It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Runyenjes

Makengi Water Project

location
Makengi (in Runyenjes)
year first funded
2004
action
Construction Of An Intake,Construction Of A Recevior Tank And Laying Of Pipes In The Area Of Supply
output
Water To Sub-Location Residents.
implementation status
Project Complete And In Use.
total cost
Ksh 4,500,000
estimate
Ksh 5,000,000

Kevote Police Post

location
Makengi (in Runyenjes)
year first funded
2004
action
Cons-Truction Of Main Administration Blocks (Offices) And Staff Houses And Fencing Of Copound.
output
Provide Security
implementation status
Main Office Block And Staff Houses Complete Including Toilets.
total cost
Ksh 3,132,220
estimate
Ksh 3,500,000

Karu-Rumo Health C

location
Karurumo (in Runyenjes)
year first funded
2006
action
Purchase Of A New Ambulance For The Hospital
output
Provide Urgent Medical Care
implementation status
Ambulance Was And Handed To The Hospital On 4/08/07
total cost
Ksh 2,690,000
estimate
Ksh 2,690,000

Karu-Rumo Rural Health Training Centre

location
Kyeni South (in Runyenjes)
year first funded
2004
action
Construction Of A New Male Ward Block.
output
Provide Wards For Male And Female Patients.
implementation status
Main Structure Complete And Roofed, Remaining Works -Fixing Of Doors, Window S, Ceiling And Painting.
total cost
Ksh 2,500,000
estimate
Ksh 3,000,000

Kathanjuri Dispensary Maternity

location
Kyeni South (in Runyenjes)
year first funded
2006
action
Construction Of Maternity Unit.
output
Bring Maternal Care To People
implementation status
Main Structure Complete. Kitchen Construction Ongoing.
total cost
Ksh 2,500,000
estimate
Ksh 2,000,000

Kianjo-Koma H Maternity

location
Kagaari N.W. (in Runyenjes)
year first funded
2004
action
Construction Of Female Wards.
output
Provide Wards For Men Patients.
implementation status
The Project Is Complete And In Use.
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Kanja Health Cmater-Nity

location
Kagaari North (in Runyenjes)
year first funded
2006
action
Construction of A New Maternity Unit.
output
Bring Maternal Care To The People
implementation status
Main Structure Complete.
total cost
Ksh 2,450,000
estimate
Ksh 1,450,000

Kasafari Dispensarye-Nsary

location
KaruRumo (in Runyenjes)
year first funded
2005
action
Construction Of A New Dispensary Block With Offices And Fencing Of The Compound.
output
Offer Medicare To Residents.
implementation status
Project Complete.
total cost
Ksh 2,150,000
estimate
Ksh 2,500,000

Nyagari Dispensarye-Nsary

location
Kyeni South (in Runyenjes)
year first funded
2005
action
Construction Of A New Dispensary Block With Offices And Fencing Of The Compound.
output
Medicare To Residents.
implementation status
Project Complete.
total cost
Ksh 2,050,000
estimate
Ksh 2,500,000

Kathari Dispensarye-Nsary

location
Kyeni North (in Runyenjes)
year first funded
2005
action
Construction Of A New Dispensary Block With Offices And Fencing Of The Compound, Water And Electrical Installation.
output
Medical Facilities To Residents
implementation status
Main Dispensary Block Complete.Fencing Ongoing
total cost
Ksh 2,050,000
estimate
Ksh 2,500,000

Kianjuki Schooldorm

location
Gaturi North (in Runyenjes)
year first funded
2004
action
Construction Of A New Dormitory.
output
Provide Boarding To Girl Students
implementation status
Project Complete And In Use.
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Karu-Rumo Police Post

location
Kyeni South (in Runyenjes)
year first funded
2005
action
Constru-Ction Of Administration Blocks (Offices),Construction Of Staff Houses And Fencing Of The Compound.
output
Provide Security To The Residents
implementation status
Main Office Block $ Staff Houses Complete.Aaso Fencing.
total cost
Ksh 1,950,000
estimate
Ksh 2,500,000

Njeruri Dispensarye-Nsary

location
Kyeni North (in Runyenjes)
year first funded
2006
action
Construction Of A New Dispensary Block With Offics And Fencing Of The Compound.
output
Avail Helth Care
implementation status
Project Complete
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Mukuuri Dispensary

location
Kagari North East (in Runyenjes)
year first funded
2003
action
Expansion Of The Main Blcook And Fencing Of The Compound
output
Provision Of Medical Services
implementation status
Project Complete And In Use
total cost
Ksh 1,853,450
estimate
Ksh 1,860,000

Kigumo Dispensary

location
Kyeni East (in Runyenjes)
year first funded
2003
action
Roofing Of Main Block Painting, Fencing Of The Compound
output
Provision Of Medical Services
implementation status
Facility Complete And In Use
total cost
Ksh 1,839,244
estimate
Ksh 1,840,000

Muchagori Dispensary

location
Gaturi North (in Runyenjes)
year first funded
2003
action
Upgrade To Health Centre
output
Provision Of Medical Services
implementation status
Complete And Facilitaty Operational:
total cost
Ksh 1,826,173
estimate
Ksh 1,800,000

Gitare Dispensary

location
Runyenjes West (in Runyenjes)
year first funded
2003
action
Expansion Of The Main Block And Waiting Bay.
output
Provision Of Medical Services
implementation status
Project Complete And In Use.
total cost
Ksh 1,803,248
estimate
Ksh 1,850,000

Kanduri -Dispensary-Nsary

location
Kagaari South (in Runyenjes)
year first funded
2007
action
Construction Of A New Dispensary.
output
Enhance Quality Health
implementation status
Construction Of Dispensary Block Nad Toilets Complete.
total cost
Ksh 1,650,000
estimate
Ksh 2,000,000

Nguire Day Secondary & Primary School Lab & Lighting

location
Makengi (in Runyenjes)
year first funded
2006
action
Construction Of A New Science Lab.And Installation Of Electricity In The School
output
Encourage Scienec Edu.
implementation status
The Lab Complete And Roofed. Electrical Installation Complete And In Use.
total cost
Ksh 1,550,000
estimate
Ksh 1,200,000

Kavuru Primary School

location
Kagaari South (in Runyenjes)
year first funded
2006
action
Construction Of 6 New Class
output
Improve Education
implementation status
2 Class Es Completed & Opened On 12.10.07 .Constructio Of 4 More Classes In Progress.
total cost
Ksh 1,500,000
estimate
Ksh 1,000,000

Utheri Nguke Mini Hydro Electrs

location
Kyeni South (in Runyenjes)
year first funded
2006
action
Construction of A Power Generating Station And Suply To The Community.
output
Provide Cheap Electricity
implementation status
Power House Complete.
total cost
Ksh 1,500,000
estimate
Ksh 2,500,000

Muganjuki Primary School

location
Kyeni North (in Runyenjes)
year first funded
2005
action
Construction Of 6 New Class
output
Offer Conducive Learning
implementation status
6 Classes Complete And In Use.
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Kavutiri Day Secondary School Lab

location
Gaturi North (in Runyenjes)
year first funded
2006
action
Construction Of A New Science Laboratory And 2 Classes.
output
Encourage Scienec Education. &Improve Education.
implementation status
2 Classes And Lab Complete.
total cost
Ksh 1,400,000
estimate
Ksh 1,200,000

Stichael Kevote Day Secondary School

location
Makengi (in Runyenjes)
year first funded
2006
action
Construction Of A New Science Laboratory
output
Encourage Science Education.
implementation status
Complete And Roofed.
total cost
Ksh 1,400,000
estimate
Ksh 1,200,000

Ugweri Dispensary

location
Kagaari S.E. (in Runyenjes)
year first funded
2003
action
Expansion Of Main Block And Theatre
output
Provision Of Medical Services
implementation status
Project Complete And In Use.
total cost
Ksh 1,399,910
estimate
Ksh 1,370,000

Lower Makengi Electricity Project

location
Makengi (in Runyenjes)
year first funded
2005
action
Construction Of A Power Line Network To Supply Electricity Wihtin Makengi Area.
output
Alleviate Poverty.
implementation status
Project Complete And In Use.
total cost
Ksh 1,320,000
estimate
Ksh 1,320,000

Gatumbi Day Secondary School

location
Kyeni North (in Runyenjes)
year first funded
2006
action
Construction Of 4 Class
output
Improve Education.
implementation status
Project Complete And Ready For Use.
total cost
Ksh 1,300,000
estimate
Ksh 1,200,000

S Manyatta Day Secondary School emergency

location
Gaturi North (in Runyenjes)
year first funded
2006
action
Construction Of 2 New Class
output
Improve Education
implementation status
2 Classes Complete And In Use. The Science Lab Complete D & Roofed.
total cost
Ksh 1,200,000
estimate
Ksh 1,400,000

Starna-Bas Kathari Secondary School

location
Kyeni North (in Runyenjes)
year first funded
2006
action
Construction Of A New Dining Hall.
output
Reduce Congestion In Sch.
implementation status
Project Complete And In Use.
total cost
Ksh 1,150,000
estimate
Ksh 1,200,000

Kianjo-Koma Day Secondary School Lab

location
Gaturi North (in Runyenjes)
year first funded
2004
action
Construction Of A New Science Laboratory.
output
Avail Learning Of Science Subjects & Practicals.
implementation status
Project Complete And In Use.
total cost
Ksh 1,150,000
estimate
Ksh 1,200,000

Stkarue Primary School

location
Makengi (in Runyenjes)
year first funded
2005
action
Construction Of 2 New Class
output
Offer Conducive Learning
implementation status
3 Classes Complete And In Use
total cost
Ksh 1,100,000
estimate
Ksh 2,400,000

Ithatha Eam

location
Kagaari South (in Runyenjes)
year first funded
2006
action
Buy Land For Construction Of A Water Dam.
output
Irrigation Water To Be Availed.
implementation status
Land Already Purchased And Transfered To The Project.
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mbui-Njeru Day Secondary School

location
Kagaari North (in Runyenjes)
year first funded
2006
action
Construction Of 2 New Clas
output
Improve Education.
implementation status
Project Complete And In Use.
total cost
Ksh 900,000
estimate
Ksh 1,200,000

Ena Day Secondary School

location
Kagaari South (in Runyenjes)
year first funded
2007
action
Construction Of A New Dining Hall.
output
Enhance Quality Education
implementation status
Project Complete Up To Window Level.
total cost
Ksh 900,000
estimate
Ksh 1,200,000

Kamugere Primary School

location
Kagaari North (in Runyenjes)
year first funded
2006
action
Construction Of 4 New Class
output
Improve Education.
implementation status
3 Classes Complete And In Use.Construction Of 4Th Class In Progress.
total cost
Ksh 900,000
estimate
Ksh 2,400,000

Gichugu Primary School

location
Gaturi North (in Runyenjes)
year first funded
2005
action
Construction Of 2 New Classrooms
output
Offer Conducive Learning.
implementation status
Complete And In Use.
total cost
Ksh 600,000
estimate
Ksh 600,000

Gatumbi Primary School

location
Kyeni North (in Runyenjes)
year first funded
2007
action
Construction Of 2 New Class
output
Enhance Quality Eduaction.
implementation status
2 Classes Completed And In Use .Upgradingof 6 Classes Done.
total cost
Ksh 600,000
estimate
Ksh 2,400,000

Keruri Primary School Supplementary Grant

location
Makengi (in Runyenjes)
year first funded
2006
action
Construction Of 2 New Clas
output
Improve Education.
implementation status
Project Complete And In Use.
total cost
Ksh 600,000
estimate
Ksh 2,400,000

St. Joseph Primary School

location
Makengi (in Runyenjes)
year first funded
2006
action
Construction Of 2 Classroms
output
Improve Education
implementation status
Project Complete And In Use.
total cost
Ksh 600,000
estimate
Ksh 2,400,000

Kavutiri Secondary School

location
Gaturi North (in Runyenjes)
year first funded
2004
action
Renovation Of A Dormitory: To Replace The Whole Roof, Repair The Floor, Replacement Of Broken Window Panes And Painting.
output
Provide A Comfortable Boys Boarding
implementation status
Project Complete And In Use.
total cost
Ksh 574,345
estimate
Ksh 574,345

Makengi Dispensary

location
Makengi (in Runyenjes)
year first funded
2007
action
Construction Of A Maternity Ward.
output
Enhance Quality Health.
implementation status
No Work Done.
total cost
Ksh 500,000
estimate
Ksh 2,150,000

Kasafari Secondary School

location
KaruRumo (in Runyenjes)
year first funded
2007
action
Construction Of 2 Class
output
Enhance Quality Education
implementation status
2 Classes Complete.
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kiamboa Secondary School

location
KaruRumo (in Runyenjes)
year first funded
2007
action
Installation Of Electricity
output
Enhance Quality Education.
implementation status
No Work Done As The School Does Not Exist. Funds Reallocated To Land Purchase Project In The Area.
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Karurumo Youth Polytechnic

location
Kyeni South (in Runyenjes)
year first funded
2007
action
Construction Of A New Administraton Block. Money Reallocated To The Construction Of A M.V. Garage.
output
Enhance Quality Education.
implementation status
Implementation At Foundation Level.
total cost
Ksh 500,000
estimate
Ksh 1,500,000

Gichera Primary School

location
Kagaari South (in Runyenjes)
year first funded
2007
action
Construction Of 2 New Class
output
Enhance Quality Education.
implementation status
Project Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Ngeniari Primary School

location
Kagaari South (in Runyenjes)
year first funded
2007
action
Construction Of 2 New Class
output
Enhance Quality Education.
implementation status
Construction Of 2 Classes Done.
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Kaveti Primary School

location
KarUrumo (in Runyenjes)
year first funded
2007
action
Construction Of 2 New Class
output
Enhance Quality Eduaction.
implementation status
2 Class Es Complete And In Use.
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kanja Youth Poly-Technic

location
Kagaari North (in Runyenjes)
year first funded
2006
action
Renovation Of Leaking Roof, Floor And Painting.
output
Enhance Youth Self Reliance
implementation status
Facility Complete.
total cost
Ksh 500,000
estimate
Ksh 500,000

Nyagari Schoolsupplementary Grant

location
Kyeni South (in Runyenjes)
year first funded
2006
action
Construction Of 2 New Classrooms
output
Improve Education
implementation status
The Classrooms Are Complete And In Use.
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kariru Secondary School

location
KaruRumo (in Runyenjes)
year first funded
2005
action
Construction Of 2 New Class
output
Offer Good Learning.
implementation status
Complete And In Use.
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Canon Hubert Primary School

location
KaruRumo (in Runyenjes)
year first funded
2006
action
Construction Of 2 New Classrooms
output
Improve Education
implementation status
2 Classes Completed.
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Mugui Day Secondary Equip& Elec-Tricity

location
Kagaari North (in Runyenjes)
year first funded
2006
action
Purchase Science Lab Equipment And Installation Of Electricity.
output
Use In Lab Classes.
implementation status
Project Complete And In Use.
total cost
Ksh 448,991
estimate
Ksh 650,000

Kandete Primary School

location
KaruRumo (in Runyenjes)
year first funded
2007
action
Construction Of 1 Clas
output
Enhance Quality Eduaction.
implementation status
Project Complete .
total cost
Ksh 400,000
estimate
Ksh 2,000,000

Kithare Primary School

location
Kyeni North (in Runyenjes)
year first funded
2007
action
Construction Of A New Class
output
Enhance Quality Eduaction.
implementation status
Project Complete.
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Mugui Dispensarye-Nsary

location
Kagaari North (in Runyenjes)
year first funded
2007
action
Fencing Of The Compound, Construction of A Gate And Install Eletricity.
output
Enhance Quality Health.
implementation status
All Work Complete, Waiting Connection By Kplc.
total cost
Ksh 350,000
estimate
Ksh 400,000

Kianjuki Primary School

location
Gaturi North (in Runyenjes)
year first funded
2007
action
Rehabilitate The Classroom I.E. Replaces Leaking Iron Sheets, Repair Floor For Whole School And Painting.
output
Enhance Quality Education.
implementation status
Project Complete.
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Staul High-Kevote

location
Makengi (in Runyenjes)
year first funded
2007
action
Renovate The School I.E. Replace Leaking Iron Shets Repair The Floor In Dinng Hall, Replace Broken Window Panes And Painting Of Whole Block.
output
Enhance Quality Eduaction.
implementation status
Roofing And Floor Work Done. Painting In Progress.
total cost
Ksh 300,000
estimate
Ksh 2,300,000

Kinthithe Day Secondary School

location
KaruRumo (in Runyenjes)
year first funded
2007
action
Renovate The Roof Of 4 Classrooms Repair The Floor, Window Panes And Panting.
output
Enhance Quality Eduaction.
implementation status
Project Complete And In Use.
total cost
Ksh 300,000
estimate
Ksh 2,000,000

Muchagori Primary School

location
Gaturi North (in Runyenjes)
year first funded
2007
action
Construction Of 1 New Clas
output
Enhance Quality Eduaction.
implementation status
Project Complete And Roofed.
total cost
Ksh 300,000
estimate
Ksh 2,400,000

Karago Primary School

location
Kyeni South (in Runyenjes)
year first funded
2007
action
Construction Of 1 New Class
output
Enhance Quality Educaction.
implementation status
Project Complete And In Use.
total cost
Ksh 300,000
estimate
Ksh 2,400,000

Matururi Primary School

location
Kagaari South (in Runyenjes)
year first funded
2007
action
Construction Of 2 New Class
output
Enhance Quality Educaction.
implementation status
2 Classes Complete And In Use.
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Kiangungi Primary School Toilets

location
Kyeni North (in Runyenjes)
year first funded
2006
action
Construction Of 12 New Pit Latrines.
output
Permanent Primary Toilets.
implementation status
Project Complete And In Use.
total cost
Ksh 240,000
estimate
Ksh 240,000

Ngorweri Rural Electr

location
Kyeni North (in Runyenjes)
year first funded
2007
action
To Support The Community In Purchasing A Transformer.
output
Poverty Reduction.
implementation status
No Work Done.
total cost
Ksh 200,000
estimate
Ksh 2,000,000

Magaca Primary School Kegamui Electrification S

location
Kyeni South (in Runyenjes)
year first funded
2007
action
To Support The Communty In Purchasing Of An Electricity Transformer From Kplc.
output
Poverty Reduction.
implementation status
Transformer Was Paid For. Waiting For Kplc To Install And Supply Power.
total cost
Ksh 200,000
estimate
Ksh 200,000

Kanja Primary School

location
Kagaari North (in Runyenjes)
year first funded
2007
action
Renovation Of The School Classrooms Ie Repairs The Floor In 4 Classrooms And Painting Of The Walls And Replace Broken Window Panes Plus Gate Construction.
output
Enhance Quality Education.
implementation status
Complete.
total cost
Ksh 150,000
estimate
Ksh 300,000

Kiangungi Secondary School Toilets

location
Kyeni North (in Runyenjes)
year first funded
2006
action
Construction Of 2 New Pit Latrines.
output
Permanent Sec. Toilets.
implementation status
Project Complete And In Use.
total cost
Ksh 125,000
estimate
Ksh 125,000

Kanyueri Water Project

location
Kyeni South (in Runyenjes)
year first funded
2006
action
Purchase And Donate Pipes To The Community Water Project.
output
Poverty Eradi-Cation.
implementation status
Pipes Were Bought And Donated- Project Complete.
total cost
Ksh 100,000
estimate
Ksh 100,000

Ena College Of Catering

location
Kagaari South (in Runyenjes)
year first funded
2007
action
Purchasing Of Teaching /Learning Equipment For The College.
output
Poverty Reduction.
implementation status
No Work Done.
total cost
Ksh 100,000
estimate
Ksh 100,000

Kathu-Nguri Dispensarye-Nsary

location
Kyeni South (in Runyenjes)
year first funded
2003
action
Installation Of Water Storage Tanks
output
Avail Clean-Liness In The Dispensary
implementation status
Work Complete And In Use.
total cost
Ksh 100,000
estimate
Ksh 100,000