It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Nithi
Mwonge W/P
- location
-
Mwonge
(in Nithi)
- year first funded
- 2005
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 9,473,265
- estimate
- Ksh 0
Iruma Day
- location
-
Maara
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes And Lab
- output
- Classes
- implementation status
- 4 Classes Require Internal Finishing And
- total cost
- Ksh 6,644,303
- estimate
- Ksh 0
Kamwene W/P
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 5,380,000
- estimate
- Ksh 0
Manyaga W/P
- location
-
KiangOndu/Karingani
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 4,900,000
- estimate
- Ksh 0
Muthambi /Gitije W/P
- location
-
Muthambi
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 3,550,000
- estimate
- Ksh 0
Mpukoni Dispensary
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2006
- action
- Construction of Ward
- output
- Ward
- implementation status
- Complete
- total cost
- Ksh 3,350,000
- estimate
- Ksh 0
Gatua / Karimbaw/P
- location
-
Mitheru
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 3,200,000
- estimate
- Ksh 0
Chogoria W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Pipes Installed
- total cost
- Ksh 3,100,000
- estimate
- Ksh 0
Kajuki Dispensary
- location
-
Kajuki
(in Nithi)
- year first funded
- 2007
- action
- Construction of Maternity Ward.
- output
- Maternity Block
- implementation status
- Materials On Ground
- total cost
- Ksh 3,100,000
- estimate
- Ksh 0
Katharaka Farmers Market
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Market Stalls
- output
- Market Stalls
- implementation status
- 15 Stallscomplete And 18 Require Internal Finishes
- total cost
- Ksh 3,050,000
- estimate
- Ksh 0
Chuka Open Air Market
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Construction of Market Sheds
- output
- Market Sheds
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 0
Magutuni Mortuary
- location
-
Kiera
(in Nithi)
- year first funded
- 2004
- action
- Construction of Mortuary & Install Cooler
- output
- Improve Health Facility
- implementation status
- Mortuary Block Complete
- total cost
- Ksh 2,870,000
- estimate
- Ksh 0
Mutino W/P
- location
-
Mutino
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 2,650,000
- estimate
- Ksh 0
Ndigia W/P
- location
-
Mugwe
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
Mwithanga W/P
- location
-
Muthambi
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- More funds needed to complete
- total cost
- Ksh 2,185,000
- estimate
- Ksh 0
Chuka Market Sheds
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Shoe Shiners Sheds,And Miraa Sheds
- output
- Sheds
- implementation status
- Shoe Shiers Shed Built Miraa Sheds Being Constructed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Eastern University
- location
-
KiangOndu District Proj.
(in Nithi)
- year first funded
- 2004
- action
- Rehabilitation Of Dormitories To Hostels
- output
- Hostels
- implementation status
- Hostels In Place
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Kithangani W/P
- location
-
Kithangani
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 1,840,000
- estimate
- Ksh 0
Pole Pole Open Air Market
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction of Market Sheds
- output
- Market Sheds
- implementation status
- Roofed Market In Place
- total cost
- Ksh 1,750,000
- estimate
- Ksh 7,000,000
Ganga Division Dos Office And Residence
- location
-
Ganga
(in Nithi)
- year first funded
- 2009
- action
- Construction of Offices And Residence
- output
- -
- implementation status
- Foundation stage
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Thiga/Kithituw/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Kamwangu Dispensary
- location
-
Gitije
(in Nithi)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Operational Dispensary
- implementation status
- 3 Rooms Roofed And 4 At Lintel Level
- total cost
- Ksh 1,345,000
- estimate
- Ksh 0
Njaina Day
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes And Lab
- output
- Classes And Lab
- implementation status
- 3Classes Complete
- total cost
- Ksh 1,245,000
- estimate
- Ksh 0
Igakiramba Day
- location
-
Kiera
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Class Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kajiampau Day Secondary School o
- location
-
Mutino
(in Nithi)
- year first funded
- 2003
- action
- Construction of Classes, Admin& Buy Textbooks With 50000
- output
- Classes, Admin& Textbooks
- implementation status
- Completed Admin, 2Class. Bought Books.
- total cost
- Ksh 1,195,000
- estimate
- Ksh 0
Chamunga /Kamamwankiu Dispensary
- location
-
Gitije
(in Nithi)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Operational Dispensary
- implementation status
- 3Rooms Internally Plastered And 6 At Lintel Level
- total cost
- Ksh 1,145,000
- estimate
- Ksh 0
Kathigirini Day
- location
-
Karingani
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes, Plaster Lab & Buy Textbooks With 50000
- output
- Classes, Plastered Lab & Textbooks
- implementation status
- Classes And Lab Plastered
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kiaritha Day Secondary School
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2003
- action
- Construction of Classes And Admin
- output
- Classes And Admin
- implementation status
- 4 Classes Complete And Admin
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kibumbu Day
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Class & Books
- implementation status
- Books Bought, 2 Classes Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Munga Day Secondary School
- location
-
Murugi
(in Nithi)
- year first funded
- 2003
- action
- Construction Classes & Buy Textbooks With 50000
- output
- Classes & Textbooks
- implementation status
- Books Bought ; 3 Class & Admin Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Kiamucii Dispensary
- location
-
Gitareni
(in Nithi)
- year first funded
- 2004
- action
- Expansion & Renovation Of Dispensary And Construction of Maternity
- output
- Provide Health Services
- implementation status
- 3 Roomed Staff House Built One Room Expanded Maternity At Window Level
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Kieni Day Secondary School
- location
-
Maara
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes,Plastering Floor And Windows For Lab & Buy Textbooks With 50000
- output
- Class & Books
- implementation status
- 3 Class Complete, Lab Plastered And Windows Fixed Books Bought
- total cost
- Ksh 1,045,000
- estimate
- Ksh 0
Gituja Day Secondary School
- location
-
Muthambi
(in Nithi)
- year first funded
- 2003
- action
- Construction Classes & Buy Textbooks With 50000
- output
- Classes & Textbooks
- implementation status
- Books Bought, 2 Complete 2 Incomplete
- total cost
- Ksh 1,019,000
- estimate
- Ksh 0
Ntumbara Day
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Textbooks
- implementation status
- 3 Classes Comlete 4Th At Roofing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Maguma Day
- location
-
Kiera
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Classescomplete And 1Require Floor And Internal Finishes
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Karigini Day
- location
-
Gitije
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1 Class Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kanthanje Day
- location
-
Mutino
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Classes Completed
- total cost
- Ksh 995,000
- estimate
- Ksh 0
Mutidwa Day Secondary School
- location
-
Murugi
(in Nithi)
- year first funded
- 2003
- action
- Construction Class, Lab & Buy Textbooks With 50000
- output
- Class, Lab. & Textbooks
- implementation status
- Project Complete
- total cost
- Ksh 975,000
- estimate
- Ksh 0
Magumoni Day Secondary School o
- location
-
Thuita
(in Nithi)
- year first funded
- 2003
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes,Lab & Textbooks
- implementation status
- 3 Classes & Lab Complete
- total cost
- Ksh 965,000
- estimate
- Ksh 0
Mwanjati Water Project
- location
-
Karingani
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kaanwa Maternity Wing
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Construction of Maternity Wing
- output
- Operational Maternity Wing
- implementation status
- Roofed Awaiting Plastering
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Itara Day Secondary School
- location
-
Muthambi
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Books
- implementation status
- 4 Classes Complete, Bought Books.
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kiangiri Day
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes, Water Tank
- output
- Classes
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Kianjagi Day
- location
-
Murugi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Toilets &Classes
- output
- Lclasses/Toiets
- implementation status
- 2 Complete, And Toilets Complete
- total cost
- Ksh 940,000
- estimate
- Ksh 0
Mugona Day
- location
-
Mitheru
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes,Ablution & Buy Textbooks With 50000
- output
- Classes,Ablution & Textbooks
- implementation status
- Ablution Complete And 4 Classes At Foundation Level
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kiunguni Day Secondary School
- location
-
Mugwe
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Books
- output
- Classes & Books
- implementation status
- 100% Complete, 50000 Bought Books
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Karewa Day Secondary School
- location
-
Chogoria
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Class & Books
- implementation status
- 3 Classes Complete Books Bought
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Mutuguni Day Secondary School
- location
-
Thuita
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- 4 Classes & Textbooks
- implementation status
- 4 Complete Requiring Internal Finishing
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kamaindi Polytechnic
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Classes Built
- total cost
- Ksh 895,000
- estimate
- Ksh 0
Staugustine Day
- location
-
Mitheru
(in Nithi)
- year first funded
- 2004
- action
- Construction of Lab And Girls Dormitory
- output
- Lab And Dormitory
- implementation status
- Lab Complete& Dormitory At Roofing Level
- total cost
- Ksh 880,000
- estimate
- Ksh 0
Maabi Day Secondary School
- location
-
Rubate
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Textbooks
- implementation status
- Complete. Textbooks Bought
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Ndagoni Day Secondary School
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Dormitory And Lab & Buy Textbooks With 50000
- output
- Dormitory ,Lab,Class & Books
- implementation status
- Twin Dormitory , Classand Lab Complete, Bought Books.
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Kaanwa Day Secondary School
- location
-
Karingani
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes, Lab & Offices
- output
- Classes &Offices
- implementation status
- 4 Classes &Offices Completed Lab Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Magenka Day Secondary School
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Books
- implementation status
- 2Classes& Water Tank Complete, Bought Books Dh Complete Admin Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Muthambi Health Centre
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Kitchen
- output
- Kitchen Block
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Stann Day Secondary School
- location
-
Ganga
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Class & Books
- implementation status
- 1 Class Complete, Books Bought
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Mumbuni Day Secondary School st Bonaventur
- location
-
Gitije
(in Nithi)
- year first funded
- 2004
- action
- Construction of Lab, Gas & Water System
- output
- Operational Lab.
- implementation status
- Water System Not Done
- total cost
- Ksh 845,000
- estimate
- Ksh 15,000,000
Mwienderi W/P
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2005
- action
- Construction of W/P
- output
- Water Project
- implementation status
- 3 Km Pipes Laid;
- total cost
- Ksh 845,000
- estimate
- Ksh 18,000,000
Gitareni Policepost
- location
-
Gitareni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Police Post
- output
- Police Post
- implementation status
- Materials On Ground
- total cost
- Ksh 845,000
- estimate
- Ksh 0
Weru Youth Polytechnic
- location
-
Gitareni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes &Admin Block
- output
- Classes &Admin Block
- implementation status
- 1 Class Renovated 3 Classes & Store Remains Internal Completion, Admin At Foundation
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Itugururu Chief Office
- location
-
Itugururu
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Muthambi Ap Lines
- location
-
Muthambi
(in Nithi)
- year first funded
- 2004
- action
- Construction of Res. Houses
- output
- Residential Houses For Police
- implementation status
- 98% Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Riamama W/P
- location
-
Kithangani
(in Nithi)
- year first funded
- 2009
- action
- Intake Construction
- output
- -
- implementation status
- Awaits for Cheque
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Thuita W/P
- location
-
Thuita
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Mbogoni W/P
- location
-
Itugururu
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Igamurathi W/P
- location
-
Muthambi
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kamaindi Dispensary
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2004
- action
- Renovate dispensary &Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- Renovation, Finishing Of Dispensary Maternity Roofed Require Internal Finish
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Magenka Bridge
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge For Safe Crossing
- implementation status
- 80% Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kabui Sec
- location
-
Maara
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Classe Complete,
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kimuchia Day
- location
-
Chogoria
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Textbooks
- implementation status
- Complete.
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Itugururu Day Secondary School
- location
-
Itugururu
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- 4 Classes & Textbooks
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Gituntu Day
- location
-
Mitheru
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Books
- implementation status
- 4Classes Complete, Bought Books.
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kiamucii Day
- location
-
Gitareni
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes And Lab
- output
- Classes And Lab
- implementation status
- 3 Classes And Lab Built But Not Internally Finished
- total cost
- Ksh 795,000
- estimate
- Ksh 0
Kanyuru Day Secondary School
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes
- implementation status
- 3 Classes Complete, Lab And 1 Class Require Internal Finishing
- total cost
- Ksh 775,000
- estimate
- Ksh 0
Mukui Day Sec
- location
-
Ganga
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 755,000
- estimate
- Ksh 0
District Ap Lines
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Increase Res. Houses For Aps
- output
- Residential Houses For Aps
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kabururu Health Centre
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2004
- action
- Construction of health center
- output
- Operational H/C
- implementation status
- Fixing Of Doors Not Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kieganguru Polytechnic
- location
-
Chogoria
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 3 Classes Requiring Internal Finishing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kiamaogo Day
- location
-
Ganga
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Class Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Makawani Day School
- location
-
Gitareni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes,D/H & Buy Textbooks With 50000
- output
- Class,D/H & Books
- implementation status
- 1 Classes Complete,Books Bought, Dh Require Internal Finish
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Mira Miraja
- location
-
Karingani
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- 4 Classes
- implementation status
- 2 Classes Started
- total cost
- Ksh 745,000
- estimate
- Ksh 0
Mukuuni Dispensary
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2005
- action
- Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- Roofed Require Internal Fiishes
- total cost
- Ksh 745,000
- estimate
- Ksh 0
K Mwendwaw/P
- location
-
Karingani
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes& Build Office
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 740,000
- estimate
- Ksh 0
Kariakomo Dispensary
- location
-
Ganga
(in Nithi)
- year first funded
- 2007
- action
- Renovate Disp
- output
- Renovated Disp
- implementation status
- Work In Progress
- total cost
- Ksh 725,000
- estimate
- Ksh 0
Ibiriga Day Secondary School
- location
-
Mwonge
(in Nithi)
- year first funded
- 2003
- action
- Construction of Lab & Equip
- output
- Equipped Lab.
- implementation status
- Lab Equipment Bought & 1 Lab Complete Other Requires Floor &Plastering
- total cost
- Ksh 715,000
- estimate
- Ksh 0
Ikuu School Of Disabled
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes
- output
- 2 Classes
- implementation status
- 2 Classes Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Gianchuku Day
- location
-
Chogoria
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Textbooks
- implementation status
- 2 Classes Complete & 3Rd In Progress
- total cost
- Ksh 695,072
- estimate
- Ksh 0
Kiangondu Day Secondary School
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2003
- action
- Construction of Classroom And Lab
- output
- Classroom & Laboratory And Lab
- implementation status
- Class Complete, Admin & Lab Ongoing
- total cost
- Ksh 669,000
- estimate
- Ksh 0
Mwirithi Bridge
- location
-
Thuita / Magumoni
(in Nithi)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Chuka Ap Lines
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Construction of Res. Houses
- output
- Residential Houses
- implementation status
- 4 Semi- Permanent Buildings Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Kavando Irrigation W/P
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Survey In Progress
- total cost
- Ksh 645,000
- estimate
- Ksh 0
Mungoni Polytechnic
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Classes Completed
- total cost
- Ksh 645,000
- estimate
- Ksh 0
Kieganguru Primary School
- location
-
Chogoria
(in Nithi)
- year first funded
- 2009
- action
- Installation Of Transformer
- output
- -
- implementation status
- Foundation stage
- total cost
- Ksh 625,000
- estimate
- Ksh 0
Njaina Area
- location
-
Karingani
(in Nithi)
- year first funded
- 2009
- action
- Installation Of Transformer
- output
- -
- implementation status
- not known
- total cost
- Ksh 625,000
- estimate
- Ksh 0
Nkumbo Area
- location
-
Mugwe
(in Nithi)
- year first funded
- 2009
- action
- Installation Of Transformer
- output
- -
- implementation status
- not known
- total cost
- Ksh 625,000
- estimate
- Ksh 0
Iruma A\Rea
- location
-
Maara
(in Nithi)
- year first funded
- 2009
- action
- Installation Of Transformer
- output
- -
- implementation status
- To be funded from second Instalment
- total cost
- Ksh 625,000
- estimate
- Ksh 0
Kalewa Secondary School
- location
-
Murugi
(in Nithi)
- year first funded
- 2009
- action
- Installation Of Transformer
- output
- -
- implementation status
- To be funded from second Instalment
- total cost
- Ksh 625,000
- estimate
- Ksh 0
Chumaita Tea Buying Centre
- location
-
Murugi
(in Nithi)
- year first funded
- 2009
- action
- Installation Of Transformer
- output
- -
- implementation status
- To be funded from second Instalment
- total cost
- Ksh 625,000
- estimate
- Ksh 0
Nturiri Girls Secondary School
- location
-
Chogoria
(in Nithi)
- year first funded
- 2005
- action
- Construction of D/H
- output
- D/H
- implementation status
- D/H Completet
- total cost
- Ksh 600,000
- estimate
- Ksh 15,000,000
Kiroo Ass Chiefs Office
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construction Of An Office
- implementation status
- At Roofing Level
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Gantaraki W/P
- location
-
Murugi
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- More funds needed to complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Wiru W/P
- location
-
Murugi
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ukuruini /Ikumbo W/P
- location
-
Ganga
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Mutindwa Dispensary
- location
-
Chogoria
(in Nithi)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary Block
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kibugua Health Centre
- location
-
Thuita
(in Nithi)
- year first funded
- 2004
- action
- Construction of Kitchen
- output
- Provide Kitchen Facility
- implementation status
- 50% Complete.
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Nturiri Boys Sec
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction of D/H
- output
- D/H
- implementation status
- At Roofinglevel
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kamwimbi Day
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes & Science Lab.
- output
- Classes & Science Lab.
- implementation status
- Class Complete And Lab At Lintel
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ngeru Day
- location
-
Ganga
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Classes & Books
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Jasho W/P
- location
-
Itugururu
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 595,000
- estimate
- Ksh 0
Mugumango W/P
- location
-
Ganga
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 595,000
- estimate
- Ksh 0
Kamwango Water Fallow
- location
-
Gitije
(in Nithi)
- year first funded
- 2005
- action
- Construction of Water Fallow
- output
- Water Fallow
- implementation status
- 3 Lorries Of Ballast On Site ; Survey Was Done
- total cost
- Ksh 595,000
- estimate
- Ksh 0
Majira Health Centre
- location
-
Chogoria
(in Nithi)
- year first funded
- 2008
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- Work In Progress
- total cost
- Ksh 595,000
- estimate
- Ksh 0
Ndumbini Secondary School
- location
-
Mitheru
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- 2 Classes Started 1 At Roofing The Other At Window Level
- total cost
- Ksh 595,000
- estimate
- Ksh 0
Mubukuro Polytechnic
- location
-
Mugwe
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- Roofed,Requires Internal Finish
- total cost
- Ksh 595,000
- estimate
- Ksh 0
Kamaindi W/P
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kangoro Day
- location
-
Mwonge
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 3 Class Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Nkuthika Assistant Chief Office
- location
-
Muiru
(in Nithi)
- year first funded
- 2004
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Ikumbo Secondary School
- location
-
Ganga
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Complete,
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Igamatundu Health Centre
- location
-
Itugururu
(in Nithi)
- year first funded
- 2004
- action
- Construction of health center
- output
- Operational H/C
- implementation status
- 3 Rooms Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Enamakithi W/P
- location
-
Thuita
(in Nithi)
- year first funded
- 2005
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Muiru Chief Camp
- location
-
Muiru
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 545,000
- estimate
- Ksh 0
Ndiruni Mixed Day
- location
-
Mwonge
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Class Roofed &Require Internal Finishing
- total cost
- Ksh 515,000
- estimate
- Ksh 0
Kiriani Mwemaw/P
- location
-
Murugi
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Maara W/P
- location
-
Maara
(in Nithi)
- year first funded
- 2008
- action
- Construction of Intake
- output
- Water Project
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mwimbi Ap Lines
- location
-
Chogoria
(in Nithi)
- year first funded
- 2005
- action
- Construction of Res. Houses
- output
- Residential Houses
- implementation status
- 100% Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kieganguru Ap Lines
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction of Res. Houses
- output
- Residential Houses
- implementation status
- 2 Ap Houses Built
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chogoria Police Post
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction of Offices
- output
- Construction Of A Offices
- implementation status
- Awaiting Plastering
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kamaindi Ap Lines
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Meru South Honey Processing Training Centre
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Purchase Processing Machines & Training Farmers
- output
- Equipped Processing & Training Center
- implementation status
- 100% Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Meru South Marketing
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mariani Day Secondary School
- location
-
Karingani
(in Nithi)
- year first funded
- 2003
- action
- Construction of Laboratory
- output
- Lab
- implementation status
- Lab Awaiting Plastering
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mukuuni Secondary School
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2004
- action
- Dormitory Construction& Payment Of Bus
- output
- Dormitory&Bus
- implementation status
- 100% Complete,Bus Repayment On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kaare Day
- location
-
Kiera
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- 4 Classes
- implementation status
- 2 Classes Renovated,2 Built 1 Roofed And The Other At Lintel Level
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kairuni Special Unit
- location
-
Chogoria
(in Nithi)
- year first funded
- 2006
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Roofed And Requires Internal Finish
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lab Equipment Kirumi Dispensary
- location
-
Ganga
(in Nithi)
- year first funded
- 2003
- action
- Provide Lab Equipments
- output
- Lab Equipments
- implementation status
- Equipments Bought
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Nguruki Polytechnic
- location
-
Maara
(in Nithi)
- year first funded
- 2007
- action
- Construction of Workshops
- output
- Construct Workshop
- implementation status
- 2 Workshops Built Requiring Internal Finish Doors&Windows
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Makuri Dispensary
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- At Roofing Level
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiriani Assistant Chiefs Office
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construction Of An Office
- implementation status
- Work In Progress
- total cost
- Ksh 495,000
- estimate
- Ksh 0
Rubate Nkwego Health Centre
- location
-
Rubate
(in Nithi)
- year first funded
- 2004
- action
- Construction of dispensary
- output
- Dispensary
- implementation status
- 2 Rooms Constructed
- total cost
- Ksh 495,000
- estimate
- Ksh 0
Baragu Dispensary
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- At Roofing Level
- total cost
- Ksh 495,000
- estimate
- Ksh 0
Karongoni Dispensary
- location
-
Karingani
(in Nithi)
- year first funded
- 2007
- action
- Construction of Staff House.
- output
- Staff House
- implementation status
- Awaiting Disbursement Of Funds
- total cost
- Ksh 495,000
- estimate
- Ksh 0
Kiairugu Dispensary
- location
-
(in Nithi)
- year first funded
- 2008
- action
- Finish Maternity Ward.
- output
- Maternity Block
- implementation status
- Work In Progress
- total cost
- Ksh 495,000
- estimate
- Ksh 0
Kiangondu Dispensary
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2004
- action
- Construction of dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Arithi W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Nkabu W/P
- location
-
Muthambi
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous& Office Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Mwonge Dispensary
- location
-
Mwonge
(in Nithi)
- year first funded
- 2004
- action
- Expansion & Renovation Of dispensary & Lab.
- output
- Dispensary Block With Lab Services
- implementation status
- Expansion & Renovation Of Rooms Done.
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Kirege Dispensary
- location
-
Mugwe
(in Nithi)
- year first funded
- 2004
- action
- Construction of dispensary
- output
- Operational Dispensary
- implementation status
- 70% Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Salama Primary School
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2007
- action
- Renovate Classes& Boys Dormitory
- output
- Classes& Dormitory
- implementation status
- Classes Renovated Dormitory Complete But Requires Internal Finshes
- total cost
- Ksh 445,000
- estimate
- Ksh 0
Kagumo Ass Chief
- location
-
Mwonge
(in Nithi)
- year first funded
- 2007
- action
- Construction Of Office
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 415,000
- estimate
- Ksh 0
Igambangombe Chiefs Office
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2009
- action
- Construction of Office
- output
- -
- implementation status
- Slab Stage
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kaare Ap Line
- location
-
Kiera
(in Nithi)
- year first funded
- 2009
- action
- Construction of 3 Ap Houses
- output
- -
- implementation status
- Co-funded, roofed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Magumoni Ap Lines
- location
-
Thuita
(in Nithi)
- year first funded
- 2005
- action
- Construction of Res. Houses
- output
- Residential Houses
- implementation status
- 100% Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Gitije Police Camp
- location
-
Gitije
(in Nithi)
- year first funded
- 2004
- action
- Construction of Res. Houses
- output
- Residential Houses For Police
- implementation status
- 4 Houses Constructed And Materials On Ground
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kamurwata W/P
- location
-
Murugi
(in Nithi)
- year first funded
- 2009
- action
- Construction of Tank
- output
- -
- implementation status
- Completetd and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mutuanyin Gi W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2009
- action
- Purchase Pipes
- output
- -
- implementation status
- Funds reallocated to Electric
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mugumango W/P
- location
-
Ganga
(in Nithi)
- year first funded
- 2005
- action
- Construction of Water Project
- output
- Water
- implementation status
- Purchased Pipes, Building Materials For Intake
- total cost
- Ksh 400,000
- estimate
- Ksh 131
Muthambia W/P
- location
-
Muthambi
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mwicuiri W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2004
- action
- Construction of Water Project
- output
- Operational Water Project
- implementation status
- Laying Of Pipes & Installation Is Continuous
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Gianchuku Dispensary
- location
-
Chogoria
(in Nithi)
- year first funded
- 2009
- action
- Construction of Maternity
- output
- -
- implementation status
- Completed and in use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Karandini Dispensaryry
- location
-
Magumoni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Lab
- output
- Operational Lab
- implementation status
- Lab Complete.
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mukui Health Centre
- location
-
Ganga
(in Nithi)
- year first funded
- 2004
- action
- Renovate Dispensary
- output
- Provide Health Services
- implementation status
- General Wards Complete; Require Plastering, Flooring, Painting, Furniture, Toilets
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Murugi Youth Centre
- location
-
Murugi
(in Nithi)
- year first funded
- 2009
- action
- Construction of Workshop
- output
- -
- implementation status
- Project not completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Iruri Primary School
- location
-
Kiera
(in Nithi)
- year first funded
- 2009
- action
- Renovate Classes
- output
- Renovated Clasess
- implementation status
- Project not completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ngunga Low Cost School
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1Class Complete,
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ngaita Secondary School
- location
-
Ganga
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2Complete,
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Magumoni Girls
- location
-
Thuita
(in Nithi)
- year first funded
- 2005
- action
- Construction of dining Hall & Toilets
- output
- dining Hall & Toilets
- implementation status
- Toilets &Dh Complete & Already In Use.
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Muthambi Boys
- location
-
Muthambi
(in Nithi)
- year first funded
- 2005
- action
- Construction of Library
- output
- Library
- implementation status
- At Roofing Level
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Chief Mbogori Girls Secondary School
- location
-
Murugi
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- Complete, Remaining Painting, Ceiling, Floor Screed & Install Electricity
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ntakani Primary School
- location
-
Gitije
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 3 Classes Constructed,Require Internal Finishing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Rubati Secondary School
- location
-
Rubate
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1Class Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kabuboni Chiefoffice
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- Was Completed But Facility Not In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Muthiru Cooling Plant
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Build Oddice Block
- output
- Office Block
- implementation status
- At Roofing Level
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Meru South Food Processing Centre
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Construction of & Purchase Food Processing Equipments
- output
- Food Processing Centre
- implementation status
- Trainings On Organic Projects Done
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Karongoni Chief Office
- location
-
Karingani
(in Nithi)
- year first funded
- 2009
- action
- Construction of Office
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ndagani Ass Chief Office
- location
-
Karingani
(in Nithi)
- year first funded
- 2009
- action
- Construction of Office
- output
- -
- implementation status
- Final touches
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Njaina Ass Chief Office
- location
-
Karingani
(in Nithi)
- year first funded
- 2009
- action
- Construction of Office
- output
- -
- implementation status
- Completion of phase 1
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Rukindu Ass Chief Office
- location
-
Karingani
(in Nithi)
- year first funded
- 2009
- action
- Construction of Office
- output
- -
- implementation status
- More funds needed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kathanje Primary School
- location
-
Mutino
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Classes Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kariani Primary School
- location
-
Gitije
(in Nithi)
- year first funded
- 2005
- action
- Construction of Classes
- output
- Classes
- implementation status
- Special Class Built And Office Furniture Purchased
- total cost
- Ksh 398,943
- estimate
- Ksh 0
Rukindu W/P
- location
-
Kithangani
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Kiruire W/P
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Awaiting Release Of Funds
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Gitombani W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Makengi Dispensary
- location
-
Kiera
(in Nithi)
- year first funded
- 2006
- action
- Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- 45% Complete
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Kambandi Dispensary
- location
-
Muiru
(in Nithi)
- year first funded
- 2004
- action
- Renovate Disp
- output
- Operational Health Facility
- implementation status
- Partly Renovated
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Kigogo Day
- location
-
Thuita
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Work In Progress
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Kathiguni Primary School
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Work In Progress
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Ciamakie Youth Polytechnic
- location
-
Gitareni
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom/Workshop
- output
- Classes/Workshop
- implementation status
- Complete and in use
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Kamaindi Ass Chiefs Office
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2007
- action
- Construction Of Permanentoffice
- output
- Construction Of An Office
- implementation status
- Awaiting Disbursment Of Funds
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Rubate Ass Chief Office
- location
-
Rubate
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Kirumi Police Post
- location
-
Maara
(in Nithi)
- year first funded
- 2005
- action
- Construction of Police Post Block
- output
- Police Post
- implementation status
- 40% Complete
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Chuka Township Assistant Chiefs Off
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2006
- action
- Construction Of Office
- output
- Office Block
- implementation status
- Require Internal Finishes
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Kaare Ass Chief
- location
-
Kiera
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 395,000
- estimate
- Ksh 0
Karamani Technical
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Work In Progress
- total cost
- Ksh 375,000
- estimate
- Ksh 0
Kwendwa Dispensary
- location
-
Karingani
(in Nithi)
- year first funded
- 2005
- action
- Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- 60% Complete
- total cost
- Ksh 352,078
- estimate
- Ksh 0
Kibumbu Small Home
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Requires Painting &Floor Polishing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Igangara Day
- location
-
Mitheru
(in Nithi)
- year first funded
- 2003
- action
- Buy & Install Water Pump
- output
- Water Pump
- implementation status
- Water Pump Was Installed
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mukuuni Polytechnic
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2009
- action
- Renovate Workshop
- output
- -
- implementation status
- Project not completed
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Weru Dispensary
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- At Roofing Level
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Gantaraki Dispensary
- location
-
Murugi
(in Nithi)
- year first funded
- 2006
- action
- Construction of dispensary
- output
- Provide Health Services
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Magenka Dispensary
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2009
- action
- Construction of Mch Block
- output
- -
- implementation status
- Contractor is on site
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kiraro Assistant Chiefs Office
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construction Of An Office
- implementation status
- At Lintel Level
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kiereni Dispensary
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- 2 Rooms Cmplete
- total cost
- Ksh 345,000
- estimate
- Ksh 0
Mugumango Assistant Chiefs Office
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction Of Permanent Office
- output
- Construction Of An Office
- implementation status
- Awaiting Disbursment Of Funds
- total cost
- Ksh 340,000
- estimate
- Ksh 0
Wiru Day Sec
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Class Constructed
- total cost
- Ksh 330,000
- estimate
- Ksh 0
Chuka Hawkers Market
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2008
- action
- Construction of Hawkers Sheds
- output
- Sheds
- implementation status
- Complete
- total cost
- Ksh 323,057
- estimate
- Ksh 0
Karamani Ass Chief Mwong
- location
-
Mwonge
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 315,000
- estimate
- Ksh 0
Magutuni Ass Chief
- location
-
Kiera
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kirege Ass Chiefs Office
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construction Of An Office
- implementation status
- Work In Progress
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kanthiiri Assistant Chiefs Office
- location
-
Rubate
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construction Of An Office
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mukwengo Ass Chiefs Office
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction Of Permanentoffice
- output
- Construction Of An Office
- implementation status
- At Roofing Level
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Maara Chiefs Office
- location
-
Maara
(in Nithi)
- year first funded
- 2005
- action
- Construction of Office Block
- output
- Chief?S Office
- implementation status
- 85% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nithi Tea Growers
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- To be funded from seond instalment
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Riankui C/D
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Cattle Dip
- output
- Operational Cattle Dip
- implementation status
- At Roofing Level
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Igamatundu C/D
- location
-
Itugururu
(in Nithi)
- year first funded
- 2006
- action
- Construction of Cattle Dip
- output
- Operational Cattle Dip
- implementation status
- 70% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Muthambi Do Office
- location
-
Muthambi
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Karingani Chiefsoffice
- location
-
Karingani
(in Nithi)
- year first funded
- 2005
- action
- Construction of Office Block
- output
- Chief?S Office
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
K Muthambi W/P
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Gitumbi Muthambi
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chuka Girls W/P
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Install Watertank
- output
- Tank Installed
- implementation status
- 100% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mwigito Water Fallow
- location
-
Thuita
(in Nithi)
- year first funded
- 2005
- action
- Construction of Water Fallow
- output
- Water Fallow
- implementation status
- 100% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nduka W/P
- location
-
Muthambi
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kiramba Dispensary
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- 55% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kamwimbi Dispensary
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2006
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- 6 Rooms Roofed 1 Internaly Plastered
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Makutano Dispensary
- location
-
Mutino
(in Nithi)
- year first funded
- 2006
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- 3 Rooms Built Require Internal Finish
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chuka Orphans Home
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials Bought
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chuka Library
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Renovate Library
- output
- Renovated Library
- implementation status
- Library Renovated
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Muthambu Girls
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- C0Mplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chuka Muslim Nursery
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- Class Roofed ,Require Internal Finish
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nditune Sec
- location
-
Kiera
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 2 Classes Requiring Internal Finishing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chuka Secondary School
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 35% Complete, Materials On Ground
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Rubate College
- location
-
Rubate
(in Nithi)
- year first funded
- 2006
- action
- Construction of Library
- output
- Library Facility
- implementation status
- Complete,
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ikuu Girls Secondary School
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2006
- action
- Completion Of Dining/Public Hall Complex
- output
- dining Hall Complex
- implementation status
- Complete,
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ikawa Special Class
- location
-
Gitareni
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1 Class Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kagumo Day
- location
-
Mwonge
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1 Class Complete One Reuires Painting And Window Panes
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Karamugi Girls
- location
-
Gitareni
(in Nithi)
- year first funded
- 2005
- action
- Construction of Ablution Bloc& Install Electricity
- output
- Ablution & Electricity
- implementation status
- Ablution Completed But Electricity Is Yet To Be Installed
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kajiunduthi Grounds
- location
-
Muthambi
(in Nithi)
- year first funded
- 2005
- action
- Renovations
- output
- Improved Facility
- implementation status
- 100% Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kamuthiga
- location
-
Itugururu
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 295,000
- estimate
- Ksh 0
Kamutiria Dispensary
- location
-
Kajuki
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- At Foundation Level
- total cost
- Ksh 295,000
- estimate
- Ksh 0
Kiini Dispensary
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- At Roofing Level
- total cost
- Ksh 270,000
- estimate
- Ksh 0
Gichege Primary School
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Class Being Constructed
- total cost
- Ksh 265,000
- estimate
- Ksh 0
Mbugi Ntuntuni
- location
-
Kithangani
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 255,000
- estimate
- Ksh 0
Mukuuni Ap Lines
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2006
- action
- Construction of Res. Houses
- output
- Residential Houses For Aps
- implementation status
- 80% Complete Awaiting Plastering
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kauriko W/P
- location
-
Murugi
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Purchase 100% Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kamwonka Dispensary
- location
-
Mutino
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- Awaiting Disbursement Of Funds
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kathwana Dispensary
- location
-
Mutino
(in Nithi)
- year first funded
- 2006
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- 75% Complete, Plaster, Roofed. No Windows & Doors
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Ndagani Secondary School
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Repay School Bus
- output
- Bus
- implementation status
- Repayment Is Continous
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Magutuni Day Secondary School
- location
-
Kiera
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Class & Books
- implementation status
- Class Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Chuka Township
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Construction of Class
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Ikawa Day Secondary School
- location
-
Gitareni
(in Nithi)
- year first funded
- 2004
- action
- Construction of Classes & Buy Textbooks With 50000
- output
- Class & Books
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Chuka Law Court
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2008
- action
- Construction Of Cells
- output
- Construct Cells.
- implementation status
- Cells Constructed
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Karongoni Assistant Chiefs Office
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Magutuni Ap Lines
- location
-
Kiera
(in Nithi)
- year first funded
- 2006
- action
- Construction of Res. Houses
- output
- Residential Houses For Aps
- implementation status
- 2 Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kamwonka Ass Chief
- location
-
Mutino
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 245,000
- estimate
- Ksh 0
Ntutuni W/P
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 240,000
- estimate
- Ksh 0
Mwonge Chiefs Office
- location
-
Mwonge
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 0
Kamirugi Footbridge
- location
-
Kithangani
(in Nithi)
- year first funded
- 2003
- action
- Constructfoot Bridge
- output
- Footbridge For Safe Crossing
- implementation status
- Complete
- total cost
- Ksh 210,000
- estimate
- Ksh 0
Magundu Primary School special Clas
- location
-
Mitheru
(in Nithi)
- year first funded
- 2008
- action
- Repair Classes
- output
- Classes
- implementation status
- 2 Classes Repaired
- total cost
- Ksh 205,000
- estimate
- Ksh 0
Kageni Polytechnic
- location
-
Ganga
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- Require Internal Finish
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiganjo Day
- location
-
Gitije
(in Nithi)
- year first funded
- 2005
- action
- Construction of Class
- output
- Class
- implementation status
- 100% Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiereni Secondary School
- location
-
Mugwe
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1 Class Complete,
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kambandi Secondary School
- location
-
Muiru
(in Nithi)
- year first funded
- 2006
- action
- Construction of Admin
- output
- Admin Block
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Magundu Girls
- location
-
Mitheru
(in Nithi)
- year first funded
- 2006
- action
- Construction of Ablution And Underground Water Tank
- output
- Ablution &Underground Water Tank
- implementation status
- Complete,
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Muraga TechSchool
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1 Claass Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Chogoria Girls
- location
-
Chogoria
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 35% Complete, Materials On Ground
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mwimbi Boys
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ndunguri Youth Poly
- location
-
Ganga
(in Nithi)
- year first funded
- 2008
- action
- Construction of Workshop
- output
- Construct Workshop
- implementation status
- Awaiting Release Of Funds
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nthima F/B
- location
-
Muiru
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 90% Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kirogo/Kaare F/B
- location
-
Kiera
(in Nithi)
- year first funded
- 2008
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Pillars Built
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kigogo Dispensary
- location
-
Thuita
(in Nithi)
- year first funded
- 2006
- action
- Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- 60% Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kathanje Dispensary
- location
-
Mutino
(in Nithi)
- year first funded
- 2006
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- 50% Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Gitogoto Dispensary
- location
-
Magumoni
(in Nithi)
- year first funded
- 2008
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- Work In Progress
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamatumo W/P
- location
-
Kithangani
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Rwanchege W/P
- location
-
Murugi
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Wakulima W/P
- location
-
Mitheru
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Makanyanga W/P
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mutindwa W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Gianchuku W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kathatwa Assistant Chiefs Office
- location
-
Thuita
(in Nithi)
- year first funded
- 2005
- action
- Construction of Office Block
- output
- Ass.Chief?S Office
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Murugi Ap Lines
- location
-
Murugi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Res. Houses
- output
- Residential Houses For Aps
- implementation status
- At Lintel Level
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mitheru Ap Lines
- location
-
Mitheru
(in Nithi)
- year first funded
- 2006
- action
- Construction of Res. Houses
- output
- Residential Houses For Aps
- implementation status
- 3 Houses Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Gitije Ap Lines
- location
-
Gitije
(in Nithi)
- year first funded
- 2006
- action
- Construction of Res. Houses
- output
- Residential Houses For Aps
- implementation status
- 3 Complete Houses
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Iriga Ap Lines
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Res. Houses
- output
- Residential Houses For Aps
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Magutuni Police Post
- location
-
Kiera
(in Nithi)
- year first funded
- 2006
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mbogoni Assistant Chiefs Office
- location
-
Itugururu
(in Nithi)
- year first funded
- 2006
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- 50% Complete At Lintel Level
- total cost
- Ksh 200,000
- estimate
- Ksh 0
District Security Office
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2006
- action
- Expand & Renovation Of Office
- output
- Renovated Block
- implementation status
- Renovation Done
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Gitombani Ass Chief
- location
-
Chogoria
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kimbumbu Tea Buying Centre
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Awaiting Disbursment Of Funds
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiangondu Water Project
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Awaiting Release Of Funds
- total cost
- Ksh 197,500
- estimate
- Ksh 0
Kairini Day
- location
-
Kithangani
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Work In Progress
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Gianchuku Ass Chief
- location
-
Murugi
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Gantaraki Ass Chief
- location
-
Murugi
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Chogoria Mukwego W/P
- location
-
Chogoria
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Iruri Ntakani F/B
- location
-
Kiera
(in Nithi)
- year first funded
- 2008
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Pillars Built
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Keriani Primary School
- location
-
Ganga
(in Nithi)
- year first funded
- 2008
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Work In Progress
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Ngeru Elite Primary School
- location
-
Ganga
(in Nithi)
- year first funded
- 2008
- action
- Renovate Classes
- output
- Renovated Classes
- implementation status
- Work In Progress
- total cost
- Ksh 195,000
- estimate
- Ksh 0
Deo Maara
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Renovate Offices
- output
- Renovated Offices
- implementation status
- Offices Renovated
- total cost
- Ksh 162,000
- estimate
- Ksh 0
Ntuibu Nursery
- location
-
Gitije
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- Complete,
- total cost
- Ksh 150,000
- estimate
- Ksh 0
United Methodist School
- location
-
Mwonge
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 1 Class Complete,
- total cost
- Ksh 150,000
- estimate
- Ksh 250,000
Limoni Polytechnic
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 35% Complete,
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chogoria Boys
- location
-
Chogoria
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- 55% Complete, Materials On Ground
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Iruku Primary School
- location
-
Muiru
(in Nithi)
- year first funded
- 2007
- action
- Renovate Classes
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mbaraga Primary School
- location
-
Kithangani
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ganga Location Education Office
- location
-
Ganga
(in Nithi)
- year first funded
- 2008
- action
- Construction of 1 Roomed Office
- output
- Office
- implementation status
- Just awarded cheque
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mutuguta /Kiraro F/B
- location
-
Maara
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mumbuni Maternity Wing
- location
-
Gitije
(in Nithi)
- year first funded
- 2005
- action
- Construction of M/W
- output
- Operational Maternity Wing
- implementation status
- Materials On Ground, 8% Complete;
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mucwa Ass Chief
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ciangoi/Cabugi Dairy Centre
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Purchase Of Milking Equipments
- output
- Milking Equipments
- implementation status
- 100% Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Magundu Organic Food Project
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Trainings On Organic Projects
- output
- Capacity Building
- implementation status
- Trainings On Organic Projects Done
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kangoji Tea Buying Centre
- location
-
Murugi
(in Nithi)
- year first funded
- 2009
- action
- Shed Construction
- output
- -
- implementation status
- Re-allocated from Nkora school
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mwonge Voc T/Centre
- location
-
Mwonge
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- At Foundation Level
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Ndagani Schoolor Street Children
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2005
- action
- Renovations & Expansion
- output
- Enough Accommodation
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Rubate Voct/ Institute
- location
-
Rubate
(in Nithi)
- year first funded
- 2006
- action
- Construction of Classes
- output
- Classes
- implementation status
- At Lintel Level
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kiraro Social Welfare
- location
-
Chogoria
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 145,000
- estimate
- Ksh 0
Kinoru Ass Chief Office
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 130,000
- estimate
- Ksh 0
Weru C/D
- location
-
Kithangani
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Magenka Play Ground
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2008
- action
- Leveling Play Ground
- output
- Leveled Play Ground
- implementation status
- Work In Progress
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Nkuneni F/B
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Kirege Buying Centre
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction of Tea Buying Centre
- output
- Tea Buying Centre
- implementation status
- Re-allocated Kshs.375,000 from Kenyenya Dispensary
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Igamurathi Ass Chief
- location
-
Muthambi
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kagunda Dairy Centre
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2005
- action
- Construction of Office
- output
- Office Block
- implementation status
- 100% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chogoria Jua Kali
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Meru South Agro Processing Mucwa
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Meru South Agro Processing Igoki
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nthambo/Mbatha Hydro
- location
-
Thuita
(in Nithi)
- year first funded
- 2007
- action
- Provide Electricity
- output
- Electricity
- implementation status
- Awaiting Disbursment Of Funds
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Barani Hydro
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Provide Electricity
- output
- Electricity
- implementation status
- Awaiting Disbursment Of Funds
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ikame Tea Buying Centre
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Construction of Tea Buying Centre
- output
- Tea Buying Centre
- implementation status
- Roofed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kaanwa Primary School
- location
-
Karingani
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Fr Airadi Primary School
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Roofing And Plastering On 1 Class Done
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Thigaa Sec
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Not Started
- implementation status
- Cheque Not Released
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kirege Sec
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiunguni Primary School
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mandugo Primary School
- location
-
Mutino
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nkumbo Primary School
- location
-
Muiru
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ntutuni Primary School
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Miruri Boarding Primary School
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Class At Roofing Level
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Iruma Girls
- location
-
Maara
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kagongo/Gaceke Polytechnic
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ruria Primary School
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chuka Girls
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Perimeter Wall
- output
- Perimeter Wall
- implementation status
- Constructed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kianjeru Primary School
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Murunga Primary School
- location
-
Kiera
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ntatua Primary School
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiairugu Primary School
- location
-
Maara
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Not Started
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Twamikua Lowcost
- location
-
Mutino
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Not Started
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mutiguru Primary School
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Not Started
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kanoro Primary School
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mugirirwa Community Hall
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Makuri Girls
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kibumbu Primary School
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Igambangombe Primary School
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2008
- action
- Renovate Classes
- output
- Renovated Classes
- implementation status
- Work In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ikame Rumandi F/B
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nduka River Bridge
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kagaani/Kambandi F/B
- location
-
Muiru
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Thaaria Drift
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Materials On Ground
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Itugururu/ Kanyuambora
- location
-
Itugururu
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Gakuyuni F/B
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Gachoka Mwirithi F/B
- location
-
Thuita
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kithinu River Bridge
- location
-
Thuita
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 50% Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Murigi Bridge
- location
-
Mutino
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Bridge
- implementation status
- One Pillar Done
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Riamugaraci
- location
-
Kiera
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Work In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Riambugi F/B
- location
-
Itugururu
(in Nithi)
- year first funded
- 2008
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Karumbi F/B
- location
-
Maara
(in Nithi)
- year first funded
- 2008
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Tapwa
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2006
- action
- Purchase Drugs
- output
- Plwas Care Support
- implementation status
- Drugs Bought
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ndumbini Dispensary
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- Awaiting Disbursement Of Funds
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Twamikua Dispensary
- location
-
Mutino
(in Nithi)
- year first funded
- 2007
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- Awaiting Disbursement Of Funds
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Weru Dispensary Kithangani
- location
-
Kithangani
(in Nithi)
- year first funded
- 2008
- action
- Purchase Equipments
- output
- Equipments
- implementation status
- Work In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chera Dispensary
- location
-
Gitareni
(in Nithi)
- year first funded
- 2008
- action
- Construction of dispensary
- output
- Dispensary Block
- implementation status
- Work In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Igangara Secondary School W/P
- location
-
Mitheru
(in Nithi)
- year first funded
- 2005
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Murugi/ Mugumango W/P
- location
-
Murugi
(in Nithi)
- year first funded
- 2006
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mugirirwa W/P
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kirigi Giancanaru Irig
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Makuri Water Project
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kagongo Water Pipeline
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Muthande W/P
- location
-
Ganga
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Gitoto Water Project
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiamatumo W/P
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Munyaka W/P
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kathareni W/P
- location
-
Maara
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Keria Iruma-Kiroo W/P
- location
-
Maara
(in Nithi)
- year first funded
- 2008
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Pipes Bought
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kianjagi Assistant Chiefs Office
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction Of Permanent Office
- output
- Construction Of An Office
- implementation status
- Awaiting Disbursment Of Funds
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiaritha Assistant Chiefs Office
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construciton Of Office
- implementation status
- To modify a class into a lab. Funds allocated
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kithangani Assistant Chiefs Office
- location
-
Kithangani
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construction Of An Office
- implementation status
- Insufficient funds were allocated
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kamaindi Chiefs Office
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2007
- action
- Construction Of An Office
- output
- Construciton Of An Office
- implementation status
- About to commence
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kiangondu Ap Lines
- location
-
Kiangodu
(in Nithi)
- year first funded
- 2007
- action
- Increase Res. Houses For Aps
- output
- Residential Houses For Aps
- implementation status
- About to commence
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Thigaa Ass Chuef
- location
-
Maara
(in Nithi)
- year first funded
- 2008
- action
- Construction Office
- output
- Office Block
- implementation status
- Work In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Utheri Wamicii Electricity
- location
-
Kamwimbi
(in Nithi)
- year first funded
- 2006
- action
- Provide Electricity
- output
- Electricity Available
- implementation status
- Waiting For Line To Be Installed
- total cost
- Ksh 98,000
- estimate
- Ksh 0
Mautini Primary School
- location
-
Kiera
(in Nithi)
- year first funded
- 2008
- action
- Renovate Classes
- output
- Renovated Classes
- implementation status
- Work In Progress
- total cost
- Ksh 95,000
- estimate
- Ksh 0
Muragara /Mutonga F/B
- location
-
Kiera
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 88,000
- estimate
- Ksh 0
Mukuuni C/D
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Kiandumi
- location
-
Muthambi
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Gakongoro F/B
- location
-
Itugururu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Naka F/B
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Magenka F/Bkigum
- location
-
Mukuuni
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 68,000
- estimate
- Ksh 0
Wiru C/D
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Njaina Cattle Dip
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Mbwiru C/D
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Ndunguri C/D
- location
-
Ganga
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Nguruki C/D
- location
-
Maara
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kieganguru C/D
- location
-
Chogoria
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Mumbuni C/D
- location
-
Gitije
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Muthiru C/D
- location
-
Muthambi
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Ruguta C/D
- location
-
Mitheru
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Mwonge C/D
- location
-
Mwonge
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Rubate C/D
- location
-
Rubate
(in Nithi)
- year first funded
- 2006
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- 100% Complete .
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Gatua Dip
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- not known
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kiriani C/D
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kiairugu C/D
- location
-
Maara
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kagongo/Gaceke
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kathathani C/D
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kirigi C/D
- location
-
Mwonge
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Majira
- location
-
Chogoria
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- not known
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Munga
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Muraga
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Iriga
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- not known
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Baragu
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Kiambui
- location
-
Kabuboni
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- To be funded from second instalment
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Naka F/B Mubukor
- location
-
Mugwe
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 58,000
- estimate
- Ksh 0
Michuki Nith
- location
-
Gitije
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 53,000
- estimate
- Ksh 0
Lions Bridge Mar F/B
- location
-
Gitije
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 53,000
- estimate
- Ksh 0
Igangara/Nithi Foot Bridge
- location
-
Mitheru
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 52,000
- estimate
- Ksh 0
Karugio
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Protected springs are in good condition
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Jitahindi W/P
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Purchase Pipes
- output
- Water Project
- implementation status
- Laying Of Pipes Is Continuous
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kagaani F/B
- location
-
Kabuiboni
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- In good condition but one needs rehabilitatioin
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mundi
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Completed and in use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Ngoko Rugutf/B
- location
-
Thuita
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gatenderu F/B
- location
-
Chogoria
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gakongoro /Mara F/B
- location
-
Maara
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Lower Muthanga F/B
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Awaits cheque
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Mugamu F/B
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Not installed as electricity line in awaited
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gachiankuref/B
- location
-
Karingani
(in Nithi)
- year first funded
- 2006
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Tungu Foot Bridge
- location
-
Karingani
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Not completed but in use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Riankui F/B
- location
-
Kamaindi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Project not complete. Need more funds
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Naka F/K Karurin
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- More funds allocated
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Ciancere
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Project not completed. Need more funds
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Gatogo F/B
- location
-
Kiangondu
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Need funds to complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nithi/Kamwangu
- location
-
Gitije
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Facility in use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kagiti/Iruri
- location
-
Kiera
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- More funds allocated
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Ntagana/Kithitu
- location
-
Kiera
(in Nithi)
- year first funded
- 2007
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Protected springs are in good condition
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Wiru Library
- location
-
Murugi
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Insufficient funds were allocated
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Ikame Primary School
- location
-
Mitheru
(in Nithi)
- year first funded
- 2007
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Materials On Ground
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kiereni Primary School
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Install Electricity
- output
- Electricity
- implementation status
- Work In Progress
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kajiunduthi Primary School
- location
-
Muthambi
(in Nithi)
- year first funded
- 2007
- action
- Renovate Classroom
- output
- Renovated Classes
- implementation status
- 1 Class Renovated
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nthirani F/B
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2003
- action
- Construction of Foot Bridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nkobi F/B
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2003
- action
- Construction of Foot Bridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kiandume
- location
-
Muthambi
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Kirege
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- not known
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Nkenye F/B
- location
-
KiangOndu
(in Nithi)
- year first funded
- 2003
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- 100% Complete
- total cost
- Ksh 38,000
- estimate
- Ksh 0
Kirubia
- location
-
Mugwe
(in Nithi)
- year first funded
- 2007
- action
- Rehabilitate Cattle Dip
- output
- Cattle Dip
- implementation status
- not known
- total cost
- Ksh 20,000
- estimate
- Ksh 0
Kangoro Primary School
- location
-
Mwonge
(in Nithi)
- action
- n/a
- output
- -
- implementation status
- Project not complete
- total cost
- Ksh 0
- estimate
- Ksh 0
Chukka United Dairy
- location
-
Kiangondu
(in Nithi)
- action
- Purchase Of Milking Equipments
- output
- Milking Equipments
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 0
Adult Education Library
- location
-
Murugi
(in Nithi)
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Project not completed
- total cost
- Ksh 0
- estimate
- Ksh 0
Kaigoro Primary School
- location
-
Kiangondu
(in Nithi)
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Project not completed
- total cost
- Ksh 0
- estimate
- Ksh 0
Muthambi Polytechnic
- location
-
Muthambi
(in Nithi)
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Completed and in use
- total cost
- Ksh 0
- estimate
- Ksh 0
Kanya Kanuikamuru F/B
- location
-
Maara
(in Nithi)
- action
- Construction of Footbridge
- output
- Footbridge For Safe Crossing
- implementation status
- Funds from emergency reserve 50,000/=
- total cost
- Ksh 0
- estimate
- Ksh 0
Kiangondu Dairy
- location
-
Kiangondu
(in Nithi)
- action
- Purchase Of Milking Equipments
- output
- Milking Equipments
- implementation status
- not known
- total cost
- Ksh 0
- estimate
- Ksh 0
Kiriani Home For The Aged
- location
-
Murugi
(in Nithi)
- action
- Construction of Training Block
- output
- Training Block
- implementation status
- Re-allocated to Mongorisi & Kenyambi Health centres
- total cost
- Ksh 0
- estimate
- Ksh 0
Ngaani Primary School
- location
-
Kiangondu
(in Nithi)
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Project not complete
- total cost
- Ksh 0
- estimate
- Ksh 0
Kathituni Primary School
- location
-
Kiangondu
(in Nithi)
- action
- Construction of Classroom
- output
- Not Started
- implementation status
- Parents have accepted to finish the remaining part so as to request for Dormitory construction
- total cost
- Ksh 0
- estimate
- Ksh 0
Baragu Secondary School
- location
-
Murugi
(in Nithi)
- action
- Construction of Classroom
- output
- Classes
- implementation status
- Project not completed
- total cost
- Ksh 0
- estimate
- Ksh 0