 3 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 580,000
- estimate
- Ksh 500,000
Konyua Water Project
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2004
- action
- Drilling Borehole
- output
- Availability Of Clean Water For Community
- implementation status
- Project Complete And Not In Use.
- total cost
- Ksh 555,000
- estimate
- Ksh 1,000,000
Minyere Primary School
- location
-
Central Kanyikela
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
Nyandoto Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
Sangore Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- One Skeleton Structure Classroom Roofed And One At Lintel Level.
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
Arina Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
Kolwalo Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Classrooms Roofed, Steeled Windows Fitted
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
Koduogo Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 2 Skeleton Structure Classrooms Roofed & One Skeleton At Gable Level
- total cost
- Ksh 550,000
- estimate
- Ksh 1,350,000
Kuoyo Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 3 Skeleton Classrooms Roofed
- total cost
- Ksh 550,000
- estimate
- Ksh 1,350,000
Abura Girls Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- The Construction Works Of 2 Classrooms At Gable Level
- total cost
- Ksh 500,000
- estimate
- Ksh 1,400,000
Ojodeh Rachar
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed.
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Abura Girls Secondary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 2 Classrooms At Gable Level.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,400,000
St. Philips Wayaga Secondary School
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Renovation And Completion Of Classrooms
- output
- Students Enrolment Increase
- implementation status
- Complete Project And In Use.
- total cost
- Ksh 500,000
- estimate
- Ksh 250,000
God Poko Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrollment Increase
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Wachara Kwabwai Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- Two Skeleton Classrooms Roofed
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Ranen Mikumu Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Classrooms Waling At Lintel Level.
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Osogo Primary School
- location
-
West Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- -
- implementation status
- 2 Skeleton Classrooms Roofed.
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Rota Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 3 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 3 Skeleton Classrooms Roofed
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Manywanda - Kome Road
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Road Grading & Sport Murruming
- output
- Improved Communication Network
- implementation status
- The Road Opened Up
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mirogi Boys Secondary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Completion Of Dormitory
- output
- Pupils Enrolment Increase
- implementation status
- Construction At Gable Level
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Wiburu Atego Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Classrooms At Wall Plate
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Okota Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Students Able To Learn Science Subjects
- implementation status
- Construction Complete Except Ceiling Board And Parchments Slab And In Use.
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Kaguria Res Cent
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Library
- output
- Ease Access To Leaning Facilities For Community
- implementation status
- 186.3Sq Mts Building At Lintel Level
- total cost
- Ksh 500,000
- estimate
- Ksh 1,800,000
Ototo Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Two Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Angiya Dispensary
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Purchase Of Equipments For Treatment Rooms And Partitioning Of The Rooms
- output
- Ease Access To Medical Services For The Community
- implementation status
- Renovation Of Treatment Room Completed And In Use.
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Ongako Primary School
- location
-
N/Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms
- output
- Students Enrolment Increase
- implementation status
- One Classroom At Lintel Level
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Ojode Mikumu Primary School
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- Skeleton At Lintel Level
- total cost
- Ksh 450,000
- estimate
- Ksh 1,200,000
Longo Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- Work Yet To Start For The Construction Of One Classroom
- total cost
- Ksh 450,000
- estimate
- Ksh 1,200,000
Wikoonje Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 6 Classrooms
- output
- Students Enrolment Increase
- implementation status
- One Skeleton Classroom Roofed
- total cost
- Ksh 450,000
- estimate
- Ksh 1,300,000
Nyakwere Kamito Primary School
- location
-
S/Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Skeleton Classroom Roofed.
- total cost
- Ksh 450,000
- estimate
- Ksh 1,200,000
Kombe Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Class
- output
- Pupils Enrolment Increase
- implementation status
- One Classroom Roofed And One Classroom At Foundation Level.
- total cost
- Ksh 450,000
- estimate
- Ksh 700,000
Malela Primary School
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Repair Of Damaged Roofs
- output
- Continuity In Learning
- implementation status
- 2 Skeleton Classrooms Roofed. Repair Of Damaged Roofs Completed And In Use.
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Rambusi Girls Secondary School
- location
-
S/Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 3 Classrooms Roofed. 1 Classroom At Windowest Cill Level.
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Osani Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Classroom Roofed With Cdf. Emergency Funding And 1 Classroom At Wall Plate/Gable Level.
- total cost
- Ksh 400,000
- estimate
- Ksh 1,600,000
Kamenya School
- location
-
S/Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Skeleton Classroom Roofed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Nguku Chiefs Camp
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Administration Block
- output
- Improved Administration Services
- implementation status
- 2 Offices Complete And In Use.
- total cost
- Ksh 400,000
- estimate
- Ksh 1,500,000
Aora Chuodho Primary School
- location
-
West Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed.
- total cost
- Ksh 400,000
- estimate
- Ksh 1,700,000
Ondati Primary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Completion Of 5 Classrooms
- output
- Increase In Students Enrollment
- implementation status
- 3 Skeleton Classrooms Roofed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,500,000
Nyamware Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- One Skeleton Classroom At Gable Level.
- total cost
- Ksh 350,000
- estimate
- Ksh 1,400,000
Manera Primary School
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- Construction Of One Classroom At Lintel Level
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Abura Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- One Skeleton Classroom Roofed.
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Rayudhi Health Centre
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of Treatment Rooms, Female And Male Wards.
- output
- Availability Of Health Facilities.
- implementation status
- The Construction Works At Lintel Level.
- total cost
- Ksh 300,000
- estimate
- Ksh 4,500,000
Miranga Primary School
- location
-
West Kanyadoto
(in Ndhiwa)
- year first funded
- 2006
- action
- Completion Of 2 Classrooms
- output
- Increase In Pupils Enrolment
- implementation status
- 1 Classroom Roofed.
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Magina Girls Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- School Compound Fencing With Barbed Wires
- output
- School Compound Secured.
- implementation status
- Fencing Complete.
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Magina Girls Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2008
- action
- Completion Of Dormitory.
- output
- Increase Student Boarders
- implementation status
- ? Of Works Completed.
- total cost
- Ksh 300,000
- estimate
- Ksh 150,000
Nyamatara Dam
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2005
- action
- Water Dam Construction
- output
- Community Access To Clean Water And Animals
- implementation status
- Geo Survey Done
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kiasa Dispensary
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Renovation Of 2 Treatment Rooms
- output
- Availability Of Health Services For Community
- implementation status
- Renovation Of 2 Treatment Rooms
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ndhiwa Muslim Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- Work Yet To Start
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Konyuowa Water Dam
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Dam Construction
- output
- Access To Water For Community And Domestic Animals
- implementation status
- Geo Survey Done
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Nyamanga Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed And Final Touches On Progress
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Ndisi Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- .2 Classrooms At Lintel
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Samanga Primary School
- location
-
West Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increases
- implementation status
- 2 Skeleton Classrooms Roofed.
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
St. Philips Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Pupils Enrolment Increase
- implementation status
- 2 Classrooms Roofed
- total cost
- Ksh 300,000
- estimate
- Ksh 8,000,000
Kodiera Health Centre
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2006
- action
- Construction Of Treatment Room
- output
- Availability Of Health Services To Community
- implementation status
- Stopped Due To Court Case
- total cost
- Ksh 300,000
- estimate
- Ksh 1,600,000
Saka Oro Dam
- location
-
North Kanyamwa
(in Ndhiwa)
- year first funded
- 2005
- action
- Construction Of Water Dam
- output
- Ease Access To Water For Community And Domestic Animals
- implementation status
- Geo Survey Done
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Sango Primary School
- location
-
K Kologi
(in Ndhiwa)
- year first funded
- 2006
- action
- Constructions Of 2 Classrooms
- output
- Increase In Students Enrolment
- implementation status
- 2 Classrooms At Final, Windowest Level
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Ligega Primary School
- location
-
S/Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Classroom At Lintel Level.
- total cost
- Ksh 250,000
- estimate
- Ksh 1,800,000
Alara Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Repairs Of Classrooms Damaged By Wind
- output
- Availability Of Cheap Prices For Community
- implementation status
- Repair Work Complete Except Painting
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Wiodielo Primary School
- location
-
N/Kanyikela
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 6 Classrooms
- output
- Students Enrolment Increase
- implementation status
- One Skeleton Classroom Roofed.
- total cost
- Ksh 250,000
- estimate
- Ksh 2,100,000
Nyagidha Primary School
- location
-
N/Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Classroom At Lintel Level.
- total cost
- Ksh 250,000
- estimate
- Ksh 900,000
Ndira Kokoth Primary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Skeleton Classroom Roofed
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Adek Primary School
- location
-
West Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- One Skeleton Classroom At Gable Level.
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Nyoniang Primary School
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 2 Skeleton Classrooms Roofed
- total cost
- Ksh 250,000
- estimate
- Ksh 1,400,000
Langi Primary School
- location
-
N/Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Renovation Of 4 Classrooms
- output
- Students Enrolment Increase
- implementation status
- Renovation Work Yet To Start
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Gina Primary School
- location
-
S/Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Skeleton Classroom Roofed
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Ogango Primary School
- location
-
S/Kabuoch
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- One Skeleton Classroom Roofed
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Kome Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Skeleton Classroom Roofed.
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Pala Primary School
- location
-
East Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Skeleton Classroom Roofed
- total cost
- Ksh 250,000
- estimate
- Ksh 900,000
Radienya Primary School
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms
- output
- Students Enrolment Increase
- implementation status
- 1 Classroom At Lintel Level
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Koguta Comwat Project
- location
-
S/K Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Purchase Of Water Pump And Installation Costs.
- output
- Availability Of Clean Water For The Community
- implementation status
- Water Pump Installed And In Use.
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nguku Water Project
- location
-
Central Kanyamwa
(in Ndhiwa)
- year first funded
- 2007
- action
- Purchase Of Water Pump And Installation Of The Same.
- output
- Availability Of Clean Water For The Community.
- implementation status
- The Committee Purchased Water Pump Indian Mark
- total cost
- Ksh 200,000
- estimate
- Ksh 1,200,000
Sagomba Dam
- location
-
Central Kanyadoto
(in Ndhiwa)
- year first funded
- 2006
- action
- Water Dam Construction
- output
- Ease Access To Water For Community And Domestic Animals
- implementation status
- Geo Survey Done
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Lwanda Kawuor Secondary School
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2003
- action
- Completion Of 4 Classrooms And Admin Block
- output
- Increase In Students Enrollment
- implementation status
- 4 Classrooms Complete - Administration Block Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gina Secondary School
- location
-
South Kabuoch
(in Ndhiwa)
- year first funded
- 2008
- action
- Renovation Of Two Classrooms
- output
- Increase In Students Enrollment
- implementation status
- Renovation Complete And In Use.
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Ongeng Co-Op Society
- location
-
North Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Purchase Of Cereals For Resale
- output
- Availability Of Cereals For The Community At Cheap Prices
- implementation status
- 70 Bags Of Maize Sold
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Kosoko Coop. Society
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2005
- action
- Purchase Of Cereals For Resale
- output
- Improved Administration Facilities
- implementation status
- 80 Bags Of Maize Sold
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Pala Co-Op Society
- location
-
S/K Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Purchase Of Cereals For Sale
- output
- Availability Of Cereals To The Community
- implementation status
- Cereals Purchased And Sold.
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Magina Co-Op Sec
- location
-
Central Kabuoch
(in Ndhiwa)
- year first funded
- 2005
- action
- Purchase Of Cereals For Resale
- output
- Availability Of Purchase At Cheap Price
- implementation status
- Cereals Purchase And Sold
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Got Kojowi Water Project
- location
-
East Kwabwai
(in Ndhiwa)
- year first funded
- 2006
- action
- Installation Of Water Pump
- output
- Availability Of Clean Water For Students And Staff
- implementation status
- Water Pump Installed And Not In Use.
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Odhiambo Rambo Water Project
- location
-
West Kanyadoto
(in Ndhiwa)
- year first funded
- 2006
- action
- Repair Borehole
- output
- Availability Of Clean Water For Community
- implementation status
- Complete And In Use.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ndhiwa Community Resource Centre
- location
-
Central Kanyamwa
(in Ndhiwa)
- action
- Construction Of A One Stoney Building Measuring 39M X 13M
- output
- A Community Library $ Community Computer Training Centre
- implementation status
- The Construction Works Done Up To Floor, Slab Level
- total cost
- Ksh 0
- estimate
- Ksh 138,709,312
Ndhiwa Cdf Office At Ratanga
- location
-
East Kwabwai
(in Ndhiwa)
- action
- Cdf Administration Offices Of 10 Rooms Complete Works
- output
- Improved Administrative Facilities To The Cdf
- implementation status
- Construction Of Office Block Complete.
- total cost
- Ksh 0
- estimate
- Ksh 4,500,000
Ober Kabuoch Health Centre
- location
-
South Kabuoch
(in Ndhiwa)
- action
- Construction Of Treatment Rooms, Female And Male Wards And Maternity Wings
- output
- Availability Of Health Facilities To The Community
- implementation status
- The Construction Works At Foundation Level
- total cost
- Ksh 0
- estimate
- Ksh 4,500,000