The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Rongo

Rongo Sub- District Hospital

location
Central Kamagambo (in Rongo)
year first funded
2003
action
Construction Of Staff Offices & Patient Support Center
output
Staff Offices, Patient Support Center
implementation status
Complete
total cost
Ksh 6,200,000
estimate
Ksh 4,000,000

Awendo Water Project

location
Central Sakwa (in Rongo)
year first funded
2005
action
Pumping & Piping Water
output
Water
implementation status
On Going
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Nyarach Secondary School

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Construction Of 3 Class Rooms & Lab.
output
Classrooms & Laboratory
implementation status
On Going
total cost
Ksh 3,950,000
estimate
Ksh 1,500,000

Ombo Kware & Otacho Electrification

location
Central Sakwa (in Rongo)
year first funded
2009
action
Rural Electrification
output
Electricty Connection
implementation status
New
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Moi Institute Of Technology

location
South Kamagambo (in Rongo)
year first funded
2008
action
Construction Of 4 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Rongo Town Water Project

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Pumping & Piping Water
output
Water Supply
implementation status
On Going
total cost
Ksh 3,000,000
estimate
Ksh 3,500,000

Komolorume Secondary School

location
Central Sakwa (in Rongo)
year first funded
2003
action
Construction Of 4 Storey Class Rooms & Admin Block
output
Class Rooms & Admin Block
implementation status
On Going
total cost
Ksh 2,932,000
estimate
Ksh 2,500,000

Kanyadieto Bridge

location
East Kamagambo (in Rongo)
year first funded
2005
action
Construction Of Bridge
output
Completion
implementation status
Stalled
total cost
Ksh 2,800,000
estimate
Ksh 3,000,000

Awendo Sub-District Hospital

location
Central Sakwa (in Rongo)
year first funded
2003
action
Construction Of Patient Support Unit And Laundry Room
output
Patient Support Unit And Laundry Room
implementation status
Complete
total cost
Ksh 2,700,000
estimate
Ksh 2,500,000

Kangeso Community Dispensary

location
West Kamagambo (in Rongo)
year first funded
2007
action
Construction Of Hospital
output
Treatment Rooms
implementation status
New
total cost
Ksh 2,400,000
estimate
Ksh 400,000

Anding'o Kokebe Primary School

location
North Kamagambo (in Rongo)
year first funded
2006
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 2,318,300
estimate
Ksh 0

St. Pauline Malunga Secondary School

location
South Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms & Admin Block
output
Classrooms & Admin Block
implementation status
On Going
total cost
Ksh 2,190,000
estimate
Ksh 1,800,000

Miyare Vocational Training Centre

location
East Kamagambo (in Rongo)
year first funded
2009
action
Construction Of Workshop
output
Workshop Rooms
implementation status
New
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Yago Secondary School

location
North Sakwa (in Rongo)
year first funded
2004
action
Construction Of 5 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 2,074,000
estimate
Ksh 1,500,000

Matagaro Primary School

location
Central Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 5 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 2,050,000
estimate
Ksh 1,500,000

Siala Technical Centre

location
Central Kamagambo (in Rongo)
year first funded
2009
action
Construction Of Workshop
output
Workshop Rooms
implementation status
New
total cost
Ksh 2,023,405
estimate
Ksh 2,023,405

Awendo Community Library

location
Central Sakwa (in Rongo)
year first funded
2006
action
Construction Of Library
output
Completion Of Library
implementation status
Ongoing
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Cham Gi Wadu Admin Offices

location
South Kamagambo (in Rongo)
year first funded
2009
action
Dos Offices
output
Construction
implementation status
New
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Awendo Marindi Youth Polytechnic

location
Central Sakwa (in Rongo)
year first funded
2004
action
Construction Of 6 Workshop Rooms
output
Workshop Rooms
implementation status
Complete
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Aora Jope Primary School

location
South Sakwa (in Rongo)
year first funded
2003
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,800,000
estimate
Ksh 1,200,000

Manyatta/Nyasori Youth Polytechnic

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of 6 Workshop Rooms
output
Workshop Rooms
implementation status
On Going
total cost
Ksh 1,700,000
estimate
Ksh 1,800,000

Kameji Secondary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Construction Of Dormitory
output
Dormitory
implementation status
On Going
total cost
Ksh 1,624,000
estimate
Ksh 2,000,000

Miyare Primary School

location
East Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 8 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,600,000
estimate
Ksh 2,400,000

Angaga Dispensary

location
East Sakwa (in Rongo)
year first funded
2003
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 1,550,000
estimate
Ksh 600,000

Nyakuru Secondary School

location
North Sakwa (in Rongo)
year first funded
2004
action
Construction Of 4 Class Rooms & Admin Block
output
Class Rooms & Admin Block
implementation status
On Going
total cost
Ksh 1,474,000
estimate
Ksh 1,500,000

Rairi Primary School

location
West Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 4 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,450,000
estimate
Ksh 1,200,000

Kitere Community Dispensary

location
South Kamagambo (in Rongo)
year first funded
2004
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Nyanga'O Secondary School

location
North Kamagambo (in Rongo)
year first funded
2003
action
Construction Of Lab & 1 Staff House
output
Lab & Staff House
implementation status
On Going
total cost
Ksh 1,374,000
estimate
Ksh 1,500,000

Kabuoro Primary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of 3 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 1,350,000
estimate
Ksh 900,000

Mitwe Primary School

location
South Kamagambo (in Rongo)
year first funded
2004
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 1,333,333
estimate
Ksh 0

St. Patrick Kamgundho Secondary School

location
West Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,332,000
estimate
Ksh 1,200,000

Kudho Primary School

location
East Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 3 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 900,000

Minyenyadispensarysary

location
North Kamagambo (in Rongo)
year first funded
2003
action
Construction Of Wards
output
Wards
implementation status
On Going
total cost
Ksh 1,300,000
estimate
Ksh 1,500,000

St. Dalmas Primary School

location
East Kamagambo (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms & Admin Block
output
Classrooms & Admin Block
implementation status
On Going
total cost
Ksh 1,250,000
estimate
Ksh 1,000,000

Omware Secondary School

location
South Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 3 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,216,000
estimate
Ksh 900,000

Uradi Primary School

location
South Sakwa (in Rongo)
year first funded
2004
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Nyakwere Primary School

location
Central Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 4 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Bishop Odera Agongo Secondary School

location
West Sakwa (in Rongo)
year first funded
2006
action
Construction Of 3 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,200,000
estimate
Ksh 900,000

St. Jonathan Primary School

location
South Kamagambo (in Rongo)
year first funded
2004
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Kuoyo Kodalo Secondary School

location
North Sakwa (in Rongo)
year first funded
2003
action
Construction Of 4 Class Rooms & Admin Block
output
Class Rooms & Admin Block
implementation status
On Going
total cost
Ksh 1,174,000
estimate
Ksh 1,500,000

Koderobara Primary School

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,150,000
estimate
Ksh 600,000

Kogelo Mixed Secondary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of Lab & Supply Of Equipment
output
Laboratory
implementation status
On Going
total cost
Ksh 1,144,000
estimate
Ksh 1,800,000

Nyaoke Primary School

location
South Kamagambo (in Rongo)
year first funded
2008
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 1,132,619
estimate
Ksh 0

St. Peters Ofwanga Secondary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Nyaburu Primary School

location
East Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 4 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Nyamuga Secondary School

location
East Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Bonde Dispensary

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Nyaoke Primary School

location
South Kamagambo (in Rongo)
year first funded
2004
action
Rehabilitation Of Admin Block
output
Admin Block
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 500,000

Marera Primary School

location
Central Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,050,000
estimate
Ksh 600,000

St. Jonathan Primary School

location
West Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,050,000
estimate
Ksh 600,000

Opapo Primary School

location
East Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,050,000
estimate
Ksh 600,000

Mariwa Health Centre

location
South Sakwa (in Rongo)
year first funded
2003
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 1,050,000
estimate
Ksh 1,200,000

Bondo Kogelo Primary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,050,000
estimate
Ksh 600,000

Dago Kodero Primary School

location
South Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 4 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,050,000
estimate
Ksh 1,200,000

Komire Lwala Bridge

location
West Kamagambo (in Rongo)
year first funded
2005
action
Construction Of Bridge
output
Bridge
implementation status
Stalled
total cost
Ksh 1,049,872
estimate
Ksh 1,200,000

Gamba Secondary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,016,000
estimate
Ksh 1,200,000

Mulo Primary School

location
East Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Rongo Hospital

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Wards
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Ndonyo Primary School

location
South Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Ombo Kware Primary School

location
Central Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 600,000

Ndonyo-Okumba Bridge

location
South Kamagambo (in Rongo)
year first funded
2006
action
Construction Of Bridge
output
Bridge
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 1,200,000

Kanga Secondary School

location
South Kamagambo (in Rongo)
year first funded
2004
action
Construction Of Storey Dormitory
output
Dormitory
implementation status
On Going
total cost
Ksh 990,000
estimate
Ksh 1,200,000

Siala Primary School

location
Central Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 8 Classrooms & Admin Block
output
Class Rooms & Admin Block
implementation status
On Going
total cost
Ksh 950,000
estimate
Ksh 2,700,000

Koderobara Secondary School

location
Central Kamagambo (in Rongo)
year first funded
2003
action
Construction Of Library
output
Library
implementation status
Complete
total cost
Ksh 920,000
estimate
Ksh 1,200,000

Ng'Ong'A Dispensary

location
South Sakwa (in Rongo)
year first funded
2004
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 900,000

Ombo Bita Dispensary

location
Central Sakwa (in Rongo)
year first funded
2003
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 900,000

Mariwa Primary School

location
South Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 600,000

Nyarombo Primary School

location
West Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 600,000

Kokuro Secondary School

location
Central Sakwa (in Rongo)
year first funded
2005
action
Construction Of Staff Room
output
Staff Room
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Manyatta Secondary School

location
East Sakwa (in Rongo)
year first funded
2005
action
Construction Of Dormitory & Library
output
Lab & Library
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,800,000

Anding'o Kokebe Primary School

location
North Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 900,000
estimate
Ksh 600,000

Kokore-Kokuro Bridge

location
Central Sakwa (in Rongo)
year first funded
2006
action
Construction Of Foot Bridge
output
Foot Bridge
implementation status
On Going
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Matagaro Primary School

location
Central Kamagambo (in Rongo)
year first funded
2007
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 862,619
estimate
Ksh 0

Rabondo Dispensary

location
West Sakwa (in Rongo)
year first funded
2003
action
Construction Of 2 Staff Houses
output
Staff Houses
implementation status
1 Complete, 1 On Going
total cost
Ksh 857,375
estimate
Ksh 1,200,000

Get Primary School

location
East Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 850,000
estimate
Ksh 600,000

Aila Primary School

location
West Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 4 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 850,000
estimate
Ksh 1,200,000

Kitunja Primary School

location
West Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 4 Classrooms
output
Class Rooms
implementation status
2 C/Rooms At Windowest Level
total cost
Ksh 850,000
estimate
Ksh 1,600,000

Kameji Primary School

location
North Kamagambo (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 850,000
estimate
Ksh 600,000

Kuoyo Kodalo Primary School

location
North Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 850,000
estimate
Ksh 600,000

Uriri Primary School

location
North Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 829,135
estimate
Ksh 600,000

Arundo Secondary School

location
South Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 816,000
estimate
Ksh 1,200,000

Siruti Dispensary

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 1,200,000

St. Cecilia Olare Primary School

location
East Sakwa (in Rongo)
year first funded
2007
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Sigiria Primary School

location
West Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 600,000

Kanyadgiro Primary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 800,000
estimate
Ksh 600,000

Tonye Primary School

location
North Kamagambo (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 600,000

Marienga Primary School

location
South Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Class Rooms
output
Class Rooms
implementation status
New
total cost
Ksh 800,000
estimate
Ksh 600,000

St. Albert Ulanda Girls

location
South Sakwa (in Rongo)
year first funded
2004
action
Supply Of Lab Equipment & Construction Of Dormitory
output
Lab. Equipment Dormitory
implementation status
On Going
total cost
Ksh 766,000
estimate
Ksh 900,000

Rabuor Kogelo Primary School

location
East Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 750,000
estimate
Ksh 600,000

Nyang'Inja Primary School

location
North Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 750,000
estimate
Ksh 600,000

Ranen Water Project

location
North Sakwa (in Rongo)
year first funded
2006
action
Drilling Of Borehole
output
Borehole
implementation status
On Going
total cost
Ksh 750,000
estimate
Ksh 1,500,000

Winyo Secondary School

location
East Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 724,000
estimate
Ksh 600,000

Nyokal Kuja Dispensary

location
North Sakwa (in Rongo)
year first funded
2004
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 900,000

Dede Dispensary

location
West Sakwa (in Rongo)
year first funded
2003
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Pundo Kawiti Primary School

location
East Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 8 Classrooms & Admin Blockl
output
Classrooms & Admin Block
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 2,400,000

Rare Primary School

location
West Kamagambo (in Rongo)
year first funded
2005
action
Construction Of 3 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 900,000

Ng'Ou Primary School

location
West Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 3 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 900,000

Kanyawanga Secondary School

location
West Kamagambo (in Rongo)
year first funded
2005
action
Construction Of Dormitory
output
Dormitory
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 1,500,000

Lang'O Arek Secondary School

location
South Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 3 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 900,000

Koyier Primary School

location
North Sakwa (in Rongo)
year first funded
2004
action
Construction Of 3 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 900,000

Ngodhe Kambij Dispensary

location
East Kamagambo (in Rongo)
year first funded
2004
action
Construction Of Treatment Rooms & 1 Staff House
output
Treatment Rooms & Staff House
implementation status
On Going
total cost
Ksh 700,000
estimate
Ksh 1,200,000

Minyenya Secondary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Construction Of Lab & 1 Staff House
output
Lab & Staff House
implementation status
On Going
total cost
Ksh 674,000
estimate
Ksh 1,500,000

Siala Primary School

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 673,481
estimate
Ksh 0

Rinya Primary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 600,000

Dede Girls Secondary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of Dormitory
output
Dormitory
implementation status
On Going
total cost
Ksh 650,000
estimate
Ksh 1,200,000

Rakwaro Secondary School

location
West Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 3 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 632,000
estimate
Ksh 900,000

Oyugi Ogango Girls' Secondary School

location
South Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Owiro Akoko Secondary School

location
Central Sakwa (in Rongo)
year first funded
2005
action
Construction Of Lab.
output
Laboratory
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 600,000

Sigiria Secondary School

location
West Kamagambo (in Rongo)
year first funded
2006
action
Construction Of Laboratory
output
Laboratory
implementation status
On Going
total cost
Ksh 600,000
estimate
Ksh 900,000

Pe- Hill Secondary School

location
South Sakwa (in Rongo)
year first funded
2004
action
Construction Of Staff House
output
Staff House
implementation status
On Going
total cost
Ksh 566,000
estimate
Ksh 900,000

Sango Primary School

location
East Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 600,000

Anindo Primary School

location
Central Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 600,000

Agongo Primary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 550,000
estimate
Ksh 600,000

Koyar Bridge

location
West Kamagambo (in Rongo)
year first funded
2006
action
Construction Of Bridge
output
Bridge
implementation status
Complete
total cost
Ksh 549,872
estimate
Ksh 600,000

St. Joseph's Kamyawa Secondary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of 4 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 516,000
estimate
Ksh 1,200,000

Oyugi Ogango Secondary School

location
South Kamagambo (in Rongo)
year first funded
2005
action
Installation Of 4 Water Tanks
output
Water Supply
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Kadiang'A Primary School

location
North Kamagambo (in Rongo)
year first funded
2003
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Tuk Jowi Primary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Sare Primary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Kwar Primary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 500,000
estimate
Ksh 600,000

Raywer Primary School

location
Central Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Sangla Kagak Primary School

location
North Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Kachangwe Primary School

location
West Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Opapo Community Water Project

location
East Kamagambo (in Rongo)
year first funded
2005
action
Sinking Of Borehole
output
Borehole
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 800,000

Dede Girls Secondary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Installation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 550,000

Manyatta Secondary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Insatallation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 600,000

Homa Bay Mtc

location
(in Rongo)
year first funded
2004
action
Contribution Construction Of Hostels
output
Hostels
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Yamo Oloko Bridge

location
North Kamagambo (in Rongo)
year first funded
2006
action
Construction Of Foot Bridge
output
Foot Bridge
implementation status
Shoddy Work Done
total cost
Ksh 500,000
estimate
Ksh 600,000

Nyarach Primary School

location
Central Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Kamondi Primary School

location
Central Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Banda Primary School

location
West Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 500,000
estimate
Ksh 600,000

Otacho Dispensary

location
Central Sakwa (in Rongo)
year first funded
2004
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
Complete
total cost
Ksh 475,000
estimate
Ksh 475,000

Nyakuru Dispensary

location
North Sakwa (in Rongo)
year first funded
2003
action
Construction Of Treatment Rooms
output
Treatment Rooms
implementation status
On Going
total cost
Ksh 466,313
estimate
Ksh 500,000

Siany Primary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 600,000

Kodeny Primary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 600,000

Gamba Primary School

location
West Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 450,000
estimate
Ksh 600,000

Ngere Dispensary

location
West Kamagambo (in Rongo)
year first funded
2005
action
Renovation Of Treatment Rooms
output
Renovation
implementation status
On Going
total cost
Ksh 425,000
estimate
Ksh 500,000

Utoma Primary School

location
South Sakwa (in Rongo)
year first funded
2005
action
Construction Of 3 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 900,000

Ang'Ogo Primary School

location
North Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 600,000

Manyatta Primary School

location
East Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 600,000

Kuna Primary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 600,000

Toku Primary School

location
South Kamagambo (in Rongo)
year first funded
2005
action
Rehabilitation Of 8 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 1,500,000

Nyitienge Primary School

location
West Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 600,000

Mitwe Primary School

location
West Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 600,000

Kanyimach Primary School

location
West Kamagambo (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 600,000

Rongo Tea Development Project

location
Central Kamagambo (in Rongo)
year first funded
2007
action
Construction Of A Nursery Unit
output
Nursery Unit
implementation status
New
total cost
Ksh 400,000
estimate
Ksh 400,000

Ogeng'O Area Rural Elecproject

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 500,000

Sere Rinya Bridge

location
East Sakwa (in Rongo)
year first funded
2006
action
Construction Of Foot Bridge
output
Foot Bridge
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 500,000

Komingo Bridge Project

location
East Kamagambo (in Rongo)
year first funded
2006
action
Construction Of Foot Bridge
output
Foot Bridge
implementation status
Shoddy Work Done
total cost
Ksh 400,000
estimate
Ksh 500,000

Onai-Riana Bridge Project

location
East Kamagambo (in Rongo)
year first funded
2006
action
Construction Of Foot Bridge
output
Foot Bridge
implementation status
Shoddy Work Done
total cost
Ksh 400,000
estimate
Ksh 500,000

Kwe Primary School

location
West Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 380,000
estimate
Ksh 600,000

Kameji Secondary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Sinking Of Borehole
output
Borehole
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Kindu Primary School

location
North Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 350,000
estimate
Ksh 600,000

Bongu Primary School

location
East Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 350,000
estimate
Ksh 600,000

Nyasore Kangore Primary School

location
North Sakwa (in Rongo)
year first funded
2007
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Ongo Health Centre

location
South Kamagambo (in Rongo)
year first funded
2004
action
Renovation Of Treatment Rooms
output
Renovation
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Nyakuru Dispensary

location
North Sakwa (in Rongo)
year first funded
2004
action
Installation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Apondo Primary School

location
East Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 4 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 308,700
estimate
Ksh 1,200,000

Dago Kogelo Primary School

location
East Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 600,000

Rongo Dairy Cooperative Society

location
Central Kamagambo (in Rongo)
year first funded
2007
action
Machinery For Cooperative
output
Sheds
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Awendo Jua Kali Shed

location
Central Sakwa (in Rongo)
year first funded
2007
action
Jua Kali Shed
output
Sheds
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Kitembe Police Post

location
South Kamagambo (in Rongo)
year first funded
2005
action
Construction Of Two Staff Houses
output
Housing Units
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 300,000

Kokuro Area R

location
Central Sakwa (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Rakwaro Market R

location
South Kamagambo (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Yet To Start
total cost
Ksh 300,000
estimate
Ksh 300,000

Kwoyo Dispensary

location
North Sakwa (in Rongo)
year first funded
2007
action
Construction Of Hospital
output
Completion
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 400,000

Cham Gi Wadu Project

location
West Kamagambo (in Rongo)
year first funded
2007
action
Sinking Of Borehole
output
Borehole
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Mahena Primary School

location
South Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Class Rooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Akoko Primary School

location
South Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Class Rooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Ringa Kodongo Primary School

location
West Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Ombasa Primary School

location
West Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Kanyasrega Secondary School

location
North Sakwa (in Rongo)
year first funded
2005
action
Construction Of 3 Class Rooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 900,000

Nyang'Aya Primary School

location
North Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Nyambija Primary School

location
North Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 600,000

Kokuro Primary School

location
Central Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Ong'Ora Primary School

location
East Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Komito Primary School

location
North Kamagambo (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 600,000

Kakwara Primary School

location
South Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 600,000

Kondoro Primary School

location
West Kamagambo (in Rongo)
year first funded
2007
action
Construction 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Rongo Primary School

location
Central Kamagambo (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 600,000

Ngodhe Primary School

location
East Kamagambo (in Rongo)
year first funded
2006
action
Construction Admin Block
output
Admin Block
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 600,000

Sare Kamagambo Primary School

location
East Kamagambo (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 600,000

Rongo Jua Kali Shed

location
Central Kamagambo (in Rongo)
year first funded
2007
action
Jua Kali Shed
output
Sheds
implementation status
New
total cost
Ksh 300,000
estimate
Ksh 300,000

Kitweru Primary School

location
West Kamagambo (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 600,000

Rongo Boda Boda Cycle Stage

location
Central Kamagambo (in Rongo)
year first funded
2006
action
Construction Of Sheds
output
Sheds
implementation status
Stalled
total cost
Ksh 250,000
estimate
Ksh 250,000

Awendo Boda Boda Cycle Stage

location
Central Sakwa (in Rongo)
year first funded
2006
action
Construction Of Sheds
output
Sheds
implementation status
Stalled
total cost
Ksh 250,000
estimate
Ksh 250,000

Sariah Primary School

location
North Sakwa (in Rongo)
year first funded
2007
action
Rehabilitation Of Roof Blown By Wind
output
Rehabilitation Of Class Rooms
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Okumba Police Post

location
South Kamagambo (in Rongo)
year first funded
2004
action
Police Post Construction
output
Staff Houses
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 250,000

St. Cecilia Olare

location
East Sakwa (in Rongo)
year first funded
2004
action
Sinking Of Borehole
output
Borehole
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Siruti Dispensary

location
West Sakwa (in Rongo)
year first funded
2006
action
Drilling Of Borehole
output
Borehole
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Odongo Oer Water Project

location
West Sakwa (in Rongo)
year first funded
2004
action
Drilling Of Borehole
output
Borehole
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Mariwa Market Water Project

location
South Sakwa (in Rongo)
year first funded
2006
action
Sinking Of Borehole
output
Borehole
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 300,000

Ulanda Girls Secondary School

location
South Sakwa (in Rongo)
year first funded
2004
action
Installation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Owiro Akoko Secondary School

location
Central Sakwa (in Rongo)
year first funded
2004
action
Water Supply
output
Water
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 300,000

Warieya Community Water Project

location
North Kamagambo (in Rongo)
year first funded
2006
action
Construction Of A Spring Water Protection
output
Spring Protection
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 350,000

Sigiria Secondary School

location
West Kamagambo (in Rongo)
year first funded
2005
action
Installation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Ng'Ou Primary School

location
West Kamagambo (in Rongo)
year first funded
2004
action
Sinking Of Borehole
output
Borehole
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Kitere Water Project

location
South Kamagambo (in Rongo)
year first funded
2006
action
Sinking Of Borehole
output
Borehole
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 250,000

Okumba Police Post Water Project

location
South Kamagambo (in Rongo)
year first funded
2005
action
Sinking Of Borehole
output
Borehole
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Kuja School For Deaf

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Water Supply
output
Water Supply
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 300,000

Winyo Self Help Group

location
East Kamagambo (in Rongo)
year first funded
2006
action
Sinking Of Borehole
output
Borehole
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 250,000

Otacho Primary School

location
Central Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 600,000

Kokore Primary School

location
Central Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 600,000

Ranjira Primary School

location
Central Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 600,000

St. Cecilia Olare Primary School

location
East Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 600,000

Sumba Primary School

location
North Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 250,000
estimate
Ksh 600,000

Kitembe Primary School

location
South Kamagambo (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 600,000

Nyamaroka Primary School

location
South Kamagambo (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 600,000

Kosodo Primary School

location
Central Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 234,000
estimate
Ksh 600,000

Olare Area R

location
East Sakwa (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 200,000

Ongo Primary School

location
West Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Kanga Primary School

location
South Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Minyenya Primary School

location
North Kamagambo (in Rongo)
year first funded
2007
action
Construction Of 2 Class Rooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Angaga Primary School

location
East Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Sony Primary School

location
East Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Komolorume Primary School

location
Central Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Yago Primary School

location
North Sakwa (in Rongo)
year first funded
2003
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Alara Dago Primary School

location
North Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Kuja Nyokal Primary School

location
North Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Saria Primary School

location
North Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Nyasore Kangore Primary School

location
North Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Rabondo Primary School

location
West Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 200,000
estimate
Ksh 600,000

Siruti Primary School

location
West Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Dede Primary School

location
West Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Oboke Primary School

location
West Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 200,000
estimate
Ksh 600,000

Aila Matafari R

location
West Kamagambo (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Yet To Start
total cost
Ksh 200,000
estimate
Ksh 200,000

Ngere Dispensary

location
West Kamagambo (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Ranjira Area R

location
Central Sakwa (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Yet To Start
total cost
Ksh 200,000
estimate
Ksh 200,000

St. Marks Sare Area R.E.P.

location
East Sakwa (in Rongo)
year first funded
2004
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Bonde Primary School

location
East Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 600,000

Bondo Otuchi Primary School

location
Central Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 600,000

Got Ogwamrondo Primary School

location
Central Sakwa (in Rongo)
year first funded
2007
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
New
total cost
Ksh 150,000
estimate
Ksh 600,000

Malunga School R

location
South Sakwa (in Rongo)
year first funded
2004
action
Rural Electrification
output
Electricty Connection
implementation status
Yet To Start
total cost
Ksh 150,000
estimate
Ksh 150,000

Awendo Division Education Office

location
Central Sakwa (in Rongo)
year first funded
2006
action
Construction Of Admin Offices
output
Office Completion
implementation status
Stalled
total cost
Ksh 150,000
estimate
Ksh 200,000

Komolo Rume R

location
Central Sakwa (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 105,000
estimate
Ksh 120,000

Nyang'Wen Water Project

location
Central Sakwa (in Rongo)
year first funded
2005
action
Construction Of A Spring Water Protection
output
Spring Protection
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Awendo Sub-District Hospital

location
Central Sakwa (in Rongo)
year first funded
2006
action
Insatallation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mariwa Health Centre

location
South Sakwa (in Rongo)
year first funded
2005
action
Installation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

St. Joseph's Kamyawa Secondary School

location
West Sakwa (in Rongo)
year first funded
2005
action
Drilling Of Borehole
output
Borehole
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 100,000

Kolang Spring Water Project

location
East Kamagambo (in Rongo)
year first funded
2005
action
Construction Of Spring Water
output
Spring Water
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kanga Secondary School R

location
South Kamagambo (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Obama Chief's Camp

location
Central Sakwa (in Rongo)
year first funded
2005
action
Rehabilitation Of Camp
output
Rehabilitation
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Dindi Water Project

location
East Sakwa (in Rongo)
year first funded
2005
action
Construction Of Spring Water Protection
output
Spring Protection
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 150,000

Njiri Water Project

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Construction Of Spring Water
output
Spring Water
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Rongo Sub- District Hospital

location
Central Kamagambo (in Rongo)
year first funded
2006
action
Installation Of 2 Water Tanks
output
2 Water Tanks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Kakwara Primary School

location
South Kamagambo (in Rongo)
year first funded
2005
action
Sinking Of Borehole
output
Borehole
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Rare Primary School

location
West Kamagambo (in Rongo)
year first funded
2006
action
Sinking Of Borehole
output
Borehole
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 250,000

Nyakuru Secondary School

location
North Sakwa (in Rongo)
year first funded
2005
action
Installation Of Water Tanks
output
Water Tanks
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Winyo Primary School

location
East Kamagambo (in Rongo)
year first funded
2006
action
Roofing Of Class Rooms
output
Roofing
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 450,000

Koyar Primary School

location
West Kamagambo (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Ofwanga Primary School

location
North Kamagambo (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Lianda Primary School

location
Central Sakwa (in Rongo)
year first funded
2005
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Ranen Primary School

location
North Sakwa (in Rongo)
year first funded
2004
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Raruowa Kadera Primary School

location
North Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 100,000
estimate
Ksh 600,000

Awendo Sub District Hospital

location
Central Sakwa (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Nyarach Secondary School R

location
Central Kamagambo (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Minyenya Secondary School

location
North Kamagambo (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Kameji Secondary School

location
North Kamagambo (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

St. Mary's Nyanga'O Secondary School

location
East Kamagambo (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Kanyasrega Secondary School R

location
North Sakwa (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Bonde Primary School

location
West Sakwa (in Rongo)
year first funded
2007
action
Rehabilitation Of Toilets That Sunk
output
Rehabilitation Of Toilets
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 0

Kogelo Mixed Secondary School R

location
East Sakwa (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Gamba Primary School

location
West Sakwa (in Rongo)
year first funded
2006
action
Construction Of 2 Classrooms
output
Class Rooms
implementation status
On Going
total cost
Ksh 50,000
estimate
Ksh 600,000

Rinya Chief's Camp

location
East Sakwa (in Rongo)
year first funded
2006
action
Rehabilitation Of Camp
output
Rehabilitation
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 50,000

Division Office Awendo

location
Central Sakwa (in Rongo)
year first funded
2006
action
Furnishing D.O'S Office
output
Furnishing
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Minyenya Dispensary

location
North Kamagambo (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Kanyasrega Nyokal Primary School

location
North Sakwa (in Rongo)
year first funded
2005
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Nyokal Kuja Health Centre R

location
North Sakwa (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Kitere Community Hospital R

location
South Kamagambo (in Rongo)
year first funded
2006
action
Rural Electrification
output
Electricty Connection
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Nyakuru Primary School

location
North Sakwa (in Rongo)
action
n/a
output
-
implementation status
in-use
total cost
Ksh 0
estimate
Ksh 600,000