The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Saku
Sasura Girls Secondary School
- location
-
Dirib
(in Saku)
- year first funded
- 2004
- action
- Construction Of Classes, Boarding Facilities, Purchase Of Books & Installation Of Solar Panels
- output
- -
- implementation status
- Complete
- total cost
- Ksh 15,418,000
- estimate
- Ksh 0
Dakabaricha Day Secondary School
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2005
- action
- Construction Of Sec. Sch, Purchase Of Books, Furniture And Electrical Wiring
- output
- -
- implementation status
- Complete
- total cost
- Ksh 8,300,000
- estimate
- Ksh 0
Songa Primary School
- location
-
Songa
(in Saku)
- year first funded
- 2008
- action
- Conservation Of Environment
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 5,000,000
- estimate
- Ksh 0
Dir Division Headquarters
- location
-
Dirib
(in Saku)
- year first funded
- 2007
- action
- Construction Of Divisional Offices
- output
- -
- implementation status
- Phase One Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 0
Mountain Location Water Tank
- location
-
Mountain
(in Saku)
- year first funded
- 2006
- action
- Purchase Of Water Tanks/Drums For Households And Monitoring Of The Project
- output
- -
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 0
Nagayo Water Tank
- location
-
Nagayo
(in Saku)
- year first funded
- 2006
- action
- Purchase Of Water Tanks/Drums For Households And Monitoring Of The Project
- output
- -
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 0
Kubi Qalo Borehole
- location
-
Qilta
(in Saku)
- year first funded
- 2004
- action
- Construction Of Tank Base And Cattle Trough
- output
- -
- implementation status
- Funds Re-Allocated
- total cost
- Ksh 3,000,000
- estimate
- Ksh 0
Boru Haro Water Project
- location
-
Dirr
(in Saku)
- year first funded
- 2006
- action
- Construction Of A Dam
- output
- -
- implementation status
- Complete
- total cost
- Ksh 3,000,000
- estimate
- Ksh 0
Borru Haro Dispensary
- location
-
Dirib
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Yearly disbursements
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
Boru Haro Dispensary
- location
-
Dirib
(in Saku)
- year first funded
- 2005
- action
- Construction Of Dispensary & A Staff House
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 0
Dakabaricha Water Project
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2007
- action
- Purchase Of Water Tanks/Drums For Households
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Dakabaricha Pan
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2007
- action
- Scooping Of Water Pan
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Illmanchito Water Project
- location
-
Qilta
(in Saku)
- year first funded
- 2006
- action
- Rehabilitation Of Pan
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Ula Ula Pan
- location
-
Karare
(in Saku)
- year first funded
- 2007
- action
- Scooping Of Water Pan
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Badassa Dispensary Staff House
- location
-
Jaldessa
(in Saku)
- year first funded
- 2003
- action
- Construction Of Staff House S
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Karare Primary School Classroom
- location
-
Karare
(in Saku)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms & Purchase Of Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Dakabaricha Water Tank
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Bank Charges
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Songa Primary School Classroom
- location
-
Songa
(in Saku)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 0
Goro Rukesa Borehole
- location
-
Sagante
(in Saku)
- year first funded
- 2004
- action
- Re0Allocation To Diri Divisional Hqs
- output
- -
- implementation status
- Funds Re-Allocated
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Qilta Water Tank
- location
-
Qilta
(in Saku)
- year first funded
- 2006
- action
- Construction Of A Water Tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Marsabit Boys Secondary School
- location
-
Mountain
(in Saku)
- year first funded
- 2008
- action
- Preparation Of Saku Constituency Cdf) Strategic Plan
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Rukessa Dispensary Staff House
- location
-
Sagante
(in Saku)
- year first funded
- 2007
- action
- Construction Of A Staff House
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Qilta Social Hall
- location
-
Qilta
(in Saku)
- year first funded
- 2007
- action
- Construction Of Social Hall
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Dirib Slum Upgrading
- location
-
Dirib
(in Saku)
- year first funded
- 2007
- action
- Surveying And Pdp For Slum
- output
- -
- implementation status
- Stalled
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Manyatta Afya Slum Up-Grading
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2007
- action
- Surveying And Pdp For Slum
- output
- -
- implementation status
- On Going
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
St. Peters Primary School
- location
-
Sagante
(in Saku)
- year first funded
- 2004
- action
- Construction Of A Classroom And Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Parkishon Classroom Construction
- location
-
Karare
(in Saku)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,450,000
- estimate
- Ksh 0
Health
- location
-
(in Saku)
- year first funded
- 2008
- action
- Emergency Response Activities
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Goro Rukessa Dam
- location
-
Sagante
(in Saku)
- year first funded
- 2005
- action
- Construction Of A Dam
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Kituruni Primary School
- location
-
Songa
(in Saku)
- year first funded
- 2004
- action
- Construction Of 2 No.Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Ulaula Classroom And Office
- location
-
Karare
(in Saku)
- year first funded
- 2006
- action
- Construction Of A Classroom And Office
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Ula Ula School
- location
-
Karare
(in Saku)
- year first funded
- 2004
- action
- Fabrication Of Timber Desks & Construction Of 1 No.Clssroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 0
Mwangaza Primary School
- location
-
Sagante
(in Saku)
- year first funded
- 2008
- action
- Purchase Of Furniture
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Qilta Water Project
- location
-
Qilta
(in Saku)
- year first funded
- 2004
- action
- Water Tanks And Temporary Structures To Harvest Water
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Karare Ap Lines
- location
-
Karare
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- One off expense
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Hekima Primary School Desk
- location
-
Dirib
(in Saku)
- year first funded
- 2004
- action
- Construction Of 1No.Classroom & Fencing
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kiwanja Ndege Primary School Classroom
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2005
- action
- Classroom Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Leyai Primary School Classroom
- location
-
Songa
(in Saku)
- year first funded
- 2004
- action
- Classroom Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Marsabit Boys Secondary School Class Construction
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Moi Girls Secondary School Dormitory
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Construction Of Dormitory
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Dakabaricha Social Hall & Water Tank
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2004
- action
- Construction Of A Hall And Water Tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Jua Kali Shed
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Rehabilitation Of Jua Kali Shed
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Nagayo Slum Upgrading Nyay
- location
-
Nagayo
(in Saku)
- year first funded
- 2004
- action
- Slum Upgrading
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Wabera Slum Upgrading
- location
-
Mountain
(in Saku)
- year first funded
- 2004
- action
- Slum Upgrading
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Dakabaricha Dispensary
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kituruni Dispensary Staff House
- location
-
Songa
(in Saku)
- year first funded
- 2005
- action
- Dispensary Staff House Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Manyatta Jillo Ap Lines
- location
-
Qilta
(in Saku)
- year first funded
- 2006
- action
- Construction Of Staff Houses' Toilets For Ap Lines
- output
- -
- implementation status
- Complete
- total cost
- Ksh 957,573
- estimate
- Ksh 0
Leyai Water Project
- location
-
Songa
(in Saku)
- year first funded
- 2006
- action
- Protection Of Water Spring
- output
- -
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Hula Hula Dispensary Construction
- location
-
Karare
(in Saku)
- year first funded
- 2005
- action
- Dispensary Construction & A Staff House
- output
- -
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Kubi Dibayu Community
- location
-
Qilta
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- One off expense
- total cost
- Ksh 762,240
- estimate
- Ksh 0
St. Peters Primary School
- location
-
Sagante
(in Saku)
- year first funded
- 2008
- action
- Construction Of Ap Lines
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Ipus Primary School
- location
-
Songa
(in Saku)
- year first funded
- 2008
- action
- Fencing Of The Community Land
- output
- -
- implementation status
- Not Started
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Jirime Social Hall & Furniture
- location
-
Nagayo
(in Saku)
- year first funded
- 2006
- action
- Construction And Furnishing Of Social Hall
- output
- -
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Marta Arba Nursery And Furniture
- location
-
Qilta
(in Saku)
- year first funded
- 2006
- action
- 1 Classroom And Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Dirib Nursery School Class
- location
-
Dirib
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Road opened half way
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Mwangaza Primary School
- location
-
Sagante
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Road opened but impassable currently; should be maintained
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Qilta Social Hall
- location
-
Qilta
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Maintenance
- total cost
- Ksh 632,218
- estimate
- Ksh 0
Boru Haro Water Catchments
- location
-
Dirib Location
(in Saku)
- year first funded
- 2003
- action
- Construction Of A Water Catchment
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Leyai Primary School Teachers House
- location
-
Songa
(in Saku)
- year first funded
- 2006
- action
- Construction Of Staff House
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Elpus Primary School
- location
-
Songa
(in Saku)
- year first funded
- 2005
- action
- Classroom Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Hula Hula Dispensary Desks
- location
-
Karare
(in Saku)
- year first funded
- 2006
- action
- Purchase Of Dispensary Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Manyatta Jillo Primary School Classroom
- location
-
Qilta
(in Saku)
- year first funded
- 2005
- action
- Classroom Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Dirib Nursery School
- location
-
Dirib
(in Saku)
- year first funded
- 2007
- action
- Construction Of 1 No. Classroom
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Boru Haro Dam Scooping
- location
-
Dirr
(in Saku)
- year first funded
- 2006
- action
- Scooping Of Dam
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Gotu GaRoadi Water Pan Rehabilitation
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2003
- action
- Rehabilitation Of Pan
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Jillo Schooleme Water Tank
- location
-
Qilta
(in Saku)
- year first funded
- 2006
- action
- Purchase Of Water Tanks/Drums For Households
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kituruni Water Project Rehabilitation
- location
-
Songa
(in Saku)
- year first funded
- 2003
- action
- Rehabilitation Of Karawale Springs
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Qilta Dam Construction
- location
-
Qilta
(in Saku)
- year first funded
- 2003
- action
- 1 Dam Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Wambera Water Tank Construction
- location
-
Mountain
(in Saku)
- year first funded
- 2003
- action
- Construction Of 1 Water Tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Qilta Ap Lines Water Tank
- location
-
Qilta
(in Saku)
- year first funded
- 2007
- action
- Construction Of Water Tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Manyatta Gila Water Tank & Structure
- location
-
Qilta
(in Saku)
- year first funded
- 2007
- action
- Construction Of A Water Harvesting Structure And Construction Of Tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Dirib Gombo Borehole Repair
- location
-
Dirib
(in Saku)
- year first funded
- 2006
- action
- Repair Of Borehall
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kubi Bagasa Water Project
- location
-
Dirib
(in Saku)
- year first funded
- 2006
- action
- Repair Of Borehole
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Boru Haro Primary School Classroom
- location
-
Dirib
(in Saku)
- year first funded
- 2004
- action
- Construction Of A Class
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Parkishon Water Project
- location
-
Karare
(in Saku)
- year first funded
- 2004
- action
- Procurement Of Pipes
- output
- -
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mwangaza Primary School Teachers House
- location
-
Sagante
(in Saku)
- year first funded
- 2004
- action
- Construction Of Staff House
- output
- -
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Manyatta Jillo Primary School Desks
- location
-
Qilta
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Metal Frame Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Boru Haro Primary School Desks
- location
-
Dirib
(in Saku)
- year first funded
- 2006
- action
- Fabrication Of Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Mwangaza Primary School Desks
- location
-
Sagante
(in Saku)
- year first funded
- 2006
- action
- Fabrication Of Metal Frame Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
St John Primary School Water Tank
- location
-
Mountain
(in Saku)
- year first funded
- 2006
- action
- Construction Of Water Tank
- output
- -
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Saku Primary School Desk
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Timber Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Hula Hula Dispensary
- location
-
Hula Hula
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Office running expenses
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Moi Girls Secondary School
- location
-
Mountain
(in Saku)
- year first funded
- 2007
- action
- Purchase Of Building Materials
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Majengo Dispensary
- location
-
Nagayo
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- An emergency fund, poorly done, but Road board also claims ownership of project
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Al Hidaya Primary School Desks
- location
-
Mountain
(in Saku)
- year first funded
- 2006
- action
- Fabrication Of Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kiwanja Ndege Primary School Desks
- location
-
Dakabaricha
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Metal Frame Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kubi Bagasa Primary School Desk
- location
-
Dirib
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Metal Frame Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Marsabit Boys Secondary School Lockers
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Lockers & Chairs
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Marsabit Full Primary School
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Timber Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Moi Girls Secondary School
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Lockers & Chairs
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
St. Theresa Primary School Desk
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Timber Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
St. Primary School
- location
-
Mountain
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Metal Frame Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Songa Primary School desks
- location
-
Songa
(in Saku)
- year first funded
- 2006
- action
- Fabrication Of Timber Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Garqarsa Primary School Desk
- location
-
Qilta
(in Saku)
- year first funded
- 2005
- action
- Fabrication Of Timber Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Parkishon Primary School Desks
- location
-
Karare
(in Saku)
- year first funded
- 2006
- action
- Fabrication Of Metal Frame Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Sasura Girls Secondary School
- location
-
Mountain
(in Saku)
- year first funded
- 2008
- action
- Purchase Of Saku Cdf Office Motor Bike
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 137,484
- estimate
- Ksh 0
Qachacha Nursery Desk
- location
-
Dirib
(in Saku)
- year first funded
- 2004
- action
- Fabrication Of Metal Frame Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Elpus Primary School
- location
-
Songa
(in Saku)
- year first funded
- 2006
- action
- Fabrication Of Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Kituruni Primary School - Desks
- location
-
Songa
(in Saku)
- year first funded
- 2007
- action
- Fabrication Of 25 Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Leyai School Desk
- location
-
Songa
(in Saku)
- year first funded
- 2004
- action
- Fabrication Of Timber Desks
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
St. Theresa Primary School Electrification
- location
-
Mountain
(in Saku)
- year first funded
- 2007
- action
- Overhaul Of Wiring System
- output
- -
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
St. Peters Primary School
- location
-
Sagante
(in Saku)
- year first funded
- 2008
- action
- n/a
- output
- -
- implementation status
- Complete, though needs maintenance
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Manyatta Gilla Nursery
- location
-
Qilta
(in Saku)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- Complete
- total cost
- Ksh 63,722
- estimate
- Ksh 0
Manyatta Jillo Primary School - Electrification
- location
-
Qilta
(in Saku)
- action
- Projects Monitoring & Capicity Building Of Cdfc & Pmcs On Procurement And Project Management
- output
- -
- implementation status
- On-Going
- total cost
- Ksh 0
- estimate
- Ksh 0
Manyatta Jillo Dispensary
- location
-
Qilta
(in Saku)
- action
- n/a
- output
- -
- implementation status
- One off expense
- total cost
- Ksh 0
- estimate
- Ksh 0
Dakabarricha-Dub Goba Electrification
- location
-
Dakabaricha
(in Saku)
- action
- Electrification
- output
- -
- implementation status
- Funds Re-Allocated
- total cost
- Ksh 0
- estimate
- Ksh 0
Qilta Water Pan
- location
-
Qilta
(in Saku)
- action
- n/a
- output
- -
- implementation status
- One off expense
- total cost
- Ksh 0
- estimate
- Ksh 0
Marsabit General Hospital
- location
-
Mountain
(in Saku)
- action
- n/a
- output
- -
- implementation status
- No evidence of office
- total cost
- Ksh 0
- estimate
- Ksh 0
Dakabaricha Mixed Day Secondary School
- location
-
Dakabaricha
(in Saku)
- action
- Distribution Of Bursaries To Needy Students
- output
- -
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 0