The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Emergency Reserve
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2004
- action
- For Emergency Situations
- output
- Disusters Addressed
- implementation status
- not known
- total cost
- Ksh 9,983,940
- estimate
- Ksh 0
Office Administration
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Management And Supervision
- output
- Project Implementation
- implementation status
- On Going
- total cost
- Ksh 5,922,999
- estimate
- Ksh 0
Ds Office
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Do's Office
- output
- Do?S Office
- implementation status
- Finishing
- total cost
- Ksh 3,300,000
- estimate
- Ksh 2,550,000
Cdf Vehicle
- location
-
Pap Onditi
(in Nyakach)
- year first funded
- 2005
- action
- Procurement
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,037,350
- estimate
- Ksh 3,037,350
Ramula Odowa Secondary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Not Started
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Community Development Centre
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Community Centre
- output
- Community Centre
- implementation status
- Plastering
- total cost
- Ksh 2,750,000
- estimate
- Ksh 2,000,000
Oriang Earth Dam
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Water
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 2,700,000
- estimate
- Ksh 2,796,334
Cherwa Dispensary
- location
-
North E Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Plastering
- total cost
- Ksh 2,553,333
- estimate
- Ksh 2,914,784
Radienya Dispensary
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Plastering
- total cost
- Ksh 2,469,085
- estimate
- Ksh 2,366,898
Nyakach Constituency Office
- location
-
Pap Onditi
(in Nyakach)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
South Nyakach Coffee Factory
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Coffee Factory
- output
- Coffee Factory
- implementation status
- Plastering
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,657,134
Gari Dispensary
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Fitting
- total cost
- Ksh 2,105,000
- estimate
- Ksh 2,161,920
Bonde Maternity
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Maternity Ward
- output
- Maternity Ward
- implementation status
- Finishing
- total cost
- Ksh 2,100,000
- estimate
- Ksh 3,023,688
Onyuongo Medical Clinic
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Medical Clinic
- output
- Medical Clinic
- implementation status
- Fitting
- total cost
- Ksh 2,050,000
- estimate
- Ksh 2,514,900
Sangoro Dispensary
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Dispensary Foundation
- output
- Dispensary Foundation
- implementation status
- Ongoing
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,581,000
Pedo Dispensary
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Fitting
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,004,892
Nyabola Dispensary
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Newest
- total cost
- Ksh 1,850,000
- estimate
- Ksh 2,362,137
Katito Youth Polytechnic
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,850,000
- estimate
- Ksh 1,350,000
Chiefs Camp
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Chief's Camp
- output
- Chief?S Camp
- implementation status
- not known
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Rangul Community Development Centre
- location
-
Rangul
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Community Centre
- output
- Community Centre
- implementation status
- Complete
- total cost
- Ksh 1,660,000
- estimate
- Ksh 1,748,378
Camp-Upper Nyakach Do
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction Of Offices
- output
- Offices
- implementation status
- Foundation Level
- total cost
- Ksh 1,600,000
- estimate
- Ksh 3,500,000
Sangoro Secondary School
- location
-
Thurtiboro
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Laboratory
- output
- Labaratory
- implementation status
- Foundation Level
- total cost
- Ksh 1,503,737
- estimate
- Ksh 150,373,775
Oboch Community Centre
- location
-
Oboch
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Community Centre
- output
- Community Centre
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Nyabola Mixed Secondary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 100,000
Nyabola Sec
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Admin. Block
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,350,000
Nyadina Primary School
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction 4 Classrooms And Staffroom
- output
- Classrooms To Serve 435 Students
- implementation status
- Complete
- total cost
- Ksh 1,305,810
- estimate
- Ksh 705,000
Water Pond S
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Water
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,202,700
Nnyakach Chiefs Camp
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Chief's Camp
- output
- Chief?S Camp
- implementation status
- Newest
- total cost
- Ksh 1,300,000
- estimate
- Ksh 300,000
Olembo Community Water Project
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Water
- output
- Water
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,000,000
St. Patrick Obange Primary School
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction -4 Classrooms
- output
- Classrooms To Serve 552 Students
- implementation status
- Finishing To Completed
- total cost
- Ksh 1,086,190
- estimate
- Ksh 580,000
Gul Maembe Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,060,000
- estimate
- Ksh 820,000
M&E
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 1,055,867
- estimate
- Ksh 0
Lisana Primary School
- location
-
Asao
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of 4 Classrooms
- output
- Classrooms
- implementation status
- Yet To Start
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kogola Girls Secondary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Tuition Block
- output
- -
- implementation status
- Yet To Start
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Sigoti Health Centre
- location
-
Sigoti
(in Nyakach)
- year first funded
- 2007
- action
- Contruction
- output
- Ward
- implementation status
- Slab Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Ng'Adi & Ato Yieng'O Box Culvets Projects
- location
-
Rangul
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of 2 Concrete And Steel Reinforced Box Culverts On Ng'Adi & Ato Yieng'O Streams
- output
- Bridges
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Sango Buru Primary School
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 975,000
- estimate
- Ksh 775,000
Anding'o Opanga Maternity
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Maternity Ward
- output
- Maternity Ward
- implementation status
- Painting
- total cost
- Ksh 910,000
- estimate
- Ksh 810,000
Orobi Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Fitting
- total cost
- Ksh 910,000
- estimate
- Ksh 510,000
Asao Chiefs Office-
- location
-
Asao
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Offices And Other Offices For Locational Hods
- output
- Offices
- implementation status
- Yet To Start
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Achego Youth Polytechnic
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 890,000
- estimate
- Ksh 890,000
Siany Secondary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Plastering
- total cost
- Ksh 850,000
- estimate
- Ksh 450,000
Kangombe Water
- location
-
Rangul
(in Nyakach)
- year first funded
- 2005
- action
- Water Project
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 300,000
St. Hilarius Nyabondo Mixed
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 835,000
- estimate
- Ksh 535,000
Kobeto Primary School
- location
-
Asao
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 830,000
- estimate
- Ksh 630,000
Konditi Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 822,000
- estimate
- Ksh 25,000
Nyongonga Secondary School
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Plastering
- total cost
- Ksh 803,510
- estimate
- Ksh 703,510
Kandaria Secondary School
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Plastering
- total cost
- Ksh 770,000
- estimate
- Ksh 570,000
Nyakwere Dispensary
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Dispensary
- output
- -
- implementation status
- Yet To Start
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Ndori Secondary School
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Roofing
- total cost
- Ksh 750,000
- estimate
- Ksh 400,000
Kagwel Primary School
- location
-
Asao
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 730,000
- estimate
- Ksh 430,000
Ragen Secondary School
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Pap Onditi Water Point
- location
-
Pap Onditi
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Water
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
St. Marys Nyamarimba Girls Sec
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Oboch Dispensary
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Painting To Finish
- total cost
- Ksh 690,000
- estimate
- Ksh 490,000
Kanyalwal Primary School
- location
-
Ragul
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 683,400
- estimate
- Ksh 483,400
Jimo Water Project
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Water Project
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 680,000
- estimate
- Ksh 680,000
Keyo Nyadundo Primary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Plastering
- total cost
- Ksh 675,000
- estimate
- Ksh 225,000
Nyamarumbe Primary School
- location
-
Ragul
(in Nyakach)
- year first funded
- 2004
- action
- Construction of 8 Classrooms
- output
- 8 Classrooms To Serve 267 Students
- implementation status
- Lintel Level
- total cost
- Ksh 650,000
- estimate
- Ksh 450,000
Olembo Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 645,555
- estimate
- Ksh 445,555
Rakwaro Secondary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 640,000
- estimate
- Ksh 340,000
Rariera Kokech Primary School
- location
-
Asao
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 630,000
- estimate
- Ksh 130,000
Kandaria Water Project
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Water
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 400,000
Lisana Secondary School
- location
-
Asao
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 350,000
St Antony Secondary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 100,000
Pap-Onditi Police Station
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2008
- action
- Construction OcsS Office And Wiring Of Police Residential Houses
- output
- Offices And Wiring
- implementation status
- Yet To Start
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Asao Footbridge Project
- location
-
Rangul
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Concrete And Steel Reinforced Footbidge On Lower Asao Rriverl
- output
- Footbridge
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Nyangonga Primary School
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 300,000
Miruka Primary School
- location
-
North Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of 3 Classes
- output
- 3 Classes
- implementation status
- Finishing
- total cost
- Ksh 590,000
- estimate
- Ksh 390,000
Ngomo Primary School
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 576,667
- estimate
- Ksh 376,667
Michura Primary School
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 575,000
- estimate
- Ksh 275,000
Bishop Okumu Secondary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Electrification
- output
- Lighting Of Classrooms
- implementation status
- Complete
- total cost
- Ksh 570,000
- estimate
- Ksh 170,000
Bur Kamach Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 310,000
Urudi Secondary School
- location
-
Rangul
(in Nyakach)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2Classrooms
- implementation status
- Lintel Level
- total cost
- Ksh 550,000
- estimate
- Ksh 350,000
Nyaksure Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 545,555
- estimate
- Ksh 345,555
Bwaja Primary School
- location
-
North Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 540,000
- estimate
- Ksh 340,000
Urudi Primary School
- location
-
Rangul
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 533,300
- estimate
- Ksh 183,300
Kanyateng Primary School
- location
-
Asao
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 530,000
- estimate
- Ksh 330,000
Nduga Primary School
- location
-
Asao
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 530,000
- estimate
- Ksh 230,000
Kasao Primary School
- location
-
Rangul
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 250,000
Mbugura Primary School
- location
-
Thurtiboro
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Nyabondo Boys
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2007
- action
- Purchase Generator
- output
- Generator
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyakach Girls Secondary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2008
- action
- Roofing Of Dining Hall
- output
- dining Hall
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Pap-Onditi Chiefs Office
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Offices And Other Offices For Locational Hods
- output
- Offices
- implementation status
- Yet To Start
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kabuya Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 490,000
- estimate
- Ksh 240,000
Nyalunya Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Windows To Complete
- total cost
- Ksh 475,000
- estimate
- Ksh 225,000
Miriu Daraja
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Bridges
- output
- Bridges
- implementation status
- Stalled
- total cost
- Ksh 470,000
- estimate
- Ksh 235,000
Ragen A Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 470,000
- estimate
- Ksh 70,000
Ogeko Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 310,000
Ochwado Primary School
- location
-
North Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 440,000
- estimate
- Ksh 240,000
Wasare Primary School
- location
-
Rangul
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 433,300
- estimate
- Ksh 183,300
Rae Mixed Primary School
- location
-
North Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 410,000
- estimate
- Ksh 410,000
ThuRoadibuoro Primary School
- location
-
Thurtiboro
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Rakwaro Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 360,000
Omwango Primary School
- location
-
Thurtiboro
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Nyamanyinya Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Kokungu Primary School
- location
-
North Eastnyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- -
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Konditi Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2008
- action
- Plastering Of Four Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Rangul Crush Pen
- location
-
Rangul
(in Nyakach)
- year first funded
- 2008
- action
- Construction of 4 Crush- Pens
- output
- 4 Crush- Pens
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nyamarimba Maternity
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Maternity Ward
- output
- Maternity Ward
- implementation status
- Complete
- total cost
- Ksh 360,000
- estimate
- Ksh 360,000
Othith Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Lower Nyakach Divisional H/Q
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2008
- action
- Wiring Of Administrative Police Houses.
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Bodi Mixed Secondary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 340,000
- estimate
- Ksh 340,000
Obwon Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Innis Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kagwel Primary School Scool
- location
-
Asao
(in Nyakach)
- year first funded
- 2008
- action
- Plastering Of 3 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ochwado Primary School
- location
-
North
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Olwalo Primary School
- location
-
Central
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sigoti Primary School
- location
-
East
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lisana Primary School
- location
-
Asawo
(in Nyakach)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Painting
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Oboch Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Wenwa Primary School
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Lintel Level
- total cost
- Ksh 300,000
- estimate
- Ksh 150,000
Bolo Girls Secondary School
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2008
- action
- Plastering Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Moro Secondary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
St. Charles Lwanga Ndori
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Central Nyakach Water Project
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Water
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamichura Water Project
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Water Project
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Upper Nyalunya Water Project
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Water
- output
- Water
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Siany Primary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 295,000
- estimate
- Ksh 95,000
Chiefs Office
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Chief's Camp
- output
- Chief?S Camp
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 200,000
Nyakach Girls
- location
-
Oboch
(in Nyakach)
- year first funded
- 2007
- action
- Built Water Tank
- output
- -
- implementation status
- not known
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Bishop Ngala Sec
- location
-
Oboch
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Otho Abwao Primary School
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Olembo Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2008
- action
- Roofing Of 3 Classrooms
- output
- Classrooms
- implementation status
- Not Yet Started
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mbugra Primary School
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kusa Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kawili Primary School
- location
-
Central
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Akado Primary School
- location
-
East
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kabuya Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Anding'o Olasi Primary School
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kamtudi Primary School
- location
-
Thurdibuoro
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kandiege Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 245,555
- estimate
- Ksh 45,555
Ngege Primary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 212,500
- estimate
- Ksh 112,500
Obuora Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 210,000
- estimate
- Ksh 10,000
Pedo Primary School
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Doors And Windows Fitting Plastering
- total cost
- Ksh 210,000
- estimate
- Ksh 160,000
Pap-Onditi Police
- location
-
Pap Onditi
(in Nyakach)
- year first funded
- 2006
- action
- Construction Of Police Post
- output
- Police Post
- implementation status
- Not Started
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Bishop Okumu Sec
- location
-
Oboch
(in Nyakach)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Olwalo Primary School
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ngope Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 250,000
Kamtudi Primary School
- location
-
Thurtiboro
(in Nyakach)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyaksure Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2008
- action
- Roofing Of Classroom And Administration Block
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kodum Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2008
- action
- Plastering Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Pap Lisana Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Fencing & Construction
- output
- 3 Clasess & Fences For 453 Pupils
- implementation status
- On Going
- total cost
- Ksh 195,555
- estimate
- Ksh 295,555
Onyuogo R Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Foundation
- total cost
- Ksh 195,555
- estimate
- Ksh 195,555
Tulu Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Constructin
- output
- Classrooms
- implementation status
- Lintel Level
- total cost
- Ksh 175,000
- estimate
- Ksh 25,000
Bur Kamwana Primary School
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of 8 Classrooms
- output
- 8 Classrooms
- implementation status
- Finishing
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Olwa Primary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Magunga Primary School
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 155,000
- estimate
- Ksh 155,000
Anding'o Ulasi Primary School
- location
-
Thurtiboro
(in Nyakach)
- year first funded
- 2006
- action
- Construction of 7 Classes
- output
- 7 Classes
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kabete Primary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 250,000
Nyalwalo Primary School
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of 2 Class Rooms
- output
- 2 Class Rooms
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Miriu Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2008
- action
- Rennovation Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kowire Primary School
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 140,000
- estimate
- Ksh 290,000
Nyabola Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 135,000
- estimate
- Ksh 35,000
Ochol Primary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Wiring Of Classes
- output
- Lighting Of School
- implementation status
- Complete
- total cost
- Ksh 112,500
- estimate
- Ksh 212,500
Kogola Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyadina Secondary School
- location
-
West Nyakach
(in Nyakach)
- year first funded
- 2006
- action
- Construction of 2 Classes
- output
- 2 Classes
- implementation status
- Floor Finishing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Magunga Secondary School
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 85,000
- estimate
- Ksh 55,000
Dirubi Mixed Secondary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Kawili Primary School
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 60,000
- estimate
- Ksh 210,000
Odhong Primary School
- location
-
South Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 60,000
Regen MPrimary School
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ogilo Komulo Primary School
- location
-
Central Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
St. Peters Kogola Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 45,555
- estimate
- Ksh 45,555
Kodum Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 45,555
- estimate
- Ksh 45,555
Moro Primary School
- location
-
PapOnditi
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 45,555
- estimate
- Ksh 45,555
Bugo Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Obugi Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Thurgem Secondary School
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kusa Primary School
- location
-
Nyalunya
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Achi-Ngure Primary School
- location
-
South West Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 50,000
Pawtenge Primary School
- location
-
North East Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Akado Primary School
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 25,000
- estimate
- Ksh 25,000
Oremo Primary School
- location
-
North Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Rae Girls Secondary School
- location
-
North Nyakach
(in Nyakach)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Rae Primary School
- location
-
Asawo
(in Nyakach)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Miriu Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Nyalnganya Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Oboch Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Othith Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Ramula Odowa Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Sigoti Primary School
- location
-
East Nyakach
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Kajimbo Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Chachi Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Apoko Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Anis Education Centre
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Nyakach Mixed Primary School
- location
-
Oboch
(in Nyakach)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 10,000
- estimate
- Ksh 10,000
Nyamarimba Primary School
- location
-
South West Nyakach
(in Nyakach)
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 50,000
Bungu Mary Primary School
- location
-
South West Nyakach
(in Nyakach)
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 50,000
Barkawarinda Primary School
- location
-
South West Nyakach
(in Nyakach)
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 50,000
Anding'o Bware Primary School
- location
-
South West Nyakach
(in Nyakach)
- action
- Rehabilitation
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 50,000
Odino Water Project
- location
-
South West Nyakach
(in Nyakach)
- action
- Water Project
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 0
- estimate
- Ksh 400,000