The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Sabatia Sports Complex
- location
-
West Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Purchase Of Land
- output
- Land
- implementation status
- Complete
- total cost
- Ksh 5,180,495
- estimate
- Ksh 51,804,952
Bukhulunya Secondary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2003
- action
- Complete The On-Going Student Dormitory;Classroom, Dormitory & Text Books
- output
- Classroom Dormitory & Text Book
- implementation status
- On-Going. Structure Is Now Roofed And Requires Plastering, Flooring And All Fittings;Ongoing
- total cost
- Ksh 5,050,000
- estimate
- Ksh 1,300,000
Lotego Polytechnic
- location
-
Busali West
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of Youth Polytechnic
- output
- Youth Polytechnic
- implementation status
- Complete
- total cost
- Ksh 4,300,000
- estimate
- Ksh 500,000
Lwunza Havuyiya Bridge
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- Ongoing
- total cost
- Ksh 3,330,000
- estimate
- Ksh 2,500,000
Munugi Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Fencing Classroom & Electricity; Renovation Of Classrooms
- output
- Fencing Classroom & Electricity
- implementation status
- Complete
- total cost
- Ksh 3,088,643
- estimate
- Ksh 892,474
Sabatia Cdf Office
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2007
- action
- Renovation Of Old Dos Office + Construction Of A Model Sabatia Constituency Office
- output
- -
- implementation status
- Complete And In Use; New Project. Funds Are Yet To Utilized
- total cost
- Ksh 2,850,655
- estimate
- Ksh 0
Keveye Girls Secondary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Construction Of Teacher's Houses (Wiring) + Construction Of A New Dormitory For The Girls.
- output
- Staff Houses
- implementation status
- Ongoing; Complete And Now In Use.; New Project
- total cost
- Ksh 2,600,000
- estimate
- Ksh 400,230
Inyali Health Centre
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Wiring Of Rooms And Construction Of Power House; Supply 3-Phase Line; Renovation And Equipping
- output
- Equipped Health Centre
- implementation status
- Complete; On- Going.
- total cost
- Ksh 2,569,325
- estimate
- Ksh 2,380,445
Solongo Youth Polytechnic
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Renovation And Electricity; Constructed Mechanic Workshop, Classroom, And Gate & Fenced Polytechnic.
- output
- -
- implementation status
- Complete ; Complete.
- total cost
- Ksh 2,480,000
- estimate
- Ksh 2,180,000
Nabwani/ Wagevi Bridge
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Bridge Construction
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 2,346,417
- estimate
- Ksh 780,000
Kisangula Secondary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2003
- action
- Construction Of Modern Dining Hall, Home Science Class And Purchase 5,000 Liters Plastic Tank.
- output
- Classrooms
- implementation status
- Ongoing; With Government Support The Project Been Roofed; Complete And Now
- total cost
- Ksh 2,258,550
- estimate
- Ksh 658,550
Chavogere Secondary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of Kitchen & Electricity; Complete The On-Going Cdf Dining Hall Project
- output
- Kitchen & Electricity
- implementation status
- Complete; On-Going.
- total cost
- Ksh 2,137,980
- estimate
- Ksh 2,200,000
Gahumbwa-Lwenya Foot Bridge
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2007
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- Ongoing
- total cost
- Ksh 1,988,240
- estimate
- Ksh 1,988,240
Chugi Primary School -Phase Line Supply
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Flooring Of Classroom; Renovation Of Classrooms; Instal 3- Phase Line
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,930,000
- estimate
- Ksh 900,000
Nadanya Health Centre
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Gate Construction & Maternity Wing + Electrical Wiring Of Facility Rooms + Digging Of Borehole For Dispensary
- output
- Security & Maternity Wing
- implementation status
- Ongoing; Complete And School Now Awaits Power Connection Any Moment From Now.
- total cost
- Ksh 1,920,000
- estimate
- Ksh 12,550,000
Ivona Secondary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Construction of New Classroom + Construction Of 3 Classrooms & Construction of H/M Office
- output
- Classrooms
- implementation status
- Ongoing; New Project
- total cost
- Ksh 1,912,500
- estimate
- Ksh 2,119,232
Gaigedi Secondary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of School Laboratory + Classroom Construction
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 1,870,000
- estimate
- Ksh 250,000
Kivagala Secondary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Dining Hall Construction; Complete On-Going Dining Hall Project; Wiring Of School
- output
- Dining Hall
- implementation status
- Ongoing ; Complete. Project Awaits Official Opening By Cdfc; Complete And In Use.
- total cost
- Ksh 1,821,000
- estimate
- Ksh 1,063,190
Kapsambo Secondary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2004
- action
- Renovation Of Classes; Construction of School Dining Hall; Floor, Fit Steel Windows, Wooden Doors And Wiring 2 Classrooms
- output
- Classroom
- implementation status
- Ongoing; Project On The Wall Plate; Complete And In Use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 600,000
Demesi Secondary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- School Library, Dining Hall & Kitchen Jiko
- output
- School Library, Dining Hall & Kitchen Jiko
- implementation status
- On-Going. However Initial 331,500 Went To Drain Given The Structure Had To Be Demolished Due To Poor Workmanship
- total cost
- Ksh 1,731,250
- estimate
- Ksh 400,000
Ikuvu Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Construction & Electricity; Started Construction Of 2 New Classrooms And Electrical Wiring
- output
- Classroom & Electricity
- implementation status
- On- Going. Block Has Been Roofed But No Plaster
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,249,400
Chamakanga Girls Secondary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2007
- action
- H/Science/ Administration Block; Build Walls, Plaster, Floor, Fit Windows, Doors,
- output
- -
- implementation status
- On- Going. Only ? Of The 2Nd Floor Of The Building Has Been Laid The Slab.
- total cost
- Ksh 1,662,500
- estimate
- Ksh 3,303,565
Ds Office Sabatia
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Construction Of D.OS Office
- output
- D.O?S Office
- implementation status
- Complete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,150,000
Mbale Secondary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Renovation Of Dormitory & Water; Complete On-Going Cdf Library Cum Room Storey Building
- output
- Dormitory & Water
- implementation status
- Ongoing ; Complete And In Use
- total cost
- Ksh 1,650,000
- estimate
- Ksh 300,000
Mukingi Secondary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Classroom And Electricity + construction Of Twin Laboratory
- output
- Classroom And Electricity
- implementation status
- Ongoing ; On-Going. The Laboratory Has Been Roofed..Funds To Be Disbursed Mid February 2010
- total cost
- Ksh 1,622,250
- estimate
- Ksh 5,570,880
Busamo-Vudukura Bridge
- location
-
Izava South
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 1,615,000
- estimate
- Ksh 1,615,000
Viyalo Secondary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2003
- action
- Classroom & Computer Installation; School Laboratory + Library & Computer Laboratory
- output
- Classroom And Computer
- implementation status
- Complete;On-Going Project. The Building Has Been Roofed.
- total cost
- Ksh 1,612,500
- estimate
- Ksh 3,063,400
Chavakali Secondary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Renovation Of Dormitory & Lab Equipments; To Roof The Stalled Storey Administration Block
- output
- Dormitory And Lab
- implementation status
- Complete; Ongoing
- total cost
- Ksh 1,580,000
- estimate
- Ksh 600,000
Chamakanga Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2006
- action
- Renovation Of Dormitory +10 Classrooms; Re-Roofing Plaster, Floor, Fit Windows, Doors, Apply Self Priming Paint
- output
- Dormitory
- implementation status
- Ongoing; 80% Complete.
- total cost
- Ksh 1,550,000
- estimate
- Ksh 2,150,000
Tsimbalo Secondary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Roofing & Shutter For 2 Classrooms; Construction of New Classroom; Wiring Of 3 Classrooms + Small Office
- output
- Classroom
- implementation status
- Complete; Complete; The Classroom And Small Office Are Complete And Now In Use. .
- total cost
- Ksh 1,548,889
- estimate
- Ksh 267,639
Mudete-Wasundi Bridge
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 1,544,608
- estimate
- Ksh 15,446,076
Ikobero Secondary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2005
- action
- Electricity Renovation, 30 Door Ablution Blocks; Purchase Text Books Do Fencing, Construction of Temporal Kitchen
- output
- Electricity & Classrooms
- implementation status
- Ongoing; Complete And In Use ; On- Going. Management Now Working On Boarding Section.
- total cost
- Ksh 1,512,500
- estimate
- Ksh 1,908,539
Chekombero Special School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2006
- action
- Electricity Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Chandumba Secondary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Roofing Of Dining Hall And Lab; Lab, Electricity & Classroom; Purchase Of School Dining Hall Furniture
- output
- Dining Hall And Lab, Classroom & Electricity; Dining Hall Furniture
- implementation status
- On-Going.
- total cost
- Ksh 1,476,000
- estimate
- Ksh 400,000
Galoni Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Electricity Installation; Plastering Walls Of 8 Classrooms, Fit Windows, Shutters, Window Panes,Purchase Of Land; 3 phase Line
- output
- Electricity
- implementation status
- Complete; On- Going. ? Of Payments Now Made And School Has Started Settling On The Land; New Project
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,100,000
Kumbaga Road
- location
-
Izava South
(in Sabatia)
- year first funded
- 2007
- action
- Payment Of Casual Labourers
- output
- Road
- implementation status
- Complete;Complete
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,450,000
Mulele Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Electricity Installation; Funds Used To Do Wiring Of Classrooms
- output
- Electricity
- implementation status
- Ongoing ; Complete And Now In Use.
- total cost
- Ksh 1,431,000
- estimate
- Ksh 1,431,000
St. Pauls Musalia Secondary School , Halombove
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Start Construction Of School Twin Laboratory;Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On-Going ; Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 200,000
Mukomba Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2003
- action
- Construction of 1 New Classroom; Renovation Of Classroom; Class Renovation; Fencing Of School Land
- output
- Classrooms; Classroom
- implementation status
- Ongoing; Pmc Constructed Office Instead Of Classroom; Complete;Completed. Land Has Been Sourced And Fenced.
- total cost
- Ksh 1,318,475
- estimate
- Ksh 1,100,000
Chekombero Special Unit
- location
-
Busali West
(in Sabatia)
- year first funded
- 2007
- action
- Electricity Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
JoRoadan Bridge
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Construction Of A New Bridge Linking Mbale Market And Itando Rehabilitation Centre
- output
- -
- implementation status
- New Project.
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Bridge Extra Works
- location
-
Izava South
(in Sabatia)
- year first funded
- 2006
- action
- Backfiling Of 3 Bridges
- output
- Backfilled
- implementation status
- Complete
- total cost
- Ksh 1,291,000
- estimate
- Ksh 1,291,000
Maganyi Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of The Toilets and classrooms + Supply of 3 Phase Line To The School
- output
- Classrooms
- implementation status
- Ongoing ; Complete And In Use; On- Going. The Classrooms Have Now Been Roofed; New Cdf Project In The School.
- total cost
- Ksh 1,279,500
- estimate
- Ksh 1,250,000
Busali Union Secondary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2004
- action
- Panting Borehole, School Bus; Renovated 4 Classrooms; Re-Roofed With New Timber And New Iron Sheets
- output
- Painting Borehole School Bus
- implementation status
- Complete
- total cost
- Ksh 1,260,000
- estimate
- Ksh 1,200,000
Igunga Girls Secondary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2005
- action
- Furniture & Staff Houses; Used On On-Going Storey Dormitory
- output
- Furniture & Staff Houses
- implementation status
- Ongoing ; First Floor Has Been Screed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 250,000
Bugina Secondary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2005
- action
- Laboratory & Admin. Block; Roof, Fit Windows, Doors, Ceiling Board In Administration Block
- output
- Lab & Admin. Block
- implementation status
- Ongoing; Require Vital Finishes
- total cost
- Ksh 1,220,000
- estimate
- Ksh 200,000
Mwilitsa Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2003
- action
- Construction Of 3 New Classrooms
- output
- Classroom
- implementation status
- On- Going. The Classrooms Have Now Been Roofed; Ongoing
- total cost
- Ksh 1,137,500
- estimate
- Ksh 1,450,000
Walodeya Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2005
- action
- Fencing Of School;Complete Cdf Classroom And Build Toilets; Constructed New Classroom To Completion
- output
- Security
- implementation status
- Complete; The School Completed And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 100,000
Vokoli Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Flooring Electricity &, Classroom;Construction of 1 New Classroom
- output
- Classroom & Electricity
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 200,000
Kibaala Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Electrical Wiring, + renovation Of 14 Classrooms: Plastering,Flooring,Fit Windows, Roof, Build Verandas & Paint.
- output
- Toilet & Classroom
- implementation status
- Complete; Complete/ School Now Awaits Power Connection Any Moment From Now.; Ongoing. Th E Renovation Work Not Complete.
- total cost
- Ksh 1,037,500
- estimate
- Ksh 1,200,000
Lyaduywa Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Classroom Renovation Gate Construction & Verandah; Construction of New Classroom To Completion + Wiring
- output
- Classroom And Security
- implementation status
- Ongoing; New Project.
- total cost
- Ksh 1,034,480
- estimate
- Ksh 634,480
Itegero Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2004
- action
- Class Renovation And Electricity; New Project. Part Payment To Build H/M Office.
- output
- Classrooms And Electricity
- implementation status
- Ongoing; New Project.
- total cost
- Ksh 1,012,640
- estimate
- Ksh 100,000
Tsimbalo Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Toilet Construction; Classroom Renovation + Electrical Wiring Of 6 Classrooms; Plastered, Floored & Re-Roofed
- output
- Toilets
- implementation status
- Complete; Complete And The School Now Awaits Power Connection Any Moment From Now.;On- Going. The Renovation Of Six Classrooms Complete And The Classes Are Now I Use.
- total cost
- Ksh 1,011,574
- estimate
- Ksh 1,055,266
Inyali Chugi Bridge
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Bridge Construction
- output
- Bridge
- implementation status
- Funds Reallocated To 5 Roads
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Lososi Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2007
- action
- Plaster, Floor, Fitting Steel Windows, Wooden Doors And Sealing Gables In All The Classrooms
- output
- -
- implementation status
- On- Going Project
- total cost
- Ksh 1,000,000
- estimate
- Ksh 407,000
North Maragoli Chiefs Office
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2007
- action
- Construction of Ap Houses And Armory Room; Deepening Of 10 Boreholes In The Location
- output
- -
- implementation status
- Funds Re-Allocated To Part Finance Mbale High School Lab/ 3 Phase Line Supply To Inyali Dispensary; Complete. Project Characterized With Clan Interests
- total cost
- Ksh 1,000,000
- estimate
- Ksh 555,600
Losengeli Power Saving Centre
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Supply Of Energy Saving Batteries
- output
- Energy Saving Batteries
- implementation status
- Ongoing
- total cost
- Ksh 928,000
- estimate
- Ksh 928,000
Homunoywa Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Renovation Of 5 Classrooms; Re-Roof With New Iron Sheets, Fit Steel Windows And Doors, Plaster & Floor
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 100,000
Hakelongo Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2003
- action
- Construction Of Two New Classrooms & Supply Three Phase Line
- output
- Classroom
- implementation status
- Ongoing; Pmc Diverted Funds To Do Wiring Of School. Case Under Investigation
- total cost
- Ksh 900,000
- estimate
- Ksh 200,000
Vihindi Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Re-Roofing, Plastering & Flooring Of Three Classrooms; Supply 3-Phase Line To The School
- output
- Classrooms
- implementation status
- Ongoing; On- Going Project. Only ? Of The School Classrooms Renovated And In Use.
- total cost
- Ksh 900,000
- estimate
- Ksh 350,000
Lyaduywa Ward Water Project
- location
-
Izava South
(in Sabatia)
- year first funded
- 2007
- action
- Mbihi- Demesi (;2Km) And Mbale- Elwunza (2Km) Water Line Renovation Of 10 Natural Springs
- output
- -
- implementation status
- The Upgrading Of The Line And Renovation Of Natural Spring Is Complete However Public Complain That The Line Was Not Done To Standard.
- total cost
- Ksh 900,000
- estimate
- Ksh 987,000
Chamakanga Lotego-Busali Road
- location
-
Busali West
(in Sabatia)
- year first funded
- 2006
- action
- Reshaping Of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 896,420
- estimate
- Ksh 896,420
Vohovole Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Flooring, Shutters Electricity & Roof Painting; Construction of 1 New Classroom
- output
- Classroom & Electricity
- implementation status
- Ongoing ; Only Foundation Done. Diverted Part Of Funds To Start Computer Lab
- total cost
- Ksh 887,480
- estimate
- Ksh 587,480
Ondeyo Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2007
- action
- Wiring Of 4 Classrooms And Office; Plaster, Floor, Build Gables And Verandah On Half Of School Classrooms
- output
- -
- implementation status
- Complete ; The Renovated Classrooms Are Complete And Now In Use. However, The Project Of Renovating The Classrooms Is On- Going.
- total cost
- Ksh 884,000
- estimate
- Ksh 1,699,640
Inyali Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- General School Renovation; Classroom Flooring
- output
- Classroom
- implementation status
- On- Going The Remaining 5 Classrooms To Be Renovated When Funds Are Disbursed..
- total cost
- Ksh 875,500
- estimate
- Ksh 2,308,750
Logemo Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2003
- action
- Renovation Of Classrooms And Purchase Of 0.5 Acres Of Land For School Expansion
- output
- -
- implementation status
- On- Going.
- total cost
- Ksh 870,000
- estimate
- Ksh 320,000
Lossos Busweta Bridge
- location
-
Wodanga/ Busali East
(in Sabatia)
- year first funded
- 2007
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Busweta Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2004
- action
- Boarding Facility And Electricity; Renovate 3 Classrooms' Plaster And Floor All Classrooms
- output
- Dormitory And Electricity
- implementation status
- Complete
- total cost
- Ksh 837,000
- estimate
- Ksh 537,000
Wangulu Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Plastering, Flooring & Electricity;Renovation Of Classrooms And Build School Gate
- output
- Classroom & Electricity
- implementation status
- Complete; Complete; On- Going Project. Funds Got Exhausted When Only Half Of The Classes Had Been Plastered/Floored/ And Fitted Steel Windows. However Are Still Being Used.
- total cost
- Ksh 829,157
- estimate
- Ksh 563,147
Mutsulyu Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of Admin. Block;Construction of 1 New Classroom + Electrical Wiring Of 8 Class
- output
- Admin. Block
- implementation status
- Ongoing ;Complete;Wiring Of 8 Classrooms Is Complete. Needs More Funds To Complete Remaining 3 Classrooms.
- total cost
- Ksh 800,000
- estimate
- Ksh 536,500
Bugina Kilagilu Health Centre
- location
-
Busali West
(in Sabatia)
- year first funded
- 2007
- action
- Purchase Laboratory Equipments
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 875,000
Mukingi Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Toilets & Roofing; Construction of 1 New Classroom
- output
- Toilets & Classes
- implementation status
- Complete; Pmc Diverted Funds To Do Wiring, Fit Steel Windows And Plaster Classrooms
- total cost
- Ksh 750,000
- estimate
- Ksh 250,000
Viyalo Wamage Water Piping
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2005
- action
- Water Piping Viyalo-Wamage
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 729,833
- estimate
- Ksh 729,833
Kigunga Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Plastering Of Classrooms; Construction of New Ecd Classrom And 2 New Toilets & Renovating Admin Block
- output
- Classrooms
- implementation status
- Complete ; Complete And Now In Use
- total cost
- Ksh 720,000
- estimate
- Ksh 280,000
Moi Girls Secondary School , Vokoli
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Complete On-Going Pta Dormitory Project; Construction Of Dormitory
- output
- Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 200,000
Budaywa Secondary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2006
- action
- Classroom Construction: Part Financed Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On- Going. Project Been Roofed With No Plaster, No Floor, No Doors
- total cost
- Ksh 700,000
- estimate
- Ksh 300,000
Mulundu Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Flooring Of Classroom;Construction of 1 New Classroom;Put Veranda On All Classrooms
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 100,000
Wangulu Secondary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Roofing; Fit Side Benches/Demonstration Tables And Electrical Works In Laboratory
- output
- Classroom
- implementation status
- Ongoing; Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 200,000
Munoywa Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Flooring & Shutters;Renovation Of Classrooms;Wiring Of Staffroom And Classes Eight
- output
- Classroom
- implementation status
- Ongoing ;Complete
- total cost
- Ksh 667,585
- estimate
- Ksh 217,585
Mudete-Wasundi Road
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2006
- action
- Reshaping Of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 659,600
- estimate
- Ksh 659,600
Sabatia Eye Hospital
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Eye Medical Camp;Facilitation Of One Major Free Eye Medical Camp In The Constituency
- output
- Medical Camp
- implementation status
- Complete; Complete ? Institution Held Free Eye Camp In At Igunga Primary School In Chavakali Division
- total cost
- Ksh 655,000
- estimate
- Ksh 655,000
Madegwa Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Flooring & Plastering Of Classes;Renovation Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 636,000
- estimate
- Ksh 100,000
Havuyiya Bridge
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2007
- action
- Construction Of Foot Bridge
- output
- Foot Bridge
- implementation status
- Complete
- total cost
- Ksh 635,000
- estimate
- Ksh 635,000
Demesi Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Electricity + Construction Of One Classroom
- output
- Classroom And Electricity
- implementation status
- Ongoing
- total cost
- Ksh 621,000
- estimate
- Ksh 500,000
Bukulunya Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Flooring And Electricity Fittings In 10 Classrooms; Re- Roofing 3 Classrooms With New Iron Sheets/Timber
- output
- Classroom & Electricity
- implementation status
- Complete And In Use
- total cost
- Ksh 620,660
- estimate
- Ksh 186,180
Investors Youth Group
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2006
- action
- Tea Seedling Production
- output
- Tea Seedlings
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Mbale Friends Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2005
- action
- Wiring Of 4 Classrooms; Classroom Renovation And Build Toilets
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 100,000
Proposed Chamasili Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- To Purchase 3 Acres Of Land For School Expansion
- output
- -
- implementation status
- New Project
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Itiru S
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Renovation & Construction Of Springs
- output
- Water Spring
- implementation status
- Complete
- total cost
- Ksh 560,000
- estimate
- Ksh 170,000
Lotego Youth Polytechnic
- location
-
Busali West
(in Sabatia)
- year first funded
- 2009
- action
- Purchase Of Furniture, Fencing, Build Modern Gate For The Polytechnic.
- output
- -
- implementation status
- On-Going Cdf Project. Funds To Disbursed Mid February 2010
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kilagilu Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2005
- action
- Flooring Classrooms; Renovate 8 Classrooms And Build 6 New Toilets
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 100,000
Simboyi Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2009
- action
- Renovation Of Classrooms
- output
- -
- implementation status
- To Be Considered During The 2Nd Disbursement To Be Effected By The Board
- total cost
- Ksh 543,000
- estimate
- Ksh 0
Budaywa Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2006
- action
- Flooring & Shutters; Re-Roofing Classrooms, Fit Fascia Board, Plaster/Floor, Fit Steel Windows
- output
- Classrooms
- implementation status
- On- Going/ Renovated Half The Classrooms To Completion And Are Now In Use.
- total cost
- Ksh 537,500
- estimate
- Ksh 739,200
Elwunza Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Workshop & Electricity; Renovate 1 Classroom And Construction of Three Toilets To Completion
- output
- Workshop & Electricity
- implementation status
- Ongoing
- total cost
- Ksh 537,480
- estimate
- Ksh 137,480
Mudungu Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Flooring Shutters & Electricity; Construction of 1 New Classroom
- output
- Classroom & Electricity
- implementation status
- Complete ;To Be Considered During The 2Nd Disbursement To Be Effected By The Board
- total cost
- Ksh 534,480
- estimate
- Ksh 200,000
Endeli Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Flooring & Shutters; Renovation Of Classrooms; Funds Used To Do Electrical Wiring
- output
- -
- implementation status
- Complete. The School Awaits Power Supply
- total cost
- Ksh 526,022
- estimate
- Ksh 226,022
Givudimbuli Health Centre
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2007
- action
- Purchase And Install Plastic Water Tank
- output
- -
- implementation status
- Complete And Now In Use
- total cost
- Ksh 505,000
- estimate
- Ksh 505,000
Lusengeli Secondary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2009
- action
- Part Payment For Construction Of 50Ft X 30Ft School Kitchen
- output
- -
- implementation status
- New Project. Funds To Disbursed Mid February 2010
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Chavakali Choir S
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Fish Farming
- output
- Fish Ponds
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Chekombero Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2009
- action
- Roofing, Shuttering, Flooring Of 6 Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Digula Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Re-Roofing & Plastering; Classroom
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Ellongo Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Construction of One New Classroom; Flooring Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Halombove Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Flooring; Renovate Classrooms And Build Toilets
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Hamuyundi Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- School Office & Verandah; Construction of 1 New Classroom
- output
- Office
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Igunga Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Flooring; To Build Eight 2-Door Toilets For The School
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Itando Rehabcentre
- location
-
Izava North
(in Sabatia)
- year first funded
- 2004
- action
- Renovation Of Centre
- output
- Rehabilitation Centre
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Jemovo Secondary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Renovation; Purchased Laboratory Equipments
- output
- Classroom
- implementation status
- Ongoing;On- Going Cdf Project. Only Half Of The Apparatus Have Been Acquired
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Lotego Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2009
- action
- Classroom Renovation
- output
- -
- implementation status
- New Project. To Be Considered During The 2Nd Disbursement To Be Effected By The Board
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mudete Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Flooring & Plastering; Renovate 5 Classrooms
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Nadanya Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Fencing & Shutters;Construction of 1 New Classroom
- output
- Security
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Nadanya-Wangoya-Ikuvu Road
- location
-
Izava South
(in Sabatia)
- year first funded
- 2006
- action
- Reshaping Of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nadiradi Borehole-Phase Line Supply
- location
-
Busali East
(in Sabatia)
- year first funded
- 2009
- action
- Costs Of Installing A 3-Phase Line At The Bore And Its Environs
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Proposed Evojo Dispensary
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2009
- action
- Part Payment For Purchase Of The Land
- output
- -
- implementation status
- not known
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Wanondi Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Flooring; Classroom Renovation And Toilets
- output
- Classroom
- implementation status
- Ongoing ; On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Mudete Police Post
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Police Hoses
- output
- Houses
- implementation status
- Complete
- total cost
- Ksh 480,000
- estimate
- Ksh 400,000
Mutambi Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Re-Roofing Of Classrooms;Wiring 13 Classrooms, Administration Block And Single Phase Line Supply.
- output
- Classrooms
- implementation status
- Complete ;Complete. However Works Not Done As Per Submitted Bqs
- total cost
- Ksh 466,690
- estimate
- Ksh 316,690
Gahumbwa Secondary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2007
- action
- Purchase & Installation Of 20 Litres Plastic Water Tank At School Lab; Purchase Of Lab Equipments/Chemicals
- output
- -
- implementation status
- Complete Equipping One Laboratory And Now In Use.
- total cost
- Ksh 462,000
- estimate
- Ksh 624,730
Kigama Secondary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Dormitory Construction; Dormitory Construction
- output
- Dormitory
- implementation status
- Ongoing ; Ongoing. The Project Is Now At Wall Plate
- total cost
- Ksh 450,250
- estimate
- Ksh 1,726,050
Digula Secondary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Lab Construction
- output
- Laboratory
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Masinde Tea Buying Centre
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2003
- action
- Plastering Of Banda; Built Gables, Office, Sorting Tables, Fit 2 Steel Doors, Plaster Inner Walls; Supply 3-Phase To School
- output
- Tea Banda
- implementation status
- not known
- total cost
- Ksh 450,000
- estimate
- Ksh 160,000
Kivuye Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2004
- action
- Construction Of Latrines; Constuct Classrooms
- output
- Latrines
- implementation status
- Complete; Pmc Diverted Funds And Did Wiring And Fitted Steel Window Frames In 2 Classrooms
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Kisatiru Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Classroom Renovation; Fit 36 Steel Windows And 336 Pieces Of Window Planes In 14 Class
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Ikobero Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2005
- action
- Flooring & Plastering Classrooms; Fix 30 Steel Windows And Assorted Fittings
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Munoywa Itando Dispensary
- location
-
Izava North
(in Sabatia)
- year first funded
- 2005
- action
- Renovation & Equipping
- output
- Renovates
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 250,000
N/Maragoli Community Resource Centre
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of Resource Centre
- output
- Recourse Centre
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Friends Technical School Munoywa
- location
-
Izava North
(in Sabatia)
- year first funded
- 2008
- action
- Complete On-Going Cdf Classroom Project
- output
- -
- implementation status
- Completed Constructing Two Classrooms
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Hammadra Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2005
- action
- Flooring & Electricity
- output
- Classrooms & Electricity
- implementation status
- Ongoing
- total cost
- Ksh 446,000
- estimate
- Ksh 246,000
Wandega Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2007
- action
- Fencing School Compound & Complete H/M Office.
- output
- -
- implementation status
- Complete
- total cost
- Ksh 437,500
- estimate
- Ksh 850,000
Bayusuf Primary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2003
- action
- Build Eight 2-Door Toilets; Flooring And Electricity
- output
- Classroom & Power
- implementation status
- Complete
- total cost
- Ksh 434,000
- estimate
- Ksh 134,000
Chavogere Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2006
- action
- Electricity Installation; Renovate 6 Classrooms; Plaster, Floor, Fit Windows, Doors, Fit Fascia Board
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 432,480
- estimate
- Ksh 32,480
Sabatia Health Centre
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Re-Roofing & Comp. Purchase; Renovation Of Pharmacy
- output
- Computer & Room
- implementation status
- Ongoing; Complete And Now In Use.
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mudete- Wamajai Road
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2009
- action
- Opening Up Of The Road, Heavy Bush Clearing, Bridge Works
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 7,000,000
Losengeli Secondary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Kapsambo Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2008
- action
- Construction Of Three 6-Door Pit Latrines In School + Electrical Wiring Of Adminstration Block, 2 Classes
- output
- -
- implementation status
- Complete; New Project
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Jemovo Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Classroom Flooring;Construction of 1 New Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Busali Ward Water Project
- location
-
Busali East
(in Sabatia)
- year first funded
- 2009
- action
- Renovate 8 Natural Springs In Busali East & Busali West Location.
- output
- -
- implementation status
- On-Going. Funds To Disbursed Mid February 2010
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Hamadira Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2009
- action
- Purchase Of 0.26Ha Plot Of Land For The School Expansion Title No. Kakamega /Lyaduywa./386
- output
- -
- implementation status
- New Project.
- total cost
- Ksh 400,000
- estimate
- Ksh 0
West Maragoli Chiefs Centre- Ap Houses
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2009
- action
- Renovate Chiefs Office/Construction of Ap Houses/Construction of Armory Room
- output
- -
- implementation status
- not known
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Wamage Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2003
- action
- Classroom Flooring;Renovate 11 Classrooms
- output
- Classroom
- implementation status
- Ongoing; Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Ivona Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Flooring Of 4 Classrooms; Renovate Classrooms And Build Toilets
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Chavakali Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Classrooms; Construction of To Completion Of A New Ecd Classroom
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Guluma Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2009
- action
- Re-Roofing Nursery/Primary Block With New Iron Sheets, Plaster/Floor 8 Classes
- output
- -
- implementation status
- New Project
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Walodelu S
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Bee Farming
- output
- Bee Farming
- implementation status
- Complete
- total cost
- Ksh 395,000
- estimate
- Ksh 395,000
Mago Lwenya Road
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Road Reshaping
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 351,000
- estimate
- Ksh 351,000
Viyalo Tea Buying Centre
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2003
- action
- Banda Renovation; Purchase 0.065Ha Of Land For The Re-Allocation Of Banda From Road Reserve
- output
- Tea Banda
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 50,000
Mambai Energy Centre
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2003
- action
- Energy Saving Batteries For Gas And Light
- output
- Energy Saving Batteries For Cookers And Light
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kigulienyi Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Construction Of Admin. Block; Renovate 6 Classsrooms In The School.
- output
- Admin. Block
- implementation status
- Ongoing; Complete. However Further Funding Is Required To Complete Remaining Classes
- total cost
- Ksh 350,000
- estimate
- Ksh 100,000
Kidundu Foot Bridge
- location
-
Izava South
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Chandumba Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Classroom Flooring & Windows; Renovation Of Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 600,000
Vokoli Gavudia Foot Bridge
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of Footbridge
- output
- Foot Bridge
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Evojo Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Room Construction & Electricity (Self Priming Paint/ Replace /Repair School Leaking Roof)
- output
- Comp. Room & Electricity
- implementation status
- Complete And Now In Use
- total cost
- Ksh 342,480
- estimate
- Ksh 305,000
Hakedohi Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Flooring & Electricity; Renovate Classrooms And Build Toilets
- output
- Classroom & Electricity
- implementation status
- Ongoing
- total cost
- Ksh 332,480
- estimate
- Ksh 100,000
Munoywa Secondary School
- location
-
Izava North
(in Sabatia)
- year first funded
- 2007
- action
- Part Funding Of On-Going 2 Classrooms
- output
- -
- implementation status
- On- Going
- total cost
- Ksh 331,250
- estimate
- Ksh 549,200
Galoni Bridge
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of Bridge
- output
- Bridge
- implementation status
- Funds Reallocated To Galoni -Hamuyundi
- total cost
- Ksh 330,000
- estimate
- Ksh 330,000
Lwunza Havuyiya Road
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2006
- action
- Reshaping Of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 325,000
- estimate
- Ksh 325,000
Lusala Keveye Road
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Reshaping Of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 316,000
- estimate
- Ksh 316,000
Sabatia Pioneer Group
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Facilitation Of Hiv/Aids Awareness
- output
- Hiv/Aids Awareness
- implementation status
- Ongoing
- total cost
- Ksh 310,000
- estimate
- Ksh 310,000
Emulele Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2003
- action
- Flooring Of 6 Classrooms
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 300,489
- estimate
- Ksh 1,100,000
Nabwani Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2009
- action
- Construction of 1 New Classroom
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Avenyelitsi Youth Group
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Tea Seedling Construction
- output
- Tea Seedlings
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Busali East Chiefs Office
- location
-
Busali East
(in Sabatia)
- year first funded
- 2008
- action
- Renovate Ap Houses And Build Armory House
- output
- -
- implementation status
- Funds Re-Allocated To Part Finance Mbale High School Lab/ 3 Phase Line Supply To Inyali Dispensary
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Busali Union- Logemo- Mukenye Market Road
- location
-
Busali West
(in Sabatia)
- year first funded
- 2009
- action
- Heavy Bush Clearing, Opening Up The Road And Provide Drainage
- output
- -
- implementation status
- Finishings yet to be done
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Busali West Chief Office
- location
-
Busali West
(in Sabatia)
- year first funded
- 2008
- action
- Renovate Ap Houses And Build Armory House
- output
- -
- implementation status
- Funds Re-Allocated To Part Finance Mbale High School Lab/ 3 Phase Line Supply To Inyali Dispensary
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Gahumbwa Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2008
- action
- Renovation Of 3 Classrooms
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Gavudia Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2008
- action
- Renovate 8 Classrooms
- output
- -
- implementation status
- Kshs 600,000 Re allocated to Ahero Sub District Hospital theatre project Ref. CDF BOARD/NYANDO/VOL.II/39
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Givudianyi Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2008
- action
- Renovate 7 Classrooms
- output
- -
- implementation status
- On-Going. Re-Roofed 2 Classrooms And Partly Plastered 1 Classroom
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Havuyiya Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2009
- action
- Construction of To Completion Of A New Class
- output
- -
- implementation status
- New Project.
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kegongi Health Centre
- location
-
W/ Maragoli
(in Sabatia)
- year first funded
- 2003
- action
- Fencing And Equipping The Centre
- output
- Security And Running
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Keveye Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Classroom Flooring; Renovation Of Classrooms
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Kilagilu Health Centre
- location
-
Busali West
(in Sabatia)
- year first funded
- 2005
- action
- Borehole Drilling
- output
- Borehole
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lusengeli Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2008
- action
- Complete On-Going Cdf Classroom
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lwenya Clinic
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2009
- action
- Complete Plastering, Flooring, And Roofing. Project Initiated By County Council Vihiga
- output
- -
- implementation status
- New Project. Cdf Is Partnering With Vihiga County Council To Finance The Project.
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mambai Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2008
- action
- Renovate Classrooms
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Moses Mudavadi Mululu Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2005
- action
- Painting & Electricity
- output
- Classroom & Electricity
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Mudungu Chiefs Centre- Ap Houses
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2009
- action
- Part Finance Construction Of Ap Houses
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Proposed North Maragoli Youth Polytechnic
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2009
- action
- Renovate 3 Classrooms To Be Used As Polytechnic. Works Include Plaster, Floor, Fit Windows, Doors
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sabatia Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2008
- action
- Construction of 1 New Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Viyalo Primary School
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2006
- action
- Electrical Wiring;Floor 6 Classes & Build Verandah
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Wagevi Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2009
- action
- Construction of 1 New Classroom
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kivagala Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Classroom & Electricity
- output
- Classrooms & Electricity
- implementation status
- Complete
- total cost
- Ksh 276,230
- estimate
- Ksh 150,000
Wagevi Nabwayi Road
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Vudukura Busamo Road
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Friends School Munoywa
- location
-
Izava North
(in Sabatia)
- year first funded
- 2006
- action
- Classroom Construction
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Itegero Guluma- Chavogere Mrkt- Maganyi Road
- location
-
Busali East
(in Sabatia)
- year first funded
- 2009
- action
- Opening Up Drainage System Of The Road And Light Gravelling
- output
- -
- implementation status
- New Project.
- total cost
- Ksh 250,000
- estimate
- Ksh 900,000
Inyali Tea Buying Centre
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2007
- action
- Flooring, Plastering, Fit Doors/Windows, Construction of Verandah And Build Sorting Tables
- output
- -
- implementation status
- On- Going Cdf Project. 80% Complete Though It?S Being Used By Farmers At The Moment.
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Mago Lwenya Bridge
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Bridge Construction
- output
- Bridge
- implementation status
- Ongoing
- total cost
- Ksh 249,000
- estimate
- Ksh 2,000,000
Givudimbuli Dispensary
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Electricity Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 240,000
- estimate
- Ksh 240,000
Demesi Ikuvu Road
- location
-
Izava South
(in Sabatia)
- year first funded
- 2009
- action
- For Opening Up The Road And Providing Drainage On Both Sides
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Wekikubo Water Spring
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Spring
- output
- Water Spring
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Vumilivu Self Help Group
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Tea Seedling Production
- output
- Tea Seedlings
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St. Marks Orthodox Dispensary
- location
-
Busali East
(in Sabatia)
- year first funded
- 2005
- action
- Renovation & Equipping
- output
- Renovated Block & Equipments
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mulele Vavuka S
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Fish Keeping
- output
- Fish Ponds
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lusaala Primary School
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2008
- action
- Construction of Ecd Classroom
- output
- -
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Izava South Chiefs Centre- Ap Houses
- location
-
Izava South
(in Sabatia)
- year first funded
- 2009
- action
- Renovation Of Existing Three Ap Houses And Construction of An Armory Room
- output
- -
- implementation status
- New Project.
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Isitsi Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Fahari S
- location
-
Izava North
(in Sabatia)
- year first funded
- 2003
- action
- Fish Farming
- output
- Fish Pond
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Chamakanga Secondary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Electricity Installation
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 180,000
Kisangula Electricity Project
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Electricity Installation
- output
- Electricity
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Bugina- Kilagilu Masiola- Ludzu Market Road
- location
-
Busali West
(in Sabatia)
- year first funded
- 2009
- action
- Heavy Bush Clearing, Opening Up The Road And Provide Drainage
- output
- -
- implementation status
- Finishings yet to be done
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Busweta Tea Banda
- location
-
Busali East
(in Sabatia)
- year first funded
- 2007
- action
- Part Payment To Start The Construction Of Tea Banda
- output
- -
- implementation status
- Project Now On Wall Plate.
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Chamakanga Cattle Dip
- location
-
Busali East
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Dip
- output
- Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Chanderema Cattle Dip
- location
-
N/Maragoli and Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Dip
- output
- Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Endohani S
- location
-
Izava North
(in Sabatia)
- year first funded
- 2003
- action
- Tea Seedling Production
- output
- Tea Seedlings
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Galagoli Cattle Dip
- location
-
Busali East
(in Sabatia)
- year first funded
- 2004
- action
- Renovation Of Dip
- output
- Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Lusala Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2003
- action
- Sch. Fencing & Classroom
- output
- Security And Classrooms
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 250,000
Lwenya Gaigedi Cattle Dip
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mago Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Another Donor Took Over Renovation Of Whole School
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Mudete Cattle Dip
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Dip
- output
- Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Munugi Cattle Dip
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Renovation
- output
- Cattle Dip
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Viyalo Cattle Dip
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Vohovole- Iliva
- location
-
Busali West
(in Sabatia)
- year first funded
- 2009
- action
- Manual Opening Up Of The Road
- output
- -
- implementation status
- not known
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Walodeya Cattle Dip
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Nabwani Tea Buying Centre
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2009
- action
- Renovation Of The Tea Buying Centre
- output
- -
- implementation status
- not known
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Lovei Foot Bridge
- location
-
Busali East
(in Sabatia)
- year first funded
- 2004
- action
- Construction Of Footbridge
- output
- Foot Bridge
- implementation status
- Complete
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Busweta- Mukunzura Road
- location
-
Busali East
(in Sabatia)
- year first funded
- 2009
- action
- Heavy Bush Clearing, Opening Up The Road And Provide Drainage
- output
- -
- implementation status
- Staff yet to posted
- total cost
- Ksh 125,000
- estimate
- Ksh 0
Lotego-Elunyu Road
- location
-
Busali East
(in Sabatia)
- year first funded
- 2009
- action
- Opening Up The Road
- output
- -
- implementation status
- New Project. To Be Considered During The 2Nd Disbursement To Be Effected By The Board
- total cost
- Ksh 125,000
- estimate
- Ksh 0
Munoywa Tea Buying Centre
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Renovation Of The Banda
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Wasundi Tea Buying Centre
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Construction of Sorting Tables/Re-Roof, Plaster
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Mutsulyu- Mugangu Road
- location
-
Izava South
(in Sabatia)
- year first funded
- 2009
- action
- Manual Opening Up The Road
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chatamilu Primary School
- location
-
Busali West
(in Sabatia)
- year first funded
- 2003
- action
- Fencing
- output
- Security
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Elunyu Primary School
- location
-
Busali East
(in Sabatia)
- year first funded
- 2006
- action
- Classroom Flooring
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Elwunza- Kichutu Road
- location
-
Izava South
(in Sabatia)
- year first funded
- 2009
- action
- For Opening Up The Road And Providing Drainage On Both Sides
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Keveye Tea Banda
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2003
- action
- Roofing The Banda; Re-Roofing, Construction of Storage Tables
- output
- Tea Banda
- implementation status
- Complete, Complete And Now In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kisangula Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Lusosi Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2003
- action
- Pit Latrines
- output
- Pit Latrines
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Lwunza Mukingi Road
- location
-
Izava South
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of Road
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Mudungu Water Pump
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2003
- action
- Purchase Of Mortar
- output
- Mortar
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Bukaywa Primary School
- location
-
Izava South
(in Sabatia)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Vokoli-Mudete Mktcattle Dip/ Water Project
- location
-
Wodanga/N/Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Repair Of Water System & Market
- output
- Piped Water & Market
- implementation status
- Complete
- total cost
- Ksh 95,480
- estimate
- Ksh 95,480
Kisatiru Youth Group
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Facilities Of Kisatiru F.C. Team
- output
- -
- implementation status
- Complete
- total cost
- Ksh 95,000
- estimate
- Ksh 95,000
Mago Youth Group
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2006
- action
- Facilitate Aluance F.C. Team
- output
- K.F.F. Super League
- implementation status
- Complete
- total cost
- Ksh 95,000
- estimate
- Ksh 95,000
Mambai Medical Camp
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2006
- action
- Medical Camp
- output
- Medical Camp
- implementation status
- Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kiritu Tea Banda
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2009
- action
- Renovate The Tea Banda
- output
- -
- implementation status
- not known
- total cost
- Ksh 76,916
- estimate
- Ksh 0
Lunyerere Tea Buying Centre
- location
-
Izava South
(in Sabatia)
- year first funded
- 2009
- action
- Part Payment To Build New Banda. Current One Is On Road Reserve
- output
- -
- implementation status
- New Project. However The Seed Funding Allocated Cannot Create Any Tangible Impact.
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Mwangaza S
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2003
- action
- Bee Farming
- output
- Bee Farming
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
Mululu S
- location
-
Busali West
(in Sabatia)
- year first funded
- 2004
- action
- Fish Farming
- output
- Ponds
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 70,000
China S
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Fish Farming
- output
- Fish Ponds
- implementation status
- Ongoing
- total cost
- Ksh 65,000
- estimate
- Ksh 65,000
Mambai Tea Buying Centre
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2009
- action
- Renovation Of The Tea Buying Centre
- output
- -
- implementation status
- not known
- total cost
- Ksh 60,000
- estimate
- Ksh 0
Wa Ulali
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Upgrading Of The Spring
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Wa Nyonge
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Upgrading Of The Spring
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Wa Mbani
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Upgrading Of The Spring
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Wa Lunganyi
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Upgrading Of The Spring
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Wa Libese
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Upgrading Of The Spring
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Bugina Tea Banda
- location
-
Busali West
(in Sabatia)
- year first funded
- 2007
- action
- Funds Used To Put Up A Verandah On The Tea Banda
- output
- -
- implementation status
- Complete And Now In Use.
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ellongo S
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Tea Farming
- output
- Tea Seedlings
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ikuvu Water Spring
- location
-
Izava South
(in Sabatia)
- year first funded
- 2004
- action
- Spring Renovation
- output
- Water Spring
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
Linkune S
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2003
- action
- Tea Seedlings Production
- output
- Tea Seedlings
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mbale Water Pump
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Repair Of Water Pump
- output
- Water Pump
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mu JoRoadanyi
- location
-
Izava North
(in Sabatia)
- year first funded
- 2009
- action
- Construction of To Completion Of A New Bridge
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Upe S
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Tea Seedling Production
- output
- Tea Seedlings
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Vigina Tea Banda
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Construction Of Banda
- output
- Tea Banda
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mago Tea Banda
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2007
- action
- Funds Used Construction of A New Toilet At Mago Tea Collection Centre.
- output
- -
- implementation status
- Complete And Now In Use
- total cost
- Ksh 38,570
- estimate
- Ksh 38,570
Vuyiya Primary School
- location
-
N/Maragoli
(in Sabatia)
- year first funded
- 2006
- action
- Electricity Installation
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 35,980
- estimate
- Ksh 35,980
Losengeli Primary School
- location
-
Wodanga
(in Sabatia)
- year first funded
- 2004
- action
- Pay For Electricity
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 35,000
- estimate
- Ksh 35,000
Kisatiru Elders Group
- location
-
W/Maragoli
(in Sabatia)
- year first funded
- 2004
- action
- Payment For Kplc Quotation
- output
- Electricity
- implementation status
- Complete
- total cost
- Ksh 34,000
- estimate
- Ksh 34,000
Cdf St. D Kkmg Show
- location
-
Sabatia
(in Sabatia)
- year first funded
- 2004
- action
- Construction Of Cdf Std
- output
- Cdf Stand
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 30,000
Chifudura Water Spring
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2005
- action
- Renovation Of Spring
- output
- Water Spring
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Lyamuvuki S
- location
-
Izava South
(in Sabatia)
- year first funded
- 2003
- action
- Fish Farming
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000
Chamakanga Dispensary
- location
-
Busali West
(in Sabatia)
- year first funded
- 2005
- action
- Renovation
- output
- Renovated Block
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 200,000
Ivona Water Spring
- location
-
Chavakali
(in Sabatia)
- year first funded
- 2004
- action
- Spring Renovation
- output
- Water Spring
- implementation status
- Complete
- total cost
- Ksh 20,000
- estimate
- Ksh 20,000