The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Samburu West

Maralal Women Bandas

location
Maralal (in Samburu West)
year first funded
2003
action
Construction Of 20 Market Stalls
output
20 Market Stalls
implementation status
Ongoing
total cost
Ksh 2,800,000
estimate
Ksh 0

Samuburu Wildlife Forum Communication

location
Maralal (in Samburu West)
year first funded
2003
action
Purchase Of Handset And Base Radios
output
Operational Network Of Uhf/Vhf
implementation status
Equipmets Have Been Purcahsed And Installed
total cost
Ksh 2,530,486
estimate
Ksh 0

Loosuk Dispensary

location
Loosuk (in Samburu West)
year first funded
2004
action
Construction Of A Merternity Wing
output
A Maternity Block
implementation status
Complete
total cost
Ksh 2,380,000
estimate
Ksh 0

Pura Water Project

location
Loosuk (in Samburu West)
year first funded
2005
action
Purchase Of Water Pump And Laying Of Ext Pipes
output
Water Pumps And Extension Pipeline Of 2.5 Km
implementation status
On Going
total cost
Ksh 1,800,000
estimate
Ksh 0

Leparnjorin Dam

location
Lodokejek (in Samburu West)
year first funded
2005
action
De-Silting
output
An Earth Dam
implementation status
Complete
total cost
Ksh 1,800,000
estimate
Ksh 0

Seren water

location
Ndoto (in Samburu West)
year first funded
2005
action
Water extension
output
Pipeline and 2 water tanks
implementation status
complete
total cost
Ksh 1,540,000
estimate
Ksh 4,500,000

Arsim Dispensary

location
Arsim (in Samburu West)
year first funded
2006
action
Construction Of A Merternity Wing
output
A Maternity Wing
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 0

Nachola dam

location
Nachola (in Samburu West)
year first funded
2003
action
De-silting
output
A dam
implementation status
complete
total cost
Ksh 1,400,000
estimate
Ksh 2,400,000

Cdf Motor Vehicle

location
Maralal (in Samburu West)
year first funded
2007
action
Purchase Of Motor Vehicle
output
Motor Vehicle
implementation status
Not Yet
total cost
Ksh 1,300,000
estimate
Ksh 0

Aic Moi Girls

location
Maralal (in Samburu West)
year first funded
2003
action
Construction Of The Dormitory
output
A Dormitory
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 2,400,000

Lesidai Dispensary

location
Loosuk (in Samburu West)
year first funded
2004
action
Construction Of A Dispensary
output
A Dispensary Block
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 0

Lesidai Primary School

location
Loosuk (in Samburu West)
year first funded
2005
action
Construction Of 3 Classes
output
3 Classes
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 0

Aic Moi Girls

location
Maralal (in Samburu West)
year first funded
2005
action
Construction Of 2 Classroom And Computer Lab
output
2 Classes And Lab
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Southhorr dispensary

location
Southhorr (in Samburu West)
year first funded
2005
action
Construction of dispensary block
output
A dispensary block
implementation status
complete
total cost
Ksh 1,200,000
estimate
Ksh 0

Sirata Oirobi Primary School

location
Sirata Oirobi (in Samburu West)
year first funded
2005
action
Construction Of A Dormitory
output
A Dormitory
implementation status
Ongoing
total cost
Ksh 1,200,000
estimate
Ksh 0

Kawop primary

location
kawop (in Samburu West)
year first funded
2004
action
Construction of 2 teachers houses
output
2 teachers, houses
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 0

Kirimon Dispensary

location
Kirimon (in Samburu West)
year first funded
2005
action
Construction Of Dispensary
output
A Dispensary Block
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 0

Lparatuk Water Project

location
Maralal (in Samburu West)
year first funded
2003
action
Electricity Supply And Purchase Of Motor
output
Power Supply Toborehole And Pump
implementation status
Complete
total cost
Ksh 1,087,000
estimate
Ksh 0

Longewan Primary School

location
Amaiya (in Samburu West)
year first funded
2006
action
Construction Of A Dormitory
output
1 Dormitory For Boys
implementation status
Complete
total cost
Ksh 1,070,000
estimate
Ksh 0

Milimani Primary School

location
Maralal (in Samburu West)
year first funded
2005
action
Construction Of 3 Classroom
output
3 Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Parkati primary

location
parkati (in Samburu West)
year first funded
2004
action
renovation
output
Repaired walls and roof
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Nachola primary

location
Nachola (in Samburu West)
year first funded
2005
action
Construction of a dormitory
output
A dormitory
implementation status
complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Marti primary

location
Marti (in Samburu West)
year first funded
2005
action
Construction of a dormitory
output
A dormitory
implementation status
complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Kirisia Secondary Sec

location
Maralal (in Samburu West)
year first funded
2005
action
Construction Of 2 Classes
output
2 Classrooms
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Longewan Primary School

location
Amaiya (in Samburu West)
year first funded
2005
action
Construction Of Girls Dormitory
output
1 Dormitory For Girls
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Lomaiyana Extension

location
Sirata Oirobi (in Samburu West)
year first funded
2004
action
Purchase Of Wind Mill
output
Windmill Pump
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 0

Lchakwai Primary School

location
Lbukoi (in Samburu West)
year first funded
2004
action
Construction Of 3 Classes
output
3 Classroom Complete
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 0

Lulu Primary School

location
Opiroi (in Samburu West)
year first funded
2004
action
Construction Of 3 Classroom
output
3 Classroom
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 0

Lkuruto Primary School

location
Maralal (in Samburu West)
year first funded
2003
action
Construction Of 2 Classes And Purchase Of Desks
output
2 Classes Equipped With Desks
implementation status
Complete
total cost
Ksh 920,000
estimate
Ksh 0

Samburu Community Radio Project

location
Maralal (in Samburu West)
year first funded
2006
action
Erection Of A Perimeter Fence
output
Fence Around The Compound
implementation status
Ongoing
total cost
Ksh 905,298
estimate
Ksh 800,000

Kirisia Secondary School

location
Maralal (in Samburu West)
year first funded
2003
action
Dorm Renovation
output
Painting And Floor Repair
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Nachola primary

location
Nachola (in Samburu West)
year first funded
2006
action
Completion of girls’ dormitory
output
Girls’ dormitory
implementation status
To be completed in this phase
total cost
Ksh 900,000
estimate
Ksh 0

Loikumkum Dispensary

location
Latakweny (in Samburu West)
year first funded
2007
action
Construction Of Dispensary
output
Dispensary
implementation status
complete
total cost
Ksh 900,000
estimate
Ksh 0

Lolmolog Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2006
action
Construction Of Adormitory
output
A Dormitory
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Loosuk Primary School

location
Loosuk (in Samburu West)
year first funded
2006
action
Construction Of Adormitory
output
A Dormitory Block
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 0

Pura -Kurkur Ap Line

location
Loosuk (in Samburu West)
year first funded
2006
action
Construction Of Ap Houses
output
Ap Camp
implementation status
Ongoing
total cost
Ksh 899,451
estimate
Ksh 0

Loosuk Primary School

location
Loosuk (in Samburu West)
year first funded
2005
action
Construction Of 2 Classes And Purchase Of Desks
output
2 Claassrooms Equipped With Desk
implementation status
Complete
total cost
Ksh 880,000
estimate
Ksh 0

Suguta Dispensary

location
Suguta Marmar (in Samburu West)
year first funded
2005
action
Mortury Construction
output
A Mortury Block
implementation status
On Going
total cost
Ksh 850,000
estimate
Ksh 0

Maralal Deb

location
Maralal (in Samburu West)
year first funded
2005
action
Constrution Of 2 Classroom
output
2 Classroom Complete
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Noonkeek Primary School

location
Lodokejek (in Samburu West)
year first funded
2004
action
Construction Of 2 Classroom
output
2 Classroom Complete
implementation status
Complete
total cost
Ksh 800,000
estimate
Ksh 0

Maralal Secondary School

location
Maralal (in Samburu West)
year first funded
2003
action
Construction Of A Dormitory
output
1 Dormitory Of 60 Students Capacity
implementation status
80%Complete
total cost
Ksh 800,000
estimate
Ksh 0

South Horr Primary School

location
South Horr (in Samburu West)
year first funded
2007
action
Construction Of Girls Dormitory
output
Girls Dormitory
implementation status
pump fitted
total cost
Ksh 800,000
estimate
Ksh 0

Maralal District Hospital

location
Maralal (in Samburu West)
year first funded
2006
action
Purchase Of A Generator
output
Stand By Generator
implementation status
Purchase
total cost
Ksh 800,000
estimate
Ksh 0

Baragoi girls secondary

location
Baragoi (in Samburu West)
year first funded
2004
action
Construction of 2 classes
output
2 complete classes
implementation status
Complete
total cost
Ksh 740,000
estimate
Ksh 0

Masikita dispensary

location
El-barta (in Samburu West)
year first funded
2004
action
Construction 0f dispensary
output
Dispensary block
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Baragoi girls secondary

location
Baragoi (in Samburu West)
year first funded
2007
action
Construction Of dining Hall
output
dining Hall
implementation status
Incomplete
total cost
Ksh 700,000
estimate
Ksh 0

Opiroi Primary School

location
Opiroi (in Samburu West)
year first funded
2004
action
Construction Of 4 Teachers Houses
output
4 Teachers Housed
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Marti dispensary

location
Marti (in Samburu West)
year first funded
2004
action
Purchase of water tanks
output
2 plastic tanks
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 0

Illaut primary

location
Arsim (in Samburu West)
year first funded
2003
action
Construction of 2 classes and purchase of desks
output
2 classes and desks purchased
implementation status
complete
total cost
Ksh 700,000
estimate
Ksh 0

Loltelelei Primary School

location
Lodokejek (in Samburu West)
year first funded
2004
action
Construction Of 2 Classes And Purchase Of Desks
output
2 Classes Equipped With Desks
implementation status
Complete
total cost
Ksh 680,000
estimate
Ksh 0

Kelele Primary School

location
Kirimon (in Samburu West)
year first funded
2004
action
Construction Of 2 Classes And Purchase Of Desks
output
2 Classes Equipped With Desks
implementation status
Complete
total cost
Ksh 680,000
estimate
Ksh 0

Angata Rongai Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2006
action
Construction Of 2 Classes
output
2 Classroom Complete
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 0

Morijo primary

location
A/Nanyukie (in Samburu West)
year first funded
2006
action
Construction of 2 classes
output
2 classrooms
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 0

Nomboni Primary School

location
Opiroi (in Samburu West)
year first funded
2005
action
Construction A Class And Purchase Of Desk
output
1 Classroom Equipped With Desks
implementation status
Classroom Comleted Desk To Be Purchased In This Phase
total cost
Ksh 640,000
estimate
Ksh 0

Kirimon Water Extension

location
Kirimon (in Samburu West)
year first funded
2004
action
Water Extension
output
3 Km Water Pipeline
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Baragoi Boys Secondary School

location
Baragoi (in Samburu West)
year first funded
2006
action
Erection of perimeter fence
output
Perimeter fence round sch compound
implementation status
ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Constituency Office Food Store

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of Food Store
output
Food Store
implementation status
Not Yet
total cost
Ksh 600,000
estimate
Ksh 0

Lorrok Primary School

location
Porro (in Samburu West)
year first funded
2007
action
Supply Of Electricity
output
Electricity
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Murua Nkai Primary School

location
Lbukoi (in Samburu West)
year first funded
2007
action
Construction Of Boys Dormitory
output
Boys Dormitory
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Parkati Primary School

location
Parkati (in Samburu West)
year first funded
2007
action
Construction Of Dormitory
output
Dormitory
implementation status
Incomplete
total cost
Ksh 600,000
estimate
Ksh 0

Samburu Wildlife Forum

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of Wildlife Forum
output
Wildlife Forum Base
implementation status
trees planted
total cost
Ksh 600,000
estimate
Ksh 0

Loogoben Water Project

location
Loosuk (in Samburu West)
year first funded
2006
action
Water Pipeline Extension
output
3.5 Km Water Pipeline
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Garma Nursery

location
Kirimon (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1Classroom Complete
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 0

Logorate Water Project

location
Suguta Marmar (in Samburu West)
year first funded
2004
action
Borehole Drilling
output
A Borehole
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kitabory Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2004
action
Construction Of 2 Classes
output
2 Classrooms
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Lolmolog Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2004
action
Construction Of 2 Classes
output
2 Classes
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Porro Water

location
Porro Ntachata (in Samburu West)
year first funded
2004
action
Water Extension
output
2 Km Water Pipeline To Community Tank
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Shabba Extension

location
Maralal (in Samburu West)
year first funded
2004
action
Water Extension
output
Water Pipes To Community Tanks
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Pura Primary School

location
Loosuk (in Samburu West)
year first funded
2004
action
Construction Of 2 Classroom
output
2 Classroom Complete
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Baawa Primary School

location
Baawa (in Samburu West)
year first funded
2004
action
Construction Of A Dormitory
output
A Dormitory
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 0

Kisima Dispensary Phamacy

location
Kisima (in Samburu West)
year first funded
2005
action
Phamacy Construction
output
Phamarcy Block Construction
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 0

Suguta Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2005
action
Electricity Supply
output
Electricity Supplied
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 0

Kirisia Secondary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of Library
output
Library
implementation status
Incomplete
total cost
Ksh 500,000
estimate
Ksh 0

Arsim Lutheran Dispensary

location
Arsim (in Samburu West)
year first funded
2007
action
Purchase Of Maternity Wing Bed
output
Maternity Bed
implementation status
on going
total cost
Ksh 500,000
estimate
Ksh 0

Morijo primary

location
A/Nanyukie (in Samburu West)
year first funded
2005
action
Construction of a dormitory
output
1 dormitory to be complete
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 0

Latakweny Maternity Wing

location
Latakweny (in Samburu West)
year first funded
2007
action
Construction Of Maternity Wing
output
Maternity
implementation status
plastered
total cost
Ksh 450,000
estimate
Ksh 0

Tuum girls

location
Tuum (in Samburu West)
year first funded
2006
action
Construction of a dormitory
output
A dormitory
implementation status
complete
total cost
Ksh 450,000
estimate
Ksh 0

Samburu Bee Keepers

location
Maralal (in Samburu West)
year first funded
2007
action
Procurement Of Bee Hives
output
Bee Hives
implementation status
Not Yet
total cost
Ksh 400,000
estimate
Ksh 0

Baragoi girls secondary

location
Baragoi (in Samburu West)
year first funded
2006
action
Purchase of kitchen equipment[4 jikos]
output
Kitchen equipment[4jikos]
implementation status
purchased
total cost
Ksh 400,000
estimate
Ksh 0

Lorruko Rock Catchments

location
Uaso Rongai (in Samburu West)
year first funded
2006
action
Construction Of Rock Catchment Tank
output
Tan And Rock Catchment Tank
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Lalilai Sand Dam

location
Opiroi (in Samburu West)
year first funded
2007
action
Construction Of Sand Dam
output
Sand Dam
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Moi Girls Secondary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of School Ablution
output
School Ablution
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Towankai Dam

location
Barsaloi (in Samburu West)
year first funded
2007
action
Construction Of Dam
output
Dam
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Tuum water

location
Tuum (in Samburu West)
year first funded
2004
action
Water extension
output
Tank and 1.2 km pipeline
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Lodokejek Primary School

location
Lodokejek (in Samburu West)
year first funded
2004
action
Construction Of A Dormitor
output
A Dormitory
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Baawa Primary School

location
Baawa (in Samburu West)
year first funded
2005
action
Construction Of A Class
output
1 Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Pura Primary School

location
Loosuk (in Samburu West)
year first funded
2005
action
Construction Of A Class
output
1 Classroom
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 0

Baragoi girls secondary

location
Baragoi (in Samburu West)
year first funded
2005
action
Construction of computer lab
output
Computer lab
implementation status
ongoing
total cost
Ksh 400,000
estimate
Ksh 0

Lkuroto

location
Maralal (in Samburu West)
year first funded
2006
action
Fencing Of School Compound
output
Fence Around School Compound
implementation status
Complete
total cost
Ksh 380,000
estimate
Ksh 0

Ngari Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Lkiroriti Primary School

location
Baawa (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Lchakwai

location
Lbukoi (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Mugur Primary School

location
Kirimon (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Keleswa Primary School

location
Baragoi (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Sura Adoru Primary School

location
Kirimon (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Samburu Sports And Cultural Exhibition

location
Maralal (in Samburu West)
year first funded
2007
action
n/a
output
-
implementation status
procurement
total cost
Ksh 350,000
estimate
Ksh 0

Simiti primary

location
El-barta (in Samburu West)
year first funded
2006
action
Construction of a Classroom
output
1 complete classroom
implementation status
ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Lare Orok Primary School

location
Tuum (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
complete
total cost
Ksh 350,000
estimate
Ksh 0

Ura Primary School

location
Ndoto (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
blg vandalised
total cost
Ksh 350,000
estimate
Ksh 0

Lolkunono Primary School

location
Loosuk (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Suyan Primary School

location
Suyan (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
to be funded
total cost
Ksh 350,000
estimate
Ksh 0

Nomotio Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Lporos Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
procurement stage
total cost
Ksh 350,000
estimate
Ksh 0

Lchoro Lelerai Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Deb Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Tamiyoi Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Lpartuk Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Seketet Community Dam

location
Porro (in Samburu West)
year first funded
2007
action
Construction Of Dam
output
Dam
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Mtaro Water Extension

location
Maralal (in Samburu West)
year first funded
2007
action
Extension Of Water
output
Water Extension
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Naling'Ang'Or Hand Pump

location
Baragoi (in Samburu West)
year first funded
2007
action
Construction Of Hand Pump
output
Hand Pump
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Morijo Chiefs Camp-Ap Line

location
Angata Nanyukie (in Samburu West)
year first funded
2007
action
Construction Of Chiefs Camp
output
Chiefs Camp
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Sirata Oirobi Ap Line

location
Sirata Oirobi (in Samburu West)
year first funded
2007
action
Construction Of Ap Line
output
Ap Line
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Lkiloriti Primary School

location
Baawa (in Samburu West)
year first funded
2007
action
Construction Of AClassroom
output
1 Classroom
implementation status
Yet To Begin
total cost
Ksh 350,000
estimate
Ksh 0

Mtaro Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of AClassroom
output
1 Classroom
implementation status
Yet To Begin
total cost
Ksh 350,000
estimate
Ksh 0

Lkuroto Water Extension

location
Maralal (in Samburu West)
year first funded
2007
action
Water Pipeline Extension
output
Water Pipeline
implementation status
Yet To Begin
total cost
Ksh 350,000
estimate
Ksh 0

Shabaa Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of AClassroom
output
1 Classroom
implementation status
Yet To Begin
total cost
Ksh 350,000
estimate
Ksh 0

Sumuruai Nursery School

location
South Horr (in Samburu West)
year first funded
2007
action
Construction Of AClassroom
output
1 Classroom
implementation status
Yet To Begin
total cost
Ksh 350,000
estimate
Ksh 0

Lolkunono Primary School

location
Loosuk (in Samburu West)
year first funded
2007
action
Construction Of AClassroom
output
1 Classroom
implementation status
Yet To Begin
total cost
Ksh 350,000
estimate
Ksh 0

Lemeisigiyo Primary School

location
Sirata Oirobi (in Samburu West)
year first funded
2006
action
Construction Of Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Nkeju Emuny Primary School

location
Sirata Oirobi (in Samburu West)
year first funded
2006
action
Construction Of Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Nomotio Primary School

location
Maralal (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Muslim Primary School

location
Maralal (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Tamiyoi Primary School

location
Maralal (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Ngari Primary School

location
Maralal (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Lolmoti Primary School

location
Lodokejek (in Samburu West)
year first funded
2006
action
1 Completet Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Sura Adoru Primary School

location
Kirimon (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom Complete
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Mugur Primary School

location
Kirimon (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1Classroom Complete
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Lpus Primary School

location
Barsaloi (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Nkirenyi Primary School

location
Nanyuki (in Samburu West)
year first funded
2006
action
Construction Of 2 Classes
output
1 Classroom Complete
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Barsaloi Fly Over

location
Barsaloi (in Samburu West)
year first funded
2005
action
Construction Of Water Extension
output
Water Supply To The School
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 0

Porro Dispensaryaensary

location
Porro (in Samburu West)
year first funded
2006
action
Construction Of A Laborotary
output
A Laborotary
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 0

Angata Nanyokie

location
Angata Nanyukie (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete But In Use
total cost
Ksh 350,000
estimate
Ksh 0

Tangar Primary School

location
Ndoto (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
roofed
total cost
Ksh 350,000
estimate
Ksh 0

Siambu Primary School

location
Porro (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 350,000
estimate
Ksh 0

Sirata Primary School

location
Sirata Oirobi (in Samburu West)
year first funded
2007
action
Purchase Of Beds
output
Equiped With Beds
implementation status
Yet To Be Purchased
total cost
Ksh 336,546
estimate
Ksh 0

Lpartuk primary

location
Porro (in Samburu West)
year first funded
2006
action
Fencing of school compound
output
Fence around school. compound
implementation status
complete
total cost
Ksh 300,000
estimate
Ksh 0

Ura primary

location
Ndoto (in Samburu West)
year first funded
2006
action
Construction of a Classroom
output
1 complete classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Lodwa primary

location
Ndoto (in Samburu West)
year first funded
2006
action
Construction of a Classroom
output
1 complete classroom
implementation status
Almost complete
total cost
Ksh 300,000
estimate
Ksh 0

Kawop primary

location
kawop (in Samburu West)
year first funded
2006
action
Renovation of classes
output
Classes repaired
implementation status
complete
total cost
Ksh 300,000
estimate
Ksh 0

Suiyan nursery

location
El-barta (in Samburu West)
year first funded
2006
action
Construction of a Classroom
output
1 complete classroom
implementation status
ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Bendera primary

location
Baragoi (in Samburu West)
year first funded
2006
action
Construction of a dining hall
output
1 dining hall
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Location Committee

location
Maralal (in Samburu West)
year first funded
2007
action
Training Of Location Comm. On Basic Book Keeping
output
Training
implementation status
Done
total cost
Ksh 300,000
estimate
Ksh 0

Baragoi Boys Secondary School

location
Baragoi (in Samburu West)
year first funded
2007
action
Fencing Of School
output
School Fence
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Samburu Language Devand Resource Initiative

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of A Cultural Centre
output
Centre
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Maralal Gk Prison

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of Nursery School
output
Nursery
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Lechet Nursery School

location
Arsim (in Samburu West)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Ngilai Community Dam

location
ElBarta (in Samburu West)
year first funded
2007
action
Construction Of Dam
output
Dam
implementation status
purchased
total cost
Ksh 300,000
estimate
Ksh 0

Barsaloi Ap Line

location
Barsaloi (in Samburu West)
year first funded
2007
action
Construction Of Ap Line
output
Ap Line
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Chiefs Office Longewan

location
Amaiya (in Samburu West)
year first funded
2007
action
Construction Of Chiefs Office
output
Chiefs Office
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Opiro Ap Line

location
Opiroi (in Samburu West)
year first funded
2007
action
Construction Of Ap Line
output
Ap Line
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Lulu Primary School

location
Opiroi (in Samburu West)
year first funded
2007
action
Construction Of Teachers Houses
output
Teachers Houses
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Lorrukoti Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2007
action
Construction Of Teachers Houses
output
Teachers Houses
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Keno Primary School

location
Arsim (in Samburu West)
year first funded
2007
action
Construction Of Teachers Houses
output
Teachers Houses
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Nkopeliani Primary School

location
Loosuk (in Samburu West)
year first funded
2007
action
Construction Of Teachers Houses
output
Teachers Houses
implementation status
Incomplete
total cost
Ksh 300,000
estimate
Ksh 0

Milimani Water Project

location
Maralal (in Samburu West)
year first funded
2007
action
Borehole Drilling
output
A Bolehole
implementation status
Yet To Begin
total cost
Ksh 300,000
estimate
Ksh 0

Lmisigiyoi Primary School

location
Sirata Oirobi (in Samburu West)
year first funded
2007
action
Renovation Of Classroom
output
Roof And Wall To Be Repaired
implementation status
Yet To Begin
total cost
Ksh 300,000
estimate
Ksh 0

Lorruko Nursery

location
Uaso Rongai (in Samburu West)
year first funded
2006
action
Construction Of Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Lareorok Primary School

location
Tuum (in Samburu West)
year first funded
2006
action
Construction Of Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Nkutoto Lepere Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2006
action
Construction Of Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Lariak Orok Nursery

location
Suguta Marmar (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Ledero Primary School

location
Maralal (in Samburu West)
year first funded
2006
action
Construction Of 2 Teacherhouses
output
2 Teachers Houses
implementation status
On Going
total cost
Ksh 300,000
estimate
Ksh 0

Loikas Water Project

location
Maralal (in Samburu West)
year first funded
2006
action
Fencing Of Loikas Water Project
output
Fence Around The Water Source
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Murua Nkai

location
Lbukoi (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 0

Nkoteiya Conservancy

location
Kirimon (in Samburu West)
year first funded
2006
action
Bush Clearing
output
Cleared Path For Airstrip
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Latakweny primary School

location
latakweny (in Samburu West)
year first funded
2004
action
Construction 0f a dormitory and provision of 40 beds
output
Dormitory equipped with beds
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 0

Parkati AP

location
Parkati (in Samburu West)
year first funded
2006
action
Construction of AP houses
output
Ap camp
implementation status
complete
total cost
Ksh 300,000
estimate
Ksh 0

Marti Primary School

location
Marti (in Samburu West)
year first funded
2007
action
Purchase Of School Beds
output
Beds
implementation status
on going
total cost
Ksh 250,000
estimate
Ksh 0

Loonjorin Sand Dam

location
South Horr (in Samburu West)
year first funded
2007
action
Construction Of Sand Dam
output
Sand Dam
implementation status
complete
total cost
Ksh 250,000
estimate
Ksh 0

Lpartuk Ngano Handpump

location
Porro (in Samburu West)
year first funded
2006
action
Buying And Fixing Of An Handpump
output
Hundpump
implementation status
Purchased
total cost
Ksh 250,000
estimate
Ksh 0

Ltunga Conservacy

location
Amaiya (in Samburu West)
year first funded
2006
action
Construction Of Campsites
output
2 Campsite Complete With Toilets
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 0

Loonjorin Conservancy

location
South Horr (in Samburu West)
year first funded
2007
action
Construction Of Camp Site
output
Camp Site
implementation status
Complete
total cost
Ksh 243,228
estimate
Ksh 0

Milimani Water Project

location
Maralal (in Samburu West)
year first funded
2007
action
Construction Of Water Project
output
Water Project
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Louwai Dam Repair

location
Kirimon (in Samburu West)
year first funded
2007
action
Repair Of Dam
output
Dam Repair
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Sulubei Village Water Extension

location
Suyan (in Samburu West)
year first funded
2007
action
Extension Of Water
output
Water Extension
implementation status
roofed
total cost
Ksh 200,000
estimate
Ksh 0

Marti Police Line Water Extension

location
Marti (in Samburu West)
year first funded
2007
action
Extension Of Water
output
Water Extension
implementation status
roofed
total cost
Ksh 200,000
estimate
Ksh 0

Seiya River Pedestrian Bridge

location
Opiroi (in Samburu West)
year first funded
2007
action
Construction Of Seiya River Pedestrian Bridge
output
Pedestrian Bridge
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Ledero Primary School

location
Maralal (in Samburu West)
year first funded
2007
action
Fencing Of School
output
School Fence
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Constituency Devcommittee

location
Maralal (in Samburu West)
year first funded
2007
action
Training Of Constituency Dev. Comm. On Proposal Skill
output
Training
implementation status
Done
total cost
Ksh 200,000
estimate
Ksh 0

Nkutoto Engewesi

location
Suguta Marmar (in Samburu West)
year first funded
2006
action
Construction Of A Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Lolmoti Road

location
Lodokejek (in Samburu West)
year first funded
2007
action
Road Construction
output
A Road
implementation status
Yet To Begin
total cost
Ksh 200,000
estimate
Ksh 0

Sulubei Water Extension

location
Suyan (in Samburu West)
year first funded
2007
action
Water Pipeline Extension
output
Water Pipeline
implementation status
Yet To Begin
total cost
Ksh 200,000
estimate
Ksh 0

Logorate Ap Line

location
Suguta Marmar (in Samburu West)
year first funded
2007
action
Construction Of Ap Line
output
Ap Line
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Uaso Rongai Primary School

location
Uaso Rongai (in Samburu West)
year first funded
2007
action
Purchase Of School Beds
output
Beds
implementation status
Incomplete
total cost
Ksh 200,000
estimate
Ksh 0

Lesirkan primary

location
Ndoto (in Samburu West)
year first funded
2004
action
Construction of 3 classes
output
3 classrooms
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Soit Pus Primary School

location
Angata Nanyukie (in Samburu West)
year first funded
2004
action
Renovation Of Classes
output
Wall And Floor Repairs
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Lkiloriti Water Tank

location
Baawa (in Samburu West)
year first funded
2006
action
Water Tank Construction
output
Masonry Tanks
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Lchakwi Ap

location
Lbukoi (in Samburu West)
year first funded
2006
action
Construction Of Ap Houses
output
Ap Camp
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Maralal Chiefs Office

location
Maralal (in Samburu West)
year first funded
2006
action
Construction Of 4 Ap Houses
output
Ap Camp
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Logorate Primary School

location
Suguta Marmar (in Samburu West)
year first funded
2007
action
Fencing Of School
output
School Fence
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 0

Laibornkan Primary School

location
Loosuk (in Samburu West)
year first funded
2005
action
Renovation of Classes
output
Roof For 4 Classses Repaired
implementation status
Complete
total cost
Ksh 168,000
estimate
Ksh 0

Longewan Borehole

location
Amaiya (in Samburu West)
year first funded
2003
action
Repair Of Water Pump (Borehole)
output
Borehole Operation
implementation status
Complete
total cost
Ksh 163,000
estimate
Ksh 0

Barsaloi Dispensary

location
Barsaloi (in Samburu West)
year first funded
2007
action
Erection Of A Perimerter Fence Round The Dispensary
output
Afence Around Dispensary
implementation status
Yet To Begin
total cost
Ksh 150,000
estimate
Ksh 0

Nomotio Water Extension

location
Maralal (in Samburu West)
year first funded
2007
action
Extension Of Water
output
Water Extension
implementation status
Incomplete
total cost
Ksh 150,000
estimate
Ksh 0

Leparngojin Feasibility Study

location
Baawa (in Samburu West)
year first funded
2007
action
Study Of Feasibility
output
Feasibility Study
implementation status
roofed
total cost
Ksh 150,000
estimate
Ksh 0

Lamayiana Windmill Fencing

location
Sirata Oirobi (in Samburu West)
year first funded
2007
action
Fencing Of Windmill
output
Fence
implementation status
roofed
total cost
Ksh 120,000
estimate
Ksh 0