The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Kijauri Dispensary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- walling
- total cost
- Ksh 7,600,000
- estimate
- Ksh 13,074,565
Rionyari- Nyabikomu- Egentubi- Gucha Rd
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Road Construction
- output
- Road
- implementation status
- Stump removal, bush clearing and levelising done. Laying culverts
- total cost
- Ksh 2,667,237
- estimate
- Ksh 3,667,237
Ensakia primary School
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of Classrooms electr/installalation
- output
- Reduction of learning congestion
- implementation status
- Finishing with plastering and flooring
- total cost
- Ksh 2,600,000
- estimate
- Ksh 606,000
Chebilate Water Project
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of piped water
- output
- Proximity to water
- implementation status
- Reservoiur tank to construct
- total cost
- Ksh 2,576,000
- estimate
- Ksh 2,739,000
AIC Nyabikomu Health Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Completed
- total cost
- Ksh 2,414,000
- estimate
- Ksh 3,180,671
St. Joseph Biego secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of Admin Block and Classrooms(phase 1).
- output
- improve learning conditions
- implementation status
- Ground floor on finishing level. Windows, doors,flooring.
- total cost
- Ksh 2,347,000
- estimate
- Ksh 3,159,304
Nyamusi Health Center
- location
-
Bokeira
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Ceiling, paiting,wiring the remaining part
- total cost
- Ksh 2,300,000
- estimate
- Ksh 1,341,120
Riechieri Dispensary
- location
-
Obwari
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of facility
- output
- Provide health services
- implementation status
- completed facility.
- total cost
- Ksh 2,189,000
- estimate
- Ksh 2,089,000
Nyakenimo secondary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Classrooms, Offices & Teachers' house
- output
- Reduction of learning congestion
- implementation status
- Finishing of teacher"s house
- total cost
- Ksh 2,050,000
- estimate
- Ksh 1,750,000
Eronge SDA secondary School
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of lab
- output
- Improve science subjects
- implementation status
- Roofing to do
- total cost
- Ksh 1,917,000
- estimate
- Ksh 1,842,924
Manga Girls Water Project
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of water supply system
- output
- water supply to school
- implementation status
- drilling of borehole
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,080,000
Nyangoge secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Lab & Library Construction
- output
- improve learning conditions
- implementation status
- walling a storey structure
- total cost
- Ksh 1,700,000
- estimate
- Ksh 4,585,343
Endiba secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Lab and wiring 2 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Fittings and Equipment procurement. Classrooms completed and wiring done
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,203,470
Mecheo secondary School
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- dining Hall Construction
- output
- dining Hall
- implementation status
- Skeleton done and roofing done.
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,375,000
Ikonge Dispesary
- location
-
Obwari
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of facility
- output
- Provide health services
- implementation status
- Facility completed and in use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,113,160
Chaina Dispensary
- location
-
Itibo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Finishing with painting and fittings
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,634,080
Isoge/Kineni Water Project
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of piped water
- output
- Proximity to water
- implementation status
- Piping on
- total cost
- Ksh 1,512,371
- estimate
- Ksh 5,456,570
Entono Health Centre
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- facility completed. Wiring to do.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,520,300
Kenyoro Dispensary
- location
-
Itibo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Finishing with palstring, floors,painting and wiring
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,316,820
Riagechiko Bridge
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of bridge
- output
- Improve communication
- implementation status
- Finishing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,138,000
Nyamiranga secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Twin lab construction
- output
- Improve science subjects
- implementation status
- At walling
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Nyankono Dispensary
- location
-
Kiang'eni
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- completed facility. Doctor's house need plastering and flooring and ceiling
- total cost
- Ksh 1,500,000
- estimate
- Ksh 3,740,500
Mecheo Dispensary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- Completed and in use
- total cost
- Ksh 1,414,000
- estimate
- Ksh 1,931,590
Ntana secondary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Textbooks,Tank & electricty
- output
- provision of enough books,water and lighting
- implementation status
- Books bought,tak made & Electrical wiring to do
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,767,650
Kineni- Saigangiya Rd
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Road Construction
- output
- Road
- implementation status
- Bush clearing, culverting stump removal
- total cost
- Ksh 1,400,000
- estimate
- Ksh 5,118,750
Chepngombe Health Centre
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of Martanity
- output
- Martanity services
- implementation status
- Completed and in use
- total cost
- Ksh 1,394,000
- estimate
- Ksh 2,980,000
Eronge DEB secondary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Lab Construction
- output
- Improve science subjects
- implementation status
- Finishing with plastering and flooring and fittings & wiring
- total cost
- Ksh 1,352,940
- estimate
- Ksh 5,484,524
Isoge Health Centre
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- At slab level
- total cost
- Ksh 1,300,000
- estimate
- Ksh 8,692,639
Eronge Board. primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of burnt dorm
- output
- To provide accommodation to learners
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Gisage Dispensary
- location
-
Borangi
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Completed and in use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,366,480
Kineni Dispensary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity maternity ward
- output
- Provide health services
- implementation status
- complete
- total cost
- Ksh 1,285,000
- estimate
- Ksh 1,738,901
Endiba Dispensary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Completed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,950,000
St. Mattias Mulumba secondary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Classroooms construction
- output
- Reduction of learning congestion
- implementation status
- Roofing
- total cost
- Ksh 1,210,588
- estimate
- Ksh 10,000,000
Mokomoni Dispensary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,546,702
Egentubi secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of twin Lab
- output
- improve learning conditions
- implementation status
- Wing one completed
- total cost
- Ksh 1,197,000
- estimate
- Ksh 1,039,393
Kahawa Dispensary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- Finishing of structure
- total cost
- Ksh 1,145,000
- estimate
- Ksh 1,976,827
Mwongori Dispensary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity and electricity
- output
- Provide health services
- implementation status
- Project completed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 800,000
Nyansiongo secondary School
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Completion of PTA dormitory
- output
- Enough accomodation
- implementation status
- complete and in use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 200,000
Saiga Ngiya Bridge
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of bridge
- output
- Improve communication
- implementation status
- Completed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,160,000
Nyandoche II secondary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Equipment and Lab
- output
- Improve science subjects
- implementation status
- Equipment bought. Building at foundation
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,611,678
Ribaita primary School
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Demolished during post election skirmishes
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,872,327
Amatierio Dispensary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Completed
- total cost
- Ksh 1,097,000
- estimate
- Ksh 3,430,600
Riensune primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Renovation of classrooms
- total cost
- Ksh 1,050,000
- estimate
- Ksh 2,718,382
Itibo primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing with plastering and flooring
- total cost
- Ksh 1,000,800
- estimate
- Ksh 700,000
mwongori riamoseti
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2009
- action
- Construction of road
- output
- now passable
- implementation status
- almost complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 4,320,030
Nyakwerema secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Lab Construction and equiping
- output
- Improve science subjects
- implementation status
- At walling
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,847,782
Nsicha Dispensary
- location
-
Kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- Roofing is on
- total cost
- Ksh 1,000,000
- estimate
- Ksh 4,393,207
Nyanchoka Bridge
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of bridge
- output
- Improve communication
- implementation status
- Construction is on
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,044,500
Kemunchugu Dispensary
- location
-
Bokeira
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- Plastering,doors,windows, flooring and painting of wing 1
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,141,919
Kitaru Dispensary
- location
-
kiang'eni
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- Roofing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,994,562
Mwongori secondary School
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Classrooms Construction & wiring
- output
- Electricity and Classrooms
- implementation status
- complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,596,039
Mogusii secondary School
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of lab
- output
- Improve science subjects
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,600,000
Kerumbe Dispensary
- location
-
kiang'eni
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,650,000
Bomwagamo W. Springs
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- 8 springs protected
- output
- Water
- implementation status
- One gravity project is underway
- total cost
- Ksh 982,784
- estimate
- Ksh 580,000
Esianyi Dispensary
- location
-
Borangi
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- completed facility. Start doctor's house
- total cost
- Ksh 970,000
- estimate
- Ksh 1,239,000
Orwaki Dispesary
- location
-
Bokeira
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- facility completed
- total cost
- Ksh 900,000
- estimate
- Ksh 927,200
Itumbe secondary School
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Lab Construction
- output
- Improve science subjects
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 1,400,000
St. Stephen Youth Polytechnic
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Facility Construction
- output
- Provide technical training
- implementation status
- Lecture rooms now at plastering
- total cost
- Ksh 900,000
- estimate
- Ksh 1,198,496
Ibara Boarding primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of Dormitory
- output
- To provide enough boarding facilities
- implementation status
- Finishing with plastering and flooring and painting
- total cost
- Ksh 900,000
- estimate
- Ksh 1,030,886
Kenyoro SDA primary School
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Reduce congestion
- implementation status
- Finishing of structure
- total cost
- Ksh 900,000
- estimate
- Ksh 7,765,600
Nyambiri secondary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing with plastering and flooring
- total cost
- Ksh 900,000
- estimate
- Ksh 1,114,600
Nyamori primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Painting and flooring
- total cost
- Ksh 860,000
- estimate
- Ksh 621,640
Bomwagamo Chiefs Office
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of chief's offices
- output
- Efficient administration
- implementation status
- Plastering and pflooring and painting to be done
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Chinche primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of Latrines
- output
- Improve hygiene
- implementation status
- Completed and in use
- total cost
- Ksh 800,000
- estimate
- Ksh 600,000
St. Pauls Omonayo secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of Dormitory
- output
- improve learning conditions
- implementation status
- Dorm completed
- total cost
- Ksh 800,000
- estimate
- Ksh 661,000
St. Thomas Moore secondary School
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Admin Block and computers
- implementation status
- completed admin. Block
- total cost
- Ksh 800,000
- estimate
- Ksh 825,125
Riomego/Magwagwa Dispensary
- location
-
Borangi
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Ceiling, paiting,wiring the remaining part
- total cost
- Ksh 800,000
- estimate
- Ksh 1,388,128
St. James Nyaronde secondary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- lab construction
- output
- Improve science subjects
- implementation status
- complete
- total cost
- Ksh 780,000
- estimate
- Ksh 1,055,536
Gesabakwa Bridge
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of bridge
- output
- Improve communication
- implementation status
- completed
- total cost
- Ksh 770,000
- estimate
- Ksh 771,570
Nyaramba Special Unit
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Special Unit Construction
- output
- Meet special cases
- implementation status
- Complete
- total cost
- Ksh 768,000
- estimate
- Ksh 1,017,966
Kiamanyomba Dispensary
- location
-
Borangi
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- At walling
- total cost
- Ksh 750,000
- estimate
- Ksh 1,366,480
St. Francis Kerema secondary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Lab Construction & renovation of 4 Classrooms
- output
- improve learning conditions
- implementation status
- Renovation completed, Lab on roofing
- total cost
- Ksh 750,000
- estimate
- Ksh 850,600
Rianyakangi primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Completed and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 969,000
Tindereti secondary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Not yet started
- total cost
- Ksh 700,000
- estimate
- Ksh 1,501,250
riasimiti bridge
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2009
- action
- Construction of bridge
- output
- To provide accessibity to the community
- implementation status
- new
- total cost
- Ksh 700,000
- estimate
- Ksh 4,800,000
Kahawa secondary School
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of library & wiring
- output
- Reduction of learning congestion
- implementation status
- Completed and in use
- total cost
- Ksh 700,000
- estimate
- Ksh 794,933
Amakura primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of Admin. Block
- output
- Reduction of learning congestion
- implementation status
- Changed to wiring . Done and completed
- total cost
- Ksh 700,000
- estimate
- Ksh 650,000
Omonono primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Office with 3 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Roofing
- total cost
- Ksh 650,000
- estimate
- Ksh 600,000
Nyankongo primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Reduce congestion
- implementation status
- complete and in use
- total cost
- Ksh 650,000
- estimate
- Ksh 300,000
Nyakenimo primary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing with flooring and plastering
- total cost
- Ksh 650,000
- estimate
- Ksh 1,700,000
St. Joseph's Lietego secondary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Classroooms construction
- output
- Reduce congestion
- implementation status
- Finishing of structure
- total cost
- Ksh 630,000
- estimate
- Ksh 1,130,000
Nyageita primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Reduce congestion
- implementation status
- complete and in use
- total cost
- Ksh 600,000
- estimate
- Ksh 514,680
Sere Dispensary
- location
-
Obwari
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- At foundation level
- total cost
- Ksh 600,000
- estimate
- Ksh 5,296,829
Keneni STU Police Post
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of Post
- output
- Efficient administration
- implementation status
- At roofing
- total cost
- Ksh 600,000
- estimate
- Ksh 470,000
Nderema primary School
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing with plastering and flooring
- total cost
- Ksh 597,000
- estimate
- Ksh 657,000
Nyansiongo W. Springs
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Protection
- output
- Water
- implementation status
- 8 springs protected
- total cost
- Ksh 580,000
- estimate
- Ksh 580,000
Omonayo secondary Comp. Project
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Procurement of computers
- output
- Computer literacy
- implementation status
- Computers bought
- total cost
- Ksh 560,000
- estimate
- Ksh 801,300
Ibara DOK primary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Materials on site
- total cost
- Ksh 550,000
- estimate
- Ksh 533,540
Emboye primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Need plastering and painting
- total cost
- Ksh 520,000
- estimate
- Ksh 812,566
Moteoguto primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- plastering anfd flooring
- total cost
- Ksh 500,000
- estimate
- Ksh 1,528,160
Nyandoche Ibere Disp
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Roofing done. Plastering, flooring and painting needed
- total cost
- Ksh 500,000
- estimate
- Ksh 1,150,975
Kiabonyoru secondary Comp. Project
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Procurement of computers
- output
- Computer literacy
- implementation status
- Computers bought
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Nyangoge primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Renovation of Classrooms
- output
- Classrooms
- implementation status
- Renovation done
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Eaka- Mabariri Road
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Bush clearing
- output
- Passable road
- implementation status
- rehabilitaton
- total cost
- Ksh 500,000
- estimate
- Ksh 592,000
Kioge- Nyangoso Road
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Bush clearing
- output
- Passable road
- implementation status
- completed
- total cost
- Ksh 500,000
- estimate
- Ksh 592,000
Nyabweri Dispensary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- At foundation level
- total cost
- Ksh 500,000
- estimate
- Ksh 1,720,800
Monga primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofed. Need doors windows, floor and plastering
- total cost
- Ksh 500,000
- estimate
- Ksh 726,526
Nyamonuri primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Classrooms at lintel
- total cost
- Ksh 500,000
- estimate
- Ksh 544,440
Kebariga primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 1 Class Plastering done partly
- output
- Reduction of learning congestion
- implementation status
- Roofing done. Need plastering, flooring and painting
- total cost
- Ksh 500,000
- estimate
- Ksh 555,280
Biego secondary Comp. Project
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Procurement of computers
- output
- Computer literacy
- implementation status
- Computers are being procured
- total cost
- Ksh 460,000
- estimate
- Ksh 801,300
Esise W. Project
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- 4 Springs protected
- output
- Clean water provision
- implementation status
- 4 completed
- total cost
- Ksh 453,196
- estimate
- Ksh 380,000
Ribwago Water Project
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of piped water
- output
- Proximity to water
- implementation status
- Await Cheque to complete
- total cost
- Ksh 450,000
- estimate
- Ksh 200,000
Tindereti Dispensary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- Not started
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Mokomoni primary
- location
-
Kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- Reduction of learning congestion
- implementation status
- At lintels. Need roofing
- total cost
- Ksh 450,000
- estimate
- Ksh 988,000
Monyara primary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing with flooring and plastering
- total cost
- Ksh 450,000
- estimate
- Ksh 2,066,980
Mageri primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of 2 Classrooms and hall
- output
- Reduction of learning congestion
- implementation status
- Completed and in use
- total cost
- Ksh 450,000
- estimate
- Ksh 1,008,900
Kiabiraa primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction 2 of Classrooms
- output
- Reduction of learning congestion
- implementation status
- One roofed another on lintels
- total cost
- Ksh 450,000
- estimate
- Ksh 413,850
Nyagacho primary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing. Need funds to finish with plastrring,flooring
- total cost
- Ksh 450,000
- estimate
- Ksh 10,000,000
Keginga secondary School
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Classroooms construction
- output
- Reduction of learning congestion
- implementation status
- Project never stated
- total cost
- Ksh 400,000
- estimate
- Ksh 7,945,972
Ensoko primary School
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Classroom
- output
- Reduce congestion
- implementation status
- Finishing of structure
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
Etono DEB primary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- 200,000 Emergency for roofing done. Plastering & flooring to be done
- total cost
- Ksh 400,000
- estimate
- Ksh 993,000
Eronge DEB primary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofed. Need doors windows, floor and plastering
- total cost
- Ksh 400,000
- estimate
- Ksh 1,057,500
Nyanchoka primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Finishing. Need windows and doors, plastering and flooring
- total cost
- Ksh 400,000
- estimate
- Ksh 881,095
St. Gonzaga Gonza W.Project
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of piped water
- output
- Proximity to water
- implementation status
- Water supply in school
- total cost
- Ksh 400,000
- estimate
- Ksh 3,500,000
Nyageita/Rirumi W. Project
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- piped water
- output
- Safe water
- implementation status
- phase 1 complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Eaka primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing with plastering and flooring
- total cost
- Ksh 400,000
- estimate
- Ksh 621,560
Kiabonyoru W. Springs
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Protection
- output
- Water
- implementation status
- 6 springs protection completed
- total cost
- Ksh 380,000
- estimate
- Ksh 180,000
Rigena primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Not started
- total cost
- Ksh 350,000
- estimate
- Ksh 700,000
Riang'ombe primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Matunwa primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 350,000
- estimate
- Ksh 1,400,000
Kebuse primary School
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Classroom
- output
- Reduce congestion
- implementation status
- Finishing of structure
- total cost
- Ksh 350,000
- estimate
- Ksh 4,000,000
Kegogi primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Construction and renovation of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing of 1 classroom. 4 rooms renovated
- total cost
- Ksh 350,000
- estimate
- Ksh 408,000
Endiba primary
- location
-
Kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting system
- implementation status
- wiring done on 14 classrooms. 5 remains
- total cost
- Ksh 350,000
- estimate
- Ksh 2,532,726
Nyakwerema primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of Latrines. 4 for staff and five for girls
- output
- Improve hygiene
- implementation status
- complete and in use
- total cost
- Ksh 350,000
- estimate
- Ksh 271,980
Nyabweri Polytechnic
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2003
- action
- Construction of faciltity's study rooms
- output
- Provide technical training
- implementation status
- 2 Completed
- total cost
- Ksh 344,000
- estimate
- Ksh 609,760
Gozaga Gonzaga secondary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Classrooms lab, adm. block & Computers
- output
- Computers and classrooms
- implementation status
- Ongoing. At foundation
- total cost
- Ksh 320,000
- estimate
- Ksh 7,557,283
Memisi primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 310,000
- estimate
- Ksh 200,000
Rianyaemo primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Awaits Funds to commence
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Rigoko secondary School
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Construction of lab & Equipment
- output
- Improve science subjects
- implementation status
- At lintels
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Mogusii Dispensary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of faciltity
- output
- Provide health services
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 925,413
Kitaru primary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 300,000
- estimate
- Ksh 886,000
Biego primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At walling
- total cost
- Ksh 300,000
- estimate
- Ksh 841,648
Nsicha primary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At walling
- total cost
- Ksh 300,000
- estimate
- Ksh 792,836
Kiabonyoru primary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Renovation done
- total cost
- Ksh 300,000
- estimate
- Ksh 866,350
Nyabikomu primary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At walling
- total cost
- Ksh 300,000
- estimate
- Ksh 1,871,000
Egentubi primary
- location
-
Kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of toilets &Classrooms
- output
- Reduction of learning congestion
- implementation status
- Toilets complete
- total cost
- Ksh 300,000
- estimate
- Ksh 790,000
Nyagware primary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Renovation of 9 Classrooms
- output
- Improve structures
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 469,000
Manga Chief's Office
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of chiefs offices
- output
- Efficient administration
- implementation status
- Procurement of materials and digging foundation
- total cost
- Ksh 300,000
- estimate
- Ksh 862,100
Erandi Water Project
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of piped water
- output
- Proximity to water
- implementation status
- Construction is on. CDF funds used to purcahase some materials
- total cost
- Ksh 292,784
- estimate
- Ksh 400,000
Eaka Coffee Factory
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of factory facilities
- output
- Improve coffee factiory
- implementation status
- Drying bed made
- total cost
- Ksh 260,000
- estimate
- Ksh 734,080
St. Gonzaga Gonza secondary Comp. Project
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Procurement of computers
- output
- Computer literacy
- implementation status
- Computers bought
- total cost
- Ksh 260,000
- estimate
- Ksh 801,300
Menyenya secondary Comp. Project
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Procurement of computers
- output
- Computer literacy
- implementation status
- Funds reallocatted to electrity project
- total cost
- Ksh 260,000
- estimate
- Ksh 801,300
Mecheo secondary Comp. Project
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Procurement of computers
- output
- Computer literacy
- implementation status
- Computers bought
- total cost
- Ksh 260,000
- estimate
- Ksh 801,300
Riontonyi Police Post
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of Post
- output
- Efficient administration
- implementation status
- Not started
- total cost
- Ksh 250,000
- estimate
- Ksh 770,000
Kiomachingi primary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Reduction of learning congestion
- implementation status
- Finishing one classrooom. 2 others at foundation
- total cost
- Ksh 250,000
- estimate
- Ksh 813,460
Ntana primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Finishing with flooring and plastering
- total cost
- Ksh 250,000
- estimate
- Ksh 2,078,850
Kerobo Dispensary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of faciltity's store for IFAD funded construction
- output
- Health Services
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 188,800
Kiabonyoru Cheifs Office
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Renovation of chiefs offices
- output
- Efficient administration
- implementation status
- Completed and in use
- total cost
- Ksh 250,000
- estimate
- Ksh 468,520
Borabu primary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing done. Plastering, flooring and painting needed
- total cost
- Ksh 250,000
- estimate
- Ksh 1,980,600
Mwongori primary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing done. Plastering, flooring and painting needed
- total cost
- Ksh 250,000
- estimate
- Ksh 1,947,241
Nyansiongo DOK primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintel lvel
- total cost
- Ksh 212,000
- estimate
- Ksh 1,857,600
Mekenene W. Springs
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2005
- action
- Spring protection
- output
- Proximity to water
- implementation status
- 3 springs protected.
- total cost
- Ksh 200,843
- estimate
- Ksh 200,843
Nderema Dispensary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Purchase of equipment
- output
- Health Services
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiomara dispensary
- location
-
Bokeira
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Purchase of equipment
- output
- Health Services
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 2,381,000
Nyabweri primary School
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing done. Need plastering, flooring and painting
- total cost
- Ksh 200,000
- estimate
- Ksh 540,600
Etono Boarding primary
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Classroom needs windows and painting
- total cost
- Ksh 200,000
- estimate
- Ksh 1,146,630
Nyamiacho Bridge
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of bridge
- output
- Improve communication
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Omosocho primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 200,000
- estimate
- Ksh 238,430
Raitigo Dam
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Dam
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 3,712,500
Tente Dam
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Dam
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Eturungi Dispensary
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- At foundation level
- total cost
- Ksh 200,000
- estimate
- Ksh 4,393,207
Kineni secondary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Equipment for Lab
- output
- Improve science subjects
- implementation status
- Equipment bought.
- total cost
- Ksh 200,000
- estimate
- Ksh 1,001,250
Gesibei primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing. Need funds to finish with plastrring,flooring
- total cost
- Ksh 200,000
- estimate
- Ksh 2,787,170
Raitigo disp
- location
-
esise
(in North Mugirango Borabu)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Eaka Coffee Factory
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2009
- action
- Renovation of factory facilities
- output
- Improve coffee factiory
- implementation status
- renovation going on
- total cost
- Ksh 160,000
- estimate
- Ksh 200,000
Rieko Bridge
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2006
- action
- Construction of bridge
- output
- Improve communication
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nyageita Tea Buying Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of factory facilities
- output
- Improve tea centres
- implementation status
- Partily done
- total cost
- Ksh 150,000
- estimate
- Ksh 468,154
Kegogi Tea Buying Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of factory facilities
- output
- Improve tea factory
- implementation status
- Materials on site
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Mekenene primary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing done. Plastering, flooring and painting needed
- total cost
- Ksh 150,000
- estimate
- Ksh 2,420,500
Nyaronde primary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing done. Plastering, flooring and painting needed
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Mogusii primary
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing done. Plastering, flooring and painting needed
- total cost
- Ksh 150,000
- estimate
- Ksh 1,321,300
Mekenene Chiefs Office
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of office
- output
- Improve administration
- implementation status
- Not issued with cheque
- total cost
- Ksh 150,000
- estimate
- Ksh 750,000
Riamanoti primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Roofing. Need funds to finish with plastrring,flooring
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Manga Police Post
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Wiring of the police houses
- output
- Efficient administration
- implementation status
- not completed
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Mabariri Coffee Factory
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of factory facilities
- output
- Improve coffee factiory
- implementation status
- Drying bed made
- total cost
- Ksh 150,000
- estimate
- Ksh 734,080
Keginga primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintel lvel
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Nyansiongo DEB primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of toilets &Classrooms
- output
- Improve hygiene
- implementation status
- Rooofing
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Tindereti primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintel lvel
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Itumbe primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintel lvel
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Saigangiya primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintel lvel
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Mogusii W. Project
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Spring protection
- output
- Proximity to water
- implementation status
- Not issued with cheque
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Isoge primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintel lvel
- total cost
- Ksh 100,000
- estimate
- Ksh 757,000
Menyenya primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintel lvel
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Masige primary
- location
-
Nyansiongo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- Not started
- total cost
- Ksh 100,000
- estimate
- Ksh 732,050
moteoguto tea buying centreprimary School
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2009
- action
- Renovation of factory facilities
- output
- Improve tea leaf collection
- implementation status
- Just issued a cheque
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Manga DEB primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Mecheo primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Mebeno Cattle Dip
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Rehabilitation of dip
- output
- Improve cattle rearing actvities
- implementation status
- not completed
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kerema Polytechnic
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Facility's Classroom Construction
- output
- Provide technical training
- implementation status
- At walling
- total cost
- Ksh 100,000
- estimate
- Ksh 740,895
Kerema Pri
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At walling
- total cost
- Ksh 100,000
- estimate
- Ksh 740,895
Kerenda Tea Buying Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Contruction of factory facilities
- output
- Improve tea centres
- implementation status
- Materials on site
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Riomoruri Tea Buying Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Contruction of factory facilities
- output
- Improve tea centres
- implementation status
- Materials on site
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ekerubo W. Project
- location
-
Mekenene
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Spring protection
- output
- Proximity to water
- implementation status
- Not issued with cheque
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyageita Tea Buying Centre
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Renovation of factory facilities
- output
- Improve tea factory
- implementation status
- Procurement of materials
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kioge dispensary
- location
-
Bokeira
(in North Mugirango Borabu)
- year first funded
- 2008
- action
- Construction of faciltity
- output
- Health Services
- implementation status
- Foundation setting
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Esise primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 100,000
- estimate
- Ksh 1,700,300
Endemu primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 100,000
- estimate
- Ksh 664,000
Rietego primary
- location
-
Esise
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Reduction of learning congestion
- implementation status
- At lintels
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Mokomoni Water Project
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Spring protection
- output
- Clean water provision
- implementation status
- Not yet started
- total cost
- Ksh 73,196
- estimate
- Ksh 100,000
Omonono W. Springs
- location
-
Kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Spring protection
- output
- Clean water provision
- implementation status
- Not yet started
- total cost
- Ksh 73,196
- estimate
- Ksh 100,000
Nyangoge W. Springs
- location
-
Kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Spring protection
- output
- Clean water provision
- implementation status
- 1 spring protection done
- total cost
- Ksh 73,196
- estimate
- Ksh 100,000
Nyaramba Water Project
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Spring protection
- output
- Clean water provision
- implementation status
- 2 springs under protected
- total cost
- Ksh 73,196
- estimate
- Ksh 695,670
Egentubi Tea Buying Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Construction of factory facilities
- output
- Improve tea centres
- implementation status
- At lintels
- total cost
- Ksh 50,000
- estimate
- Ksh 1,103,456
Eng'eta Tea Buying Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of factory facilities
- output
- Improve tea centres
- implementation status
- Materials on site
- total cost
- Ksh 50,000
- estimate
- Ksh 649,240
Omosocho Tea Buying Centre
- location
-
kiabonyoru
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of factory facilities
- output
- Improve tea centres
- implementation status
- Materials on site
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Nyakenimo Coffee Factory
- location
-
Bomwagamo
(in North Mugirango Borabu)
- year first funded
- 2007
- action
- Renovation of factory facilities
- output
- Improve coffee factiory
- implementation status
- Drying bed made
- total cost
- Ksh 50,000
- estimate
- Ksh 734,080