The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Nithi

Mwonge W/P

location
Mwonge (in Nithi)
year first funded
2005
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 9,473,265
estimate
Ksh 0

Iruma Day

location
Maara (in Nithi)
year first funded
2006
action
Construction of Classes And Lab
output
Classes
implementation status
4 Classes Require Internal Finishing And
total cost
Ksh 6,644,303
estimate
Ksh 0

Kamwene W/P

location
Mitheru (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 5,380,000
estimate
Ksh 0

Manyaga W/P

location
KiangOndu/Karingani (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 4,900,000
estimate
Ksh 0

Muthambi /Gitije W/P

location
Muthambi (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 3,550,000
estimate
Ksh 0

Mpukoni Dispensary

location
Kabuboni (in Nithi)
year first funded
2006
action
Construction of Ward
output
Ward
implementation status
Complete
total cost
Ksh 3,350,000
estimate
Ksh 0

Gatua / Karimbaw/P

location
Mitheru (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 3,200,000
estimate
Ksh 0

Chogoria W/P

location
Chogoria (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Pipes Installed
total cost
Ksh 3,100,000
estimate
Ksh 0

Kajuki Dispensary

location
Kajuki (in Nithi)
year first funded
2007
action
Construction of Maternity Ward.
output
Maternity Block
implementation status
Materials On Ground
total cost
Ksh 3,100,000
estimate
Ksh 0

Katharaka Farmers Market

location
Murugi (in Nithi)
year first funded
2007
action
Construction of Market Stalls
output
Market Stalls
implementation status
15 Stallscomplete And 18 Require Internal Finishes
total cost
Ksh 3,050,000
estimate
Ksh 0

Chuka Open Air Market

location
KiangOndu (in Nithi)
year first funded
2005
action
Construction of Market Sheds
output
Market Sheds
implementation status
Complete
total cost
Ksh 3,000,000
estimate
Ksh 0

Magutuni Mortuary

location
Kiera (in Nithi)
year first funded
2004
action
Construction of Mortuary & Install Cooler
output
Improve Health Facility
implementation status
Mortuary Block Complete
total cost
Ksh 2,870,000
estimate
Ksh 0

Mutino W/P

location
Mutino (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 2,650,000
estimate
Ksh 0

Ndigia W/P

location
Mugwe (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 2,500,000
estimate
Ksh 0

Mwithanga W/P

location
Muthambi (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
More funds needed to complete
total cost
Ksh 2,185,000
estimate
Ksh 0

Chuka Market Sheds

location
KiangOndu (in Nithi)
year first funded
2007
action
Construction of Shoe Shiners Sheds,And Miraa Sheds
output
Sheds
implementation status
Shoe Shiers Shed Built Miraa Sheds Being Constructed
total cost
Ksh 2,000,000
estimate
Ksh 0

Eastern University

location
KiangOndu District Proj. (in Nithi)
year first funded
2004
action
Rehabilitation Of Dormitories To Hostels
output
Hostels
implementation status
Hostels In Place
total cost
Ksh 2,000,000
estimate
Ksh 0

Kithangani W/P

location
Kithangani (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 1,840,000
estimate
Ksh 0

Pole Pole Open Air Market

location
Chogoria (in Nithi)
year first funded
2007
action
Construction of Market Sheds
output
Market Sheds
implementation status
Roofed Market In Place
total cost
Ksh 1,750,000
estimate
Ksh 7,000,000

Ganga Division Dos Office And Residence

location
Ganga (in Nithi)
year first funded
2009
action
Construction of Offices And Residence
output
-
implementation status
Foundation stage
total cost
Ksh 1,600,000
estimate
Ksh 0

Thiga/Kithituw/P

location
Chogoria (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 1,350,000
estimate
Ksh 0

Kamwangu Dispensary

location
Gitije (in Nithi)
year first funded
2004
action
Construction of Dispensary
output
Operational Dispensary
implementation status
3 Rooms Roofed And 4 At Lintel Level
total cost
Ksh 1,345,000
estimate
Ksh 0

Njaina Day

location
Karingani (in Nithi)
year first funded
2006
action
Construction of Classes And Lab
output
Classes And Lab
implementation status
3Classes Complete
total cost
Ksh 1,245,000
estimate
Ksh 0

Igakiramba Day

location
Kiera (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
2 Class Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Kajiampau Day Secondary School o

location
Mutino (in Nithi)
year first funded
2003
action
Construction of Classes, Admin& Buy Textbooks With 50000
output
Classes, Admin& Textbooks
implementation status
Completed Admin, 2Class. Bought Books.
total cost
Ksh 1,195,000
estimate
Ksh 0

Chamunga /Kamamwankiu Dispensary

location
Gitije (in Nithi)
year first funded
2004
action
Construction of Dispensary
output
Operational Dispensary
implementation status
3Rooms Internally Plastered And 6 At Lintel Level
total cost
Ksh 1,145,000
estimate
Ksh 0

Kathigirini Day

location
Karingani (in Nithi)
year first funded
2004
action
Construction of Classes, Plaster Lab & Buy Textbooks With 50000
output
Classes, Plastered Lab & Textbooks
implementation status
Classes And Lab Plastered
total cost
Ksh 1,100,000
estimate
Ksh 0

Kiaritha Day Secondary School

location
Kamwimbi (in Nithi)
year first funded
2003
action
Construction of Classes And Admin
output
Classes And Admin
implementation status
4 Classes Complete And Admin
total cost
Ksh 1,100,000
estimate
Ksh 0

Kibumbu Day

location
Kiangondu (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Class & Books
implementation status
Books Bought, 2 Classes Complete
total cost
Ksh 1,100,000
estimate
Ksh 0

Munga Day Secondary School

location
Murugi (in Nithi)
year first funded
2003
action
Construction Classes & Buy Textbooks With 50000
output
Classes & Textbooks
implementation status
Books Bought ; 3 Class & Admin Complete
total cost
Ksh 1,050,000
estimate
Ksh 0

Kiamucii Dispensary

location
Gitareni (in Nithi)
year first funded
2004
action
Expansion & Renovation Of Dispensary And Construction of Maternity
output
Provide Health Services
implementation status
3 Roomed Staff House Built One Room Expanded Maternity At Window Level
total cost
Ksh 1,050,000
estimate
Ksh 0

Kieni Day Secondary School

location
Maara (in Nithi)
year first funded
2004
action
Construction of Classes,Plastering Floor And Windows For Lab & Buy Textbooks With 50000
output
Class & Books
implementation status
3 Class Complete, Lab Plastered And Windows Fixed Books Bought
total cost
Ksh 1,045,000
estimate
Ksh 0

Gituja Day Secondary School

location
Muthambi (in Nithi)
year first funded
2003
action
Construction Classes & Buy Textbooks With 50000
output
Classes & Textbooks
implementation status
Books Bought, 2 Complete 2 Incomplete
total cost
Ksh 1,019,000
estimate
Ksh 0

Ntumbara Day

location
Kamaindi (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Textbooks
implementation status
3 Classes Comlete 4Th At Roofing
total cost
Ksh 1,000,000
estimate
Ksh 0

Maguma Day

location
Kiera (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
2 Classescomplete And 1Require Floor And Internal Finishes
total cost
Ksh 1,000,000
estimate
Ksh 0

Karigini Day

location
Gitije (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
1 Class Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kanthanje Day

location
Mutino (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
2 Classes Completed
total cost
Ksh 995,000
estimate
Ksh 0

Mutidwa Day Secondary School

location
Murugi (in Nithi)
year first funded
2003
action
Construction Class, Lab & Buy Textbooks With 50000
output
Class, Lab. & Textbooks
implementation status
Project Complete
total cost
Ksh 975,000
estimate
Ksh 0

Magumoni Day Secondary School o

location
Thuita (in Nithi)
year first funded
2003
action
Construction of Classes & Buy Textbooks With 50000
output
Classes,Lab & Textbooks
implementation status
3 Classes & Lab Complete
total cost
Ksh 965,000
estimate
Ksh 0

Mwanjati Water Project

location
Karingani (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 950,000
estimate
Ksh 0

Kaanwa Maternity Wing

location
Karingani (in Nithi)
year first funded
2006
action
Construction of Maternity Wing
output
Operational Maternity Wing
implementation status
Roofed Awaiting Plastering
total cost
Ksh 950,000
estimate
Ksh 0

Itara Day Secondary School

location
Muthambi (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Books
implementation status
4 Classes Complete, Bought Books.
total cost
Ksh 950,000
estimate
Ksh 0

Kiangiri Day

location
Kamwimbi (in Nithi)
year first funded
2004
action
Construction of Classes, Water Tank
output
Classes
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 0

Kianjagi Day

location
Murugi (in Nithi)
year first funded
2006
action
Construction of Toilets &Classes
output
Lclasses/Toiets
implementation status
2 Complete, And Toilets Complete
total cost
Ksh 940,000
estimate
Ksh 0

Mugona Day

location
Mitheru (in Nithi)
year first funded
2004
action
Construction of Classes,Ablution & Buy Textbooks With 50000
output
Classes,Ablution & Textbooks
implementation status
Ablution Complete And 4 Classes At Foundation Level
total cost
Ksh 900,000
estimate
Ksh 0

Kiunguni Day Secondary School

location
Mugwe (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Books
output
Classes & Books
implementation status
100% Complete, 50000 Bought Books
total cost
Ksh 900,000
estimate
Ksh 0

Karewa Day Secondary School

location
Chogoria (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Class & Books
implementation status
3 Classes Complete Books Bought
total cost
Ksh 900,000
estimate
Ksh 0

Mutuguni Day Secondary School

location
Thuita (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
4 Classes & Textbooks
implementation status
4 Complete Requiring Internal Finishing
total cost
Ksh 900,000
estimate
Ksh 0

Kamaindi Polytechnic

location
Kamaindi (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
2 Classes Built
total cost
Ksh 895,000
estimate
Ksh 0

Staugustine Day

location
Mitheru (in Nithi)
year first funded
2004
action
Construction of Lab And Girls Dormitory
output
Lab And Dormitory
implementation status
Lab Complete& Dormitory At Roofing Level
total cost
Ksh 880,000
estimate
Ksh 0

Maabi Day Secondary School

location
Rubate (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Textbooks
implementation status
Complete. Textbooks Bought
total cost
Ksh 850,000
estimate
Ksh 0

Ndagoni Day Secondary School

location
Mukuuni (in Nithi)
year first funded
2004
action
Construction of Dormitory And Lab & Buy Textbooks With 50000
output
Dormitory ,Lab,Class & Books
implementation status
Twin Dormitory , Classand Lab Complete, Bought Books.
total cost
Ksh 850,000
estimate
Ksh 0

Kaanwa Day Secondary School

location
Karingani (in Nithi)
year first funded
2005
action
Construction of Classes, Lab & Offices
output
Classes &Offices
implementation status
4 Classes &Offices Completed Lab Ongoing
total cost
Ksh 850,000
estimate
Ksh 0

Magenka Day Secondary School

location
Mukuuni (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Books
implementation status
2Classes& Water Tank Complete, Bought Books Dh Complete Admin Ongoing
total cost
Ksh 850,000
estimate
Ksh 0

Muthambi Health Centre

location
Muthambi (in Nithi)
year first funded
2006
action
Construction of Kitchen
output
Kitchen Block
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 0

Stann Day Secondary School

location
Ganga (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Class & Books
implementation status
1 Class Complete, Books Bought
total cost
Ksh 850,000
estimate
Ksh 0

Mumbuni Day Secondary School st Bonaventur

location
Gitije (in Nithi)
year first funded
2004
action
Construction of Lab, Gas & Water System
output
Operational Lab.
implementation status
Water System Not Done
total cost
Ksh 845,000
estimate
Ksh 15,000,000

Mwienderi W/P

location
Kamwimbi (in Nithi)
year first funded
2005
action
Construction of W/P
output
Water Project
implementation status
3 Km Pipes Laid;
total cost
Ksh 845,000
estimate
Ksh 18,000,000

Gitareni Policepost

location
Gitareni (in Nithi)
year first funded
2004
action
Construction of Police Post
output
Police Post
implementation status
Materials On Ground
total cost
Ksh 845,000
estimate
Ksh 0

Weru Youth Polytechnic

location
Gitareni (in Nithi)
year first funded
2004
action
Construction of Classes &Admin Block
output
Classes &Admin Block
implementation status
1 Class Renovated 3 Classes & Store Remains Internal Completion, Admin At Foundation
total cost
Ksh 800,000
estimate
Ksh 0

Itugururu Chief Office

location
Itugururu (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 800,000
estimate
Ksh 0

Muthambi Ap Lines

location
Muthambi (in Nithi)
year first funded
2004
action
Construction of Res. Houses
output
Residential Houses For Police
implementation status
98% Complete
total cost
Ksh 800,000
estimate
Ksh 0

Riamama W/P

location
Kithangani (in Nithi)
year first funded
2009
action
Intake Construction
output
-
implementation status
Awaits for Cheque
total cost
Ksh 800,000
estimate
Ksh 0

Thuita W/P

location
Thuita (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 800,000
estimate
Ksh 0

Mbogoni W/P

location
Itugururu (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 800,000
estimate
Ksh 0

Igamurathi W/P

location
Muthambi (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 800,000
estimate
Ksh 0

Kamaindi Dispensary

location
Kamaindi (in Nithi)
year first funded
2004
action
Renovate dispensary &Construction of Maternity Wing
output
Maternity Wing
implementation status
Renovation, Finishing Of Dispensary Maternity Roofed Require Internal Finish
total cost
Ksh 800,000
estimate
Ksh 0

Magenka Bridge

location
Mukuuni (in Nithi)
year first funded
2005
action
Construction of Bridge
output
Bridge For Safe Crossing
implementation status
80% Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kabui Sec

location
Maara (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
2 Classe Complete,
total cost
Ksh 800,000
estimate
Ksh 0

Kimuchia Day

location
Chogoria (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Textbooks
implementation status
Complete.
total cost
Ksh 800,000
estimate
Ksh 0

Itugururu Day Secondary School

location
Itugururu (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
4 Classes & Textbooks
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Gituntu Day

location
Mitheru (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Books
implementation status
4Classes Complete, Bought Books.
total cost
Ksh 800,000
estimate
Ksh 0

Kiamucii Day

location
Gitareni (in Nithi)
year first funded
2006
action
Construction of Classes And Lab
output
Classes And Lab
implementation status
3 Classes And Lab Built But Not Internally Finished
total cost
Ksh 795,000
estimate
Ksh 0

Kanyuru Day Secondary School

location
Kabuboni (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes
implementation status
3 Classes Complete, Lab And 1 Class Require Internal Finishing
total cost
Ksh 775,000
estimate
Ksh 0

Mukui Day Sec

location
Ganga (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 755,000
estimate
Ksh 0

District Ap Lines

location
KiangOndu (in Nithi)
year first funded
2005
action
Increase Res. Houses For Aps
output
Residential Houses For Aps
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Kabururu Health Centre

location
Kamwimbi (in Nithi)
year first funded
2004
action
Construction of health center
output
Operational H/C
implementation status
Fixing Of Doors Not Complete
total cost
Ksh 750,000
estimate
Ksh 0

Kieganguru Polytechnic

location
Chogoria (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
3 Classes Requiring Internal Finishing
total cost
Ksh 750,000
estimate
Ksh 0

Kiamaogo Day

location
Ganga (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
2 Class Complete
total cost
Ksh 750,000
estimate
Ksh 0

Makawani Day School

location
Gitareni (in Nithi)
year first funded
2004
action
Construction of Classes,D/H & Buy Textbooks With 50000
output
Class,D/H & Books
implementation status
1 Classes Complete,Books Bought, Dh Require Internal Finish
total cost
Ksh 750,000
estimate
Ksh 0

Mira Miraja

location
Karingani (in Nithi)
year first funded
2005
action
Construction of Classes
output
4 Classes
implementation status
2 Classes Started
total cost
Ksh 745,000
estimate
Ksh 0

Mukuuni Dispensary

location
Mukuuni (in Nithi)
year first funded
2005
action
Construction of Maternity Wing
output
Maternity Wing
implementation status
Roofed Require Internal Fiishes
total cost
Ksh 745,000
estimate
Ksh 0

K Mwendwaw/P

location
Karingani (in Nithi)
year first funded
2005
action
Purchase Pipes& Build Office
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 740,000
estimate
Ksh 0

Kariakomo Dispensary

location
Ganga (in Nithi)
year first funded
2007
action
Renovate Disp
output
Renovated Disp
implementation status
Work In Progress
total cost
Ksh 725,000
estimate
Ksh 0

Ibiriga Day Secondary School

location
Mwonge (in Nithi)
year first funded
2003
action
Construction of Lab & Equip
output
Equipped Lab.
implementation status
Lab Equipment Bought & 1 Lab Complete Other Requires Floor &Plastering
total cost
Ksh 715,000
estimate
Ksh 0

Ikuu School Of Disabled

location
Kabuboni (in Nithi)
year first funded
2004
action
Construction of Classes
output
2 Classes
implementation status
2 Classes Complete
total cost
Ksh 700,000
estimate
Ksh 0

Gianchuku Day

location
Chogoria (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Textbooks
implementation status
2 Classes Complete & 3Rd In Progress
total cost
Ksh 695,072
estimate
Ksh 0

Kiangondu Day Secondary School

location
KiangOndu (in Nithi)
year first funded
2003
action
Construction of Classroom And Lab
output
Classroom & Laboratory And Lab
implementation status
Class Complete, Admin & Lab Ongoing
total cost
Ksh 669,000
estimate
Ksh 0

Mwirithi Bridge

location
Thuita / Magumoni (in Nithi)
year first funded
2005
action
Construction of Bridge
output
Bridge
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 0

Chuka Ap Lines

location
KiangOndu (in Nithi)
year first funded
2005
action
Construction of Res. Houses
output
Residential Houses
implementation status
4 Semi- Permanent Buildings Complete
total cost
Ksh 650,000
estimate
Ksh 0

Kavando Irrigation W/P

location
Kamwimbi (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Survey In Progress
total cost
Ksh 645,000
estimate
Ksh 0

Mungoni Polytechnic

location
KiangOndu (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
2 Classes Completed
total cost
Ksh 645,000
estimate
Ksh 0

Kieganguru Primary School

location
Chogoria (in Nithi)
year first funded
2009
action
Installation Of Transformer
output
-
implementation status
Foundation stage
total cost
Ksh 625,000
estimate
Ksh 0

Njaina Area

location
Karingani (in Nithi)
year first funded
2009
action
Installation Of Transformer
output
-
implementation status
not known
total cost
Ksh 625,000
estimate
Ksh 0

Nkumbo Area

location
Mugwe (in Nithi)
year first funded
2009
action
Installation Of Transformer
output
-
implementation status
not known
total cost
Ksh 625,000
estimate
Ksh 0

Iruma A\Rea

location
Maara (in Nithi)
year first funded
2009
action
Installation Of Transformer
output
-
implementation status
To be funded from second Instalment
total cost
Ksh 625,000
estimate
Ksh 0

Kalewa Secondary School

location
Murugi (in Nithi)
year first funded
2009
action
Installation Of Transformer
output
-
implementation status
To be funded from second Instalment
total cost
Ksh 625,000
estimate
Ksh 0

Chumaita Tea Buying Centre

location
Murugi (in Nithi)
year first funded
2009
action
Installation Of Transformer
output
-
implementation status
To be funded from second Instalment
total cost
Ksh 625,000
estimate
Ksh 0

Nturiri Girls Secondary School

location
Chogoria (in Nithi)
year first funded
2005
action
Construction of D/H
output
D/H
implementation status
D/H Completet
total cost
Ksh 600,000
estimate
Ksh 15,000,000

Kiroo Ass Chiefs Office

location
Chogoria (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construction Of An Office
implementation status
At Roofing Level
total cost
Ksh 600,000
estimate
Ksh 0

Gantaraki W/P

location
Murugi (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
More funds needed to complete
total cost
Ksh 600,000
estimate
Ksh 0

Wiru W/P

location
Murugi (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 600,000
estimate
Ksh 0

Ukuruini /Ikumbo W/P

location
Ganga (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 600,000
estimate
Ksh 0

Mutindwa Dispensary

location
Chogoria (in Nithi)
year first funded
2005
action
Construction of Dispensary
output
Dispensary Block
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kibugua Health Centre

location
Thuita (in Nithi)
year first funded
2004
action
Construction of Kitchen
output
Provide Kitchen Facility
implementation status
50% Complete.
total cost
Ksh 600,000
estimate
Ksh 0

Nturiri Boys Sec

location
Chogoria (in Nithi)
year first funded
2007
action
Construction of D/H
output
D/H
implementation status
At Roofinglevel
total cost
Ksh 600,000
estimate
Ksh 0

Kamwimbi Day

location
Kamwimbi (in Nithi)
year first funded
2005
action
Construction of Classes & Science Lab.
output
Classes & Science Lab.
implementation status
Class Complete And Lab At Lintel
total cost
Ksh 600,000
estimate
Ksh 0

Ngeru Day

location
Ganga (in Nithi)
year first funded
2005
action
Construction of Classes & Buy Textbooks With 50000
output
Classes & Books
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Jasho W/P

location
Itugururu (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 595,000
estimate
Ksh 0

Mugumango W/P

location
Ganga (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 595,000
estimate
Ksh 0

Kamwango Water Fallow

location
Gitije (in Nithi)
year first funded
2005
action
Construction of Water Fallow
output
Water Fallow
implementation status
3 Lorries Of Ballast On Site ; Survey Was Done
total cost
Ksh 595,000
estimate
Ksh 0

Majira Health Centre

location
Chogoria (in Nithi)
year first funded
2008
action
Construction of dispensary
output
Dispensary Block
implementation status
Work In Progress
total cost
Ksh 595,000
estimate
Ksh 0

Ndumbini Secondary School

location
Mitheru (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
2 Classes Started 1 At Roofing The Other At Window Level
total cost
Ksh 595,000
estimate
Ksh 0

Mubukuro Polytechnic

location
Mugwe (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
Roofed,Requires Internal Finish
total cost
Ksh 595,000
estimate
Ksh 0

Kamaindi W/P

location
Kamaindi (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 550,000
estimate
Ksh 0

Kangoro Day

location
Mwonge (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
3 Class Complete
total cost
Ksh 550,000
estimate
Ksh 0

Nkuthika Assistant Chief Office

location
Muiru (in Nithi)
year first funded
2004
action
Construction of Office Block
output
Office Block
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 0

Ikumbo Secondary School

location
Ganga (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
2 Complete,
total cost
Ksh 550,000
estimate
Ksh 0

Igamatundu Health Centre

location
Itugururu (in Nithi)
year first funded
2004
action
Construction of health center
output
Operational H/C
implementation status
3 Rooms Complete
total cost
Ksh 550,000
estimate
Ksh 0

Enamakithi W/P

location
Thuita (in Nithi)
year first funded
2005
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 550,000
estimate
Ksh 0

Muiru Chief Camp

location
Muiru (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 545,000
estimate
Ksh 0

Ndiruni Mixed Day

location
Mwonge (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Class Roofed &Require Internal Finishing
total cost
Ksh 515,000
estimate
Ksh 0

Kiriani Mwemaw/P

location
Murugi (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 500,000
estimate
Ksh 0

Maara W/P

location
Maara (in Nithi)
year first funded
2008
action
Construction of Intake
output
Water Project
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Mwimbi Ap Lines

location
Chogoria (in Nithi)
year first funded
2005
action
Construction of Res. Houses
output
Residential Houses
implementation status
100% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kieganguru Ap Lines

location
Chogoria (in Nithi)
year first funded
2007
action
Construction of Res. Houses
output
Residential Houses
implementation status
2 Ap Houses Built
total cost
Ksh 500,000
estimate
Ksh 0

Chogoria Police Post

location
Chogoria (in Nithi)
year first funded
2007
action
Construction of Offices
output
Construction Of A Offices
implementation status
Awaiting Plastering
total cost
Ksh 500,000
estimate
Ksh 0

Kamaindi Ap Lines

location
Kamaindi (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 500,000
estimate
Ksh 0

Meru South Honey Processing Training Centre

location
KiangOndu (in Nithi)
year first funded
2005
action
Purchase Processing Machines & Training Farmers
output
Equipped Processing & Training Center
implementation status
100% Complete
total cost
Ksh 500,000
estimate
Ksh 0

Meru South Marketing

location
KiangOndu (in Nithi)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Mariani Day Secondary School

location
Karingani (in Nithi)
year first funded
2003
action
Construction of Laboratory
output
Lab
implementation status
Lab Awaiting Plastering
total cost
Ksh 500,000
estimate
Ksh 0

Mukuuni Secondary School

location
Mukuuni (in Nithi)
year first funded
2004
action
Dormitory Construction& Payment Of Bus
output
Dormitory&Bus
implementation status
100% Complete,Bus Repayment On Going
total cost
Ksh 500,000
estimate
Ksh 0

Kaare Day

location
Kiera (in Nithi)
year first funded
2005
action
Construction of Classes
output
4 Classes
implementation status
2 Classes Renovated,2 Built 1 Roofed And The Other At Lintel Level
total cost
Ksh 500,000
estimate
Ksh 0

Kairuni Special Unit

location
Chogoria (in Nithi)
year first funded
2006
action
Construction of Dormitory
output
Dormitory
implementation status
Roofed And Requires Internal Finish
total cost
Ksh 500,000
estimate
Ksh 0

Lab Equipment Kirumi Dispensary

location
Ganga (in Nithi)
year first funded
2003
action
Provide Lab Equipments
output
Lab Equipments
implementation status
Equipments Bought
total cost
Ksh 500,000
estimate
Ksh 0

Nguruki Polytechnic

location
Maara (in Nithi)
year first funded
2007
action
Construction of Workshops
output
Construct Workshop
implementation status
2 Workshops Built Requiring Internal Finish Doors&Windows
total cost
Ksh 500,000
estimate
Ksh 0

Makuri Dispensary

location
Chogoria (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
At Roofing Level
total cost
Ksh 500,000
estimate
Ksh 0

Kiriani Assistant Chiefs Office

location
Murugi (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construction Of An Office
implementation status
Work In Progress
total cost
Ksh 495,000
estimate
Ksh 0

Rubate Nkwego Health Centre

location
Rubate (in Nithi)
year first funded
2004
action
Construction of dispensary
output
Dispensary
implementation status
2 Rooms Constructed
total cost
Ksh 495,000
estimate
Ksh 0

Baragu Dispensary

location
Murugi (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
At Roofing Level
total cost
Ksh 495,000
estimate
Ksh 0

Karongoni Dispensary

location
Karingani (in Nithi)
year first funded
2007
action
Construction of Staff House.
output
Staff House
implementation status
Awaiting Disbursement Of Funds
total cost
Ksh 495,000
estimate
Ksh 0

Kiairugu Dispensary

location
(in Nithi)
year first funded
2008
action
Finish Maternity Ward.
output
Maternity Block
implementation status
Work In Progress
total cost
Ksh 495,000
estimate
Ksh 0

Kiangondu Dispensary

location
KiangOndu (in Nithi)
year first funded
2004
action
Construction of dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Arithi W/P

location
Chogoria (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 450,000
estimate
Ksh 0

Nkabu W/P

location
Muthambi (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous& Office Complete
total cost
Ksh 450,000
estimate
Ksh 0

Mwonge Dispensary

location
Mwonge (in Nithi)
year first funded
2004
action
Expansion & Renovation Of dispensary & Lab.
output
Dispensary Block With Lab Services
implementation status
Expansion & Renovation Of Rooms Done.
total cost
Ksh 450,000
estimate
Ksh 0

Kirege Dispensary

location
Mugwe (in Nithi)
year first funded
2004
action
Construction of dispensary
output
Operational Dispensary
implementation status
70% Complete
total cost
Ksh 450,000
estimate
Ksh 0

Salama Primary School

location
Kabuboni (in Nithi)
year first funded
2007
action
Renovate Classes& Boys Dormitory
output
Classes& Dormitory
implementation status
Classes Renovated Dormitory Complete But Requires Internal Finshes
total cost
Ksh 445,000
estimate
Ksh 0

Kagumo Ass Chief

location
Mwonge (in Nithi)
year first funded
2007
action
Construction Of Office
output
Office Block
implementation status
Complete
total cost
Ksh 415,000
estimate
Ksh 0

Igambangombe Chiefs Office

location
Kamaindi (in Nithi)
year first funded
2009
action
Construction of Office
output
-
implementation status
Slab Stage
total cost
Ksh 400,000
estimate
Ksh 0

Kaare Ap Line

location
Kiera (in Nithi)
year first funded
2009
action
Construction of 3 Ap Houses
output
-
implementation status
Co-funded, roofed
total cost
Ksh 400,000
estimate
Ksh 0

Magumoni Ap Lines

location
Thuita (in Nithi)
year first funded
2005
action
Construction of Res. Houses
output
Residential Houses
implementation status
100% Complete
total cost
Ksh 400,000
estimate
Ksh 0

Gitije Police Camp

location
Gitije (in Nithi)
year first funded
2004
action
Construction of Res. Houses
output
Residential Houses For Police
implementation status
4 Houses Constructed And Materials On Ground
total cost
Ksh 400,000
estimate
Ksh 0

Kamurwata W/P

location
Murugi (in Nithi)
year first funded
2009
action
Construction of Tank
output
-
implementation status
Completetd and in use
total cost
Ksh 400,000
estimate
Ksh 0

Mutuanyin Gi W/P

location
Chogoria (in Nithi)
year first funded
2009
action
Purchase Pipes
output
-
implementation status
Funds reallocated to Electric
total cost
Ksh 400,000
estimate
Ksh 0

Mugumango W/P

location
Ganga (in Nithi)
year first funded
2005
action
Construction of Water Project
output
Water
implementation status
Purchased Pipes, Building Materials For Intake
total cost
Ksh 400,000
estimate
Ksh 131

Muthambia W/P

location
Muthambi (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 400,000
estimate
Ksh 0

Mwicuiri W/P

location
Chogoria (in Nithi)
year first funded
2004
action
Construction of Water Project
output
Operational Water Project
implementation status
Laying Of Pipes & Installation Is Continuous
total cost
Ksh 400,000
estimate
Ksh 0

Gianchuku Dispensary

location
Chogoria (in Nithi)
year first funded
2009
action
Construction of Maternity
output
-
implementation status
Completed and in use
total cost
Ksh 400,000
estimate
Ksh 0

Karandini Dispensaryry

location
Magumoni (in Nithi)
year first funded
2004
action
Construction of Lab
output
Operational Lab
implementation status
Lab Complete.
total cost
Ksh 400,000
estimate
Ksh 0

Mukui Health Centre

location
Ganga (in Nithi)
year first funded
2004
action
Renovate Dispensary
output
Provide Health Services
implementation status
General Wards Complete; Require Plastering, Flooring, Painting, Furniture, Toilets
total cost
Ksh 400,000
estimate
Ksh 0

Murugi Youth Centre

location
Murugi (in Nithi)
year first funded
2009
action
Construction of Workshop
output
-
implementation status
Project not completed
total cost
Ksh 400,000
estimate
Ksh 0

Iruri Primary School

location
Kiera (in Nithi)
year first funded
2009
action
Renovate Classes
output
Renovated Clasess
implementation status
Project not completed
total cost
Ksh 400,000
estimate
Ksh 0

Ngunga Low Cost School

location
Kamwimbi (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
1Class Complete,
total cost
Ksh 400,000
estimate
Ksh 0

Ngaita Secondary School

location
Ganga (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
2Complete,
total cost
Ksh 400,000
estimate
Ksh 0

Magumoni Girls

location
Thuita (in Nithi)
year first funded
2005
action
Construction of dining Hall & Toilets
output
dining Hall & Toilets
implementation status
Toilets &Dh Complete & Already In Use.
total cost
Ksh 400,000
estimate
Ksh 0

Muthambi Boys

location
Muthambi (in Nithi)
year first funded
2005
action
Construction of Library
output
Library
implementation status
At Roofing Level
total cost
Ksh 400,000
estimate
Ksh 0

Chief Mbogori Girls Secondary School

location
Murugi (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
Complete, Remaining Painting, Ceiling, Floor Screed & Install Electricity
total cost
Ksh 400,000
estimate
Ksh 0

Ntakani Primary School

location
Gitije (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
3 Classes Constructed,Require Internal Finishing
total cost
Ksh 400,000
estimate
Ksh 0

Rubati Secondary School

location
Rubate (in Nithi)
year first funded
2004
action
Construction of Classes
output
Classes
implementation status
1Class Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kabuboni Chiefoffice

location
Kabuboni (in Nithi)
year first funded
2004
action
Construction of Office Block
output
Office Block
implementation status
Was Completed But Facility Not In Use
total cost
Ksh 400,000
estimate
Ksh 0

Muthiru Cooling Plant

location
Muthambi (in Nithi)
year first funded
2007
action
Build Oddice Block
output
Office Block
implementation status
At Roofing Level
total cost
Ksh 400,000
estimate
Ksh 0

Meru South Food Processing Centre

location
KiangOndu (in Nithi)
year first funded
2005
action
Construction of & Purchase Food Processing Equipments
output
Food Processing Centre
implementation status
Trainings On Organic Projects Done
total cost
Ksh 400,000
estimate
Ksh 0

Karongoni Chief Office

location
Karingani (in Nithi)
year first funded
2009
action
Construction of Office
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Ndagani Ass Chief Office

location
Karingani (in Nithi)
year first funded
2009
action
Construction of Office
output
-
implementation status
Final touches
total cost
Ksh 400,000
estimate
Ksh 0

Njaina Ass Chief Office

location
Karingani (in Nithi)
year first funded
2009
action
Construction of Office
output
-
implementation status
Completion of phase 1
total cost
Ksh 400,000
estimate
Ksh 0

Rukindu Ass Chief Office

location
Karingani (in Nithi)
year first funded
2009
action
Construction of Office
output
-
implementation status
More funds needed
total cost
Ksh 400,000
estimate
Ksh 0

Kathanje Primary School

location
Mutino (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
2 Classes Completed
total cost
Ksh 400,000
estimate
Ksh 0

Kariani Primary School

location
Gitije (in Nithi)
year first funded
2005
action
Construction of Classes
output
Classes
implementation status
Special Class Built And Office Furniture Purchased
total cost
Ksh 398,943
estimate
Ksh 0

Rukindu W/P

location
Kithangani (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 395,000
estimate
Ksh 0

Kiruire W/P

location
Kiangondu (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Awaiting Release Of Funds
total cost
Ksh 395,000
estimate
Ksh 0

Gitombani W/P

location
Chogoria (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 395,000
estimate
Ksh 0

Makengi Dispensary

location
Kiera (in Nithi)
year first funded
2006
action
Construction of Maternity Wing
output
Maternity Wing
implementation status
45% Complete
total cost
Ksh 395,000
estimate
Ksh 0

Kambandi Dispensary

location
Muiru (in Nithi)
year first funded
2004
action
Renovate Disp
output
Operational Health Facility
implementation status
Partly Renovated
total cost
Ksh 395,000
estimate
Ksh 0

Kigogo Day

location
Thuita (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
Work In Progress
total cost
Ksh 395,000
estimate
Ksh 0

Kathiguni Primary School

location
Kabuboni (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
Work In Progress
total cost
Ksh 395,000
estimate
Ksh 0

Ciamakie Youth Polytechnic

location
Gitareni (in Nithi)
year first funded
2007
action
Construction of Classroom/Workshop
output
Classes/Workshop
implementation status
Complete and in use
total cost
Ksh 395,000
estimate
Ksh 0

Kamaindi Ass Chiefs Office

location
Kamaindi (in Nithi)
year first funded
2007
action
Construction Of Permanentoffice
output
Construction Of An Office
implementation status
Awaiting Disbursment Of Funds
total cost
Ksh 395,000
estimate
Ksh 0

Rubate Ass Chief Office

location
Rubate (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 395,000
estimate
Ksh 0

Kirumi Police Post

location
Maara (in Nithi)
year first funded
2005
action
Construction of Police Post Block
output
Police Post
implementation status
40% Complete
total cost
Ksh 395,000
estimate
Ksh 0

Chuka Township Assistant Chiefs Off

location
KiangOndu (in Nithi)
year first funded
2006
action
Construction Of Office
output
Office Block
implementation status
Require Internal Finishes
total cost
Ksh 395,000
estimate
Ksh 0

Kaare Ass Chief

location
Kiera (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Complete
total cost
Ksh 395,000
estimate
Ksh 0

Karamani Technical

location
Mukuuni (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
Work In Progress
total cost
Ksh 375,000
estimate
Ksh 0

Kwendwa Dispensary

location
Karingani (in Nithi)
year first funded
2005
action
Construction of Maternity Wing
output
Maternity Wing
implementation status
60% Complete
total cost
Ksh 352,078
estimate
Ksh 0

Kibumbu Small Home

location
KiangOndu (in Nithi)
year first funded
2005
action
Construction of Dormitory
output
Dormitory
implementation status
Requires Painting &Floor Polishing
total cost
Ksh 350,000
estimate
Ksh 0

Igangara Day

location
Mitheru (in Nithi)
year first funded
2003
action
Buy & Install Water Pump
output
Water Pump
implementation status
Water Pump Was Installed
total cost
Ksh 350,000
estimate
Ksh 0

Mukuuni Polytechnic

location
Mukuuni (in Nithi)
year first funded
2009
action
Renovate Workshop
output
-
implementation status
Project not completed
total cost
Ksh 350,000
estimate
Ksh 0

Weru Dispensary

location
Muthambi (in Nithi)
year first funded
2006
action
Construction of dispensary
output
Dispensary Block
implementation status
At Roofing Level
total cost
Ksh 350,000
estimate
Ksh 0

Gantaraki Dispensary

location
Murugi (in Nithi)
year first funded
2006
action
Construction of dispensary
output
Provide Health Services
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Magenka Dispensary

location
Mukuuni (in Nithi)
year first funded
2009
action
Construction of Mch Block
output
-
implementation status
Contractor is on site
total cost
Ksh 350,000
estimate
Ksh 0

Kiraro Assistant Chiefs Office

location
Mitheru (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construction Of An Office
implementation status
At Lintel Level
total cost
Ksh 350,000
estimate
Ksh 0

Kiereni Dispensary

location
Mugwe (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
2 Rooms Cmplete
total cost
Ksh 345,000
estimate
Ksh 0

Mugumango Assistant Chiefs Office

location
Murugi (in Nithi)
year first funded
2007
action
Construction Of Permanent Office
output
Construction Of An Office
implementation status
Awaiting Disbursment Of Funds
total cost
Ksh 340,000
estimate
Ksh 0

Wiru Day Sec

location
Murugi (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Class Constructed
total cost
Ksh 330,000
estimate
Ksh 0

Chuka Hawkers Market

location
Kiangondu (in Nithi)
year first funded
2008
action
Construction of Hawkers Sheds
output
Sheds
implementation status
Complete
total cost
Ksh 323,057
estimate
Ksh 0

Karamani Ass Chief Mwong

location
Mwonge (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 315,000
estimate
Ksh 0

Magutuni Ass Chief

location
Kiera (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kirege Ass Chiefs Office

location
Mugwe (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construction Of An Office
implementation status
Work In Progress
total cost
Ksh 300,000
estimate
Ksh 0

Kanthiiri Assistant Chiefs Office

location
Rubate (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construction Of An Office
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Mukwengo Ass Chiefs Office

location
Chogoria (in Nithi)
year first funded
2007
action
Construction Of Permanentoffice
output
Construction Of An Office
implementation status
At Roofing Level
total cost
Ksh 300,000
estimate
Ksh 0

Maara Chiefs Office

location
Maara (in Nithi)
year first funded
2005
action
Construction of Office Block
output
Chief?S Office
implementation status
85% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Nithi Tea Growers

location
KiangOndu (in Nithi)
year first funded
2007
action
n/a
output
-
implementation status
To be funded from seond instalment
total cost
Ksh 300,000
estimate
Ksh 0

Riankui C/D

location
Kamwimbi (in Nithi)
year first funded
2006
action
Construction of Cattle Dip
output
Operational Cattle Dip
implementation status
At Roofing Level
total cost
Ksh 300,000
estimate
Ksh 0

Igamatundu C/D

location
Itugururu (in Nithi)
year first funded
2006
action
Construction of Cattle Dip
output
Operational Cattle Dip
implementation status
70% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Muthambi Do Office

location
Muthambi (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 300,000
estimate
Ksh 0

Karingani Chiefsoffice

location
Karingani (in Nithi)
year first funded
2005
action
Construction of Office Block
output
Chief?S Office
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

K Muthambi W/P

location
Muthambi (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 300,000
estimate
Ksh 0

Gitumbi Muthambi

location
Muthambi (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 300,000
estimate
Ksh 0

Chuka Girls W/P

location
KiangOndu (in Nithi)
year first funded
2005
action
Install Watertank
output
Tank Installed
implementation status
100% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Mwigito Water Fallow

location
Thuita (in Nithi)
year first funded
2005
action
Construction of Water Fallow
output
Water Fallow
implementation status
100% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Nduka W/P

location
Muthambi (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 300,000
estimate
Ksh 0

Kiramba Dispensary

location
Karingani (in Nithi)
year first funded
2006
action
Construction of dispensary
output
Dispensary Block
implementation status
55% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kamwimbi Dispensary

location
Kamwimbi (in Nithi)
year first funded
2006
action
Construction of dispensary
output
Dispensary Block
implementation status
6 Rooms Roofed 1 Internaly Plastered
total cost
Ksh 300,000
estimate
Ksh 0

Makutano Dispensary

location
Mutino (in Nithi)
year first funded
2006
action
Construction of dispensary
output
Dispensary Block
implementation status
3 Rooms Built Require Internal Finish
total cost
Ksh 300,000
estimate
Ksh 0

Chuka Orphans Home

location
Kiangondu (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
Materials Bought
total cost
Ksh 300,000
estimate
Ksh 0

Chuka Library

location
Kiangondu (in Nithi)
year first funded
2007
action
Renovate Library
output
Renovated Library
implementation status
Library Renovated
total cost
Ksh 300,000
estimate
Ksh 0

Muthambu Girls

location
Muthambi (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
C0Mplete
total cost
Ksh 300,000
estimate
Ksh 0

Chuka Muslim Nursery

location
KiangOndu (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
Class Roofed ,Require Internal Finish
total cost
Ksh 300,000
estimate
Ksh 0

Nditune Sec

location
Kiera (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
2 Classes Requiring Internal Finishing
total cost
Ksh 300,000
estimate
Ksh 0

Chuka Secondary School

location
KiangOndu (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
35% Complete, Materials On Ground
total cost
Ksh 300,000
estimate
Ksh 0

Rubate College

location
Rubate (in Nithi)
year first funded
2006
action
Construction of Library
output
Library Facility
implementation status
Complete,
total cost
Ksh 300,000
estimate
Ksh 0

Ikuu Girls Secondary School

location
Kabuboni (in Nithi)
year first funded
2006
action
Completion Of Dining/Public Hall Complex
output
dining Hall Complex
implementation status
Complete,
total cost
Ksh 300,000
estimate
Ksh 0

Ikawa Special Class

location
Gitareni (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
1 Class Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kagumo Day

location
Mwonge (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
1 Class Complete One Reuires Painting And Window Panes
total cost
Ksh 300,000
estimate
Ksh 0

Karamugi Girls

location
Gitareni (in Nithi)
year first funded
2005
action
Construction of Ablution Bloc& Install Electricity
output
Ablution & Electricity
implementation status
Ablution Completed But Electricity Is Yet To Be Installed
total cost
Ksh 300,000
estimate
Ksh 0

Kajiunduthi Grounds

location
Muthambi (in Nithi)
year first funded
2005
action
Renovations
output
Improved Facility
implementation status
100% Complete
total cost
Ksh 300,000
estimate
Ksh 0

Kamuthiga

location
Itugururu (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 295,000
estimate
Ksh 0

Kamutiria Dispensary

location
Kajuki (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
At Foundation Level
total cost
Ksh 295,000
estimate
Ksh 0

Kiini Dispensary

location
Mitheru (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
At Roofing Level
total cost
Ksh 270,000
estimate
Ksh 0

Gichege Primary School

location
Mukuuni (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
Class Being Constructed
total cost
Ksh 265,000
estimate
Ksh 0

Mbugi Ntuntuni

location
Kithangani (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 255,000
estimate
Ksh 0

Mukuuni Ap Lines

location
Mukuuni (in Nithi)
year first funded
2006
action
Construction of Res. Houses
output
Residential Houses For Aps
implementation status
80% Complete Awaiting Plastering
total cost
Ksh 250,000
estimate
Ksh 0

Kauriko W/P

location
Murugi (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Purchase 100% Complete
total cost
Ksh 250,000
estimate
Ksh 0

Kamwonka Dispensary

location
Mutino (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
Awaiting Disbursement Of Funds
total cost
Ksh 250,000
estimate
Ksh 0

Kathwana Dispensary

location
Mutino (in Nithi)
year first funded
2006
action
Construction of dispensary
output
Dispensary Block
implementation status
75% Complete, Plaster, Roofed. No Windows & Doors
total cost
Ksh 250,000
estimate
Ksh 0

Ndagani Secondary School

location
Karingani (in Nithi)
year first funded
2006
action
Repay School Bus
output
Bus
implementation status
Repayment Is Continous
total cost
Ksh 250,000
estimate
Ksh 0

Magutuni Day Secondary School

location
Kiera (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Class & Books
implementation status
Class Complete
total cost
Ksh 250,000
estimate
Ksh 0

Chuka Township

location
KiangOndu (in Nithi)
year first funded
2005
action
Construction of Class
output
1 Classroom
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Ikawa Day Secondary School

location
Gitareni (in Nithi)
year first funded
2004
action
Construction of Classes & Buy Textbooks With 50000
output
Class & Books
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Chuka Law Court

location
Kiangondu (in Nithi)
year first funded
2008
action
Construction Of Cells
output
Construct Cells.
implementation status
Cells Constructed
total cost
Ksh 250,000
estimate
Ksh 0

Karongoni Assistant Chiefs Office

location
Karingani (in Nithi)
year first funded
2006
action
Construction of Office Block
output
Office Block
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Magutuni Ap Lines

location
Kiera (in Nithi)
year first funded
2006
action
Construction of Res. Houses
output
Residential Houses For Aps
implementation status
2 Complete
total cost
Ksh 250,000
estimate
Ksh 0

Kamwonka Ass Chief

location
Mutino (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 245,000
estimate
Ksh 0

Ntutuni W/P

location
KiangOndu (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 240,000
estimate
Ksh 0

Mwonge Chiefs Office

location
Mwonge (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Complete
total cost
Ksh 240,000
estimate
Ksh 0

Kamirugi Footbridge

location
Kithangani (in Nithi)
year first funded
2003
action
Constructfoot Bridge
output
Footbridge For Safe Crossing
implementation status
Complete
total cost
Ksh 210,000
estimate
Ksh 0

Magundu Primary School special Clas

location
Mitheru (in Nithi)
year first funded
2008
action
Repair Classes
output
Classes
implementation status
2 Classes Repaired
total cost
Ksh 205,000
estimate
Ksh 0

Kageni Polytechnic

location
Ganga (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
Require Internal Finish
total cost
Ksh 200,000
estimate
Ksh 0

Kiganjo Day

location
Gitije (in Nithi)
year first funded
2005
action
Construction of Class
output
Class
implementation status
100% Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kiereni Secondary School

location
Mugwe (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
1 Class Complete,
total cost
Ksh 200,000
estimate
Ksh 0

Kambandi Secondary School

location
Muiru (in Nithi)
year first funded
2006
action
Construction of Admin
output
Admin Block
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Magundu Girls

location
Mitheru (in Nithi)
year first funded
2006
action
Construction of Ablution And Underground Water Tank
output
Ablution &Underground Water Tank
implementation status
Complete,
total cost
Ksh 200,000
estimate
Ksh 0

Muraga TechSchool

location
Muthambi (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
1 Claass Complete
total cost
Ksh 200,000
estimate
Ksh 0

Chogoria Girls

location
Chogoria (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
35% Complete, Materials On Ground
total cost
Ksh 200,000
estimate
Ksh 0

Mwimbi Boys

location
Murugi (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 200,000
estimate
Ksh 0

Ndunguri Youth Poly

location
Ganga (in Nithi)
year first funded
2008
action
Construction of Workshop
output
Construct Workshop
implementation status
Awaiting Release Of Funds
total cost
Ksh 200,000
estimate
Ksh 0

Nthima F/B

location
Muiru (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
90% Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kirogo/Kaare F/B

location
Kiera (in Nithi)
year first funded
2008
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Pillars Built
total cost
Ksh 200,000
estimate
Ksh 0

Kigogo Dispensary

location
Thuita (in Nithi)
year first funded
2006
action
Construction of Maternity Wing
output
Maternity Wing
implementation status
60% Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kathanje Dispensary

location
Mutino (in Nithi)
year first funded
2006
action
Construction of dispensary
output
Dispensary Block
implementation status
50% Complete
total cost
Ksh 200,000
estimate
Ksh 0

Gitogoto Dispensary

location
Magumoni (in Nithi)
year first funded
2008
action
Construction of dispensary
output
Dispensary Block
implementation status
Work In Progress
total cost
Ksh 200,000
estimate
Ksh 0

Kamatumo W/P

location
Kithangani (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 200,000
estimate
Ksh 0

Rwanchege W/P

location
Murugi (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 200,000
estimate
Ksh 0

Wakulima W/P

location
Mitheru (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 200,000
estimate
Ksh 0

Makanyanga W/P

location
Kamaindi (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 200,000
estimate
Ksh 0

Mutindwa W/P

location
Chogoria (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 200,000
estimate
Ksh 0

Gianchuku W/P

location
Chogoria (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 200,000
estimate
Ksh 0

Kathatwa Assistant Chiefs Office

location
Thuita (in Nithi)
year first funded
2005
action
Construction of Office Block
output
Ass.Chief?S Office
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Murugi Ap Lines

location
Murugi (in Nithi)
year first funded
2006
action
Construction of Res. Houses
output
Residential Houses For Aps
implementation status
At Lintel Level
total cost
Ksh 200,000
estimate
Ksh 0

Mitheru Ap Lines

location
Mitheru (in Nithi)
year first funded
2006
action
Construction of Res. Houses
output
Residential Houses For Aps
implementation status
3 Houses Complete
total cost
Ksh 200,000
estimate
Ksh 0

Gitije Ap Lines

location
Gitije (in Nithi)
year first funded
2006
action
Construction of Res. Houses
output
Residential Houses For Aps
implementation status
3 Complete Houses
total cost
Ksh 200,000
estimate
Ksh 0

Iriga Ap Lines

location
Muthambi (in Nithi)
year first funded
2006
action
Construction of Res. Houses
output
Residential Houses For Aps
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Magutuni Police Post

location
Kiera (in Nithi)
year first funded
2006
action
Construction of Office Block
output
Office Block
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Mbogoni Assistant Chiefs Office

location
Itugururu (in Nithi)
year first funded
2006
action
Construction of Office Block
output
Office Block
implementation status
50% Complete At Lintel Level
total cost
Ksh 200,000
estimate
Ksh 0

District Security Office

location
KiangOndu (in Nithi)
year first funded
2006
action
Expand & Renovation Of Office
output
Renovated Block
implementation status
Renovation Done
total cost
Ksh 200,000
estimate
Ksh 0

Gitombani Ass Chief

location
Chogoria (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kimbumbu Tea Buying Centre

location
KiangOndu (in Nithi)
year first funded
2007
action
n/a
output
-
implementation status
Awaiting Disbursment Of Funds
total cost
Ksh 200,000
estimate
Ksh 0

Kiangondu Water Project

location
Kiangondu (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Awaiting Release Of Funds
total cost
Ksh 197,500
estimate
Ksh 0

Kairini Day

location
Kithangani (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
Work In Progress
total cost
Ksh 195,000
estimate
Ksh 0

Gianchuku Ass Chief

location
Murugi (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 195,000
estimate
Ksh 0

Gantaraki Ass Chief

location
Murugi (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 195,000
estimate
Ksh 0

Chogoria Mukwego W/P

location
Chogoria (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 195,000
estimate
Ksh 0

Iruri Ntakani F/B

location
Kiera (in Nithi)
year first funded
2008
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Pillars Built
total cost
Ksh 195,000
estimate
Ksh 0

Keriani Primary School

location
Ganga (in Nithi)
year first funded
2008
action
Construction of Classroom
output
Classes
implementation status
Work In Progress
total cost
Ksh 195,000
estimate
Ksh 0

Ngeru Elite Primary School

location
Ganga (in Nithi)
year first funded
2008
action
Renovate Classes
output
Renovated Classes
implementation status
Work In Progress
total cost
Ksh 195,000
estimate
Ksh 0

Deo Maara

location
Chogoria (in Nithi)
year first funded
2007
action
Renovate Offices
output
Renovated Offices
implementation status
Offices Renovated
total cost
Ksh 162,000
estimate
Ksh 0

Ntuibu Nursery

location
Gitije (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
Complete,
total cost
Ksh 150,000
estimate
Ksh 0

United Methodist School

location
Mwonge (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
1 Class Complete,
total cost
Ksh 150,000
estimate
Ksh 250,000

Limoni Polytechnic

location
Karingani (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
35% Complete,
total cost
Ksh 150,000
estimate
Ksh 0

Chogoria Boys

location
Chogoria (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
55% Complete, Materials On Ground
total cost
Ksh 150,000
estimate
Ksh 0

Iruku Primary School

location
Muiru (in Nithi)
year first funded
2007
action
Renovate Classes
output
Classes
implementation status
Materials On Ground
total cost
Ksh 150,000
estimate
Ksh 0

Mbaraga Primary School

location
Kithangani (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 150,000
estimate
Ksh 0

Ganga Location Education Office

location
Ganga (in Nithi)
year first funded
2008
action
Construction of 1 Roomed Office
output
Office
implementation status
Just awarded cheque
total cost
Ksh 150,000
estimate
Ksh 0

Mutuguta /Kiraro F/B

location
Maara (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 150,000
estimate
Ksh 0

Mumbuni Maternity Wing

location
Gitije (in Nithi)
year first funded
2005
action
Construction of M/W
output
Operational Maternity Wing
implementation status
Materials On Ground, 8% Complete;
total cost
Ksh 150,000
estimate
Ksh 0

Mucwa Ass Chief

location
Kiangondu (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 150,000
estimate
Ksh 0

Ciangoi/Cabugi Dairy Centre

location
KiangOndu (in Nithi)
year first funded
2005
action
Purchase Of Milking Equipments
output
Milking Equipments
implementation status
100% Complete
total cost
Ksh 150,000
estimate
Ksh 0

Magundu Organic Food Project

location
KiangOndu (in Nithi)
year first funded
2005
action
Trainings On Organic Projects
output
Capacity Building
implementation status
Trainings On Organic Projects Done
total cost
Ksh 150,000
estimate
Ksh 0

Kangoji Tea Buying Centre

location
Murugi (in Nithi)
year first funded
2009
action
Shed Construction
output
-
implementation status
Re-allocated from Nkora school
total cost
Ksh 150,000
estimate
Ksh 0

Mwonge Voc T/Centre

location
Mwonge (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
At Foundation Level
total cost
Ksh 150,000
estimate
Ksh 0

Ndagani Schoolor Street Children

location
KiangOndu (in Nithi)
year first funded
2005
action
Renovations & Expansion
output
Enough Accommodation
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Rubate Voct/ Institute

location
Rubate (in Nithi)
year first funded
2006
action
Construction of Classes
output
Classes
implementation status
At Lintel Level
total cost
Ksh 150,000
estimate
Ksh 0

Kiraro Social Welfare

location
Chogoria (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 145,000
estimate
Ksh 0

Kinoru Ass Chief Office

location
Mukuuni (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 130,000
estimate
Ksh 0

Weru C/D

location
Kithangani (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 120,000
estimate
Ksh 0

Magenka Play Ground

location
Mukuuni (in Nithi)
year first funded
2008
action
Leveling Play Ground
output
Leveled Play Ground
implementation status
Work In Progress
total cost
Ksh 120,000
estimate
Ksh 0

Nkuneni F/B

location
KiangOndu (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 120,000
estimate
Ksh 0

Kirege Buying Centre

location
Mugwe (in Nithi)
year first funded
2007
action
Construction of Tea Buying Centre
output
Tea Buying Centre
implementation status
Re-allocated Kshs.375,000 from Kenyenya Dispensary
total cost
Ksh 100,000
estimate
Ksh 0

Igamurathi Ass Chief

location
Muthambi (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 100,000
estimate
Ksh 0

Kagunda Dairy Centre

location
Mukuuni (in Nithi)
year first funded
2005
action
Construction of Office
output
Office Block
implementation status
100% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Chogoria Jua Kali

location
Chogoria (in Nithi)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Meru South Agro Processing Mucwa

location
KiangOndu (in Nithi)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Meru South Agro Processing Igoki

location
KiangOndu (in Nithi)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Nthambo/Mbatha Hydro

location
Thuita (in Nithi)
year first funded
2007
action
Provide Electricity
output
Electricity
implementation status
Awaiting Disbursment Of Funds
total cost
Ksh 100,000
estimate
Ksh 0

Barani Hydro

location
Chogoria (in Nithi)
year first funded
2007
action
Provide Electricity
output
Electricity
implementation status
Awaiting Disbursment Of Funds
total cost
Ksh 100,000
estimate
Ksh 0

Ikame Tea Buying Centre

location
Mitheru (in Nithi)
year first funded
2007
action
Construction of Tea Buying Centre
output
Tea Buying Centre
implementation status
Roofed
total cost
Ksh 100,000
estimate
Ksh 0

Kaanwa Primary School

location
Karingani (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Fr Airadi Primary School

location
Kiangondu (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Roofing And Plastering On 1 Class Done
total cost
Ksh 100,000
estimate
Ksh 0

Thigaa Sec

location
Chogoria (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Not Started
implementation status
Cheque Not Released
total cost
Ksh 100,000
estimate
Ksh 0

Kirege Sec

location
Mugwe (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Kiunguni Primary School

location
Mugwe (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Mandugo Primary School

location
Mutino (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Nkumbo Primary School

location
Muiru (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Ntutuni Primary School

location
Kiangondu (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Miruri Boarding Primary School

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Class At Roofing Level
total cost
Ksh 100,000
estimate
Ksh 0

Iruma Girls

location
Maara (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Kagongo/Gaceke Polytechnic

location
Mitheru (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Ruria Primary School

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Chuka Girls

location
Kiangondu (in Nithi)
year first funded
2007
action
Construction of Perimeter Wall
output
Perimeter Wall
implementation status
Constructed
total cost
Ksh 100,000
estimate
Ksh 0

Kianjeru Primary School

location
Mugwe (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Murunga Primary School

location
Kiera (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Ntatua Primary School

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Kiairugu Primary School

location
Maara (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Not Started
total cost
Ksh 100,000
estimate
Ksh 0

Twamikua Lowcost

location
Mutino (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Not Started
total cost
Ksh 100,000
estimate
Ksh 0

Mutiguru Primary School

location
Muthambi (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Not Started
total cost
Ksh 100,000
estimate
Ksh 0

Kanoro Primary School

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Mugirirwa Community Hall

location
Mugwe (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Makuri Girls

location
Chogoria (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 0

Kibumbu Primary School

location
Kiangondu (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Igambangombe Primary School

location
Kamaindi (in Nithi)
year first funded
2008
action
Renovate Classes
output
Renovated Classes
implementation status
Work In Progress
total cost
Ksh 100,000
estimate
Ksh 0

Ikame Rumandi F/B

location
Muthambi (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Nduka River Bridge

location
Muthambi (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kagaani/Kambandi F/B

location
Muiru (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Thaaria Drift

location
Kamwimbi (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Materials On Ground
total cost
Ksh 100,000
estimate
Ksh 0

Itugururu/ Kanyuambora

location
Itugururu (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Gakuyuni F/B

location
Kamwimbi (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Gachoka Mwirithi F/B

location
Thuita (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kithinu River Bridge

location
Thuita (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
50% Complete
total cost
Ksh 100,000
estimate
Ksh 0

Murigi Bridge

location
Mutino (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Bridge
implementation status
One Pillar Done
total cost
Ksh 100,000
estimate
Ksh 0

Riamugaraci

location
Kiera (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Work In Progress
total cost
Ksh 100,000
estimate
Ksh 0

Riambugi F/B

location
Itugururu (in Nithi)
year first funded
2008
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Karumbi F/B

location
Maara (in Nithi)
year first funded
2008
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Tapwa

location
KiangOndu (in Nithi)
year first funded
2006
action
Purchase Drugs
output
Plwas Care Support
implementation status
Drugs Bought
total cost
Ksh 100,000
estimate
Ksh 0

Ndumbini Dispensary

location
Mitheru (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
Awaiting Disbursement Of Funds
total cost
Ksh 100,000
estimate
Ksh 0

Twamikua Dispensary

location
Mutino (in Nithi)
year first funded
2007
action
Construction of dispensary
output
Dispensary Block
implementation status
Awaiting Disbursement Of Funds
total cost
Ksh 100,000
estimate
Ksh 0

Weru Dispensary Kithangani

location
Kithangani (in Nithi)
year first funded
2008
action
Purchase Equipments
output
Equipments
implementation status
Work In Progress
total cost
Ksh 100,000
estimate
Ksh 0

Chera Dispensary

location
Gitareni (in Nithi)
year first funded
2008
action
Construction of dispensary
output
Dispensary Block
implementation status
Work In Progress
total cost
Ksh 100,000
estimate
Ksh 0

Igangara Secondary School W/P

location
Mitheru (in Nithi)
year first funded
2005
action
Purchase Pipes
output
Water Project
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Murugi/ Mugumango W/P

location
Murugi (in Nithi)
year first funded
2006
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Mugirirwa W/P

location
Mugwe (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Kirigi Giancanaru Irig

location
Mitheru (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Makuri Water Project

location
Chogoria (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Kagongo Water Pipeline

location
Muthambi (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Muthande W/P

location
Ganga (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Gitoto Water Project

location
Mitheru (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Kiamatumo W/P

location
Mitheru (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Munyaka W/P

location
Mitheru (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 100,000
estimate
Ksh 0

Kathareni W/P

location
Maara (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 100,000
estimate
Ksh 0

Keria Iruma-Kiroo W/P

location
Maara (in Nithi)
year first funded
2008
action
Purchase Pipes
output
Water Project
implementation status
Pipes Bought
total cost
Ksh 100,000
estimate
Ksh 0

Kianjagi Assistant Chiefs Office

location
Murugi (in Nithi)
year first funded
2007
action
Construction Of Permanent Office
output
Construction Of An Office
implementation status
Awaiting Disbursment Of Funds
total cost
Ksh 100,000
estimate
Ksh 0

Kiaritha Assistant Chiefs Office

location
Kamwimbi (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construciton Of Office
implementation status
To modify a class into a lab. Funds allocated
total cost
Ksh 100,000
estimate
Ksh 0

Kithangani Assistant Chiefs Office

location
Kithangani (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construction Of An Office
implementation status
Insufficient funds were allocated
total cost
Ksh 100,000
estimate
Ksh 0

Kamaindi Chiefs Office

location
Kamaindi (in Nithi)
year first funded
2007
action
Construction Of An Office
output
Construciton Of An Office
implementation status
About to commence
total cost
Ksh 100,000
estimate
Ksh 0

Kiangondu Ap Lines

location
Kiangodu (in Nithi)
year first funded
2007
action
Increase Res. Houses For Aps
output
Residential Houses For Aps
implementation status
About to commence
total cost
Ksh 100,000
estimate
Ksh 0

Thigaa Ass Chuef

location
Maara (in Nithi)
year first funded
2008
action
Construction Office
output
Office Block
implementation status
Work In Progress
total cost
Ksh 100,000
estimate
Ksh 0

Utheri Wamicii Electricity

location
Kamwimbi (in Nithi)
year first funded
2006
action
Provide Electricity
output
Electricity Available
implementation status
Waiting For Line To Be Installed
total cost
Ksh 98,000
estimate
Ksh 0

Mautini Primary School

location
Kiera (in Nithi)
year first funded
2008
action
Renovate Classes
output
Renovated Classes
implementation status
Work In Progress
total cost
Ksh 95,000
estimate
Ksh 0

Muragara /Mutonga F/B

location
Kiera (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 88,000
estimate
Ksh 0

Mukuuni C/D

location
Mukuuni (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 80,000
estimate
Ksh 0

Kiandumi

location
Muthambi (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 80,000
estimate
Ksh 0

Gakongoro F/B

location
Itugururu (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 0

Naka F/B

location
KiangOndu (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 70,000
estimate
Ksh 0

Magenka F/Bkigum

location
Mukuuni (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 68,000
estimate
Ksh 0

Wiru C/D

location
Murugi (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Njaina Cattle Dip

location
Karingani (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Mbwiru C/D

location
Karingani (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Ndunguri C/D

location
Ganga (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Nguruki C/D

location
Maara (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Kieganguru C/D

location
Chogoria (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Mumbuni C/D

location
Gitije (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Muthiru C/D

location
Muthambi (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Ruguta C/D

location
Mitheru (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Mwonge C/D

location
Mwonge (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Rubate C/D

location
Rubate (in Nithi)
year first funded
2006
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
100% Complete .
total cost
Ksh 60,000
estimate
Ksh 0

Gatua Dip

location
Mitheru (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
not known
total cost
Ksh 60,000
estimate
Ksh 0

Kiriani C/D

location
Murugi (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Kiairugu C/D

location
Maara (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Kagongo/Gaceke

location
Mitheru (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Kathathani C/D

location
Chogoria (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Kirigi C/D

location
Mwonge (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Majira

location
Chogoria (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
not known
total cost
Ksh 60,000
estimate
Ksh 0

Munga

location
Murugi (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Muraga

location
Muthambi (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Iriga

location
Muthambi (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
not known
total cost
Ksh 60,000
estimate
Ksh 0

Baragu

location
Murugi (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second
total cost
Ksh 60,000
estimate
Ksh 0

Kiambui

location
Kabuboni (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
To be funded from second instalment
total cost
Ksh 60,000
estimate
Ksh 0

Naka F/B Mubukor

location
Mugwe (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 58,000
estimate
Ksh 0

Michuki Nith

location
Gitije (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 53,000
estimate
Ksh 0

Lions Bridge Mar F/B

location
Gitije (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 53,000
estimate
Ksh 0

Igangara/Nithi Foot Bridge

location
Mitheru (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 52,000
estimate
Ksh 0

Karugio

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Protected springs are in good condition
total cost
Ksh 50,000
estimate
Ksh 0

Jitahindi W/P

location
Mugwe (in Nithi)
year first funded
2007
action
Purchase Pipes
output
Water Project
implementation status
Laying Of Pipes Is Continuous
total cost
Ksh 50,000
estimate
Ksh 0

Kagaani F/B

location
Kabuiboni (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
In good condition but one needs rehabilitatioin
total cost
Ksh 50,000
estimate
Ksh 0

Mundi

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Completed and in use
total cost
Ksh 50,000
estimate
Ksh 0

Ngoko Rugutf/B

location
Thuita (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 50,000
estimate
Ksh 0

Gatenderu F/B

location
Chogoria (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 50,000
estimate
Ksh 0

Gakongoro /Mara F/B

location
Maara (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 50,000
estimate
Ksh 0

Lower Muthanga F/B

location
Muthambi (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Awaits cheque
total cost
Ksh 50,000
estimate
Ksh 0

Mugamu F/B

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Not installed as electricity line in awaited
total cost
Ksh 50,000
estimate
Ksh 0

Gachiankuref/B

location
Karingani (in Nithi)
year first funded
2006
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 50,000
estimate
Ksh 0

Tungu Foot Bridge

location
Karingani (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Not completed but in use
total cost
Ksh 50,000
estimate
Ksh 0

Riankui F/B

location
Kamaindi (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Project not complete. Need more funds
total cost
Ksh 50,000
estimate
Ksh 0

Naka F/K Karurin

location
Mugwe (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
More funds allocated
total cost
Ksh 50,000
estimate
Ksh 0

Ciancere

location
Kiangondu (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Project not completed. Need more funds
total cost
Ksh 50,000
estimate
Ksh 0

Gatogo F/B

location
Kiangondu (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Need funds to complete
total cost
Ksh 50,000
estimate
Ksh 0

Nithi/Kamwangu

location
Gitije (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Facility in use
total cost
Ksh 50,000
estimate
Ksh 0

Kagiti/Iruri

location
Kiera (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
More funds allocated
total cost
Ksh 50,000
estimate
Ksh 0

Ntagana/Kithitu

location
Kiera (in Nithi)
year first funded
2007
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Protected springs are in good condition
total cost
Ksh 50,000
estimate
Ksh 0

Wiru Library

location
Murugi (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Insufficient funds were allocated
total cost
Ksh 50,000
estimate
Ksh 0

Ikame Primary School

location
Mitheru (in Nithi)
year first funded
2007
action
Construction of Classroom
output
Classes
implementation status
Materials On Ground
total cost
Ksh 50,000
estimate
Ksh 0

Kiereni Primary School

location
Mugwe (in Nithi)
year first funded
2007
action
Install Electricity
output
Electricity
implementation status
Work In Progress
total cost
Ksh 50,000
estimate
Ksh 0

Kajiunduthi Primary School

location
Muthambi (in Nithi)
year first funded
2007
action
Renovate Classroom
output
Renovated Classes
implementation status
1 Class Renovated
total cost
Ksh 50,000
estimate
Ksh 0

Nthirani F/B

location
KiangOndu (in Nithi)
year first funded
2003
action
Construction of Foot Bridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 50,000
estimate
Ksh 0

Nkobi F/B

location
KiangOndu (in Nithi)
year first funded
2003
action
Construction of Foot Bridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 50,000
estimate
Ksh 0

Kiandume

location
Muthambi (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 50,000
estimate
Ksh 0

Kirege

location
Mugwe (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
not known
total cost
Ksh 40,000
estimate
Ksh 0

Nkenye F/B

location
KiangOndu (in Nithi)
year first funded
2003
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
100% Complete
total cost
Ksh 38,000
estimate
Ksh 0

Kirubia

location
Mugwe (in Nithi)
year first funded
2007
action
Rehabilitate Cattle Dip
output
Cattle Dip
implementation status
not known
total cost
Ksh 20,000
estimate
Ksh 0

Kangoro Primary School

location
Mwonge (in Nithi)
action
n/a
output
-
implementation status
Project not complete
total cost
Ksh 0
estimate
Ksh 0

Chukka United Dairy

location
Kiangondu (in Nithi)
action
Purchase Of Milking Equipments
output
Milking Equipments
implementation status
not known
total cost
Ksh 0
estimate
Ksh 0

Adult Education Library

location
Murugi (in Nithi)
action
Construction of Classroom
output
Classes
implementation status
Project not completed
total cost
Ksh 0
estimate
Ksh 0

Kaigoro Primary School

location
Kiangondu (in Nithi)
action
Construction of Classroom
output
Classes
implementation status
Project not completed
total cost
Ksh 0
estimate
Ksh 0

Muthambi Polytechnic

location
Muthambi (in Nithi)
action
Construction of Classroom
output
Classes
implementation status
Completed and in use
total cost
Ksh 0
estimate
Ksh 0

Kanya Kanuikamuru F/B

location
Maara (in Nithi)
action
Construction of Footbridge
output
Footbridge For Safe Crossing
implementation status
Funds from emergency reserve 50,000/=
total cost
Ksh 0
estimate
Ksh 0

Kiangondu Dairy

location
Kiangondu (in Nithi)
action
Purchase Of Milking Equipments
output
Milking Equipments
implementation status
not known
total cost
Ksh 0
estimate
Ksh 0

Kiriani Home For The Aged

location
Murugi (in Nithi)
action
Construction of Training Block
output
Training Block
implementation status
Re-allocated to Mongorisi & Kenyambi Health centres
total cost
Ksh 0
estimate
Ksh 0

Ngaani Primary School

location
Kiangondu (in Nithi)
action
Construction of Classroom
output
Classes
implementation status
Project not complete
total cost
Ksh 0
estimate
Ksh 0

Kathituni Primary School

location
Kiangondu (in Nithi)
action
Construction of Classroom
output
Not Started
implementation status
Parents have accepted to finish the remaining part so as to request for Dormitory construction
total cost
Ksh 0
estimate
Ksh 0

Baragu Secondary School

location
Murugi (in Nithi)
action
Construction of Classroom
output
Classes
implementation status
Project not completed
total cost
Ksh 0
estimate
Ksh 0