The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Shauri Yako Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2003
- action
- Construction of A Storey School Block
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 5,500,000
- estimate
- Ksh 5,000,000
Kogwawi Bridge
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- On Going
- total cost
- Ksh 2,700,000
- estimate
- Ksh 5,000,000
Homa Bay Dicece
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2006
- action
- Construction of Tuition Block
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,700,000
- estimate
- Ksh 30,000,000
Ndiru Youth Polytechnic
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 6 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,679,995
- estimate
- Ksh 2,500,000
Rariewest Dispensary
- location
-
East Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Dispensary, & Staff House
- output
- Patient Support Center& Residence
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,500,000
Gongo Dispensary
- location
-
Gongo
(in Rangwe)
- year first funded
- 2003
- action
- Construction Of Support Center & Staff Quarters
- output
- Patient Support Center& Residence
- implementation status
- On Going
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,600,000
Nyangu Homabay Road
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2007
- action
- Murram 5 Km Road
- output
- Road
- implementation status
- Complee
- total cost
- Ksh 2,015,000
- estimate
- Ksh 1,500,000
Nyalienga Girls Sec
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2008
- action
- 4 Classes & Admn Blck
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,900,000
- estimate
- Ksh 3,000,000
West Kagan Chief's Office
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2005
- action
- Construction of An Office
- output
- Administration Office
- implementation status
- Complete And In Use
- total cost
- Ksh 1,900,000
- estimate
- Ksh 2,000,000
Electricity To Schools
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2004
- action
- Electricity Connection
- output
- Electricity
- implementation status
- not known
- total cost
- Ksh 1,842,800
- estimate
- Ksh 1,500,000
Ndiru-Maugo Road
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Opening & Maitenance
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Obambo Bridge
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2003
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,200,000
Ruga Mixed Secondary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,700,000
- estimate
- Ksh 17,500,000
Wi Obiero Secondary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,645,000
- estimate
- Ksh 1,800,000
Nyambare Omoche Bridge
- location
-
East Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,000,000
Randung Dispensary
- location
-
West Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction Of Dispensary, & Staff House
- output
- Patient Support Center& Residence
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 1,567,507
- estimate
- Ksh 1,500,000
Nyambori Dam
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Dam Excavation
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,561,185
- estimate
- Ksh 2,000,000
St Patricks Makongeni Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office And 1 Classroom
- output
- Classrooms And Office
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 1,550,000
- estimate
- Ksh 1,300,000
Aoch Muga Secondary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,510,000
- estimate
- Ksh 900,000
Maguti Mixed Secondary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classroom
- output
- Classrooms
- implementation status
- Coplete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,300,000
K'Atieno Youth Polytechnic
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 3/Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,497,787
- estimate
- Ksh 2,000,000
Marindi Girls Secondary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,500,000
Kuoyo Kochia Secondary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of Staff House And Install Water Tanks
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,500,000
Ludhe Dongo Secondary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2003
- action
- Construction of A Laboratory
- output
- Labaratory
- implementation status
- Complete And In Use
- total cost
- Ksh 1,400,000
- estimate
- Ksh 800,000
God Ponge Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms & Administration Office
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,600,000
West Gem Borehole
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 1,361,185
- estimate
- Ksh 150,000
East Kagan Chief's Office
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 1,350,000
- estimate
- Ksh 1,500,000
Rangwe Hospital
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2003
- action
- Constuction Of Wards(Patient Support Center)
- output
- Patient Support Center
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,600,000
Ndiru Dispensary
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2003
- action
- Construction Ofdispensary
- output
- Patient Support Center
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,500,000
Ngegu Dispensary
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2003
- action
- Construction Staff House And Electricity Supply
- output
- Residence & Electricity
- implementation status
- On Going
- total cost
- Ksh 1,270,000
- estimate
- Ksh 1,500,000
Rabango Secondary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of Office Block And Classrooms
- output
- Offices
- implementation status
- Complete & In Use
- total cost
- Ksh 1,250,000
- estimate
- Ksh 950,000
Achego Secondary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2003
- action
- Construction of Dormitory & Staff House
- output
- Dormitory & House
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,300,000
Wiga Dispensary
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Dispensary, & Staff House
- output
- Patient Support Center& Residence
- implementation status
- On Going But In Use
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,200,000
Obwanda Dispensary
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Patient Support Center
- implementation status
- On Going
- total cost
- Ksh 1,110,000
- estimate
- Ksh 1,600,000
Got Kochungo Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 800,000
Manga Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Ang'Iro Secondary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 4 Classrooms, Office, Laboratory
- output
- Classrooms, Lab & Office
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,050,000
Miniambo Dispensary
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Patient Support Center
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
Manga Dam
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Dam Excavation
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 1,093,460
- estimate
- Ksh 2,000,000
Oneno Dispensary
- location
-
Central Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Patient Support Center
- implementation status
- On Going
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,500,000
Obuya Dispensary
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Patient Support Center
- implementation status
- On Going
- total cost
- Ksh 1,029,990
- estimate
- Ksh 900,000
God Bondo Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- To Fence And Renovate Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Omoya-Sota-Got Kabok Road
- location
-
Central Kochia
(in Rangwe)
- year first funded
- 2009
- action
- Road Opening
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nduga Dispensary
- location
-
Gem West
(in Rangwe)
- year first funded
- 2009
- action
- Construction of Dispensary
- output
- Patient Support
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Kijawa Dispensary
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Patient Support Center
- implementation status
- On Going
- total cost
- Ksh 980,000
- estimate
- Ksh 1,600,000
Nyamasi Dispensary
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Dispensary, & Staff House
- output
- Patient Support Center& Residence
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 1,200,000
East Gem Chief's Office
- location
-
East Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of An Office
- output
- Administration Office
- implementation status
- Complete And In Use
- total cost
- Ksh 950,000
- estimate
- Ksh 1,000,000
Nyauu Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Class & Adm
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 700,000
Disii Secondary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2003
- action
- To Construct1 Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 1,000,000
Gogo Katuma Mixed Secondary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 950,000
- estimate
- Ksh 900,000
Otolo Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 2 Classrooms & Supply Desks
- output
- Classrooms &Desks
- implementation status
- On Going
- total cost
- Ksh 928,000
- estimate
- Ksh 900,000
Ogongo Katuma Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 950,000
East Kochia Chief's Office
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of An Office
- output
- Administration Office
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Nyaudho Dam
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Dam Excavation
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Omoche Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Gul Kagembe Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 7 Classrooms & Office
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 870,268
- estimate
- Ksh 1,500,000
Manyatta Chiefs Office
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2007
- action
- Office Construction
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 854,208
- estimate
- Ksh 850,000
Odienya Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- To Fence The School And Finishing Of Classes
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 750,000
Lala Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classrooms
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 450,000
Wiamen Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 800,000
Rabuor Ponge Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office & 1 Classroom
- output
- Classrooms & Office
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Obwanda Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms & Office
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 1,250,000
Kimanyi Primary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 6 Classrooms
- output
- Classrooms
- implementation status
- On Going But In Use
- total cost
- Ksh 828,000
- estimate
- Ksh 2,500,000
Luora-Kodhoch Road
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Gongo- Nyawita Dispensary
- location
-
Gongo
(in Rangwe)
- year first funded
- 2009
- action
- Construction of Dispensary
- output
- Patien Support
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 2,000,000
Olare Secondary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2003
- action
- Construction of Laboratory
- output
- Labaratory
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 950,000
Koyoo Secondary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- Admn Block
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 850,000
Nyabola Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2009
- action
- Construction of 3 Classes
- output
- 3 Classrooms
- implementation status
- Complete & In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Rangwe Do's House
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of The Do Residence
- output
- Residence
- implementation status
- On Going
- total cost
- Ksh 770,000
- estimate
- Ksh 950,000
Thethra Oluch Road
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2005
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 850,000
Wang'Apala Kobuola Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Majiwa Mixed Secondary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- To Renovate 1 Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 300,000
Ongeti Mixed Secondary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 950,000
Ongoro Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 5 Classrooms & Office
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 1,200,000
West Kochia Chief's Office
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office
- output
- Administration Office
- implementation status
- Complete And In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 850,000
Nyawita Secondary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2003
- action
- Construction of A Laboratory
- output
- Labaratory
- implementation status
- On Going
- total cost
- Ksh 740,000
- estimate
- Ksh 1,000,000
West Kochia Horticulture
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2005
- action
- Water Pumps And Pipes
- output
- -
- implementation status
- Complete And In Use
- total cost
- Ksh 720,550
- estimate
- Ksh 900,000
Wikoteng Dispensary
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Patient Support
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Koduogo Health Centre
- location
-
West Kanyanda
(in Rangwe)
- year first funded
- 2009
- action
- Construction of Health centre
- output
- Patient Support
- implementation status
- To Start
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
Nyawawa Dispensary
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- Patient Support
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Koga Primary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 3 Classrooms & Office Block
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Olodo Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
Kambeke Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 850,000
Nyalkinyi Secondary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of A Lab And Supply Lab Equipment
- output
- Equipment
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 950,000
God Bondo Secondary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 2 Classrooms And Electricity Wiring
- output
- Classrooms & Electricity
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 850,000
Ndiru Ap Line
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2007
- action
- Construction of A Police Post
- output
- Residence And Office
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,200,000
Ngere Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 3 C /Rooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 691,242
- estimate
- Ksh 900,000
Nyalkinyi Secondary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Emergency Fund To Roof School Blown Of
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 673,000
- estimate
- Ksh 273,000
Rabango Ogweyo Bridge
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Complete And In Use
- total cost
- Ksh 670,000
- estimate
- Ksh 1,000,000
Bondo Primary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 670,000
- estimate
- Ksh 1,400,000
Ongeti Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 670,000
- estimate
- Ksh 700,000
Rabuor Masawa Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2003
- action
- Desk & Class
- output
- Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 664,000
- estimate
- Ksh 20,000
Onyege Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 4 Classrooms & Office
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 660,000
- estimate
- Ksh 900,000
Lwaho Mixed Secondary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 660,000
- estimate
- Ksh 700,000
n/a
- location
-
West Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 655,000
- estimate
- Ksh 750,000
Lake Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 800,000
Ogande Mixed Secondary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom And Laboratory
- output
- Classroom & Labaratory
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 950,000
Manyatta Dispensary
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Patient Support Center
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 750,000
East Kanyada Chief's Office
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office
- output
- Administration Office
- implementation status
- Complete And In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Wikoteng Secondary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of An Office
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 850,000
God Nyalgosi Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 8 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 900,000
Bondo Mixed Secondary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 2 Class Rooms & 0Ffice
- output
- Classooms
- implementation status
- Ongoing
- total cost
- Ksh 647,787
- estimate
- Ksh 800,000
Nyawita Primary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2005
- action
- Construction of An Office Block
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 630,000
- estimate
- Ksh 800,000
Kogelo Kalanya Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2003
- action
- To Supply Desks And Construction of 2 Classrooms
- output
- Desks &Classrooms
- implementation status
- On Going
- total cost
- Ksh 614,000
- estimate
- Ksh 850,000
Manga Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 610,000
- estimate
- Ksh 900,000
Kangowe Omoche Road
- location
-
East Gem
(in Rangwe)
- year first funded
- 2005
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 850,000
Orero Secondary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of A Laboratory
- output
- Labaratory
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Akele Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
Riwa Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 750,000
God Kokech Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 7 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,050,000
Lorateng Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Olare Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 850,000
Akado Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 850,000
Lwaho Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms And Office
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 850,000
Pundo Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Ang'Iro Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Nyalieng'A Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 950,000
Odienya Secondary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2003
- action
- To Construst 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 1,050,000
Obengle Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 600,000
- estimate
- Ksh 950,000
Lake Nursery School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Class Rooms
- output
- Classrooms
- implementation status
- Stalled
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
West Kochia Resource Centre
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of Resource Centre Offices
- output
- Offices And Lecture Halls
- implementation status
- Stalled
- total cost
- Ksh 600,000
- estimate
- Ksh 2,500,000
Anding'o Nori Bridge
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Stalled
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Nyandara-Wikoteng Bridge
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
West Kochia Water Points
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Kanyokong'O Dam
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Water Pan
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Nyakwadha Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Ngegu Police Post
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2005
- action
- Construction of A Police Post
- output
- Administration Office
- implementation status
- Stalled
- total cost
- Ksh 586,000
- estimate
- Ksh 800,000
Marindi Dispensary
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2003
- action
- Construction Of Dispensary, & Staff House
- output
- Patient Support Center& Residence
- implementation status
- On Going
- total cost
- Ksh 577,717
- estimate
- Ksh 800,000
Luora Primary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going But In Use
- total cost
- Ksh 570,000
- estimate
- Ksh 900,000
Thethra Cattle Dip
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2005
- action
- Roof&Plaster
- output
- -
- implementation status
- not known
- total cost
- Ksh 570,000
- estimate
- Ksh 750,000
Obunga Dispensary
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Staff House
- output
- Patient Support Center
- implementation status
- Complete And In Use
- total cost
- Ksh 560,000
- estimate
- Ksh 700,000
Kaura Sub Location
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2007
- action
- Office Construction
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 950,000
Gem Central Chief's Office
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2007
- action
- Office Construction
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Asumbi Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of An Office
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 850,000
Komolo Youth Polytechnic
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Rang'Wena Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2005
- action
- To Renovate 4 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 300,000
K'Opiyo Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
Nyadiere Primary School
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office & 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 800,000
God Puro Primary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 2 Class Rooms & 0Ffice
- output
- Classrooms
- implementation status
- On Going But In Use
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Kachar Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 8 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 548,000
- estimate
- Ksh 1,200,000
Nyagoro Hospital
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Patient Support Center
- implementation status
- On Going
- total cost
- Ksh 542,800
- estimate
- Ksh 950,000
Sinogo Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 6 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 520,000
- estimate
- Ksh 2,100,000
Sango Gem Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 510,000
- estimate
- Ksh 700,000
Marienga Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 510,000
- estimate
- Ksh 800,000
Homa Bay Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2008
- action
- Renovation 10 Classrooms
- output
- Classsrooms
- implementation status
- On Going
- total cost
- Ksh 506,150
- estimate
- Ksh 1,000,000
Wi Obiero Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 10 Pit Latrines
- output
- Pit Latrines
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 150,000
Luora Mixed Secondary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2005
- action
- Construction of A Dormitory
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Anding'o Secondary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office
- output
- Office
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 850,000
God Marera Mix Secondary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2009
- action
- To Cnostruct 1 Class
- output
- Classroo
- implementation status
- To Start
- total cost
- Ksh 500,000
- estimate
- Ksh 50,000
Anding'o Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms & Office
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 850,000
Nyandiwa Secondary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of An Office
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 850,000
Lala Secondary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2003
- action
- Supply Of Laboratory Equipment
- output
- Labaratory Equipment
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 50,000
Pedo Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 750,000
Asego Nursery School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 850,000
Nyatago Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 6 Classrooms & An Office
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Wahambla Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of An Office Block
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Ngegu -Got Kabok Road
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Kodhoch Bridge
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2003
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Kotora-Marera-Witeng
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Road Opening
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Rangwe Gulkagembe Road
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Road Opening
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kanyoloo Shallowest Well
- location
-
West Gem
(in Rangwe)
- year first funded
- 2005
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Gongo Chief's Office
- location
-
Gongo
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office Extension
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Homa Bay Town Chief's Office
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2004
- action
- To Renovate The Office
- output
- Administration Office
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Magwar Primary School
- location
-
Gongo
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 5 Classrooms
- output
- Classrooms
- implementation status
- On Going 3 Are In Use
- total cost
- Ksh 490,000
- estimate
- Ksh 1,000,000
Nyakune Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 470,000
- estimate
- Ksh 800,000
Kuoyo Kaura Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- To Complete Plastering Of Six Classes
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 650,000
Kuoyo Kochia Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of Staff House
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 700,000
Aoch Muga Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 900,000
K'Oyoo Secondary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of Laboratory And Latrines
- output
- Labaratory & Latrines
- implementation status
- Complete And In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 1,500,000
Nyambare Dispensary
- location
-
East Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction Of Dispensary, & Staff House
- output
- Patient Support Center& Residence
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,500,000
Kirongo Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 750,000
Disii Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 430,000
- estimate
- Ksh 900,000
Otweyo Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 414,000
- estimate
- Ksh 850,000
West Gem Roads Maintenance
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Opening Up Of The Road
- output
- Foot Bridge
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Homa Bay Polytechnic
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 850,000
Oluso Secondary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Nyopuge Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 850,000
Nyawawa Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 3 Classrooms & Office
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 850,000
Rabuor Kaura Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Nyachar Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 3 Classrooms & Office
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Ng'Ura Irrigation
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2005
- action
- Water Pumps And Pipes
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Onyege Manyatta Borehole
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2005
- action
- Borehole Pump Maintenance
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Thethra Ombogo Rarieda Drainage
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Drainage Of Trenches
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 850,000
Chiepe Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 5 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 390,000
- estimate
- Ksh 900,000
Nyambare Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 378,000
- estimate
- Ksh 700,000
Nyalunya Ecd Centre
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- To Construst A Three Bed Roomed House
- output
- Residence
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 750,000
Yao Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2008
- action
- Construction of 1 Class
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
Rang'I Youth Polytechnic
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 700,000
Rangwe Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 700,000
K'Oyoo Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Opinde Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 900,000
Othoro Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 5 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Ojunge Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 900,000
West Gem Chief's Office
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Office
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 347,566
- estimate
- Ksh 850,000
Roba Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 330,000
- estimate
- Ksh 700,000
Aora Chak Bridge
- location
-
Gongo
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Complete And In Use
- total cost
- Ksh 320,000
- estimate
- Ksh 900,000
Wang'A Pala Kolielo Prim
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- To Construct3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 320,000
- estimate
- Ksh 1,050,000
Nyanguu Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 6 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 307,711
- estimate
- Ksh 1,800,000
Yogo Bridge
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Achego Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 350,000
Obunga Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Ongang'A Primary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Wikoteng Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Rabango Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Lieta Kabunde Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 350,000
Arunda Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
St. Paul's Catholic Ecd Ttc
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Masakla Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Muche Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Pap Ndege Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Pundo Kalanya Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Ariwa Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms & Office
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Ngengu Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of Head Teacher'S House
- output
- Residence
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Randung-Rangwe Bridge
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Rangwe-Rabango
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Road Opening
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kamifira -Oyuma
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Road Opening
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Randung Dam
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Water Pan
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Komolo Dam
- location
-
West Gem
(in Rangwe)
- year first funded
- 2005
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Orwa Dam
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Water Pan
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Nyalunda Borehole
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
West Kanyada Chief's Office
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- To Renovate The Office Construction of Staff Houses
- output
- Administration Officeand Residence
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Gem West Ass Chief's Office
- location
-
Gem West
(in Rangwe)
- year first funded
- 2007
- action
- Office Construction
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 950,000
Onjinyo-Kamuga-Abala Road
- location
-
Gongo
(in Rangwe)
- year first funded
- 2006
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 297,787
- estimate
- Ksh 600,000
Abala Bridge
- location
-
Gongo
(in Rangwe)
- year first funded
- 2004
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Complete And In Use
- total cost
- Ksh 280,000
- estimate
- Ksh 700,000
Orego Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 270,000
- estimate
- Ksh 1,200,000
Arujo Primary School
- location
-
Homa Bay Town
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 256,000
- estimate
- Ksh 450,000
Maguje Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 900,000
Otaro Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 5 Classrooms & An Office
- output
- Classroom &Office
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,800,000
Nyalkinyi Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of An Office
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 800,000
Ndori Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,400,000
Nduta Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 700,000
Oluso Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
FrSchooleffer Boys Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of A Storey School Block
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Nyaliech Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 700,000
Pap Alara Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 3 Classrooms & Office
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 900,000
Landa Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 700,000
Ndiru Education Centre
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of And Administration Office
- output
- Administration Office
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Nyaluya Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of An Administration Office
- output
- Classrooms & Office
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Nyandiwa Borehole
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Gongo Com Resource Cnt
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2007
- action
- Construction of Resource Centre Offices
- output
- Offices And Lecture Halls
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 2,500,000
Soko Ecd Centre
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Stalled
- total cost
- Ksh 250,000
- estimate
- Ksh 450,000
Anind Oko Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 245,000
- estimate
- Ksh 700,000
Nyangweso Schoolfor Deaf
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 240,000
- estimate
- Ksh 700,000
Randung Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 220,000
- estimate
- Ksh 700,000
Nyaundho Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 214,000
- estimate
- Ksh 700,000
Rodi Ap Line
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2007
- action
- Construction of A Police Post
- output
- Residende And Offices
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 850,000
Riegi Dam
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Water Pan
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Obuya Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
God Ndiru Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Rachar Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Ayuyu Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Adongo Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2008
- action
- To Complete 3 Classrooms
- output
- Classrooms
- implementation status
- Complete In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lang'O Oromo Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Renovation Of 4 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 250,000
Chiga Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 4 Classrooms & Office
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 1,400,000
Sero Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2008
- action
- To Complete 2 Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Pala Masogo Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Mama Prisca Ecd Centre
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Got Lwala Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Nyando Primary School
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Manyatta-Onyege Road
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Ludhe Dongo-Nyalgosi Road
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 900,000
Kosina-Mbeke
- location
-
Gem East
(in Rangwe)
- year first funded
- 2008
- action
- Road Opening
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Magare Water
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Sinking A Borehole
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Nyaguda Borehole
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2004
- action
- Sinking A Borehole
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 650,000
Kochia East Water Points
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Gongodispensarysary Water Project
- location
-
Gongo
(in Rangwe)
- year first funded
- 2005
- action
- Sinking A Borehole At Hospital
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 900,000
East Gem Water Points
- location
-
East Gem
(in Rangwe)
- year first funded
- 2005
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Yogo Primary School
- location
-
West Gem
(in Rangwe)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 180,000
- estimate
- Ksh 850,000
Wahambla-Kotewa
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2008
- action
- Road Opening
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 161,892
- estimate
- Ksh 161,892
Maugo Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Ludhe Dongo Primary School
- location
-
East Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Achanjo Spring
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Spring Protection
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 100,000
Nyamanga Shallowest Well
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Dam Excavation
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 150,000
- estimate
- Ksh 100,000
Omoche Secondary School
- location
-
East Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Kochienge Primary School
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2003
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Nyakahia Primary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2003
- action
- Supply Of Desks
- output
- Desks
- implementation status
- Complete And In Use
- total cost
- Ksh 128,000
- estimate
- Ksh 200,000
Alizababa Shallowest Well
- location
-
Gongo
(in Rangwe)
- year first funded
- 2007
- action
- Borehole Pump Maintenance
- output
- Water
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Nyawita-Nyalunya Road
- location
-
Gongo
(in Rangwe)
- year first funded
- 2007
- action
- Construction Of Culverts
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Gem West Chief's Office
- location
-
Gem West
(in Rangwe)
- year first funded
- 2007
- action
- Office Construction
- output
- Administration Office
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 750,000
Nyawita Ap Line
- location
-
Gongo
(in Rangwe)
- year first funded
- 2007
- action
- Construction of A Police Post
- output
- Residence And Office
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
Siala Shallowest Well
- location
-
East Gem
(in Rangwe)
- year first funded
- 2006
- action
- Sinking Of Shallowest Well
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 450,000
God Kwach Onjinyo Road
- location
-
Gongo
(in Rangwe)
- year first funded
- 2007
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Ndiru-Onjinyo Road
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Opening Up Of The Road
- output
- Road
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
West Kagan Water Points
- location
-
West Kagan
(in Rangwe)
- year first funded
- 2004
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 250,000
Otip Shallowest Ell
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 450,000
K'Odhiambo Shallowest Well
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 450,000
Akiro Shallowest Well
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kamuga Shallowest Well
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Alalo Shallowest Well
- location
-
West Gem
(in Rangwe)
- year first funded
- 2006
- action
- Sinking Of Water Points
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 450,000
Rang'I Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 8 Classrooms
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 2,500,000
Kotora Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 900,000
Asumbi Girls Secondary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- To Renovate 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Bishop Okullu Magare Secondary School
- location
-
West Kanyada
(in Rangwe)
- year first funded
- 2003
- action
- To Complete Dormitory
- output
- Dormitory
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Sero Mixed Secondary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 700,000
Sero Youth Polytechnic
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classrooms
- output
- Classroom
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 450,000
Kuja Primary School
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 900,000
Lower Nyokal Educatoff
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 450,000
Kuoyo Kochia Jua Kali Shed
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2007
- action
- Construction of Workshop Sheds
- output
- Workshop
- implementation status
- Stalled
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
Rangwe Sinema Road
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction Of Road
- output
- Foot Bridge
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
God Marera Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 100,000
- estimate
- Ksh 700,000
Orero Primary School
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- Classroom
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 350,000
Ngegu Small Scale
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2008
- action
- Disilting
- output
- -
- implementation status
- not known
- total cost
- Ksh 93,916
- estimate
- Ksh 0
Nyangweso Ecd Centre
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2007
- action
- Construction of 1 Classroom
- output
- Classrooms
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 450,000
Ombogo Girls Academy
- location
-
West Kochia
(in Rangwe)
- year first funded
- 2004
- action
- Construction of 1 Classrooms
- output
- Classrooms
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 450,000
Masko Borehole
- location
-
East Kochia
(in Rangwe)
- year first funded
- 2006
- action
- Dam Excavation
- output
- Water
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 450,000
Sota Drainage
- location
-
East Kanyada
(in Rangwe)
- year first funded
- 2006
- action
- Drainage
- output
- -
- implementation status
- Complete And In Use
- total cost
- Ksh 50,000
- estimate
- Ksh 600,000
Rariwest Cbo Centre
- location
-
East Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of A Resource Centre
- output
- Classrooms
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 2,500,000
Rangwe Junior Academy
- location
-
Central Gem
(in Rangwe)
- year first funded
- 2004
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Stalled
- total cost
- Ksh 50,000
- estimate
- Ksh 350,000
Kayieko Springs
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Rehablitation
- output
- Water
- implementation status
- Further funding for electrification & fencing recommeded
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Sori Springs
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Rehablitation
- output
- Water
- implementation status
- More funding needed for bridge to be in use
- total cost
- Ksh 40,000
- estimate
- Ksh 0
Kokode Springs
- location
-
Gem Central
(in Rangwe)
- year first funded
- 2008
- action
- Rehablitation
- output
- Water
- implementation status
- More funding recommended
- total cost
- Ksh 36,974
- estimate
- Ksh 0