The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Nyatike

Kibuon Secondary School

location
North Kadem (in Nyatike)
year first funded
2008
action
Construction of 4 Classroom
output
4 Classroom
implementation status
Complete
total cost
Ksh 5,000,000
estimate
Ksh 0

Tito Bridge Tanganyika Road

location
South East Muhuru (in Nyatike)
year first funded
2005
action
Construction Of Road
output
Roads
implementation status
Complete
total cost
Ksh 4,109,167
estimate
Ksh 3,709,167

Sota Wich Omuga

location
West Kadem (in Nyatike)
year first funded
2006
action
Construction of dam
output
Water
implementation status
On Going
total cost
Ksh 3,059,153
estimate
Ksh 700,000

Kibuon Dam

location
North Kadem (in Nyatike)
year first funded
2008
action
Construction of dam
output
Water
implementation status
Complete
total cost
Ksh 2,900,000
estimate
Ksh 0

St. Monica Bondo Kosiemo Secondary School

location
East Karungu (in Nyatike)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
Complete Pending Eqipment
total cost
Ksh 2,550,000
estimate
Ksh 1,000,000

Diruma Primary School

location
North Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 2,500,000
estimate
Ksh 2,400,000

Otati Dam

location
Central Karungu (in Nyatike)
year first funded
2006
action
Construction of dam
output
Water
implementation status
New
total cost
Ksh 2,200,000
estimate
Ksh 700,000

Dak Lango Dam

location
East Kadem (in Nyatike)
year first funded
2006
action
Construction of dam
output
Water
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 700,000

Omuk Ogada Dam

location
East Kadem (in Nyatike)
year first funded
2006
action
Construction of dam
output
Water
implementation status
Ongoing
total cost
Ksh 2,200,000
estimate
Ksh 700,000

Ageng'A Secondary School

location
Central Kadem (in Nyatike)
year first funded
2004
action
Construction
output
Not Stated
implementation status
Complete
total cost
Ksh 2,100,000
estimate
Ksh 1,600,000

Sagama Dam

location
Central Kadem (in Nyatike)
year first funded
2005
action
Construction of dam
output
Water
implementation status
On Going
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Sagenya Dam

location
Kaler (in Nyatike)
year first funded
2004
action
Construction of dam
output
Water
implementation status
Complete
total cost
Ksh 1,938,760
estimate
Ksh 1,938,760

Moi Nyatike Secondary School

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of Admin. Block
output
Admin. Block
implementation status
Complete
total cost
Ksh 1,800,000
estimate
Ksh 900,000

Nyandago Primary School

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Winjo Dispensary

location
East Muhuru (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,650,000
estimate
Ksh 1,300,000

Macalder Youth Polytechnic

location
South East Kadem (in Nyatike)
year first funded
2005
action
Not Stated
output
Not Stated
implementation status
On Going
total cost
Ksh 1,600,000
estimate
Ksh 1,200,000

Mariba Water Pan

location
South Kadem (in Nyatike)
year first funded
2003
action
Water Supply
output
Water
implementation status
Complete
total cost
Ksh 1,509,535
estimate
Ksh 1,509,535

Ndiwa Dispensary

location
North East Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Roofed Pending Finish.
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Muhuru Divisional Headquarters

location
Central Muhuru (in Nyatike)
year first funded
2004
action
Cosntruction
output
D. O.'S Office & Residential
implementation status
Complete &Functional
total cost
Ksh 1,500,000
estimate
Ksh 1,300,000

Nyangere Secondary School

location
West Kadem (in Nyatike)
year first funded
2004
action
Construction of Admin. Block
output
Admin. Block
implementation status
Complete &Functional
total cost
Ksh 1,500,000
estimate
Ksh 1,200,000

St. Joseph Modi Secondary School

location
Central Kadem (in Nyatike)
year first funded
2004
action
Construction of Admin. Block
output
Admin. Block
implementation status
Super Structure Complete
total cost
Ksh 1,450,000
estimate
Ksh 900,000

Okenge Secondary School

location
North East Kadem (in Nyatike)
year first funded
2004
action
Construction of Laboratory
output
Laboratory
implementation status
Roofed
total cost
Ksh 1,450,000
estimate
Ksh 1,200,000

Rabwao Secondary School

location
Central Muhuru (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 900,000

Diruma Dispensary

location
North Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 600,000

Bande Girls Secondary School

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 900,000

Kanga Onditi Mixed Secondary School

location
Kaler (in Nyatike)
year first funded
2004
action
Construction of Domitory
output
Domitory
implementation status
Plastering Stage.
total cost
Ksh 1,400,000
estimate
Ksh 1,000,000

Lwanda Magwar Secondary School

location
South East Karungu (in Nyatike)
year first funded
2004
action
Construction of Twin Staff House and Dining Hall
output
1.Twin Staff House 2.Dining Hall
implementation status
Phase 1 Complete Phase 2 At Foundation
total cost
Ksh 1,400,000
estimate
Ksh 900,000

Munyu Primary School

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of 2 Classrooms 1 Admin Block 2 Units Pit Latrine
output
2 Classrooms 1 Admin Block 2 Units Pit Latrine
implementation status
Phase 1 And 2 Complete Phase 3 Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 500,000

Majengo Wgwater Project

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction
output
Water
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 1,000,000

Otati Community Dispensary Project

location
Central Karungu (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 1,100,000

Kumoni Dispensary

location
West Muhuru (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Roofed Pending Finish.
total cost
Ksh 1,250,000
estimate
Ksh 900,000

Aneko Dispensary

location
West Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 550,000

St. Joseph Gunga Secondary School

location
West Karungu (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 900,000

Olasi Dispensary

location
Kaler (in Nyatike)
year first funded
2004
action
Construction of Dispensary and Maternity Wing
output
1.Dispensary2.Maternity Wing
implementation status
Phase 1 Complete Phase 2 Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 800,000

Aringo Primary School

location
East Karungu (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 600,000

Bande Dam

location
East Kadem (in Nyatike)
year first funded
2006
action
Construction of dam
output
Water
implementation status
Complete
total cost
Ksh 1,077,535
estimate
Ksh 500,000

Rabwao Primary School

location
Central Muhuru (in Nyatike)
year first funded
2005
action
Rehabilitation And Construction
output
4 Classrooms
implementation status
Phase 1 Complete Phase 2 Ongoing
total cost
Ksh 1,050,000
estimate
Ksh 550,000

Got Kachola Dispensary

location
West Kadem (in Nyatike)
year first funded
2006
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 300,000

Sori Sub District Hospital

location
West Karungu (in Nyatike)
year first funded
2006
action
Construction of Twin Staff House
output
Twin Staff House
implementation status
Phase I Complete & Phase Ii Roofed
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Miroche Primary School

location
South Kadem (in Nyatike)
year first funded
2005
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Kombato Dispensary

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Complete , Pending Painting
total cost
Ksh 1,000,000
estimate
Ksh 700,000

Orango Primary School

location
North East Kadem (in Nyatike)
year first funded
2005
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Super Structure Complete
total cost
Ksh 1,000,000
estimate
Ksh 300,000

Kimae Secondary School

location
South Kadem (in Nyatike)
year first funded
2004
action
Construction
output
Not Stated
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Olando Secondary School

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 900,000

Odiyo Primary School

location
North East Kadem (in Nyatike)
year first funded
2004
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Super Structure Complete
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Ogongo Primary School

location
South East Kadem (in Nyatike)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 938,139
estimate
Ksh 200,000

Kaduro Primary School

location
West Karungu (in Nyatike)
year first funded
2003
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 900,000

Angugo Primary School

location
Central Kadem (in Nyatike)
year first funded
2003
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Obolo Primary School

location
East Muhuru (in Nyatike)
year first funded
2004
action
Construction 2 Rehabilitation 2
output
4 Classroom
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 500,000

Kituka Dispensary

location
Central Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Complete &Functional
total cost
Ksh 900,000
estimate
Ksh 700,000

Sota Rangenya Primary School

location
North Kadem (in Nyatike)
year first funded
2004
action
Construction of 2 Classroom
output
2 Classroom
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 700,000

Kopala Primary School

location
West Karungu (in Nyatike)
year first funded
2004
action
Construction of 2 Classroom
output
2 Classroom
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 500,000

Nyamache Primary School

location
Kaler (in Nyatike)
year first funded
2006
action
Rehabilitation And Construction
output
4 Classrooms
implementation status
Phase 1 Complete Phase 2 Ongoing
total cost
Ksh 850,000
estimate
Ksh 200,000

Riat Dispensary

location
East Karungu (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 600,000

Kea Primary School

location
Kaler (in Nyatike)
year first funded
2005
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Super Structure Complete
total cost
Ksh 800,000
estimate
Ksh 300,000

Nyangere Primary School

location
West Kadem (in Nyatike)
year first funded
2005
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Super Structure Complete
total cost
Ksh 800,000
estimate
Ksh 300,000

Tuk Primary School

location
North Kadem (in Nyatike)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 200,000

Kogore Primary School

location
East Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation And Construction
output
4 Classrooms
implementation status
Phase 1 Complete,Phase 2 On Going
total cost
Ksh 800,000
estimate
Ksh 200,000

Owiro Primary School

location
North Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 600,000

Magungu Primary School

location
North Kadem (in Nyatike)
year first funded
2004
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
2 Classrooms Complete & 2 Classrooms At Lintel.
total cost
Ksh 800,000
estimate
Ksh 400,000

Nyakurungoto Primary School

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 600,000

Olasi Primary School

location
Kaler (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 700,000

Obware Primary School

location
South Eastkarungu (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 700,000

Rabare Primary School

location
East Karungu (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 600,000

Ndemra Primary School

location
South Kadem (in Nyatike)
year first funded
2004
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Super Structure Complete
total cost
Ksh 753,312
estimate
Ksh 650,000

Wath Onger Primary School

location
South Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 750,000
estimate
Ksh 650,000

Nyangwayo Primary School

location
West Muhuru (in Nyatike)
year first funded
2005
action
Construction of 2 Classroom
output
2 Classroom
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 350,000

Wachara Primary School

location
West Karungu (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 750,000
estimate
Ksh 600,000

Sota Goglo Dam

location
Central Kadem (in Nyatike)
year first funded
2006
action
Construction of dam
output
Water
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

God Bim Primary School

location
East Karungu (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 500,000

Opeya Primary School

location
East Karungu (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 500,000

Lisori Primary School

location
South E Muhuru (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 500,000

Raga Primary School

location
Central Karungu (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

Amoyo Primary School

location
West Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

God Kwach Primary School

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

Got Orango Primary School

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

Nyatuoro Primary School

location
North Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

Kolanya Primary School

location
North East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

Pom Primary School

location
Central Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 600,000

Nyasoko Primary School

location
South East Karungu (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 500,000

Okayo Primary School

location
South East Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation And Construction
output
4 Classrooms
implementation status
Phase 1 Complete Phase 2 On Going
total cost
Ksh 700,000
estimate
Ksh 200,000

Sidika Primary School

location
Central Karungu (in Nyatike)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 200,000

Chamachichi Primary School

location
East Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation And Construction
output
4 Classrooms
implementation status
Phase 1 Complete Phase 2 On Going
total cost
Ksh 700,000
estimate
Ksh 200,000

Miriwi Primary School

location
West Kade (in Nyatike)
year first funded
2006
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 200,000

Othoch Rakuom Dispensary

location
West Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 600,000

Wath Onger Dispensary

location
South Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 700,000

Thim Lich Dispensary

location
North East Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 500,000

Ondingo Dam

location
North East Kadem (in Nyatike)
year first funded
2006
action
Construction of dam
output
Water
implementation status
New
total cost
Ksh 700,000
estimate
Ksh 700,000

Ongoche Primary School

location
South Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 550,000

Senye Primary School

location
Central Muhuru (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 550,000

Nyamanga Primary School

location
West Karungu (in Nyatike)
year first funded
2005
action
Construction of 4 Classrooms
output
4 Classrooms
implementation status
Roofed Pending Finishi.
total cost
Ksh 650,000
estimate
Ksh 450,000

Sota S Primary School

location
West Kadem (in Nyatike)
year first funded
2004
action
Construction of 4 Classroom
output
4 Classroom
implementation status
Complete
total cost
Ksh 650,000
estimate
Ksh 450,000

Ogaka Primary School

location
South Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 550,000

Orore Primary School

location
West Karungu (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Othora Primary School

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 500,000

Kayara Primary School

location
South East Karungu (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Nyakiringoto Community Devgroup Pharmacy

location
East Kadem (in Nyatike)
year first funded
2005
action
Construction of Dispensary
output
Dispensary
implementation status
Roofed Pending Finish
total cost
Ksh 600,000
estimate
Ksh 300,000

Kituka Primary School

location
Central Kadem (in Nyatike)
year first funded
2006
action
Construction of 2 Classroom
output
2 Classroom
implementation status
Super Structure Complete
total cost
Ksh 600,000
estimate
Ksh 200,000

Pawest Ndege Primary School

location
Central Kadem (in Nyatike)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Super Structure Complete
total cost
Ksh 600,000
estimate
Ksh 200,000

Tulu Primary School

location
West Kadem (in Nyatike)
year first funded
2004
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Plastering Stage.
total cost
Ksh 600,000
estimate
Ksh 500,000

Aonge Dhiang Primary School

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 450,000

Bande Dispensary

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 550,000

Wangaya Primary School

location
Central Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
1 Classroom
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 200,000

Nyamitha Primary School

location
Kaler (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 450,000

Goglo Primary School

location
Central Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 400,000

D.O. Office Nyatike

location
South East Kadem (in Nyatike)
year first funded
2008
action
Construction of dam
output
D.O.'S Office
implementation status
Complete &Functional
total cost
Ksh 500,000
estimate
Ksh 0

Namba Kodero Primary School

location
South Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ongoche Youth Polytechnc

location
South Kadem (in Nyatike)
year first funded
2008
action
Rehabilitation
output
Classrooms
implementation status
Complete &Functional
total cost
Ksh 500,000
estimate
Ksh 0

Aneko Secondary School

location
West Kadem (in Nyatike)
year first funded
2008
action
Contruction
output
2 Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Gunga Primary School

location
West Karungu (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 400,000

Bltezza Secondary School

location
West Karungu (in Nyatike)
year first funded
2006
action
Construction
output
Not Stated
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 300,000

Mangu Primary School

location
East Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation And Construction
output
4 Classroom
implementation status
Phase 1 Complette Phase 2 Ongoing
total cost
Ksh 500,000
estimate
Ksh 200,000

Sagenya Primary School

location
Kaler (in Nyatike)
year first funded
2006
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Super Structure Complete
total cost
Ksh 500,000
estimate
Ksh 200,000

Ibencho Primary School

location
South East Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation And Construction
output
4 Classrooms
implementation status
Phase1 Complete,Phase 2 Ongoing
total cost
Ksh 500,000
estimate
Ksh 100,000

Got Kachola Primary School

location
West Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 400,000

Winjo Primary School

location
East Muhuru (in Nyatike)
year first funded
2005
action
Construction of 2 Classroom
output
2 Classroom
implementation status
Super Structure Complete
total cost
Ksh 500,000
estimate
Ksh 200,000

Onger Primary School

location
Central Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 400,000

Kabuto Primary School

location
Central Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 200,000

Kumoni Primary School

location
West Muhuru (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 350,000

Mikei Primary School

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Namba Koder Communit Power Project

location
South Kadem (in Nyatike)
year first funded
2006
action
Power Installation
output
Improve Security
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Akala Primary School

location
Central Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Macalder Primary School

location
South Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Obalwanda Primary School

location
South Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Aneko Primary School

location
West Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Othoch Rakuom Primary School

location
West Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Otati Primary School

location
Central Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Got Keyo Primary School

location
Central Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Not Primary School

location
Central Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Lwanda Magwar Primary School

location
South East Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Agolo Muok Primary School

location
West Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Sori Primary School

location
West Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Sere Primary School

location
Central Kadem (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 300,000

Kikongo Primary School

location
North Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Kowuor Primary School

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 400,000

Nyandago Primary School

location
East Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 400,000

Bande Primary School

location
East Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 200,000

Muhuru Health Centre

location
Central Karungu (in Nyatike)
year first funded
2004
action
Construction of Health Centre
output
Health Centre
implementation status
Complete
total cost
Ksh 380,000
estimate
Ksh 300,000

Kipingi Dispensary

location
South East Karungu (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Dispensary
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 200,000

Thim Lich Primary School

location
North East Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 200,000

Koweru Primary School

location
East Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 200,000

Radienya Primary School

location
South East Kadem (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Modi Primary School

location
Central Kadem (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 200,000

Nyora Primary School

location
Central Kadem (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Lwala Rabuor Primary School

location
Central Kadem (in Nyatike)
year first funded
2004
action
Construction of Classroom
output
Classroom
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Chamachichi Water Project

location
East Kadem (in Nyatike)
year first funded
2005
action
Construction
output
Water
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 300,000

Radienya Commproject Dispensary

location
South East Kadem (in Nyatike)
year first funded
2004
action
Construction of Dispensary
output
Dispensary
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Ratienyi Cattle Dip

location
West Kadem (in Nyatike)
year first funded
2005
action
Rehabilitation Of Cattle Dips
output
Improve On Livestock Health
implementation status
On Going
total cost
Ksh 290,000
estimate
Ksh 290,000

Nyankondo Secondary School

location
South East Muhuru (in Nyatike)
year first funded
2008
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Lintel Stage
total cost
Ksh 250,000
estimate
Ksh 0

Okenge Secondary School

location
North East Kadem (in Nyatike)
year first funded
2008
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Roofed Pending Finish.
total cost
Ksh 250,000
estimate
Ksh 0

Senye Secondary School

location
Central Muhuru (in Nyatike)
year first funded
2008
action
Construction of 2 Classrooms
output
2 Classrooms
implementation status
Roofed Pending Finish.
total cost
Ksh 250,000
estimate
Ksh 0

Ratieny Primary School

location
West Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 100,000

Lwanda Magwar Secondary School

location
South East Karungu (in Nyatike)
year first funded
2008
action
Construction of Multipurpose Dining Hall
output
Multipurpose Din. Hall
implementation status
At Foundation
total cost
Ksh 200,000
estimate
Ksh 900,000

Mariba Primary School

location
South Kadem (in Nyatike)
year first funded
2006
action
Rehabilitation
output
Classroom
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 100,000

Tagache Cattle Dip

location
West Muhuru (in Nyatike)
year first funded
2005
action
Rehabilitation Of Cattle Dips
output
Improve On Livestock Health
implementation status
On Going
total cost
Ksh 190,000
estimate
Ksh 190,000

Kiranda Cattle Dip

location
West Karungu (in Nyatike)
year first funded
2005
action
Rehabilitation Of Cattle Dips
output
Improve On Livestock Health
implementation status
Complete
total cost
Ksh 190,000
estimate
Ksh 190,000

Bala Cattle Dip

location
Central Kadem (in Nyatike)
year first funded
2005
action
Rehabilitation Of Cattle Dips
output
Improve On Livestock Health
implementation status
On Going
total cost
Ksh 190,000
estimate
Ksh 190,000

Yago Community Dispensary

location
East Kadem (in Nyatike)
year first funded
2005
action
Renovation
output
Dispensary
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 150,000

Miroche Cattledip

location
South Kadem (in Nyatike)
year first funded
2005
action
Rehabilitation Of Cattle Dips
output
Improve On Livestock Health
implementation status
On Going
total cost
Ksh 140,000
estimate
Ksh 140,000

Kaduro Water Project

location
West Karungu (in Nyatike)
year first funded
2005
action
Water Supply
output
Water
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Ap Line Nyatike Division

location
South East Kadem (in Nyatike)
year first funded
2006
action
n/a
output
Improve Security
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Bondo Kosiemo Primary School water Project

location
East Karungu (in Nyatike)
year first funded
2005
action
Rehabilitation
output
Classroom
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Osiri Primary School

location
South East Kadem (in Nyatike)
year first funded
2005
action
Construction of Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000