It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Maralal Women Bandas
- location
-
Maralal
(in Samburu West)
- year first funded
- 2003
- action
- Construction Of 20 Market Stalls
- output
- 20 Market Stalls
- implementation status
- Ongoing
- total cost
- Ksh 2,800,000
- estimate
- Ksh 0
Samuburu Wildlife Forum Communication
- location
-
Maralal
(in Samburu West)
- year first funded
- 2003
- action
- Purchase Of Handset And Base Radios
- output
- Operational Network Of Uhf/Vhf
- implementation status
- Equipmets Have Been Purcahsed And Installed
- total cost
- Ksh 2,530,486
- estimate
- Ksh 0
Loosuk Dispensary
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of A Merternity Wing
- output
- A Maternity Block
- implementation status
- Complete
- total cost
- Ksh 2,380,000
- estimate
- Ksh 0
Pura Water Project
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2005
- action
- Purchase Of Water Pump And Laying Of Ext Pipes
- output
- Water Pumps And Extension Pipeline Of 2.5 Km
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Leparnjorin Dam
- location
-
Lodokejek
(in Samburu West)
- year first funded
- 2005
- action
- De-Silting
- output
- An Earth Dam
- implementation status
- Complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Seren water
- location
-
Ndoto
(in Samburu West)
- year first funded
- 2005
- action
- Water extension
- output
- Pipeline and 2 water tanks
- implementation status
- complete
- total cost
- Ksh 1,540,000
- estimate
- Ksh 4,500,000
Arsim Dispensary
- location
-
Arsim
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Merternity Wing
- output
- A Maternity Wing
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Nachola dam
- location
-
Nachola
(in Samburu West)
- year first funded
- 2003
- action
- De-silting
- output
- A dam
- implementation status
- complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,400,000
Cdf Motor Vehicle
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Purchase Of Motor Vehicle
- output
- Motor Vehicle
- implementation status
- Not Yet
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Aic Moi Girls
- location
-
Maralal
(in Samburu West)
- year first funded
- 2003
- action
- Construction Of The Dormitory
- output
- A Dormitory
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,400,000
Lesidai Dispensary
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of A Dispensary
- output
- A Dispensary Block
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 0
Lesidai Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of 3 Classes
- output
- 3 Classes
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Aic Moi Girls
- location
-
Maralal
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of 2 Classroom And Computer Lab
- output
- 2 Classes And Lab
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Southhorr dispensary
- location
-
Southhorr
(in Samburu West)
- year first funded
- 2005
- action
- Construction of dispensary block
- output
- A dispensary block
- implementation status
- complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Sirata Oirobi Primary School
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of A Dormitory
- output
- A Dormitory
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Kawop primary
- location
-
kawop
(in Samburu West)
- year first funded
- 2004
- action
- Construction of 2 teachers houses
- output
- 2 teachers, houses
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Kirimon Dispensary
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- A Dispensary Block
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Lparatuk Water Project
- location
-
Maralal
(in Samburu West)
- year first funded
- 2003
- action
- Electricity Supply And Purchase Of Motor
- output
- Power Supply Toborehole And Pump
- implementation status
- Complete
- total cost
- Ksh 1,087,000
- estimate
- Ksh 0
Longewan Primary School
- location
-
Amaiya
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Dormitory
- output
- 1 Dormitory For Boys
- implementation status
- Complete
- total cost
- Ksh 1,070,000
- estimate
- Ksh 0
Milimani Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of 3 Classroom
- output
- 3 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Parkati primary
- location
-
parkati
(in Samburu West)
- year first funded
- 2004
- action
- renovation
- output
- Repaired walls and roof
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Nachola primary
- location
-
Nachola
(in Samburu West)
- year first funded
- 2005
- action
- Construction of a dormitory
- output
- A dormitory
- implementation status
- complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Marti primary
- location
-
Marti
(in Samburu West)
- year first funded
- 2005
- action
- Construction of a dormitory
- output
- A dormitory
- implementation status
- complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Kirisia Secondary Sec
- location
-
Maralal
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of 2 Classes
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Longewan Primary School
- location
-
Amaiya
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of Girls Dormitory
- output
- 1 Dormitory For Girls
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lomaiyana Extension
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2004
- action
- Purchase Of Wind Mill
- output
- Windmill Pump
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lchakwai Primary School
- location
-
Lbukoi
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 3 Classes
- output
- 3 Classroom Complete
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Lulu Primary School
- location
-
Opiroi
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 3 Classroom
- output
- 3 Classroom
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Lkuruto Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2003
- action
- Construction Of 2 Classes And Purchase Of Desks
- output
- 2 Classes Equipped With Desks
- implementation status
- Complete
- total cost
- Ksh 920,000
- estimate
- Ksh 0
Samburu Community Radio Project
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Erection Of A Perimeter Fence
- output
- Fence Around The Compound
- implementation status
- Ongoing
- total cost
- Ksh 905,298
- estimate
- Ksh 800,000
Kirisia Secondary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2003
- action
- Dorm Renovation
- output
- Painting And Floor Repair
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Nachola primary
- location
-
Nachola
(in Samburu West)
- year first funded
- 2006
- action
- Completion of girls’ dormitory
- output
- Girls’ dormitory
- implementation status
- To be completed in this phase
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Loikumkum Dispensary
- location
-
Latakweny
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Lolmolog Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Adormitory
- output
- A Dormitory
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Loosuk Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Adormitory
- output
- A Dormitory Block
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Pura -Kurkur Ap Line
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Ap Houses
- output
- Ap Camp
- implementation status
- Ongoing
- total cost
- Ksh 899,451
- estimate
- Ksh 0
Loosuk Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of 2 Classes And Purchase Of Desks
- output
- 2 Claassrooms Equipped With Desk
- implementation status
- Complete
- total cost
- Ksh 880,000
- estimate
- Ksh 0
Suguta Dispensary
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2005
- action
- Mortury Construction
- output
- A Mortury Block
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 0
Maralal Deb
- location
-
Maralal
(in Samburu West)
- year first funded
- 2005
- action
- Constrution Of 2 Classroom
- output
- 2 Classroom Complete
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Noonkeek Primary School
- location
-
Lodokejek
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 2 Classroom
- output
- 2 Classroom Complete
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Maralal Secondary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2003
- action
- Construction Of A Dormitory
- output
- 1 Dormitory Of 60 Students Capacity
- implementation status
- 80%Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
South Horr Primary School
- location
-
South Horr
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Girls Dormitory
- output
- Girls Dormitory
- implementation status
- pump fitted
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Maralal District Hospital
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Purchase Of A Generator
- output
- Stand By Generator
- implementation status
- Purchase
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Baragoi girls secondary
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2004
- action
- Construction of 2 classes
- output
- 2 complete classes
- implementation status
- Complete
- total cost
- Ksh 740,000
- estimate
- Ksh 0
Masikita dispensary
- location
-
El-barta
(in Samburu West)
- year first funded
- 2004
- action
- Construction 0f dispensary
- output
- Dispensary block
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Baragoi girls secondary
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of dining Hall
- output
- dining Hall
- implementation status
- Incomplete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Opiroi Primary School
- location
-
Opiroi
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 4 Teachers Houses
- output
- 4 Teachers Housed
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Marti dispensary
- location
-
Marti
(in Samburu West)
- year first funded
- 2004
- action
- Purchase of water tanks
- output
- 2 plastic tanks
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Illaut primary
- location
-
Arsim
(in Samburu West)
- year first funded
- 2003
- action
- Construction of 2 classes and purchase of desks
- output
- 2 classes and desks purchased
- implementation status
- complete
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Loltelelei Primary School
- location
-
Lodokejek
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 2 Classes And Purchase Of Desks
- output
- 2 Classes Equipped With Desks
- implementation status
- Complete
- total cost
- Ksh 680,000
- estimate
- Ksh 0
Kelele Primary School
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 2 Classes And Purchase Of Desks
- output
- 2 Classes Equipped With Desks
- implementation status
- Complete
- total cost
- Ksh 680,000
- estimate
- Ksh 0
Angata Rongai Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of 2 Classes
- output
- 2 Classroom Complete
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Morijo primary
- location
-
A/Nanyukie
(in Samburu West)
- year first funded
- 2006
- action
- Construction of 2 classes
- output
- 2 classrooms
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Nomboni Primary School
- location
-
Opiroi
(in Samburu West)
- year first funded
- 2005
- action
- Construction A Class And Purchase Of Desk
- output
- 1 Classroom Equipped With Desks
- implementation status
- Classroom Comleted Desk To Be Purchased In This Phase
- total cost
- Ksh 640,000
- estimate
- Ksh 0
Kirimon Water Extension
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2004
- action
- Water Extension
- output
- 3 Km Water Pipeline
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Baragoi Boys Secondary School
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2006
- action
- Erection of perimeter fence
- output
- Perimeter fence round sch compound
- implementation status
- ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Constituency Office Food Store
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Food Store
- output
- Food Store
- implementation status
- Not Yet
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Lorrok Primary School
- location
-
Porro
(in Samburu West)
- year first funded
- 2007
- action
- Supply Of Electricity
- output
- Electricity
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Murua Nkai Primary School
- location
-
Lbukoi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Boys Dormitory
- output
- Boys Dormitory
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Parkati Primary School
- location
-
Parkati
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Dormitory
- output
- Dormitory
- implementation status
- Incomplete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Samburu Wildlife Forum
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Wildlife Forum
- output
- Wildlife Forum Base
- implementation status
- trees planted
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Loogoben Water Project
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2006
- action
- Water Pipeline Extension
- output
- 3.5 Km Water Pipeline
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Garma Nursery
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1Classroom Complete
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Logorate Water Project
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2004
- action
- Borehole Drilling
- output
- A Borehole
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kitabory Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 2 Classes
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Lolmolog Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 2 Classes
- output
- 2 Classes
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Porro Water
- location
-
Porro Ntachata
(in Samburu West)
- year first funded
- 2004
- action
- Water Extension
- output
- 2 Km Water Pipeline To Community Tank
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Shabba Extension
- location
-
Maralal
(in Samburu West)
- year first funded
- 2004
- action
- Water Extension
- output
- Water Pipes To Community Tanks
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Pura Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of 2 Classroom
- output
- 2 Classroom Complete
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Baawa Primary School
- location
-
Baawa
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of A Dormitory
- output
- A Dormitory
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Kisima Dispensary Phamacy
- location
-
Kisima
(in Samburu West)
- year first funded
- 2005
- action
- Phamacy Construction
- output
- Phamarcy Block Construction
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Suguta Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2005
- action
- Electricity Supply
- output
- Electricity Supplied
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kirisia Secondary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Library
- output
- Library
- implementation status
- Incomplete
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Arsim Lutheran Dispensary
- location
-
Arsim
(in Samburu West)
- year first funded
- 2007
- action
- Purchase Of Maternity Wing Bed
- output
- Maternity Bed
- implementation status
- on going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Morijo primary
- location
-
A/Nanyukie
(in Samburu West)
- year first funded
- 2005
- action
- Construction of a dormitory
- output
- 1 dormitory to be complete
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Latakweny Maternity Wing
- location
-
Latakweny
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Maternity Wing
- output
- Maternity
- implementation status
- plastered
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Tuum girls
- location
-
Tuum
(in Samburu West)
- year first funded
- 2006
- action
- Construction of a dormitory
- output
- A dormitory
- implementation status
- complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Samburu Bee Keepers
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Procurement Of Bee Hives
- output
- Bee Hives
- implementation status
- Not Yet
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Baragoi girls secondary
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2006
- action
- Purchase of kitchen equipment[4 jikos]
- output
- Kitchen equipment[4jikos]
- implementation status
- purchased
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Lorruko Rock Catchments
- location
-
Uaso Rongai
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Rock Catchment Tank
- output
- Tan And Rock Catchment Tank
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Lalilai Sand Dam
- location
-
Opiroi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Sand Dam
- output
- Sand Dam
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Moi Girls Secondary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of School Ablution
- output
- School Ablution
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Towankai Dam
- location
-
Barsaloi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Dam
- output
- Dam
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Tuum water
- location
-
Tuum
(in Samburu West)
- year first funded
- 2004
- action
- Water extension
- output
- Tank and 1.2 km pipeline
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Lodokejek Primary School
- location
-
Lodokejek
(in Samburu West)
- year first funded
- 2004
- action
- Construction Of A Dormitor
- output
- A Dormitory
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Baawa Primary School
- location
-
Baawa
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of A Class
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Pura Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of A Class
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Baragoi girls secondary
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2005
- action
- Construction of computer lab
- output
- Computer lab
- implementation status
- ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Lkuroto
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Fencing Of School Compound
- output
- Fence Around School Compound
- implementation status
- Complete
- total cost
- Ksh 380,000
- estimate
- Ksh 0
Ngari Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lkiroriti Primary School
- location
-
Baawa
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lchakwai
- location
-
Lbukoi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mugur Primary School
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Keleswa Primary School
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Sura Adoru Primary School
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Samburu Sports And Cultural Exhibition
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- procurement
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Simiti primary
- location
-
El-barta
(in Samburu West)
- year first funded
- 2006
- action
- Construction of a Classroom
- output
- 1 complete classroom
- implementation status
- ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lare Orok Primary School
- location
-
Tuum
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Ura Primary School
- location
-
Ndoto
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- blg vandalised
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lolkunono Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Suyan Primary School
- location
-
Suyan
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- to be funded
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Nomotio Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lporos Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- procurement stage
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lchoro Lelerai Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Deb Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Tamiyoi Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lpartuk Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Seketet Community Dam
- location
-
Porro
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Dam
- output
- Dam
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mtaro Water Extension
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Extension Of Water
- output
- Water Extension
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Naling'Ang'Or Hand Pump
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Hand Pump
- output
- Hand Pump
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Morijo Chiefs Camp-Ap Line
- location
-
Angata Nanyukie
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Chiefs Camp
- output
- Chiefs Camp
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Sirata Oirobi Ap Line
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Ap Line
- output
- Ap Line
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lkiloriti Primary School
- location
-
Baawa
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of AClassroom
- output
- 1 Classroom
- implementation status
- Yet To Begin
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mtaro Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of AClassroom
- output
- 1 Classroom
- implementation status
- Yet To Begin
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lkuroto Water Extension
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Water Pipeline Extension
- output
- Water Pipeline
- implementation status
- Yet To Begin
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Shabaa Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of AClassroom
- output
- 1 Classroom
- implementation status
- Yet To Begin
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Sumuruai Nursery School
- location
-
South Horr
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of AClassroom
- output
- 1 Classroom
- implementation status
- Yet To Begin
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lolkunono Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of AClassroom
- output
- 1 Classroom
- implementation status
- Yet To Begin
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lemeisigiyo Primary School
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Nkeju Emuny Primary School
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Nomotio Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Muslim Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Tamiyoi Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Ngari Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lolmoti Primary School
- location
-
Lodokejek
(in Samburu West)
- year first funded
- 2006
- action
- 1 Completet Classroom
- output
- 1 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Sura Adoru Primary School
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom Complete
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Mugur Primary School
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1Classroom Complete
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Lpus Primary School
- location
-
Barsaloi
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Nkirenyi Primary School
- location
-
Nanyuki
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of 2 Classes
- output
- 1 Classroom Complete
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Barsaloi Fly Over
- location
-
Barsaloi
(in Samburu West)
- year first funded
- 2005
- action
- Construction Of Water Extension
- output
- Water Supply To The School
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Porro Dispensaryaensary
- location
-
Porro
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Laborotary
- output
- A Laborotary
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Angata Nanyokie
- location
-
Angata Nanyukie
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete But In Use
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Tangar Primary School
- location
-
Ndoto
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- roofed
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Siambu Primary School
- location
-
Porro
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Sirata Primary School
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2007
- action
- Purchase Of Beds
- output
- Equiped With Beds
- implementation status
- Yet To Be Purchased
- total cost
- Ksh 336,546
- estimate
- Ksh 0
Lpartuk primary
- location
-
Porro
(in Samburu West)
- year first funded
- 2006
- action
- Fencing of school compound
- output
- Fence around school. compound
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ura primary
- location
-
Ndoto
(in Samburu West)
- year first funded
- 2006
- action
- Construction of a Classroom
- output
- 1 complete classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lodwa primary
- location
-
Ndoto
(in Samburu West)
- year first funded
- 2006
- action
- Construction of a Classroom
- output
- 1 complete classroom
- implementation status
- Almost complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kawop primary
- location
-
kawop
(in Samburu West)
- year first funded
- 2006
- action
- Renovation of classes
- output
- Classes repaired
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Suiyan nursery
- location
-
El-barta
(in Samburu West)
- year first funded
- 2006
- action
- Construction of a Classroom
- output
- 1 complete classroom
- implementation status
- ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Bendera primary
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2006
- action
- Construction of a dining hall
- output
- 1 dining hall
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Location Committee
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Training Of Location Comm. On Basic Book Keeping
- output
- Training
- implementation status
- Done
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Baragoi Boys Secondary School
- location
-
Baragoi
(in Samburu West)
- year first funded
- 2007
- action
- Fencing Of School
- output
- School Fence
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Samburu Language Devand Resource Initiative
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of A Cultural Centre
- output
- Centre
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Maralal Gk Prison
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Nursery School
- output
- Nursery
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lechet Nursery School
- location
-
Arsim
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- 1 Classroom
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ngilai Community Dam
- location
-
ElBarta
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Dam
- output
- Dam
- implementation status
- purchased
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Barsaloi Ap Line
- location
-
Barsaloi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Ap Line
- output
- Ap Line
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Chiefs Office Longewan
- location
-
Amaiya
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Chiefs Office
- output
- Chiefs Office
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Opiro Ap Line
- location
-
Opiroi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Ap Line
- output
- Ap Line
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lulu Primary School
- location
-
Opiroi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers Houses
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lorrukoti Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers Houses
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Keno Primary School
- location
-
Arsim
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers Houses
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nkopeliani Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Teachers Houses
- output
- Teachers Houses
- implementation status
- Incomplete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Milimani Water Project
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Borehole Drilling
- output
- A Bolehole
- implementation status
- Yet To Begin
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lmisigiyoi Primary School
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2007
- action
- Renovation Of Classroom
- output
- Roof And Wall To Be Repaired
- implementation status
- Yet To Begin
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lorruko Nursery
- location
-
Uaso Rongai
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lareorok Primary School
- location
-
Tuum
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nkutoto Lepere Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- 1 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Lariak Orok Nursery
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ledero Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of 2 Teacherhouses
- output
- 2 Teachers Houses
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Loikas Water Project
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Fencing Of Loikas Water Project
- output
- Fence Around The Water Source
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Murua Nkai
- location
-
Lbukoi
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nkoteiya Conservancy
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2006
- action
- Bush Clearing
- output
- Cleared Path For Airstrip
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Latakweny primary School
- location
-
latakweny
(in Samburu West)
- year first funded
- 2004
- action
- Construction 0f a dormitory and provision of 40 beds
- output
- Dormitory equipped with beds
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Parkati AP
- location
-
Parkati
(in Samburu West)
- year first funded
- 2006
- action
- Construction of AP houses
- output
- Ap camp
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Marti Primary School
- location
-
Marti
(in Samburu West)
- year first funded
- 2007
- action
- Purchase Of School Beds
- output
- Beds
- implementation status
- on going
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Loonjorin Sand Dam
- location
-
South Horr
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Sand Dam
- output
- Sand Dam
- implementation status
- complete
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Lpartuk Ngano Handpump
- location
-
Porro
(in Samburu West)
- year first funded
- 2006
- action
- Buying And Fixing Of An Handpump
- output
- Hundpump
- implementation status
- Purchased
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Ltunga Conservacy
- location
-
Amaiya
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Campsites
- output
- 2 Campsite Complete With Toilets
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Loonjorin Conservancy
- location
-
South Horr
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Camp Site
- output
- Camp Site
- implementation status
- Complete
- total cost
- Ksh 243,228
- estimate
- Ksh 0
Milimani Water Project
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Water Project
- output
- Water Project
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Louwai Dam Repair
- location
-
Kirimon
(in Samburu West)
- year first funded
- 2007
- action
- Repair Of Dam
- output
- Dam Repair
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Sulubei Village Water Extension
- location
-
Suyan
(in Samburu West)
- year first funded
- 2007
- action
- Extension Of Water
- output
- Water Extension
- implementation status
- roofed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Marti Police Line Water Extension
- location
-
Marti
(in Samburu West)
- year first funded
- 2007
- action
- Extension Of Water
- output
- Water Extension
- implementation status
- roofed
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Seiya River Pedestrian Bridge
- location
-
Opiroi
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Seiya River Pedestrian Bridge
- output
- Pedestrian Bridge
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ledero Primary School
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Fencing Of School
- output
- School Fence
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Constituency Devcommittee
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Training Of Constituency Dev. Comm. On Proposal Skill
- output
- Training
- implementation status
- Done
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nkutoto Engewesi
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of A Classroom
- output
- 1 Classroom
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Lolmoti Road
- location
-
Lodokejek
(in Samburu West)
- year first funded
- 2007
- action
- Road Construction
- output
- A Road
- implementation status
- Yet To Begin
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Sulubei Water Extension
- location
-
Suyan
(in Samburu West)
- year first funded
- 2007
- action
- Water Pipeline Extension
- output
- Water Pipeline
- implementation status
- Yet To Begin
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Logorate Ap Line
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2007
- action
- Construction Of Ap Line
- output
- Ap Line
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Uaso Rongai Primary School
- location
-
Uaso Rongai
(in Samburu West)
- year first funded
- 2007
- action
- Purchase Of School Beds
- output
- Beds
- implementation status
- Incomplete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Lesirkan primary
- location
-
Ndoto
(in Samburu West)
- year first funded
- 2004
- action
- Construction of 3 classes
- output
- 3 classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Soit Pus Primary School
- location
-
Angata Nanyukie
(in Samburu West)
- year first funded
- 2004
- action
- Renovation Of Classes
- output
- Wall And Floor Repairs
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Lkiloriti Water Tank
- location
-
Baawa
(in Samburu West)
- year first funded
- 2006
- action
- Water Tank Construction
- output
- Masonry Tanks
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Lchakwi Ap
- location
-
Lbukoi
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of Ap Houses
- output
- Ap Camp
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Maralal Chiefs Office
- location
-
Maralal
(in Samburu West)
- year first funded
- 2006
- action
- Construction Of 4 Ap Houses
- output
- Ap Camp
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Logorate Primary School
- location
-
Suguta Marmar
(in Samburu West)
- year first funded
- 2007
- action
- Fencing Of School
- output
- School Fence
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Laibornkan Primary School
- location
-
Loosuk
(in Samburu West)
- year first funded
- 2005
- action
- Renovation of Classes
- output
- Roof For 4 Classses Repaired
- implementation status
- Complete
- total cost
- Ksh 168,000
- estimate
- Ksh 0
Longewan Borehole
- location
-
Amaiya
(in Samburu West)
- year first funded
- 2003
- action
- Repair Of Water Pump (Borehole)
- output
- Borehole Operation
- implementation status
- Complete
- total cost
- Ksh 163,000
- estimate
- Ksh 0
Barsaloi Dispensary
- location
-
Barsaloi
(in Samburu West)
- year first funded
- 2007
- action
- Erection Of A Perimerter Fence Round The Dispensary
- output
- Afence Around Dispensary
- implementation status
- Yet To Begin
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Nomotio Water Extension
- location
-
Maralal
(in Samburu West)
- year first funded
- 2007
- action
- Extension Of Water
- output
- Water Extension
- implementation status
- Incomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Leparngojin Feasibility Study
- location
-
Baawa
(in Samburu West)
- year first funded
- 2007
- action
- Study Of Feasibility
- output
- Feasibility Study
- implementation status
- roofed
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Lamayiana Windmill Fencing
- location
-
Sirata Oirobi
(in Samburu West)
- year first funded
- 2007
- action
- Fencing Of Windmill
- output
- Fence
- implementation status
- roofed
- total cost
- Ksh 120,000
- estimate
- Ksh 0