The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Bursary
- location
-
Nyaribari Masaba
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Bursary
- output
- Assist Needy Students
- implementation status
- Bursary Issued
- total cost
- Ksh 23,695,995
- estimate
- Ksh 15,827,995
Nyamasibi Health Centre/Nyasike
- location
-
Masaba North
(in Nyaribari Masaba)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- In-Complete But In Use
- total cost
- Ksh 6,306,534
- estimate
- Ksh 5,306,534
Geteri Dispensary
- location
-
Gesusu
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- In-Complete But In Use
- total cost
- Ksh 4,006,100
- estimate
- Ksh 2,006,100
Moreremi Polytechnic
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Electrification Sutrvey
- output
- Lighting Of Polytechnic
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 1,200,000
Moreremi Youth Polytechnic
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 4,000,000
- estimate
- Ksh 8,000,000
Ibacho Health Centre
- location
-
Central
(in Nyaribari Masaba)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- In-Complete But In Use
- total cost
- Ksh 3,190,920
- estimate
- Ksh 1,190,920
Masimba Cdf Office
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,500,000
Nyamagesa Dispensary
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On-Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 3,500,000
Sasati-Moreremi Road
- location
-
Masabo N
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Openning
- output
- Opened Feeder Roads
- implementation status
- Complete And In Use
- total cost
- Ksh 1,900,000
- estimate
- Ksh 400,000
Mogweko Dispensary
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of Stored Block
- output
- Stored Block
- implementation status
- On-Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 6,000,000
Sosera Health Centre
- location
-
Ikorongo
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Rehabilitation
- output
- Dispensary
- implementation status
- In-Complete But In Use
- total cost
- Ksh 1,008,700
- estimate
- Ksh 6,000,000
Nyandusi Youth Polytechnic
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Incomplete But In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,500,000
Kiamirega Resource Centre
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of 5 Classrooms
- output
- 5 Classrooms
- implementation status
- Incomplete But In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Nyasike Health Centre
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of Maternity Wing
- output
- Maternity Wing
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 5,000,000
Ekware Secondary School
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Riatirimba Sda Girls
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 4,500,000
Ibacho Do Office
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Construction of Office Block
- output
- Office Block
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,500,000
Getare Girls Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Construction of 4 Classtooms
- output
- 4 Classtooms
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 8,000,000
Getare Pag Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Construction of 3 Classtooms
- output
- 3 Classtooms
- implementation status
- On-Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Ramasha Dispensary
- location
-
Ramasha
(in Nyaribari Masaba)
- year first funded
- 2003
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- In-Complete But In Use
- total cost
- Ksh 972,480
- estimate
- Ksh 572,480
Kiamokama-Masabo Road
- location
-
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Improved Accesibility
- implementation status
- Complete And In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
Gekonge Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Nyamagesa Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 3 Classtooms
- output
- 3 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Masimba- Chibwobi Road
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of Feeder Roads
- output
- Improved Accesibility
- implementation status
- Complete And In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Gesicho Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 637,000
- estimate
- Ksh 637,000
Ibacho Stadium
- location
-
Nyaribari Central
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Improved Sports
- implementation status
- Complete And In Use
- total cost
- Ksh 635,000
- estimate
- Ksh 635,000
Science Equip For Secondary School
- location
-
Nyaribari Masaba
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Supply Of Equipment
- output
- 37 Secondary Schools
- implementation status
- Computer Issued.
- total cost
- Ksh 555,000
- estimate
- Ksh 555,000
Gisembe/Goti Nyango
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of Feeder Roads
- output
- Opened Feeder Roads
- implementation status
- Complete And In Use
- total cost
- Ksh 514,100
- estimate
- Ksh 514,100
Gesusu Dispensary
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Purchase
- output
- Vehecle
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 5,000,000
Riuri Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyamoiseke Muya Primary School
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Nyamagesa Boarding Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gesicho Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 4 Classtooms
- output
- 4 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
St. James Ichuni Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 440,000
- estimate
- Ksh 440,000
Rianyoka /Giesembe
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of Feeder Roads
- output
- Opened Feeder Roads
- implementation status
- Complete And In Use
- total cost
- Ksh 422,000
- estimate
- Ksh 422,000
Rianyoka/Ekerubo Murram
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of Feeder Roads
- output
- Opened Feeder Roads
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Obwari Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Krk Junction/Itangi Road
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Improved Accesibility
- implementation status
- Complete And In Use
- total cost
- Ksh 374,400
- estimate
- Ksh 374,400
Chitago Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Riasena/Kerubo Road
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Improved Accesibility
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kenyoro Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Emeroka Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ichuni Boys Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Macheachumbi Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Mokorogonwa Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ichuni Girls Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mogweko Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyambosi Youth Polytechnic
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyanturago Secondary School
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Keroka Resouse Centre
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2008
- action
- Rehabilitation
- output
- Roofing Block
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,500,000
Itangi Tree Nursery
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of Tree Seedlings
- output
- Tree Seedlings
- implementation status
- Stalled
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Riakiana/Riasomba
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of Feeder Roads
- output
- Opened Feeder Roads
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Moreremi Tree Nursery
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of Tree Seedlings
- output
- Tree Seedlings
- implementation status
- On-Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Rianyoka Mosoito Road
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of Feeder Roads
- output
- Opened Feeder Roads
- implementation status
- Complete And In Use
- total cost
- Ksh 229,400
- estimate
- Ksh 229,400
Keroka Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ichuni Girlls Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Father Oucho Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Giesembe Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyambogo Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyamagesa Cog Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiamirega Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kiago Bridge Multipurpose Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2005
- action
- Rehabilitation
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Mogweko Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Rehabilitation
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 137,000
- estimate
- Ksh 137,000
Amasege Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Riabikutu Secondary School
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Mogweko Tea Buying Centre
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Chitago Secondary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Amabuko Secondary School Comps
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2004
- action
- Supply Of Computers
- output
- 5 Computers
- implementation status
- Computer Issued
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Amasege Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Getare Tea Buying Centre
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Re-Roofing
- output
- Tbc
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Riamakanda Primary School
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of 2 Classtooms
- output
- 2 Classtooms
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyamasibi Tbc
- location
-
Masaba N
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Re-Roofing
- output
- Tbc
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nyamagesa Tbc
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Re-Roofing
- output
- Tbc
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Moreremi Tbc
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2009
- action
- Re-Roofing
- output
- Tbc
- implementation status
- On-Going
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Riatoto Tea Bc
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Construction of Centres
- output
- Shelterd Collection Centres
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Rianyangau Tea Bc
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Shelterd Collection Centres
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Rakiona Tea Buying Centre
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2007
- action
- Rehabilitation
- output
- Shelterd Collection Centres
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Amasege Sda Church
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Ekerubo Sda Church
- location
-
Nyamagesa
(in Nyaribari Masaba)
- year first funded
- 2006
- action
- Electrification
- output
- Lighting Of Schools
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000