The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Bursary Fund
- location
-
North-Horr
(in North Horr)
- year first funded
- 2007
- action
- Pay School Fees
- output
- Improve Education
- implementation status
- On Going
- total cost
- Ksh 9,951,904
- estimate
- Ksh 3,966,060
Drodana Memorial Sec,Dorm,dining &Lab,Lab Gas System,Furniture,Reagents,Classroom Furnitures,Dormitory Beddings And Textbooks
- location
-
Maikona
(in North Horr)
- year first funded
- 2007
- action
- Construction of A Dormitory, dining &Labatory,Lab Gas System,Furniture,Reagents,Beddings And Textbook
- output
- Increase Enrolment & Learning Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 7,373,747
- estimate
- Ksh 5,000,000
Drgodana Memorial Secondary School
- location
-
Maikona
(in North Horr)
- year first funded
- 2006
- action
- Construction of Classes, Staff House, DormS Equipment Ect
- output
- Increase Secondary Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 7,000,000
- estimate
- Ksh 7,000,000
Emergency Fund
- location
-
North-Horr
(in North Horr)
- year first funded
- 2007
- action
- Emergency Fund
- output
- Improve Water Supply/Security
- implementation status
- On Going
- total cost
- Ksh 4,665,238
- estimate
- Ksh 2,332,619
North Horr Sec,Water Piping,Fencing And School Renovation
- location
-
North Horr
(in North Horr)
- year first funded
- 2007
- action
- Fencing,Water Piping,Generator,Tanks & School Renovation
- output
- Improve Water Supply& Security
- implementation status
- Complete And In Use
- total cost
- Ksh 4,400,000
- estimate
- Ksh 4,000,000
North Horr Cdf Motor Vehicle
- location
-
North-Horr
(in North Horr)
- year first funded
- 2008
- action
- Purchase Of A Vehicle With Communication Equipment
- output
- Proper Monitoring Of Cdf Funded Projects
- implementation status
- Complete And In Use
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,700,000
Afkab Rock Water Catchments
- location
-
Kalacha
(in North Horr)
- year first funded
- 2003
- action
- Construction of Water Catchments
- output
- Provision Of Water
- implementation status
- Complete & In Use
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Dukana Police Station, Renovation
- location
-
Dukana
(in North Horr)
- year first funded
- 2006
- action
- Renovation Of Structures
- output
- Improve Security
- implementation status
- Stalled
- total cost
- Ksh 2,882,757
- estimate
- Ksh 2,882,757
Bubisa Health Centre Upgrading
- location
-
Bubisa
(in North Horr)
- year first funded
- 2007
- action
- Construction of Martenity Ward,Water Tank And Latrine
- output
- Improve Health Facilities
- implementation status
- Complete & In Use
- total cost
- Ksh 2,262,037
- estimate
- Ksh 1,262,037
Office Administration
- location
-
North-Horr
(in North Horr)
- year first funded
- 2007
- action
- Office Expenses
- output
- Improve Service Delivery
- implementation status
- Used Up
- total cost
- Ksh 2,254,380
- estimate
- Ksh 1,127,190
Admdukana Ap Post
- location
-
Dukana
(in North Horr)
- year first funded
- 2005
- action
- Construction of Adm. Block
- output
- Improve Services
- implementation status
- Complete & In Use
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Kalacha Dispensary
- location
-
Kalacha
(in North Horr)
- year first funded
- 2006
- action
- Construction of A Dispensary
- output
- Improve Health Services
- implementation status
- Complete & In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Turbi Dispensary
- location
-
Turbi
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Dispensary
- output
- Access Health Services
- implementation status
- Complete And Not In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Hurri Hills, Underground Tanks
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2007
- action
- Construction of 4 Tanks
- output
- Improve Water Supply
- implementation status
- Complete And In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Turbi Apline And Sanitation
- location
-
Turbi
(in North Horr)
- year first funded
- 2007
- action
- Construction of Ap Line, Latrines And Bathrooms
- output
- Improve Security
- implementation status
- Complete And In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Maikona Girls Secondary School - Units Staffhouses
- location
-
Maikona
(in North Horr)
- year first funded
- 2008
- action
- Construc 4 Units Staff Houses
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Maikona Girls Secondary Adm Block
- location
-
Maikona
(in North Horr)
- year first funded
- 2003
- action
- Construction of Adm Block
- output
- Increase Work Place
- implementation status
- Complete & In Use
- total cost
- Ksh 1,820,000
- estimate
- Ksh 1,820,000
Elgade Dispensary
- location
-
Kalacha
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Dispensary
- output
- Access Health Services
- implementation status
- Complete & In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Hurri Hills Primary School , Class & A Tank
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Class & A Tank
- output
- Increase Enrolment &Water
- implementation status
- Complete & In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,700,000
Turbi Rock Catchment
- location
-
Turbi
(in North Horr)
- year first funded
- 2004
- action
- Construction of Of Water Catchment
- output
- Improve Water Supply
- implementation status
- Complete & In Use
- total cost
- Ksh 1,666,000
- estimate
- Ksh 1,666,000
El-Hadi Rock Catchment
- location
-
Balesa
(in North Horr)
- year first funded
- 2004
- action
- Construction of Of Water Catchment
- output
- Improve Water Supply
- implementation status
- Complete & In Use
- total cost
- Ksh 1,616,000
- estimate
- Ksh 1,616,000
Project Monitoring And Evaluation
- location
-
North-Horr
(in North Horr)
- year first funded
- 2007
- action
- Monitoring And Evaluation
- output
- Proper Monitoring Of Cdf Funded Projects
- implementation status
- On Going
- total cost
- Ksh 1,596,226
- estimate
- Ksh 798,113
Maikona Girls Sec,Staff House
- location
-
Maikona
(in North Horr)
- year first funded
- 2006
- action
- Construction of A Staff House
- output
- Improve Facility
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Turbi Primary School , Classes &Furnitures
- location
-
Turbi
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes & FurnitureS
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Forole Dispensary
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2004
- action
- Construction of A Dispensary
- output
- Improve Health Access
- implementation status
- Complete & Not In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Clean Water For Maikona Fromgamura Spring
- location
-
Maikona
(in North Horr)
- year first funded
- 2005
- action
- Feasibility Study & Water From Spring
- output
- Piped Clean Water
- implementation status
- Stalled
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Telesgay Primary School , Classes & A Tank
- location
-
Illeret
(in North Horr)
- year first funded
- 2005
- action
- Construction of 2 Class & A Tank
- output
- Increase Enrolment &Water
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Arano Dam, Disilting &Fencing
- location
-
Maikona
(in North Horr)
- year first funded
- 2007
- action
- Dam Fencing &Desilting
- output
- Improve Water Supply
- implementation status
- Complete & In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Telesgay Primary School , Staff House
- location
-
North Horr
(in North Horr)
- year first funded
- 2007
- action
- Construction of A Staff House
- output
- Improve Working Environ.
- implementation status
- Not Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 800,000
Shura Dispensary
- location
-
Bubisa
(in North Horr)
- year first funded
- 2006
- action
- Construction of A Dispensary
- output
- Improve Health Services
- implementation status
- Complete Not In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
El-Hadi Dispensary
- location
-
Dukana
(in North Horr)
- year first funded
- 2004
- action
- Construction of A Dispensary
- output
- Improve Health Access
- implementation status
- Complete & Not In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Balesa Primary School Girls Dorm & A Tank Construction
- location
-
Balesa
(in North Horr)
- year first funded
- 2005
- action
- Construction of 3 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Bubisa Primary School
- location
-
Bubisa
(in North Horr)
- year first funded
- 2007
- action
- Construction of Adm. Block And
- output
- Improve Work Space
- implementation status
- Complete And In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 800,000
Balesa Ap Line And Sanitation
- location
-
Balesa
(in North Horr)
- year first funded
- 2007
- action
- Construction of Apline, Latrines And Bathrooms
- output
- Improve Security
- implementation status
- Complete And In Use
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,350,000
Elgade Primary School
- location
-
Kalacha
(in North Horr)
- year first funded
- 2007
- action
- Construction of Dormitory
- output
- Improve Accommodation
- implementation status
- Complete & In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Bubisa Apline Blocks
- location
-
Bubisa
(in North Horr)
- year first funded
- 2006
- action
- Construction of Apline Blocks
- output
- Improve Security
- implementation status
- Complete & In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Elhadi Shallow Well Protection
- location
-
Balesa
(in North Horr)
- year first funded
- 2006
- action
- Protection Of Well
- output
- Improve Water Facilities
- implementation status
- Complete & In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Turbi Primary School , dining Hall
- location
-
Turbi
(in North Horr)
- year first funded
- 2004
- action
- Construction of A dining Hall
- output
- Improve Catering
- implementation status
- Complete & In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Helmer Memorial Primary School , Classes
- location
-
North Horr
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Helmer Memorial Primary School , Dorm
- location
-
North Horr
(in North Horr)
- year first funded
- 2007
- action
- Construction of A Dorm
- output
- Improve Accommodation
- implementation status
- Complete In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
New Rage Primary School - Classrooms
- location
-
Kalacha
(in North Horr)
- year first funded
- 2008
- action
- Construction of 2 Classes
- output
- Increase Enrolment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 3,000,000
Cavalera Primary School
- location
-
Bubisa
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 1,182,000
- estimate
- Ksh 1,182,000
Emergency Work
- location
-
North-Horr
(in North Horr)
- year first funded
- 2004
- action
- Emergency Intervention
- output
- Meet Emergency Needs
- implementation status
- Used Up
- total cost
- Ksh 1,105,000
- estimate
- Ksh 1,105,000
Ririba Girls Primary School -Adminblock
- location
-
Balesa
(in North Horr)
- year first funded
- 2008
- action
- Construction of Administration Block
- output
- Improve Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,500,000
Hurri Hills Underground Water
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2008
- action
- Construction of 100,000 Litres Underground Tank
- output
- Improve Access To Safe And Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Balesa Ap Line And Sanitation
- location
-
Balesa
(in North Horr)
- year first funded
- 2008
- action
- Construction of Apline, Latrines And Bathrooms
- output
- Improve Security
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Borehole Maintenance And Repair
- location
-
Bubisa
(in North Horr)
- year first funded
- 2008
- action
- Repair And Maintenance Of Existing Boreholes
- output
- Improve Access To Safe And Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bishop Cavalera Primary School Construction
- location
-
Bubisa
(in North Horr)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Elgade Primary School
- location
-
Kalacha
(in North Horr)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Illeret Primary School , Girls Dormitory
- location
-
Illeret
(in North Horr)
- year first funded
- 2004
- action
- Solar Installation &Construction Library
- output
- Improve Learning
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kalacha Nomadic Girls, A Dormitory
- location
-
Kalacha
(in North Horr)
- year first funded
- 2004
- action
- Construction of A Dormitory
- output
- Increase Accommodation
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
North-Horr Primary School , A Dormitory
- location
-
NorthHorr
(in North Horr)
- year first funded
- 2004
- action
- Construction of A Dormitory
- output
- Increase Accommodation
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Water Tank-Shura
- location
-
Bubisa
(in North Horr)
- year first funded
- 2004
- action
- Construction of A Tank
- output
- Access To Clean Water
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
North-Horr Sec,Lab Reagent
- location
-
NorthHorr
(in North Horr)
- year first funded
- 2004
- action
- Purchase Lab Reagent
- output
- Improve Learning Facility
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chalbi Primary School
- location
-
Maikona
(in North Horr)
- year first funded
- 2006
- action
- Construction of A Dormitory
- output
- Increase Accommodation
- implementation status
- Complete In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Telesgay Primary School , Classes
- location
-
Illeret
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Hurri Hills, Water Tanks
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Tanks
- output
- Improve Water Facilities
- implementation status
- Complete & In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Dukana Boys Primary School
- location
-
Dukana
(in North Horr)
- year first funded
- 2007
- action
- Construction of 2 Classes
- output
- Improve Enrolment
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bales Saru,Apline
- location
-
Dukana
(in North Horr)
- year first funded
- 2007
- action
- Construction of Apline
- output
- Improve Security
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Idps Acres Settlement
- location
-
North Horr
(in North Horr)
- year first funded
- 2007
- action
- Land Purchase
- output
- Resettle Displaced
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Qorqa Primary School , Classes
- location
-
North Horr
(in North Horr)
- year first funded
- 2008
- action
- Construction of 2 Classes
- output
- Increase Enrolment
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Dukana Shallow Wells Protection
- location
-
Dukana
(in North Horr)
- year first funded
- 2008
- action
- Protection Of Well
- output
- Improve Access To Safe And Clean Water
- implementation status
- Not Started
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Maikona Community Store
- location
-
Maikona
(in North Horr)
- year first funded
- 2008
- action
- Construction Of Community Store
- output
- Improve Storage Facility
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Forole Primary School
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Balesa Primary School Girls Classroom
- location
-
Balesa
(in North Horr)
- year first funded
- 2004
- action
- Construction Of 2 Classroom
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Maikona Primary School , Classes
- location
-
Maikona
(in North Horr)
- year first funded
- 2004
- action
- Construction Of 2 Classroom
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Burgabo Tanks And Trough
- location
-
Turbi
(in North Horr)
- year first funded
- 2005
- action
- Livestock Water Access
- output
- Improve Livestock Health
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Renovation Of Bubisa Health Centre
- location
-
Bubisa
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Maternity
- output
- Access Health Services
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Bubisa Primary School
- location
-
Bubisa
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Chalbi Primary School
- location
-
Maikona
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Bubisa Primary School
- location
-
Bubisa
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Cavalera Primary School
- location
-
Bubisa
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Helmer Memorial Primary School , Classes
- location
-
North Horr
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Malabot Primary School , Classes
- location
-
North Horr
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Forole Primary School
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Balesa Girls Primary School , Classes
- location
-
Balesa
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Burgabo Water Users Store
- location
-
Turbi
(in North Horr)
- year first funded
- 2006
- action
- Construction of A Store
- output
- Improve Storage Facility
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Illeret Chiefs Office
- location
-
Illeret
(in North Horr)
- year first funded
- 2006
- action
- Construction of ChiefS Office
- output
- Improve Prov. Adm. Services
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Qorqa Primary School , Classes
- location
-
North Horr
(in North Horr)
- year first funded
- 2007
- action
- Construction of 2 Classes
- output
- Increase Enrolment
- implementation status
- New Project Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Maikona Dispensary Upgrading
- location
-
Maikona
(in North Horr)
- year first funded
- 2007
- action
- Upgrade Dispensary
- output
- Improve Health Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Dukana Borehole &Shallow Well Rehabilitation
- location
-
Dukana
(in North Horr)
- year first funded
- 2007
- action
- Rehabilitate Bore Hole &Shallow Well
- output
- Improve Water Supply
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Recurrent Expenditure
- location
-
North-Horr
(in North Horr)
- year first funded
- 2008
- action
- Recurrent Expenses
- output
- -
- implementation status
- On Going
- total cost
- Ksh 798,113
- estimate
- Ksh 798,113
Elbeso Pre-Unit, Classes
- location
-
North Horr
(in North Horr)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 780,000
- estimate
- Ksh 780,000
Dukana Girls Primary School
- location
-
Dukana
(in North Horr)
- year first funded
- 2004
- action
- Construction of Adm Block
- output
- Increase Work Place
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kalacha Primary School , A Class &Renovation
- location
-
Kalacha
(in North Horr)
- year first funded
- 2007
- action
- Construction of A Class &Renovate 6 Others
- output
- Improve Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Kalacha Nomadic Girls Primary School
- location
-
Kalacha
(in North Horr)
- year first funded
- 2005
- action
- School Fencing
- output
- Improve Security
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Bubisa Borehole, Generator
- location
-
Bubisa
(in North Horr)
- year first funded
- 2007
- action
- Procure A Generator
- output
- Improve Water Supply
- implementation status
- New Project Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Ruso Primary School dining Hall Construction
- location
-
NorthHorr
(in North Horr)
- year first funded
- 2005
- action
- Construction of Adm. Block
- output
- Increase Working Space
- implementation status
- Complete & In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Shura Asal,Renovation
- location
-
Bubisa
(in North Horr)
- year first funded
- 2007
- action
- Renovation Asal Building
- output
- Improve Livestock Marketing
- implementation status
- Complete & In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Review Of / Action Plan And Strategic Plan Documentation
- location
-
North-Horr
(in North Horr)
- year first funded
- 2008
- action
- Action Plan And Strategic Plannig And Documentation
- output
- Enhance Participatory Planning
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Dukana Under Ground Water Tank
- location
-
Dukana
(in North Horr)
- year first funded
- 2004
- action
- Construction of A Water Tank
- output
- Access To Clean Water
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Balesa Dispensary Renovation
- location
-
Balesa
(in North Horr)
- year first funded
- 2005
- action
- Renovate Dispensary
- output
- Improve Health Services
- implementation status
- Complete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Turbi Primary School , -Boarding Facilities Fencing
- location
-
Turbi
(in North Horr)
- year first funded
- 2008
- action
- School Compound Fencing
- output
- Increase Security
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Galasa Dispensary, Staff House
- location
-
Galasa
(in North Horr)
- year first funded
- 2007
- action
- Construction of A Staff House
- output
- Improve Health Eservices
- implementation status
- New Project Completed And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maikona Girls Sec, Text Book
- location
-
Maikona
(in North Horr)
- year first funded
- 2007
- action
- Purchase Of Text Books
- output
- Improve Learning Facilities
- implementation status
- Complete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Maikona Primary School ,Furnitures
- location
-
Maikona
(in North Horr)
- year first funded
- 2007
- action
- Purchase FurnitureS
- output
- Improve Learning Environment
- implementation status
- Complete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Turbi Primary School , Fencing
- location
-
Turbi
(in North Horr)
- year first funded
- 2007
- action
- School Compound Fencing
- output
- Increase Security
- implementation status
- Used Up
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Dukana Water Piping System
- location
-
Dukana
(in North Horr)
- year first funded
- 2006
- action
- Water Piping
- output
- Improve Water Facilities
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kalacha Police Line Renovation
- location
-
Kalacha
(in North Horr)
- year first funded
- 2005
- action
- Renovate Police Line
- output
- Improve Services
- implementation status
- Complete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Dukana Dispensary Renovation
- location
-
Dukana
(in North Horr)
- year first funded
- 2005
- action
- Renovate Dispensary
- output
- Improve Health Services
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Hurri Hills Water Tanks
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2005
- action
- Construction of A Tank
- output
- Improve Water Supply
- implementation status
- Complete & In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Malabot Primary School A Class
- location
-
NorthHorr
(in North Horr)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Increased Enrolment
- implementation status
- Complete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Surge Water Catchments Rehabilitation
- location
-
Illeret
(in North Horr)
- year first funded
- 2007
- action
- Water Catchments Rehabilitation
- output
- Improve Water Supply
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Forole Tanks Renovation
- location
-
Hurri Hills
(in North Horr)
- year first funded
- 2005
- action
- Renovation O F Tank
- output
- Improve Water Supply
- implementation status
- Complete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kalacha Shallow Well Construct
- location
-
Kalacha
(in North Horr)
- year first funded
- 2005
- action
- Well Protection
- output
- Clean Water
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Balesa Cattle Crash
- location
-
Balesa
(in North Horr)
- year first funded
- 2008
- action
- Contruct Cattle Crush
- output
- Improve Cattles' Health
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 30,000
Elgade Primary School
- location
-
Kalacha
(in North Horr)
- year first funded
- 2006
- action
- Purchase FurnitureS
- output
- Improve Learning
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Illeret Vct
- location
-
Illeret
(in North Horr)
- year first funded
- 2004
- action
- Construction of A Vct Center
- output
- Improve Hiv Testing
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Umuro Youth Plytechnic
- location
-
Kalacha
(in North Horr)
- year first funded
- 2008
- action
- Polytecnic Support
- output
- Unleasing Youth Potentials
- implementation status
- 0N Going
- total cost
- Ksh 240,000
- estimate
- Ksh 500,000
Dukana Health Centre, Solar Panel
- location
-
Dukana
(in North Horr)
- year first funded
- 2006
- action
- Installation Of Solar System
- output
- Improve Health Services
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Burgabo Cattle Crash
- location
-
Turbi
(in North Horr)
- year first funded
- 2007
- action
- Construction of A Cattle Crash
- output
- Improve Cattle Health
- implementation status
- Complete & In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Cattle Crash Construction At Balesa
- location
-
Balesa
(in North Horr)
- year first funded
- 2007
- action
- Construction of A Cattle Crash
- output
- Increase Access To Health Facility
- implementation status
- Reallocated
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Capacity Builing For Cdfc And Pmc
- location
-
North-Horr
(in North Horr)
- year first funded
- 2008
- action
- Training Of Committees
- output
- Improve Knowledgeon Cdf Operations And Procedures
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Bursary
- location
-
North-Horr
(in North Horr)
- year first funded
- 2004
- action
- Pay School Fees
- output
- Improve Education
- implementation status
- Used Up
- total cost
- Ksh 2,000
- estimate
- Ksh 2,000,000
Office Administration
- location
-
North-Horr
(in North Horr)
- action
- Pay Office Expenses
- output
- -
- implementation status
- Used Up
- total cost
- Ksh 0
- estimate
- Ksh 663,000