The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Othaya

Othaya Social Hall

location
Iria Ini (in Othaya)
year first funded
2004
action
Flooring
output
Recreation
implementation status
On - Going
total cost
Ksh 16,347,286
estimate
Ksh 11,411,088

Witima Health Centre

location
Karima (in Othaya)
year first funded
2005
action
Flooring&Walling
output
Closer Services
implementation status
On - Going
total cost
Ksh 5,500,000
estimate
Ksh 2,700,000

Witima Police Station

location
Karima (in Othaya)
year first funded
2003
action
Flooring&Walling
output
Security
implementation status
On - Going
total cost
Ksh 4,100,000
estimate
Ksh 3,100,000

Munyange Police Station

location
Mahiga (in Othaya)
year first funded
2003
action
Flooring&Walling
output
Security
implementation status
On - Going
total cost
Ksh 3,550,000
estimate
Ksh 2,550,000

Munyange Dispensary

location
Mahiga (in Othaya)
year first funded
2005
action
Walling,Painting
output
Closer Services
implementation status
On - Going
total cost
Ksh 3,325,856
estimate
Ksh 1,807,658

Othaya Boys

location
Iria Ini (in Othaya)
year first funded
2004
action
Flooring
output
Quality Education
implementation status
On - Going
total cost
Ksh 3,270,000
estimate
Ksh 19,708,748

Mahiga Commcentre

location
Mahiga (in Othaya)
year first funded
2006
action
Foundation
output
Centres
implementation status
On - Going
total cost
Ksh 3,000,000
estimate
Ksh 9,560,140

Iria - Ini Commcentre

location
Iria Ini (in Othaya)
year first funded
2006
action
Walling
output
-
implementation status
On - Going
total cost
Ksh 2,900,000
estimate
Ksh 3,844,713

Mch/Refrigerators

location
(in Othaya)
year first funded
2007
action
n/a
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 2,417,992
estimate
Ksh 2,417,992

Thunguri Dispensary

location
Iria Ini (in Othaya)
year first funded
2005
action
Plastering&Walling
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 2,351,664
estimate
Ksh 1,388,793

Giathenge Ap's House

location
Karima (in Othaya)
year first funded
2005
action
Electrification
output
Closer Services
implementation status
Installation Yet To Be Done
total cost
Ksh 2,350,000
estimate
Ksh 2,501,170

Gichiche Health Centre

location
Chinga (in Othaya)
year first funded
2006
action
Walling
output
Closer Services
implementation status
On - Going
total cost
Ksh 2,285,000
estimate
Ksh 1,009,015

Mathenge Technical Inst

location
Mahiga (in Othaya)
year first funded
2004
action
Walling
output
Quality Education
implementation status
On - Going
total cost
Ksh 2,209,099
estimate
Ksh 9,210,580

Stkaruthi Secondary School

location
Chinga (in Othaya)
year first funded
2004
action
Flooring
output
Quality Education
implementation status
On - Going
total cost
Ksh 2,063,198
estimate
Ksh 1,818,725

Mucharage Dispensary

location
Chinga (in Othaya)
year first funded
2005
action
Flooring
output
Closer Services
implementation status
On - Going
total cost
Ksh 1,908,908
estimate
Ksh 1,462,207

Chinga South Chiefs Office

location
Chinga (in Othaya)
year first funded
2007
action
Walling & Painting
output
Closer Services
implementation status
On - Going
total cost
Ksh 1,880,000
estimate
Ksh 1,290,000

Chinga Police Station

location
Chinga (in Othaya)
year first funded
2003
action
Flooring
output
Security
implementation status
On - Going
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Gatugi Girls Secondary School

location
Karima (in Othaya)
year first funded
2007
action
Flooring
output
Quality Education
implementation status
On - Going
total cost
Ksh 1,759,099
estimate
Ksh 2,083,645

Kianganda Dispensary

location
Karima (in Othaya)
year first funded
2005
action
Flooring&Walling
output
Closer Services
implementation status
On - Going
total cost
Ksh 1,718,198
estimate
Ksh 806,820

Muirungi Secondary School

location
Chinga (in Othaya)
year first funded
2004
action
Plastering
output
Quality Education
implementation status
On - Going
total cost
Ksh 1,718,198
estimate
Ksh 1,970,423

Kariko Secondary School

location
Chinga (in Othaya)
year first funded
2006
action
Wiring
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 1,685,777
estimate
Ksh 3,295,587

Gikoe Polytechnic

location
Mahiga (in Othaya)
year first funded
2006
action
Flooring&Walling
output
Quality Education
implementation status
On - Going
total cost
Ksh 1,444,099
estimate
Ksh 2,453,352

Gikurwe Primary School

location
Iria Ini (in Othaya)
year first funded
2004
action
Foundation
output
Quality Education
implementation status
On - Going
total cost
Ksh 1,415,832
estimate
Ksh 7,693,780

Kairia Primary School

location
Karima (in Othaya)
year first funded
2003
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 1,393,829
estimate
Ksh 993,829

Kiahagu Secondary School

location
Iria Ini (in Othaya)
year first funded
2007
action
Wiring
output
Quality Education
implementation status
On - Going
total cost
Ksh 1,241,664
estimate
Ksh 3,064,467

Kairuthi Secondary School

location
Iria Ini (in Othaya)
year first funded
2006
action
Plastering
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 1,225,832
estimate
Ksh 3,295,587

Irindi Secondary School

location
Karima (in Othaya)
year first funded
2004
action
Piping
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 1,223,198
estimate
Ksh 3,295,587

Unjiru Youth Polytechnic

location
Karima (in Othaya)
year first funded
2004
action
Wiring
output
Quality Education
implementation status
Complete & In Use
total cost
Ksh 1,190,000
estimate
Ksh 2,501,170

Gakuyu Secondary School

location
Mahiga (in Othaya)
year first funded
2003
action
Flooring
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 1,172,928
estimate
Ksh 4,119,484

Kiamuya Dispensary

location
Chinga (in Othaya)
year first funded
2004
action
Walling&Roofing
output
Closer Services
implementation status
On - Going
total cost
Ksh 1,162,012
estimate
Ksh 734,913

Kiaguthu Police Post

location
Chinga (in Othaya)
year first funded
2005
action
Walling&Roofing
output
Security
implementation status
Complete&In Use
total cost
Ksh 1,150,099
estimate
Ksh 2,155,254

Kagumo Mixed Secondary School

location
Karima (in Othaya)
year first funded
2004
action
Flooring
output
Quality Education
implementation status
On - Going
total cost
Ksh 1,059,099
estimate
Ksh 4,023,999

Mahiga Girls

location
Mahiga (in Othaya)
year first funded
2004
action
Foundation
output
Quality Education
implementation status
On - Going
total cost
Ksh 1,050,000
estimate
Ksh 2,583,395

Karima Commdispensarye

location
Karima (in Othaya)
year first funded
2003
action
Flooring
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 1,048,198
estimate
Ksh 974,210

Kihuri Secondary School

location
Iria Ini (in Othaya)
year first funded
2005
action
Walling & Plastering
output
Quality Education
implementation status
On - Going
total cost
Ksh 995,832
estimate
Ksh 4,394,679

Ngaru Dispensary

location
Chinga (in Othaya)
year first funded
2003
action
Walling&Roofing
output
Closer Services
implementation status
On - Going
total cost
Ksh 980,000
estimate
Ksh 980,000

Kihuri Dispensary

location
Iria Ini (in Othaya)
year first funded
2005
action
Flooring&Walling
output
Closer Services
implementation status
On - Going
total cost
Ksh 970,000
estimate
Ksh 970,000

Chinga Commlibrary

location
Chinga (in Othaya)
year first funded
2004
action
Wiring
output
Closer Library
implementation status
Complete& In Use
total cost
Ksh 960,000
estimate
Ksh 960,000

Mumbu - Ini Primary School

location
Chinga (in Othaya)
year first funded
2006
action
Flooring
output
Quality Education
implementation status
On - Going
total cost
Ksh 959,099
estimate
Ksh 1,093,444

Gitundu Secondary School

location
Iria Ini (in Othaya)
year first funded
2008
action
Flooring
output
Quality Education
implementation status
On - Going
total cost
Ksh 951,664
estimate
Ksh 0

Gichiche/Kagongo Poly

location
Chinga (in Othaya)
year first funded
2004
action
Flooring&Walling
output
Quality Education
implementation status
Complete & Not Use
total cost
Ksh 924,200
estimate
Ksh 924,200

Kirai Primary School

location
Mahiga (in Othaya)
year first funded
2004
action
Classroom Renovation
output
Quality Education
implementation status
On - Going
total cost
Ksh 909,099
estimate
Ksh 1,896,430

Kiamuya Secondary School

location
Chinga (in Othaya)
year first funded
2007
action
Walling & Plastering
output
Quality Education
implementation status
On - Going
total cost
Ksh 882,000
estimate
Ksh 400,000

Kamoko Health Centre

location
Mahiga (in Othaya)
year first funded
2003
action
Equip Mch
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 870,000
estimate
Ksh 870,000

Gatugi Day Mixed

location
Karima (in Othaya)
year first funded
2003
action
Furniture
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 863,829
estimate
Ksh 863,829

Muna - Ini Primary School

location
Iria Ini (in Othaya)
year first funded
2004
action
Walling
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 840,000
estimate
Ksh 840,000

Gitundu Primary School

location
Iria Ini (in Othaya)
year first funded
2004
action
Toilets Contr.
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 830,000
estimate
Ksh 830,000

Ihuririo Dispensary

location
Iria Ini (in Othaya)
year first funded
2003
action
Equip Mch
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Munyange Secondary School

location
Mahiga (in Othaya)
year first funded
2004
action
Euip Laboratory
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Kagongo Assistant Chief's Off

location
Chinga (in Othaya)
year first funded
2006
action
Painting & Furniture
output
Closer Services
implementation status
Complete
total cost
Ksh 782,000
estimate
Ksh 782,816

Ruirie Nursery

location
Chinga (in Othaya)
year first funded
2007
action
Flooring
output
-
implementation status
On - Going
total cost
Ksh 776,678
estimate
Ksh 3,295,587

Kamoko Primary School

location
Mahiga (in Othaya)
year first funded
2004
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 759,099
estimate
Ksh 3,040,076

Kagere Dispensary

location
Mahiga (in Othaya)
year first funded
2003
action
Equip Mch
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 738,829
estimate
Ksh 738,829

Gitugi Dispensary

location
Mumwe (in Othaya)
year first funded
2003
action
Equip Mch
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 737,829
estimate
Ksh 2,501,170

Gatuya - Ini Primary School

location
Iria Ini (in Othaya)
year first funded
2004
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 720,000
estimate
Ksh 720,000

Kihugiru Primary School

location
Karima (in Othaya)
year first funded
2003
action
Drainage Construction
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 720,000
estimate
Ksh 720,000

Mutitu Primary School

location
Karima (in Othaya)
year first funded
2004
action
Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 708,829
estimate
Ksh 708,829

Gura Primary School

location
Karima (in Othaya)
year first funded
2004
action
Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 705,000
estimate
Ksh 3,295,587

Kiiri - Ini Primary School

location
Iria Ini (in Othaya)
year first funded
2005
action
Toilets Contr.
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 650,000
estimate
Ksh 650,000

Thuti Primary School

location
Karima (in Othaya)
year first funded
2003
action
Walling & Flooring
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 615,000
estimate
Ksh 615,000

Kenyatta Mahiga

location
Mahiga (in Othaya)
year first funded
2005
action
Desks
output
Quality Education
implementation status
On - Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Konyu Primary School

location
Iria Ini (in Othaya)
year first funded
2003
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Kariko Police Post

location
Chinga (in Othaya)
year first funded
2004
action
Plastering&Armoury
output
Security
implementation status
Complete&In Use
total cost
Ksh 596,111
estimate
Ksh 596,111

Irindi Primary School

location
Karima (in Othaya)
year first funded
2003
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 560,000
estimate
Ksh 560,000

Ihuririo Assistant Chief's Office

location
Iria Ini (in Othaya)
year first funded
2003
action
Plastering
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 550,000
estimate
Ksh 550,000

Thunguri Secondary School

location
Iria Ini (in Othaya)
year first funded
2003
action
Walling & Plastering
output
Quality Education
implementation status
On - Going
total cost
Ksh 530,000
estimate
Ksh 897,991

Gathumbi Polytechnic

location
Iria Ini (in Othaya)
year first funded
2006
action
Walling & Flooring
output
Quality Education
implementation status
On - Going
total cost
Ksh 500,000
estimate
Ksh 5,877,947

Gathumbi Secondary School

location
Iria Ini (in Othaya)
year first funded
2005
action
Flooring
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Witima Assoffice

location
Karima (in Othaya)
year first funded
2006
action
Wiring
output
Closer Services
implementation status
Complete & In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Kagicha Dispensary

location
Chinga (in Othaya)
year first funded
2006
action
Walling
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 467,579
estimate
Ksh 467,579

Ngaru Cattle Dip

location
Chinga (in Othaya)
year first funded
2007
action
Foundation
output
Increase Productivity
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 450,000

Karuthi Assistant Chief's Off

location
Chinga (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 444,421
estimate
Ksh 444,421

Gaturuturu Assichief's Off

location
Mahiga (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 436,000
estimate
Ksh 436,000

Muirungi Primary School

location
Chinga (in Othaya)
year first funded
2008
action
Classroom Renovation
output
Quality Education
implementation status
Starting
total cost
Ksh 410,000
estimate
Ksh 410,000

Mucharage Secondary School

location
Chinga (in Othaya)
year first funded
2006
action
Painting
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Gaturuturu Primary School

location
Mahiga (in Othaya)
year first funded
2006
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 383,829
estimate
Ksh 521,973

Kairuthi Assistant Chief's Office

location
Iria Ini (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 365,000
estimate
Ksh 365,000

Kiaguthu Primary School

location
Chinga (in Othaya)
year first funded
2006
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Kiinu Primary School

location
Chinga (in Othaya)
year first funded
2006
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Kiangumba Primary School

location
Chinga (in Othaya)
year first funded
2006
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Kairuthi Dispensary

location
Iria Ini (in Othaya)
year first funded
2005
action
Water Tank Construction
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 350,000
estimate
Ksh 350,000

Chinga Chiefs Off& Tiolets

location
Chinga (in Othaya)
year first funded
2005
action
Toilets
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 336,154
estimate
Ksh 336,154

Gituiga Primary School

location
Mahiga (in Othaya)
year first funded
2004
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 330,000
estimate
Ksh 330,000

Kagicha Cattle Dip

location
Chinga (in Othaya)
year first funded
2005
action
Foundation
output
Increase Productivity
implementation status
On-Going
total cost
Ksh 323,325
estimate
Ksh 323,325

Ugachiku Assoffice

location
Mahiga (in Othaya)
year first funded
2004
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 320,000
estimate
Ksh 320,000

Thunguri Primary School

location
Iria Ini (in Othaya)
year first funded
2004
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Mahiga Chief's Office

location
Mahiga (in Othaya)
year first funded
2003
action
Wiring
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Karima

location
Karima (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Gatugi Primary School

location
Karima (in Othaya)
year first funded
2006
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kiaguthu Secondary School

location
Chinga (in Othaya)
year first funded
2006
action
Plastering
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Chinga Boys Secondary School

location
Chinga (in Othaya)
year first funded
2007
action
Painting
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Kiaguthu Assistant Chief's Of

location
Chinga (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 297,579
estimate
Ksh 297,579

Karuthiru Bridge

location
Mahiga (in Othaya)
year first funded
2004
action
Calvert
output
Services
implementation status
Complete& In Use
total cost
Ksh 290,000
estimate
Ksh 290,000

Ihuririo Secondary School

location
Iria Ini (in Othaya)
year first funded
2004
action
Walling & Plastering
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 280,000
estimate
Ksh 280,000

Karima Primary School

location
Karima (in Othaya)
year first funded
2005
action
Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 280,000
estimate
Ksh 280,000

Iteme - Ini Assistant Chief's Office

location
Karima (in Othaya)
year first funded
2005
action
Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 280,000
estimate
Ksh 280,000

Kagongo Primary School

location
Chinga (in Othaya)
year first funded
2007
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 267,579
estimate
Ksh 267,579

Gatuya - Ini Cattle Dip

location
Iria Ini (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 260,000
estimate
Ksh 260,000

Mucharage Primary School

location
Chinga (in Othaya)
year first funded
2006
action
Wiring
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 250,000
estimate
Ksh 250,000

Kiaguthu Polytechnic

location
Chinga (in Othaya)
year first funded
2006
action
Sewing Machines
output
Quality Education
implementation status
Complete & In Use
total cost
Ksh 250,000
estimate
Ksh 860,270

Kiinu Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 233,999
estimate
Ksh 233,999

Thunguri Assistant Chief's Office

location
Iria Ini (in Othaya)
year first funded
2004
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 230,000
estimate
Ksh 230,000

Mumbu - Ini Assistant Chief's Of

location
Chinga (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 227,000
estimate
Ksh 227,000

Iria - Ini Chief's Office

location
Iria Ini (in Othaya)
year first funded
2003
action
Fencing
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 225,000
estimate
Ksh 225,000

Kiahagu Assistant Chief's Office

location
Iria Ini (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 220,000
estimate
Ksh 220,000

Gichami Primary School

location
Chinga (in Othaya)
year first funded
2006
action
Wiring
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 217,579
estimate
Ksh 217,579

Kihugiru/Kianganda Cdip

location
Karima (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 215,600
estimate
Ksh 215,600

Gatugi /Thuti

location
Karima (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 209,900
estimate
Ksh 209,900

Ruruguti Dispensary

location
Iria Ini (in Othaya)
year first funded
2004
action
Water Tank Ren.
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Stanely Mathenge Poly

location
Mahiga (in Othaya)
year first funded
2007
action
n/a
output
Quality Education
implementation status
On - Going
total cost
Ksh 200,000
estimate
Ksh 577,574

Kagere Primary School

location
Mahiga (in Othaya)
year first funded
2007
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Miiri - Ini Primary School

location
Mahiga (in Othaya)
year first funded
2007
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kariko Primary School

location
Chinga (in Othaya)
year first funded
2007
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Gichiche Primary School

location
Chinga (in Othaya)
year first funded
2007
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 200,000
estimate
Ksh 2,164,720

Mutitu Cattle Dip

location
Karima (in Othaya)
year first funded
2006
action
Renovation
output
Increase Productivity
implementation status
On-Going
total cost
Ksh 200,000
estimate
Ksh 200,000

Kihugiru Assistant Chief's Off

location
Karima (in Othaya)
year first funded
2003
action
Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Kagumo

location
Karima (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 198,670
estimate
Ksh 198,670

Gathanji Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 191,029
estimate
Ksh 191,029

Boma Nursery

location
Iria Ini (in Othaya)
year first funded
2006
action
Flooring
output
-
implementation status
Roofing Yet To Be Done
total cost
Ksh 190,000
estimate
Ksh 190,000

Mucharage Assichief's Off

location
Chinga (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 190,000
estimate
Ksh 190,000

Kihuri Primary School

location
Iria Ini (in Othaya)
year first funded
2003
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 185,000
estimate
Ksh 185,000

Gituiga/Gura Cattle Dip

location
Mahiga (in Othaya)
year first funded
2005
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 180,000
estimate
Ksh 180,000

Ngaru Primary School

location
Chinga (in Othaya)
year first funded
2007
action
Toilets Construction
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 167,579
estimate
Ksh 167,579

Kariko Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 163,999
estimate
Ksh 163,999

Ruirie Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 160,790
estimate
Ksh 160,790

Witima Cattle Dip

location
Karima (in Othaya)
year first funded
2004
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 160,000
estimate
Ksh 160,000

Muirungi Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 158,999
estimate
Ksh 158,999

Gathundia

location
Karima (in Othaya)
year first funded
2003
action
Fencing
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 155,000
estimate
Ksh 155,000

Kiyu Primary School

location
Karima (in Othaya)
year first funded
2006
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 153,829
estimate
Ksh 153,829

Kiandemi Ap Post

location
Iria Ini (in Othaya)
year first funded
2006
action
Wiring
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Gathanji Primary School

location
Chinga (in Othaya)
year first funded
2007
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Karuthi Primary School

location
Chinga (in Othaya)
year first funded
2007
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Njigari Primary School

location
Mahiga (in Othaya)
year first funded
2005
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 150,000
estimate
Ksh 150,000

Mucharage Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 146,000
estimate
Ksh 146,000

Munyange Cattle Dip

location
Mahiga (in Othaya)
year first funded
2004
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 145,000
estimate
Ksh 145,000

Mumbu - Ini Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 143,999
estimate
Ksh 143,999

Kihugiru Nursery

location
Karima (in Othaya)
year first funded
2006
action
Flooring
output
-
implementation status
Complete & In Use
total cost
Ksh 143,829
estimate
Ksh 143,829

Ruruguti

location
Iria Ini (in Othaya)
year first funded
2003
action
Fencing
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 140,000
estimate
Ksh 140,000

Kiamuya Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 137,360
estimate
Ksh 137,360

Njigari

location
Mahiga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 130,000
estimate
Ksh 130,000

Gathumbi

location
Iria Ini (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 128,000
estimate
Ksh 128,000

Huho - Ini Catle

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 124,560
estimate
Ksh 124,560

Mairo - Ini Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 110,540
estimate
Ksh 110,540

Kihuri

location
Iria Ini (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 106,000
estimate
Ksh 106,000

Mahiga Children's Home

location
Mahiga (in Othaya)
year first funded
2003
action
Tank Renovation
output
Safe Drinking Water
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Othaya Youth Polytech

location
Iria Ini (in Othaya)
year first funded
2003
action
Fencing
output
Quality Education
implementation status
Complete & In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Ihuririo Police Post

location
Iria Ini (in Othaya)
year first funded
2004
action
Painting
output
Security
implementation status
Complete&In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Gaturuturu Cattle Dip

location
Mahiga (in Othaya)
year first funded
2006
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kamoko Cattle Dip

location
Mahiga (in Othaya)
year first funded
2006
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Karima Chief's Office

location
Karima (in Othaya)
year first funded
2004
action
Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Karuthi Cattle Dip

location
Chinga (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 96,880
estimate
Ksh 96,880

Kagere Cattle Dip

location
Mahiga (in Othaya)
year first funded
2006
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 95,000
estimate
Ksh 95,000

Gathumbi Primary School

location
Iria Ini (in Othaya)
year first funded
2003
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Kabebero Cattle Dip

location
Iria Ini (in Othaya)
year first funded
2006
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 87,000
estimate
Ksh 87,000

Ruruguti Primary School

location
Iria Ini (in Othaya)
year first funded
2003
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 85,000
estimate
Ksh 85,000

Gitundu Cattle Dip

location
Iria Ini (in Othaya)
year first funded
2004
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 80,000
estimate
Ksh 80,000

Kabebero Commground

location
Iria Ini (in Othaya)
year first funded
2005
action
Leveling
output
Good Transport
implementation status
Complete& In Use
total cost
Ksh 70,000
estimate
Ksh 70,000

Karima Assistant Chief's Off

location
Karima (in Othaya)
year first funded
2003
action
Wiring
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 55,000
estimate
Ksh 55,000

Gathera Assistant Chief's Off

location
Chinga (in Othaya)
year first funded
2005
action
Wiring
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 51,550
estimate
Ksh 150,130

Burnt House

location
Karima (in Othaya)
year first funded
2006
action
Walling
output
Services
implementation status
Complete& In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Ihuririo Primary School

location
Iria Ini (in Othaya)
year first funded
2004
action
Classroom Renovation
output
Quality Education
implementation status
Complete&In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Kiandemi Assistant Chief's Office

location
Iria Ini (in Othaya)
year first funded
2003
action
Painting & Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 50,000
estimate
Ksh 100,000

Gitundu Assistant Chief's Office

location
Iria Ini (in Othaya)
year first funded
2003
action
Furniture
output
Closer Services
implementation status
Complete&In Use
total cost
Ksh 50,000
estimate
Ksh 50,000

Konyu

location
Iria Ini (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 30,000
estimate
Ksh 30,000

Kairuthi

location
Iria Ini (in Othaya)
year first funded
2003
action
Renovation
output
Increase Productivity
implementation status
Complete&In Use
total cost
Ksh 30,000
estimate
Ksh 30,000