The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Wamba Boys Secondary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms /Admin Block
- output
- 2 Classrooms /Admin Block Constructed
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 0
Samburu East Cdf Office
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Cdf Office Block
- output
- Cdf Office Constructed
- implementation status
- on going
- total cost
- Ksh 4,000,000
- estimate
- Ksh 0
Nteppes Primary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2003
- action
- Construction Of 2 Classes And Admin Block
- output
- Administration Block And Classroom Constructed
- implementation status
- Complete
- total cost
- Ksh 2,050,000
- estimate
- Ksh 0
Waso Secondary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms/Dormitory
- output
- Classrooms And Dormitory Constructed
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Ndonyo Wasin Water Project
- location
-
Waso West
(in Samburu East)
- year first funded
- 2003
- action
- Construction Of Water Extension And Tank
- output
- 2.5 Km Pipeline And A Tank
- implementation status
- Water Extension Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Sere-Olipi Dispensary
- location
-
SereOlipi
(in Samburu East)
- year first funded
- 2006
- action
- Construction Of Maternity
- output
- Maternity Constructed
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Matakwani Cultural Manyatta
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of A Vip Dais And Ablution Block
- output
- Vip Dias And Ablution Block Constructed
- implementation status
- on going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Samburu Women Empowerment Forum
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Road Bush Clearing
- output
- Bush Clearing
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Remot Primary School
- location
-
Waso West
(in Samburu East)
- year first funded
- 2006
- action
- Toilets And Desks
- output
- Toilets And Desks
- implementation status
- Ongoing
- total cost
- Ksh 1,100,004
- estimate
- Ksh 0
Constituency Office
- location
-
Wamba
(in Samburu East)
- year first funded
- 2003
- action
- Renovation Of Old DoS Office
- output
- Cdf Office Complete
- implementation status
- Complete
- total cost
- Ksh 1,020,000
- estimate
- Ksh 1,020,000
Sere-Olipi Chiefs Office
- location
-
SereOlipi
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of ChiefS Office & A/P Line
- output
- Ap Line Constructed
- implementation status
- complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Archers Post Police Post
- location
-
Waso East
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Administration Block
- output
- Admn Block Constructed
- implementation status
- complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers House Constructed
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers House Constructed
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Wamba Secondary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of School Perimeter Fence
- output
- 3 Classrooms Constructed Completed
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Waso Secondary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of 1 Teachers House
- output
- Dormitory Constructed
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Ngutuk- Engiron Primary School
- location
-
Waso West
(in Samburu East)
- year first funded
- 2004
- action
- Renovation Of 5 Classrooms
- output
- 5 Classrooms Renovated
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of Girls Dormitory
- output
- Dormitory Constructed
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Nairimirimo Primary School
- location
-
Nairimirimo
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- 2 Classrooms Constructed
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Nteppes Primary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- 2 Classroom Constructed
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Huruma Home
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of A Multi Purpose Hall
- output
- Multipurpose Hall Constructed
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Archers Health Centre
- location
-
Waso East
(in Samburu East)
- year first funded
- 2006
- action
- Construction Of Incinerators And Construction Of Vct/Mch Hall.
- output
- Incinerators And Placenta Pits Constructed And Vct Hall
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lerata Health Centre
- location
-
Waso East
(in Samburu East)
- year first funded
- 2006
- action
- Construction Of Doctors House
- output
- Doctors House Constructed
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers House Constructed
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Swari Primary School
- location
-
Nairimirimo
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Girls Dormitory
- output
- Girls Dormitory Constructed.
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Ngutuk Elmuget Dispensary
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Dispensary Block
- output
- Dispensary Block Constructed
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Ngutuk Engiron Dispensary
- location
-
Waso West
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Nurses House, Partitioning And Equipping -Dispensary
- output
- Construction Of Nurse House.
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Wamba Health Centre
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Completion Of Maternity Ward
- output
- Marternity Ward Completed.
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Ngutuk Engiron Dispensary
- location
-
Waso East
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- Dispensary Constructed
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Sere-Olipi Primary School t Houses
- location
-
SereOlipi
(in Samburu East)
- year first funded
- 2006
- action
- Construction Of Teachers House
- output
- Teachers House Constructed
- implementation status
- Ongoing
- total cost
- Ksh 858,333
- estimate
- Ksh 0
Catholic Hospital, Wamba
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Acquisition Of Generator
- output
- Acquisition Of Generator
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Londungokwe
(in Samburu East)
- year first funded
- 2005
- action
- Equipping Of Boys Dormitory
- output
- Equipping Of Boys Dormitory
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Girgir Primary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Classroom Constructed
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Londungokwe
(in Samburu East)
- year first funded
- 2005
- action
- Equipping Of Boys Dormitory
- output
- Equipping Of Boys Dormitory
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Raraiti Primary School
- location
-
Nairimirimo
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of Administration Block
- output
- Administration Block Constructed
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Lorubae Primary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2007
- action
- Completion Of Girls Dormitory
- output
- Ddomitory Completed.
- implementation status
- -
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Samburu East Reforestation Project
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Purchase Of Seedlings For Schools And Institutions
- output
- Seedlings Purchased And Distributed
- implementation status
- complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Waso Secondary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of Dining
- output
- dining Constructed
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Wamba Deb Primary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Classroom
- output
- Classroom Constructed
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Lodungokwe Water Project
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2006
- action
- Water Extension
- output
- Water Extension
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Waso Secondary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of Dining
- output
- dining Constructed
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Wamba Catholic Hospital
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Perimeter Fence
- output
- Perimeter Fence Erected.
- implementation status
- -
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Waso Secondary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of Dining
- output
- dining Constructed
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Wamba Secondary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2003
- action
- Teachers Houses /Dormitory Renovations
- output
- Teacher?S Houses /Dormitory Renovated
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Waso Boys Secondary School
- location
-
Wamba Town
(in Samburu East)
- year first funded
- 2003
- action
- Purchase Of Dining Hall Furniture
- output
- Tables And Forms Bought
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ngaroni Primary School
- location
-
Ngaroni
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of Admin Block
- output
- Administration Block And Classroom Constructed
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Embakasi Primary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Fencing The School
- output
- School Fenced
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Swari Primary School classrooms
- location
-
Nairimirimo
(in Samburu East)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms Constructed
- implementation status
- Complete
- total cost
- Ksh 530,000
- estimate
- Ksh 0
Swari Health Centre
- location
-
Nairimilimo
(in Samburu East)
- year first funded
- 2006
- action
- Construction Nurses House
- output
- Nurses House Constructed
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ndonyo Wasin Health Centre
- location
-
Ndonyo Wasin
(in Samburu East)
- year first funded
- 2006
- action
- Renovation Of Health Centre.
- output
- Health Centre Renovated
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Emanuel Pre-School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Classroom Constructed
- implementation status
- -
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Matakwani Pre-School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Classroom Constructed
- implementation status
- Pre Funding Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lkuasi Primary School
- location
-
Nairimirimo
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Classroom Constructed
- implementation status
- -
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lorok-Onyokie Primary School
- location
-
Nairimirimo
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Classroom Constructed
- implementation status
- -
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sere-Olipi Primary School
- location
-
SereOlipi
(in Samburu East)
- year first funded
- 2007
- action
- Fencing Of School Compound
- output
- School Fenced
- implementation status
- -
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Uaso Secondary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2007
- action
- Purchase Of Desks And Chairs
- output
- Desks Acquired
- implementation status
- -
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Wamba Boys Secondary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Purchase Of Desks And Chairs
- output
- Furniture Acquired
- implementation status
- --
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sukuroi Pre-School
- location
-
Waso West
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Classroom Constructed
- implementation status
- on going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kiltamany Primary School
- location
-
Waso West
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers House Constructed
- implementation status
- -
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sere-Olipi Integrated Dispensary
- location
-
SereOlipi
(in Samburu East)
- year first funded
- 2007
- action
- Furnishing Of Maternity Ward
- output
- Maternity Ward Furnished.
- implementation status
- -
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sereolipi Primary School
- location
-
Sereolipi
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of Teachers House
- output
- Teachers House Constructed
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Archers Post Water Project
- location
-
Waso East
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of Water Kiosks And Water Extension
- output
- Piping Done
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lempuranai Primary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of 1 Classroom
- output
- 1Classroom Constructed
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Radios For Conservancy
- location
-
Wamba
(in Samburu East)
- year first funded
- 2004
- action
- Radio Calls
- output
- Radio Calls Acquired
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lerata Primary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of 2 Teachers House
- output
- Teachers House Constructed
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kalama Primary School
- location
-
Waso East
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of 2 Teacher Houses
- output
- Teachers House Constructed
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Sereolipi Primary School
- location
-
SereOlipi
(in Samburu East)
- year first funded
- 2005
- action
- Construction Of 2 Teachers Houses
- output
- 2 Teachers House Constructed
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Gabions In Wamba Town
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Construction Of Gabions
- output
- Gabions Constructed
- implementation status
- Stalled
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Tree Planting In Wamba Town
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Planting Trees Along Wamba Streets
- output
- Trees Planted Along Wamba Street
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Waso West Location Purchase Of Radio Calls
- location
-
Waso West
(in Samburu East)
- year first funded
- 2006
- action
- Purchase And Installation Of Radio Calls
- output
- Radio Calls Acquired
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Wamba Health Centre
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Completion Of Maternity Ward
- output
- Maternity Ward Completed
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2006
- action
- Dormitory Block Completion
- output
- Completion Of Boys Dormitory
- implementation status
- Complete
- total cost
- Ksh 458,333
- estimate
- Ksh 0
Lodungokwe Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2006
- action
- Dormitory Block Completion
- output
- Completion Of Boys Dormitory
- implementation status
- Complete
- total cost
- Ksh 458,333
- estimate
- Ksh 0
Dos Office & House- Wamba
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Renovation Of DoS Residence And Office
- output
- Do?S Residence Renovated
- implementation status
- on going
- total cost
- Ksh 416,000
- estimate
- Ksh 0
Huruma Home
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Purchase Of Wheelchairs
- output
- Wheelchairs Acquired
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
St. Theresa's Secondary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2005
- action
- Renovation Of Toilets
- output
- Renovation Of Toilets
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Wamba Ccm Primary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2003
- action
- Purchase Of Furniture
- output
- Desks And Tables Bought
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Wamba Deb Primary School - Fencing
- location
-
Wamba
(in Samburu East)
- year first funded
- 2004
- action
- Construction Of School Perimeter Fence
- output
- School Fenced
- implementation status
- Complete
- total cost
- Ksh 390,804
- estimate
- Ksh 0
Lorubae Primary School desks
- location
-
Waso East
(in Samburu East)
- year first funded
- 2006
- action
- Purchase Of Desks
- output
- Desks Acquired
- implementation status
- Complete
- total cost
- Ksh 358,333
- estimate
- Ksh 0
Wamba Deb Desk
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Desks Acquisition
- output
- Acquisition Of Desks
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lekiji Pre School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2006
- action
- Purchase Of Desks
- output
- Desks Acquired
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lpul Clasroom
- location
-
Londungokwe
(in Samburu East)
- year first funded
- 2006
- action
- Renovation Of Classroom
- output
- Classroom Renovated
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lpus Primary School desks
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2006
- action
- Desks Acquisition
- output
- Acquisition Of Desks
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sessia Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2006
- action
- Desks Acquisition
- output
- Acquisition Of Desks
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ldupai Water Project
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Extension Pipeline
- output
- Water Pipeline Extended
- implementation status
- -
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Locational Resource Centre
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Installation Of Solar Panels
- output
- Solar System Installed
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Wamba Ccm Desk
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Desks Acquisition
- output
- Acquisition Of Desks
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nteppes Primary School desks
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Desks Acquisition
- output
- Acquisition Of Desks
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
SeRoadol Classroom
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Renovation Of Classroom
- output
- Classroom Renovated
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Wamba Sports Ground
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Fencing Of Wamba Sports Ground
- output
- Sports Field Fenced
- implementation status
- on going
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Milimani Classroom
- location
-
Wamba
(in Samburu East)
- year first funded
- 2006
- action
- Fencing The Pre-School
- output
- School Fenced
- implementation status
- Complete
- total cost
- Ksh 158,333
- estimate
- Ksh 0
Village Pit Latrines
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of 5 Pit Latrines
- output
- Pit Latrine Erected
- implementation status
- -
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Jerusalem Water Project
- location
-
Wamba
(in Samburu East)
- year first funded
- 2007
- action
- Construction Of Extension Pipeline
- output
- Water Pipeline Extended
- implementation status
- -
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Lpus Primary School
- location
-
Lodungokwe
(in Samburu East)
- year first funded
- 2004
- action
- Renovation Of Classroom And Purchase Of Desks And Tables
- output
- Renovation Of Classroom And Tables Desks Acquired
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Oromodei Dispensary
- location
-
Nkare Narok
(in Samburu East)
- year first funded
- 2007
- action
- Installation Of Solar Panels
- output
- Solar System Installed
- implementation status
- -
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Archers Post Sports Facility
- location
-
Wamba
(in Samburu East)
- year first funded
- 2003
- action
- Clearing Of A Sports Ground
- output
- Sports Ground Cleared
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ccm Primary School
- location
-
Wamba
(in Samburu East)
- year first funded
- 2004
- action
- Fencing Of School
- output
- School Fence
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Lpus Primary School
- location
-
Londungokwe
(in Samburu East)
- year first funded
- 2005
- action
- Renovation Of A Classroom
- output
- Classrooms Renovated
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Laresore Primary School classrooms
- location
-
Waso East
(in Samburu East)
- year first funded
- 2006
- action
- Renovation Of Classroom
- output
- Classrooms Renovated
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 0