The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Nyang`Ande Health Centre
- location
-
Kawino
(in Nyando)
- year first funded
- 2003
- action
- Construction of Dispensary Block & 2 Staff Houses
- output
- Out-Patient Block & 2 Staff Houses
- implementation status
- Complete & In Use
- total cost
- Ksh 5,150,000
- estimate
- Ksh 5,000,000
Arombo Secondary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2008
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 5,000,000
- estimate
- Ksh 2,000,000
Nyakongo Dispensary
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2003
- action
- Construction of Maternity Block & 2 Staff Houses
- output
- Maternity Ward & 2 Staff Houses
- implementation status
- Complete
- total cost
- Ksh 4,660,000
- estimate
- Ksh 4,000,000
Konim Secondary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2004
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- Complete & In Use
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Olasi Dispensary
- location
-
East Kano
(in Nyando)
- year first funded
- 2003
- action
- Construction of Dispensary Block & 2 Staff Houses
- output
- Out-Patient Block & 2 Staff Houses
- implementation status
- Complete & In Use
- total cost
- Ksh 3,850,000
- estimate
- Ksh 4,100,000
Okanja Secondary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- Complete & In Use
- total cost
- Ksh 3,800,000
- estimate
- Ksh 3,750,000
Pala Secondary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 3,750,000
- estimate
- Ksh 4,500,000
Nyakakana Secondary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2004
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- Complete & In Use
- total cost
- Ksh 3,700,000
- estimate
- Ksh 3,650,000
Wanga`Nga Secondary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 3,550,000
- estimate
- Ksh 0
Apondo Secondary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 3,425,000
- estimate
- Ksh 4,500,000
Karanda Secondary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 3,350,000
- estimate
- Ksh 4,600,000
St. Camulus Ogwedhi Secondary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2006
- action
- Laboratory & 2 Classrooms
- output
- Construction Of Laboratory & 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 3,325,000
- estimate
- Ksh 0
Oren Secondary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2004
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- Complete & In Use
- total cost
- Ksh 3,320,000
- estimate
- Ksh 3,270,000
Ayucha Secondary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2004
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- Complete & In Use
- total cost
- Ksh 3,200,000
- estimate
- Ksh 3,200,000
Holo Orucho Water Project
- location
-
East Kano
(in Nyando)
- year first funded
- 2005
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- On-Going
- total cost
- Ksh 3,000,000
- estimate
- Ksh 0
Rabuor Health Centre
- location
-
Kochieng
(in Nyando)
- year first funded
- 2004
- action
- Construction Of Maternity Ward
- output
- Maternity Ward
- implementation status
- On-Going
- total cost
- Ksh 2,850,000
- estimate
- Ksh 2,850,000
Kowuor Primary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- Complete & In Use
- total cost
- Ksh 2,825,000
- estimate
- Ksh 2,825,000
Masogo Dispensary
- location
-
Kombura
(in Nyando)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Out-Patient Block
- implementation status
- Complete & In Use
- total cost
- Ksh 2,725,000
- estimate
- Ksh 2,225,000
East Kano Location Chief's Camp
- location
-
East Kano
(in Nyando)
- year first funded
- 2004
- action
- Construction Of Chiefs Office And Social Hall
- output
- Chiefs Offices & Social Hall
- implementation status
- Complete & In Use
- total cost
- Ksh 2,550,000
- estimate
- Ksh 0
Arombo Access Road
- location
-
Kawino
(in Nyando)
- year first funded
- 2005
- action
- Construction Of Access Road To The School
- output
- Access Road To Arombo Sec School
- implementation status
- On-Going
- total cost
- Ksh 2,550,000
- estimate
- Ksh 0
Kobura Girls Secondary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 4 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 2,408,000
- estimate
- Ksh 4,200,000
Kanyagwal Health Centre
- location
-
Kanyagwal
(in Nyando)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Out-Patient Block
- implementation status
- Complete & In Use
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Bunde Health Centre
- location
-
Kakola
(in Nyando)
- year first funded
- 2003
- action
- Construction Of Maternity Ward
- output
- Maternity Ward
- implementation status
- On-Going
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,750,000
Katolo Mixed Secondary School
- location
-
East Kano
(in Nyando)
- year first funded
- 2008
- action
- Construction of 6 Classrooms
- output
- 6 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 2,050,000
- estimate
- Ksh 6,000,000
Ahero Girls Secondary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2008
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Kodete-Wangneno Road
- location
-
East Kano
(in Nyando)
- year first funded
- 2008
- action
- Grading Of Road
- output
- Graded Road
- implementation status
- not known
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Migingo Secondary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2004
- action
- Construction of Admin & Tuition Block
- output
- Admin & Tuition Block
- implementation status
- Complete & In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 1,200,000
Rabuor Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Holo Dispensary
- location
-
East Kano
(in Nyando)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Out-Patient Block
- implementation status
- Complete But Not In Use
- total cost
- Ksh 1,925,000
- estimate
- Ksh 1,925,000
Nyamware Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,913,501
- estimate
- Ksh 0
Onjiko Secondary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2006
- action
- Murraming Of The Access Road To The School
- output
- Road
- implementation status
- Complete & In Use
- total cost
- Ksh 1,900,000
- estimate
- Ksh 0
Ombaka Secondary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (4) Classrooms & Admin. Block
- output
- 5 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 1,900,000
- estimate
- Ksh 3,800,000
Bunde Secondary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2005
- action
- Construction Of Administration Block
- output
- Administration Block
- implementation status
- Complete & In Use
- total cost
- Ksh 1,850,000
- estimate
- Ksh 1,800,000
Ahero Sub Distrct Hospital
- location
-
Kakola
(in Nyando)
- year first funded
- 2007
- action
- Construction Of Theatre
- output
- Theatre
- implementation status
- On-Going
- total cost
- Ksh 1,850,000
- estimate
- Ksh 11,000,000
Kochogo Secondary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2005
- action
- Construction of Laboratory & 2 Classrooms
- output
- Laboratory & 2Classrooms
- implementation status
- Lab Complete & In Use. Classroms On-Going
- total cost
- Ksh 1,845,000
- estimate
- Ksh 795,000
Withur Water Project
- location
-
Bwanda
(in Nyando)
- year first funded
- 2003
- action
- Rehabilitation & Reticulation Of Water
- output
- Piped Water To The Community
- implementation status
- Stalled
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Rabuor Water Project
- location
-
Kochieng
(in Nyando)
- year first funded
- 2006
- action
- Reticulation Of Water
- output
- Piped Water To The Community
- implementation status
- Complete & In Use
- total cost
- Ksh 1,665,000
- estimate
- Ksh 1,165,000
Nduru Secondary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2008
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,800,000
Kogwedhi Primary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2004
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,550,000
- estimate
- Ksh 0
Alendu Ayweyo Water
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2005
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
West Kano Kadhiambo Out Growers Rice Schooleme
- location
-
Kawino
(in Nyando)
- year first funded
- 2007
- action
- Rehabilitation Of Irrigation Scheme
- output
- Rehabilitated Water Canals
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Awasi Water Project
- location
-
Awasi
(in Nyando)
- year first funded
- 2005
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- On-Going
- total cost
- Ksh 1,450,000
- estimate
- Ksh 0
Alendu Secondary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (2) Classrooms Block
- output
- 2 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,400,000
Disi Primary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Lela Primary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2008
- action
- Construction Of (3) Classrooms
- output
- 3 Classroom
- implementation status
- Complete & In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Kolal Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Obugi Primary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (3) Classrooms & Fecing
- output
- 3 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,375,000
- estimate
- Ksh 0
Mao Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
St. Christopher Ayweyo Secondary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2004
- action
- Construction of 2 Classroom Block
- output
- 2 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,350,000
Bungu Koraga Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (5) Classrooms
- output
- 5 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 0
Kamunda Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Osino Primary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- Complete But Not In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Boya Water Project
- location
-
Onjiko
(in Nyando)
- year first funded
- 2006
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- Complete & In Use
- total cost
- Ksh 1,265,000
- estimate
- Ksh 1,500,000
Ojere Primary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (6) Classrooms
- output
- 6 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,250,000
- estimate
- Ksh 0
Kokwoyo Water Project
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2003
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- Stalled
- total cost
- Ksh 1,220,000
- estimate
- Ksh 0
Alendu Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Onongno Primary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (3) Classrooms & Pit Latrines
- output
- 4 Classrooms & Pit Latrines
- implementation status
- On-Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Odienya Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (2) Classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 0
Withur Primary School
- location
-
Bwanda
(in Nyando)
- year first funded
- 2008
- action
- Construction Of Pit Latrines & 2 Classrooms
- output
- Pit Latrines Lassrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Mbega Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (8) Classrooms
- output
- 8 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Nyomwaro Primary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2004
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Dispensary In Onjiko Location
- location
-
Onjiko
(in Nyando)
- year first funded
- 2007
- action
- Out-Patient Block
- output
- Out-Patient Block
- implementation status
- Stalled
- total cost
- Ksh 1,093,681
- estimate
- Ksh 1,093,681
Otieno Oyoo Secondary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2009
- action
- Purchase Of School Bus
- output
- School Bus
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Traders Sheds At Ahero Market
- location
-
Kakola
(in Nyando)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Nyalenda Water Project
- location
-
Onjiko
(in Nyando)
- year first funded
- 2005
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kolunga Water Project
- location
-
Onjiko
(in Nyando)
- year first funded
- 2005
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Angoro Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (2) Skeleton Classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kokwoyo Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 995,291
- estimate
- Ksh 0
Ojienda Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2005
- action
- Completion Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Onera Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2006
- action
- Completion Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Ugwe Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Onjiko Kobongo Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 920,000
- estimate
- Ksh 0
Boya Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Bunde Primary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kibarwa Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Siany Kabonyo Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2008
- action
- Construction Of (2) Classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kombura Chiefs Camp
- location
-
Kombura
(in Nyando)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- Chiefs Office
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kamita Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Reru Primary School
- location
-
Bwanda
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 825,000
- estimate
- Ksh 0
Masune Ayweyo Rice Schooleme
- location
-
Onjiko
(in Nyando)
- year first funded
- 2007
- action
- Rehabilitation Of Irrigation Scheme
- output
- Rehabilitated Water Canals
- implementation status
- Complete & In Use
- total cost
- Ksh 820,000
- estimate
- Ksh 0
Nyachoda Irrigation Schooleme
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2007
- action
- Rehabilitation Of Irrigation Scheme
- output
- Rehabilitated Water Canals
- implementation status
- On-Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kakola/Tura Irrig Schooleme
- location
-
Kakola
(in Nyando)
- year first funded
- 2007
- action
- Rehabilitation Of Irrigation Scheme
- output
- Rehabilitated Water Canals
- implementation status
- Stalled
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kadete Primary School
- location
-
Bwanda
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 2 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 775,000
- estimate
- Ksh 0
Nyalenda Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2006
- action
- Construction of Administration Block
- output
- Administration Block
- implementation status
- Complete & In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Ogenya Primary School
- location
-
Bwanda
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Bondo Kachola Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Awach Irrigation Schooleme
- location
-
East Kano
(in Nyando)
- year first funded
- 2007
- action
- Rehabilitation Of Irrigation Scheme
- output
- Rehabilitated Water Canals
- implementation status
- On-Going
- total cost
- Ksh 722,676
- estimate
- Ksh 0
Nyang`Ande Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Completion Of (2) Classrooms Block
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 708,000
- estimate
- Ksh 0
Sare Primary School
- location
-
East Kano
(in Nyando)
- year first funded
- 2009
- action
- Plastering Of 8 Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kanyangoro Primary School
- location
-
East Kano
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Wanganga Bridge
- location
-
Awasi
(in Nyando)
- year first funded
- 2007
- action
- Construction of Bridge On Nyaitho Stream
- output
- Bridge
- implementation status
- Complete & In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Karombe Primary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 675,000
- estimate
- Ksh 0
Kasangany Primary School
- location
-
Bwanda
(in Nyando)
- year first funded
- 2005
- action
- Construction of 2 Classrooms & Admin Block
- output
- 2 Classrooms & Admin Block
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Korwana Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Nyamurundu Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Achego Primary School
- location
-
(in Nyando)
- year first funded
- 2009
- action
- Construction Of (1) Classrooms
- output
- One Classroom
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Wanga`Nga Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Rongo Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2008
- action
- Construction Of Pit Latrine
- output
- Pit Latrine
- implementation status
- Complete & In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Onjiko Primary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2006
- action
- Completion Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 575,000
- estimate
- Ksh 0
Kandaria Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Miguye Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Bonde Kakoko Primary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 525,000
- estimate
- Ksh 0
Nyarombe Primary School
- location
-
East Kano
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Nyakakana Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2009
- action
- Construction Of (1) Classroom
- output
- 1 Classroom
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Korowe Primary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kochieng Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2009
- action
- Construction Of (1) Classroom
- output
- 1 Classroom
- implementation status
- Complete & In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kawino Water Project
- location
-
Kawino
(in Nyando)
- year first funded
- 2009
- action
- Distribution Of Water To The Sorrounding Homes
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
East Kochieng Water Project
- location
-
Kochieng
(in Nyando)
- year first funded
- 2008
- action
- Distribution Of Water To The Sorrounding Homes
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Alendu Water Project
- location
-
Kochieng
(in Nyando)
- year first funded
- 2008
- action
- Distribution Of Water To The Sorrounding Homes
- output
- Piped Water To The Community
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ombaka Primary School
- location
-
Bwanda
(in Nyando)
- year first funded
- 2009
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Nyakongo Primary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 475,000
- estimate
- Ksh 0
Okiro Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 470,000
- estimate
- Ksh 0
Akwanya Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2005
- action
- Reconstruction Of Damaged Classrooms
- output
- Rehabilitated Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 460,000
- estimate
- Ksh 460,000
Kochogo Chiefs Camp
- location
-
Kochogo
(in Nyando)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- Chiefs Office
- implementation status
- Stalled
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Luora Ayweyo Primary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2009
- action
- Construction Of (1) Classroom
- output
- 1 Classroom
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kobura Primary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2005
- action
- Construction Of (2) Classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Yogo Primary School
- location
-
East Kano
(in Nyando)
- year first funded
- 2006
- action
- Reconstruction Of Damaged Classrooms
- output
- Rehabilitated Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kagimba Primary School
- location
-
Kochogo
(in Nyando)
- year first funded
- 2008
- action
- Construction Of Pit Latrines & Plastering Of 8 Classrooms
- output
- Pit Latrine
- implementation status
- Complete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kasuna Primary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2008
- action
- Construction Of Pit Latrine And Finishing Of Three Classrooms
- output
- Pit Latrine And Three Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ranjira Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (4) Classrooms
- output
- 4 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Oren Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2008
- action
- Construction Of (1) Classroom
- output
- 1 Classroom
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Okana Primary School
- location
-
Kochieng
(in Nyando)
- year first funded
- 2008
- action
- Completion Of (1) Classroom
- output
- 1 Classroom
- implementation status
- On-Going
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ahero Teachers Education Resource Centre
- location
-
Kakola
(in Nyando)
- year first funded
- 2006
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Ahero Town Council
- location
-
Kakola
(in Nyando)
- year first funded
- 2006
- action
- Construction Of Jua Kali Shades
- output
- Jua Kali Shades
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kamita Secondary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2007
- action
- Construction Of 5 Classrooms & Admin. Block
- output
- 5 Classrooms & Admin. Block
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 4,500,000
Awasi Secondary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2006
- action
- Completion Of (2) Classroom Block
- output
- 2 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Apondo Primary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Bwanda Chief's Camp
- location
-
Bwanda
(in Nyando)
- year first funded
- 2006
- action
- Construction Of Chiefs Office
- output
- Chiefs Office
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Miringo Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2006
- action
- Reconstruction Of Damaged Classrooms
- output
- Rehabilitated Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kolunga Primary School
- location
-
Onjiko
(in Nyando)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Administration Block
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Holo Orucho Primary School
- location
-
East Kano
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
St. Annes Ahero Primary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2005
- action
- Construction Of Library
- output
- Library
- implementation status
- Complete & In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Waradho Primary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2008
- action
- Construction Of 7 Classrooms And Admin Block
- output
- 7 Classrooms And Administration Block
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nyamasao Primary School
- location
-
Kakola
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ogwedhi Primary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2007
- action
- Construction Of (2) Classrooms
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
West Kochieng Location
- location
-
Kochieng
(in Nyando)
- year first funded
- 2005
- action
- Construction Of Chiefs Office
- output
- Chiefs Office
- implementation status
- On-Going
- total cost
- Ksh 280,000
- estimate
- Ksh 0
Nduru Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Completion Of (2) Classrooms Block
- output
- 2 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 207,000
- estimate
- Ksh 0
Nyachoda Primary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2008
- action
- Constructio Of (1) Classrooms
- output
- 1 Classroom
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Arombo Primary School
- location
-
Kawino
(in Nyando)
- year first funded
- 2006
- action
- Construction Of Pit Latrine
- output
- Pit Latrine
- implementation status
- Complete & In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ahero Youth Polytechnic
- location
-
Onjiko
(in Nyando)
- year first funded
- 2006
- action
- Rehabilitation Of Classrooms
- output
- Rehabilitated Classrooms
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Lela Secondary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2008
- action
- Electrical Wiring
- output
- Electricity
- implementation status
- Complete & In Use
- total cost
- Ksh 120,000
- estimate
- Ksh 0
Masogo Primary School
- location
-
Kombura
(in Nyando)
- year first funded
- 2006
- action
- Construction Of (3) Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Olasi Primary School
- location
-
East Kano
(in Nyando)
- year first funded
- 2008
- action
- Construction Of Pit Latrine
- output
- Pit Latrine
- implementation status
- Complete & In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nyamware North Assistant Chief's Office
- location
-
Kochieng
(in Nyando)
- year first funded
- 2008
- action
- Construction Of Ass. Chief'S Office
- output
- Ass. Chief'S Office
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Nyando Do's Office
- location
-
Kakola
(in Nyando)
- year first funded
- 2005
- action
- Electrical Wiring
- output
- Electricity
- implementation status
- Complete & In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Ayucha Primary School
- location
-
Awasi
(in Nyando)
- year first funded
- 2008
- action
- Construction Of Pit Latrine
- output
- Pit Latrine
- implementation status
- Complete & In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kowuor Secondary School
- location
-
Wawidhi
(in Nyando)
- year first funded
- 2007
- action
- Construction Of 6 Classrooms & Admin. Block
- output
- 6 Classrooms & Admin. Block
- implementation status
- On-Going
- total cost
- Ksh 58,000
- estimate
- Ksh 4,500,000
Nyamware Beach
- location
-
Kochieng
(in Nyando)
- year first funded
- 2008
- action
- Electrical Wiring
- output
- Electricity
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nduru Beach
- location
-
Kawino
(in Nyando)
- year first funded
- 2008
- action
- Electrical Wiring
- output
- Electricity
- implementation status
- On-Going
- total cost
- Ksh 50,000
- estimate
- Ksh 0