The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Sabatia

Sabatia Sports Complex

location
West Maragoli (in Sabatia)
year first funded
2006
action
Purchase Of Land
output
Land
implementation status
Complete
total cost
Ksh 5,180,495
estimate
Ksh 51,804,952

Bukhulunya Secondary School

location
Izava North (in Sabatia)
year first funded
2003
action
Complete The On-Going Student Dormitory;Classroom, Dormitory & Text Books
output
Classroom Dormitory & Text Book
implementation status
On-Going. Structure Is Now Roofed And Requires Plastering, Flooring And All Fittings;Ongoing
total cost
Ksh 5,050,000
estimate
Ksh 1,300,000

Lotego Polytechnic

location
Busali West (in Sabatia)
year first funded
2005
action
Construction Of Youth Polytechnic
output
Youth Polytechnic
implementation status
Complete
total cost
Ksh 4,300,000
estimate
Ksh 500,000

Lwunza Havuyiya Bridge

location
Chavakali (in Sabatia)
year first funded
2006
action
Construction Of Bridge
output
Bridge
implementation status
Ongoing
total cost
Ksh 3,330,000
estimate
Ksh 2,500,000

Munugi Primary School

location
Izava South (in Sabatia)
year first funded
2004
action
Fencing Classroom & Electricity; Renovation Of Classrooms
output
Fencing Classroom & Electricity
implementation status
Complete
total cost
Ksh 3,088,643
estimate
Ksh 892,474

Sabatia Cdf Office

location
Wodanga (in Sabatia)
year first funded
2007
action
Renovation Of Old Dos Office + Construction Of A Model Sabatia Constituency Office
output
-
implementation status
Complete And In Use; New Project. Funds Are Yet To Utilized
total cost
Ksh 2,850,655
estimate
Ksh 0

Keveye Girls Secondary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Construction Of Teacher's Houses (Wiring) + Construction Of A New Dormitory For The Girls.
output
Staff Houses
implementation status
Ongoing; Complete And Now In Use.; New Project
total cost
Ksh 2,600,000
estimate
Ksh 400,230

Inyali Health Centre

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Wiring Of Rooms And Construction Of Power House; Supply 3-Phase Line; Renovation And Equipping
output
Equipped Health Centre
implementation status
Complete; On- Going.
total cost
Ksh 2,569,325
estimate
Ksh 2,380,445

Solongo Youth Polytechnic

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Renovation And Electricity; Constructed Mechanic Workshop, Classroom, And Gate & Fenced Polytechnic.
output
-
implementation status
Complete ; Complete.
total cost
Ksh 2,480,000
estimate
Ksh 2,180,000

Nabwani/ Wagevi Bridge

location
Wodanga (in Sabatia)
year first funded
2005
action
Bridge Construction
output
Bridge
implementation status
Complete
total cost
Ksh 2,346,417
estimate
Ksh 780,000

Kisangula Secondary School

location
N/Maragoli (in Sabatia)
year first funded
2003
action
Construction Of Modern Dining Hall, Home Science Class And Purchase 5,000 Liters Plastic Tank.
output
Classrooms
implementation status
Ongoing; With Government Support The Project Been Roofed; Complete And Now
total cost
Ksh 2,258,550
estimate
Ksh 658,550

Chavogere Secondary School

location
Busali East (in Sabatia)
year first funded
2005
action
Construction Of Kitchen & Electricity; Complete The On-Going Cdf Dining Hall Project
output
Kitchen & Electricity
implementation status
Complete; On-Going.
total cost
Ksh 2,137,980
estimate
Ksh 2,200,000

Gahumbwa-Lwenya Foot Bridge

location
Wodanga (in Sabatia)
year first funded
2007
action
Construction Of Bridge
output
Bridge
implementation status
Ongoing
total cost
Ksh 1,988,240
estimate
Ksh 1,988,240

Chugi Primary School -Phase Line Supply

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Flooring Of Classroom; Renovation Of Classrooms; Instal 3- Phase Line
output
Classroom
implementation status
Ongoing
total cost
Ksh 1,930,000
estimate
Ksh 900,000

Nadanya Health Centre

location
Izava South (in Sabatia)
year first funded
2004
action
Gate Construction & Maternity Wing + Electrical Wiring Of Facility Rooms + Digging Of Borehole For Dispensary
output
Security & Maternity Wing
implementation status
Ongoing; Complete And School Now Awaits Power Connection Any Moment From Now.
total cost
Ksh 1,920,000
estimate
Ksh 12,550,000

Ivona Secondary School

location
W/Maragoli (in Sabatia)
year first funded
2006
action
Construction of New Classroom + Construction Of 3 Classrooms & Construction of H/M Office
output
Classrooms
implementation status
Ongoing; New Project
total cost
Ksh 1,912,500
estimate
Ksh 2,119,232

Gaigedi Secondary School

location
Wodanga (in Sabatia)
year first funded
2006
action
Construction Of School Laboratory + Classroom Construction
output
Classroom
implementation status
Ongoing
total cost
Ksh 1,870,000
estimate
Ksh 250,000

Kivagala Secondary School

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Dining Hall Construction; Complete On-Going Dining Hall Project; Wiring Of School
output
Dining Hall
implementation status
Ongoing ; Complete. Project Awaits Official Opening By Cdfc; Complete And In Use.
total cost
Ksh 1,821,000
estimate
Ksh 1,063,190

Kapsambo Secondary School

location
Busali East (in Sabatia)
year first funded
2004
action
Renovation Of Classes; Construction of School Dining Hall; Floor, Fit Steel Windows, Wooden Doors And Wiring 2 Classrooms
output
Classroom
implementation status
Ongoing; Project On The Wall Plate; Complete And In Use
total cost
Ksh 1,800,000
estimate
Ksh 600,000

Demesi Secondary School

location
Izava South (in Sabatia)
year first funded
2004
action
School Library, Dining Hall & Kitchen Jiko
output
School Library, Dining Hall & Kitchen Jiko
implementation status
On-Going. However Initial 331,500 Went To Drain Given The Structure Had To Be Demolished Due To Poor Workmanship
total cost
Ksh 1,731,250
estimate
Ksh 400,000

Ikuvu Primary School

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Classroom Construction & Electricity; Started Construction Of 2 New Classrooms And Electrical Wiring
output
Classroom & Electricity
implementation status
On- Going. Block Has Been Roofed But No Plaster
total cost
Ksh 1,700,000
estimate
Ksh 1,249,400

Chamakanga Girls Secondary School

location
Busali West (in Sabatia)
year first funded
2007
action
H/Science/ Administration Block; Build Walls, Plaster, Floor, Fit Windows, Doors,
output
-
implementation status
On- Going. Only ? Of The 2Nd Floor Of The Building Has Been Laid The Slab.
total cost
Ksh 1,662,500
estimate
Ksh 3,303,565

Ds Office Sabatia

location
Wodanga (in Sabatia)
year first funded
2004
action
Construction Of D.OS Office
output
D.O?S Office
implementation status
Complete
total cost
Ksh 1,650,000
estimate
Ksh 2,150,000

Mbale Secondary School

location
Izava North (in Sabatia)
year first funded
2004
action
Renovation Of Dormitory & Water; Complete On-Going Cdf Library Cum Room Storey Building
output
Dormitory & Water
implementation status
Ongoing ; Complete And In Use
total cost
Ksh 1,650,000
estimate
Ksh 300,000

Mukingi Secondary School

location
Izava South (in Sabatia)
year first funded
2004
action
Classroom And Electricity + construction Of Twin Laboratory
output
Classroom And Electricity
implementation status
Ongoing ; On-Going. The Laboratory Has Been Roofed..Funds To Be Disbursed Mid February 2010
total cost
Ksh 1,622,250
estimate
Ksh 5,570,880

Busamo-Vudukura Bridge

location
Izava South (in Sabatia)
year first funded
2006
action
Construction Of Bridge
output
Bridge
implementation status
Complete
total cost
Ksh 1,615,000
estimate
Ksh 1,615,000

Viyalo Secondary School

location
Chavakali (in Sabatia)
year first funded
2003
action
Classroom & Computer Installation; School Laboratory + Library & Computer Laboratory
output
Classroom And Computer
implementation status
Complete;On-Going Project. The Building Has Been Roofed.
total cost
Ksh 1,612,500
estimate
Ksh 3,063,400

Chavakali Secondary School

location
Chavakali (in Sabatia)
year first funded
2004
action
Renovation Of Dormitory & Lab Equipments; To Roof The Stalled Storey Administration Block
output
Dormitory And Lab
implementation status
Complete; Ongoing
total cost
Ksh 1,580,000
estimate
Ksh 600,000

Chamakanga Primary School

location
Busali West (in Sabatia)
year first funded
2006
action
Renovation Of Dormitory +10 Classrooms; Re-Roofing Plaster, Floor, Fit Windows, Doors, Apply Self Priming Paint
output
Dormitory
implementation status
Ongoing; 80% Complete.
total cost
Ksh 1,550,000
estimate
Ksh 2,150,000

Tsimbalo Secondary School

location
Izava North (in Sabatia)
year first funded
2004
action
Roofing & Shutter For 2 Classrooms; Construction of New Classroom; Wiring Of 3 Classrooms + Small Office
output
Classroom
implementation status
Complete; Complete; The Classroom And Small Office Are Complete And Now In Use. .
total cost
Ksh 1,548,889
estimate
Ksh 267,639

Mudete-Wasundi Bridge

location
Chavakali (in Sabatia)
year first funded
2006
action
Construction Of Bridge
output
Bridge
implementation status
Complete
total cost
Ksh 1,544,608
estimate
Ksh 15,446,076

Ikobero Secondary School

location
Busali East (in Sabatia)
year first funded
2005
action
Electricity Renovation, 30 Door Ablution Blocks; Purchase Text Books Do Fencing, Construction of Temporal Kitchen
output
Electricity & Classrooms
implementation status
Ongoing; Complete And In Use ; On- Going. Management Now Working On Boarding Section.
total cost
Ksh 1,512,500
estimate
Ksh 1,908,539

Chekombero Special School

location
Busali West (in Sabatia)
year first funded
2006
action
Electricity Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Chandumba Secondary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Roofing Of Dining Hall And Lab; Lab, Electricity & Classroom; Purchase Of School Dining Hall Furniture
output
Dining Hall And Lab, Classroom & Electricity; Dining Hall Furniture
implementation status
On-Going.
total cost
Ksh 1,476,000
estimate
Ksh 400,000

Galoni Primary School

location
W/Maragoli (in Sabatia)
year first funded
2005
action
Electricity Installation; Plastering Walls Of 8 Classrooms, Fit Windows, Shutters, Window Panes,Purchase Of Land; 3 phase Line
output
Electricity
implementation status
Complete; On- Going. ? Of Payments Now Made And School Has Started Settling On The Land; New Project
total cost
Ksh 1,450,000
estimate
Ksh 1,100,000

Kumbaga Road

location
Izava South (in Sabatia)
year first funded
2007
action
Payment Of Casual Labourers
output
Road
implementation status
Complete;Complete
total cost
Ksh 1,450,000
estimate
Ksh 1,450,000

Mulele Primary School

location
W/Maragoli (in Sabatia)
year first funded
2006
action
Electricity Installation; Funds Used To Do Wiring Of Classrooms
output
Electricity
implementation status
Ongoing ; Complete And Now In Use.
total cost
Ksh 1,431,000
estimate
Ksh 1,431,000

St. Pauls Musalia Secondary School , Halombove

location
Chavakali (in Sabatia)
year first funded
2004
action
Start Construction Of School Twin Laboratory;Construction Of 2 Classrooms
output
Classrooms
implementation status
On-Going ; Complete
total cost
Ksh 1,400,000
estimate
Ksh 200,000

Mukomba Primary School

location
N/Maragoli (in Sabatia)
year first funded
2003
action
Construction of 1 New Classroom; Renovation Of Classroom; Class Renovation; Fencing Of School Land
output
Classrooms; Classroom
implementation status
Ongoing; Pmc Constructed Office Instead Of Classroom; Complete;Completed. Land Has Been Sourced And Fenced.
total cost
Ksh 1,318,475
estimate
Ksh 1,100,000

Chekombero Special Unit

location
Busali West (in Sabatia)
year first funded
2007
action
Electricity Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

JoRoadan Bridge

location
Izava North (in Sabatia)
year first funded
2009
action
Construction Of A New Bridge Linking Mbale Market And Itando Rehabilitation Centre
output
-
implementation status
New Project.
total cost
Ksh 1,300,000
estimate
Ksh 0

Bridge Extra Works

location
Izava South (in Sabatia)
year first funded
2006
action
Backfiling Of 3 Bridges
output
Backfilled
implementation status
Complete
total cost
Ksh 1,291,000
estimate
Ksh 1,291,000

Maganyi Primary School

location
Busali East (in Sabatia)
year first funded
2006
action
Construction Of The Toilets and classrooms + Supply of 3 Phase Line To The School
output
Classrooms
implementation status
Ongoing ; Complete And In Use; On- Going. The Classrooms Have Now Been Roofed; New Cdf Project In The School.
total cost
Ksh 1,279,500
estimate
Ksh 1,250,000

Busali Union Secondary School

location
Busali East (in Sabatia)
year first funded
2004
action
Panting Borehole, School Bus; Renovated 4 Classrooms; Re-Roofed With New Timber And New Iron Sheets
output
Painting Borehole School Bus
implementation status
Complete
total cost
Ksh 1,260,000
estimate
Ksh 1,200,000

Igunga Girls Secondary School

location
Chavakali (in Sabatia)
year first funded
2005
action
Furniture & Staff Houses; Used On On-Going Storey Dormitory
output
Furniture & Staff Houses
implementation status
Ongoing ; First Floor Has Been Screed
total cost
Ksh 1,250,000
estimate
Ksh 250,000

Bugina Secondary School

location
Busali West (in Sabatia)
year first funded
2005
action
Laboratory & Admin. Block; Roof, Fit Windows, Doors, Ceiling Board In Administration Block
output
Lab & Admin. Block
implementation status
Ongoing; Require Vital Finishes
total cost
Ksh 1,220,000
estimate
Ksh 200,000

Mwilitsa Primary School

location
Busali East (in Sabatia)
year first funded
2003
action
Construction Of 3 New Classrooms
output
Classroom
implementation status
On- Going. The Classrooms Have Now Been Roofed; Ongoing
total cost
Ksh 1,137,500
estimate
Ksh 1,450,000

Walodeya Primary School

location
Chavakali (in Sabatia)
year first funded
2005
action
Fencing Of School;Complete Cdf Classroom And Build Toilets; Constructed New Classroom To Completion
output
Security
implementation status
Complete; The School Completed And In Use
total cost
Ksh 1,100,000
estimate
Ksh 100,000

Vokoli Primary School

location
Wodanga (in Sabatia)
year first funded
2005
action
Flooring Electricity &, Classroom;Construction of 1 New Classroom
output
Classroom & Electricity
implementation status
Ongoing
total cost
Ksh 1,100,000
estimate
Ksh 200,000

Kibaala Primary School

location
Izava North (in Sabatia)
year first funded
2004
action
Electrical Wiring, + renovation Of 14 Classrooms: Plastering,Flooring,Fit Windows, Roof, Build Verandas & Paint.
output
Toilet & Classroom
implementation status
Complete; Complete/ School Now Awaits Power Connection Any Moment From Now.; Ongoing. Th E Renovation Work Not Complete.
total cost
Ksh 1,037,500
estimate
Ksh 1,200,000

Lyaduywa Primary School

location
Izava South (in Sabatia)
year first funded
2003
action
Classroom Renovation Gate Construction & Verandah; Construction of New Classroom To Completion + Wiring
output
Classroom And Security
implementation status
Ongoing; New Project.
total cost
Ksh 1,034,480
estimate
Ksh 634,480

Itegero Primary School

location
Busali East (in Sabatia)
year first funded
2004
action
Class Renovation And Electricity; New Project. Part Payment To Build H/M Office.
output
Classrooms And Electricity
implementation status
Ongoing; New Project.
total cost
Ksh 1,012,640
estimate
Ksh 100,000

Tsimbalo Primary School

location
Izava North (in Sabatia)
year first funded
2004
action
Toilet Construction; Classroom Renovation + Electrical Wiring Of 6 Classrooms; Plastered, Floored & Re-Roofed
output
Toilets
implementation status
Complete; Complete And The School Now Awaits Power Connection Any Moment From Now.;On- Going. The Renovation Of Six Classrooms Complete And The Classes Are Now I Use.
total cost
Ksh 1,011,574
estimate
Ksh 1,055,266

Inyali Chugi Bridge

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Bridge Construction
output
Bridge
implementation status
Funds Reallocated To 5 Roads
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Lososi Primary School

location
Wodanga (in Sabatia)
year first funded
2007
action
Plaster, Floor, Fitting Steel Windows, Wooden Doors And Sealing Gables In All The Classrooms
output
-
implementation status
On- Going Project
total cost
Ksh 1,000,000
estimate
Ksh 407,000

North Maragoli Chiefs Office

location
N/Maragoli (in Sabatia)
year first funded
2007
action
Construction of Ap Houses And Armory Room; Deepening Of 10 Boreholes In The Location
output
-
implementation status
Funds Re-Allocated To Part Finance Mbale High School Lab/ 3 Phase Line Supply To Inyali Dispensary; Complete. Project Characterized With Clan Interests
total cost
Ksh 1,000,000
estimate
Ksh 555,600

Losengeli Power Saving Centre

location
Wodanga (in Sabatia)
year first funded
2004
action
Supply Of Energy Saving Batteries
output
Energy Saving Batteries
implementation status
Ongoing
total cost
Ksh 928,000
estimate
Ksh 928,000

Homunoywa Primary School

location
Izava North (in Sabatia)
year first funded
2004
action
Renovation Of 5 Classrooms; Re-Roof With New Iron Sheets, Fit Steel Windows And Doors, Plaster & Floor
output
Classroom
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 100,000

Hakelongo Primary School

location
Busali East (in Sabatia)
year first funded
2003
action
Construction Of Two New Classrooms & Supply Three Phase Line
output
Classroom
implementation status
Ongoing; Pmc Diverted Funds To Do Wiring Of School. Case Under Investigation
total cost
Ksh 900,000
estimate
Ksh 200,000

Vihindi Primary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Re-Roofing, Plastering & Flooring Of Three Classrooms; Supply 3-Phase Line To The School
output
Classrooms
implementation status
Ongoing; On- Going Project. Only ? Of The School Classrooms Renovated And In Use.
total cost
Ksh 900,000
estimate
Ksh 350,000

Lyaduywa Ward Water Project

location
Izava South (in Sabatia)
year first funded
2007
action
Mbihi- Demesi (;2Km) And Mbale- Elwunza (2Km) Water Line Renovation Of 10 Natural Springs
output
-
implementation status
The Upgrading Of The Line And Renovation Of Natural Spring Is Complete However Public Complain That The Line Was Not Done To Standard.
total cost
Ksh 900,000
estimate
Ksh 987,000

Chamakanga Lotego-Busali Road

location
Busali West (in Sabatia)
year first funded
2006
action
Reshaping Of Road
output
Road
implementation status
Complete
total cost
Ksh 896,420
estimate
Ksh 896,420

Vohovole Primary School

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Flooring, Shutters Electricity & Roof Painting; Construction of 1 New Classroom
output
Classroom & Electricity
implementation status
Ongoing ; Only Foundation Done. Diverted Part Of Funds To Start Computer Lab
total cost
Ksh 887,480
estimate
Ksh 587,480

Ondeyo Primary School

location
Izava South (in Sabatia)
year first funded
2007
action
Wiring Of 4 Classrooms And Office; Plaster, Floor, Build Gables And Verandah On Half Of School Classrooms
output
-
implementation status
Complete ; The Renovated Classrooms Are Complete And Now In Use. However, The Project Of Renovating The Classrooms Is On- Going.
total cost
Ksh 884,000
estimate
Ksh 1,699,640

Inyali Primary School

location
N/Maragoli (in Sabatia)
year first funded
2004
action
General School Renovation; Classroom Flooring
output
Classroom
implementation status
On- Going The Remaining 5 Classrooms To Be Renovated When Funds Are Disbursed..
total cost
Ksh 875,500
estimate
Ksh 2,308,750

Logemo Primary School

location
Busali East (in Sabatia)
year first funded
2003
action
Renovation Of Classrooms And Purchase Of 0.5 Acres Of Land For School Expansion
output
-
implementation status
On- Going.
total cost
Ksh 870,000
estimate
Ksh 320,000

Lossos Busweta Bridge

location
Wodanga/ Busali East (in Sabatia)
year first funded
2007
action
Construction Of Bridge
output
Bridge
implementation status
Ongoing
total cost
Ksh 850,000
estimate
Ksh 850,000

Busweta Primary School

location
Busali East (in Sabatia)
year first funded
2004
action
Boarding Facility And Electricity; Renovate 3 Classrooms' Plaster And Floor All Classrooms
output
Dormitory And Electricity
implementation status
Complete
total cost
Ksh 837,000
estimate
Ksh 537,000

Wangulu Primary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Plastering, Flooring & Electricity;Renovation Of Classrooms And Build School Gate
output
Classroom & Electricity
implementation status
Complete; Complete; On- Going Project. Funds Got Exhausted When Only Half Of The Classes Had Been Plastered/Floored/ And Fitted Steel Windows. However Are Still Being Used.
total cost
Ksh 829,157
estimate
Ksh 563,147

Mutsulyu Primary School

location
Izava South (in Sabatia)
year first funded
2005
action
Construction Of Admin. Block;Construction of 1 New Classroom + Electrical Wiring Of 8 Class
output
Admin. Block
implementation status
Ongoing ;Complete;Wiring Of 8 Classrooms Is Complete. Needs More Funds To Complete Remaining 3 Classrooms.
total cost
Ksh 800,000
estimate
Ksh 536,500

Bugina Kilagilu Health Centre

location
Busali West (in Sabatia)
year first funded
2007
action
Purchase Laboratory Equipments
output
-
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 875,000

Mukingi Primary School

location
Izava South (in Sabatia)
year first funded
2004
action
Toilets & Roofing; Construction of 1 New Classroom
output
Toilets & Classes
implementation status
Complete; Pmc Diverted Funds To Do Wiring, Fit Steel Windows And Plaster Classrooms
total cost
Ksh 750,000
estimate
Ksh 250,000

Viyalo Wamage Water Piping

location
Chavakali (in Sabatia)
year first funded
2005
action
Water Piping Viyalo-Wamage
output
Piped Water
implementation status
Complete
total cost
Ksh 729,833
estimate
Ksh 729,833

Kigunga Primary School

location
Chavakali (in Sabatia)
year first funded
2004
action
Plastering Of Classrooms; Construction of New Ecd Classrom And 2 New Toilets & Renovating Admin Block
output
Classrooms
implementation status
Complete ; Complete And Now In Use
total cost
Ksh 720,000
estimate
Ksh 280,000

Moi Girls Secondary School , Vokoli

location
Wodanga (in Sabatia)
year first funded
2004
action
Complete On-Going Pta Dormitory Project; Construction Of Dormitory
output
Dormitory
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 200,000

Budaywa Secondary School

location
Busali West (in Sabatia)
year first funded
2006
action
Classroom Construction: Part Financed Construction Of 2 Classrooms
output
Classrooms
implementation status
On- Going. Project Been Roofed With No Plaster, No Floor, No Doors
total cost
Ksh 700,000
estimate
Ksh 300,000

Mulundu Primary School

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Flooring Of Classroom;Construction of 1 New Classroom;Put Veranda On All Classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 100,000

Wangulu Secondary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Classroom Roofing; Fit Side Benches/Demonstration Tables And Electrical Works In Laboratory
output
Classroom
implementation status
Ongoing; Ongoing
total cost
Ksh 700,000
estimate
Ksh 200,000

Munoywa Primary School

location
Izava North (in Sabatia)
year first funded
2004
action
Flooring & Shutters;Renovation Of Classrooms;Wiring Of Staffroom And Classes Eight
output
Classroom
implementation status
Ongoing ;Complete
total cost
Ksh 667,585
estimate
Ksh 217,585

Mudete-Wasundi Road

location
Chavakali (in Sabatia)
year first funded
2006
action
Reshaping Of Road
output
Road
implementation status
Complete
total cost
Ksh 659,600
estimate
Ksh 659,600

Sabatia Eye Hospital

location
Wodanga (in Sabatia)
year first funded
2005
action
Eye Medical Camp;Facilitation Of One Major Free Eye Medical Camp In The Constituency
output
Medical Camp
implementation status
Complete; Complete ? Institution Held Free Eye Camp In At Igunga Primary School In Chavakali Division
total cost
Ksh 655,000
estimate
Ksh 655,000

Madegwa Primary School

location
W/Maragoli (in Sabatia)
year first funded
2005
action
Flooring & Plastering Of Classes;Renovation Of Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 636,000
estimate
Ksh 100,000

Havuyiya Bridge

location
Chavakali (in Sabatia)
year first funded
2007
action
Construction Of Foot Bridge
output
Foot Bridge
implementation status
Complete
total cost
Ksh 635,000
estimate
Ksh 635,000

Demesi Primary School

location
Izava South (in Sabatia)
year first funded
2004
action
Electricity + Construction Of One Classroom
output
Classroom And Electricity
implementation status
Ongoing
total cost
Ksh 621,000
estimate
Ksh 500,000

Bukulunya Primary School

location
Izava North (in Sabatia)
year first funded
2004
action
Flooring And Electricity Fittings In 10 Classrooms; Re- Roofing 3 Classrooms With New Iron Sheets/Timber
output
Classroom & Electricity
implementation status
Complete And In Use
total cost
Ksh 620,660
estimate
Ksh 186,180

Investors Youth Group

location
Chavakali (in Sabatia)
year first funded
2006
action
Tea Seedling Production
output
Tea Seedlings
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 600,000

Mbale Friends Primary School

location
Izava South (in Sabatia)
year first funded
2005
action
Wiring Of 4 Classrooms; Classroom Renovation And Build Toilets
output
Electricity
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 100,000

Proposed Chamasili Primary School

location
Izava North (in Sabatia)
year first funded
2009
action
To Purchase 3 Acres Of Land For School Expansion
output
-
implementation status
New Project
total cost
Ksh 600,000
estimate
Ksh 0

Itiru S

location
W/Maragoli (in Sabatia)
year first funded
2005
action
Renovation & Construction Of Springs
output
Water Spring
implementation status
Complete
total cost
Ksh 560,000
estimate
Ksh 170,000

Lotego Youth Polytechnic

location
Busali West (in Sabatia)
year first funded
2009
action
Purchase Of Furniture, Fencing, Build Modern Gate For The Polytechnic.
output
-
implementation status
On-Going Cdf Project. Funds To Disbursed Mid February 2010
total cost
Ksh 550,000
estimate
Ksh 0

Kilagilu Primary School

location
Busali West (in Sabatia)
year first funded
2005
action
Flooring Classrooms; Renovate 8 Classrooms And Build 6 New Toilets
output
Classroom
implementation status
Complete
total cost
Ksh 550,000
estimate
Ksh 100,000

Simboyi Primary School

location
N/Maragoli (in Sabatia)
year first funded
2009
action
Renovation Of Classrooms
output
-
implementation status
To Be Considered During The 2Nd Disbursement To Be Effected By The Board
total cost
Ksh 543,000
estimate
Ksh 0

Budaywa Primary School

location
Busali West (in Sabatia)
year first funded
2006
action
Flooring & Shutters; Re-Roofing Classrooms, Fit Fascia Board, Plaster/Floor, Fit Steel Windows
output
Classrooms
implementation status
On- Going/ Renovated Half The Classrooms To Completion And Are Now In Use.
total cost
Ksh 537,500
estimate
Ksh 739,200

Elwunza Primary School

location
Izava South (in Sabatia)
year first funded
2004
action
Workshop & Electricity; Renovate 1 Classroom And Construction of Three Toilets To Completion
output
Workshop & Electricity
implementation status
Ongoing
total cost
Ksh 537,480
estimate
Ksh 137,480

Mudungu Primary School

location
Wodanga (in Sabatia)
year first funded
2005
action
Flooring Shutters & Electricity; Construction of 1 New Classroom
output
Classroom & Electricity
implementation status
Complete ;To Be Considered During The 2Nd Disbursement To Be Effected By The Board
total cost
Ksh 534,480
estimate
Ksh 200,000

Endeli Primary School

location
Izava North (in Sabatia)
year first funded
2004
action
Classroom Flooring & Shutters; Renovation Of Classrooms; Funds Used To Do Electrical Wiring
output
-
implementation status
Complete. The School Awaits Power Supply
total cost
Ksh 526,022
estimate
Ksh 226,022

Givudimbuli Health Centre

location
Wodanga (in Sabatia)
year first funded
2007
action
Purchase And Install Plastic Water Tank
output
-
implementation status
Complete And Now In Use
total cost
Ksh 505,000
estimate
Ksh 505,000

Lusengeli Secondary School

location
Wodanga (in Sabatia)
year first funded
2009
action
Part Payment For Construction Of 50Ft X 30Ft School Kitchen
output
-
implementation status
New Project. Funds To Disbursed Mid February 2010
total cost
Ksh 500,000
estimate
Ksh 0

Chavakali Choir S

location
Chavakali (in Sabatia)
year first funded
2004
action
Fish Farming
output
Fish Ponds
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 500,000

Chekombero Primary School

location
Busali West (in Sabatia)
year first funded
2009
action
Roofing, Shuttering, Flooring Of 6 Classrooms
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Digula Primary School

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Re-Roofing & Plastering; Classroom
output
Classrooms
implementation status
On-Going
total cost
Ksh 500,000
estimate
Ksh 100,000

Ellongo Primary School

location
Izava South (in Sabatia)
year first funded
2004
action
Construction of One New Classroom; Flooring Classroom
output
Classroom
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 100,000

Halombove Primary School

location
Chavakali (in Sabatia)
year first funded
2004
action
Classroom Flooring; Renovate Classrooms And Build Toilets
output
Classroom
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 100,000

Hamuyundi Primary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
School Office & Verandah; Construction of 1 New Classroom
output
Office
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 100,000

Igunga Primary School

location
Chavakali (in Sabatia)
year first funded
2004
action
Classroom Flooring; To Build Eight 2-Door Toilets For The School
output
Classroom
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 100,000

Itando Rehabcentre

location
Izava North (in Sabatia)
year first funded
2004
action
Renovation Of Centre
output
Rehabilitation Centre
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Jemovo Secondary School

location
Wodanga (in Sabatia)
year first funded
2004
action
Classroom Renovation; Purchased Laboratory Equipments
output
Classroom
implementation status
Ongoing;On- Going Cdf Project. Only Half Of The Apparatus Have Been Acquired
total cost
Ksh 500,000
estimate
Ksh 900,000

Lotego Primary School

location
Busali West (in Sabatia)
year first funded
2009
action
Classroom Renovation
output
-
implementation status
New Project. To Be Considered During The 2Nd Disbursement To Be Effected By The Board
total cost
Ksh 500,000
estimate
Ksh 0

Mudete Primary School

location
Chavakali (in Sabatia)
year first funded
2004
action
Classroom Flooring & Plastering; Renovate 5 Classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 100,000

Nadanya Primary School

location
Izava South (in Sabatia)
year first funded
2003
action
Fencing & Shutters;Construction of 1 New Classroom
output
Security
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 100,000

Nadanya-Wangoya-Ikuvu Road

location
Izava South (in Sabatia)
year first funded
2006
action
Reshaping Of Road
output
Road
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Nadiradi Borehole-Phase Line Supply

location
Busali East (in Sabatia)
year first funded
2009
action
Costs Of Installing A 3-Phase Line At The Bore And Its Environs
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Proposed Evojo Dispensary

location
Chavakali (in Sabatia)
year first funded
2009
action
Part Payment For Purchase Of The Land
output
-
implementation status
not known
total cost
Ksh 500,000
estimate
Ksh 0

Wanondi Primary School

location
Chavakali (in Sabatia)
year first funded
2004
action
Classroom Flooring; Classroom Renovation And Toilets
output
Classroom
implementation status
Ongoing ; On-Going
total cost
Ksh 500,000
estimate
Ksh 100,000

Mudete Police Post

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Renovation Of Police Hoses
output
Houses
implementation status
Complete
total cost
Ksh 480,000
estimate
Ksh 400,000

Mutambi Primary School

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Re-Roofing Of Classrooms;Wiring 13 Classrooms, Administration Block And Single Phase Line Supply.
output
Classrooms
implementation status
Complete ;Complete. However Works Not Done As Per Submitted Bqs
total cost
Ksh 466,690
estimate
Ksh 316,690

Gahumbwa Secondary School

location
Wodanga (in Sabatia)
year first funded
2007
action
Purchase & Installation Of 20 Litres Plastic Water Tank At School Lab; Purchase Of Lab Equipments/Chemicals
output
-
implementation status
Complete Equipping One Laboratory And Now In Use.
total cost
Ksh 462,000
estimate
Ksh 624,730

Kigama Secondary School

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Dormitory Construction; Dormitory Construction
output
Dormitory
implementation status
Ongoing ; Ongoing. The Project Is Now At Wall Plate
total cost
Ksh 450,250
estimate
Ksh 1,726,050

Digula Secondary School

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Lab Construction
output
Laboratory
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 450,000

Masinde Tea Buying Centre

location
W/Maragoli (in Sabatia)
year first funded
2003
action
Plastering Of Banda; Built Gables, Office, Sorting Tables, Fit 2 Steel Doors, Plaster Inner Walls; Supply 3-Phase To School
output
Tea Banda
implementation status
not known
total cost
Ksh 450,000
estimate
Ksh 160,000

Kivuye Primary School

location
Busali East (in Sabatia)
year first funded
2004
action
Construction Of Latrines; Constuct Classrooms
output
Latrines
implementation status
Complete; Pmc Diverted Funds And Did Wiring And Fitted Steel Window Frames In 2 Classrooms
total cost
Ksh 450,000
estimate
Ksh 150,000

Kisatiru Primary School

location
W/Maragoli (in Sabatia)
year first funded
2006
action
Classroom Renovation; Fit 36 Steel Windows And 336 Pieces Of Window Planes In 14 Class
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 150,000

Ikobero Primary School

location
Busali East (in Sabatia)
year first funded
2005
action
Flooring & Plastering Classrooms; Fix 30 Steel Windows And Assorted Fittings
output
Classrooms
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 150,000

Munoywa Itando Dispensary

location
Izava North (in Sabatia)
year first funded
2005
action
Renovation & Equipping
output
Renovates
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 250,000

N/Maragoli Community Resource Centre

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Construction Of Resource Centre
output
Recourse Centre
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Friends Technical School Munoywa

location
Izava North (in Sabatia)
year first funded
2008
action
Complete On-Going Cdf Classroom Project
output
-
implementation status
Completed Constructing Two Classrooms
total cost
Ksh 450,000
estimate
Ksh 0

Hammadra Primary School

location
Izava South (in Sabatia)
year first funded
2005
action
Flooring & Electricity
output
Classrooms & Electricity
implementation status
Ongoing
total cost
Ksh 446,000
estimate
Ksh 246,000

Wandega Primary School

location
Busali West (in Sabatia)
year first funded
2007
action
Fencing School Compound & Complete H/M Office.
output
-
implementation status
Complete
total cost
Ksh 437,500
estimate
Ksh 850,000

Bayusuf Primary School

location
Izava North (in Sabatia)
year first funded
2003
action
Build Eight 2-Door Toilets; Flooring And Electricity
output
Classroom & Power
implementation status
Complete
total cost
Ksh 434,000
estimate
Ksh 134,000

Chavogere Primary School

location
Busali East (in Sabatia)
year first funded
2006
action
Electricity Installation; Renovate 6 Classrooms; Plaster, Floor, Fit Windows, Doors, Fit Fascia Board
output
Electricity
implementation status
Complete
total cost
Ksh 432,480
estimate
Ksh 32,480

Sabatia Health Centre

location
Wodanga (in Sabatia)
year first funded
2004
action
Re-Roofing & Comp. Purchase; Renovation Of Pharmacy
output
Computer & Room
implementation status
Ongoing; Complete And Now In Use.
total cost
Ksh 400,000
estimate
Ksh 400,000

Mudete- Wamajai Road

location
Chavakali (in Sabatia)
year first funded
2009
action
Opening Up Of The Road, Heavy Bush Clearing, Bridge Works
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 7,000,000

Losengeli Secondary School

location
Wodanga (in Sabatia)
year first funded
2005
action
Construction Of Classrooms
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 200,000

Kapsambo Primary School

location
Busali East (in Sabatia)
year first funded
2008
action
Construction Of Three 6-Door Pit Latrines In School + Electrical Wiring Of Adminstration Block, 2 Classes
output
-
implementation status
Complete; New Project
total cost
Ksh 400,000
estimate
Ksh 0

Jemovo Primary School

location
Wodanga (in Sabatia)
year first funded
2005
action
Classroom Flooring;Construction of 1 New Classroom
output
Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 100,000

Busali Ward Water Project

location
Busali East (in Sabatia)
year first funded
2009
action
Renovate 8 Natural Springs In Busali East & Busali West Location.
output
-
implementation status
On-Going. Funds To Disbursed Mid February 2010
total cost
Ksh 400,000
estimate
Ksh 0

Hamadira Primary School

location
Izava South (in Sabatia)
year first funded
2009
action
Purchase Of 0.26Ha Plot Of Land For The School Expansion Title No. Kakamega /Lyaduywa./386
output
-
implementation status
New Project.
total cost
Ksh 400,000
estimate
Ksh 0

West Maragoli Chiefs Centre- Ap Houses

location
W/Maragoli (in Sabatia)
year first funded
2009
action
Renovate Chiefs Office/Construction of Ap Houses/Construction of Armory Room
output
-
implementation status
not known
total cost
Ksh 400,000
estimate
Ksh 0

Wamage Primary School

location
Chavakali (in Sabatia)
year first funded
2003
action
Classroom Flooring;Renovate 11 Classrooms
output
Classroom
implementation status
Ongoing; Complete
total cost
Ksh 400,000
estimate
Ksh 100,000

Ivona Primary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Flooring Of 4 Classrooms; Renovate Classrooms And Build Toilets
output
Classrooms
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 100,000

Chavakali Primary School

location
Chavakali (in Sabatia)
year first funded
2005
action
Renovation Of Classrooms; Construction of To Completion Of A New Ecd Classroom
output
Classrooms
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 100,000

Guluma Primary School

location
Busali East (in Sabatia)
year first funded
2009
action
Re-Roofing Nursery/Primary Block With New Iron Sheets, Plaster/Floor 8 Classes
output
-
implementation status
New Project
total cost
Ksh 400,000
estimate
Ksh 0

Walodelu S

location
Izava South (in Sabatia)
year first funded
2003
action
Bee Farming
output
Bee Farming
implementation status
Complete
total cost
Ksh 395,000
estimate
Ksh 395,000

Mago Lwenya Road

location
Wodanga (in Sabatia)
year first funded
2004
action
Road Reshaping
output
Road
implementation status
Complete
total cost
Ksh 351,000
estimate
Ksh 351,000

Viyalo Tea Buying Centre

location
Chavakali (in Sabatia)
year first funded
2003
action
Banda Renovation; Purchase 0.065Ha Of Land For The Re-Allocation Of Banda From Road Reserve
output
Tea Banda
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 50,000

Mambai Energy Centre

location
Wodanga (in Sabatia)
year first funded
2003
action
Energy Saving Batteries For Gas And Light
output
Energy Saving Batteries For Cookers And Light
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Kigulienyi Primary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Construction Of Admin. Block; Renovate 6 Classsrooms In The School.
output
Admin. Block
implementation status
Ongoing; Complete. However Further Funding Is Required To Complete Remaining Classes
total cost
Ksh 350,000
estimate
Ksh 100,000

Kidundu Foot Bridge

location
Izava South (in Sabatia)
year first funded
2006
action
Construction Of Bridge
output
Bridge
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Chandumba Primary School

location
W/Maragoli (in Sabatia)
year first funded
2005
action
Classroom Flooring & Windows; Renovation Of Classrooms
output
Classrooms
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 600,000

Vokoli Gavudia Foot Bridge

location
Wodanga (in Sabatia)
year first funded
2006
action
Construction Of Footbridge
output
Foot Bridge
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Evojo Primary School

location
Chavakali (in Sabatia)
year first funded
2004
action
Room Construction & Electricity (Self Priming Paint/ Replace /Repair School Leaking Roof)
output
Comp. Room & Electricity
implementation status
Complete And Now In Use
total cost
Ksh 342,480
estimate
Ksh 305,000

Hakedohi Primary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Classroom Flooring & Electricity; Renovate Classrooms And Build Toilets
output
Classroom & Electricity
implementation status
Ongoing
total cost
Ksh 332,480
estimate
Ksh 100,000

Munoywa Secondary School

location
Izava North (in Sabatia)
year first funded
2007
action
Part Funding Of On-Going 2 Classrooms
output
-
implementation status
On- Going
total cost
Ksh 331,250
estimate
Ksh 549,200

Galoni Bridge

location
W/Maragoli (in Sabatia)
year first funded
2005
action
Construction Of Bridge
output
Bridge
implementation status
Funds Reallocated To Galoni -Hamuyundi
total cost
Ksh 330,000
estimate
Ksh 330,000

Lwunza Havuyiya Road

location
Chavakali (in Sabatia)
year first funded
2006
action
Reshaping Of Road
output
Road
implementation status
Complete
total cost
Ksh 325,000
estimate
Ksh 325,000

Lusala Keveye Road

location
W/Maragoli (in Sabatia)
year first funded
2006
action
Reshaping Of Road
output
Road
implementation status
Complete
total cost
Ksh 316,000
estimate
Ksh 316,000

Sabatia Pioneer Group

location
Izava South (in Sabatia)
year first funded
2004
action
Facilitation Of Hiv/Aids Awareness
output
Hiv/Aids Awareness
implementation status
Ongoing
total cost
Ksh 310,000
estimate
Ksh 310,000

Emulele Primary School

location
Wodanga (in Sabatia)
year first funded
2003
action
Flooring Of 6 Classrooms
output
Classroom
implementation status
Complete
total cost
Ksh 300,489
estimate
Ksh 1,100,000

Nabwani Primary School

location
Wodanga (in Sabatia)
year first funded
2009
action
Construction of 1 New Classroom
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Avenyelitsi Youth Group

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Tea Seedling Construction
output
Tea Seedlings
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Busali East Chiefs Office

location
Busali East (in Sabatia)
year first funded
2008
action
Renovate Ap Houses And Build Armory House
output
-
implementation status
Funds Re-Allocated To Part Finance Mbale High School Lab/ 3 Phase Line Supply To Inyali Dispensary
total cost
Ksh 300,000
estimate
Ksh 0

Busali Union- Logemo- Mukenye Market Road

location
Busali West (in Sabatia)
year first funded
2009
action
Heavy Bush Clearing, Opening Up The Road And Provide Drainage
output
-
implementation status
Finishings yet to be done
total cost
Ksh 300,000
estimate
Ksh 0

Busali West Chief Office

location
Busali West (in Sabatia)
year first funded
2008
action
Renovate Ap Houses And Build Armory House
output
-
implementation status
Funds Re-Allocated To Part Finance Mbale High School Lab/ 3 Phase Line Supply To Inyali Dispensary
total cost
Ksh 300,000
estimate
Ksh 0

Gahumbwa Primary School

location
Wodanga (in Sabatia)
year first funded
2008
action
Renovation Of 3 Classrooms
output
-
implementation status
On-Going
total cost
Ksh 300,000
estimate
Ksh 0

Gavudia Primary School

location
Wodanga (in Sabatia)
year first funded
2008
action
Renovate 8 Classrooms
output
-
implementation status
Kshs 600,000 Re allocated to Ahero Sub District Hospital theatre project Ref. CDF BOARD/NYANDO/VOL.II/39
total cost
Ksh 300,000
estimate
Ksh 0

Givudianyi Primary School

location
Wodanga (in Sabatia)
year first funded
2008
action
Renovate 7 Classrooms
output
-
implementation status
On-Going. Re-Roofed 2 Classrooms And Partly Plastered 1 Classroom
total cost
Ksh 300,000
estimate
Ksh 0

Havuyiya Primary School

location
Chavakali (in Sabatia)
year first funded
2009
action
Construction of To Completion Of A New Class
output
-
implementation status
New Project.
total cost
Ksh 300,000
estimate
Ksh 0

Kegongi Health Centre

location
W/ Maragoli (in Sabatia)
year first funded
2003
action
Fencing And Equipping The Centre
output
Security And Running
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Keveye Primary School

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Classroom Flooring; Renovation Of Classrooms
output
Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 100,000

Kilagilu Health Centre

location
Busali West (in Sabatia)
year first funded
2005
action
Borehole Drilling
output
Borehole
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Lusengeli Primary School

location
Wodanga (in Sabatia)
year first funded
2008
action
Complete On-Going Cdf Classroom
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Lwenya Clinic

location
Wodanga (in Sabatia)
year first funded
2009
action
Complete Plastering, Flooring, And Roofing. Project Initiated By County Council Vihiga
output
-
implementation status
New Project. Cdf Is Partnering With Vihiga County Council To Finance The Project.
total cost
Ksh 300,000
estimate
Ksh 0

Mambai Primary School

location
Wodanga (in Sabatia)
year first funded
2008
action
Renovate Classrooms
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Moses Mudavadi Mululu Primary School

location
Busali West (in Sabatia)
year first funded
2005
action
Painting & Electricity
output
Classroom & Electricity
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 100,000

Mudungu Chiefs Centre- Ap Houses

location
Wodanga (in Sabatia)
year first funded
2009
action
Part Finance Construction Of Ap Houses
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Proposed North Maragoli Youth Polytechnic

location
N/Maragoli (in Sabatia)
year first funded
2009
action
Renovate 3 Classrooms To Be Used As Polytechnic. Works Include Plaster, Floor, Fit Windows, Doors
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Sabatia Primary School

location
Wodanga (in Sabatia)
year first funded
2008
action
Construction of 1 New Classroom
output
-
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Viyalo Primary School

location
Chavakali (in Sabatia)
year first funded
2006
action
Electrical Wiring;Floor 6 Classes & Build Verandah
output
Electricity
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 100,000

Wagevi Primary School

location
Wodanga (in Sabatia)
year first funded
2009
action
Construction of 1 New Classroom
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Kivagala Primary School

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Classroom & Electricity
output
Classrooms & Electricity
implementation status
Complete
total cost
Ksh 276,230
estimate
Ksh 150,000

Wagevi Nabwayi Road

location
Wodanga (in Sabatia)
year first funded
2004
action
Road Construction
output
Road
implementation status
Complete
total cost
Ksh 260,000
estimate
Ksh 260,000

Vudukura Busamo Road

location
Izava South (in Sabatia)
year first funded
2004
action
Road Construction
output
Road
implementation status
Complete
total cost
Ksh 260,000
estimate
Ksh 260,000

Friends School Munoywa

location
Izava North (in Sabatia)
year first funded
2006
action
Classroom Construction
output
Classrooms
implementation status
New
total cost
Ksh 250,000
estimate
Ksh 250,000

Itegero Guluma- Chavogere Mrkt- Maganyi Road

location
Busali East (in Sabatia)
year first funded
2009
action
Opening Up Drainage System Of The Road And Light Gravelling
output
-
implementation status
New Project.
total cost
Ksh 250,000
estimate
Ksh 900,000

Inyali Tea Buying Centre

location
N/Maragoli (in Sabatia)
year first funded
2007
action
Flooring, Plastering, Fit Doors/Windows, Construction of Verandah And Build Sorting Tables
output
-
implementation status
On- Going Cdf Project. 80% Complete Though It?S Being Used By Farmers At The Moment.
total cost
Ksh 250,000
estimate
Ksh 250,000

Mago Lwenya Bridge

location
Wodanga (in Sabatia)
year first funded
2005
action
Bridge Construction
output
Bridge
implementation status
Ongoing
total cost
Ksh 249,000
estimate
Ksh 2,000,000

Givudimbuli Dispensary

location
Wodanga (in Sabatia)
year first funded
2005
action
Electricity Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 240,000
estimate
Ksh 240,000

Demesi Ikuvu Road

location
Izava South (in Sabatia)
year first funded
2009
action
For Opening Up The Road And Providing Drainage On Both Sides
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Wekikubo Water Spring

location
Wodanga (in Sabatia)
year first funded
2005
action
Renovation Of Spring
output
Water Spring
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Vumilivu Self Help Group

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Tea Seedling Production
output
Tea Seedlings
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

St. Marks Orthodox Dispensary

location
Busali East (in Sabatia)
year first funded
2005
action
Renovation & Equipping
output
Renovated Block & Equipments
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Mulele Vavuka S

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Fish Keeping
output
Fish Ponds
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Lusaala Primary School

location
W/Maragoli (in Sabatia)
year first funded
2008
action
Construction of Ecd Classroom
output
-
implementation status
not known
total cost
Ksh 200,000
estimate
Ksh 0

Izava South Chiefs Centre- Ap Houses

location
Izava South (in Sabatia)
year first funded
2009
action
Renovation Of Existing Three Ap Houses And Construction of An Armory Room
output
-
implementation status
New Project.
total cost
Ksh 200,000
estimate
Ksh 0

Isitsi Primary School

location
Izava South (in Sabatia)
year first funded
2005
action
Construction Of 2 Classrooms
output
Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 100,000

Fahari S

location
Izava North (in Sabatia)
year first funded
2003
action
Fish Farming
output
Fish Pond
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 180,000

Chamakanga Secondary School

location
Wodanga (in Sabatia)
year first funded
2004
action
Electricity Installation
output
Electricity
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 180,000

Kisangula Electricity Project

location
N/Maragoli (in Sabatia)
year first funded
2004
action
Electricity Installation
output
Electricity
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Bugina- Kilagilu Masiola- Ludzu Market Road

location
Busali West (in Sabatia)
year first funded
2009
action
Heavy Bush Clearing, Opening Up The Road And Provide Drainage
output
-
implementation status
Finishings yet to be done
total cost
Ksh 150,000
estimate
Ksh 0

Busweta Tea Banda

location
Busali East (in Sabatia)
year first funded
2007
action
Part Payment To Start The Construction Of Tea Banda
output
-
implementation status
Project Now On Wall Plate.
total cost
Ksh 150,000
estimate
Ksh 500,000

Chamakanga Cattle Dip

location
Busali East (in Sabatia)
year first funded
2005
action
Renovation Of Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Chanderema Cattle Dip

location
N/Maragoli and Wodanga (in Sabatia)
year first funded
2005
action
Renovation Of Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Endohani S

location
Izava North (in Sabatia)
year first funded
2003
action
Tea Seedling Production
output
Tea Seedlings
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Galagoli Cattle Dip

location
Busali East (in Sabatia)
year first funded
2004
action
Renovation Of Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Lusala Primary School

location
Wodanga (in Sabatia)
year first funded
2003
action
Sch. Fencing & Classroom
output
Security And Classrooms
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 250,000

Lwenya Gaigedi Cattle Dip

location
Wodanga (in Sabatia)
year first funded
2005
action
Renovation Of Dip
output
Cattle Dip
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Mago Primary School

location
Wodanga (in Sabatia)
year first funded
2006
action
Construction Of Classroom
output
Classroom
implementation status
Another Donor Took Over Renovation Of Whole School
total cost
Ksh 150,000
estimate
Ksh 150,000

Mudete Cattle Dip

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Renovation Of Dip
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 150,000

Munugi Cattle Dip

location
Izava South (in Sabatia)
year first funded
2004
action
Renovation
output
Cattle Dip
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 200,000

Viyalo Cattle Dip

location
Chavakali (in Sabatia)
year first funded
2005
action
Renovation Of Dip
output
Cattle Dip
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Vohovole- Iliva

location
Busali West (in Sabatia)
year first funded
2009
action
Manual Opening Up Of The Road
output
-
implementation status
not known
total cost
Ksh 150,000
estimate
Ksh 0

Walodeya Cattle Dip

location
Chavakali (in Sabatia)
year first funded
2005
action
Renovation Of Dip
output
Cattle Dip
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 150,000

Nabwani Tea Buying Centre

location
Wodanga (in Sabatia)
year first funded
2009
action
Renovation Of The Tea Buying Centre
output
-
implementation status
not known
total cost
Ksh 140,000
estimate
Ksh 0

Lovei Foot Bridge

location
Busali East (in Sabatia)
year first funded
2004
action
Construction Of Footbridge
output
Foot Bridge
implementation status
Complete
total cost
Ksh 130,000
estimate
Ksh 130,000

Busweta- Mukunzura Road

location
Busali East (in Sabatia)
year first funded
2009
action
Heavy Bush Clearing, Opening Up The Road And Provide Drainage
output
-
implementation status
Staff yet to posted
total cost
Ksh 125,000
estimate
Ksh 0

Lotego-Elunyu Road

location
Busali East (in Sabatia)
year first funded
2009
action
Opening Up The Road
output
-
implementation status
New Project. To Be Considered During The 2Nd Disbursement To Be Effected By The Board
total cost
Ksh 125,000
estimate
Ksh 0

Munoywa Tea Buying Centre

location
Izava North (in Sabatia)
year first funded
2009
action
Renovation Of The Banda
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Wasundi Tea Buying Centre

location
Izava North (in Sabatia)
year first funded
2009
action
Construction of Sorting Tables/Re-Roof, Plaster
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Mutsulyu- Mugangu Road

location
Izava South (in Sabatia)
year first funded
2009
action
Manual Opening Up The Road
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Chatamilu Primary School

location
Busali West (in Sabatia)
year first funded
2003
action
Fencing
output
Security
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Elunyu Primary School

location
Busali East (in Sabatia)
year first funded
2006
action
Classroom Flooring
output
Classrooms
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Elwunza- Kichutu Road

location
Izava South (in Sabatia)
year first funded
2009
action
For Opening Up The Road And Providing Drainage On Both Sides
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 0

Keveye Tea Banda

location
W/Maragoli (in Sabatia)
year first funded
2003
action
Roofing The Banda; Re-Roofing, Construction of Storage Tables
output
Tea Banda
implementation status
Complete, Complete And Now In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Kisangula Primary School

location
N/Maragoli (in Sabatia)
year first funded
2005
action
Renovation Of Classes
output
Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Lusosi Primary School

location
Wodanga (in Sabatia)
year first funded
2003
action
Pit Latrines
output
Pit Latrines
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Lwunza Mukingi Road

location
Izava South (in Sabatia)
year first funded
2005
action
Construction Of Road
output
Road
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 1,000,000

Mudungu Water Pump

location
Wodanga (in Sabatia)
year first funded
2003
action
Purchase Of Mortar
output
Mortar
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Bukaywa Primary School

location
Izava South (in Sabatia)
year first funded
2005
action
Construction Of 1 Classroom
output
Classrooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 100,000

Vokoli-Mudete Mktcattle Dip/ Water Project

location
Wodanga/N/Maragoli (in Sabatia)
year first funded
2006
action
Repair Of Water System & Market
output
Piped Water & Market
implementation status
Complete
total cost
Ksh 95,480
estimate
Ksh 95,480

Kisatiru Youth Group

location
W/Maragoli (in Sabatia)
year first funded
2006
action
Facilities Of Kisatiru F.C. Team
output
-
implementation status
Complete
total cost
Ksh 95,000
estimate
Ksh 95,000

Mago Youth Group

location
Wodanga (in Sabatia)
year first funded
2006
action
Facilitate Aluance F.C. Team
output
K.F.F. Super League
implementation status
Complete
total cost
Ksh 95,000
estimate
Ksh 95,000

Mambai Medical Camp

location
Wodanga (in Sabatia)
year first funded
2006
action
Medical Camp
output
Medical Camp
implementation status
Complete
total cost
Ksh 80,000
estimate
Ksh 80,000

Kiritu Tea Banda

location
N/Maragoli (in Sabatia)
year first funded
2009
action
Renovate The Tea Banda
output
-
implementation status
not known
total cost
Ksh 76,916
estimate
Ksh 0

Lunyerere Tea Buying Centre

location
Izava South (in Sabatia)
year first funded
2009
action
Part Payment To Build New Banda. Current One Is On Road Reserve
output
-
implementation status
New Project. However The Seed Funding Allocated Cannot Create Any Tangible Impact.
total cost
Ksh 70,000
estimate
Ksh 0

Mwangaza S

location
Chavakali (in Sabatia)
year first funded
2003
action
Bee Farming
output
Bee Farming
implementation status
Complete
total cost
Ksh 70,000
estimate
Ksh 70,000

Mululu S

location
Busali West (in Sabatia)
year first funded
2004
action
Fish Farming
output
Ponds
implementation status
Ongoing
total cost
Ksh 70,000
estimate
Ksh 70,000

China S

location
Chavakali (in Sabatia)
year first funded
2004
action
Fish Farming
output
Fish Ponds
implementation status
Ongoing
total cost
Ksh 65,000
estimate
Ksh 65,000

Mambai Tea Buying Centre

location
Wodanga (in Sabatia)
year first funded
2009
action
Renovation Of The Tea Buying Centre
output
-
implementation status
not known
total cost
Ksh 60,000
estimate
Ksh 0

Wa Ulali

location
Izava North (in Sabatia)
year first funded
2009
action
Upgrading Of The Spring
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Wa Nyonge

location
Izava North (in Sabatia)
year first funded
2009
action
Upgrading Of The Spring
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Wa Mbani

location
Izava North (in Sabatia)
year first funded
2009
action
Upgrading Of The Spring
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Wa Lunganyi

location
Izava North (in Sabatia)
year first funded
2009
action
Upgrading Of The Spring
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Wa Libese

location
Izava North (in Sabatia)
year first funded
2009
action
Upgrading Of The Spring
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Bugina Tea Banda

location
Busali West (in Sabatia)
year first funded
2007
action
Funds Used To Put Up A Verandah On The Tea Banda
output
-
implementation status
Complete And Now In Use.
total cost
Ksh 50,000
estimate
Ksh 50,000

Ellongo S

location
Izava South (in Sabatia)
year first funded
2003
action
Tea Farming
output
Tea Seedlings
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Ikuvu Water Spring

location
Izava South (in Sabatia)
year first funded
2004
action
Spring Renovation
output
Water Spring
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 500,000

Linkune S

location
Chavakali (in Sabatia)
year first funded
2003
action
Tea Seedlings Production
output
Tea Seedlings
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 50,000

Mbale Water Pump

location
Izava South (in Sabatia)
year first funded
2003
action
Repair Of Water Pump
output
Water Pump
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Mu JoRoadanyi

location
Izava North (in Sabatia)
year first funded
2009
action
Construction of To Completion Of A New Bridge
output
-
implementation status
not known
total cost
Ksh 50,000
estimate
Ksh 0

Upe S

location
Izava South (in Sabatia)
year first funded
2003
action
Tea Seedling Production
output
Tea Seedlings
implementation status
Complete
total cost
Ksh 50,000
estimate
Ksh 50,000

Vigina Tea Banda

location
Izava South (in Sabatia)
year first funded
2003
action
Construction Of Banda
output
Tea Banda
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 50,000

Mago Tea Banda

location
Wodanga (in Sabatia)
year first funded
2007
action
Funds Used Construction of A New Toilet At Mago Tea Collection Centre.
output
-
implementation status
Complete And Now In Use
total cost
Ksh 38,570
estimate
Ksh 38,570

Vuyiya Primary School

location
N/Maragoli (in Sabatia)
year first funded
2006
action
Electricity Installation
output
Electricity
implementation status
Complete
total cost
Ksh 35,980
estimate
Ksh 35,980

Losengeli Primary School

location
Wodanga (in Sabatia)
year first funded
2004
action
Pay For Electricity
output
Electricity
implementation status
Complete
total cost
Ksh 35,000
estimate
Ksh 35,000

Kisatiru Elders Group

location
W/Maragoli (in Sabatia)
year first funded
2004
action
Payment For Kplc Quotation
output
Electricity
implementation status
Complete
total cost
Ksh 34,000
estimate
Ksh 34,000

Cdf St. D Kkmg Show

location
Sabatia (in Sabatia)
year first funded
2004
action
Construction Of Cdf Std
output
Cdf Stand
implementation status
Complete
total cost
Ksh 30,000
estimate
Ksh 30,000

Chifudura Water Spring

location
Chavakali (in Sabatia)
year first funded
2005
action
Renovation Of Spring
output
Water Spring
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000

Lyamuvuki S

location
Izava South (in Sabatia)
year first funded
2003
action
Fish Farming
output
-
implementation status
Ongoing
total cost
Ksh 20,000
estimate
Ksh 20,000

Chamakanga Dispensary

location
Busali West (in Sabatia)
year first funded
2005
action
Renovation
output
Renovated Block
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 200,000

Ivona Water Spring

location
Chavakali (in Sabatia)
year first funded
2004
action
Spring Renovation
output
Water Spring
implementation status
Complete
total cost
Ksh 20,000
estimate
Ksh 20,000