It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Saku

Sasura Girls Secondary School

location
Dirib (in Saku)
year first funded
2004
action
Construction Of Classes, Boarding Facilities, Purchase Of Books & Installation Of Solar Panels
output
-
implementation status
Complete
total cost
Ksh 15,418,000
estimate
Ksh 0

Dakabaricha Day Secondary School

location
Dakabaricha (in Saku)
year first funded
2005
action
Construction Of Sec. Sch, Purchase Of Books, Furniture And Electrical Wiring
output
-
implementation status
Complete
total cost
Ksh 8,300,000
estimate
Ksh 0

Songa Primary School

location
Songa (in Saku)
year first funded
2008
action
Conservation Of Environment
output
-
implementation status
On-Going
total cost
Ksh 5,000,000
estimate
Ksh 0

Dir Division Headquarters

location
Dirib (in Saku)
year first funded
2007
action
Construction Of Divisional Offices
output
-
implementation status
Phase One Complete
total cost
Ksh 4,000,000
estimate
Ksh 0

Mountain Location Water Tank

location
Mountain (in Saku)
year first funded
2006
action
Purchase Of Water Tanks/Drums For Households And Monitoring Of The Project
output
-
implementation status
Complete
total cost
Ksh 4,000,000
estimate
Ksh 0

Nagayo Water Tank

location
Nagayo (in Saku)
year first funded
2006
action
Purchase Of Water Tanks/Drums For Households And Monitoring Of The Project
output
-
implementation status
Complete
total cost
Ksh 4,000,000
estimate
Ksh 0

Kubi Qalo Borehole

location
Qilta (in Saku)
year first funded
2004
action
Construction Of Tank Base And Cattle Trough
output
-
implementation status
Funds Re-Allocated
total cost
Ksh 3,000,000
estimate
Ksh 0

Boru Haro Water Project

location
Dirr (in Saku)
year first funded
2006
action
Construction Of A Dam
output
-
implementation status
Complete
total cost
Ksh 3,000,000
estimate
Ksh 0

Borru Haro Dispensary

location
Dirib (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
Yearly disbursements
total cost
Ksh 2,500,000
estimate
Ksh 0

Boru Haro Dispensary

location
Dirib (in Saku)
year first funded
2005
action
Construction Of Dispensary & A Staff House
output
-
implementation status
Complete
total cost
Ksh 2,300,000
estimate
Ksh 0

Dakabaricha Water Project

location
Dakabaricha (in Saku)
year first funded
2007
action
Purchase Of Water Tanks/Drums For Households
output
-
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Dakabaricha Pan

location
Dakabaricha (in Saku)
year first funded
2007
action
Scooping Of Water Pan
output
-
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Illmanchito Water Project

location
Qilta (in Saku)
year first funded
2006
action
Rehabilitation Of Pan
output
-
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Ula Ula Pan

location
Karare (in Saku)
year first funded
2007
action
Scooping Of Water Pan
output
-
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Badassa Dispensary Staff House

location
Jaldessa (in Saku)
year first funded
2003
action
Construction Of Staff House S
output
-
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Karare Primary School Classroom

location
Karare (in Saku)
year first funded
2004
action
Construction Of 3 Classrooms & Purchase Of Desks
output
-
implementation status
Complete
total cost
Ksh 2,000,000
estimate
Ksh 0

Dakabaricha Water Tank

location
Dakabaricha (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
Bank Charges
total cost
Ksh 2,000,000
estimate
Ksh 0

Songa Primary School Classroom

location
Songa (in Saku)
year first funded
2005
action
Construction Of 3 Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,750,000
estimate
Ksh 0

Goro Rukesa Borehole

location
Sagante (in Saku)
year first funded
2004
action
Re0Allocation To Diri Divisional Hqs
output
-
implementation status
Funds Re-Allocated
total cost
Ksh 1,500,000
estimate
Ksh 0

Qilta Water Tank

location
Qilta (in Saku)
year first funded
2006
action
Construction Of A Water Tank
output
-
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Marsabit Boys Secondary School

location
Mountain (in Saku)
year first funded
2008
action
Preparation Of Saku Constituency Cdf) Strategic Plan
output
-
implementation status
On-Going
total cost
Ksh 1,500,000
estimate
Ksh 0

Rukessa Dispensary Staff House

location
Sagante (in Saku)
year first funded
2007
action
Construction Of A Staff House
output
-
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Qilta Social Hall

location
Qilta (in Saku)
year first funded
2007
action
Construction Of Social Hall
output
-
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Dirib Slum Upgrading

location
Dirib (in Saku)
year first funded
2007
action
Surveying And Pdp For Slum
output
-
implementation status
Stalled
total cost
Ksh 1,500,000
estimate
Ksh 0

Manyatta Afya Slum Up-Grading

location
Dakabaricha (in Saku)
year first funded
2007
action
Surveying And Pdp For Slum
output
-
implementation status
On Going
total cost
Ksh 1,500,000
estimate
Ksh 0

St. Peters Primary School

location
Sagante (in Saku)
year first funded
2004
action
Construction Of A Classroom And Desks
output
-
implementation status
Complete
total cost
Ksh 1,500,000
estimate
Ksh 0

Parkishon Classroom Construction

location
Karare (in Saku)
year first funded
2003
action
Construction Of 4 Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,450,000
estimate
Ksh 0

Health

location
(in Saku)
year first funded
2008
action
Emergency Response Activities
output
-
implementation status
Complete
total cost
Ksh 1,400,000
estimate
Ksh 0

Goro Rukessa Dam

location
Sagante (in Saku)
year first funded
2005
action
Construction Of A Dam
output
-
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Kituruni Primary School

location
Songa (in Saku)
year first funded
2004
action
Construction Of 2 No.Classrooms
output
-
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Ulaula Classroom And Office

location
Karare (in Saku)
year first funded
2006
action
Construction Of A Classroom And Office
output
-
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 0

Ula Ula School

location
Karare (in Saku)
year first funded
2004
action
Fabrication Of Timber Desks & Construction Of 1 No.Clssroom
output
-
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 0

Mwangaza Primary School

location
Sagante (in Saku)
year first funded
2008
action
Purchase Of Furniture
output
-
implementation status
Not Started
total cost
Ksh 1,000,000
estimate
Ksh 0

Qilta Water Project

location
Qilta (in Saku)
year first funded
2004
action
Water Tanks And Temporary Structures To Harvest Water
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Karare Ap Lines

location
Karare (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
One off expense
total cost
Ksh 1,000,000
estimate
Ksh 0

Hekima Primary School Desk

location
Dirib (in Saku)
year first funded
2004
action
Construction Of 1No.Classroom & Fencing
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kiwanja Ndege Primary School Classroom

location
Dakabaricha (in Saku)
year first funded
2005
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Leyai Primary School Classroom

location
Songa (in Saku)
year first funded
2004
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Marsabit Boys Secondary School Class Construction

location
Mountain (in Saku)
year first funded
2005
action
Construction Of Classroom
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Moi Girls Secondary School Dormitory

location
Mountain (in Saku)
year first funded
2005
action
Construction Of Dormitory
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Dakabaricha Social Hall & Water Tank

location
Dakabaricha (in Saku)
year first funded
2004
action
Construction Of A Hall And Water Tank
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Jua Kali Shed

location
Mountain (in Saku)
year first funded
2005
action
Rehabilitation Of Jua Kali Shed
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Nagayo Slum Upgrading Nyay

location
Nagayo (in Saku)
year first funded
2004
action
Slum Upgrading
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Wabera Slum Upgrading

location
Mountain (in Saku)
year first funded
2004
action
Slum Upgrading
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Dakabaricha Dispensary

location
Dakabaricha (in Saku)
year first funded
2003
action
Construction Of Dispensary
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kituruni Dispensary Staff House

location
Songa (in Saku)
year first funded
2005
action
Dispensary Staff House Construction
output
-
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Manyatta Jillo Ap Lines

location
Qilta (in Saku)
year first funded
2006
action
Construction Of Staff Houses' Toilets For Ap Lines
output
-
implementation status
Complete
total cost
Ksh 957,573
estimate
Ksh 0

Leyai Water Project

location
Songa (in Saku)
year first funded
2006
action
Protection Of Water Spring
output
-
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 0

Hula Hula Dispensary Construction

location
Karare (in Saku)
year first funded
2005
action
Dispensary Construction & A Staff House
output
-
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Kubi Dibayu Community

location
Qilta (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
One off expense
total cost
Ksh 762,240
estimate
Ksh 0

St. Peters Primary School

location
Sagante (in Saku)
year first funded
2008
action
Construction Of Ap Lines
output
-
implementation status
On-Going
total cost
Ksh 750,000
estimate
Ksh 0

Ipus Primary School

location
Songa (in Saku)
year first funded
2008
action
Fencing Of The Community Land
output
-
implementation status
Not Started
total cost
Ksh 750,000
estimate
Ksh 0

Jirime Social Hall & Furniture

location
Nagayo (in Saku)
year first funded
2006
action
Construction And Furnishing Of Social Hall
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Marta Arba Nursery And Furniture

location
Qilta (in Saku)
year first funded
2006
action
1 Classroom And Desks
output
-
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 0

Dirib Nursery School Class

location
Dirib (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
Road opened half way
total cost
Ksh 650,000
estimate
Ksh 0

Mwangaza Primary School

location
Sagante (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
Road opened but impassable currently; should be maintained
total cost
Ksh 650,000
estimate
Ksh 0

Qilta Social Hall

location
Qilta (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
Maintenance
total cost
Ksh 632,218
estimate
Ksh 0

Boru Haro Water Catchments

location
Dirib Location (in Saku)
year first funded
2003
action
Construction Of A Water Catchment
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Leyai Primary School Teachers House

location
Songa (in Saku)
year first funded
2006
action
Construction Of Staff House
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Elpus Primary School

location
Songa (in Saku)
year first funded
2005
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Hula Hula Dispensary Desks

location
Karare (in Saku)
year first funded
2006
action
Purchase Of Dispensary Desks
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Manyatta Jillo Primary School Classroom

location
Qilta (in Saku)
year first funded
2005
action
Classroom Construction
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Dirib Nursery School

location
Dirib (in Saku)
year first funded
2007
action
Construction Of 1 No. Classroom
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Boru Haro Dam Scooping

location
Dirr (in Saku)
year first funded
2006
action
Scooping Of Dam
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Gotu GaRoadi Water Pan Rehabilitation

location
Dakabaricha (in Saku)
year first funded
2003
action
Rehabilitation Of Pan
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Jillo Schooleme Water Tank

location
Qilta (in Saku)
year first funded
2006
action
Purchase Of Water Tanks/Drums For Households
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Kituruni Water Project Rehabilitation

location
Songa (in Saku)
year first funded
2003
action
Rehabilitation Of Karawale Springs
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Qilta Dam Construction

location
Qilta (in Saku)
year first funded
2003
action
1 Dam Construction
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Wambera Water Tank Construction

location
Mountain (in Saku)
year first funded
2003
action
Construction Of 1 Water Tank
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Qilta Ap Lines Water Tank

location
Qilta (in Saku)
year first funded
2007
action
Construction Of Water Tank
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Manyatta Gila Water Tank & Structure

location
Qilta (in Saku)
year first funded
2007
action
Construction Of A Water Harvesting Structure And Construction Of Tank
output
-
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Dirib Gombo Borehole Repair

location
Dirib (in Saku)
year first funded
2006
action
Repair Of Borehall
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Kubi Bagasa Water Project

location
Dirib (in Saku)
year first funded
2006
action
Repair Of Borehole
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Boru Haro Primary School Classroom

location
Dirib (in Saku)
year first funded
2004
action
Construction Of A Class
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Parkishon Water Project

location
Karare (in Saku)
year first funded
2004
action
Procurement Of Pipes
output
-
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Mwangaza Primary School Teachers House

location
Sagante (in Saku)
year first funded
2004
action
Construction Of Staff House
output
-
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Manyatta Jillo Primary School Desks

location
Qilta (in Saku)
year first funded
2005
action
Fabrication Of Metal Frame Desks
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Boru Haro Primary School Desks

location
Dirib (in Saku)
year first funded
2006
action
Fabrication Of Desks
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Mwangaza Primary School Desks

location
Sagante (in Saku)
year first funded
2006
action
Fabrication Of Metal Frame Desks
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

St John Primary School Water Tank

location
Mountain (in Saku)
year first funded
2006
action
Construction Of Water Tank
output
-
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 0

Saku Primary School Desk

location
Dakabaricha (in Saku)
year first funded
2005
action
Fabrication Of Timber Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Hula Hula Dispensary

location
Hula Hula (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
Office running expenses
total cost
Ksh 200,000
estimate
Ksh 0

Moi Girls Secondary School

location
Mountain (in Saku)
year first funded
2007
action
Purchase Of Building Materials
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Majengo Dispensary

location
Nagayo (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
An emergency fund, poorly done, but Road board also claims ownership of project
total cost
Ksh 200,000
estimate
Ksh 0

Al Hidaya Primary School Desks

location
Mountain (in Saku)
year first funded
2006
action
Fabrication Of Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kiwanja Ndege Primary School Desks

location
Dakabaricha (in Saku)
year first funded
2005
action
Fabrication Of Metal Frame Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Kubi Bagasa Primary School Desk

location
Dirib (in Saku)
year first funded
2005
action
Fabrication Of Metal Frame Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Marsabit Boys Secondary School Lockers

location
Mountain (in Saku)
year first funded
2005
action
Fabrication Of Lockers & Chairs
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Marsabit Full Primary School

location
Mountain (in Saku)
year first funded
2005
action
Fabrication Of Timber Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Moi Girls Secondary School

location
Mountain (in Saku)
year first funded
2005
action
Fabrication Of Lockers & Chairs
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

St. Theresa Primary School Desk

location
Mountain (in Saku)
year first funded
2005
action
Fabrication Of Timber Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

St. Primary School

location
Mountain (in Saku)
year first funded
2005
action
Fabrication Of Metal Frame Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Songa Primary School desks

location
Songa (in Saku)
year first funded
2006
action
Fabrication Of Timber Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Garqarsa Primary School Desk

location
Qilta (in Saku)
year first funded
2005
action
Fabrication Of Timber Desks
output
-
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Parkishon Primary School Desks

location
Karare (in Saku)
year first funded
2006
action
Fabrication Of Metal Frame Desks
output
-
implementation status
Complete
total cost
Ksh 150,000
estimate
Ksh 0

Sasura Girls Secondary School

location
Mountain (in Saku)
year first funded
2008
action
Purchase Of Saku Cdf Office Motor Bike
output
-
implementation status
On-Going
total cost
Ksh 137,484
estimate
Ksh 0

Qachacha Nursery Desk

location
Dirib (in Saku)
year first funded
2004
action
Fabrication Of Metal Frame Desks
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Elpus Primary School

location
Songa (in Saku)
year first funded
2006
action
Fabrication Of Desks
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Kituruni Primary School - Desks

location
Songa (in Saku)
year first funded
2007
action
Fabrication Of 25 Desks
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

Leyai School Desk

location
Songa (in Saku)
year first funded
2004
action
Fabrication Of Timber Desks
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

St. Theresa Primary School Electrification

location
Mountain (in Saku)
year first funded
2007
action
Overhaul Of Wiring System
output
-
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 0

St. Peters Primary School

location
Sagante (in Saku)
year first funded
2008
action
n/a
output
-
implementation status
Complete, though needs maintenance
total cost
Ksh 100,000
estimate
Ksh 0

Manyatta Gilla Nursery

location
Qilta (in Saku)
year first funded
2006
action
n/a
output
-
implementation status
Complete
total cost
Ksh 63,722
estimate
Ksh 0

Manyatta Jillo Primary School - Electrification

location
Qilta (in Saku)
action
Projects Monitoring & Capicity Building Of Cdfc & Pmcs On Procurement And Project Management
output
-
implementation status
On-Going
total cost
Ksh 0
estimate
Ksh 0

Manyatta Jillo Dispensary

location
Qilta (in Saku)
action
n/a
output
-
implementation status
One off expense
total cost
Ksh 0
estimate
Ksh 0

Dakabarricha-Dub Goba Electrification

location
Dakabaricha (in Saku)
action
Electrification
output
-
implementation status
Funds Re-Allocated
total cost
Ksh 0
estimate
Ksh 0

Qilta Water Pan

location
Qilta (in Saku)
action
n/a
output
-
implementation status
One off expense
total cost
Ksh 0
estimate
Ksh 0

Marsabit General Hospital

location
Mountain (in Saku)
action
n/a
output
-
implementation status
No evidence of office
total cost
Ksh 0
estimate
Ksh 0

Dakabaricha Mixed Day Secondary School

location
Dakabaricha (in Saku)
action
Distribution Of Bursaries To Needy Students
output
-
implementation status
Complete
total cost
Ksh 0
estimate
Ksh 0