The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Makengi Water Project
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2004
- action
- Construction Of An Intake,Construction Of A Recevior Tank And Laying Of Pipes In The Area Of Supply
- output
- Water To Sub-Location Residents.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 4,500,000
- estimate
- Ksh 5,000,000
Kevote Police Post
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2004
- action
- Cons-Truction Of Main Administration Blocks (Offices) And Staff Houses And Fencing Of Copound.
- output
- Provide Security
- implementation status
- Main Office Block And Staff Houses Complete Including Toilets.
- total cost
- Ksh 3,132,220
- estimate
- Ksh 3,500,000
Karu-Rumo Health C
- location
-
Karurumo
(in Runyenjes)
- year first funded
- 2006
- action
- Purchase Of A New Ambulance For The Hospital
- output
- Provide Urgent Medical Care
- implementation status
- Ambulance Was And Handed To The Hospital On 4/08/07
- total cost
- Ksh 2,690,000
- estimate
- Ksh 2,690,000
Karu-Rumo Rural Health Training Centre
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2004
- action
- Construction Of A New Male Ward Block.
- output
- Provide Wards For Male And Female Patients.
- implementation status
- Main Structure Complete And Roofed, Remaining Works -Fixing Of Doors, Window S, Ceiling And Painting.
- total cost
- Ksh 2,500,000
- estimate
- Ksh 3,000,000
Kathanjuri Dispensary Maternity
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of Maternity Unit.
- output
- Bring Maternal Care To People
- implementation status
- Main Structure Complete. Kitchen Construction Ongoing.
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,000,000
Kianjo-Koma H Maternity
- location
-
Kagaari N.W.
(in Runyenjes)
- year first funded
- 2004
- action
- Construction Of Female Wards.
- output
- Provide Wards For Men Patients.
- implementation status
- The Project Is Complete And In Use.
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Kanja Health Cmater-Nity
- location
-
Kagaari North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction of A New Maternity Unit.
- output
- Bring Maternal Care To The People
- implementation status
- Main Structure Complete.
- total cost
- Ksh 2,450,000
- estimate
- Ksh 1,450,000
Kasafari Dispensarye-Nsary
- location
-
KaruRumo
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of A New Dispensary Block With Offices And Fencing Of The Compound.
- output
- Offer Medicare To Residents.
- implementation status
- Project Complete.
- total cost
- Ksh 2,150,000
- estimate
- Ksh 2,500,000
Nyagari Dispensarye-Nsary
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of A New Dispensary Block With Offices And Fencing Of The Compound.
- output
- Medicare To Residents.
- implementation status
- Project Complete.
- total cost
- Ksh 2,050,000
- estimate
- Ksh 2,500,000
Kathari Dispensarye-Nsary
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of A New Dispensary Block With Offices And Fencing Of The Compound, Water And Electrical Installation.
- output
- Medical Facilities To Residents
- implementation status
- Main Dispensary Block Complete.Fencing Ongoing
- total cost
- Ksh 2,050,000
- estimate
- Ksh 2,500,000
Kianjuki Schooldorm
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2004
- action
- Construction Of A New Dormitory.
- output
- Provide Boarding To Girl Students
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Karu-Rumo Police Post
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2005
- action
- Constru-Ction Of Administration Blocks (Offices),Construction Of Staff Houses And Fencing Of The Compound.
- output
- Provide Security To The Residents
- implementation status
- Main Office Block $ Staff Houses Complete.Aaso Fencing.
- total cost
- Ksh 1,950,000
- estimate
- Ksh 2,500,000
Njeruri Dispensarye-Nsary
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of A New Dispensary Block With Offics And Fencing Of The Compound.
- output
- Avail Helth Care
- implementation status
- Project Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
Mukuuri Dispensary
- location
-
Kagari North East
(in Runyenjes)
- year first funded
- 2003
- action
- Expansion Of The Main Blcook And Fencing Of The Compound
- output
- Provision Of Medical Services
- implementation status
- Project Complete And In Use
- total cost
- Ksh 1,853,450
- estimate
- Ksh 1,860,000
Kigumo Dispensary
- location
-
Kyeni East
(in Runyenjes)
- year first funded
- 2003
- action
- Roofing Of Main Block Painting, Fencing Of The Compound
- output
- Provision Of Medical Services
- implementation status
- Facility Complete And In Use
- total cost
- Ksh 1,839,244
- estimate
- Ksh 1,840,000
Muchagori Dispensary
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2003
- action
- Upgrade To Health Centre
- output
- Provision Of Medical Services
- implementation status
- Complete And Facilitaty Operational:
- total cost
- Ksh 1,826,173
- estimate
- Ksh 1,800,000
Gitare Dispensary
- location
-
Runyenjes West
(in Runyenjes)
- year first funded
- 2003
- action
- Expansion Of The Main Block And Waiting Bay.
- output
- Provision Of Medical Services
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 1,803,248
- estimate
- Ksh 1,850,000
Kanduri -Dispensary-Nsary
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of A New Dispensary.
- output
- Enhance Quality Health
- implementation status
- Construction Of Dispensary Block Nad Toilets Complete.
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,000,000
Nguire Day Secondary & Primary School Lab & Lighting
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of A New Science Lab.And Installation Of Electricity In The School
- output
- Encourage Scienec Edu.
- implementation status
- The Lab Complete And Roofed. Electrical Installation Complete And In Use.
- total cost
- Ksh 1,550,000
- estimate
- Ksh 1,200,000
Kavuru Primary School
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 6 New Class
- output
- Improve Education
- implementation status
- 2 Class Es Completed & Opened On 12.10.07 .Constructio Of 4 More Classes In Progress.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,000,000
Utheri Nguke Mini Hydro Electrs
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2006
- action
- Construction of A Power Generating Station And Suply To The Community.
- output
- Provide Cheap Electricity
- implementation status
- Power House Complete.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,500,000
Muganjuki Primary School
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of 6 New Class
- output
- Offer Conducive Learning
- implementation status
- 6 Classes Complete And In Use.
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
Kavutiri Day Secondary School Lab
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of A New Science Laboratory And 2 Classes.
- output
- Encourage Scienec Education. &Improve Education.
- implementation status
- 2 Classes And Lab Complete.
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,200,000
Stichael Kevote Day Secondary School
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of A New Science Laboratory
- output
- Encourage Science Education.
- implementation status
- Complete And Roofed.
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,200,000
Ugweri Dispensary
- location
-
Kagaari S.E.
(in Runyenjes)
- year first funded
- 2003
- action
- Expansion Of Main Block And Theatre
- output
- Provision Of Medical Services
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 1,399,910
- estimate
- Ksh 1,370,000
Lower Makengi Electricity Project
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of A Power Line Network To Supply Electricity Wihtin Makengi Area.
- output
- Alleviate Poverty.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 1,320,000
- estimate
- Ksh 1,320,000
Gatumbi Day Secondary School
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 4 Class
- output
- Improve Education.
- implementation status
- Project Complete And Ready For Use.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,200,000
S Manyatta Day Secondary School emergency
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 2 New Class
- output
- Improve Education
- implementation status
- 2 Classes Complete And In Use. The Science Lab Complete D & Roofed.
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,400,000
Starna-Bas Kathari Secondary School
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of A New Dining Hall.
- output
- Reduce Congestion In Sch.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,200,000
Kianjo-Koma Day Secondary School Lab
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2004
- action
- Construction Of A New Science Laboratory.
- output
- Avail Learning Of Science Subjects & Practicals.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,200,000
Stkarue Primary School
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of 2 New Class
- output
- Offer Conducive Learning
- implementation status
- 3 Classes Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,400,000
Ithatha Eam
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2006
- action
- Buy Land For Construction Of A Water Dam.
- output
- Irrigation Water To Be Availed.
- implementation status
- Land Already Purchased And Transfered To The Project.
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mbui-Njeru Day Secondary School
- location
-
Kagaari North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 2 New Clas
- output
- Improve Education.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Ena Day Secondary School
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of A New Dining Hall.
- output
- Enhance Quality Education
- implementation status
- Project Complete Up To Window Level.
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Kamugere Primary School
- location
-
Kagaari North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 4 New Class
- output
- Improve Education.
- implementation status
- 3 Classes Complete And In Use.Construction Of 4Th Class In Progress.
- total cost
- Ksh 900,000
- estimate
- Ksh 2,400,000
Gichugu Primary School
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of 2 New Classrooms
- output
- Offer Conducive Learning.
- implementation status
- Complete And In Use.
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Gatumbi Primary School
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 2 New Class
- output
- Enhance Quality Eduaction.
- implementation status
- 2 Classes Completed And In Use .Upgradingof 6 Classes Done.
- total cost
- Ksh 600,000
- estimate
- Ksh 2,400,000
Keruri Primary School Supplementary Grant
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 2 New Clas
- output
- Improve Education.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 600,000
- estimate
- Ksh 2,400,000
St. Joseph Primary School
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 2 Classroms
- output
- Improve Education
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 600,000
- estimate
- Ksh 2,400,000
Kavutiri Secondary School
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2004
- action
- Renovation Of A Dormitory: To Replace The Whole Roof, Repair The Floor, Replacement Of Broken Window Panes And Painting.
- output
- Provide A Comfortable Boys Boarding
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 574,345
- estimate
- Ksh 574,345
Makengi Dispensary
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of A Maternity Ward.
- output
- Enhance Quality Health.
- implementation status
- No Work Done.
- total cost
- Ksh 500,000
- estimate
- Ksh 2,150,000
Kasafari Secondary School
- location
-
KaruRumo
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 2 Class
- output
- Enhance Quality Education
- implementation status
- 2 Classes Complete.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kiamboa Secondary School
- location
-
KaruRumo
(in Runyenjes)
- year first funded
- 2007
- action
- Installation Of Electricity
- output
- Enhance Quality Education.
- implementation status
- No Work Done As The School Does Not Exist. Funds Reallocated To Land Purchase Project In The Area.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Karurumo Youth Polytechnic
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of A New Administraton Block. Money Reallocated To The Construction Of A M.V. Garage.
- output
- Enhance Quality Education.
- implementation status
- Implementation At Foundation Level.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Gichera Primary School
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 2 New Class
- output
- Enhance Quality Education.
- implementation status
- Project Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Ngeniari Primary School
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 2 New Class
- output
- Enhance Quality Education.
- implementation status
- Construction Of 2 Classes Done.
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Kaveti Primary School
- location
-
KarUrumo
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 2 New Class
- output
- Enhance Quality Eduaction.
- implementation status
- 2 Class Es Complete And In Use.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kanja Youth Poly-Technic
- location
-
Kagaari North
(in Runyenjes)
- year first funded
- 2006
- action
- Renovation Of Leaking Roof, Floor And Painting.
- output
- Enhance Youth Self Reliance
- implementation status
- Facility Complete.
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyagari Schoolsupplementary Grant
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 2 New Classrooms
- output
- Improve Education
- implementation status
- The Classrooms Are Complete And In Use.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kariru Secondary School
- location
-
KaruRumo
(in Runyenjes)
- year first funded
- 2005
- action
- Construction Of 2 New Class
- output
- Offer Good Learning.
- implementation status
- Complete And In Use.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Canon Hubert Primary School
- location
-
KaruRumo
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 2 New Classrooms
- output
- Improve Education
- implementation status
- 2 Classes Completed.
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Mugui Day Secondary Equip& Elec-Tricity
- location
-
Kagaari North
(in Runyenjes)
- year first funded
- 2006
- action
- Purchase Science Lab Equipment And Installation Of Electricity.
- output
- Use In Lab Classes.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 448,991
- estimate
- Ksh 650,000
Kandete Primary School
- location
-
KaruRumo
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 1 Clas
- output
- Enhance Quality Eduaction.
- implementation status
- Project Complete .
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Kithare Primary School
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of A New Class
- output
- Enhance Quality Eduaction.
- implementation status
- Project Complete.
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Mugui Dispensarye-Nsary
- location
-
Kagaari North
(in Runyenjes)
- year first funded
- 2007
- action
- Fencing Of The Compound, Construction of A Gate And Install Eletricity.
- output
- Enhance Quality Health.
- implementation status
- All Work Complete, Waiting Connection By Kplc.
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
Kianjuki Primary School
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2007
- action
- Rehabilitate The Classroom I.E. Replaces Leaking Iron Sheets, Repair Floor For Whole School And Painting.
- output
- Enhance Quality Education.
- implementation status
- Project Complete.
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Staul High-Kevote
- location
-
Makengi
(in Runyenjes)
- year first funded
- 2007
- action
- Renovate The School I.E. Replace Leaking Iron Shets Repair The Floor In Dinng Hall, Replace Broken Window Panes And Painting Of Whole Block.
- output
- Enhance Quality Eduaction.
- implementation status
- Roofing And Floor Work Done. Painting In Progress.
- total cost
- Ksh 300,000
- estimate
- Ksh 2,300,000
Kinthithe Day Secondary School
- location
-
KaruRumo
(in Runyenjes)
- year first funded
- 2007
- action
- Renovate The Roof Of 4 Classrooms Repair The Floor, Window Panes And Panting.
- output
- Enhance Quality Eduaction.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
Muchagori Primary School
- location
-
Gaturi North
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 1 New Clas
- output
- Enhance Quality Eduaction.
- implementation status
- Project Complete And Roofed.
- total cost
- Ksh 300,000
- estimate
- Ksh 2,400,000
Karago Primary School
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 1 New Class
- output
- Enhance Quality Educaction.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 300,000
- estimate
- Ksh 2,400,000
Matururi Primary School
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2007
- action
- Construction Of 2 New Class
- output
- Enhance Quality Educaction.
- implementation status
- 2 Classes Complete And In Use.
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kiangungi Primary School Toilets
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 12 New Pit Latrines.
- output
- Permanent Primary Toilets.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 240,000
- estimate
- Ksh 240,000
Ngorweri Rural Electr
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2007
- action
- To Support The Community In Purchasing A Transformer.
- output
- Poverty Reduction.
- implementation status
- No Work Done.
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Magaca Primary School Kegamui Electrification S
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2007
- action
- To Support The Communty In Purchasing Of An Electricity Transformer From Kplc.
- output
- Poverty Reduction.
- implementation status
- Transformer Was Paid For. Waiting For Kplc To Install And Supply Power.
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kanja Primary School
- location
-
Kagaari North
(in Runyenjes)
- year first funded
- 2007
- action
- Renovation Of The School Classrooms Ie Repairs The Floor In 4 Classrooms And Painting Of The Walls And Replace Broken Window Panes Plus Gate Construction.
- output
- Enhance Quality Education.
- implementation status
- Complete.
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Kiangungi Secondary School Toilets
- location
-
Kyeni North
(in Runyenjes)
- year first funded
- 2006
- action
- Construction Of 2 New Pit Latrines.
- output
- Permanent Sec. Toilets.
- implementation status
- Project Complete And In Use.
- total cost
- Ksh 125,000
- estimate
- Ksh 125,000
Kanyueri Water Project
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2006
- action
- Purchase And Donate Pipes To The Community Water Project.
- output
- Poverty Eradi-Cation.
- implementation status
- Pipes Were Bought And Donated- Project Complete.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ena College Of Catering
- location
-
Kagaari South
(in Runyenjes)
- year first funded
- 2007
- action
- Purchasing Of Teaching /Learning Equipment For The College.
- output
- Poverty Reduction.
- implementation status
- No Work Done.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kathu-Nguri Dispensarye-Nsary
- location
-
Kyeni South
(in Runyenjes)
- year first funded
- 2003
- action
- Installation Of Water Storage Tanks
- output
- Avail Clean-Liness In The Dispensary
- implementation status
- Work Complete And In Use.
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000