The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Marua Dispensary
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction
- output
- Reduce Prevalence Of Diseases
- implementation status
- Complete And In Use
- total cost
- Ksh 3,480,000
- estimate
- Ksh 0
Kinunga Wangi Irrigation
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2008
- action
- n/a
- output
- Provide Safe Water
- implementation status
- New,
- total cost
- Ksh 3,171,901
- estimate
- Ksh 0
Kamuyu Dispensary
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction
- output
- Improve Health Standards
- implementation status
- OnGoing
- total cost
- Ksh 3,150,000
- estimate
- Ksh 0
Kirichu Open Air Market
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction
- output
- Improve On Market Yard
- implementation status
- OnGoing
- total cost
- Ksh 3,150,000
- estimate
- Ksh 0
Karia Dispensary
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Reduce Prevalence Of Diseases
- implementation status
- OnGoing
- total cost
- Ksh 2,600,000
- estimate
- Ksh 0
Gitathi-Ini Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Improve Access Ability
- implementation status
- Complete And In Use
- total cost
- Ksh 2,540,000
- estimate
- Ksh 0
Muruguru Dispensary
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Contruction,Purchase Of Equipment, Electrification
- output
- Reduce Prevalence Of Diseases
- implementation status
- OnGoing
- total cost
- Ksh 2,351,413
- estimate
- Ksh 0
Gachika Secondary School
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Domitory
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 2,270,580
- estimate
- Ksh 0
Kihatha Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of D/Hall
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 2,200,000
- estimate
- Ksh 0
Nyaribo Primary School
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of 5 Classroom
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 2,130,000
- estimate
- Ksh 0
Marua Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2007
- action
- Construction Of Classroom & Administration Block
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Nyamachaki Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of Adm Block & Toilets
- output
- Improve Education Standards
- implementation status
- Complete And In Use Construction Of Classroom Ongoing
- total cost
- Ksh 1,985,650
- estimate
- Ksh 0
Kamakwa Police Post
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction
- output
- Beef Up Security
- implementation status
- Complete And In Use
- total cost
- Ksh 1,955,438
- estimate
- Ksh 0
Ihwa Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Laboratory
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 1,900,000
- estimate
- Ksh 0
Ereri Kirumia Water Project
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2006
- action
- Purchase Of Pipes & Construction Of Tank
- output
- Provide Safe Water
- implementation status
- Ongoing
- total cost
- Ksh 1,750,000
- estimate
- Ksh 0
Gatitu Police Post
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction
- output
- Beef Up Security
- implementation status
- 1St Phase Complete And In Use Building Officers House Ongoing
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
IhigaIni Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation Of Classrooms,Rehabilitation Of Drainage System And Construction Of Water Breaker Walls & Diversion Channel.
- output
- Improve Education Standards
- implementation status
- Renovation Complete And In Use. On Going
- total cost
- Ksh 1,550,000
- estimate
- Ksh 0
King'Ong'O Police Post
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 1,550,000
- estimate
- Ksh 0
Mathari Ass Chiefs Office
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2008
- action
- Construction
- output
- Improve Internal Security
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Nyaribo Ass Chiefs Office
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2008
- action
- Construction
- output
- Improve Internal Security
- implementation status
- OnGoing And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Muruguru Chiefs Office
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2008
- action
- Construction
- output
- Improve Internal Security
- implementation status
- OnGoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kiganjo Chiefs Office
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2007
- action
- Construction
- output
- Improve Internal Security
- implementation status
- OnGoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kihatha Ass Chiefs Office
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2008
- action
- Construction
- output
- Improve Internal Security
- implementation status
- OnGoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Kahiga Dispensary
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction
- output
- Reduce Prevalence Of Diseases
- implementation status
- Ongoing But
- total cost
- Ksh 1,495,000
- estimate
- Ksh 0
Muringato Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- School Transfer
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 1,167,150
- estimate
- Ksh 0
King'Ong'O Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of Adm Block & Toilets,Purchase Of Office Furniture, Installation Of Grill Doors And Windows
- output
- Improve Education Standards
- implementation status
- Construction Of Adm Block & Toilets-Complete And In Use,Purchase Of Office Furniture, Installation Of Grill Doors And Windows New
- total cost
- Ksh 1,065,640
- estimate
- Ksh 0
Muthua-Ini Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of D/Hall
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 1,060,000
- estimate
- Ksh 0
Rware Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction Of Library
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kahiga Secondary School
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction Of Adm Block
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mtkenya Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Renovation Of Classrooms/Admin Block
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 978,453
- estimate
- Ksh 0
Ihwa Water Project
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Construction Of Intake
- output
- Provide Safe Water
- implementation status
- OnGoing
- total cost
- Ksh 942,975
- estimate
- Ksh 0
Riamukurwe Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Construction Of Toilets
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Kihuyo/Njengu Bridge
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction
- output
- Improve Access Ability
- implementation status
- Complete And In Use
- total cost
- Ksh 867,000
- estimate
- Ksh 0
Kanoga Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Renovation And Veranda Construction
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Githiru Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Renovation Of Classrooms & Computer Lab
- output
- Improve Education Standards
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Mathari Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Adm Block
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kirichu Primary School
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kiambuiri Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Kihuyo Dispensary
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction Of Laboratory
- output
- Improve Health Standards
- implementation status
- OnGoing
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Githwariga Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Classroom/Toilet Construction,Roofing 3 Classrooms
- output
- Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 740,000
- estimate
- Ksh 0
Ndurutu Primary School
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of Toilets
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 735,000
- estimate
- Ksh 0
Kwanderi Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 685,000
- estimate
- Ksh 0
Kihatha Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 661,000
- estimate
- Ksh 0
Tetu Boys Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Water Tank & Renovation
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Giakanja Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Water Intake
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Ihwa Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Giakanja Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 620,000
- estimate
- Ksh 0
Ithenguri Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 530,000
- estimate
- Ksh 0
Riamukurwe Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of Toilets
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 525,000
- estimate
- Ksh 0
Majengo Security Light
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Installation Of Spot Light
- output
- Beef Up Security
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Riamukurwe Home For The Aged
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction
- output
- Support The Aged
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiamuiru Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mairwe Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of A Classroom
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kirimara Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction Of Adm Block
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chorong 'I Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Toilets
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 460,000
- estimate
- Ksh 0
Njeng'U Nyaribo Water Project
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2005
- action
- Construction
- output
- Provide Safe Water
- implementation status
- Complete And Not In Use
- total cost
- Ksh 457,851
- estimate
- Ksh 0
Mwenji Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Toilets
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Mairwe Nursery School
- location
-
(in Nyeri Town)
- year first funded
- 2009
- action
- Construction Of Toilet Blocks Phase Ii
- output
- Improve Education Standards
- implementation status
- 90,000 from emergency for blown off roof classroom complete. New
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Nyaribo Secondary School
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2009
- action
- Construction Of A Classroom
- output
- Improve Education Standards
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 0
D Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Construction Of Gate/Renovtion Of Classrooms Construction Of Toilets 40Fts Deep
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kiganjo Primary School
- location
-
Kiganjo
(in Nyeri Town)
- year first funded
- 2004
- action
- Completion Of Adm Block
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ngangarithi Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kihuyo Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Electrification
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 376,425
- estimate
- Ksh 0
Tetu Girls Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction Of Headteacher'S House
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Stvincent Kiamuiru Secondary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2007
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Nyaribo Dispensary
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction Of Water Tank
- output
- Reduce Prevalence Of Diseases
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Thuguma Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 310,000
- estimate
- Ksh 0
Central Disabled
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Purchase Of Equipments
- output
- Support Disabled Group
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kamuyu Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Gitero Chiefs Office
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2008
- action
- Construction
- output
- Improve Internal Security
- implementation status
- OnGoing And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sign Post
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Fabrication
- output
- Project Identification
- implementation status
- OnGoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chorong'I Cattle Dip
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2009
- action
- Construction Of A Cattle Dip
- output
- -
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Thunguma Police Post
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Renovation & Electrification
- output
- Beef Up Security
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Riamukurwe Childrens Home
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Purchase Of Beddings
- output
- Support Disabled Group
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Chania Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Electrification
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Y.M.C.A
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Constrution Of Classrooms
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 0
D Muslim Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kandara Social Hall
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction
- output
- Provide Social Facilities
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kamwenja Teachers College
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Gitero Chiefs Camp
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Completion Of Adm Block
- output
- Beef Up Security
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Temple Road Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kairia Social Hall
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Construction Of Hall
- output
- For Social Events
- implementation status
- Stalled
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Huruma Children Home
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2004
- action
- Purchase Of Water Tank
- output
- Support Disabled Group
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Muruguru Water Project
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Construction Of Water Tank
- output
- Provide Safe Water
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Thunguma Nursery
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Renovation
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Kamuyu Bridge
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Construction
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 127,000
- estimate
- Ksh 0
Belwop Rescue
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Purchase Of Beddings
- output
- Support Disabled Group
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
GitathiIni Ass Chiefs Office
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction
- output
- Improve Internal Security
- implementation status
- Funds Reallocated
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Hill Farm Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Construction Of Adm Block
- output
- Improve Education Standards
- implementation status
- OnGoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Githiru/Thunguma Bridge
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2005
- action
- Renovation
- output
- Improve Accessibility
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
MuthuaIni Tea Centre
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2006
- action
- Collection Yard Construction
- output
- Improve On Agriculture
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Marua Primary School
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2003
- action
- Electrification
- output
- Improve Education Standards
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Municipal Chief's Office
- location
-
Mukaro
(in Nyeri Town)
- year first funded
- 2009
- action
- Aquisition Of Office Furniture
- output
- Improve Working Conditions
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0