The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Rongai

Ol-Manyatta Secondary School

location
(in Rongai)
year first funded
2004
action
Construction Of Two Classrooms, 4 Toilets, One Lab& Equipping.
output
Quality Learning Environment
implementation status
Construction Of 2 Classrooms And Purchase Of Lab Equipment Complete.
total cost
Ksh 2,150,000
estimate
Ksh 2,000,000

Nyamamithi Dispensary

location
(in Rongai)
year first funded
2003
action
Construction Of A Maternity And Out-Patient Wing
output
Provision Of Quality Health Services
implementation status
Complete Out-Patient Wing (Three Rooms). The Second Phase Is A Maternity Wing Done To Lintel Level
total cost
Ksh 2,120,000
estimate
Ksh 3,000,000

Piave Health Centre

location
(in Rongai)
year first funded
2004
action
Staff House, Toilets & Drainage
output
Accessibility To Quality Healthcare Services
implementation status
Construction And Equipping Of The Out-Patient Wing Fully Complete While Construction Of Staff House Is On Progress.
total cost
Ksh 1,972,006
estimate
Ksh 2,000,000

Kapsetek Primary School

location
(in Rongai)
year first funded
2007
action
Building Of Two Classrooms
output
Enough Learning Facilities
implementation status
Construction Of Two Classrooms Storey Building At Roofing Level
total cost
Ksh 1,950,000
estimate
Ksh 18,000,000

Athinai Secondary School

location
(in Rongai)
year first funded
2003
action
Construction Of A dining Hall And One Classroom
output
Enough Learning Facilities And Hygienic dining Hall
implementation status
One Classroom Fully Complete While Roofing Of The Dining Hall In Progress
total cost
Ksh 1,925,000
estimate
Ksh 3,000,000

Banita Dispensary

location
(in Rongai)
year first funded
2004
action
Construction Of A Maternity Block
output
Reduce Maternal Mortality
implementation status
Construction Of The Maternity Block In Progress
total cost
Ksh 1,915,582
estimate
Ksh 2,500,000

Kiamunyi Secondary School

location
(in Rongai)
year first funded
2005
action
Construction Of Lab, Admin Block, Staff Quarters, Classrooms & Furnishing, Electricity, Computers, Printers And Water
output
Accessibility To Quality Education
implementation status
Four Classrooms Complete & Equipped. Eight Toilets And Piping Is Complete And In Use.
total cost
Ksh 1,750,000
estimate
Ksh 4,083,450

Piave Secondary School

location
Ngata (in Rongai)
year first funded
2003
action
Construction Of Four Classrooms, Construction Of A Fully Furnished Lab & A Staff Room
output
Accessibility To Quality Education
implementation status
First Phase Complete.
total cost
Ksh 1,750,000
estimate
Ksh 2,000,000

Lake Solai Secondary School

location
(in Rongai)
year first funded
2004
action
Construction And Equiping Of A Labaratory And Staff Quarters
output
Quality Learning Environment
implementation status
Construction Of A Lab And Partly Equipped. Final Phase Of Equipping To Start.
total cost
Ksh 1,693,576
estimate
Ksh 2,000,000

Rongai Modern Trauma Hospital

location
(in Rongai)
year first funded
2004
action
Purchasing Of Land And Construction Of A Modern Trauma Hospital
output
Provision Of Health Services Especially To Accident Cases Along The Highway
implementation status
Complete. Construction To Be Undertaken By Moh.
total cost
Ksh 1,600,000
estimate
Ksh 1,600,000

Umoja Secondary School

location
(in Rongai)
year first funded
2004
action
Construction Of Two Classrooms And A Laboratory.
output
Quality Learning Environment
implementation status
Construction Of Two Classrooms Fully Complete While The Laboratory Is In Progress
total cost
Ksh 1,597,209
estimate
Ksh 2,000,000

Athinai Primary School

location
(in Rongai)
year first funded
2004
action
Construction Of Four Classrooms & Administration Block And Renovation Of One Classroom
output
-
implementation status
Four Classrooms Fully Complete.
total cost
Ksh 1,550,000
estimate
Ksh 2,000,000

Banita Secondary School

location
Makongeni (in Rongai)
year first funded
2003
action
Construction Of Administration Block, Two Classrooms, Library, Lab, dining Hall, Kitchen And Store
output
Quality Learning Environment
implementation status
Constitution And Equipping Of 2 Labs, One Classroom, A 100M? Water Tank And 4 Toilets Fully Complete
total cost
Ksh 1,545,292
estimate
Ksh 4,600,000

Akuis Day Secondary School

location
Solai (in Rongai)
year first funded
2004
action
Provide Quality Education
output
Quality Learning Environment
implementation status
Renovation And Equipping Of The School Laboratory Complete. Finishing Of Two Classrooms In Progress
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Lower Solai Health Centre

location
(in Rongai)
year first funded
2004
action
Construction Of A Maternity ( Post Natal)
output
Reduce Maternal Mortality
implementation status
Complete And Equipping It In Progress
total cost
Ksh 1,500,000
estimate
Ksh 2,100,000

Ol-Rongai Secondary School

location
(in Rongai)
year first funded
2004
action
Construction Of Staff Quarters, 4 Classrooms, A Lab And Equipping It, Latrines And Bathrooms
output
Accessibility To Quality Education
implementation status
Completed 4 Single Roomed Quarters, One Classroom, Laboratory & Fully Equipping It, Pit Latrine & 2 Bathrooms And A Kentank
total cost
Ksh 1,493,576
estimate
Ksh 4,000,000

Tuiyotich Primary School

location
(in Rongai)
year first funded
2005
action
Construction Of Eight Classrooms
output
Provision Of Conducive Enviroment For Learning
implementation status
Finishing Of Two Classrooms Is In Progress
total cost
Ksh 1,464,727
estimate
Ksh 1,680,000

Lelechwet Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of Two Classrooms
output
Improved Quality Learning Environment
implementation status
Two Skeleton Classrooms & One Complete Toilet
total cost
Ksh 1,450,000
estimate
Ksh 1,200,000

Gaakwen Primary School

location
Boror (in Rongai)
year first funded
2003
action
Construction Of Five Classrooms
output
Increased Level Of School Enrolment
implementation status
Five Classrooms Fully Complete And In Use, They Have Laid A Foundation Of Two Classrooms
total cost
Ksh 1,450,000
estimate
Ksh 1,450,000

Kimangu Primary School

location
(in Rongai)
year first funded
2004
action
Construction Of Eight Classrooms And An Administration Block
output
Provision Of Quality Eductio.
implementation status
2 Classrooms Fully Complete And 2 Without Window Panes
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Rongai Health Centre

location
(in Rongai)
year first funded
2007
action
Construction Of A Maternity Wing
output
Access To Quality Healthcare Services
implementation status
New
total cost
Ksh 1,400,000
estimate
Ksh 4,498,406

Lengenet Health Centre

location
(in Rongai)
year first funded
2004
action
Construction Of A Maternity Wing
output
Reduce Maternal Mortality
implementation status
Construction Of The Maternity Wing Complete But Not Furnished
total cost
Ksh 1,390,785
estimate
Ksh 2,000,000

Sasumua Primary School

location
(in Rongai)
year first funded
2004
action
Construction Of 8 Classrooms
output
Quality Learning Environment
implementation status
4 Complete Classrooms And In Use
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

Legetio Primary School

location
(in Rongai)
year first funded
2003
action
Construction Of 8 Classrooms
output
Quality Learning Environment
implementation status
5 Classrooms Complete And In Use. 2 Classrooms Yet To Be Completed
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

Belbur Primary School

location
(in Rongai)
year first funded
2004
action
Construction Of Four Classrooms
output
Provision Of Conducive Enviroment For Learning
implementation status
Two Classrooms Partially Complete And Finishing Of Two Others In Progress
total cost
Ksh 1,250,000
estimate
Ksh 1,500,000

Majani Mingi Primary School

location
(in Rongai)
year first funded
2004
action
Construction Of Ten Classrooms
output
Provision Of Quality Learning Environment
implementation status
Three Classrooms Without Window Panes Constructed And A Latrine
total cost
Ksh 1,250,000
estimate
Ksh 2,926,000

Kandutura Primary School

location
Rongai (in Rongai)
year first funded
2005
action
Construction Of Eight Classrooms, Administration Block
output
Provision Of Quality Eductio.
implementation status
One Skeleton Classroom And Administration Block
total cost
Ksh 1,200,000
estimate
Ksh 2,500,000

Makongeni Primary School

location
(in Rongai)
year first funded
2006
action
Repair Of The Blown Roof, Floor, Painting, Fixing Doors & Windows
output
Quality Learning Environment
implementation status
Rough Floors To 6 Classrooms, Fixing Of The Roof And Substandard Steel Doors Done To 6 Classrooms
total cost
Ksh 1,150,000
estimate
Ksh 2,000,000

Kokwomoi Primary School

location
(in Rongai)
year first funded
2006
action
n/a
output
-
implementation status
Construction Of Two Classrooms To Lintel Level
total cost
Ksh 1,100,000
estimate
Ksh 2,500,000

Mercy Njeri Primary School

location
(in Rongai)
year first funded
2005
action
n/a
output
-
implementation status
Construction Of Two Classrooms Done To Completion. Administration Block Is At Lintel Level.
total cost
Ksh 1,050,000
estimate
Ksh 950,000

Boito Bridge

location
(in Rongai)
year first funded
2009
action
Accsabilty Of Road Network
output
Improve Quality Services To The Community
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Sarambei Primary School

location
(in Rongai)
year first funded
2004
action
n/a
output
-
implementation status
Fully Complete 2 Classrooms, Two Offices And A Reception Room.
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Solai Kale Secondary School

location
(in Rongai)
year first funded
2009
action
Construction Of Two Classrooms
output
Quality Learning Environment
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 0

Maji Tamu Health Centre

location
(in Rongai)
year first funded
2006
action
Construction Of A Maternity Wing, Two Staff Houses And Out Patient Department
output
Reduce Maternal Mortality And Health Care Services
implementation status
Have Four Partitions Which Have Been Done Up To Roofing With The Verandah
total cost
Ksh 1,000,000
estimate
Ksh 1,841,900

Rongai Primary School

location
(in Rongai)
year first funded
2004
action
Construction Of Three Classrooms
output
Provision Of Conducive Enviroment For Learning
implementation status
Three Classrooms Fully Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mema Secondary School

location
(in Rongai)
year first funded
2003
action
Two Classrooms, dining Hall, Administration Block And Home Science Room
output
Quality Learning Environment
implementation status
Construction Of Two Classrooms Fully Complete And In Use
total cost
Ksh 970,000
estimate
Ksh 3,750,000

Lomolo Primary School

location
(in Rongai)
year first funded
2005
action
Construction Of Two Classrooms
output
Quality Learning Environment
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 950,000

Kapsetek Dispensary

location
(in Rongai)
year first funded
2005
action
Construction Of Three Rooms For The Out-Patient
output
Quality Healthcare
implementation status
Complete And In Use
total cost
Ksh 904,593
estimate
Ksh 1,000,000

Rongai Turi Health Centre

location
(in Rongai)
year first funded
2005
action
Costruction Of An Out-Patient Wing And A Maternity
output
Quality Healthcare
implementation status
Completion Of The Outpatient Wing In Progress
total cost
Ksh 900,088
estimate
Ksh 3,500,000

Kaptarakwa Primary School

location
(in Rongai)
year first funded
2006
action
n/a
output
-
implementation status
Construction In Progress.
total cost
Ksh 900,000
estimate
Ksh 1,980,000

Mogoiwet Primary School

location
(in Rongai)
year first funded
2005
action
Construction Of Six Classrooms And Administration Block
output
Quality Learning Environment
implementation status
Two Almost Completed Classrooms
total cost
Ksh 900,000
estimate
Ksh 1,910,000

Boror Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of 6 Classrooms
output
Quality Learning Environment
implementation status
Two Classroom Complete And And In Use
total cost
Ksh 854,594
estimate
Ksh 1,200,000

Leldet Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of Three Classrooms
output
Provision Of Conducive Enviroment For Learning
implementation status
One Half Complete Classroom And Foundation Of The Next Classroom
total cost
Ksh 850,000
estimate
Ksh 1,250,000

Kipsyenan Health Centre

location
(in Rongai)
year first funded
2006
action
Construction Of Staff Houses
output
Accessibility To Quality Healthcare Services
implementation status
Construction To Almost Lintel Level.
total cost
Ksh 800,000
estimate
Ksh 1,250,000

Tachasis Primary School

location
(in Rongai)
year first funded
2006
action
n/a
output
-
implementation status
Construction In Progress.
total cost
Ksh 800,000
estimate
Ksh 1,850,000

Emarangishu Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of Twelve Classrooms
output
Quality Learning Environment
implementation status
One Classroom Is 85% Complete And Have Erected A Foundation Of The Next Class
total cost
Ksh 800,000
estimate
Ksh 1,061,000

Ruiyobei Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of Eight Classrooms, Administration Block And A Toilet
output
Quality Learning Environment
implementation status
Two Classroom Constructed Up To Lintel Level.
total cost
Ksh 800,000
estimate
Ksh 1,850,000

Thirandu Primary School

location
(in Rongai)
year first funded
2005
action
Construction Of Four Classrooms
output
Quality Learning Environment
implementation status
Three Classrooms Not Complete.
total cost
Ksh 800,000
estimate
Ksh 1,479,010

Atebwo Primary School

location
(in Rongai)
year first funded
2005
action
Construction Of 2 Classrroms
output
Quality Learning Facilities
implementation status
2 Classrooms Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 800,000

Gatagati Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of Eight Classrooms
output
Quality Learning Environment
implementation status
Construction To Start Soon
total cost
Ksh 700,664
estimate
Ksh 2,400,000

Boito Primary School

location
(in Rongai)
year first funded
2006
action
Construction & Renovation Of Eight Classrooms And A Staff
output
Quality Learning Environment
implementation status
Renovated 7 Classrooms; Plastering, Painting, Fixing Doors And Windows
total cost
Ksh 700,000
estimate
Ksh 1,098,570

Lelechwet Dispensary

location
(in Rongai)
year first funded
2004
action
Renovation Of The Maternity Wing And Construction Of Toilets
output
Quality Healthcare
implementation status
Renovation Of The Outpatient Wing Complete. The Toilets Collapsed
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Koisamo Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of Two Classrooms & Fixing Steel Doors And Windows/Panes
output
-
implementation status
Construction Of A Classroom Is Fully Completed The Next Class Is At Lintel Level
total cost
Ksh 650,000
estimate
Ksh 850,000

Boror Secondary School

location
(in Rongai)
year first funded
2008
action
Construction Of A Laboratory
output
Accessibility To Quality Education
implementation status
Construction Of A Lab Is At Window Level
total cost
Ksh 650,000
estimate
Ksh 2,500,000

Kampi Ya Moto Secondary School

location
(in Rongai)
year first funded
2003
action
Equipping Of A Lab And Construction Of Two Classrooms
output
Provision Of Quality Learning Facilities
implementation status
Fully Equipped Laboratory And Construction Of One Classroom At Roofing Level.
total cost
Ksh 607,364
estimate
Ksh 900,000

Igwamiti Dispensary

location
(in Rongai)
year first funded
2005
action
Fully Equipping Of The Dispensary And Construction Of A Septic Tank, Incinerator, Two Toilets And A Water Tank
output
Access To Quality Healthcare
implementation status
The Septic Tank Is Yet To Be Completed
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Arus Primary School

location
(in Rongai)
year first funded
2007
action
Construction Of One Classroom
output
Quality Learning Environment
implementation status
Construction In The Process
total cost
Ksh 600,000
estimate
Ksh 400,000

Ngessumin Primary School

location
(in Rongai)
year first funded
2006
action
Renovation Of Four Classrooms & Administration Block
output
Quality Learning Environment
implementation status
Two Classrooms Done To Roofing Level
total cost
Ksh 600,000
estimate
Ksh 767,314

Burgei Primary School

location
Lengenet (in Rongai)
year first funded
2003
action
Renovation Of Eight Classrooms
output
Quality Learning Environment
implementation status
Renovation Of 8 Classrooms, Fixing Of Steel Doors And Windows Complete
total cost
Ksh 600,000
estimate
Ksh 745,410

Magare Primary School

location
(in Rongai)
year first funded
2006
action
n/a
output
-
implementation status
Constructed Two Skeleton Classrooms To Roofing Level.
total cost
Ksh 600,000
estimate
Ksh 0

Losibil Primary School

location
(in Rongai)
year first funded
2006
action
Construction Of Three Classrooms
output
Improved Quality Learning Environment
implementation status
2 Classrooms Done To Roofing Level.
total cost
Ksh 550,000
estimate
Ksh 775,070

Naithuiti Primary School

location
Kampi Ya Moto (in Rongai)
year first funded
2005
action
Renovation Of 8 Classrooms
output
-
implementation status
The Classrooms Renovated And In Use
total cost
Ksh 500,000
estimate
Ksh 800,000

Ogilgei Dispensary

location
(in Rongai)
year first funded
2009
action
Construction Of Marternity Wing
output
Reduce Mortality Rate
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Olrongai Dispensary

location
(in Rongai)
year first funded
2007
action
Construction Of A Maternity Wing
output
Quality Healthcare
implementation status
Construction Of Marternity Wing Is At Lintel Level
total cost
Ksh 500,000
estimate
Ksh 1,838,147

Majani Mingi Bridge

location
(in Rongai)
year first funded
2008
action
Construction Of A Bridge
output
-
implementation status
New
total cost
Ksh 480,000
estimate
Ksh 780,000

Testai Primary School

location
(in Rongai)
year first funded
2007
action
Renovation Of Classroom, Pit Latrine, Water Tank, Furniture, Fencing & Store
output
-
implementation status
Consstruction Is At Window Level
total cost
Ksh 431,492
estimate
Ksh 500,000

Kipsyenan Primary School

location
(in Rongai)
year first funded
2008
action
n/a
output
-
implementation status
Construction A Classroom And The Administration Block Is Complete,Wiring And Fixing Of Bicha Board Is In Progress.
total cost
Ksh 400,000
estimate
Ksh 2,500,000

Mbogo-Ini Dispensary

location
(in Rongai)
year first funded
2005
action
Renovated The Lab I.E. Painting And Purchase Of Furnishers And Fixing Of Wardrobe
output
Access To Quality Healthcare
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 500,000

Simboiyon Primary School

location
(in Rongai)
year first funded
2007
action
n/a
output
-
implementation status
Construction Of A Classroom Is At Lintel Level
total cost
Ksh 400,000
estimate
Ksh 1,850,000

Tulwobmoi Primary School

location
(in Rongai)
year first funded
2007
action
Construction Of Four Classrooms & Staff Room
output
Conducive Learning Environment
implementation status
Construction Of One Classroom Fully Complete And In Use,The Next Class Is At Linel Level
total cost
Ksh 400,000
estimate
Ksh 2,133,678

Gakingi Primary School

location
(in Rongai)
year first funded
2007
action
n/a
output
-
implementation status
Construction Of Two Classrooms Is At Roofing Level
total cost
Ksh 351,899
estimate
Ksh 0

Kanga Primary School

location
(in Rongai)
year first funded
2007
action
Construction Of Two Classrooms & Finishing Five Classes
output
Quality Learning Environment
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 556,000

Lari Primary School

location
(in Rongai)
year first funded
2007
action
n/a
output
-
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 1,980,000

Gitundaga Primary School

location
(in Rongai)
year first funded
2007
action
Finishing Two Classrooms & Construction Of Three New Classrooms
output
Quality Learning Environment
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 1,199,957

Gicheha Primary School

location
(in Rongai)
year first funded
2007
action
n/a
output
-
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 250,000

Tuiyotich Dispensary

location
(in Rongai)
year first funded
2007
action
n/a
output
-
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 700,000